JPH1010165A - Demand monitor - Google Patents

Demand monitor

Info

Publication number
JPH1010165A
JPH1010165A JP8165782A JP16578296A JPH1010165A JP H1010165 A JPH1010165 A JP H1010165A JP 8165782 A JP8165782 A JP 8165782A JP 16578296 A JP16578296 A JP 16578296A JP H1010165 A JPH1010165 A JP H1010165A
Authority
JP
Japan
Prior art keywords
power
pulse
input
predicted
calculating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP8165782A
Other languages
Japanese (ja)
Other versions
JP3816582B2 (en
Inventor
Kenji Ozeki
顕治 大関
Takayuki Shimizu
隆行 清水
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Toshiba Information and Control Systems Corp
Original Assignee
Toshiba Corp
Toshiba Information and Control Systems Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Toshiba Information and Control Systems Corp filed Critical Toshiba Corp
Priority to JP16578296A priority Critical patent/JP3816582B2/en
Publication of JPH1010165A publication Critical patent/JPH1010165A/en
Application granted granted Critical
Publication of JP3816582B2 publication Critical patent/JP3816582B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

PROBLEM TO BE SOLVED: To prevent the delivery of an unnecessary control output, e.g. an alarm, by processing a sampling period having no input of power pulse as an average at a moment of time having an input of power pulse. SOLUTION: An input period operating unit 7 decides whether a pulse is inputted from a power pulse input unit 1 during a sampling period inputted from a sampling period setting unit 2 and accumulates the time elapsed after previous detection it no pulse is inputted. Upon receiving a trigger signal from the unit 7, a pulse power operating unit 3 operates an electric energy based on the number of pulses during the pulse input period and the pulse rate and delivers the electric energy thus operated to a predicted power operating unit 4. In the unit 4, an electric energy predicted by the unit 3 is presented, along with a consumed electric energy, on a current and predicted power display 5. When the unit 4 decides that the predicted electric power possibly exceeds a contract demand, a control output unit 6 delivers an output, e.g. an alarm.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は電力管理に用いられ
るデマンド監視装置に関する。
The present invention relates to a demand monitoring device used for power management.

【0002】[0002]

【従来の技術】電力会社と使用電力量を契約した需要家
においては、デマンド時間毎の平均使用電力量が契約電
力量を超過することを防止するため、電力会社より渡さ
れる電力パルスからサンプリング時間毎に予測電力量を
演算し、デマンド監視を行っている。
2. Description of the Related Art In order to prevent an average power consumption per demand time from exceeding a contract power consumption, a customer who has contracted a power consumption with a power company has a sampling time from a power pulse delivered from the power company. The demand power is monitored by calculating the predicted electric energy for each time.

【0003】図4はかかる従来の電力管理に用いられる
デマンド監視装置の主要部を示すブロック構成図であ
る。図4に示すように電力会社より渡される電力パルス
は、電力パルス入力装置1に入力され、この電力パルス
を取込んでサンプリング周期設定装置2によって設定さ
れたサンプリング周期毎にパルス電力演算装置3により
演算して使用電力量を求め、この使用電力量をもとに予
測電力演算装置4によりデマンド開始からの使用電力量
の実績値とサンプリング周期内に使用した電力量から予
測演算を行って次のサンプリング周期までの予測電力量
を求めている。そして、この予測電力演算装置4で求め
られた予測電力量は現在の使用電力量と共に、現在及び
予測電力表示装置5に表示され、また予測電力演算装置
4で予測電力量が契約電力量を超過する恐れがあると判
断された場合には制御出力装置6により警報等の出力が
送出される。
FIG. 4 is a block diagram showing a main part of a conventional demand monitoring apparatus used for power management. As shown in FIG. 4, a power pulse delivered from a power company is input to a power pulse input device 1, which takes in the power pulse and outputs the power pulse by a pulse power calculating device 3 for each sampling cycle set by a sampling cycle setting device 2. The power consumption is obtained by calculation, and based on this power consumption, the predicted power calculation device 4 performs a prediction calculation from the actual value of the power consumption from the start of demand and the power used within the sampling period, and performs the following calculation. The predicted power amount up to the sampling period is obtained. The predicted power calculated by the predicted power calculator 4 is displayed on the current and predicted power display 5 together with the current power consumption, and the predicted power calculated by the predicted power calculator 4 exceeds the contracted power. When it is determined that there is a risk of the occurrence of an alarm, an output such as an alarm is sent out by the control output device 6.

