JPH10273916A - Greening structure of slope and wall face - Google Patents

Greening structure of slope and wall face

Info

Publication number
JPH10273916A
JPH10273916A JP36258497A JP36258497A JPH10273916A JP H10273916 A JPH10273916 A JP H10273916A JP 36258497 A JP36258497 A JP 36258497A JP 36258497 A JP36258497 A JP 36258497A JP H10273916 A JPH10273916 A JP H10273916A
Authority
JP
Japan
Prior art keywords
greening
embankment material
embankment
slope
front wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP36258497A
Other languages
Japanese (ja)
Other versions
JP3720969B2 (en
Inventor
Tatsuo Umemura
達夫 梅村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tenryu Industries Co Ltd
Original Assignee
Tenryu Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tenryu Industries Co Ltd filed Critical Tenryu Industries Co Ltd
Priority to JP36258497A priority Critical patent/JP3720969B2/en
Publication of JPH10273916A publication Critical patent/JPH10273916A/en
Application granted granted Critical
Publication of JP3720969B2 publication Critical patent/JP3720969B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

PROBLEM TO BE SOLVED: To prevent the flowing out of a banking material and its softening in advance and reduce cost required for the execution of works by reducing a protrusion part from a protected objective face to keep the good appearance. SOLUTION: A greening structure is provided with many recessed parts 2, frame fences 19, 6, a banking material 10, reinforced sheets 17, 5, and greening sheets 25, 16. The recessed parts 2 are drilled at positions where they are apart from each other at an equal interval in the horizontal direction and the longitudinal direction on a bedrock slope 1. The frame fences 19, 6 consist of bottom parts 20, 7 which are extended in substantially horizontal direction and are arranged in the recessed parts 2 and front wall parts 21, 8 which are extended obliquely, backward, and upward from front ends of the bottom parts 20, 7. The banking material 10 is filled in a space which is more backward than the front wall parts 21, 8 in the recessed part 2, and nursery stocks 29 are planted in its upper part. The reinforced sheet 5 is made of diotextile and is intervened between a bottom face 3 of the recessed part 2 and the banking material 10, and the greening sheets 25, 16 are made of unwoven fabric having the water permeability and are intervened between the front wall parts 21, 8 and the banking material 10.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、植物の生長が困難
な法面、壁面等を緑化する構造に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure for greening slopes, walls and the like on which plants are difficult to grow.

【0002】[0002]

【従来の技術】従来より、岩盤を緑化して景観を向上さ
せるための緑化構造が種々開発されている。その1つと
して、合成樹脂、金属等によって形成された網篭からな
る複数の緑化ボックスを、傾斜した岩盤法面の複数箇所
に打込まれたフックにそれぞれ吊下げ、各緑化ボックス
に盛土材を充填し、ここに苗木を植栽するようにした技
術がある(特許公報第2559652号参照)。この技
術は、緑化ボックス内で苗木を根付かせるとともに、各
種植物を生長させることにより、岩盤を緑化しようとす
るものである。
2. Description of the Related Art Conventionally, various greening structures have been developed for greening a bedrock to improve the landscape. As one of them, a plurality of greening boxes consisting of a mesh basket made of synthetic resin, metal, etc. are suspended on hooks driven into a plurality of locations on a sloped rock slope, respectively, and embankment material is placed in each greening box. There is a technique of filling and planting a seedling here (see Japanese Patent Publication No. 2559652). This technique aims to green the bedrock by rooting the seedlings in a greening box and growing various plants.

【0003】[0003]

【発明が解決しようとする課題】ところが、上述した緑
化構造では、傾斜した岩盤法面に緑化ボックスを配置す
る構造であるため、緑化ボックスの全体が岩盤法面から
露出してしまう。法面のところどころから緑化ボックス
が突出したように見え、これが景観を損なってしまう。
また、緑化ボックスが網篭によって形成されているの
で、雨等により、その緑化ボックス内に充填されている
盛土材が網目を通って流れ出てしまうという問題もあ
る。
However, in the above-mentioned greening structure, since the greening box is arranged on the sloped rock slope, the entire greening box is exposed from the rock slope. The greening box appears to protrude from some point on the slope, which damages the landscape.
Further, since the greening box is formed by a net cage, there is a problem that the embankment material filled in the greening box flows out through the mesh due to rain or the like.

【0004】これに対しては、単に、盛土材の流出を防
止するだけならば、例えば岩盤の一部を削り取って凹部
を設け、木を密に並べて打込んで柵を設け、柵と凹部と
の間の空間に盛土材を充填して植物を植栽することも考
えられる。しかし、この構造では、前記とは逆に、盛土
材にしみ込んだ水の流れが柵によって遮られ、十分に排
水されず、盛土材の軟弱化を招くという新たな問題が生
ずる。
[0004] On the other hand, in order to simply prevent the embankment material from flowing out, for example, a part of the bedrock is cut off to form a recess, and trees are densely arranged and driven to form a fence. It is also conceivable to fill the space in between with embankment material and plant plants. However, in this structure, on the contrary, the flow of water permeated into the embankment material is interrupted by the fence, is not sufficiently drained, and causes a new problem that the embankment material is softened.

【0005】なお、前述したものとは異なるタイプとし
て、特開平4−213625号公報には、前部壁と底部
壁とからなる多数の型格子を岩盤等の法面に沿って配置
し、植物フリースを敷いた状態で、同型格子内に盛土材
を充填する技術がある。しかし、この技術は、平坦な傾
斜面を形成して法面の全面を覆い、同傾斜面を補強する
ものである。従って、同技術では、上述したような盛土
材の流出や軟弱化はあまり問題とならないが、施工に多
くの資材が必要であるばかりでなく、施工に長い期間を
要する。このように、多数の型格子を法面全面に配置す
る技術は施工にコストがかかり、経済性の点で問題があ
った。
[0005] As a different type from that described above, Japanese Patent Application Laid-Open No. Hei 4-213625 discloses a method in which a large number of mold lattices each having a front wall and a bottom wall are arranged along a slope such as a bedrock. There is a technique of filling the embankment material in the same type of grid with a fleece laid. However, in this technique, a flat inclined surface is formed to cover the entire slope, and the inclined surface is reinforced. Therefore, in this technique, the outflow or softening of the embankment material as described above does not cause much problems, but not only requires a lot of materials for construction but also requires a long period for construction. As described above, the technique of arranging a large number of mold grids on the entire surface of the slope has a high construction cost and has a problem in terms of economy.

【0006】そこで、本発明は、法面からの突出部分を
少なくして良好な景観を保ちつつ、盛土材が流出したり
軟弱化したりするのを未然に防止でき、経済性にも優れ
た法面、壁面等の緑化構造の提供を課題とするものであ
る。
Therefore, the present invention can prevent the embankment material from flowing out or softening while maintaining a good landscape by reducing the protruding portion from the slope, and is excellent in economical efficiency. It is an object to provide a greening structure such as a surface and a wall surface.

【0007】[0007]

【課題を解決するための手段】上記課題を解決するため
に、請求項1に記載の第1の発明は、傾斜した法面、壁
面等の保護対象面に設けられた凹部と、略水平方向に延
び、かつ前記凹部に載置される底部、及びその底部の前
端から略上方へ延びる前壁部を有する格子状の枠柵と、
前記凹部内において前記枠柵の前壁部よりも後方の空間
に充填された盛土材と、ジオテキスタイルからなり、前
記凹部の底面及び盛土材間に介在された強化シートと、
前記枠柵の前壁部及び盛土材間に介在された透水性を有
する緑化シートとを備えることを要旨としている。
In order to solve the above-mentioned problems, a first aspect of the present invention is directed to a first aspect of the present invention, wherein a concave portion provided on a surface to be protected such as an inclined slope, a wall surface, etc. And a grid-shaped frame fence having a bottom placed on the recess, and a front wall extending substantially upward from a front end of the bottom,
An embankment material filled in a space behind the front wall of the frame fence in the recess, a reinforcing sheet made of geotextile, and interposed between the bottom surface of the recess and the embankment material,
The gist of the invention is to include a water-permeable greening sheet interposed between the front wall of the frame fence and the embankment material.

【0008】ここで、保護対象面の1つである法面の種
類としては、例えば、岩盤法面、コンクリート・モルタ
ル吹付け法面、切り土法面、盛土材法面等が挙げられ
る。壁面の種類としては、例えば、擁壁やダム等のコン
クリート構造物の壁面が挙げられる。また、強化シート
を構成するジオテキスタイルは地盤の補強材の一種であ
り、ポリエチレン、ポリエステル等の高分子材料を素材
としたシート状の製品をいう。ジオテキスタイルの種類
には、主として、不織布、織布、ジオグリッド、ジオネ
ットがある。不織布は、織機や編機を使用せずに繊維を
ランダムに積層し、ニードルパンチ、熱融着等の方法に
よって繊維同士を結合させて平面状にしたものである。
織布は、織機の使用により平行に並べた縦糸に横糸を交
差するように組合わせて織ったものである。ジオグリッ
ドは、引っ張り部材が交点部で強固に結合あるいは一体
化されていて格子構造となったものである。ジオネット
は、樹脂材料を押出して製造し、開口部が比較的大き
く、交点部が一体となった網目構造を有するものであ
る。
Here, as a type of the slope which is one of the protection target faces, for example, a rock slope, a concrete / mortar spraying slope, a cut slope, and an embankment slope are exemplified. Examples of the type of the wall include a wall of a concrete structure such as a retaining wall or a dam. The geotextile constituting the reinforced sheet is a kind of ground reinforcing material, and refers to a sheet-like product made of a polymer material such as polyethylene or polyester. The types of geotextiles mainly include nonwoven fabrics, woven fabrics, geogrids, and geonets. The nonwoven fabric is formed by randomly laminating fibers without using a loom or a knitting machine, and bonding the fibers to each other by a method such as needle punching or heat fusion to form a flat shape.
The woven fabric is woven by combining a warp and a weft arranged in parallel by using a loom so as to intersect. The geogrid has a lattice structure in which tension members are firmly connected or integrated at intersections. The geonet is manufactured by extruding a resin material, has a relatively large opening, and has a mesh structure in which intersections are integrated.

【0009】上記第1の発明によると、盛土材に植物が
植えられたり、植物の種子を含む植生材が緑化シートに
付着されたりする等、緑化のための処理が施されると、
その植物は時間の経過とともに徐々に生長してゆく。そ
して、法面において、植物による緑色の部分が次第に広
がってゆく。
[0009] According to the first aspect of the present invention, when a plant is planted on the embankment material, or a vegetation material containing plant seeds is attached to a greening sheet, etc.
The plant grows gradually over time. Then, on the slope, the green part of the plant gradually spreads.

【0010】ところで、枠柵が載置された状態では、そ
の枠柵の少なくとも一部が凹部内に入り込んでいる。そ
の入り込んだ分だけ、凹部のない場合に比べ、保護対象
面からの枠柵の突出量が少なくなる。また、枠柵の格子
部分及び緑化シートは水を通すが、盛土材を通さない。
強化シートは、盛土材にしみ込んで同強化シートに至っ
た水を毛細管現象により凹部の外へ導く。
By the way, when the frame fence is placed, at least a part of the frame fence enters the recess. The amount by which the frame fence protrudes from the surface to be protected is reduced by an amount corresponding to the penetration. The grid section of the fence and the greening sheet allow water to pass through, but do not allow embankment material to pass.
The reinforced sheet guides water that permeates the embankment material and reaches the reinforced sheet by capillary action to the outside of the concave portion.

【0011】請求項2に記載の第2の発明は、第1の発
明の構成に加え、前記盛土材の上部に緑化用の植物が設
けられていることを要旨としている。
According to a second aspect of the present invention, in addition to the configuration of the first aspect, a plant for greening is provided above the embankment material.

【0012】上記第2の発明によると、植物の各部は時
間の経過とともに徐々に生長してゆく。すなわち、植物
の幹が盛土材から伸び、その幹や枝に葉がつき、大きく
なる。この生長にともない、葉等の緑色の占める割合が
増加してゆく。この際、幹、枝、葉等は、凹部の内壁面
の前方に位置していることから、同内壁面を隠す機能も
発揮する。また、植物の根は盛土材内で広がってゆく。
According to the second aspect, each part of the plant grows gradually with the passage of time. That is, the stem of the plant extends from the embankment material, and the stem and the branches have leaves and grow. With this growth, the proportion of green color such as leaves increases. At this time, since the trunk, the branches, the leaves, and the like are located in front of the inner wall surface of the concave portion, they also have a function of hiding the inner wall surface. Also, the roots of the plant spread in the embankment.

【0013】請求項3に記載の第3の発明は、第1また
は2の発明の構成に加え、前記枠柵の前壁部が、前記保
護対象面に沿って傾斜していることを要旨としている。
According to a third aspect of the present invention, in addition to the configuration of the first or second aspect, the gist is that the front wall of the frame fence is inclined along the surface to be protected. I have.

【0014】上記第3の発明によると、保護対象面から
の突出部分の量は、主に、同凹部の開口部分に位置する
枠柵によって決定される。この枠柵の前壁部が保護対象
面に沿って傾斜しているので、沿ってない場合(例えば
垂直の場合)に比べ、同前壁部の出っ張りが少ない。
According to the third aspect, the amount of the protruding portion from the surface to be protected is mainly determined by the frame fence located at the opening of the concave portion. Since the front wall of the frame fence is inclined along the surface to be protected, the front wall has less protrusion than when it is not along (for example, vertical).

【0015】請求項4に記載の第4の発明は、第1乃至
3のいずれか1つの発明の構成に加え、前記凹部が、前
記保護対象面の複数箇所において、隣り合う凹部との間
隔が略一定となる位置に設けられていることを要旨とし
ている。
According to a fourth aspect of the present invention, in addition to the configuration of any one of the first to third aspects, the concave portion is formed at a plurality of positions on the surface to be protected at intervals between adjacent concave portions. The gist is that it is provided at a substantially constant position.

