JPH0953291A - Substrate for concrete slab with pre-fixed pipe, construction method of concrete slab using the substrate and structure thereof - Google Patents

Substrate for concrete slab with pre-fixed pipe, construction method of concrete slab using the substrate and structure thereof

Info

Publication number
JPH0953291A
JPH0953291A JP8040006A JP4000696A JPH0953291A JP H0953291 A JPH0953291 A JP H0953291A JP 8040006 A JP8040006 A JP 8040006A JP 4000696 A JP4000696 A JP 4000696A JP H0953291 A JPH0953291 A JP H0953291A
Authority
JP
Japan
Prior art keywords
substrate
concrete
concrete slab
equipment
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP8040006A
Other languages
Japanese (ja)
Other versions
JP3253511B2 (en
Inventor
Terumaro Nagai
照麿 永井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Kasei Co Ltd
Original Assignee
Sekisui Plastics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Plastics Co Ltd filed Critical Sekisui Plastics Co Ltd
Priority to JP04000696A priority Critical patent/JP3253511B2/en
Publication of JPH0953291A publication Critical patent/JPH0953291A/en
Application granted granted Critical
Publication of JP3253511B2 publication Critical patent/JP3253511B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Panels For Use In Building Construction (AREA)

Abstract

PROBLEM TO BE SOLVED: To make it possible to finish the arrangement and fixation of equipment pipes in a slab within a short period of time. SOLUTION: In concrete slab substrates A2 formed by arranging embedded materials 1 formed of synthetic resin foam molded products on a concrete substrate 3 at specific intervals, equipment pipes P2 which are to be buried in a concrete slab are fixed to the concrete substrate 3 in advance in a manufacturing plant. When the slub is executed, while laying the concrete slub substrates A2... in span of a skeleton, the equipment pipes P2 fixed to the adjacent concrete slab substrates A2 are connected with each other with pipe joints 30. Then, cast-in-place concrete is casted.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属す技術分野】本発明は、構築物のコンクリー
トスラブ内部へ、電気配線や電話配線等のシールドとし
て用いられる合成樹脂製電線管(CD管)や給水、給湯
用管路等のためのさや管等の種々の設備用配管を容易に
構築することを可能とするコンクリートスラブ用基板、
該基板を用いたコンクリートスラブの施工方法、及び該
基板を持つ構築物に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a sheath for a synthetic resin electric wire pipe (CD pipe) used as a shield for electric wiring, telephone wiring, etc., for water supply, hot water supply pipe, etc., inside a concrete slab of a structure. Substrates for concrete slabs that enable easy construction of pipes for various equipment such as pipes
The present invention relates to a method for constructing a concrete slab using the substrate and a structure having the substrate.

【0002】[0002]

【従来の技術】最近のコンクリート系集合住宅の床構造
体は経済性等の観点から直床、直天井仕上げが一般的と
なっており、上記のような種々の設備用配管はコンクリ
ートスラブ内部に直接埋設されるようになっている。一
方、コンクリートスラブの施工法として、軽量化、遮音
効果を向上させる目的で、図6に示すように、例えば発
泡ポリスチレンのような合成樹脂発泡成形品からなる内
部に中空部を持つ埋込材1を、トラス筋2を備えたコン
クリート基板3上に、所定の間隔で複数個、コンクリー
トが未硬化の養生過程中に配設して係止具により係止
し、コンクリートの硬化により埋込材1をコンクリート
基板3に定着固定した中空コンクリートスラブ用基板A
を用い、このコンクリートスラブ用基板Aを建築施工現
場に搬入して、図7に示すように必要個数、躯体の梁
B、B間に載置し、トラス筋2の上弦材をスペーサーと
してスラブ上端筋4等を取り付けた後、現場打ちコンク
リートCを打設していわゆる中空コンクリートスラブC
Sを構築する施工法が広く行われている。図8、図9は
埋込材1の一例であり、天板部10と側壁部11と中仕
切り壁12とを持つ全体として箱状(矩形状)の形状を
なし、内部に一方側を解放した比較的大きな底面積を持
つ複数の中空部Sを有している(特公昭57−4700
8号公報等参照)。
2. Description of the Related Art In recent years, floor structures for concrete-type apartment houses are generally finished with a straight floor or a straight ceiling from the viewpoint of economy, and the above-mentioned various equipment pipes are installed inside a concrete slab. It is designed to be buried directly. On the other hand, as a construction method for a concrete slab, as shown in FIG. 6, an embedding material 1 having a hollow portion inside made of a synthetic resin foam molded product such as expanded polystyrene, for the purpose of reducing the weight and improving the sound insulation effect. Are placed on a concrete substrate 3 having truss bars 2 at a predetermined interval during the curing process in which the concrete is uncured, and are locked by a locking tool. Substrate A for hollow concrete slab in which is fixed and fixed to concrete substrate 3
This concrete slab substrate A is carried into a construction site by using, and is placed between the beams B, B of the required number as shown in FIG. 7, and the upper chord member of the truss reinforcement 2 is used as a spacer at the upper end of the slab. So-called hollow concrete slab C by casting cast-in-place concrete C after attaching reinforcement 4 etc.
A construction method for constructing S is widely used. 8 and 9 show an example of the embedding material 1, which has a box shape (rectangular shape) as a whole having a top plate portion 10, a side wall portion 11, and a partition wall 12, and one side is released inside. It has a plurality of hollow portions S having a relatively large bottom area (Japanese Examined Patent Publication No. S57-4700).
No. 8, etc.).

【0003】そして、上記のような埋込材1を用いたコ
ンクリートスラブCSにおいて上記のような設備用配管
の埋設工事を行うに当たっては、図10に示すように埋
込材1と埋込材1の間に形成される現場打ちコンクリー
ト充填用空間部SSに前記のような設備用配管Pを配置
し、その上から現場打ちコンクリートを打設する。その
ために、目標の2地点間に設備用配管するのに迂回路を
取ることが必然となり、本来必要とされる距離以上の配
管距離が必要となる。また、設備用配管が占める容積だ
け打設されるコンクリート量が低減する。
Then, in carrying out the burying work of the equipment pipe as described above in the concrete slab CS using the burying material 1 as described above, as shown in FIG. The pipe P for equipment as described above is arranged in the space SS for filling cast-in-place concrete formed between the above, and the cast-in-place concrete is poured from above. Therefore, it is inevitable to take a detour to connect the equipment between the two target points, and a piping distance longer than the originally required distance is required. In addition, the amount of concrete that is placed is reduced by the volume occupied by the equipment piping.