【0004】[0004]

【発明が解決しようとする課題】しかし、このような構
成のデマンド監視装置において、パルス電力演算装置3
により使用電力量を求める場合、サンプリング周期内の
電力量をパルス数に1パルス当りの重みを乗算して求め
ているが、この1パルス当りの重み(パルスレート)が
大きいと数回のサンプリング周期の間パルス入力がなく
なり、その後に大きな電力使用量としてパルスが入力さ
れるため、パルスが入力される度に契約電力量を超過す
る恐れがあると判断され、警報等の制御出力が送出され
ることがあった。
However, in the demand monitoring device having such a configuration, the pulse power calculation device 3 is required.
Is calculated by multiplying the amount of power in the sampling period by the weight per pulse, but when the weight per pulse (pulse rate) is large, several sampling periods are used. During this time, there is no pulse input, and then a pulse is input as a large amount of power consumption. Therefore, each time a pulse is input, it is determined that there is a risk of exceeding the contracted power amount, and a control output such as an alarm is transmitted There was something.

【0005】本発明は上記のような問題点を解消するた
めなされたもので、電力パルスのパルスレートが大きい
ときでも、不必要な警報等の制御出力の送出を防止で
き、且つきめ細かく使用電力量を求めることができるデ
マンド監視装置を提供することを目的とする。
The present invention has been made to solve the above problems, and can prevent unnecessary output of control output such as an alarm even when the pulse rate of a power pulse is high, and can provide a finely detailed power consumption. It is an object of the present invention to provide a demand monitoring device capable of determining the demand.

【0006】[0006]

【課題を解決するための手段】本発明は上記のような目
的を達成するため、次のような手段によりデマンド監視
装置を構成するものである。請求項1に対応する発明
は、電力会社より渡される電力パルスが入力される電力
パルス入力手段と、電力会社と契約する受電電力を越え
ないように電力量を予測演算するための時間間隔を設定
するサンプリング周期設定手段と、このサンプリング周
期設定手段によって設定されたサンプリング周期毎に前
記電力パルス入力手段より入力される電力パルスの有無
を検出して電力パルスが入力されてから次の電力パルス
が入力されるまでのパルス入力周期を演算する入力周期
演算手段と、この入力周期演算手段によって演算された
パルス入力周期の間に前記電力パルス入力手段から入力
されたパルス数を演算するパルス電力演算手段と、前記
入力周期演算手段によって演算されたパルス入力周期と
前記パルス電力演算手段によってパルス入力周期の間に
使用した電力量から予測電力を演算する予測電力演算手
段と、この予測電力演算手段によって演算された予測値
と現在の使用電力量を表示する現在及び予測電力表示手
段と、前記予測電力演算手段により契約電力を超過又は
超過する恐れがあると判定されると警報等の制御出力を
送出する制御出力手段とを備える構成とする。
According to the present invention, in order to achieve the above object, a demand monitoring device is constituted by the following means. According to the first aspect of the present invention, a power pulse input unit to which a power pulse delivered from a power company is input and a time interval for predicting and calculating a power amount so as not to exceed a received power contracted with the power company are set. A sampling cycle setting means for detecting the presence or absence of a power pulse input from the power pulse input means for each sampling cycle set by the sampling cycle setting means, and inputting the next power pulse after the power pulse is input Input cycle calculating means for calculating a pulse input cycle until the input is performed, and pulse power calculating means for calculating the number of pulses input from the power pulse input means during the pulse input cycle calculated by the input cycle calculating means. The pulse input cycle calculated by the input cycle calculating means and the pulse input cycle calculated by the pulse power calculating means. Predicted power calculation means for calculating predicted power from the power amount used in between, current and predicted power display means for displaying the predicted value calculated by the predicted power calculation means and the current power consumption, and the predicted power calculation Control output means for transmitting a control output such as an alarm when it is determined that the contract power exceeds or may exceed the contract power.