【0016】上記第4の発明によると、隣り合う凹部の
間隔が略一定であることから、凹部毎に植物が設けられ
ていれば、複数の植物が保護対象面の全面に対し略等間
隔で点在することとなる。各植物の緑色の部分は時間の
経過、すなわち、植物の生長とともに拡大してゆく。こ
れにともない保護対象面が緑色の部分によって覆い隠さ
れてゆく。隣り合う植物の間隔が略一定であることか
ら、極端に緑色の部分が少なくて保護対象面が多く露出
したり、極端に緑色の部分が多くなることはない。保護
対象面の略全面が時間の経過に従い緑色の部分で覆われ
てゆく。
According to the fourth aspect, since the interval between adjacent recesses is substantially constant, if plants are provided in each of the recesses, a plurality of plants are arranged at substantially equal intervals over the entire surface to be protected. It will be scattered. The green portion of each plant expands over time, ie, as the plant grows. As a result, the surface to be protected is covered by the green portion. Since the interval between the adjacent plants is substantially constant, the green portion is not extremely small, so that the surface to be protected is not much exposed, and the green portion is not extremely large. Almost the entire surface to be protected is covered with a green portion over time.

【0017】請求項5に記載の第5の発明は、第1また
は3の発明の構成に加え、前記凹部が前記保護対象面の
傾斜方向に沿う複数箇所において、隣り合う凹部との間
隔が略一定となる位置に設けられ、かつ、前記保護対象
面の幅方向に沿って延びており、前記枠柵、盛土材、強
化シート及び緑化シートが前記凹部の略全長にわたって
配置され、さらに盛土材には、前記幅方向に沿って複数
の植物が配置されていることを要旨としている。
According to a fifth aspect of the present invention, in addition to the configuration of the first or third aspect, at a plurality of locations along the inclination direction of the surface to be protected, the interval between adjacent recesses is substantially equal. It is provided at a fixed position, and extends along the width direction of the surface to be protected, and the frame fence, the embankment material, the reinforcing sheet and the greening sheet are arranged over substantially the entire length of the concave portion, and further the embankment material The gist is that a plurality of plants are arranged along the width direction.

【0018】上記第5の発明によると、各凹部において
は、保護対象面の幅方向に沿って複数の植物が位置す
る。すなわち、複数の植物が保護対象面に対し、前記傾
斜方向だけでなく幅方向にも点在することとなる。この
ため、各植物が生長してゆくと、保護対象面の略全面が
時間の経過に従い緑色の部分で覆われていく。
According to the fifth aspect, a plurality of plants are located in each recess along the width direction of the surface to be protected. That is, a plurality of plants are scattered not only in the inclination direction but also in the width direction with respect to the protection target surface. For this reason, as each plant grows, almost the entire surface to be protected is covered with a green portion over time.

【0019】請求項6に記載の第6の発明は、第1,
2,4,5のいずれか1つの発明の構成に加え、前記枠
柵の前壁部が略垂直方向へ延びていることを要旨として
いる。
According to a sixth aspect of the present invention, there is provided
In addition to the configuration of any one of the inventions 2, 4, and 5, the gist is that the front wall portion of the frame fence extends substantially vertically.

【0020】上記第6の発明によると、凹部の内壁面か
ら前壁部の上端までの距離が大きくなり、盛土材の上面
が広くなる。
According to the sixth aspect, the distance from the inner wall surface of the concave portion to the upper end of the front wall portion increases, and the upper surface of the embankment material increases.

【0021】請求項7に記載の第7の発明は、第2また
は5の発明の構成に加え、前記植物が、前記盛土材の上
部に植栽された苗木が生長したものであることを要旨と
している。ここで、植栽の対象となる樹木の種類として
は、例えば高木の一種であるサザンカ、どろのき、中木
の一種であるシデコブシ、低木の一種であるミツバツツ
ジが挙げられるが、これに限定されるものではない。
According to a seventh aspect of the present invention, in addition to the configuration of the second or fifth aspect, the plant is a plant obtained by growing a seedling planted above the embankment material. And Here, examples of the types of trees to be planted include, but are not limited to, sasanqua, a kind of tall tree, mudwood, shidekobushi, a kind of middle tree, and honey beetle, a kind of shrub. Not something.

【0022】上記第7の発明によると、緑化構造物の構
築時に盛土材の上部に植栽される植物は、既にある程度
生長した苗木である。この苗木は時間の経過に従い生長
する。そして、この生長にともない葉等の緑色の部分が
増えてゆく。
According to the seventh aspect, the plant to be planted above the embankment at the time of constructing the greening structure is a seedling that has already grown to some extent. The seedlings grow over time. Then, with this growth, green parts such as leaves increase.

【0023】請求項8に記載の第8の発明は、第2また
は5の発明の構成に加え、前記植物が、前記盛土材の上
部に配置された土のう内の種子が発芽し生長したもので
あることを要旨としている。ここで、土のう内に入れら
れる種子としては、木本種子、外来草本種子、在来草本
種子等が挙げられる。
According to an eighth aspect of the present invention, in addition to the configuration of the second or fifth aspect, the plant is obtained by germinating and growing seeds in a sac disposed on the embankment material. The gist is that there is. Here, examples of seeds to be put into the sandbag include woody seeds, exotic herbaceous seeds, native herbaceous seeds, and the like.

【0024】上記第8の発明によると、緑化構造物の構
築後、土のう内の種子は発芽及び生長し、その過程で土
のうの袋体を通る。また、土のうは防塞機能も発揮す
る。
According to the eighth aspect, after the greening structure is constructed, seeds in the sandbag germinate and grow, and pass through the bag of the sandbag in the process. In addition, the sandbags also exhibit a blocking function.

【0025】請求項9に記載の第9の発明は、第8の発
明の構成に加え、前記土のうの袋体が生分解性材料によ
り形成されていることを要旨としている。
According to a ninth aspect of the present invention, in addition to the configuration of the eighth aspect, the bag of the sandbag is formed of a biodegradable material.

【0026】上記第9の発明によると、盛土材の上部に
配置された土のうの袋体は、その土中に存在する雑菌等
の微生物により分解される。
According to the ninth aspect, the bag of the sandbag arranged on the top of the embankment is decomposed by microorganisms such as germs present in the soil.

【0027】請求項10に記載の第10の発明は、第1
乃至9のいずれか1つの発明の構成に加え、前記枠柵の
前壁部が、前記底部の前端から略上方へ延びる棒状部材
を備えており、その棒状部材の上端部は下方へ向けて折
返されていることを要旨としている。
According to a tenth aspect of the present invention, there is provided the
In addition to the configuration of any one of the above inventions, the front wall of the frame fence includes a rod-like member extending substantially upward from the front end of the bottom, and the upper end of the rod-like member is folded downward. The gist is that it has been done.

【0028】上記第10の発明によると、枠柵の棒状部
材において最も高い箇所に位置するのは、折返された部
分(屈曲部分)であり、棒状部材の端面は同屈曲部分よ
りも下方に位置する。そのため、屈曲部分が露出しない
程度に盛土材が充填された状態では、棒状部材の端面は
盛土材内に入り込んでいる。
According to the tenth aspect, the highest portion of the bar-shaped member of the frame fence is the folded portion (bent portion), and the end surface of the bar-shaped member is located below the bent portion. I do. Therefore, in a state where the embankment material is filled to such an extent that the bent portion is not exposed, the end face of the rod-shaped member enters the embankment material.

【0029】請求項11に記載の第11の発明は、第1
乃至10のいずれか1つの発明の構成に加え、前記枠
柵、盛土材、強化シート及び緑化シートにより1つの段
が構成され、この段が前記凹部に複数積層されているこ
とを要旨としている。
[0029] An eleventh invention according to claim 11 is the first invention.
In addition to the constitution of any one of the inventions of (1) to (10), the gist is that one step is constituted by the frame fence, the embankment material, the reinforcing sheet, and the greening sheet, and a plurality of such steps are stacked in the recess.

【0030】上記第11の発明によると、1つ当りの枠
柵の高さがわずかであっても、複数の枠柵が重ねられ
て、凹部に複数の段が積層されると、最上段の枠柵や盛
土材の位置が高くなる。
According to the eleventh aspect, even when the height of one frame fence is small, when a plurality of frame fences are stacked and a plurality of steps are stacked in the concave portion, the uppermost step is formed. The position of the frame fence and the embankment material will be higher.

【0031】[0031]

【発明の実施の形態】 (第1実施形態)以下、本発明を具体化した第1実施形
態を、図1乃至図7に従って説明する。
(First Embodiment) A first embodiment of the present invention will be described below with reference to FIGS.

【0032】本実施形態では、図3に示すような岩盤法
面1を保護対象面としている。この岩盤法面1は、水平
面50に対し例えば約45度をなした急斜面となってい
る。岩盤法面1には、岩盤51の一部を削り取る(穿設
する)ことにより、複数の凹部2が形成されている。こ
れらの凹部2は岩盤法面1の傾斜方向(以下、縦方向X
という)にも、岩盤法面1の幅方向(以下、横方向Yと
いう)にも列をなしている。縦方向Xにおいて隣り合う
凹部2の間隔d1は、どの凹部2に関しても略一定であ
る。同様に、横方向Yにおいて隣り合う凹部2の間隔d
2は、どの凹部2に関しても略一定である。各凹部2は
略水平な底面3と、前記岩盤法面1よりも大きな角度
(例えば約60度)を有する内壁面4とを備え、全体と
して横方向Yに細長い形状をなしている。
In the present embodiment, the rock slope 1 as shown in FIG. The rock slope 1 is a steep slope having, for example, about 45 degrees with respect to the horizontal plane 50. A plurality of recesses 2 are formed on the rock slope 1 by shaving (piercing) a part of the rock 51. These recesses 2 are provided in the inclination direction of the rock slope 1 (hereinafter referred to as the vertical direction X).
) In the width direction of the rock slope 1 (hereinafter referred to as the lateral direction Y). The interval d1 between the adjacent recesses 2 in the vertical direction X is substantially constant for any of the recesses 2. Similarly, the interval d between the concave portions 2 adjacent in the horizontal direction Y
2 is substantially constant for any of the recesses 2. Each recess 2 has a substantially horizontal bottom surface 3 and an inner wall surface 4 having an angle (for example, about 60 degrees) larger than the rock slope 1, and has a shape elongated in the horizontal direction Y as a whole.

【0033】各凹部2には緑化構造物52が構築されて
いる。各緑化構造物52は互いに同一構成を採ってい
る。そのため、ここでは1つの緑化構造物52について
のみ詳述する。図1及び図2に示すように、底面3に
は、そのほぼ全面にわたってジオテキスタイルよりなる
下部強化シート5が敷かれ、その上に下部枠柵6が設置
されている。本実施形態では、下部強化シート5とし
て、高強度を有する厚手の不織布が用いられている。下
部枠柵6は、略水平方向に延び、かつ下部強化シート5
の前部に載置される底部7と、その底部7の前端(図1
の左端)から斜め後ろ上方へ延びる前壁部8とから構成
されている。前壁部8が底部7となす傾斜角度は約60
度であり、この角度は岩盤法面1の傾斜角度に近似して
いる。
A greening structure 52 is constructed in each recess 2. Each greening structure 52 has the same configuration as each other. Therefore, here, only one greening structure 52 will be described in detail. As shown in FIGS. 1 and 2, a lower reinforcing sheet 5 made of geotextile is laid on substantially the entire bottom surface 3, and a lower frame fence 6 is installed thereon. In the present embodiment, a thick nonwoven fabric having high strength is used as the lower reinforcing sheet 5. The lower frame fence 6 extends substantially in the horizontal direction, and the lower reinforcing sheet 5
1 and a front end of the bottom 7 (FIG. 1)
(Left end) of the front wall 8 extending obliquely rearward and upward. The inclination angle that the front wall 8 forms with the bottom 7 is about 60
Degrees, and this angle is close to the inclination angle of the rock slope 1.

【0034】下部枠柵6は、例えば、直線状をなす鉄筋
を縦方向及び横方向に配置し、互いに溶接した後、中央
部分で折曲げて製作したものである。あるいは、下部枠
柵6は、くの字状に屈曲形成してなる複数の縦用鉄筋を
水平方向に並べて配置するとともに、直線状をなす複数
の横用鉄筋を前記縦用鉄筋に交差するように配置し、こ
れらの縦用鉄筋と横用鉄筋とを互いに溶接して製作した
ものである。上述したいずれの下部枠柵6においても、
前壁部8の一部は棒状部材としての多数本の縦用鉄筋5
6によって構成されている。下部枠柵6は、その底部7
の格子部分を通じて打付けられた杭9によって、下部強
化シート5及び岩盤51に止められている。杭9の数は
1本でも複数本でもよい。この杭9に代えて、底部7
を、ワイヤ等によって下部強化シート5に結び付けて止
めてもよい。
The lower frame fence 6 is formed by, for example, arranging linear reinforcing bars in the vertical and horizontal directions, welding them to each other, and bending the central portion. Alternatively, the lower frame fence 6 arranges a plurality of vertical reinforcing bars bent in a U-shape in a horizontal direction and arranges a plurality of linear reinforcing bars crossing the vertical reinforcing bars. And these vertical reinforcing bars and horizontal reinforcing bars are welded to each other. In any of the lower frame fences 6 described above,
A part of the front wall 8 is composed of a number of vertical reinforcing bars 5 as rod-like members.
6. The lower frame fence 6 has a bottom 7
Are fixed to the lower reinforcing sheet 5 and the bedrock 51 by the pile 9 which is driven through the lattice portion. The number of the piles 9 may be one or more. Instead of this pile 9, the bottom 7
May be tied to the lower reinforcing sheet 5 by a wire or the like and stopped.

【0035】本実施形態において使用した下部枠柵6の
寸法等は次の通りであるが、例示にすぎず、この寸法等
は施工現場に応じて適宜変更可能である。
The dimensions and the like of the lower frame fence 6 used in the present embodiment are as follows, but are merely examples, and the dimensions and the like can be changed as appropriate according to the construction site.