【0004】コンクリートスラブ中に埋設すべき設備用
配管の本数が少ない場合には、配管距離の増大が施工コ
ストに与える影響は小さく格別の問題はない。また、埋
込材と埋込材の間の現場打ちコンクリート充填用空間部
に設備用配管を配置してその上から現場打ちコンクリー
トを打設しても、打設コンクリートは該空間内に密に行
きわたることができ、打設コンクリートの量の減少も少
ないことから、コンクリートスラブに顕著な断面欠損を
引き起こすこともない。
When the number of equipment pipes to be buried in the concrete slab is small, the increase in the pipe distance has a small effect on the construction cost, and there is no particular problem. Also, even if the equipment pipe is placed in the space for filling the cast-in-place concrete between the potting material and the cast-in-place concrete is placed from above, the cast concrete will be dense in the space. Since it can be spread and the amount of cast concrete is less reduced, it does not cause a significant cross-section loss in the concrete slab.

【0005】しかしながら、近年施工されるコンクリー
ト系集合住宅においては従来の電気や電話線のための配
管に加えて、衛星放送や有線放送等の配線、ホームセキ
ュリティ設備用配線のための配管、さらには給水、給湯
用管路等のさや管としての配管等の種々の設備用配管を
コンクリートスラブ中に埋設するようになってきてお
り、さらに、各部屋ごとにそれぞれのコンセントを配設
する傾向にあることから、電気、水等の分配のために配
管の必要分岐数も増大し配管距離も増大しつつある。
However, in the concrete-type housing complex constructed in recent years, in addition to the conventional piping for electricity and telephone lines, wiring for satellite broadcasting, cable broadcasting, etc., piping for home security equipment, and further Various equipment pipes such as pipes for water and hot water supply pipes are being buried in concrete slabs, and there is a tendency for each room to have its own outlet. Therefore, the number of branches required for distribution of electricity, water, etc. is increasing, and the piping distance is also increasing.

【0006】そのために、図10に示すように、コンク
リート充填用空間部SSには多数本の設備用配管Pが配
置されることとなり、現場打ちコンクリートの打設時に
十分な注意を払わないと該空間部SS内においてコンク
リートが密に侵入せず設備用配管P同志の間に空隙が形
成される場合がある。また、打設されるコンクリートの
量も低減することから、この面からも十分な施工管理が
必要とされる。さらに、多数本の設備用配管を枡目状に
形成されるコンクリート充填用空間部SSを迂回しなが
ら配置していくことは多くの作業を必要とし、また、配
管距離も増大する。
For this reason, as shown in FIG. 10, a large number of facility pipes P are arranged in the concrete filling space SS, and sufficient care must be taken when pouring concrete in place. In the space part SS, concrete may not intrude densely and a gap may be formed between the equipment pipes P. Also, since the amount of concrete to be placed is reduced, sufficient construction management is required from this aspect as well. Furthermore, arranging a large number of facility pipes while bypassing the concrete filling space SS formed in a grid shape requires a lot of work and also increases the pipe distance.

【0007】配管距離を短縮すべく、施工現場で埋込材
を部分的に剥ぎ取ったり、溝切り加工をして埋込材部分
を通過する位置に配管用の通路を作成し、その通路を通
して設備用配管を行うことが一部行われているが、現場
で埋込材に加工を加えることは容易でなく、また、埋込
材を加工した場合にその加工面が前記中空部に連通して
しまうことが生じ得、そのままの状態で現場打ちコンク
リートを打設すると、その開放面から中空部内に現場打
ちコンクリートが侵入してその部分の重量が過大化する
恐れがある。また、加工の過程において、埋込材を必要
以上に破壊していまうことも起こり得る。また、埋込材
の一部を作業者が手により剥ぎ取る場合には、剥ぎ取り
面から埋込材の破片が飛び散ることが避けられず、現場
内コンクリートを打設する前に、この破片を除去する作
業が必要となる。
In order to shorten the piping distance, the embedding material is partially peeled off at the construction site, or a groove is processed to create a passage for the piping at a position passing through the embedding material portion. Although some piping for equipment is performed, it is not easy to process the embedding material on site, and when the embedding material is processed, its processed surface communicates with the hollow part. If the cast-in-place concrete is poured in the state as it is, the cast-in-place concrete may enter the hollow portion from the open surface and the weight of the portion may become excessive. Further, in the process of processing, the embedding material may be destroyed more than necessary. Also, when a worker manually removes a part of the embedding material, it is unavoidable that the embedding material fragments will scatter from the stripping surface, and this fragment should be removed before placing the concrete on site. Work to remove is required.

【0008】また、埋込材として上面に凹溝を持つもの
を配置したコンクリートスラブ用基板を用いてコンクリ
ートスラブを構築することも提案されており、現場打ち
コンクリートが該凹溝内に流入固化することによりコン
クリートスラブの防振効果が増大すると共に、該凹溝を
配管にも利用できるとしている(実公昭60−3224
8号公報参照)。これによれば、施工現場で埋込材を加
工する必要はなく、作業がある程度は簡素化されると共
に、配管距離の短縮も可能となる。
It has also been proposed to construct a concrete slab by using a concrete slab substrate in which an embedding material having a groove on the upper surface is arranged, and the cast-in-place concrete flows into the groove and solidifies. As a result, the anti-vibration effect of the concrete slab is increased and the concave groove can be used for piping (Jitsuko Sho 60-3224).
No. 8). According to this, it is not necessary to process the embedding material at the construction site, the work is simplified to some extent, and the piping distance can be shortened.

【0009】[0009]

【発明が解決しようとする課題】実公昭60−3224
8号公報に記載のような埋込材を持つコンクリートスラ
ブ用基板を用いる場合であっても、施工現場において設
備用配管をコンクリートスラブ用基板上に配設する作業
は必要であり、配管すべき設備用配管の本数が多い場合
や多くの分岐を持つような場合には、現場作業が長期化
するのは避けられない。また、作業時に埋込材上を作業
者が動き回ることから、埋込材が破損する場合もあり得
る。
[Problems to be Solved by the Invention] Japanese Utility Model Publication No. 60-3224
Even when using a concrete slab substrate having an embedding material as described in Japanese Patent Publication No. 8 publication, it is necessary and necessary to arrange the facility piping on the concrete slab substrate at the construction site. When the number of equipment pipes is large or there are many branches, it is inevitable that the site work will be prolonged. In addition, since the worker moves around on the embedding material during work, the embedding material may be damaged.