【0007】従って、請求項1に対応する発明のデマン
ド監視装置にあっては、入力周期演算手段によるサンプ
リング周期を可変にし、電力会社より渡される電力パル
スの入力のないサンプリング周期分は電力パルスの入力
があった時点での平均として処理されるので、電力パル
スのパルスレートが大きいときでも不必要な警報等の制
御出力の送出が防止できる。
Therefore, in the demand monitoring apparatus according to the present invention, the sampling cycle by the input cycle calculating means is made variable, and the sampling cycle without the input of the power pulse passed from the power company corresponds to the power pulse. Since the processing is performed as an average at the time of input, unnecessary transmission of a control output such as an alarm can be prevented even when the pulse rate of the power pulse is high.

【0008】請求項2に対応する発明は、請求項1記載
のデマンド監視装置において、使用電力がアナログ値と
して入力される電力値入力手段と、この電力値入力手段
によって入力された電力値をサンプリング周期設定手段
によって設定時間毎に積算処理して電力量を演算する積
算電力演算手段と、この積算電力演算手段の予測積算電
力から仮の予測電力演算を行う仮予測電力演算手段とを
設け、電力パルス入力手段よりサンプリング周期設定手
段によって設定された時間間隔に電力パルスが入力され
ない場合でも、詳細な予測演算を可能とする。
According to a second aspect of the present invention, in the demand monitoring device according to the first aspect, a power value input means for inputting the power consumption as an analog value and a power value input by the power value input means are sampled. An integrated power calculating means for calculating an electric energy by performing an integration process for each set time by a cycle setting means; and a tentative predicted power calculating means for performing a tentative predicted power calculation from the predicted integrated power of the integrated power calculating means. Even when the power pulse is not input from the pulse input unit at the time interval set by the sampling cycle setting unit, a detailed prediction operation can be performed.

【0009】従って、請求項2に対応する発明のデマン
ド監視装置にあっては、電力値入力手段によって電力値
を入力し、積算電力演算手段によって使用電力を求め、
電力会社より渡される電力パルスの入力がないサンプリ
ング周期分の電力として仮予測電力演算手段により予測
演算を行うことにより、必要のない制御出力を抑えると
共に、より細かい制御を実現することが可能となる。
Therefore, in the demand monitoring device according to the present invention, a power value is input by the power value input means, and the used power is obtained by the integrated power calculation means.
By performing the prediction calculation by the provisional prediction power calculation means as the power for the sampling period without the input of the power pulse passed from the power company, unnecessary control output can be suppressed, and finer control can be realized. .

【0010】[0010]

【発明の実施の形態】以下本発明の実施の形態を図面を
参照して説明する。図1は本発明によるデマンド監視装
置の第1の実施の形態を示すブロック構成図で、図4と
同一部分には同一符号を付して説明する。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a block diagram showing a first embodiment of a demand monitoring device according to the present invention. The same parts as those in FIG.

【0011】図1において、1は電力会社より渡される
電力パルスが入力される電力パルス入力装置、2は電力
会社と契約する受電電力を越えないように電力量を予測
演算するための時間間隔を設定するサンプリング周期設
定装置、7はこのサンプリング周期設定装置2によって
設定されたサンプリング周期毎に電力パルス入力装置1
より入力される電力パルスの有無を検出して電力パルス
が入力されてから次の電力パルスが入力されるまでのパ
ルス入力周期を演算する入力周期演算装置である。
In FIG. 1, 1 is a power pulse input device to which a power pulse delivered from a power company is input, and 2 is a time interval for predicting and calculating a power amount so as not to exceed a received power contracted with the power company. The sampling period setting device 7 to be set is a power pulse input device 1 for each sampling period set by the sampling period setting device 2.
An input period calculating device detects the presence or absence of an input power pulse and calculates a pulse input period from the input of the power pulse to the input of the next power pulse.

【0012】また、3はこの入力周期演算装置7によっ
て演算されたパルス入力周期間に電力パルス入力装置1
から入力されたパルス数を演算するパルス電力演算装
置、4は入力周期演算装置7によって演算されたパルス
入力周期とパルス電力演算装置3によってパルス入力周
期間に使用した電力量から予測電力量を演算する予測電
力演算装置である。
Reference numeral 3 denotes a power pulse input device 1 during a pulse input period calculated by the input period calculation device 7.
A pulse power calculator 4 for calculating the number of pulses input from the PDP, 4 calculates a predicted power amount from the pulse input period calculated by the input period calculator 7 and the power amount used during the pulse input period by the pulse power calculator 3. Is a predicted power calculation device.