【0036】 前壁部8の傾斜長: 約600mm 前壁部8の奥行き: 約600mm 前壁部8及び底部7の左右長: 約2600mm 鉄筋の直径: 約10mm 鉄筋格子の格子ピッチ: 100乃至300m
m 前壁部8と内壁面4との間隔: 2000乃至500
0mm
Slope length of front wall 8: about 600 mm Depth of front wall 8: about 600 mm Left and right length of front wall 8 and bottom 7: about 2600 mm Diameter of rebar: about 10 mm Grid pitch of rebar grid: 100 to 300 m
m Interval between front wall portion 8 and inner wall surface 4: 2000 to 500
0mm

【0037】凹部2内において前壁部8よりも後方の空
間には、盛土材10が下部盛土層11及び中下部盛土層
12の2層に分けて充填されている。盛土材10として
は、土のみを用いてもよいが、土に岩石、クリンカアッ
シュ、フライアッシュ、アスファルト廃材等を混合した
ものを用いてもよい。岩石の寸法は特に限定されず、岩
石には大型の破砕岩石から2乃至75mm程度の礫まで
が含まれる。盛土材10としては、施工現場のものでも
他所から運んだものでもよいが、前者の方が好ましい。
これは、施工現場の環境での生育に適した植物の種子が
含まれている可能性が高いからである。
The space behind the front wall 8 in the recess 2 is filled with an embankment material 10 divided into two layers, a lower embankment layer 11 and a middle and lower embankment layer 12. As the embankment material 10, only soil may be used, or a material obtained by mixing rock, clinker ash, fly ash, asphalt waste material, and the like with the soil may be used. The size of the rock is not particularly limited, and the rock includes large crushed rocks to gravel of about 2 to 75 mm. The embankment material 10 may be that at the construction site or one that has been transported from another location, but the former is preferred.
This is because there is a high possibility that seeds of plants suitable for growing in the environment of the construction site are included.

【0038】両盛土層11,12は、いずれも衝撃ロー
ラ等を用いた転圧により押し固められている。中下部盛
土層12の上面は前壁部8の上端よりも低くなってい
る。両盛土層11,12間の前端部には養分補給部材1
3が配置されている。養分補給部材13は、透水性を有
する収納体14と、その収納体14に入れられ、かつ、
盛土材10に養分を補給し得る肥料15とを備えてい
る。収納体14としては、編物、織布、不織布、生分解
性材料からなるフィルム等よりなる袋や、金網、樹脂網
等よりなるかごが用いられる。生分解性材料は、土壌中
の雑菌等の微生物により分解されて消滅する材料であ
る。生分解性材料としては、でんぷん系化合物、蛋白質
系化合物、ビニールエマルジョン系化合物、ポリ乳酸系
化合物、でんぷんと樹脂とのブレンド等を例示でき、こ
れらから選ばれる少なくとも一種を使用できる。収納体
14には、肥料15のほかにも、土壌改良剤、保水剤、
人工土壌、種子またはこれらの組合わせを加えてもよ
い。本実施形態では、編物等により横方向Yに細長く形
成された袋が収納体14として用いられ、この中に、緩
効性の肥料15、土壌改良剤及び保水剤が入れられてい
る。なお、養分補給部材13は必須ではなく、状況に応
じ適宜省略可能である。
Both the embankment layers 11 and 12 are compacted by rolling using an impact roller or the like. The upper surface of the middle lower embankment layer 12 is lower than the upper end of the front wall portion 8. A nutrient supply member 1 is provided at the front end between the embankment layers 11 and 12.
3 are arranged. The nutrient replenishing member 13 is provided in a storage body 14 having water permeability and the storage body 14, and
And a fertilizer 15 that can supply nutrients to the embankment material 10. As the storage body 14, a bag made of a film or the like made of a knitted fabric, a woven fabric, a nonwoven fabric, a biodegradable material, or a basket made of a wire net, a resin net, or the like is used. The biodegradable material is a material that is decomposed and disappeared by microorganisms such as various bacteria in the soil. Examples of the biodegradable material include a starch compound, a protein compound, a vinyl emulsion compound, a polylactic acid compound, a blend of starch and a resin, and at least one selected from these. In addition to the fertilizer 15, the container 14 has a soil conditioner, a water retention agent,
Artificial soil, seeds or a combination thereof may be added. In the present embodiment, a bag elongated in the horizontal direction Y by a knitted fabric or the like is used as the storage body 14, and a slow-release fertilizer 15, a soil conditioner, and a water retention agent are put in the storage body 14. Note that the nutrient supply member 13 is not essential, and can be omitted as appropriate depending on the situation.

【0039】各前壁部8と両盛土層11,12との間に
は下部緑化シート16が介在されている。下部緑化シー
ト16の下端部16bは後方へ曲げられ、底部7と下部
盛土層11との間に介在されている。下部緑化シート1
6の上端部16aは後方へ曲げられ、中下部盛土層12
上に敷かれている。下部緑化シート16には、盛土材1
0の前壁部8からの抜け落ちを防止する機能と、水を通
す機能(透水性)とが要求される。そのほかにも、下部
緑化シート16は、植物の生長の妨げにならないもので
あることが好ましい。これらの機能を有するものとし
て、本実施形態では不織布が用いられている。
A lower greening sheet 16 is interposed between each front wall portion 8 and the embankment layers 11 and 12. A lower end portion 16b of the lower greening sheet 16 is bent rearward, and is interposed between the bottom portion 7 and the lower embankment layer 11. Lower greening sheet 1
6 is bent rearward to form the middle and lower embankment layer 12.
Laying on top. The lower greening sheet 16 contains the embankment material 1
A function of preventing the 0 from falling off from the front wall portion 8 and a function of passing water (water permeability) are required. In addition, it is preferable that the lower greening sheet 16 does not hinder the growth of the plant. In this embodiment, a nonwoven fabric is used as having these functions.

【0040】中下部盛土層12上には、下部強化シート
5と同一構成の上部強化シート17が載置されている。
上部強化シート17は杭18によって中下部盛土層12
に対し移動不能に係止されている。上部強化シート17
上には、下部枠柵6と同様な底部20及び前壁部21を
備えた上部枠柵19が配置されている。上部枠柵19の
格子部分には下部枠柵6の上端部が係入されている。こ
の係入により、上下両枠柵19,6が相互に連結され
て、実質上一体となっている。このように、上下両枠柵
19,6の連結のために上部枠柵19の格子部分が利用
されている。前記連結を強固なものとするためには、上
下両枠柵19,6の重なり部分を、さらに結束線等によ
って接続することが望ましい。上部枠柵19の縦用鉄筋
56の上端部分は斜め後ろ下方へ向けて折返されてお
り、その端面56aは縦用鉄筋56の最も高い箇所(屈
曲部56b)よりも低くなっている。
An upper reinforcing sheet 17 having the same structure as the lower reinforcing sheet 5 is placed on the middle and lower embankment layer 12.
The upper reinforcement sheet 17 is formed by the pile 18 so that
Are locked so that they cannot move. Upper reinforcement sheet 17
An upper frame fence 19 having a bottom 20 and a front wall 21 similar to the lower frame fence 6 is arranged on the upper side. The upper end of the lower frame fence 6 is engaged with the lattice portion of the upper frame fence 19. By this engagement, the upper and lower frame fences 19 and 6 are connected to each other and are substantially integrated. As described above, the lattice portion of the upper frame fence 19 is used for connecting the upper and lower frame fences 19 and 6. In order to strengthen the connection, it is desirable that the overlapping portions of the upper and lower frame fences 19 and 6 are further connected by a binding wire or the like. The upper end portion of the vertical reinforcing bar 56 of the upper frame fence 19 is bent obliquely rearward and downward, and its end surface 56a is lower than the highest portion (bent portion 56b) of the vertical reinforcing bar 56.

【0041】凹部2内において前壁部21よりも後方の
空間には、盛土材10が中上部盛土層22及び上部盛土
層23の2層に分けて充填されている。両盛土層22,
23間の前端部には、前記養分補給部材13と同一構成
の養分補給部材24が配置されている。この養分補給部
材24は必須ではなく、状況に応じ適宜省略可能であ
る。前壁部21と両盛土層22,23との間には上部緑
化シート25が介在されている。上部緑化シート25の
下端部25bは後方へ曲げられ、底部20と中上部盛土
層22との間に介在されている。上部緑化シート25の
上端部25aは、前記縦用鉄筋56の上端部の形状に沿
うように折曲げられ、上部盛土層23上に敷かれてい
る。上部盛土層23の上には、縦用鉄筋56の屈曲部5
6bが露出しない程度の高さまで盛土材10が充填さ
れ、この盛土材10により表土23aが形成されてい
る。縦用鉄筋56の端面56a及び上部緑化シート25
の上端部25aはいずれも盛土材10中に埋まってい
る。以上のようにして1つの単位の緑化構造物52が構
成されている。
The space behind the front wall portion 21 in the recess 2 is filled with the embankment material 10 divided into two layers, a middle upper embankment layer 22 and an upper embankment layer 23. Ryo embankment layer 22,
A nutrient replenishing member 24 having the same configuration as the nutrient replenishing member 13 is disposed at a front end between the nuts 23. The nutrient supply member 24 is not essential and can be omitted as appropriate according to the situation. An upper greening sheet 25 is interposed between the front wall 21 and the embankment layers 22 and 23. The lower end 25b of the upper greening sheet 25 is bent backward and is interposed between the bottom 20 and the middle upper embankment layer 22. The upper end portion 25 a of the upper greening sheet 25 is bent along the shape of the upper end portion of the vertical reinforcing bar 56 and laid on the upper embankment layer 23. On the upper embankment layer 23, the bent portion 5 of the vertical reinforcing bar 56 is provided.
The embankment material 10 is filled to such a height that 6b is not exposed, and the embankment material 10 forms a topsoil 23a. End surface 56a of vertical reinforcing bar 56 and upper greening sheet 25
Are buried in the embankment material 10. The greening structure 52 of one unit is configured as described above.

【0042】図1に示すように、全緑化構造物52及び
岩盤法面1には、金属、合成樹脂等の材料によって形成
された、目の粗い網部材27が敷かれている。網部材2
7は、緑化構造物52においては内壁面4の一部、表土
23a、上下両枠柵19,6に被せられている。岩盤法
面1及び各緑化構造物52の表面には、土及び種子を含
む植生材30が付着されている。植生材30としては、
人工土壌、種子等の混合物を吹付けてなる吹付け層や、
袋体に土、種子等を含ませてなる土のうが用いられる。
吹付け層としては、人工土壌、種子、肥料、吹付け層の
安定固着を図る養生剤、微生物の活性化を図る土壌活性
剤等の素材を水に溶かして吹付ける、いわゆる「客土吹
付け工法」によるもの、同様の素材を乾式で吹付ける、
いわゆる「厚層基材吹付け工法」によるものがある。種
子は施工現場の土、施工季節、気象条件等に応じて適宜
選択される。本実施形態では、「厚層基材吹付け工法」
によって吹付け層31が形成されており、この吹付け層
31によって網部材27が被覆されている。吹付け層3
1の厚みは10乃至100mm程度であることが好まし
く、例えば約60mmに設定することができる。なお、
吹付け層31は単層であっても複数層であってもよい。
As shown in FIG. 1, an open mesh member 27 made of a material such as a metal or a synthetic resin is laid on the all-green structure 52 and the rock slope 1. Net member 2
Numeral 7 covers a part of the inner wall surface 4, the topsoil 23a, and the upper and lower frame fences 19 and 6 in the greening structure 52. The vegetation material 30 including soil and seeds is attached to the surface of the rock slope 1 and each greening structure 52. As the vegetation material 30,
A spray layer formed by spraying a mixture of artificial soil and seeds,
Sandbags containing soil, seeds and the like in a bag are used.
The spraying layer is made by dissolving and spraying materials such as artificial soil, seeds, fertilizer, a curing agent to stabilize the spraying layer, a soil activator to activate microorganisms, etc. Method of spraying the same material in a dry manner,
There is a so-called “thick base material spraying method”. Seeds are appropriately selected according to soil at the construction site, construction season, weather conditions, and the like. In this embodiment, the "thick layer base material spraying method"
A spraying layer 31 is formed by this, and the net member 27 is covered with the spraying layer 31. Spray layer 3
The thickness of 1 is preferably about 10 to 100 mm, and can be set to about 60 mm, for example. In addition,
The spray layer 31 may be a single layer or a plurality of layers.

【0043】各緑化構造物52の上部には植物としての
苗木29が植栽されている。苗木29の根29aは上部
盛土層23に位置し、幹は、上部緑化シート25に形成
された十字状の切込み26(図2参照)、表土23a、
網部材27及び吹付け層31を通過して上方へ伸びてい
る。
A seedling 29 as a plant is planted above each greening structure 52. The root 29a of the seedling 29 is located in the upper embankment layer 23, and the trunk is a cross-shaped cut 26 formed in the upper greening sheet 25 (see FIG. 2), the topsoil 23a,
It extends upward through the net member 27 and the spray layer 31.

【0044】上述した緑化構造は以下の工程に従って構
築される。まず、図3に示すように、岩盤51の所定の
箇所(間隔d1,d2が一定となる箇所)を削り取るこ
とにより、各々底面3及び内壁面4からなる複数の凹部
2を岩盤法面1に形成する。図4に示すように、各底面
3に下部強化シート5を敷き、その前部に下部枠柵6を
置く。底部7の格子部分を通して所定の数の杭9を打付
ける。杭9は下部強化シート5を通り、岩盤51に打込
まれる。この杭9により下部強化シート5が岩盤51に
係止されるとともに、下部枠柵6の水平方向への移動
(ずれ)が規制される。
The above-mentioned greening structure is constructed according to the following steps. First, as shown in FIG. 3, a plurality of recesses 2 each having a bottom surface 3 and an inner wall surface 4 are cut into a rock slope 1 by shaving a predetermined portion of the rock 51 (a portion where the intervals d1 and d2 are constant). Form. As shown in FIG. 4, a lower reinforcing sheet 5 is laid on each bottom surface 3, and a lower frame fence 6 is placed in front of the lower reinforcing sheet 5. A predetermined number of piles 9 are driven through the lattice portion of the bottom 7. The pile 9 passes through the lower reinforcing sheet 5 and is driven into the bedrock 51. The lower reinforcement sheet 5 is locked to the bedrock 51 by the pile 9, and the horizontal movement (displacement) of the lower frame fence 6 is regulated.