【0010】本発明の目的は、合成樹脂発泡成形品から
なる埋込材を内部に持つコンクリートスラブ中に多数本
の設備用配管を埋設する際に生じている上記のような問
題点を解消することにあり、より具体的には、埋込材が
配置されている場所あるいはコンクリート基板内を通し
て設備用配管を配置することにより、配管距離を可能な
限り短縮させるものでありながら、施工現場での配管作
業を大幅に簡素化して作業時間を短縮させ、かつ、作業
者により埋込材が破損される可能性を大きく低減したコ
ンクリートスラブ用基板を提供することにある。また、
本発明の目的は、上記のようなコンクリートスラブ用基
板を用いたコンクリートスラブの施工方法とその構築物
を提供することにある。
An object of the present invention is to eliminate the above-mentioned problems that occur when a large number of equipment pipes are embedded in a concrete slab having an embedding material made of a synthetic resin foam molded product inside. Specifically, more specifically, by arranging the facility piping through the place where the embedding material is placed or through the concrete substrate, the piping distance can be shortened as much as possible, but at the construction site. (EN) It is intended to provide a concrete slab substrate in which the piping work is greatly simplified to shorten the working time and the possibility that the embedding material is damaged by the operator is greatly reduced. Also,
An object of the present invention is to provide a method for constructing a concrete slab using the substrate for a concrete slab as described above and a structure thereof.

【0011】[0011]

【課題を解決するための手段】上記の課題を解決するた
めの本発明によるコンクリートスラブ用基板は、コンク
リート基板上に合成樹脂発泡成形品からなる埋込材が所
定の間隔で配置されてなるコンクリートスラブ用基板で
あって、該コンクリートスラブ用基板には設備用配管が
予め定着されており、該設備用配管には隣接する設備用
配管への接続のための管継手が必要に応じて備えられる
ことを特徴とする。
A concrete slab substrate according to the present invention for solving the above-mentioned problems is concrete in which embedding materials made of synthetic resin foam-molded articles are arranged at predetermined intervals on a concrete substrate. A substrate for a slab, wherein a pipe for equipment is fixed in advance on the substrate for a concrete slab, and a pipe joint for connecting to an adjacent pipe for equipment is provided on the pipe for equipment as required. It is characterized by

【0012】また、本発明は、上記のコンクリートスラ
ブ用基板を用いたコンクリートスラブの施工方法とし
て、施工すべきコンクリートスラブにおける設備用配管
の配置状態に応じて、所定位置に設備用配管を予め定着
した前記コンクリートスラブ用基板を用意し、それを構
築物躯体側の梁間の所定の位置に載置して隣接する設備
用配管同志を、設備用配管に取り付けられている管継手
によりあるいは別途用意した管継手により接続し、しか
る後、その上から現場打ちコンクリートを打設すること
を特徴とするコンクリートスラブの施工方法を開示す
る。また、本発明は、コンクリートスラブの基板として
上記したコンクリートスラブ用基板を持つ構築物をも開
示する。
Further, the present invention provides a method for constructing a concrete slab using the above concrete slab substrate, in which the equipment pipe is pre-fixed at a predetermined position according to the arrangement state of the equipment pipe in the concrete slab to be constructed. Prepared the concrete slab substrate, which was placed at a predetermined position between the beams on the structure body side and adjacent to each other for the equipment pipes, by pipe fittings attached to the equipment pipes or separately prepared pipes Disclosed is a method for constructing a concrete slab, which comprises connecting with joints and then pouring in-situ concrete from thereupon. The present invention also discloses a structure having the above-mentioned concrete slab substrate as a substrate for the concrete slab.

【0013】[0013]

【作用】本発明によるコンクリートスラブ用基板によれ
ば、コンクリートスラブの構築時に設備用配管が予定さ
れる箇所に配置されるコンクリートスラブ用基板には、
設計図に従って、コンクリート基板上及び/又はコンク
リート基板内に埋込材と共に設備用配管が予め定着され
ている。また、定着された該設備用配管の先端には必要
に応じて管継手も取り付けられる。施工すべき構築物の
コンクリートスラブ中に埋設されるべき設備用配管の配
置状況に応じて種々の態様に配管された上記のコンクリ
ートスラブ用基板が製造工場において製造され、施工現
場に搬入される。
According to the concrete slab substrate according to the present invention, the concrete slab substrate arranged at the location where the facility piping is planned at the time of constructing the concrete slab is
According to the design drawing, facility piping is pre-fixed on the concrete substrate and / or in the concrete substrate together with the embedding material. If necessary, a pipe joint may be attached to the tip of the fixed equipment pipe. The above-mentioned concrete slab substrate, which is piped in various forms depending on the arrangement of the equipment pipes to be embedded in the concrete slab of the structure to be constructed, is manufactured in a manufacturing factory and brought to the construction site.

【0014】施工現場では、設計図に従って、搬入され
たコンクリートスラブ用基板を躯体の梁間に配置し、か
つ隣接するコンクリートスラブ用基板との間で設備用配
管同志を管継手を介して接続する。本発明によるコンク
リートスラブ用基板を用いることにより、施工現場で長
尺状の設備用配管を敷設したコンクリートスラブ用基板
上に配置する作業を行うことなく、管継手を介しての接
続作業のみで必要な設備用配管の配管作業は終了する。
必要に応じて、躯体側壁に設けたコンセントとの接続も
管継手を用いて行うこともできる。この方法によれば、
現場での埋込材の剥ぎ取りをほとんどなくすことがで
き、現場内コンクリートを打設する前に行っていた破片
除去作業は不必要となり、より省力化される。
At the construction site, the carried-in concrete slab board is arranged between the beams of the frame according to the design drawing, and the equipment pipes are connected to the adjacent concrete slab board via pipe joints. By using the concrete slab substrate according to the present invention, it is necessary only for the connecting work through the pipe joint without performing the work of arranging the long equipment pipe on the concrete slab substrate at the construction site. The piping work for various equipment pipes is completed.
If necessary, a pipe joint can be used to connect to an outlet provided on the side wall of the body. According to this method
Almost no stripping of the embedding material at the site can be eliminated, and the work of removing debris, which had been done before placing the concrete in the site, becomes unnecessary, resulting in further labor saving.

【0015】以下、スラブ上端筋の取り付け等の従来の
工法と同様の作業を行った後、現場打ちコンクリートを
打設することにより、本発明によるコンクリートスラブ
の施工方法は終了する。
After performing the same work as in the conventional method such as attaching the slab upper end streak, the concrete slab construction method according to the present invention is completed by pouring cast-in-place concrete.