【0013】さらに、5はこの予測電力演算装置4によ
って演算された予測値と現在の電力量を表示する現在及
び予測電力表示装置、6は予測電力演算装置4により契
約電力量を超過する恐れがあると判定されると警報等の
制御出力を送出する制御出力装置である。
Further, 5 is a current and predicted power display device for displaying the predicted value calculated by the predicted power calculation device 4 and the current power amount, and 6 is a possibility that the predicted power calculation device 4 will exceed the contracted power amount. This is a control output device that sends out a control output such as an alarm when it is determined that there is an alarm.

【0014】次に上記のように構成されたデマンド監視
装置の作用を図2に示すタイムチャートにより説明す
る。いま、電力パルス入力装置1に電力会社より渡され
る電力パルスが入力されているものとする。また、サン
プリング周期設定装置2より予め設定されたサンプリン
グ周期(T)でサンプリング信号が出力されているもの
とする。
Next, the operation of the demand monitoring apparatus configured as described above will be described with reference to a time chart shown in FIG. Now, it is assumed that a power pulse passed from a power company is input to the power pulse input device 1. It is also assumed that the sampling signal is output from the sampling period setting device 2 at a preset sampling period (T).

【0015】このとき、入力周期演算装置7はサンプリ
ング周期設定装置2より入力されたサンプリング周期
(T)の間に電力パルス入力装置1からパルス入力があ
るかどうかを検出し、パルス入力の検出がなければ前回
検出してからの経過時間を積算する。また、パルス入力
を検出すると、パルス電力演算装置3にトリガ信号を出
力し、予測電力演算装置4にパルス入力の検出があった
ときの経過時間であるパルス入力周期T´を予測電力演
算装置4に出力する。
At this time, the input cycle calculating device 7 detects whether or not there is a pulse input from the power pulse input device 1 during the sampling cycle (T) input from the sampling cycle setting device 2, and detects the pulse input. If not, the elapsed time from the previous detection is integrated. Further, when the pulse input is detected, a trigger signal is output to the pulse power calculation device 3, and the pulse input period T ′, which is the elapsed time when the predicted power calculation device 4 detects the pulse input, is calculated. Output to

【0016】一方、入力周期演算装置7よりパルス電力
演算装置3にトリガ信号が与えられると、このパルス電
力演算装置3はパルス入力周期T´の間のパルス数とパ
ルスレートから電力量を演算し、予測電力演算装置4に
受け渡す。この予測電力演算装置4では、パルス入力周
期T´を従来のサンプリング周期間の電力量と置換え、
従来通りの演算で予測演算を行う。
On the other hand, when a trigger signal is given from the input period calculating device 7 to the pulse power calculating device 3, the pulse power calculating device 3 calculates the power amount from the number of pulses and the pulse rate during the pulse input period T '. To the predicted power calculation device 4. In the predicted power calculation device 4, the pulse input period T ′ is replaced with the power amount during the conventional sampling period,
The prediction calculation is performed by the conventional calculation.

【0017】このようにして予測電力演算装置4では、
パルス電力演算装置3により求められた予測電力量は使
用電力量と共に、現在及び予測電力表示装置5に表示さ
れ、また予測電力演算装置4により予測電力量が契約電
力量を超過する恐れがあると判断された場合には制御出
力装置6により警報等の出力が送出される。
As described above, in the predicted power calculation device 4,
The predicted power amount obtained by the pulse power calculation device 3 is displayed on the current and predicted power display devices 5 together with the used power amount, and the predicted power amount may exceed the contract power amount by the predicted power calculation device 4. When it is determined, an output such as a warning is sent out by the control output device 6.

【0018】従って、上述した第1の実施の形態によれ
ば、入力される電力パルスによって予測演算の演算周期
を可変にしているため、電力パルスのパルスレートが大
きいときでも不必要に警報等の制御出力が出されるよう
なことがなくなる。
Therefore, according to the above-described first embodiment, the operation cycle of the prediction operation is made variable by the input power pulse, so that even when the pulse rate of the power pulse is high, an alarm or the like is unnecessary. No control output is generated.