【0045】図5に示すように、前壁部8と底部7とに
沿って下部緑化シート16を配置する。この際、長さ方
向(図5において紙面と直交する方向)にスリット32
aの入れられたパイプ32を用い、スリット32aを介
してパイプ32を縦用鉄筋56の上端部56cに被せ
る。パイプ32としては、滑らかな外周面を有するも
の、例えば塩化ビニール等の合成樹脂からなるものを用
いることが好ましい。下部緑化シート16の上端部16
aをパイプ32の上に被せ、前壁部8の前面に一時的に
垂らしておく。このとき、下部緑化シート16が上端部
56cに引っ掛かって作業性を低下させることがない。
As shown in FIG. 5, the lower greening sheet 16 is arranged along the front wall 8 and the bottom 7. At this time, the slits 32 extend in the length direction (the direction orthogonal to the plane of FIG.
Using the pipe 32 in which a is inserted, the pipe 32 is put on the upper end portion 56c of the vertical reinforcing bar 56 through the slit 32a. As the pipe 32, a pipe having a smooth outer peripheral surface, for example, a pipe made of a synthetic resin such as vinyl chloride is preferably used. Upper end 16 of lower greening sheet 16
a is put on the pipe 32 and temporarily hangs on the front surface of the front wall portion 8. At this time, the lower greening sheet 16 does not get caught on the upper end portion 56c and the workability is not reduced.

【0046】下部強化シート5、下部緑化シート16及
び内壁面4によって囲まれた空間に、前壁部8の中間高
さ位置まで、現場の土等を利用して盛土材10を充填す
る。この盛土材10を衝撃ローラ等で転圧して押し固め
る。すると、下部強化シート5上に下部盛土層11が形
成される。下部盛土層11の前部に、養分補給部材13
を横方向Yに沿って延びるように添えて配置する。続い
て、図6に示すように、下部盛土層11の上に再び盛土
材10を充填し、これを衝撃ローラ等で押し固める。す
ると、下部盛土層11上に中下部盛土層12が積層され
る。
The space surrounded by the lower reinforcing sheet 5, the lower greening sheet 16 and the inner wall surface 4 is filled with the embankment material 10 to the intermediate height position of the front wall portion 8 using the soil at the site. The embankment material 10 is compacted by rolling with an impact roller or the like. Then, the lower embankment layer 11 is formed on the lower reinforcing sheet 5. A nutrient supply member 13 is provided in front of the lower embankment layer 11.
Are arranged so as to extend along the lateral direction Y. Subsequently, as shown in FIG. 6, the embankment material 10 is filled again on the lower embankment layer 11, and is compacted by an impact roller or the like. Then, the lower middle embankment layer 12 is laminated on the lower embankment layer 11.

【0047】次に、中下部盛土層12上に上部強化シー
ト17を敷き、余らせておいた下部緑化シート16の上
端部16aを同上部強化シート17の上に重ねる。この
際、下部緑化シート16が縦用鉄筋56の上端部56c
に引っ掛かることがない。同緑化シート16はパイプ3
2から簡単に離れ、作業性がよい。その後、縦用鉄筋5
6からパイプ32を外し、上部強化シート17等の上に
上部枠柵19を置く。この際には、上部枠柵19の格子
部分に下部枠柵6の上端部を係入させ、上下両枠柵1
9,6を相互に連結させる。底部20の格子部分を通し
て所定の数の杭18を打付ける。杭18は上部強化シー
ト17を通り、中下部盛土層12に入り込む。
Next, the upper reinforcing sheet 17 is laid on the middle and lower embankment layer 12, and the upper end 16 a of the remaining lower greening sheet 16 is laid on the upper reinforcing sheet 17. At this time, the lower greening sheet 16 is attached to the upper end 56 c of the vertical reinforcing bar 56.
Never get caught in The greening sheet 16 is the pipe 3
2 and easily workable. Then, vertical reinforcing bar 5
The pipe 32 is removed from 6 and the upper frame fence 19 is placed on the upper reinforcing sheet 17 and the like. In this case, the upper end of the lower frame fence 6 is engaged with the lattice portion of the upper frame fence 19,
9 and 6 are interconnected. A predetermined number of piles 18 are driven through the lattice portion of the bottom 20. The pile 18 passes through the upper reinforcing sheet 17 and enters the middle and lower embankment layer 12.

【0048】図7に示すように、前壁部21と底部20
とに沿って上部緑化シート25を配置する。この際に
も、前述したものと同様のスリット入りパイプ(図示
略)を用い、そのスリットを介しパイプを縦用鉄筋56
の上端部56cに被せる。上部緑化シート25の上端部
25aをパイプの上に被せ、前壁部21の前面に一時的
に垂らしておく。上部強化シート17、上部緑化シート
25及び内壁面4によって囲まれた空間に、前壁部21
の中間高さ位置まで盛土材10を充填する。盛土材10
を衝撃ローラ等で転圧して押し固める。すると、上部強
化シート17上に中上部盛土層22が積層される。中上
部盛土層22の前部に養分補給部材24を配置し、さら
にその上に盛土材10を再び充填し、これを衝撃ローラ
等で押し固める。すると、中上部盛土層22上に上部盛
土層23が積層される。
As shown in FIG. 7, the front wall 21 and the bottom 20
The upper greening sheet 25 is arranged along with. At this time, a pipe with a slit (not shown) similar to that described above is used, and the pipe is connected to the vertical reinforcing bar 56 through the slit.
Cover the upper end portion 56c of the cover. The upper end portion 25a of the upper greening sheet 25 is put on the pipe and is temporarily hung on the front surface of the front wall portion 21. In the space surrounded by the upper reinforcing sheet 17, the upper greening sheet 25 and the inner wall surface 4, the front wall portion 21 is provided.
Is filled with the embankment material 10 up to the intermediate height position. Embankment material 10
Is compacted by rolling with an impact roller or the like. Then, the middle upper embankment layer 22 is laminated on the upper reinforcement sheet 17. The nutrient replenishing member 24 is disposed in front of the middle upper embankment layer 22, and the embankment material 10 is refilled thereon, and is compacted by an impact roller or the like. Then, the upper embankment layer 23 is laminated on the middle upper embankment layer 22.

【0049】余らせておいた上部緑化シート25の上端
部25aを上部盛土層23上に敷く。この際にも、上部
緑化シート25はパイプから簡単に離れる。縦用鉄筋5
6からパイプを外し、同縦用鉄筋56の上端部分を曲げ
加工する。上部盛土層23の上にさらに盛土材10を充
填し、これを衝撃ローラ等で押し固める。すると、上部
盛土層23上に表土23aが積層され、各縦用鉄筋56
の上端部が同表土23a内に埋まって隠れる。このよう
にして1つの緑化構造物52が構築される。
The upper end portion 25a of the left upper greening sheet 25 is laid on the upper embankment layer 23. At this time, the upper greening sheet 25 is easily separated from the pipe. Vertical reinforcing bar 5
The pipe is removed from 6, and the upper end portion of the vertical reinforcing bar 56 is bent. The embankment material 10 is further filled on the upper embankment layer 23, and is compacted with an impact roller or the like. Then, the topsoil 23 a is laminated on the upper embankment layer 23, and each vertical reinforcing bar 56 is formed.
Is buried and hidden in the topsoil 23a. Thus, one greening structure 52 is constructed.

【0050】続いて、全緑化構造物52及び岩盤法面1
の略全面に網部材27を被せる。網部材27の上から、
前述した「厚層基材吹付け工法」に基づき植生材30を
吹付け、吹付け層31を形成する。植生材30の一部
は、網部材27の網目及び前壁部21,8の格子部分を
通り上下両緑化シート25,16に付着する。各緑化構
造物52の上部において、苗木29を植栽する予定の箇
所に穴28を掘る。この際、網部材27の該当個所を切
抜き、上部緑化シート25の該当個所に切込み26を入
れる。切込み26に代えて、同上部緑化シート25の一
部を切抜いて孔を形成してもよい。穴28に苗木29を
入れ、隙間に盛土材10を充填する。この苗木29の植
栽作業を全緑化構造物52に対し行うと、緑化作業が終
了する。
Subsequently, the all-green structure 52 and the rock slope 1
Is covered with a net member 27 over substantially the entire surface of. From above the net member 27,
The vegetation material 30 is sprayed based on the above-mentioned “thick layer base material spraying method” to form the spray layer 31. Part of the vegetation material 30 adheres to the upper and lower greening sheets 25 and 16 through the mesh of the mesh member 27 and the lattice portion of the front wall portions 21 and 8. In the upper part of each greening structure 52, a hole 28 is dug at a place where a seedling 29 is to be planted. At this time, a corresponding portion of the net member 27 is cut out, and a cut 26 is made in a corresponding portion of the upper greening sheet 25. Instead of the cut 26, a part of the upper greening sheet 25 may be cut out to form a hole. Seedlings 29 are put in the holes 28 and the gap is filled with the embankment material 10. When the planting operation of the seedlings 29 is performed on the entire greening structure 52, the greening operation ends.

【0051】前記緑化構造によれば、図1及び図3に示
すように、岩盤法面1の複数箇所において縦横に隣り合
う凹部2の間隔d1,d2が略一定であり、各凹部2毎
に苗木29が植栽されている。このことから、複数の苗
木29が岩盤法面1の全面に対し略等間隔で点在するこ
ととなる。このときには、吹付け層31内の種子が発芽
せず、草本類が生えてない。このため、緑化構造の構築
直後には、まばらに植栽された苗木29のみによって緑
色の部分が構成される。
According to the greening structure, as shown in FIGS. 1 and 3, the intervals d1 and d2 between the vertically adjacent two concave portions 2 at the plurality of locations on the rock slope 1 are substantially constant. Seedlings 29 are planted. From this, a plurality of seedlings 29 are scattered at substantially equal intervals over the entire surface of the rock slope 1. At this time, the seeds in the spray layer 31 do not germinate, and herbs do not grow. Therefore, immediately after the construction of the greening structure, a green portion is constituted only by the sparsely planted seedlings 29.

【0052】各苗木29の各部は時間の経過とともに徐
々に生長してゆく。すなわち、苗木29の幹や枝が伸
び、葉が大きくなる。この生長にともない、葉等による
緑色の部分の面積が増加してゆく。各緑化構造物52よ
りも上方の空間が効果的に緑化される。この際、幹、
枝、葉等は凹部2の内壁面4の前方に位置していること
から、同内壁面4を隠す機能も発揮する。また、苗木2
9の根29aは盛土材10の中で伸びる。やがて、根2
9aの一部が岩盤51内に入り込む場合もある。また、
植生材30及び盛土材10に含まれている種子や飛来し
てきた種子が発芽し、時間の経過とともに徐々に生長し
てゆく。これらの生長により、枠柵19,6における前
壁部21,8の前方部分(吹付け層31)が効果的に緑
化される。
Each part of each seedling 29 gradually grows with the passage of time. In other words, the trunk and branches of the seedling 29 are elongated, and the leaves are enlarged. With this growth, the area of the green portion due to leaves and the like increases. The space above each greening structure 52 is effectively greened. At this time, the trunk,
Since the branches, leaves, and the like are located in front of the inner wall surface 4 of the concave portion 2, they also have a function of hiding the inner wall surface 4. Seedling 2
The roots 29 a of the 9 extend in the embankment material 10. Eventually, root 2
In some cases, a part of 9a may enter the rock 51. Also,
Seeds contained in the vegetation material 30 and the embankment material 10 and flying seeds germinate and gradually grow over time. Due to these growths, the front portions (spray layer 31) of the front fences 21 and 8 in the frame fences 19 and 6 are effectively greened.

【0053】ここで、隣り合う苗木29の間隔d1,d
2が略一定であることから、極端に緑色の部分が少なく
て岩盤法面1が多く露出したり、極端に緑色の部分が多
くなったりすることはない。岩盤法面1の略全面が時間
の経過に従い緑色の部分で覆われてゆく。このように、
岩盤51のみでは植物が育ちにくく緑色の部分が少ない
が、前述したように生長する樹木、草等の植物によって
緑色の部分が広がってゆく。
Here, the distance d1, d between adjacent seedlings 29
Since 2 is substantially constant, the green slope portion is extremely small and the rock slope 1 is not much exposed and the green portion is not extremely increased. Almost the entire surface of the rock slope 1 is covered with a green portion over time. in this way,
The plant is difficult to grow with the bedrock 51 alone, and the green portion is small, but as described above, the green portion is spread by plants such as trees and grass growing.

【0054】ところで、岩盤法面1に多数の凹部2が穿
設され、しかも、緑化構造物52の大部分が各凹部2内
に入り込んでいる。この入り込んだ分だけ、岩盤法面1
からの緑化構造物52の突出量が少なくてすむ。このた
め、凹部を穿設せずに岩盤法面に網篭を吊下げた従来技
術(特許公報第2559652号)とは異なり、岩盤法
面1が凸凹にならず、緑化構造によって岩盤法面1の景
観を損なうことがない。
By the way, a large number of recesses 2 are formed in the rock slope 1, and most of the greening structure 52 enters each recess 2. The rock slope 1
The projecting amount of the greening structure 52 from the space is small. For this reason, unlike the prior art (Patent Publication No. 2559652) in which a net basket is hung on a rock slope without forming a recess, the rock slope 1 does not become uneven, and the rock slope 1 is formed by a greening structure. It does not spoil the scenery.