【0016】[0016]

【実施例】以下、実施例に基づき本発明をより詳細に説
明する。図1は、例えば図7に示すように、躯体の梁
B、B間にコンクリートスラブ用基板Aを配置した構築
物におけるコンクリートスラブCS部分の設備用配管の
配置状況を示す設計図の一例であり、この例では、コン
クリートスラブ用基板Aが5枚(A1 〜A5 )配置され
ている。配管用ボックスV1 が2番目のコンクリートス
ラブ用基板A2 に取り付けられ、そこから3方の側壁に
設けたコンセントC1、C2、C3に向けて設備用配管
P1、P2、P3を配置する設計になっており、その際
に、設備用配管P2はコンクリートスラブ用基板A2
コンクリートスラブ用基板A1 とを通ってコンセントC
2に至るようにされる。
The present invention will be described in more detail based on the following examples. FIG. 1 is an example of a design diagram showing an arrangement state of equipment pipes of a concrete slab CS portion in a structure in which a concrete slab substrate A is arranged between skeleton beams B and B as shown in FIG. 7, In this example, five concrete slab substrates A (A 1 to A 5 ) are arranged. A design in which the piping box V 1 is attached to the second concrete slab substrate A 2 and the facility pipings P1, P2, P3 are arranged toward the outlets C1, C2, C3 provided on the three side walls from the box At this time, the facility pipe P2 passes through the concrete slab substrate A 2 and the concrete slab substrate A 1 and the outlet C
2 is reached.

【0017】4番目のコンクリートスラブ用基板A4
は両側部のコンセントC4、C5とを接続する設備用配
管P4が配置され、また、5番目のコンクリートスラブ
用基板A5 には配管用ボックスV2 が取り付けられて、
そこから、側壁部のコンセントC6、C7、C8に向け
て設備用配管P5、P6、P7を配置する設計となって
いる。図示のように、設備用配管P5はコンクリートス
ラブ用基板A5 とコンクリートスラブ用基板A4 とを通
ってコンセントC6に至る。
On the fourth concrete slab board A 4 , equipment pipes P4 for connecting the outlets C4 and C5 on both sides are arranged, and on the fifth concrete slab board A 5 , a piping box V is installed. 2 is attached,
From there, the equipment pipes P5, P6, and P7 are designed to be arranged toward the outlets C6, C7, and C8 on the side wall. As shown, the equipment pipe P5 reaches the outlet C6 through the concrete slab substrate A 5 and the concrete slab substrate A 4 .

【0018】以下、この設計条件に従いコンクリートス
ラブを施工する場合を例にとり本発明の一実施例を説明
する。先ず、工場において、5種類の異なった構造を持
つコンクリートスラブ用基板A1 〜A5 が製造される。
その一例を図2に示すコンクリートスラブ用基板A2
例に取り説明する。図示のように、コンクリート基板3
上には所定の間隔をおいて多数の埋込材1・・が配置固
定され、またその一部には配管用ボックスV1が取り付
けられている。該配管用ボックスV1 には3本の設備用
配管P1、P2、P3が取り付けられており、各設備用
配管P1、P2、P3は留め具21によりコンクリート
基板3に定着されている。そして、各設備用配管P1、
P2、P3の先端には図3に拡大して示す管継手30が
取り付けられている。また、設備用配管P1、P2、P
3が位置する部分には、設備用配管が埋入する大きさの
凹溝を裏面に形成した埋込材1’・・が上方から定着さ
れている。
An embodiment of the present invention will be described below by taking as an example the case of constructing a concrete slab according to these design conditions. First, in the factory, concrete slab substrates A 1 to A 5 having five different structures are manufactured.
An example thereof will be described by taking the concrete slab substrate A 2 shown in FIG. 2 as an example. As shown, concrete substrate 3
A large number of embedding materials 1 ... Are arranged and fixed at a predetermined interval on the upper part, and a piping box V 1 is attached to a part thereof. The piping boxes V 1 is mounted is three facilities pipe P1, P2, P3, each facility pipes P1, P2, P3 are fixed in the concrete substrate 3 by fasteners 21. Then, the pipe P1 for each facility,
A pipe joint 30 shown enlarged in FIG. 3 is attached to the tips of P2 and P3. Also, the equipment pipes P1, P2, P
At a portion where 3 is located, an embedding material 1 '... In which a recessed groove having a size for embedding a facility pipe is formed on the back surface is fixed from above.

【0019】このコンクリートスラブ用基板A2 は、設
備用配管P1、P2、P3をコンクリート基板3に定着
する点を除いて、例えば特公昭57−47008号公報
等に開示される従来のコンクリートスラブ用基板の場合
と同様にして製造される。すなわち、基板となるコンク
リートが未硬化のうちに、コンクリート基板3上に図
8、図9に示したような標準化された中空部を持つ埋込
材あるいは中実の埋込材(図示されない)1・・、配管
用ボックスV1 、先端に管継手30を持つ設備用配管P
1、P2、P3とを配置し、埋込材1・・は図示しない
適宜の係止具によりもしくはコンクリートが未硬化のう
ちに圧着することにより、また、設備用配管P1、P
2、P3は留め具21により、それぞれコンクリート基
板3に係止する。さらに、設備用配管P1、P2、P3
が位置する部分には前記のように設備用配管が埋入する
大きさの凹溝を裏面に形成した埋込材1’・・が上方か
ら被せられ、埋込材1と同様に適宜の係止具により係止
される。しかる後、従来と同様にコンクリートの養生が
行われる。それにより、上記各部材はコンクリート基板
3に定着固定されてコンクリートスラブ用基板A2 は完
成する(なお、図2において図解を容易にするために、
トラス筋は省略している)。なお、設備用配管の留め具
21による係止は必ずしも必須でなく、コンクリート基
板に配置したままの状態で埋込材1’により上方から押
さえ付けることにより、コンクリート基板への定着を行
うこともできる。
This concrete slab substrate A 2 is for a conventional concrete slab, for example, as disclosed in Japanese Patent Publication No. 57-47008, except that the equipment pipes P1, P2 and P3 are fixed to the concrete substrate 3. It is manufactured in the same manner as the case of the substrate. That is, an embedding material having a standardized hollow portion as shown in FIGS. 8 and 9 or a solid embedding material (not shown) 1 on the concrete substrate 3 while the concrete to be the substrate is uncured 1 ..Piping box V 1 and facility piping P with pipe fitting 30 at the tip
1, P2, P3 are arranged, and the embedding material 1 ... Is crimped by an appropriate locking tool (not shown) or while the concrete is uncured, and the equipment pipes P1, P
2 and P3 are respectively locked to the concrete substrate 3 by the fasteners 21. Furthermore, equipment pipes P1, P2, P3
The portion where is located is covered from above with an embedding material 1 '... having a recessed groove of a size large enough to embed the equipment pipe as described above. It is locked by a stopper. After that, the concrete is cured as in the conventional case. As a result, the above-mentioned members are fixed and fixed to the concrete substrate 3 to complete the concrete slab substrate A 2 (for ease of illustration in FIG. 2,
Truss muscles are omitted). It should be noted that the locking of the equipment pipe by the fastener 21 is not always necessary, and the fixing to the concrete substrate can be performed by pressing the embedding material 1'from above while keeping the equipment pipe arranged. .