【0019】即ち、図2に示す予測電力量の推移からも
分かるように、従来のパルス入力のみの演算では、サン
プリング周期Tの間にパルス入力がないときに電力を使
用しているのか、使用していないのかかが分からず、次
にパルスが入ったときに短時間で大きな電力を使用して
いるような電力計算になることがあったが、上記第1の
実施の形態ではパルス入力がないときは前回の電力値を
用いた予測計算を行って、次に電力パルスが入るときま
で計算値による予測を行い、電力パルスが入ったときは
前回パルスが入った周期からの時間での平均電力を求め
て実測値による予測計算に更新するようにしているの
で、電力パルスのパルスレートが大きいときでも不必要
に警報等の制御出力が出されるようなことがなくなる。
That is, as can be seen from the transition of the predicted power amount shown in FIG. 2, in the conventional calculation using only the pulse input, whether the power is used when there is no pulse input during the sampling period T or not. Although it is not known whether or not the power is being calculated, the power calculation may be such that a large amount of power is used in a short time when the next pulse is input. However, in the first embodiment, the pulse input is not performed. When there is no power, the prediction calculation using the previous power value is performed, and the prediction is performed using the calculated value until the next power pulse is input. Since the power is obtained and updated to the prediction calculation based on the actually measured value, a control output such as an alarm is not generated unnecessarily even when the pulse rate of the power pulse is high.

【0020】図3は本発明によるデマンド監視装置の第
2の実施の形態を示すブロック構成図であり、図1と同
一部分には同一符号を付してその説明を省略し、ここで
は異なる点についてのみ述べる。
FIG. 3 is a block diagram showing a second embodiment of the demand monitoring apparatus according to the present invention. The same parts as those in FIG. 1 are denoted by the same reference numerals, and the description thereof will be omitted. Is described only.

【0021】第2の実施の形態では、図3に示すように
入力周期演算装置7より出力されるトリガにより可変さ
れるパルス入力周期T´の間に需要家で使用されている
電力を図示しない測定器によりアナログ値として電力値
入力装置8に取込んで、この電力値入力装置8より積算
電力演算装置9にアナログ値である電力値を入力し、こ
の積算電力演算装置9によりサンプリング周期設定装置
2によって設定時間毎に積算処理して電力量を演算し、
この積算電力量を仮予測電力演算装置10に入力して予
測演算を行うようにしたものである。
In the second embodiment, as shown in FIG. 3, the power used by the customer during the pulse input period T 'which is changed by the trigger output from the input period calculation device 7 is not shown. The power is input to the power value input device 8 as an analog value by a measuring device, and the power value which is an analog value is input from the power value input device 8 to the integrated power calculation device 9. 2 to calculate the amount of electric power by performing integration processing for each set time,
The integrated power amount is input to the temporary predicted power calculation device 10 to perform a prediction calculation.

【0022】このような構成のデマンド監視装置におい
て、電力値入力装置8により電力パルスとは別に実際に
測定された電力値をアナログデータとして入力し、積算
電力演算装置9によってサンプリング周期設定装置2に
よって設定されたサンプリング周期Tの間積算処理して
サンプリング周期内の使用電力量を演算する。この積算
電力演算装置9によって演算された使用電力量は、仮予
測電力演算装置10により予測電力演算装置4と同様に
予測演算される。
In the demand monitoring device having such a configuration, the actually measured power value is inputted as analog data separately from the power pulse by the power value input device 8, and the integrated power calculation device 9 causes the sampling period setting device 2 to input the measured power value. The integration processing is performed during the set sampling period T to calculate the amount of electric power used in the sampling period. The used power amount calculated by the integrated power calculation device 9 is predicted and calculated by the provisional predicted power calculation device 10 in the same manner as the predicted power calculation device 4.

【0023】この場合、予測電力演算装置4は第1の実
施の形態で示したように電力会社から渡される電力パル
スを元に演算しているため、パルス入力周期毎に演算さ
れた結果を正とし、現在及び予測電力表示装置5での表
示はパルス入力周期毎に再表示される。
In this case, as shown in the first embodiment, the predicted power calculating device 4 calculates based on the power pulse delivered from the power company, so that the calculated result is corrected every pulse input cycle. The display on the current and predicted power display device 5 is redisplayed every pulse input cycle.