【0055】特に、岩盤法面1からの突出部分の量は、
主に、凹部2の開口部分に位置する上下両枠柵19,6
によって決定される。本実施形態では、上部両枠柵1
9,6の前壁部21,8が岩盤法面1に沿って傾斜して
いる、すなわち、前壁部21,8が底部20,7に対し
約60度の角度で傾斜している。このため、沿ってない
場合(例えば垂直の場合)に比べ、同前壁部21,8の
突出量が少ない。従って、上下両枠柵19,6を設置し
たことによる不自然さを、見る者にあまり感じさせな
い。この点も、景観向上に役立っている。
In particular, the amount of the projecting portion from the rock slope 1 is
Mainly, upper and lower frame fences 19 and 6 located at the opening portion of the concave portion 2
Is determined by In the present embodiment, the upper frame fence 1
The front wall portions 9 and 6 are inclined along the rock slope 1, that is, the front wall portions 21 and 8 are inclined at an angle of about 60 degrees with respect to the bottom portions 20 and 7. Therefore, the amount of protrusion of the front wall portions 21 and 8 is smaller than that in the case where they are not along (for example, in the case of vertical). Therefore, the viewer does not feel much unnaturalness due to the installation of the upper and lower frame fences 19 and 6. This point also contributes to the improvement of the landscape.

【0056】上下両緑化シート25,16は不織布によ
って形成されているので、土や石を通しにくい。このた
め、上下両枠柵19,6が鉄筋によって格子状に形成さ
れているにもかかわらず、網篭よりなる緑化ボックスを
用いた従来技術(特許公報第2559652号)とは異
なり、降雨によって上下両枠柵19,6から盛土材10
が抜け落ちるのを防止できる。
Since the upper and lower greening sheets 25 and 16 are formed of a nonwoven fabric, it is difficult for soil and stone to pass through. For this reason, unlike the prior art (Patent Publication No. 2559652) using a greening box made of a net cage, the upper and lower frame fences 19 and 6 are formed in a lattice shape by the reinforcing bar, but the upper and lower fences are vertically moved. Embankment material 10 from both fences 19,6
Can be prevented from falling off.

【0057】また、上下両強化シート17,5は、その
繊維材料の有する毛細管現象により、盛土材10に含ま
れて同強化シート17,5に至った水を凹部2の開口部
分へ導く。上下両緑化シート25,16及び上下両枠柵
19,6はともに水を通す。このため、たとえ大量の降
雨があっても十分に排出される。排出されずに残った水
によって盛土材10が軟弱化するおそれはない。
The upper and lower reinforcing sheets 17, 5 guide the water contained in the embankment material 10, which has reached the reinforcing sheets 17, 5, to the opening of the recess 2 by the capillary action of the fiber material. Both the upper and lower greening sheets 25, 16 and the upper and lower frame fences 19, 6 allow water to pass through. For this reason, even if there is a large amount of rainfall, it is sufficiently discharged. There is no risk that the embankment material 10 will be softened by the water remaining without being discharged.

【0058】さらに、本実施形態では、岩盤法面1のと
ころどころに凹部2を穿設し、そこに緑化構造物52を
構築しているので、岩盤法面1の全面にわたって構築す
る従来技術(特開平4−213625号公報)に比べて
資材が少なくてすみ、施工にかかる期間(工期)も短く
てすむ。施工に要するコストを低減することができ、経
済性に優れる。
Further, in the present embodiment, since the concave portion 2 is formed in some places of the rock slope 1 and the greening structure 52 is constructed there, the conventional technology (construction of the entire rock slope 1) is provided. It requires less material than in Japanese Unexamined Patent Publication No. Hei 4-213625, and requires a shorter construction period (construction period). The cost required for construction can be reduced, and the economy is excellent.

【0059】本実施形態は前述した事項以外にも以下の
特徴を有する。
This embodiment has the following features in addition to the items described above.

【0060】(a)上下両強化シート17,5により導
かれて凹部2の開口部から排出された水は、各盛土層1
1,12の前面を伝って流下する。この水により、盛土
材10の前部が削り取られたり盛土材10の養分が流れ
たりするおそれがある。しかし、その流下する水は、前
壁部21,8に沿って配置した養分補給部材24,13
にも浸潤し、緩効性の肥料15等を少しずつ溶け出させ
る。溶け出した肥料15等は盛土材10に養分を補給す
るため、前記流下水に起因する盛土材10の痩せを防止
し、緑化を促進することができる。
(A) The water guided by the upper and lower reinforcing sheets 17 and 5 and discharged from the opening of the concave portion 2 is supplied to each embankment layer 1.
It flows down along the front of 1,12. Due to this water, the front portion of the embankment material 10 may be shaved off or nutrients of the embankment material 10 may flow. However, the flowing water is supplied by the nutrient replenishing members 24, 13 arranged along the front walls 21, 8.
And gradually dissolves the slow-release fertilizer 15 and the like. Since the melted fertilizer 15 and the like replenish nutrients to the embankment material 10, it is possible to prevent the embankment material 10 from becoming thinner due to the flowing water and promote greening.

【0061】(b)不織布によって構成された上下両強
化シート17,5の一部は、対応する底部20,7を越
えて盛土材10中に広がり、上下両枠柵19,6を盛土
材10に係留するとともに、盛土材10を安定化させ
る。また、上下両強化シート17,5は厚手で高強度を
有する不織布によって形成されているので、盛土材10
からの圧力を受けても切れにくい。
(B) A part of the upper and lower reinforcing sheets 17 and 5 made of a non-woven fabric spreads into the embankment material 10 over the corresponding bottom portions 20 and 7 and the upper and lower frame fences 19 and 6 are moved to the embankment material 10. And the embankment material 10 is stabilized. Also, since the upper and lower reinforcing sheets 17 and 5 are formed of a thick and high-strength nonwoven fabric, the embankment 10
Hard to cut even under pressure from

【0062】(c)盛土材10の充填に際しては、ショ
ベルカー等の機械により同盛土材10を各凹部2の奥部
に運び入れ、その後、人手によって盛土材10をならす
ことがある。この場合、盛土材10をショベルですくっ
て上下両枠柵19,6側へ向けて放り込むことになる。
このとき、盛土材10といっても、土ばかりでなく小石
も多く含まれている。このような盛土材10を放り投げ
た場合には、一般的には、盛土材10中の土はあまり遠
くへ飛ばず、土よりも重い礫が遠くへ飛ぶ傾向にある。
その結果、底部20,7上には礫の占める割合が高くな
る。このことは、土の割合の高い箇所よりも養分が少な
いことを意味する。しかし、この礫の多い箇所は、苗木
29の植栽箇所から離れているため、同苗木29の生育
にほとんど影響がない。なお、苗木29が根付いて、そ
の根29aが伸びてきた場合には、礫が多く土が少なく
ても、その礫の溜った箇所に配置された養分補給部材2
4,13から、養分を根29aに供給することができ
る。
(C) When filling the embankment material 10, the embankment material 10 may be carried into the deep portion of each recess 2 by a machine such as a shovel car, and then the embankment material 10 may be manually leveled. In this case, the embankment material 10 is excavated and thrown toward the upper and lower frame fences 19 and 6.
At this time, the embankment material 10 contains not only soil but also many pebbles. When such an embankment material 10 is thrown away, generally, the soil in the embankment material 10 does not fly very far, and gravel heavier than the soil tends to fly far.
As a result, the proportion of gravel on the bottoms 20 and 7 increases. This means that there is less nutrients than where the soil percentage is high. However, since the location with a large amount of gravel is far from the planting location of the seedling 29, the growth of the seedling 29 is hardly affected. When the seedling 29 has taken root and its root 29a has grown, the nutrient replenishing member 2 disposed at the location where the gravel has accumulated, even if the gravel is large and the soil is small.
From 4 and 13, nutrients can be supplied to the root 29a.

【0063】(d)上下両緑化シート25,16の前面
や、岩盤法面1に、種子及び人工土壌を含む吹付け層3
1を形成しているので、単に上下両緑化シート25,1
6に種子を内蔵した場合と比べて、種子の発芽及び生長
性がよく、洋芝等の種子の発芽による一次植生を短期間
で達成することができる。その後は、木本植物が生長す
る。なお、吹付け層31内に埋設された網部材27は、
その吹付け層31が流出するのを規制する。
(D) The spray layer 3 containing seeds and artificial soil is provided on the front surfaces of the upper and lower greening sheets 25 and 16 and the rock slope 1.
1 simply form the upper and lower greening sheets 25, 1
Compared to the case where the seeds are incorporated in 6, the germination and growth of the seeds are better, and the primary vegetation by the germination of seeds such as western turf can be achieved in a short period of time. After that, the woody plants grow. The net member 27 embedded in the spray layer 31 is
The spray layer 31 is restricted from flowing out.

【0064】(e)緑化構造物52の構築時に苗木29
を植栽しているので、構築後の比較的早期から緑量を確
保することができる。また、景観向上を図るうえで効果
的である。
(E) Seedlings 29 at the time of construction of greening structure 52
Since greenery is planted, the amount of greenery can be secured relatively early after construction. It is also effective in improving the landscape.

【0065】(f)枠柵、盛土材、強化シート、緑化シ
ート等からなる段を1つの単位とし、この段を凹部2毎
に複数段にわたり積み上げることにより緑化構造物52
を構築している。このため、1つ当りの枠柵の高さがわ
ずかであっても、複数の枠柵19,6が重ねられて複数
の段が形成されると、最上段の枠柵(上部枠柵19)や
盛土材10の上面(表土23a)の位置が高くなる。少
ない種類(ここでは単一)の枠柵でも、種々の高さの緑
化構造物52を簡単に構築できる。従って、大きさの異
なる多種類の枠柵を準備しなくてもすむ。
(F) The greening structure 52 is formed by stacking a plurality of steps such as a frame fence, an embankment material, a reinforcing sheet, a greening sheet, and the like as one unit, and stacking these steps for each of the recesses 2.
Is building. For this reason, even if the height of one frame fence is small, if the plurality of frame fences 19 and 6 are stacked to form a plurality of steps, the uppermost frame fence (upper frame fence 19). And the position of the upper surface (surface soil 23a) of the embankment material 10 becomes high. Even with a small number of frame fences (here, a single type), greening structures 52 of various heights can be easily constructed. Therefore, it is not necessary to prepare various types of frame fences having different sizes.

【0066】(g)縦用鉄筋56の上端部が曲げ加工さ
れていて、端面56aが盛土材10内に埋まっている。
このため、縦用鉄筋56の端部が露出して景観を損なう
のを防止するために、特別な処理を施す必要はない。屈
曲部56bは湾曲させられているので、たとえ吹付け層
31から露出しても上記不具合を引き起さない。
(G) The upper end of the vertical reinforcing bar 56 is bent, and the end face 56 a is buried in the embankment material 10.
For this reason, it is not necessary to perform any special treatment in order to prevent the end of the vertical reinforcing bar 56 from being exposed and impairing the landscape. Since the bent portion 56b is curved, the above problem does not occur even if the bent portion 56b is exposed from the spray layer 31.

【0067】(第2実施形態)次に、本発明を具体化し
た第2実施形態について、第1実施形態との相違点を中
心に説明する。なお、第1実施形態と同様の部材につい
ては同一の符号を付して説明を省略する。
(Second Embodiment) Next, a second embodiment of the present invention will be described focusing on differences from the first embodiment. The same members as those in the first embodiment are denoted by the same reference numerals, and description thereof is omitted.

【0068】図8に示すように、複数の凹部2は岩盤法
面1の傾斜方向(縦方向X)に沿う複数箇所において、
隣り合う凹部2との間隔d1が略一定となる位置に設け
られている。各凹部2は岩盤法面1の幅方向(横方向
Y)に沿って延びている。各凹部2は、ちょうど第1実
施形態において横方向Yに隣り合う凹部が互いに繋がれ
たような形状をなしている。また、図示はしないが、上
下両強化シート17,5、上下両枠柵19,6、上下両
緑化シート25,16、表土23a及び盛土層23,2
2,12,11が各凹部2の略全長にわたって配設され
ている。このようにして1つの単位の緑化構造物52が
構成されている。各緑化構造物52の表面には網部材2
7が敷かれ、吹付け層31が形成されているが、表土2
3aに対応する箇所には網部材27は敷かれていない。
これは、吹付け層31等が雨等によって流されたとき
に、網部材27が露出して歩行の邪魔になるのを防ぐた
めである。さらに、各緑化構造物52の上面の吹付け層
31も省略可能である。
As shown in FIG. 8, the plurality of recesses 2 are formed at a plurality of locations along the slope direction (vertical direction X) of the rock slope 1.
It is provided at a position where the distance d1 between adjacent recesses 2 is substantially constant. Each recess 2 extends along the width direction (lateral direction Y) of the rock slope 1. Each concave portion 2 has a shape such that concave portions adjacent in the horizontal direction Y are connected to each other in the first embodiment. Although not shown, both upper and lower reinforcing sheets 17 and 5, upper and lower frame fences 19 and 6, upper and lower greening sheets 25 and 16, topsoil 23 a and embankment layers 23 and 2 are provided.
2, 12 and 11 are provided over substantially the entire length of each recess 2. Thus, one unit of the greening structure 52 is configured. The net member 2 is provided on the surface of each greening structure 52.
7 is laid and a spray layer 31 is formed.
The net member 27 is not laid at a position corresponding to 3a.
This is to prevent the net member 27 from being exposed and hindering walking when the spray layer 31 or the like is washed away by rain or the like. Further, the spray layer 31 on the upper surface of each greening structure 52 can be omitted.

【0069】岩盤法面1には、隣り合う緑化構造物52
の端部同士等を繋ぐ階段64が設けられている。また、
各緑化構造物52上部の上部枠柵19寄りの箇所には、
苗木29が横方向Yに沿って略一定間隔d3毎に植栽さ
れている。この間隔d3は、場所によって異なっていて
もよい。各緑化構造物52上部において苗木29よりも
後方の箇所は、人が歩くことのできる程度の幅を有して
いる。
The rock slope 1 has a greening structure 52 adjacent to it.
Is provided with a staircase 64 connecting the end portions of each other. Also,
At the location near the upper frame fence 19 above each greening structure 52,
Seedlings 29 are planted at substantially constant intervals d3 along the horizontal direction Y. This interval d3 may be different depending on the location. A portion behind the seedling 29 in the upper part of each greening structure 52 has such a width that a person can walk.