【0020】特に図示しないが、コンクリートスラブ用
基板A1 、A4 、A5 についても同様にして、コンクリ
ート基板3上に埋込材1、1’と必要な設備用配管P4
〜P6、あるいは配管用ボックスV2 が設計図に従って
定着固定される。次に、図3により、管継手30の一例
を説明する。この管継手30は設備用配管Pに外嵌する
内径を持ちかつ両端に環状フランジ32を形成した筒体
31と、該環状フランジ32に嵌合する凹溝33を持つ
締め付け具34とからなる。締め付け具34は上下の半
円環状部材35、36からなり、それぞれに形成した凹
溝33を前記筒体31に形成された環状フランジ32に
嵌合させた状態でその両側部に形成したネジ穴37・・
にネジ38を螺合して締め付けることにより、一体化さ
れる。一体化された状態での締め付け具34の内径は筒
体31の内径と同じとするか幾分小径のものとされる。
さらに、各半円環状部材35、36の内周面には突起3
9が形成されており、該突起39は締め付け時に、設備
用配管Pに形成されている環状凹溝40内に入り込み、
抜け止めとしての機能を果たす。
Although not shown in particular, the embedding materials 1 and 1'and the necessary equipment pipe P4 on the concrete substrate 3 are similarly applied to the concrete slab substrates A 1 , A 4 and A 5.
~ P6 or the piping box V 2 is fixed and fixed according to the design drawing. Next, an example of the pipe joint 30 will be described with reference to FIG. The pipe joint 30 is composed of a tubular body 31 having an inner diameter that is fitted onto the equipment pipe P and having annular flanges 32 formed at both ends thereof, and a tightening tool 34 having a groove 33 that fits into the annular flange 32. The tightening tool 34 is composed of upper and lower semi-annular members 35 and 36, and threaded holes formed on both sides of the annular groove 32 formed on the tubular body 31 with the recessed grooves 33 formed on the respective members. 37 ...
The screws 38 are screwed together and tightened to be integrated. The inner diameter of the fastening tool 34 in the integrated state is the same as or slightly smaller than the inner diameter of the tubular body 31.
Further, the projection 3 is formed on the inner peripheral surface of each semi-annular member 35, 36.
9 is formed, and the protrusion 39 enters the annular groove 40 formed in the equipment pipe P when tightened,
Serves as a retainer.

【0021】上記の構成の管継手30はコンクリートス
ラブ用基板Aの製造時にそこに配置される設備用配管P
の先端に取り付けられる。ただし、図3に例示するよう
に、隣接して配置されるコンクリートスラブ用基板(こ
の例ではコンクリートスラブ用基板A1 とA2 )のそれ
ぞれに取り付けた設備用配管P2aとP2bの先端同志
が施工現場で接続されるとした場合に、一方側の設備用
配管P2bの先端にのみ管継手30を取り付け、他方の
設備用配管P2aには取り付けない。また、側壁部に取
り付けたコンセントC1〜C8と接続する設備用配管の
端部には、該コンセント側と連結できる形成の図示しな
い適宜の管継手が取り付けられる。
The pipe joint 30 having the above-mentioned structure is used for the equipment pipe P which is arranged at the time of manufacturing the concrete slab substrate A.
Attach to the tip. However, as illustrated in FIG. 3, the ends of the equipment pipes P2a and P2b attached to the adjacent concrete slab substrates (in this example, the concrete slab substrates A 1 and A 2 ) are installed together. In the case of connection at the site, the pipe joint 30 is attached only to the tip of the equipment pipe P2b on one side, and is not attached to the other equipment pipe P2a. Further, an appropriate pipe joint (not shown) formed so as to be connectable to the outlet side is attached to the end of the equipment pipe connected to the outlets C1 to C8 attached to the side wall.

【0022】コンクリートスラブの施工に際しては、各
住戸あるいは各フロアーでのコンクリートスラブにおけ
る設備用配管設計状況に対応して、一例として図2に示
したコンクリートスラブ用基板A2 と同様にして製造さ
れた異なった配管態様を持つコンクリートスラブ用基板
1 〜A5 が、一括して構築物の施工現場に持ち込まれ
る。そして、施工現場では、形状の異なる各コンクリー
トスラブ用基板を設計図に従い躯体の梁B、B間に配置
し、カップリング30を用いて必要な配管同志の接続を
行う。
When the concrete slab was constructed, it was manufactured in the same manner as the concrete slab substrate A 2 shown in FIG. 2 as an example, in accordance with the condition of the piping design for equipment in the concrete slab in each dwelling unit or each floor. Substrates A 1 to A 5 for concrete slabs having different piping modes are collectively brought to the construction site of the structure. Then, at the construction site, each concrete slab substrate having a different shape is arranged between the beams B and B of the frame according to the design drawing, and the necessary pipes are connected to each other using the coupling 30.