【0024】このように第2の実施の形態によれば、電
力会社から渡される電力パルスが入力されない間は実際
に測定されたアナログ値の電力値を使用して予測演算す
るようにしたので、より細かい制御が可能である。
As described above, according to the second embodiment, while the power pulse delivered from the power company is not input, the prediction operation is performed using the actually measured power value of the analog value. Finer control is possible.

【0025】[0025]

【発明の効果】以上述べたように本発明によれば、電力
パルスのパルスレートが大きいときでも、不必要な警報
等の制御出力の送出を防止でき、且つきめ細かく使用電
力値を求めることができるデマンド監視装置を提供でき
る。
As described above, according to the present invention, even when the pulse rate of the power pulse is high, it is possible to prevent unnecessary output of a control output such as an alarm and to obtain a finely used power value. A demand monitoring device can be provided.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明によるデマンド監視装置の第1の実施の
形態を示すブロック構成図。
FIG. 1 is a block diagram showing a first embodiment of a demand monitoring device according to the present invention.

【図2】同実施の形態における作用を説明するためのタ
イムチャート。
FIG. 2 is a time chart for explaining an operation in the embodiment.

【図3】本発明によるデマンド監視装置の第2の実施の
形態を示すブロック構成図。
FIG. 3 is a block diagram showing a second embodiment of the demand monitoring device according to the present invention.

【図4】従来のデマンド監視装置の代表例を示すブロッ
ク構成図。
FIG. 4 is a block diagram showing a typical example of a conventional demand monitoring device.

【符号の説明】[Explanation of symbols]

1……電力パスル入力装置 2……サンプリング周期設定装置 3……パルス電力演算装置 4……予測電力演算装置 5……現在及び予測電力表示装置 6……制御出力装置 7……入力周期演算装置 8……電力値入力装置 9……積算電力演算装置 10……仮予測電力演算装置 DESCRIPTION OF SYMBOLS 1 ... Power pulse input device 2 ... Sampling period setting device 3 ... Pulse power calculation device 4 ... Predicted power calculation device 5 ... Current and predicted power display device 6 ... Control output device 7 ... Input cycle calculation device 8 Power value input device 9 Integrated power calculation device 10 Temporary predicted power calculation device

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 電力会社より渡される電力パルスが入力
される電力パルス入力手段と、電力会社と契約する受電
電力を越えないように電力量を予測演算するための時間
間隔を設定するサンプリング周期設定手段と、このサン
プリング周期設定手段によって設定されたサンプリング
周期毎に前記電力パルス入力手段より入力される電力パ
ルスの有無を検出して電力パルスが入力されてから次の
電力パルスが入力されるまでのパルス入力周期を演算す
る入力周期演算手段と、この入力周期演算手段によって
演算されたパルス入力周期の間に前記電力パルス入力手
段から入力されたパルス数を演算するパルス電力演算手
段と、前記入力周期演算手段によって演算されたパルス
入力周期と前記パルス電力演算手段によってパルス入力
周期の間に使用した電力量から予測電力を演算する予測
電力演算手段と、この予測電力演算手段によって演算さ
れた予測値と現在の電力を表示する現在及び予測電力表
示手段と、前記予測電力演算手段により契約電力を超過
又は超過する恐れがあると判定されると警報等の制御出
力を送出する制御出力手段とを備えたことを特徴とする
デマンド監視装置。
1. A power pulse input means for inputting a power pulse delivered from a power company, and a sampling period setting for setting a time interval for predicting and calculating a power amount so as not to exceed a received power contracted with the power company. Means for detecting the presence or absence of a power pulse input from the power pulse input means at each sampling cycle set by the sampling cycle setting means, from when a power pulse is input to when the next power pulse is input. Input cycle calculating means for calculating a pulse input cycle; pulse power calculating means for calculating the number of pulses input from the power pulse input means during the pulse input cycle calculated by the input cycle calculating means; Used between the pulse input cycle calculated by the calculating means and the pulse input cycle by the pulse power calculating means. Predicted power calculation means for calculating predicted power from the power amount; current and predicted power display means for displaying the predicted value calculated by the predicted power calculation means and current power; and the contracted power being exceeded by the predicted power calculation means. Or a control output means for transmitting a control output such as an alarm when it is determined that there is a possibility of exceeding the demand.
【請求項2】 請求項1記載のデマンド監視装置におい
て、使用電力がアナログ値として入力される電力値入力
手段と、この電力値入力手段によって入力された電力値
をサンプリング周期設定手段によって設定された周期毎
に積算処理して電力量を演算する積算電力演算手段と、
この積算電力演算手段の予測積算電力から仮の予測電力
演算を行う仮予測電力演算手段とを設け、電力パルス入
力手段よりサンプリング周期設定手段によって設定され
た周期に電力パルスが入力されない場合でも、詳細な予
測演算を可能としたことを特徴とするデマンド監視装
置。
2. The demand monitoring device according to claim 1, wherein the power value input means for inputting the power consumption as an analog value, and the power value input by the power value input means is set by a sampling cycle setting means. Integrated power calculation means for calculating the amount of power by performing integration processing for each cycle;
Provisional predicted power calculation means for performing a provisional predicted power calculation from the predicted integrated power of the integrated power calculation means, wherein even if a power pulse is not input in the cycle set by the sampling cycle setting means from the power pulse input means, A demand monitoring device characterized in that a simple prediction calculation is enabled.
JP16578296A 1996-06-26 1996-06-26 Demand monitoring device Expired - Fee Related JP3816582B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16578296A JP3816582B2 (en) 1996-06-26 1996-06-26 Demand monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16578296A JP3816582B2 (en) 1996-06-26 1996-06-26 Demand monitoring device