【0070】上記構成によると、各凹部2においては、
横方向Yに沿って複数の苗木29が略一定間隔d3毎に
位置する。すなわち、複数の苗木29が岩盤法面1に対
し、縦方向X及び横方向Yに点在することとなる。この
ため、各苗木29が生長してゆくと、岩盤法面1が時間
の経過に従い緑色の部分で覆われていく。このように、
本実施形態によっても第1実施形態と同様の作用及び効
果が得られる。
According to the above configuration, in each recess 2,
A plurality of seedlings 29 are located at substantially constant intervals d3 along the horizontal direction Y. That is, a plurality of seedlings 29 are scattered in the vertical direction X and the horizontal direction Y with respect to the rock slope 1. Therefore, as each seedling 29 grows, the rock slope 1 is covered with a green portion over time. in this way,
According to this embodiment, the same operation and effect as those of the first embodiment can be obtained.

【0071】また、緑化構造物52は、緑化のための植
物が根付く箇所(土壌)として機能するだけでなく、遊
歩道等の道路としての機能も発揮する。すなわち、人が
各緑化構造物52の上を歩くことにより、岩盤法面1の
横方向Yにおける位置が変化する。加えて、階段64を
登ったり降りたりすることにより縦方向Xにおける位置
(高さ)が変化する。従って、人は緑化構造物52の上
や階段64を歩くことにより、森林浴等を楽しみなが
ら、傾斜した岩盤法面1を登り降りすることができる。
The greening structure 52 not only functions as a site (soil) where plants for greening take root, but also functions as a road such as a promenade. That is, when a person walks on each greening structure 52, the position of the rock slope 1 in the lateral direction Y changes. In addition, the position (height) in the vertical direction X changes by climbing or descending the stairs 64. Therefore, by walking on the greening structure 52 and the stairs 64, the person can climb up and down the sloped rock slope 1 while enjoying a forest bath or the like.

【0072】なお、縦用鉄筋56の端部が曲げ加工され
ている点は第1実施形態と同様であるが、このことは、
第2実施形態では、歩行の際に同縦用鉄筋56が邪魔に
なるのを防止するうえで特に重要である。
The point that the end of the vertical reinforcing bar 56 is bent is the same as that of the first embodiment.
In the second embodiment, it is particularly important to prevent the vertical reinforcing bar 56 from getting in the way during walking.

【0073】(第3実施形態)次に、本発明を具体化し
た第3実施形態について、第1及び第2実施形態との相
違点を中心に説明する。なお、第1実施形態等と同様の
部材については同一の符号を付して説明を省略する。ま
た、図9及び図10には説明の便宜上、1段からなる緑
化構造物52が示されている。つまり、下部強化シート
5、杭9、下部枠柵6、下部盛土層11、中下部盛土層
12、養分補給部材13及び下部緑化シート16が省略
された状態が示されている。もちろん、複数段からなる
緑化構造物52に変更してもよい。第3実施形態では、
上部枠柵19の前壁部21が、底部20となす傾斜角度
が約90度となるように曲げ形成されている。同上部枠
柵19が凹部2に設置された状態では、前壁部21が略
垂直方向へ延びている。
(Third Embodiment) Next, a third embodiment of the present invention will be described focusing on differences from the first and second embodiments. Note that the same members as those in the first embodiment and the like are denoted by the same reference numerals and description thereof is omitted. 9 and 10 show a one-stage greening structure 52 for convenience of explanation. That is, a state in which the lower reinforcing sheet 5, the pile 9, the lower frame fence 6, the lower embankment layer 11, the middle and lower embankment layer 12, the nutrient supply member 13, and the lower greening sheet 16 are omitted is shown. Of course, it may be changed to a greening structure 52 having a plurality of stages. In the third embodiment,
The front wall portion 21 of the upper frame fence 19 is formed so as to be bent so that an inclination angle formed with the bottom portion 20 is about 90 degrees. When the upper frame fence 19 is installed in the concave portion 2, the front wall portion 21 extends in a substantially vertical direction.

【0074】上記構成によると、各凹部2の内壁面4か
ら前壁部21の上端までの距離は、前壁部21が約60
度で曲げ形成されている第1及び第2実施形態よりも大
きくなる。これにともない緑化構造物52の上面の有効
面積が広がる。従って、第2実施形態と同様に緑化構造
物52を遊歩道等の道路として機能させる場合、十分に
広い幅(幅員)を簡単に確保することができる。
According to the above configuration, the distance from the inner wall surface 4 of each recess 2 to the upper end of the front wall portion 21 is approximately 60
It becomes larger than the first and second embodiments that are formed by bending in degrees. As a result, the effective area of the upper surface of the greening structure 52 increases. Therefore, when the greening structure 52 functions as a road such as a promenade as in the second embodiment, a sufficiently wide width (width) can be easily secured.

【0075】また、前壁部21が略垂直となっているこ
とから、緑化構造物52の構築時において、充填された
盛土材10を押し固める際に、次のような利点がある。
仮に、前壁部21が後方へ大きく傾斜していると、その
根本部分の近くに衝撃ローラを配置することができな
い。これは、前壁部21と衝撃ローラとが干渉し合うか
らである。そのため、他の方法によって盛土材10を押
し固める必要が生ずるが、衝撃ローラによる場合と同程
度に盛土材10を押し固めることは難しい。これに対
し、前壁部21が略垂直であると、前述した干渉が少な
く、前壁部21の根本部分の近くであっても、他の箇所
と同様にして衝撃ローラを配置できる。このため、盛土
材10のどの箇所であっても略均一に高い圧力で押し固
めることができる。このことは、緑化構造物52を複数
段からなるものに変更した場合に特に有利である。
Further, since the front wall portion 21 is substantially vertical, there are the following advantages when the filled embankment material 10 is compacted when the greening structure 52 is constructed.
If the front wall portion 21 is greatly inclined rearward, the impact roller cannot be arranged near the root portion thereof. This is because the front wall 21 and the impact roller interfere with each other. For this reason, it is necessary to compact the embankment material 10 by another method, but it is difficult to compact the embankment material 10 to the same extent as with the impact roller. On the other hand, when the front wall 21 is substantially vertical, the above-mentioned interference is small, and the impact roller can be arranged in the same manner as other parts even near the root of the front wall 21. For this reason, any location of the embankment material 10 can be substantially uniformly compacted with a high pressure. This is particularly advantageous when the greening structure 52 is changed to one having a plurality of stages.

【0076】なお、図9及び図10では、表土23aの
上に吹付け層31が形成された状態が図示されている
が、この吹付け層31は第2実施形態と同様に省略可能
である。
FIGS. 9 and 10 show a state in which the spraying layer 31 is formed on the topsoil 23a, but this spraying layer 31 can be omitted as in the second embodiment. .

【0077】(第4実施形態)次に、本発明を具体化し
た第4実施形態について、第1実施形態との相違点を中
心に説明する。なお、第1実施形態と同様の部材につい
ては同一の符号を付して説明を省略する。
(Fourth Embodiment) Next, a fourth embodiment which embodies the present invention will be described focusing on differences from the first embodiment. The same members as those in the first embodiment are denoted by the same reference numerals, and description thereof is omitted.

【0078】図11に示すように、表土23aには前述
した苗木29に代えて、土のう58が埋められている。
土のう58は、生分解性材料によって形成された袋体5
9と、その袋体59の中に詰められた土砂60及び植物
の種子61とを備えている。なお、上部緑化シート25
における土のう58の近傍箇所に、植物の根の通過を許
容する孔を予めあけておいてもよい。
As shown in FIG. 11, a sandbag 58 is buried in the topsoil 23a in place of the seedling 29 described above.
The sandbag 58 is made of a bag 5 made of a biodegradable material.
9 and soil 60 and plant seeds 61 packed in the bag 59. The upper greening sheet 25
A hole that allows the root of the plant to pass through may be formed in advance in the vicinity of the sandbag 58 in FIG.

【0079】上記構成によると、緑化構造物52の構築
後、土のう58内の種子61が発芽及び生長し、その過
程で袋体59を通る。従って、本実施形態によっても第
1実施形態と同様の作用及び効果が得られる。そのほか
にも、土のう58は防塞機能を発揮し、雨等によって表
土23a等が軟弱化しても、その部分の流動をせき止め
る。このため、盛土材10の流出を防止できる効果があ
る。また、袋体59を構成する生分解性材料は、土砂6
0中や盛土材10中に存在する雑菌等の微生物により分
解され、時間の経過とともに消失する。袋体59が長期
にわたって残存することによる不具合、例えば、植物に
おける根の生長の妨げとなったり、除草の際に除草器具
に絡まったりするのを未然に防止できる。
According to the above configuration, after the greening structure 52 is constructed, the seeds 61 in the sandbag 58 germinate and grow, and pass through the bag 59 in the process. Therefore, according to this embodiment, the same operation and effect as those of the first embodiment can be obtained. In addition, the sandbag 58 exerts a blocking function, and even if the topsoil 23a or the like is softened by rain or the like, the sandbag 58 dams the flow of that portion. Therefore, there is an effect that the outflow of the embankment material 10 can be prevented. The biodegradable material constituting the bag 59 is earth and sand 6
At 0 or in the embankment 10, it is decomposed by microorganisms such as various germs and disappears with time. Problems caused by the bag body 59 remaining for a long period of time, for example, hindrance to root growth in plants and entanglement with a weeding device during weeding can be prevented beforehand.

【0080】本発明は次に示す別の実施形態に具体化す
ることができる。
The present invention can be embodied in another embodiment described below.

【0081】(1)第1実施形態において、岩盤法面1
での凹部2の穿設位置を適宜変更してもよい。例えば、
第1実施形態では図3に示すように、凹部2を縦方向X
にも横方向Yにも等間隔となる位置に設けたが、千鳥状
となる位置に設けてもよい。岩盤法面1の全面を満遍な
く緑化する観点からは、凹部2の配列状態が規則的にな
るように、同凹部2の位置を決定することが望ましい。
例えば、岩盤法面1を側方から見た場合に、緑色の部分
が傾斜方向に沿って連続しているようにするには、間隔
d1を略一定にすることが重要である。この際、横方向
Yにおける間隔d2は必ずしも略一定でなくてもよい。
(1) In the first embodiment, the rock slope 1
The position where the concave portion 2 is formed may be changed as appropriate. For example,
In the first embodiment, as shown in FIG.
Although they are provided at equally spaced positions in both the horizontal and Y directions, they may be provided at staggered positions. From the viewpoint of greening the entire surface of the rock slope 1, it is desirable to determine the positions of the concave portions 2 so that the arrangement state of the concave portions 2 becomes regular.
For example, when the rock slope 1 is viewed from the side, it is important to make the distance d1 substantially constant so that the green portion is continuous along the inclination direction. At this time, the interval d2 in the horizontal direction Y does not necessarily have to be substantially constant.

【0082】(2)第1実施形態では、上下両枠柵1
9,6に関し、2回に分けて盛土材10を充填してい
る。これは、主に、盛土材10が多く、1度の転圧では
十分に押し固めることが困難であることによる。従っ
て、盛土材10の量が少なく、1度の転圧で十分押し固
めることができる場合には、盛土材10を1度に(1回
で)充填してもよい。
(2) In the first embodiment, the upper and lower frame fences 1
Regarding 9 and 6, the embankment material 10 is filled twice. This is mainly due to the fact that the embankment material 10 is large and it is difficult to sufficiently compact it with one compaction. Therefore, when the amount of the embankment material 10 is small and can be sufficiently compacted by one compaction, the embankment material 10 may be filled at one time (one time).

【0083】(3)養分補給部材24,13を第1実施
形態とは異なる箇所に配置してもよい。例えば、盛土材
10中という条件のもとでは、図12に示すように、枠
柵19,6の底部20,7の上方近傍に配置してもよ
い。
(3) The nutrient replenishing members 24 and 13 may be arranged at locations different from those in the first embodiment. For example, under the condition that the embankment material is in the embankment material 10, as shown in FIG.

【0084】また、養分補給部材24,13を上下両枠
柵19,6の前方に配置してもよい。この場合には、養
分補給部材24,13を係止する手段が必要であり、例
えば、網部材27の必要箇所に同養分補給部材24,1
3を取付けてもよい。具体的には、網部材27の網目を
利用して養分補給部材24,13を紐等で結び付ける。
特に、合成樹脂製の網部材27であれば、養分補給部材
24,13を横方向Yに細長い形状とし、これを網部材
27の網目に通して係止してもよい。
The nutrient replenishing members 24, 13 may be arranged in front of the upper and lower frame fences 19, 6. In this case, a means for locking the nutrient replenishing members 24 and 13 is required.
3 may be attached. Specifically, the nutrient replenishing members 24 and 13 are tied with a string or the like using the mesh of the mesh member 27.
In particular, if the mesh member 27 is made of a synthetic resin, the nutrient supply members 24 and 13 may be elongated in the horizontal direction Y, and may be locked through the mesh of the mesh member 27.

【0085】さらに、養分補給部材24,13を、前壁
部21,8と上下両緑化シート25,16との間に配置
してもよい。この場合には、同養分補給部材24,13
を前壁部21,8に直接係止したり、同前壁部21,8
の格子部分を通じて網部材27に係止したりする。
Further, the nutrient supply members 24 and 13 may be arranged between the front wall portions 21 and 8 and the upper and lower greening sheets 25 and 16. In this case, the nutrient supply members 24, 13
Can be directly locked to the front wall portions 21 and 8 or the front wall portions 21 and 8 can be locked.
To the mesh member 27 through the lattice portion of the above.

【0086】(4)網部材27において、上下両枠柵1
9,6の前壁部21,8に対応する箇所を省略してもよ
い。この箇所では、網部材27がなくても、吹付け層3
1が前壁部21,8及び上下両緑化シート25,16に
付着して係留されるからである。
(4) In the net member 27, the upper and lower frame fences 1
The portions corresponding to the front wall portions 9 and 6 may be omitted. At this point, even if the net member 27 is not provided, the spray layer 3
1 is attached to the front wall portions 21 and 8 and the upper and lower greening sheets 25 and 16 and is moored.

【0087】(5)前記各実施形態において、重ねられ
る枠柵19,6の段の数を変更してもよい。1段の場
合、枠柵、強化シート、緑化シート等はそれぞれ1つに
なる。また、多数段にした場合、各前壁部21,8が底
部20,7となす傾斜角度を、1段毎にまたは複数段毎
に上段側ほど大きく設定することもできる。すなわち、
上側ほど前壁部21,8の傾斜を急峻にしてもよい。こ
のようにすると、盛土材10の荷重による圧力が大きな
下段側において前壁部21,8の傾斜角度が小さくな
り、同圧力に耐える強度が確保される。また、前記圧力
の小さな上段側ほど前壁部21,8の傾斜角度が大きく
なり、緑化構造物52の上面の有効面積が広がる。
(5) In each of the above embodiments, the number of steps of the frame fences 19 and 6 to be stacked may be changed. In the case of one stage, the number of frame fences, reinforcing sheets, greening sheets, etc. is one each. In the case of a plurality of stages, the inclination angle formed by the front walls 21 and 8 with the bottoms 20 and 7 can be set larger for each stage or for each of a plurality of stages toward the upper side. That is,
The inclination of the front wall portions 21 and 8 may be steeper toward the upper side. By doing so, the inclination angles of the front wall portions 21 and 8 become smaller on the lower side where the pressure due to the load of the embankment material 10 is large, and the strength to withstand the same pressure is secured. Further, the inclination angle of the front wall portions 21 and 8 becomes larger as the pressure becomes lower, so that the effective area of the upper surface of the greening structure 52 becomes larger.

【0088】(6)盛土材10からの圧力によって上下
両枠柵19,6が前方へ膨らむのを防ぐために、同枠柵
19,6を構成する鉄筋において特に強度の要求される
部分に、他よりも太い鉄筋を用いてもよい。また、剛性
の高い別の部材を添えて、枠柵19,6を補強してもよ
い。
(6) In order to prevent the upper and lower frame fences 19 and 6 from bulging forward due to the pressure from the embankment material 10, the reinforcing bars constituting the frame fences 19 and 6 need to have a particularly high strength. A thicker rebar may be used. Further, the frame fences 19 and 6 may be reinforced with another member having high rigidity.

【0089】(7)上下両強化シート17,5の後端部
をさらに後方へ延ばし、凹部2の内壁面4に杭等で固定
してもよい。このようにすれば、同強化シート17,5
に係止された枠柵19,6の移動を強力に防止すること
ができる。
(7) The rear ends of the upper and lower reinforcing sheets 17 and 5 may be further extended rearward and fixed to the inner wall surface 4 of the recess 2 with a pile or the like. By doing so, the reinforced sheets 17,5
It is possible to strongly prevent the movement of the frame fences 19 and 6 locked to the arm.

【0090】(8)前記各実施形態では説明を省略した
が、図10に示すように、枠柵19,6における前壁部
21,8の傾斜角度にかかわらず、同前壁部21,8及
び底部20,7をフック付き連結棒35、ターンバック
ル(図示略)等の連結手段によって連結することが重要
である。これは、前壁部21,8の強度を高め、盛土材
10の荷重によって比較的大きな力が加わっても、同前
壁部21,8が前方へ曲がるのを確実に阻止するためで
ある。
(8) Although not described in the above embodiments, as shown in FIG. 10, regardless of the inclination angles of the front walls 21, 8 of the frame fences 19, 6, the front walls 21, 8 are not required. It is important that the bottoms 20 and 7 are connected by connecting means such as a connecting rod 35 with a hook and a turnbuckle (not shown). This is to increase the strength of the front wall portions 21 and 8 and to reliably prevent the front wall portions 21 and 8 from bending forward even when a relatively large force is applied by the load of the embankment material 10.

【0091】(9)凹部2の内壁面4にアンカーを固定
し、そのアンカーと枠柵19,6とを連結部材によって
連結してもよい。アンカーの形状や長さは、岩盤法面1
に応じて適宜決定する。連結部材としては金属製のワイ
ヤ、金属製の鎖、合成樹脂製のロープ、ガラス繊維製の
ロープ等を用いることができる。
(9) An anchor may be fixed to the inner wall surface 4 of the recess 2 and the anchor and the frame fences 19 and 6 may be connected by a connecting member. The shape and length of the anchor is rock slope 1
Is appropriately determined according to the conditions. As the connecting member, a metal wire, a metal chain, a synthetic resin rope, a glass fiber rope, or the like can be used.

【0092】その一例を図12に示す。この例では、内
壁面4に多数の取付け穴36を縦横に間隔をおいてあ
け、各取付け穴36に金属棒等よりなるアンカー37を
挿入し、モルタル、接着剤、樹脂等の充填材38で固定
する。枠柵19,6を設置した後、これとアンカー37
とを連結部材39により連結する。詳しくは、連結部材
39はワイヤ40と、その両端に固定された二つのフッ
ク41,42とからなる。一方のフック41を上下両枠
柵19,6の鉄筋に引っ掛けるとともに、他方のフック
42をアンカー37に引っ掛ける。すると、上下両枠柵
19,6が連結部材39及びアンカー37によって内壁
面4に接続される。上下両枠柵19,6においてフック
41を引っ掛ける箇所は、底部20,7でも前壁部2
1,8でもよいが、前壁部21,8下部の横用鉄筋や底
部20,7の横用鉄筋が適当である。また、フック41
を引っ掛ける箇所の数は枠柵19,6毎に少なくとも2
箇所とするのが好ましい。
One example is shown in FIG. In this example, a number of mounting holes 36 are vertically and horizontally spaced on the inner wall surface 4, and an anchor 37 made of a metal rod or the like is inserted into each mounting hole 36, and a filler 38 such as mortar, adhesive, resin, or the like is used. Fix it. After the frame fences 19 and 6 have been installed,
Are connected by a connecting member 39. Specifically, the connecting member 39 includes a wire 40 and two hooks 41 and 42 fixed to both ends thereof. One hook 41 is hooked on the reinforcing bars of the upper and lower frame fences 19 and 6, and the other hook 42 is hooked on the anchor 37. Then, the upper and lower frame fences 19 and 6 are connected to the inner wall surface 4 by the connecting member 39 and the anchor 37. In the upper and lower fences 19 and 6, the hooks 41 are hooked on the bottom wall 20 and the front wall 2.
1, 8 may be used, but a horizontal reinforcing bar at the lower part of the front walls 21, 8 and a horizontal reinforcing bar at the bottoms 20, 7 are suitable. Also, hook 41
The number of places where hooks are hooked is at least 2
It is preferable to use a location.

【0093】このようにすれば、上下両枠柵19,6の
移動を確実に防止できる。盛土材10の奥行きを小さく
しても、アンカー37及び連結部材39によって岩盤5
1に係留された上下両枠柵19,6が盛土材10を抱持
し続けるので、その盛土材10が崩れるのを防止でき
る。
In this way, the movement of the upper and lower frame fences 19 and 6 can be reliably prevented. Even when the depth of the embankment material 10 is reduced, the rock 5
Since the upper and lower frame fences 19 and 6 moored at 1 continue to hold the embankment material 10, the embankment material 10 can be prevented from collapsing.

【0094】(10)上下両緑化シート25,16とし
て、前述した不織布以外の素材を用いてもよい。例え
ば、水溶性紙を用いたり、生分解性材料からなるシート
を用いたりできる。
(10) The upper and lower greening sheets 25 and 16 may be made of a material other than the nonwoven fabric described above. For example, water-soluble paper or a sheet made of a biodegradable material can be used.

【0095】(11)第4実施形態における土のう58
に代えて植生袋を用いてもよい。植生袋は、袋体内に堆
肥、肥料、改良土種子等を詰めたものである。
(11) Sandbag 58 in the fourth embodiment
A vegetation bag may be used instead. The vegetation bag is a bag in which compost, fertilizer, improved soil seeds and the like are packed.

【0096】(12)第1実施形態等における苗木29
に代えて、上部盛土層23に成木を植栽したり、ポット
苗を埋めたりしてもよい。
(12) Seedling 29 in First Embodiment, etc.
Instead, an adult tree may be planted in the upper embankment layer 23 or a pot seedling may be buried.

【0097】(13)縦用鉄筋56の上端部56cを、
前記各実施形態で説明した手段(斜め後ろ下方へ折返
す)以外の手段によって処理してもよい。例えば、図1
3に示すように、上端部56cの周りにコンクリート等
からなる縁石62を設けてもよい。
(13) The upper end 56c of the vertical reinforcing bar 56 is
The processing may be performed by means other than the means (turned obliquely rearward and downward) described in the above embodiments. For example, FIG.
As shown in FIG. 3, a curb 62 made of concrete or the like may be provided around the upper end 56c.

【0098】(14)第2実施形態において、岩盤法面
1の傾斜方向(縦方向X)に関し隣り合う凹部2同士を
連続して形成してもよい。この場合には、凹部2が階段
状に続くことになる。
(14) In the second embodiment, the concave portions 2 adjacent to each other in the inclination direction (vertical direction X) of the rock slope 1 may be formed continuously. In this case, the concave portion 2 continues in a stepwise manner.

【0099】(15)植物として樹木を採用する場合に
は、可食性の実がなる種類、例えば、通草(あけび)、
ぐみ、栗等の樹木を選択してもよい。
(15) When a tree is used as a plant, a variety of edible fruits, for example, weeding (akebi),
Trees such as chestnuts and chestnuts may be selected.

【0100】(16)盛土材10に植物を設ける方法と
しては、上述した苗木29を植栽する方法や、種子61
を含んだ土のう58を配置する方法以外にも、草本類や
木本類の種子を盛土材に蒔く方法(いわゆる播種工)を
採用してもよい。
(16) As a method of providing a plant on the embankment material 10, a method of planting the seedling 29 described above or a method of providing the seed 61
In addition to the method of arranging the sandbags 58 containing soybeans, a method of sowing seeds of herbs or woody plants on the embankment material (so-called sowing work) may be adopted.

【0101】(17)前記第1乃至第3実施形態におけ
る苗木29、及び第4実施形態における土のう58を省
略し、上部盛土層23に緑化用植物を設けないようにし
てもよい。
(17) The seedlings 29 in the first to third embodiments and the sandbag 58 in the fourth embodiment may be omitted, and the upper embankment layer 23 may not be provided with greening plants.

【0102】[0102]

【発明の効果】以上のように、第1の発明によれば、法
面、壁面等の保護対象面からの突出部分を少なくして良
好な景観を保つことができる、また、降雨等により盛土
材が流出したり、しみ込んだ水が排出されずに残って盛
土材が軟弱化したりするのを未然に防止できる。さら
に、緑化構造物を保護対象面の全面にわたって設ける場
合に比べて、施工に要するコストを低減し、施工期間を
短縮できる。
As described above, according to the first aspect of the present invention, it is possible to maintain a good landscape by reducing the protruding portions from the surface to be protected, such as a slope, a wall surface, and the like. The embankment material can be prevented from flowing out and the embankment material being softened due to the water soaked remaining without being discharged. Furthermore, compared with the case where the greening structure is provided over the entire surface to be protected, the cost required for construction can be reduced, and the construction period can be shortened.

【0103】第2の発明によれば、第1の発明の効果に
加え、生長する植物により凹部の内壁面を隠すととも
に、盛土材よりも上の空間を効果的に緑化することがで
きる。
According to the second aspect, in addition to the effect of the first aspect, the inner wall surface of the concave portion can be hidden by the growing plant, and the space above the embankment material can be effectively greened.

【0104】第3の発明によれば、保護対象面からの枠
柵の突出部分を極力少なくできるので、第1または2の
発明の効果を奏するうえで有効である。
According to the third aspect, the projecting portion of the frame fence from the surface to be protected can be minimized, which is effective in achieving the effects of the first or second aspect.

【0105】第4の発明によれば、第1乃至3のいずれ
か1つの発明の効果に加え、保護対象面を略均一に緑化
することができる。
According to the fourth aspect, in addition to the effects of any one of the first to third aspects, the surface to be protected can be greened substantially uniformly.

【0106】第5の発明は、第1または3の発明の効果
に加え、保護対象面の全面緑化を図るうえで有効であ
る。
The fifth invention is effective in achieving greening of the entire surface to be protected in addition to the effects of the first or third invention.

【0107】第6の発明によれば、第1,2,4,5の
いずれか1つの発明の効果に加え、盛土材の上面を緑化
だけでなくほかの用途にも利用することができる。特
に、遊歩道等の道路として利用する場合には、大きな効
果が得られる。
According to the sixth aspect, in addition to the effects of any one of the first, second, fourth and fifth aspects, the upper surface of the embankment material can be used not only for greening but also for other uses. In particular, when used as a road such as a promenade, a great effect can be obtained.

【0108】第7の発明によれば、第2または5の発明
の効果に加え、緑化構造物の構築後の比較的早期から緑
量を確保することができる。また、樹木による緑化は景
観向上を図るうえでも好ましい。
According to the seventh aspect, in addition to the effects of the second or fifth aspect, the amount of green can be secured relatively early after the construction of the green structure. In addition, tree planting is preferable for improving the landscape.

【0109】第8の発明によれば、第2または5の発明
の効果に加え、盛土材が雨等によって流出するのを防止
することができる。
According to the eighth aspect, in addition to the effects of the second or fifth aspects, the embankment material can be prevented from flowing out due to rain or the like.

【0110】第9の発明によれば、第8の発明の効果に
加え、不要となった土のうの袋体を時間の経過とともに
消失させることができる。袋体が残存することによる不
具合の発生を防止できる。
According to the ninth aspect, in addition to the effects of the eighth aspect, unnecessary bags of the sandbag can be eliminated with the passage of time. It is possible to prevent the occurrence of a problem due to the remaining bag.

【0111】第10の発明によれば、第1乃至9のいず
れか1つの発明の効果に加え、枠柵の棒状部材の端面が
盛土材から露出し、他の物や人に直接触れるのを未然に
防止することができる。
According to the tenth aspect, in addition to the effect of any one of the first to ninth aspects, the end surface of the bar-shaped member of the frame fence is exposed from the embankment material and directly touches another object or a person. It can be prevented beforehand.

【0112】第11の発明によれば、第1乃至10のい
ずれか1つの発明の効果に加え、少ない種類の枠柵で
も、種々の高さの緑化構造物を簡単に構築できる。従っ
て、大きさの異なる多種類の枠柵を準備しなくてもす
む。
According to the eleventh aspect, in addition to the effects of any one of the first to tenth aspects, a greening structure having various heights can be easily constructed even with a small number of types of frame fences. Therefore, it is not necessary to prepare various types of frame fences having different sizes.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明を具体化した第1実施形態における緑化
構造物を示す縦断面図である。
FIG. 1 is a longitudinal sectional view showing a greening structure according to a first embodiment of the present invention.

【図2】図1の緑化構造物の部分斜視図である。FIG. 2 is a partial perspective view of the greening structure of FIG.

【図3】複数の凹部が穿設された岩盤法面を示す部分斜
視図である。
FIG. 3 is a partial perspective view showing a rock slope having a plurality of recesses.

【図4】岩盤法面を緑化する工程を示す部分縦断面図で
ある。
FIG. 4 is a partial longitudinal sectional view showing a step of greening a rock slope.

【図5】同じく、岩盤法面を緑化する工程を示す部分縦
断面図である。
FIG. 5 is a partial longitudinal sectional view showing a step of greening a rock slope.

【図6】同じく、岩盤法面を緑化する工程を示す部分縦
断面図である。
FIG. 6 is a partial vertical sectional view showing a step of greening a rock slope.

【図7】同じく、岩盤法面を緑化する工程を示す部分縦
断面図である。
FIG. 7 is a partial longitudinal sectional view showing a step of greening a rock slope.

【図8】本発明を具体化した第2実施形態において、複
数の緑化構造物が構築された岩盤法面を示す部分斜視図
である。
FIG. 8 is a partial perspective view showing a rock slope on which a plurality of greening structures are constructed according to a second embodiment of the present invention.

【図9】本発明を具体化した第3実施形態における緑化
構造物の部分斜視図である。
FIG. 9 is a partial perspective view of a greening structure according to a third embodiment of the present invention.

【図10】図9の緑化構造物の縦断面図である。FIG. 10 is a longitudinal sectional view of the greening structure of FIG. 9;

【図11】本発明を具体化した第4実施形態における緑
化構造物の縦断面図である。
FIG. 11 is a longitudinal sectional view of a greening structure according to a fourth embodiment of the invention.

【図12】上下両枠柵を岩盤に係留した別の実施形態を
示す部分縦断面図である。
FIG. 12 is a partial vertical sectional view showing another embodiment in which both upper and lower frame fences are moored to rock.

【図13】前壁部の上端部を縁石によって処理した別の
実施形態を示す部分縦断面図である。
FIG. 13 is a partial longitudinal sectional view showing another embodiment in which the upper end of the front wall is treated with a curb.

【符号の説明】[Explanation of symbols]

1 保護対象面として岩盤法面 2 凹部 3 凹部の底面 5 下部強化シート 6 下部枠柵 7,20 底部 8,21 前壁部 10 盛土材 16 下部緑化シート 17 上部強化シート 19 上部枠柵 25 上部緑化シート 29 植物としての苗木 56 棒状部材としての縦用鉄筋 56c 上端部 58 土のう 59 袋体 61 種子 d1,d2,d3 間隔 X 傾斜方向としての縦方向 Y 幅方向としての横方向 DESCRIPTION OF SYMBOLS 1 Rock slope as a surface to be protected 2 Depression 3 Bottom of depression 5 Lower reinforcement sheet 6 Lower frame fence 7, 20 Bottom 8, 21 Front wall 10 Embankment material 16 Lower greening sheet 17 Upper reinforcement sheet 19 Upper frame fence 25 Upper greening Sheet 29 Sapling as a plant 56 Vertical reinforcing bar as a rod-like member 56c Upper end 58 Sandbag 59 Bag 61 Seeds d1, d2, d3 Interval X Vertical direction as tilt direction Y Horizontal direction as width direction

Claims (11)

【特許請求の範囲】[Claims] 【請求項1】 傾斜した法面、壁面等の保護対象面に設
けられた凹部と、略水平方向に延び、かつ前記凹部に載
置される底部、及びその底部の前端から略上方へ延びる
前壁部を有する格子状の枠柵と、 前記凹部内において前記枠柵の前壁部よりも後方の空間
に充填された盛土材と、 ジオテキスタイルからなり、前記凹部の底面及び盛土材
間に介在された強化シートと、 前記枠柵の前壁部及び盛土材間に介在された透水性を有
する緑化シートとを具備することを特徴とする法面、壁
面等の緑化構造。
1. A concave portion provided on a surface to be protected such as an inclined slope or a wall surface, a bottom portion extending in a substantially horizontal direction and placed in the concave portion, and a portion extending substantially upward from a front end of the bottom portion. A grid-shaped frame fence having a wall portion, an embankment material filled in a space behind the front wall portion of the frame fence in the recess, and a geotextile, which is interposed between the bottom surface of the recess and the embankment material. A green sheet having a water-permeable green sheet interposed between a front wall portion of the frame fence and an embankment material.
【請求項2】 前記盛土材の上部には緑化用の植物が設
けられていることを特徴とする請求項1に記載の法面、
壁面等の緑化構造。
2. The slope according to claim 1, wherein a plant for greening is provided above the embankment material.
Greening structures such as walls.
【請求項3】 前記枠柵の前壁部は、前記保護対象面に
沿って傾斜していることを特徴とする請求項1または2
に記載の法面、壁面等の緑化構造。
3. The front wall of the frame fence is inclined along the surface to be protected.
Greening structure such as slopes and walls described in 1.
【請求項4】 前記凹部は、前記保護対象面の複数箇所
において、隣り合う凹部との間隔が略一定となる位置に
設けられていることを特徴とする請求項1乃至3のいず
れか1つに記載の法面、壁面等の緑化構造。
4. The device according to claim 1, wherein the recess is provided at a plurality of locations on the surface to be protected, at a position where an interval between adjacent recesses is substantially constant. Greening structure such as slopes and walls described in 1.
【請求項5】 前記凹部は前記保護対象面の傾斜方向に
沿う複数箇所において、隣り合う凹部との間隔が略一定
となる位置に設けられ、かつ、前記保護対象面の幅方向
に沿って延びており、前記枠柵、盛土材、強化シート及
び緑化シートは前記凹部の略全長にわたって配置され、
さらに盛土材には、前記幅方向に沿って複数の植物が配
置されていることを特徴とする請求項1または3に記載
の法面、壁面等の緑化構造。
5. The concave portion is provided at a plurality of positions along an inclination direction of the surface to be protected, at a position where an interval between adjacent concave portions is substantially constant, and extends along a width direction of the surface to be protected. The frame fence, embankment material, reinforcing sheet and greening sheet are arranged over substantially the entire length of the recess,
The greening structure such as a slope or a wall according to claim 1, wherein a plurality of plants are arranged on the embankment material along the width direction.
【請求項6】 前記枠柵の前壁部は略垂直方向へ延びて
いることを特徴とする請求項1,2,4,5のいずれか
1つに記載の法面、壁面等の緑化構造。
6. The greening structure of a slope, a wall, or the like according to claim 1, wherein a front wall portion of the frame fence extends in a substantially vertical direction. .
【請求項7】 前記植物は、前記盛土材の上部に植栽さ
れた苗木が生長したものであることを特徴とする請求項
2または5に記載の法面、壁面等の緑化構造。
7. The greening structure as claimed in claim 2, wherein the plant is obtained by growing a seedling planted above the embankment material.
【請求項8】 前記植物は、前記盛土材の上部に配置さ
れた土のう内の種子が発芽し生長したものであることを
特徴とする請求項2または5に記載の法面、壁面等の緑
化構造。
8. The greening of a slope, a wall surface, and the like according to claim 2, wherein the plant is a seed that germinates and grows in a soil sac disposed above the embankment material. Construction.
【請求項9】 前記土のうの袋体は生分解性材料により
形成されていることを特徴とする請求項8に記載の法
面、壁面等の緑化構造。
9. The greening structure for slopes, walls, etc. according to claim 8, wherein the bag of the sandbag is formed of a biodegradable material.
【請求項10】 前記枠柵の前壁部は、前記底部の前端
から略上方へ延びる棒状部材を備えており、その棒状部
材の上端部は下方へ向けて折返されていることを特徴と
する請求項1乃至9のいずれか1つに記載の法面、壁面
等の緑化構造。
10. A front wall portion of the frame fence includes a rod-like member extending substantially upward from a front end of the bottom portion, and an upper end of the rod-like member is folded downward. A greening structure such as a slope or a wall according to any one of claims 1 to 9.
【請求項11】 前記枠柵、盛土材、強化シート及び緑
化シートにより1つの段が構成され、この段が前記凹部
に複数積層されていることを特徴とする請求項1乃至1
0のいずれか1つに記載の法面、壁面等の緑化構造。
11. A step is constituted by the frame fence, the embankment material, the reinforcing sheet and the greening sheet, and a plurality of steps are stacked in the recess.
0. A greening structure such as a slope or a wall according to any one of 0.
JP36258497A 1997-02-03 1997-12-11 Greening structures such as slopes and walls Expired - Fee Related JP3720969B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP36258497A JP3720969B2 (en) 1997-02-03 1997-12-11 Greening structures such as slopes and walls

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP3562597 1997-02-03
JP9-35625 1997-02-03
JP36258497A JP3720969B2 (en) 1997-02-03 1997-12-11 Greening structures such as slopes and walls

Publications (2)

Publication Number Publication Date
JPH10273916A true JPH10273916A (en) 1998-10-13
JP3720969B2 JP3720969B2 (en) 2005-11-30

Family

ID=26374608

Family Applications (1)

Application Number Title Priority Date Filing Date
JP36258497A Expired - Fee Related JP3720969B2 (en) 1997-02-03 1997-12-11 Greening structures such as slopes and walls

Country Status (1)

Country Link
JP (1) JP3720969B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107354911A (en) * 2017-08-31 2017-11-17 郑州大学 A kind of ecological flexible geogrid reinforcement Wharf Construction method
JP2019190096A (en) * 2018-04-24 2019-10-31 新東化成株式会社 Earth retaining member, earth retaining member installation method
JP7109840B1 (en) * 2022-03-02 2022-08-01 株式会社水戸グリーンサービス Embankment reinforced wall and construction method of embankment reinforced wall
CN115573361A (en) * 2022-11-22 2023-01-06 中国有色金属工业昆明勘察设计研究院有限公司 Rainwater collection surface construction method for ecological restoration of high and steep slope in high and cold area

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107354911A (en) * 2017-08-31 2017-11-17 郑州大学 A kind of ecological flexible geogrid reinforcement Wharf Construction method
CN107354911B (en) * 2017-08-31 2023-09-29 郑州大学 Construction method for ecological flexible geogrid reinforced wharf
JP2019190096A (en) * 2018-04-24 2019-10-31 新東化成株式会社 Earth retaining member, earth retaining member installation method
JP7109840B1 (en) * 2022-03-02 2022-08-01 株式会社水戸グリーンサービス Embankment reinforced wall and construction method of embankment reinforced wall
CN115573361A (en) * 2022-11-22 2023-01-06 中国有色金属工业昆明勘察设计研究院有限公司 Rainwater collection surface construction method for ecological restoration of high and steep slope in high and cold area

Also Published As

Publication number Publication date
JP3720969B2 (en) 2005-11-30

Similar Documents

Publication Publication Date Title
KR100920027B1 (en) Vegetation Method Reinforced Soil Slopes with Geotextile Curtain Wall combined with steel buckel and anchor Nails
GB2332353A (en) A biodegradable mat
KR100830150B1 (en) Inclined plane greening method and tree planting device for the method
KR200451156Y1 (en) Vegetation double structure
SK50582008A3 (en) Vegetation roof, especially inclined and method of her production
JPH11323943A (en) Protective afforesting structure of slope face, wall surface and shore surface
JPH0941384A (en) Method of reinforcing and greening construction of face of slope and bag body thereof
JP6694889B2 (en) It is an impervious body, specifically a dike
JP3720969B2 (en) Greening structures such as slopes and walls
KR100621174B1 (en) Net for afforestation
JP5421047B2 (en) Ground surface protection material and ground surface protection structure
JP3431783B2 (en) Protection structure for slopes and walls
KR101031370B1 (en) slope face protection engineering method with corn fabric vegetation mat
JP4220613B2 (en) Protective greening structure on slopes, walls, shores
JP3601947B2 (en) Vegetation
JP2002339335A (en) Vegetation mat for revetment work by reinforced earth and its working method
JP3740341B2 (en) Protective greening structure on slopes, walls, shores, etc.
JPS60188532A (en) Sheathing device of slope
JP2865624B2 (en) Slope protection greening structure
JP3262719B2 (en) Revegetation method of hard slope and fences used for it
KR102326713B1 (en) Vegetation Porous Block Structure using Bonded Non-Woven Fabric and Construction Method thereof
KR200324758Y1 (en) Net for afforestation
JP5699291B2 (en) Vegetation method
JP2005200953A (en) Slope face seeding and planting retaining wall structure
EP3303708A1 (en) Method for inserting fibers into a substrate

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050428

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050517

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050615

RD02 Notification of acceptance of power of attorney

Effective date: 20050615

Free format text: JAPANESE INTERMEDIATE CODE: A7422

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Effective date: 20050830

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Effective date: 20050909

Free format text: JAPANESE INTERMEDIATE CODE: A61

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080916

Year of fee payment: 3

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090916

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 4

Free format text: PAYMENT UNTIL: 20090916

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 5

Free format text: PAYMENT UNTIL: 20100916

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 5

Free format text: PAYMENT UNTIL: 20100916

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 6

Free format text: PAYMENT UNTIL: 20110916

LAPS Cancellation because of no payment of annual fees