【0023】作業者は各コンクリートスラブ用基板A1
〜A5 を所定位置に配置した後、あるいは配置しなが
ら、例えば設備用配管P2bに取り付けた管継手30の
筒体31を接続すべき設備用配管P2aの先端側に移動
し、ネジ38により上下の半円環状部材35、36を一
体に締め付ける(図3参照)。それにより、コンクリー
トスラブ用基板A2 とコンクリートスラブ用基板A1
を通る設備用配管P2の配置固定作業は終了する。同じ
作業が、コンクリートスラブ用基板A4 とコンクリート
スラブ用基板A5 との間の設備用配管P5の接続部でも
行われる。さらに、各設備用配管P1〜P6と側壁部に
設けたコンセントC1〜C8との間での接続作業も行わ
れる。なお、コンセントCと配管Pとの接続態様は配管
Pが予めコンクリートスラブ用基板Aのコンクリート基
板3に定着されている点を除き従来と同様の方法で行う
ことができる。従って、図4では各コンセントとの接続
態様は省略している。
The worker uses the substrate A 1 for each concrete slab.
After arranging ~ A 5 at a predetermined position, or while arranging them, for example, the cylinder body 31 of the pipe joint 30 attached to the equipment pipe P2b is moved to the tip side of the equipment pipe P2a to be connected, and is moved up and down by the screw 38 The semi-annular members 35 and 36 are integrally tightened (see FIG. 3). As a result, the work for disposing and fixing the equipment pipe P2 passing through the concrete slab substrate A 2 and the concrete slab substrate A 1 is completed. The same operation is performed at the connection portion of the equipment pipe P5 between the concrete slab substrate A 4 and the concrete slab substrate A 5 . Further, a connection work is also performed between each of the facility pipes P1 to P6 and the outlets C1 to C8 provided on the side wall portion. The connection between the outlet C and the pipe P can be performed in the same manner as the conventional method except that the pipe P is fixed to the concrete substrate 3 of the concrete slab substrate A in advance. Therefore, in FIG. 4, the manner of connection with each outlet is omitted.

【0024】以下、従来工法と同様に、スラブ上端筋等
の配筋を行い、現場打ちコンクリートを打設することに
よりコンクリートスラブの施工は終了する。上記の説明
は本発明によるコンクリートスラブ用基板及びその施工
方法の一実施例の説明であって、他に多くの変形例が存
在する。例えば、上記実施例によるコンクリートスラブ
用基板を用いての中空コンクリートスラブの施工におい
て、設備用配管Pが配置される場所には裏面に凹溝を形
成した埋込材1’を定着して中空率を確保しているが、
図5に示すように、本来埋込材が配置されるべき場所で
あって設備用配管Pが位置しない部分に対して中実の合
成樹脂発泡板を適宜の大きさに裁断した別の埋込材1a
・・を施工現場であるいは工場で配置固定するようにし
てもよい。このような埋込材1’あるいは1aは中実材
でもよく中空部を持つものであってもよい。また、特に
図示しないが、内部に空間を持つ埋込材を設備用配管の
定着後に上方から被せることにより、所定の中空率を得
るようにしてもよい。設計するコンクリートスラブ自重
が許す場合には、設備用配管Pを定着した部分に埋込材
を配置しないことも可能である。この場合、コンクリー
トスラブの中空率は低下するが、コンクリートスラブ用
基板の製造は容易となる。
Thereafter, similarly to the conventional method, the reinforcement of the slab and the like are arranged, and the cast-in-place concrete is poured to complete the construction of the concrete slab. The above description is one example of the concrete slab substrate and the construction method thereof according to the present invention, and there are many other modified examples. For example, in the construction of a hollow concrete slab using the concrete slab substrate according to the above-mentioned embodiment, the embedding material 1'having a recessed groove formed on the back surface thereof is fixed to the place where the equipment pipe P is arranged to fix the hollow ratio. Has been secured,
As shown in FIG. 5, another embedding in which a solid synthetic resin foam plate is cut into an appropriate size with respect to a portion where the embedding material should originally be arranged and the facility pipe P is not located Material 1a
.. may be arranged and fixed at the construction site or at the factory. Such an embedding material 1'or 1a may be a solid material or may have a hollow portion. Further, although not particularly shown, an embedding material having a space inside may be covered from above after fixing the equipment pipe to obtain a predetermined hollow ratio. If the weight of the concrete slab to be designed permits, it is possible not to arrange the embedding material in the portion where the equipment pipe P is fixed. In this case, the hollow ratio of the concrete slab decreases, but the production of the concrete slab substrate becomes easy.

【0025】管継手30の構成も任意であり、打設され
るコンクリートが侵入しない程度の密封性と打設コンク
リートにより破壊されない強度とを持つものでれば、従
来知られた適宜の管継手を適宜用いることができる。さ
らに、工場で製造する際に、設備用配管の先端に管継手
を装備することも必須でなく、施工現場において、別途
用意した適宜の管継手を用いて配管の接続を行うように
してもよい。
The structure of the pipe joint 30 is also arbitrary, and any suitable pipe joint known in the art can be used as long as it has a sealing property such that the concrete to be cast does not enter and the strength that is not destroyed by the cast concrete. It can be used as appropriate. Furthermore, when manufacturing in a factory, it is not essential to equip the tip of the equipment pipe with a pipe joint, and at the construction site, the pipe may be connected using an appropriate pipe joint prepared separately. .

【0026】以上の説明から分かるように、本発明によ
れば、従来は埋込材と埋込材との間に形成される現場打
ちコンクリート充填用空間部に配置せざるを得なかった
設備用配管の敷設を、設計条件通りの最短距離で行うこ
とが可能となり、かつ、施工現場での設備用配管の配設
作業が不要となることから、施工時間も大幅に短縮され
る。
As can be seen from the above description, according to the present invention, it is necessary for the equipment to be installed in the space for filling the cast-in-place concrete which is conventionally formed between the embedding materials. The pipes can be laid in the shortest distance according to the design conditions, and the installation work of the facility pipes at the construction site is not required, so that the construction time can be greatly reduced.

【0027】なお、配置される標準材としての埋込材1
・・の形状は任意であり、コンクリート基板の養生時に
発生する蒸気を中空部Sから抜くための開口を形成した
埋込材(特開平5−208410号公報参照)等も有効
に用いうる。さらに、埋込材及び設備用配管のコンクリ
ート基板への取り付けも、前記のようにコンクリートが
未硬化の状態で係止具により取り付けるものに限らず、
コンクリートが未硬化の状態での圧着により、あるい
は、ウレタン系接着剤のような反応型接着材を用いて接
着固定する方法、あるいは、コンクリートの硬化後にコ
ンクリート釘や、接着剤、接着テープ等を用いて固定す
る方法(特開平5−208411号公報参照)等も用い
ることができる。前記のように、設備用配管を積極的に
コンクリート基板側に定着せずに、上方から覆う埋込材
により固定するようにしてもよい。
Incidentally, the embedding material 1 as the standard material to be arranged.
The shape of .. is arbitrary, and an embedding material (see Japanese Patent Laid-Open No. 5-208410) having an opening for removing steam generated during curing of the concrete substrate from the hollow portion S can be effectively used. Furthermore, the mounting of the embedding material and the piping for equipment to the concrete substrate is not limited to the one in which the concrete is attached in the uncured state by the locking tool as described above,
A method in which the concrete is uncured by pressure bonding, or a method of bonding and fixing with a reactive adhesive such as a urethane-based adhesive, or after hardening of the concrete, concrete nails, adhesive, adhesive tape, etc. And the like (see Japanese Patent Laid-Open No. 5-208411) can also be used. As described above, the facility piping may not be positively fixed to the concrete substrate side, but may be fixed by an embedding material covering from above.

【0028】図示の例では、設備用配管Pはすべて埋込
材の位置を走るようになっているが、配管の本数が少な
い場合には、設備用配管Pを埋込材と埋込材との間の空
間に配置するようにしてもよい。この場合には、従来の
コンクリートスラブ用基板をそのまま利用できるメリッ
トがある。また、一部の設備用配管のみを埋込材と埋込
材との間の空間に配置するようにしてもよい。
In the illustrated example, all of the equipment pipes P run at the position of the embedding material. However, when the number of pipes is small, the equipment pipes P are separated into embedding materials and embedding materials. You may make it arrange | position in the space between them. In this case, there is an advantage that the conventional concrete slab substrate can be used as it is. Moreover, you may make it arrange | position only some piping for equipment in the space between embedding materials.

【0029】さらに、上記の実施例では、設備用配管P
がコンクリート基板3の上に定着されているものとした
が、コンクリート基板3を製造する過程において、一部
あるいは全部の設備用配管Pをコンクリート基板3の内
部に、コンクリートの硬化によりあるいは適宜の係止具
も用いて、定着配置するようにしてもよく、この場合で
も、同様に現場での配管作業は簡素化される。全ての設
備用配管Pをコンクリート基板3中に定着配置するもの
においては、コンクリート基板3上に配置する埋込材1
はすべて同じ形状のもの(既存のもの)を用いることが
可能となり、中空率を一定にすることができる。また、
コンクリートスラブ用基板の製造コストも低減する。
Further, in the above embodiment, the equipment pipe P
Are fixed on the concrete substrate 3, but in the process of manufacturing the concrete substrate 3, some or all of the facility pipes P are placed inside the concrete substrate 3 by hardening the concrete or by an appropriate function. A fixing tool may also be used for fixing and arrangement, and even in this case, the piping work in the field is similarly simplified. In the case where all the equipment pipes P are fixedly arranged in the concrete substrate 3, the embedding material 1 arranged on the concrete substrate 3
Can have the same shape (existing ones), and the hollow rate can be kept constant. Also,
It also reduces the manufacturing cost of substrates for concrete slabs.

【0030】[0030]

【発明の効果】上記の記載から明らかなように、本発明
によるコンクリートスラブ用基板を用いることにより、
コンクリートスラブ構築時の設備用配管の配管作業が大
幅に短縮され、かつ、その配管距離も短縮することがで
きる。
As is apparent from the above description, by using the concrete slab substrate according to the present invention,
The piping work for the equipment piping when constructing the concrete slab is greatly shortened, and the piping distance can be shortened.

【図面の簡単な説明】[Brief description of drawings]

【図1】コンクリートスラブの配管状況を説明する図。FIG. 1 is a diagram illustrating a piping state of a concrete slab.

【図2】本発明によるコンクリートスラブ用基板を説明
する斜視図。
FIG. 2 is a perspective view illustrating a concrete slab substrate according to the present invention.

【図3】本発明によるコンクリートスラブ用基板に用い
る管継手の一例を説明する図。
FIG. 3 is a view for explaining an example of a pipe joint used for the concrete slab substrate according to the present invention.

【図4】本発明によるコンクリートスラブ用基板を用い
て施工されるコンクリートスラブの途中の状態を示す斜
視図。
FIG. 4 is a perspective view showing an intermediate state of a concrete slab constructed using the concrete slab substrate according to the present invention.

【図5】本発明によるコンクリートスラブ用基板の他の
態様を説明する斜視図。
FIG. 5 is a perspective view illustrating another aspect of the concrete slab substrate according to the present invention.

【図6】従来のコンクリートスラブ用基板を示す鳥瞰
図。
FIG. 6 is a bird's-eye view showing a conventional concrete slab substrate.

【図7】従来のコンクリートスラブ用基板を用いてのコ
ンクリートスラブ及び構築物の一例を示す図。
FIG. 7 is a diagram showing an example of a concrete slab and a structure using a conventional substrate for concrete slab.

【図8】埋込材の一例を示す図。FIG. 8 is a diagram showing an example of an embedding material.

【図9】埋込材の一例を示す図。FIG. 9 is a diagram showing an example of an embedding material.

【図10】従来のコンクリートスラブ用基板を用いての
設備用配管状態を説明する図。
FIG. 10 is a diagram illustrating a state of equipment piping using a conventional concrete slab substrate.

【符合の説明】[Description of sign]

A…コンクリートスラブ用基板、P…設備用配管、V…
配管用ボックス、1…埋込材、3…コンクリート基板、
21…留め具、30…管継手
A ... Concrete slab substrate, P ... Facility piping, V ...
Piping box, 1 ... Embedded material, 3 ... Concrete substrate,
21 ... Fasteners, 30 ... Pipe fittings

───────────────────────────────────────────────────── フロントページの続き (51)Int.Cl.6 識別記号 庁内整理番号 FI 技術表示箇所 E04C 2/52 E04C 2/50 K ─────────────────────────────────────────────────── ─── Continuation of the front page (51) Int.Cl. 6 Identification code Internal reference number FI Technical display area E04C 2/52 E04C 2/50 K

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 コンクリート基板上に合成樹脂発泡成形
品からなる埋込材が所定の間隔で配置されてなるコンク
リートスラブ用基板であって、該コンクリートスラブ用
基板には設備用配管が予め定着されていることを特徴と
するコンクリートスラブ用基板。
1. A concrete slab substrate in which embedding materials made of a synthetic resin foam molded product are arranged on a concrete substrate at predetermined intervals, and equipment pipes are pre-fixed on the concrete slab substrate. Substrates for concrete slabs characterized by
【請求項2】 コンクリート基板上に合成樹脂発泡成形
品からなる埋込材が所定の間隔で配置されてなるコンク
リートスラブ用基板であって、該コンクリートスラブ用
基板には設備用配管がコンクリート基板上に予め定着さ
れていることを特徴とするコンクリートスラブ用基板。
2. A concrete slab substrate in which embedding materials made of a synthetic resin foam-molded product are arranged at a predetermined interval on a concrete substrate, wherein the concrete slab substrate has equipment piping on the concrete substrate. Substrate for concrete slab, which is pre-fixed on.
【請求項3】 コンクリート基板上に合成樹脂発泡成形
品からなる埋込材が所定の間隔で配置されてなるコンク
リートスラブ用基板であって、該コンクリートスラブ用
基板には設備用配管がコンクリート基板内に予め定着さ
れていることを特徴とするコンクリートスラブ用基板。
3. A concrete slab substrate in which an embedding material made of a synthetic resin foam molded product is arranged at a predetermined interval on a concrete substrate, wherein the equipment pipe is provided in the concrete slab substrate. Substrate for concrete slab, which is pre-fixed on.
【請求項4】 該設備用配管は管継手を有していること
を特徴とする請求項1ないし3いずれか記載のコンクリ
ートスラブ用基板。
4. The substrate for concrete slab according to claim 1, wherein the equipment pipe has a pipe joint.
【請求項5】 施工すべきコンクリートスラブにおける
設備用配管の配置状態に応じて、所定位置に設備用配管
を予め定着した請求項1ないし4いずれか記載のコンク
リートスラブ用基板を用意し、それを、躯体側の梁間の
所定の位置に載置して隣接する設備用配管同志を管継手
を介して接続し、必要に応じてスラブ上端筋を取り付け
た後、その上から現場打ちコンクリートを打設すること
を特徴とするコンクリートスラブの施工方法。
5. The concrete slab substrate according to claim 1, wherein the equipment pipe is pre-fixed at a predetermined position according to the arrangement state of the equipment pipe in the concrete slab to be constructed. , Placing it at a predetermined position between the beams on the frame side, connecting adjacent equipment pipes via pipe joints, attaching slab top bars as necessary, and then pouring in-place concrete from above A method for constructing a concrete slab characterized by:
【請求項6】 コンクリートスラブの基板として請求項
1ないし4いずれか記載のコンクリートスラブ用基板を
持つ構築物。
6. A structure having a substrate for concrete slab according to claim 1 as a substrate for concrete slab.
JP04000696A 1995-06-09 1996-02-27 Concrete slab substrate with pre-fixed piping, concrete slab construction method using the substrate, and its structure Expired - Fee Related JP3253511B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP04000696A JP3253511B2 (en) 1995-06-09 1996-02-27 Concrete slab substrate with pre-fixed piping, concrete slab construction method using the substrate, and its structure

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP14352195 1995-06-09
JP7-143521 1995-06-09
JP04000696A JP3253511B2 (en) 1995-06-09 1996-02-27 Concrete slab substrate with pre-fixed piping, concrete slab construction method using the substrate, and its structure

Publications (2)

Publication Number Publication Date
JPH0953291A true JPH0953291A (en) 1997-02-25
JP3253511B2 JP3253511B2 (en) 2002-02-04

Family

ID=26379425

Family Applications (1)

Application Number Title Priority Date Filing Date
JP04000696A Expired - Fee Related JP3253511B2 (en) 1995-06-09 1996-02-27 Concrete slab substrate with pre-fixed piping, concrete slab construction method using the substrate, and its structure

Country Status (1)

Country Link
JP (1) JP3253511B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013596A (en) * 2016-06-10 2016-10-12 华北理工大学 Prestressed reinforced concrete laminated slab with broken rib and manufacturing method thereof
CN110219413A (en) * 2019-05-31 2019-09-10 中国五冶集团有限公司 A kind of autoclaved aerated concrete slab and preparation method thereof
CN113463807A (en) * 2021-06-30 2021-10-01 北京天邦巨成科技有限公司 Double-truss system and floor support plate with same

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013596A (en) * 2016-06-10 2016-10-12 华北理工大学 Prestressed reinforced concrete laminated slab with broken rib and manufacturing method thereof
CN110219413A (en) * 2019-05-31 2019-09-10 中国五冶集团有限公司 A kind of autoclaved aerated concrete slab and preparation method thereof
CN113463807A (en) * 2021-06-30 2021-10-01 北京天邦巨成科技有限公司 Double-truss system and floor support plate with same
CN113463807B (en) * 2021-06-30 2022-04-26 北京天邦巨成科技有限公司 Double-truss system and floor support plate with same

Also Published As

Publication number Publication date
JP3253511B2 (en) 2002-02-04

Similar Documents

Publication Publication Date Title
US4468911A (en) System for forming structural concrete
KR101182536B1 (en) Prefabricated double wall precast concrete pannel having surface material, reinforcing rod according to the purpose
JPH0953291A (en) Substrate for concrete slab with pre-fixed pipe, construction method of concrete slab using the substrate and structure thereof
JPH10160881A (en) Building structure and building construction method for reactor power station
JP3169818B2 (en) Substrate for concrete slab having concave grooves formed on the surface of some embedded materials, method of constructing concrete slab using the substrate, and its construction
JP3346948B2 (en) Concrete slab substrate having solid embedded material, construction method of concrete slab using the substrate, and its structure
JP3253487B2 (en) Substrate for concrete slab having embedded material partially open at the upper side, construction method of concrete slab using the substrate, and its structure
JP3346947B2 (en) Substrate for concrete slab having embedded material with low height in part, construction method of concrete slab using the substrate, and its structure
JPH0387407A (en) Floor slab by precast slab of bridge and its installing device
KR101379949B1 (en) Corrugated pipes fixing structure and corrugated piping construction method thereby
JPH08239930A (en) Precast concrete floor slab for parking area
JP3364051B2 (en) Substrate for concrete slab partially lacking embedding material, concrete slab construction method using the substrate, and its structure
CN214925367U (en) Heat insulation board and mould thereof
CN218117232U (en) Electric shaft preformed hole mould and equipotential connection integrated component
JP3169801B2 (en) Concrete slab substrate having embedded material and concrete slab using the substrate
KR920004941Y1 (en) Distribution boxes for cable tube
JPH0628599Y2 (en) Building rigid shaft
JP2003096960A (en) Floor board block and floor slab using the same
CN2214980Y (en) Fibre reinforced cement wire groove for building
JPS61106007A (en) Foundation construction of control panel
KR200201267Y1 (en) Floor slab system
JP3062810B2 (en) Assembling method of plumbing unit in building and plumbing unit
JP2002281639A (en) Embedding of wire conduit to sc structure, laying of electrical cable and unit metal plate thereof
JPS61244213A (en) Arrangement of wire pipe
JP2004084431A (en) Plumbing work method for building, and plumbing fixing bolster and sleeve for use in the same

Legal Events