Publications (2)

Publication Number Publication Date
JPH1010165A true JPH1010165A (en) 1998-01-16
JP3816582B2 JP3816582B2 (en) 2006-08-30

Family

ID=15818917

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16578296A Expired - Fee Related JP3816582B2 (en) 1996-06-26 1996-06-26 Demand monitoring device

Country Status (1)

Country Link
JP (1) JP3816582B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11221739A (en) * 1998-02-06 1999-08-17 Tokyo Electric Power Co Inc:The Production scheduling device and power monitoring device
CN108459205A (en) * 2018-03-28 2018-08-28 合肥云智物联科技有限公司 A kind of flow monitoring equipment based on power automatic system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11221739A (en) * 1998-02-06 1999-08-17 Tokyo Electric Power Co Inc:The Production scheduling device and power monitoring device
CN108459205A (en) * 2018-03-28 2018-08-28 合肥云智物联科技有限公司 A kind of flow monitoring equipment based on power automatic system

Also Published As

Publication number Publication date
JP3816582B2 (en) 2006-08-30

Similar Documents

Publication Publication Date Title
US11386363B2 (en) Production management system, production management apparatus and production management method for manufacturing line
US10571899B2 (en) Operating state acquisition apparatus, production management system, and production management method for manufacturing line
US20170330737A1 (en) Treating Arcs in a Plasma Process
JP2011061991A (en) Device and method for monitoring power demand
JPH1010165A (en) Demand monitor
JP2002168880A (en) System for measuring electric energy
US6879260B1 (en) Load indicator
JP2005198434A (en) Remote control device
JP2002277493A (en) Demand monitor
JPH11206015A (en) Method and apparatus for monitoring demand
WO2004055536A1 (en) Remaining power-detecting system for battery, remaining power-calculating device, and current-detecting device
JP2002186163A (en) Voltage monitor
JPH0916226A (en) Arithmetic method for sequencer performing demand control and demand monitoring
JPH02276955A (en) Process analyzer
JPH0786113A (en) Heater temperature control system
JP2004206367A (en) Detection method and device for shut-off of power supply
JPH11337378A (en) Pulse signal integrating value monitoring equipment and method therefor
JP4344503B2 (en) Measurement device for measuring pulse counter value in building management system
JPH0538049A (en) Detecting method for breaking load of demand monitor
JPH07120335A (en) Apparatus for detecting torque
JP2005249549A (en) Pulse signal arithmetic unit
KR970059749A (en) Power load control device
JPH04140021A (en) Power demand monitor
JPS61157226A (en) Demand monitor controller
JPH09185796A (en) Pulse convertion measuring method and device/system for its application

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20041209

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041221

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050218

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20050405

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050601

A911 Transfer of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20050620

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060418

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060426

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060519

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060606

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060608

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees