JPH0953217A - Method of jacket construction of water-surface erected structure by h-steel bearing pile - Google Patents

Method of jacket construction of water-surface erected structure by h-steel bearing pile

Info

Publication number
JPH0953217A
JPH0953217A JP22721995A JP22721995A JPH0953217A JP H0953217 A JPH0953217 A JP H0953217A JP 22721995 A JP22721995 A JP 22721995A JP 22721995 A JP22721995 A JP 22721995A JP H0953217 A JPH0953217 A JP H0953217A
Authority
JP
Japan
Prior art keywords
pile
jacket
temporary fixing
water
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP22721995A
Other languages
Japanese (ja)
Inventor
Hideaki Otsuka
英明 大塚
Masaru Takegawa
勝 武川
Shinji Yamane
真治 山根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeda Corp
Original Assignee
Maeda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maeda Corp filed Critical Maeda Corp
Priority to JP22721995A priority Critical patent/JPH0953217A/en
Publication of JPH0953217A publication Critical patent/JPH0953217A/en
Pending legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

PROBLEM TO BE SOLVED: To hold sufficient durable strength without deforming a jacket sheathing pipe, and to fix a bearing pile easily onto the jacket sheathing pipe and cut the bearing pile. SOLUTION: Bearing piles 16 for temporary fixing consisting of H-steel are driven beforehand to the bottom of water and the upper end sections of the bearing piles 16 are projected previously onto the surface of water at places corresponding to jacket sheathing pipes 2 at a plurality of preset temporary fixing positions for temporarily fixing jackets. The bearing piles 16 for temporary fixing are inserted into the jacket sheathing pipes 2 at temporary fixing places while hanging down the jackets onto the bearing piles 16 for temporary fixing, the lower ends of the jacket sheathing pipes 2 are borne on brackets for temporarily fastening the jackets mounted on the bearing piles 16 for temporary fixing, and bearing piles 20 are hung up and inserted into the jacket sheathing pipes 2 excepting the temporary fixing places of the jackets. The bearing piles 20 are driven to the bottom of water by a pile-driver, and the excess sections of the bearing piles 20 projected to the upper sections of pile fixtures 22 are cut.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、海上、湖沼上等に仮
桟橋や作業台などの水上架設構造物を構築する場合に、
この架設構造物の基盤を構成するジャケットをH形鋼の
杭に取付支持するためのH形鋼の支持杭による水上架設
構造物のジャケット工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is useful for constructing a waterborne structure such as a temporary pier or a workbench on the sea or lake.
The present invention relates to a method for constructing a jacket of a floating erection structure using H-shaped steel support piles for mounting and supporting a jacket forming the base of the erected structure on an H-shaped steel pile.

【0002】[0002]

【従来の技術】従来のこの種のジャケット工法では、複
数の鋼管性ジャケット鞘管A,A間に受桁を架設し、さ
らに鞘管A,A間を斜めのブレスで連結してなるジャケ
ットを水上に支持する杭として鋼管杭Bを用い、このジ
ャケットを水底に打ち込んだ鋼管杭Bに仮支持した状態
で、鋼管杭Bをジャケット鞘管Aに通して水底に打ち込
んだ後、その頭部をジャケット鞘管A内で切断し、この
切断端面に図14〜図16に示すように円形の鉄板Cを
溶接し、さらにこの鉄板Cに十字状に直交させた十字プ
レートDを溶接してその各端縁部をジャケット鞘管Aの
内面に溶接し、さらにこの上に円形の鉄板Eを蓋状に溶
接していた。
2. Description of the Related Art In a conventional jacket construction method of this kind, a girder is installed between a plurality of steel tubular jacket sheath pipes A and A, and further, a jacket is formed by connecting the sheath pipes A and A with an oblique brace. A steel pipe pile B is used as a pile to be supported on the water, and in the state where this jacket is temporarily supported on the steel pipe pile B driven to the water bottom, the steel pipe pile B is driven through the jacket sheath pipe A and driven to the water bottom, and then the head is 14 to 16, a circular iron plate C is welded to the cut end face of the jacket sheath pipe A, and a cross plate D orthogonal to the cross is welded to the iron plate C. The edge portion was welded to the inner surface of the jacket sheath pipe A, and a circular iron plate E was welded thereon in a lid shape.

【0003】また従来のジャケット鞘管Aの頭部には、
その周囲に対称にボックス状の桁受ブラケットFを溶接
してこの上に受桁を載置固定していた。
Further, in the head of the conventional jacket sheath tube A,
A box-shaped girder receiving bracket F was symmetrically welded around it and the girder was placed and fixed on this.

【0004】[0004]

【発明が解決しようとする課題】上記従来の工法では、
鋼管杭Bをジャケット鞘管A内で切断するため、その切
断作業が極めて困難であると共に、現場での溶接作業が
多い上に、特に十字プレートDの端縁部の縦溶接はその
仕上がりの確実性と信頼性を確保するのが難しいなどの
問題があった。
SUMMARY OF THE INVENTION In the above conventional method,
Since the steel pipe pile B is cut in the jacket sheath pipe A, the cutting work is extremely difficult and a lot of welding work is performed on site, and in particular, the vertical welding of the edge portion of the cross plate D ensures the finish. There was a problem that it was difficult to secure reliability and reliability.

【0005】また従来のジャケット鞘管Aの頭部に設け
た桁受ブラケットFは鞘管Aの円周面に溶接により固定
されるため、桁受ブラケットF上に載せた受桁に繰り返
し荷重がかかった場合に桁受ブラケットFの付根におい
て鞘管Aが卵状に膨らんで、その断面形状が変形するこ
とによる強度低下の問題を招来する危険があった。
Further, since the girder bracket F provided on the head of the conventional jacket sheath pipe A is fixed to the circumferential surface of the sheath pipe A by welding, the girder mounted on the girder bracket F is subjected to repeated loads. When it is applied, there is a risk that the sheath tube A bulges like an egg at the root of the girder bracket F and the cross-sectional shape is deformed, which causes a problem of strength reduction.

【0006】[0006]

【課題を解決するための手段】この発明は前記従来の課
題を解決するために、縦横所要間隔で多数本配した鋼管
からなる鉛直なジャケット鞘管2,2の上端部間に一連
に受桁3を架設し、かつ隣接するジャケット鞘管2,2
相互を繋ぎ材4,5で連結し、さらに隣接する受桁3,
3間を繋ぎ材6で連結して方形架台状に構成され、前記
ジャケット鞘管2の上端外周に鋼板からなる上フランジ
8を設け、この上フランジ8の若干下方の外周に鋼板か
らなる環状の下フランジ9を設け、受桁3の載置部分に
おける上下のフランジ8,9間に所要数の鉛直な補強リ
ブ10,10,10’を設けてなるジャケット1を、ク
レーン15により吊り上げて水上の設置現場まで運搬
し、ジャケット1を仮固定するために予め設定した複数
の仮固定位置のジャケット鞘管2に対応する位置に、予
めH形鋼からなる仮固定用支持杭16を水底に打ち込ん
でその上端部を水面上に突出しておき、この仮固定用支
持杭16上にジャケット1を吊り降ろしながら仮固定位
置のジャケット鞘管2中に仮固定用支持杭16を挿通し
てこのジャケット鞘管2の下端を仮固定用支持杭16に
設けたジャケット仮固定用のブラケット17上に支持
し、この状態で杭打ち施工用作業船18のクレーン19
によりH形鋼からなる支持杭20を吊り上げてジャケッ
ト1の仮固定位置以外のジャケット鞘管2に挿通し、こ
の支持杭20を杭打機21により水底に打ち込んだ後、
上フランジ8上に垂直な杭固定面22aをもった前後一
対の杭固定金物22をボルト23により固定し、この相
対向する杭固定面22a,22aに接する支持杭20の
両フランジをボルト24によりそれぞれ締結固定すると
共に、杭固定金物22の上方に突出する支持杭20の余
剰部分を切断し、さらに仮固定用支持杭16を支持杭2
0と同様に杭固定金物22によりボルト24で締結固定
するようにしたH形鋼の支持杭による水上架設構造物の
ジャケット工法を提案するものである。
SUMMARY OF THE INVENTION In order to solve the above-mentioned conventional problems, the present invention provides a series of girders between the upper ends of vertical jacket sheath pipes 2 and 2 made of steel pipes arranged in a number of vertical and horizontal intervals. The jacket sheath pipes 2 and 2 in which 3 is installed and adjacent to each other
They are connected to each other by the connecting members 4 and 5, and the adjacent girders 3,
An upper flange 8 made of a steel plate is provided on the outer circumference of the upper end of the jacket sheath tube 2 by connecting the three with a connecting member 6, and an annular ring made of a steel plate is provided on the outer circumference slightly below the upper flange 8. The lower flange 9 is provided, and the jacket 1 having a required number of vertical reinforcing ribs 10, 10, 10 'provided between the upper and lower flanges 8, 9 in the mounting portion of the girder 3 is lifted by the crane 15 and lifted on the water. After being transported to the installation site, the temporary fixing support pile 16 made of H-shaped steel is driven into the bottom of the water at a position corresponding to the jacket sheath pipes 2 at a plurality of temporary fixing positions preset for temporarily fixing the jacket 1. The upper end portion is projected above the water surface, and while the jacket 1 is suspended on the temporary fixing support pile 16, the temporary fixing support pile 16 is inserted into the jacket sheath pipe 2 at the temporary fixing position. The lower end of 2 is supported on a bracket 17 for temporary fixing of the jacket provided on the support pile 16 for temporary fixing, and in this state, the crane 19 of the work boat 18 for pile driving.
After that, the support pile 20 made of H-shaped steel is lifted up and inserted into the jacket sheath pipe 2 other than the temporary fixing position of the jacket 1, and after the support pile 20 is driven into the water bottom by the pile driver 21,
A pair of front and rear pile fixing hardware 22 having vertical pile fixing surfaces 22a are fixed on the upper flange 8 by bolts 23, and both flanges of the support pile 20 contacting the opposite pile fixing surfaces 22a, 22a are fixed by bolts 24. While fastening and fixing each, the surplus portion of the support pile 20 protruding above the pile fixing hardware 22 is cut, and the temporary fixing support pile 16 is further supported.
As in the case of No. 0, the present invention proposes a jacket construction method for a floating installation structure using H-shaped steel support piles, which are fastened and fixed by bolts 24 by means of a pile fixing hardware 22.

【0007】[0007]

【作用】ジャケット鞘管2の上端外周に鋼板からなる上
フランジ8と、上フランジ8の若干下方の外周に鋼板か
らなる環状の下フランジ9とが設けられ、ジャケット鞘
管2の上端部はその外周を囲む上下のフランジ8,9に
よって補強され、さらに受桁3の載置部分における上下
のフランジ8,9間に所要数の鉛直な補強リブ10,1
0,10’が設けられているため、この受桁3の載置部
分における上フランジ8に載置固定した受桁3に繰り返
し荷重が作用しても、環状の上下のフランジ8,9と補
強リブ10,10,10’によってジャケット鞘管2に
変形を生ずることなく充分な耐久強度を保持する。
The jacket sheath tube 2 is provided with an upper flange 8 made of a steel plate on the outer periphery of the upper end, and an annular lower flange 9 made of a steel plate on the outer periphery slightly below the upper flange 8, and the upper end of the jacket sheath pipe 2 is It is reinforced by upper and lower flanges 8 and 9 which surround the outer periphery, and a required number of vertical reinforcing ribs 10 and 1 are provided between the upper and lower flanges 8 and 9 in the mounting portion of the receiving girder 3.
Since 0 and 10 'are provided, even if a load is repeatedly applied to the girder 3 mounted and fixed on the upper flange 8 in the mounting portion of the girder 3, the annular upper and lower flanges 8 and 9 are reinforced. The ribs 10, 10, 10 'maintain sufficient durability without causing deformation of the jacket sheath tube 2.

【0008】支持杭20を杭打機21により水底に打ち
込んだ後、上フランジ8上に垂直な杭固定面22aをも
った前後一対の杭固定金物22をボルト23により固定
し、この相対向する杭固定面22a,22aに接する支
持杭20の両フランジをボルト24によりそれぞれ締結
固定するため、溶接が不要で、作業員が作業空間に余裕
のある上フランジ8上で容易にボルト締結作業を行うこ
とができると共に、杭固定金物22より上方に突出する
余剰の支持杭20を容易に切断することができる。
After the support pile 20 is driven into the bottom of the water by the pile driver 21, a pair of front and rear pile fixing hardware 22 having a vertical pile fixing surface 22a is fixed on the upper flange 8 by the bolts 23, which face each other. Since both flanges of the support pile 20 that are in contact with the pile fixing surfaces 22a and 22a are fastened and fixed by the bolts 24, respectively, welding is not necessary, and the worker easily performs the bolt fastening work on the upper flange 8 having a sufficient working space. At the same time, the surplus support pile 20 protruding above the pile fixing metal piece 22 can be easily cut.

【0009】[0009]

【実施例】仮桟橋や作業台などの水上架設構造物の基盤
を構成するジャケット1は、縦横所要間隔で多数本配し
た鋼管からなる鉛直なジャケット鞘管2,2の上端部間
に一連にH形鋼からなる受桁3を架設し、かつ隣接する
ジャケット鞘管2,2相互を斜めおよび水平の繋ぎ材
4,5で連結し、さらに隣接する受桁3,3間を斜めま
たは直交状に交差する繋ぎ材6で連結して方形架台状に
構成されている。
[Example] A jacket 1 which forms the foundation of a waterborne structure such as a temporary pier or a workbench is a series of vertical jacket sheath pipes 2 made of steel pipes arranged at required vertical and horizontal intervals. A girder 3 made of H-shaped steel is erected, and adjacent jacket sheath pipes 2 and 2 are connected by diagonal and horizontal connecting members 4 and 5, and the adjoining girders 3 and 3 are oblique or orthogonal. Are connected by a connecting member 6 that intersects with each other to form a rectangular frame.

【0010】ジャケット鞘管2は図3〜図5に示すよう
に、その上端外周に一部の外周に鞘管2の中心に対して
対称に一対の拡張部7を設けた鋼板からなる上フランジ
8が設けられ、この上フランジ8の若干下方の外周に鋼
板からなる環状の下フランジ9が設けられ、拡張部7の
両側およびその延長線上の上フランジ8と下フランジ9
との間、および拡張部7の巾方向の中央およびその延長
線上の上フランジ8と下フランジ9との間に鋼板からな
る垂直な補強リブ10,10,10’が設けられ、これ
らの上下フランジ8,9と補強リブ10,10,10’
とによってボックス状の受桁支持部が構成され、さらに
上下フランジ8,9間のその他の所要位置に垂直な補強
リブ12が設けられ、それぞれ各フランジ8,9とジャ
ケット鞘管2の周面に接する接線を溶接して連結一体化
されている。
As shown in FIGS. 3 to 5, the jacket sheath tube 2 is an upper flange made of a steel plate having a pair of expanded portions 7 symmetrically with respect to the center of the sheath tube 2 on the outer periphery of the upper end thereof. 8 is provided, and an annular lower flange 9 made of a steel plate is provided on the outer periphery slightly below the upper flange 8, and the upper flange 8 and the lower flange 9 on both sides of the expanded portion 7 and its extension line are provided.
Vertical reinforcing ribs 10, 10, 10 ′ made of steel plates are provided between the upper flange 8 and the lower flange 9 on the center of the expanded portion 7 in the width direction and on the extension line thereof. 8, 9 and reinforcing ribs 10, 10, 10 '
A box-shaped girder support portion is constituted by and further vertical reinforcing ribs 12 are provided at other required positions between the upper and lower flanges 8 and 9, and the flanges 8 and 9 and the peripheral surface of the jacket sheath tube 2 are respectively provided. The tangents that come into contact are welded and integrated.

【0011】なお、拡張部7は受桁3を載せる上フラン
ジ8の部分に受桁3の巾に応じてフランジ巾を部分的に
拡張したもので、受桁3を載せないフランジ部分は受桁
3の幅よりも強度的に狭くてよいため、材料の節約上拡
張部7を設けたが、上フランジ8のフランジ巾を拡張部
7の先端まで拡げることによって拡張部を設けない形態
であってもよい(但し、この拡張部7に相当する部分に
補強リブ10,10,10’を設けてボックス状とする
ことは同じ)。
The expansion portion 7 is formed by partially expanding the flange width according to the width of the girder 3 on the upper flange 8 on which the girder 3 is placed. Since the material may be narrower in strength than the width of 3, the upper extension 7 is provided to save material, but the extension is not provided by expanding the flange width of the upper flange 8 to the tip of the extension 7. It is good (however, it is the same as providing the reinforcing ribs 10, 10, 10 ′ in the portion corresponding to the expanded portion 7 to form a box shape).

【0012】受桁3は、上記ボックス状に補強した上フ
ランジ8上に載せてボルト13で締結固定する。
The receiving girder 3 is placed on the upper flange 8 reinforced in the box shape and fastened and fixed with bolts 13.

【0013】上記ジャケット1は、地上で組立ててクレ
ーン船14のクレーン15により吊り上げて水上を設置
現場まで運搬する。
The jacket 1 is assembled on the ground, lifted by the crane 15 of the crane ship 14, and transported on the water to the installation site.

【0014】ジャケット1の設置現場には、例えばジャ
ケット1の四隅に位置するジャケット鞘管2等、ジャケ
ット1のいくつかのジャケット鞘管2において支持すれ
ば仮設置ができる位置のジャケット鞘管2に対応する位
置に、図10に示すように予めH形鋼からなる仮固定用
支持杭16を水底に打ち込んでその上端部を水面上に突
出しておき、その頭部には先鋭状のガイド頭部16’を
固定し、また上端部の下方にはジャケット仮固定用のブ
ラケット17を水中溶接により固定しておく。
At the installation site of the jacket 1, for example, the jacket sheath pipes 2 located at the four corners of the jacket 1 and the like can be temporarily installed by being supported by several jacket sheath pipes 2 of the jacket 1. At a corresponding position, as shown in FIG. 10, a temporary fixing support pile 16 made of H-shaped steel is driven into the water bottom in advance and its upper end is projected above the water surface. 16 'is fixed, and a bracket 17 for temporarily fixing the jacket is fixed under the upper end by underwater welding.

【0015】そして図11に示すように仮固定用支持杭
16上にジャケット1を吊り降ろしながら、図12に示
すように四隅に位置するジャケット鞘管2中に仮固定用
支持杭16を挿通し、ジャケット鞘管2の下端をジャケ
ット仮固定用のブラケット17上に支持する。
Then, while the jacket 1 is suspended on the temporary fixing support pile 16 as shown in FIG. 11, the temporary fixing support pile 16 is inserted into the jacket sheath tubes 2 located at the four corners as shown in FIG. The lower end of the jacket sheath tube 2 is supported on the bracket 17 for temporarily fixing the jacket.

【0016】この場合、仮固定用支持杭16の上端は先
鋭状のガイド頭部16’が設けられているため、これに
案内しながらジャケット鞘管2中に仮固定用支持杭16
を円滑かつ確実に挿通することができる。
In this case, since the upper end of the temporary fixing support pile 16 is provided with a sharp guide head 16 ', the temporary fixing support pile 16 is guided in the jacket sheath tube 2 while guiding it.
Can be smoothly and surely inserted.

【0017】この状態で、図13に示すように杭打ち施
工用作業船18のクレーン19によりH形鋼からなる支
持杭20をジャケット1の仮固定部位外のジャケット鞘
管2に挿通し、油圧バイブレーター等の杭打機21によ
り水底に打ち込み、支持力が得られる地層に到達するま
で必要に応じて支持杭2を複数連結して打ち込む。
In this state, as shown in FIG. 13, the supporting pile 20 made of H-shaped steel is inserted into the jacket sheath pipe 2 outside the temporary fixing portion of the jacket 1 by the crane 19 of the pile driving work boat 18, and the hydraulic pressure is applied. A pile driving machine 21 such as a vibrator is driven into the bottom of the water, and a plurality of support piles 2 are connected and driven as necessary until reaching a stratum where a supporting force is obtained.

【0018】このようにして各ジャケット鞘管2に支持
杭20を打ち込んだ後に、図6〜図8に示すように左右
の受桁3,3間の上フランジ8上に垂直な杭固定面22
aをもった前後一対の杭固定金物22をその底面の設置
面22bにボルト23により固定し、この相対向する杭
固定面22a,22aに接する支持杭20の両フランジ
をボルト24によりそれぞれ固定すると共に、杭固定金
物22の上方に突出する支持杭20の余剰部分は切断す
る。
After the support pile 20 is driven into each jacket sheath pipe 2 in this manner, as shown in FIGS. 6 to 8, a vertical pile fixing surface 22 is provided on the upper flange 8 between the left and right receiving girders 3, 3.
A pair of front and rear pile fixing hardware 22 having a is fixed to the installation surface 22b on the bottom surface thereof with bolts 23, and both flanges of the support pile 20 in contact with the opposite pile fixing surfaces 22a and 22a are fixed with bolts 24, respectively. At the same time, the surplus portion of the support pile 20 protruding above the pile fixing hardware 22 is cut.

【0019】さらに、仮固定用支持杭16は、支持杭2
0の打ち込み施工後において支持杭として上記支持杭2
0と同様に支持力が得られる地層に到達するまで必要に
応じて複数連結して打ち込み、上記と同様の工程により
杭固定金物22によりボルト24で締結固定する。
Further, the temporary fixing support pile 16 is the support pile 2
The above-mentioned support pile 2 as a support pile after 0 driving construction
As in the case of No. 0, if necessary, a plurality of them are connected and driven in until they reach the stratum where a supporting force is obtained, and by the steps similar to the above, they are fastened and fixed with bolts 24 by the pile fixing hardware 22.

【0020】このようなジャケット1の設置工を図9に
示すように必要に応じて前後または左右に連続的に行
い、これらの一連に設置したジャケット1の受桁3上に
図1、図2に示すように主桁25を取付け、その上に覆
工板26を敷設して床版部を構成し、この床版部に必要
に応じて舗装工を施したり、手摺などを設置する。
As shown in FIG. 9, the installation work of such a jacket 1 is continuously performed in the front-rear direction or the left-right direction as shown in FIG. The main girder 25 is attached as shown in FIG. 2 and the lining plate 26 is laid on the main girder 25 to form a floor slab, and the floor slab is paved and handrails are installed if necessary.

【0021】[0021]

【発明の効果】以上の通りこの発明によれば、ジャケッ
ト鞘管の上端外周に鋼板からなる上フランジと、上フラ
ンジの若干下方の外周に鋼板からなる環状の下フランジ
とが設けられ、ジャケット鞘管の上端部はその外周を囲
む上下のフランジによって補強され、さらに受桁の載置
部分における上下のフランジ間に所要数の鉛直な補強リ
ブが設けられているため、この受桁の載置部分における
上フランジに載置固定した受桁に繰り返し荷重が作用し
ても、環状の上下のフランジと補強リブによってジャケ
ット鞘管に変形を生ずることなく充分な耐久強度を保持
する。
As described above, according to the present invention, an upper flange made of a steel plate is provided on the outer periphery of the upper end of the jacket sheath pipe, and an annular lower flange made of a steel plate is provided on the outer periphery slightly below the upper flange. The upper end of the pipe is reinforced by the upper and lower flanges that surround its outer circumference, and the required number of vertical reinforcing ribs are provided between the upper and lower flanges of the girder mounting part. Even when a load is repeatedly applied to the receiving girder placed and fixed on the upper flange, the upper and lower annular flanges and the reinforcing ribs do not deform the jacket sheath pipe and maintain sufficient durability.

【0022】支持杭を杭打機により水底に打ち込んだ
後、上フランジ上に垂直な杭固定面をもった前後一対の
杭固定金物をボルトにより固定し、この相対向する杭固
定面に接する支持杭の両フランジをボルトによりそれぞ
れ締結固定するため、溶接が不要で、作業員が作業空間
に余裕のある上フランジ上で容易にボルト締結作業を行
うことができると共に、杭固定金物より上方に突出する
余剰の支持杭を容易に切断することができる。
After driving the support piles to the bottom of the water by a pile driver, a pair of front and rear pile fixing hardware having vertical pile fixing surfaces on the upper flanges are fixed by bolts, and the supports are in contact with the opposing pile fixing surfaces. Since both flanges of the pile are fastened and fixed with bolts respectively, welding is not required, and the worker can easily perform bolt fastening work on the upper flange with plenty of working space, and project above the pile fixing hardware. The surplus support pile can be easily cut.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明により施工した海上作業台の要部の縦
断側面図。
FIG. 1 is a vertical cross-sectional side view of a main part of a marine work platform constructed according to the present invention.

【図2】この発明により施工した海上作業台の要部の縦
断正面図。
FIG. 2 is a vertical sectional front view of a main part of a marine work platform constructed according to the present invention.

【図3】この発明に係るジャケットのジャケット鞘管の
正面図。
FIG. 3 is a front view of a jacket sheath tube of the jacket according to the present invention.

【図4】この発明に係るジャケットのジャケット鞘管の
側面図。
FIG. 4 is a side view of the jacket sheath tube of the jacket according to the present invention.

【図5】この発明に係るジャケットのジャケット鞘管の
平面図。
FIG. 5 is a plan view of a jacket sheath tube of the jacket according to the present invention.

【図6】この発明に係るジャケット鞘管に支持杭を固定
した状態を示す正面図。
FIG. 6 is a front view showing a state in which a support pile is fixed to the jacket sheath pipe according to the present invention.

【図7】この発明に係るジャケット鞘管に支持杭を固定
した状態を示す側面図。
FIG. 7 is a side view showing a state in which a support pile is fixed to the jacket sheath pipe according to the present invention.

【図8】この発明に係るジャケット鞘管に支持杭を固定
した状態を示す平面図。
FIG. 8 is a plan view showing a state in which a support pile is fixed to the jacket sheath pipe according to the present invention.

【図9】この発明に係るジャケットを設置した状態を示
す部分平面図。
FIG. 9 is a partial plan view showing a state in which the jacket according to the present invention is installed.

【図10】この発明の施工工程の一態様を示す側面図。FIG. 10 is a side view showing one embodiment of a construction process of the present invention.

【図11】この発明の施工工程の他の態様を示す側面
図。
FIG. 11 is a side view showing another embodiment of the construction process of the present invention.

【図12】この発明の施工工程の他の態様を示す側面
図。
FIG. 12 is a side view showing another embodiment of the construction process of the present invention.

【図13】この発明の施工工程の他の態様を示す側面
図。
FIG. 13 is a side view showing another embodiment of the construction process of the present invention.

【図14】従来のジャケット鞘管の支持杭との固定状態
を示す縦断正面図。
FIG. 14 is a vertical cross-sectional front view showing a state where a conventional jacket sheath pipe is fixed to a support pile.

【図15】図14におけるイ−イ断面図。15 is a cross-sectional view taken along the line EE in FIG.

【図16】図14におけるロ−ロ断面図。16 is a cross-sectional view taken along the line ROLL in FIG.

【符号の説明】[Explanation of symbols]

1 ジャケット 2 ジャケット鞘管 3 受桁 4 繋ぎ材 5 繋ぎ材 6 繋ぎ材 7 拡張部 8 上フランジ 9 下フランジ 10 補強リブ 10’ 補強リブ 12 補強リブ 13 ボルト 14 クレーン船 15 クレーン 16 仮固定用支持杭 16’ ガイド頭部 17 ブラケット 18 杭打ち施工用作業船 19 クレーン 20 支持杭 22 杭固定金物 22a 杭固定面 22b 設置面 23 ボルト 24 ボルト 25 主桁 26 覆工版 DESCRIPTION OF SYMBOLS 1 jacket 2 jacket sheath pipe 3 girder 4 connecting material 5 connecting material 6 connecting material 7 expansion part 8 upper flange 9 lower flange 10 reinforcing rib 10 'reinforcing rib 12 reinforcing rib 13 bolt 14 crane ship 15 crane 16 support pile for temporary fixing 16 'Guide head 17 Bracket 18 Workboat for pile driving 19 Crane 20 Support pile 22 Pile fixing hardware 22a Pile fixing surface 22b Installation surface 23 Bolt 24 Bolt 25 Main girder 26 Overlining version

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 縦横所要間隔で多数本配した鋼管からな
る鉛直なジャケット鞘管の上端部間に一連に受桁を架設
し、かつ隣接するジャケット鞘管相互を繋ぎ材で連結
し、さらに隣接する前記受桁間を繋ぎ材で連結して方形
架台状に構成され、前記ジャケット鞘管の上端外周に鋼
板からなる上フランジを設け、この上フランジの若干下
方の外周に鋼板からなる環状の下フランジを設け、前記
受桁の載置部分における上下のフランジ間に所要数の鉛
直な補強リブを設けてなるジャケットを、クレーンによ
り吊り上げて水上の設置現場まで運搬し、前記ジャケッ
トを仮固定するために予め設定した複数の仮固定位置の
ジャケット鞘管に対応する位置に、予めH形鋼からなる
仮固定用支持杭を水底に打ち込んでその上端部を水面上
に突出しておき、この仮固定用支持杭上に前記ジャケッ
トを吊り降ろしながら前記仮固定位置のジャケット鞘管
中に前記仮固定用支持杭を挿通してこのジャケット鞘管
の下端を前記仮固定用支持杭に設けたジャケット仮固定
用のブラケット上に支持し、この状態で杭打ち施工用作
業船のクレーンによりH形鋼からなる支持杭を吊り上げ
て前記ジャケットの仮固定位置以外のジャケット鞘管に
挿通し、この支持杭を杭打機により水底に打ち込んだ
後、前記上フランジ上に垂直な杭固定面をもった前後一
対の杭固定金物をボルトにより固定し、この相対向する
杭固定面に接する支持杭の両フランジをボルトによりそ
れぞれ締結固定すると共に、前記杭固定金物の上方に突
出する前記支持杭の余剰部分を切断し、さらに前記仮固
定用支持杭を前記支持杭と同様に前記杭固定金物により
ボルトで締結固定することを特徴とするH形鋼の支持杭
による水上架設構造物のジャケット工法を特徴とするH
形鋼支持杭による水上架設構造物のジャケット工法。
1. A girder is installed in series between the upper ends of vertical jacket sheath pipes made of steel pipes arranged at required vertical and horizontal intervals, and adjacent jacket sheath pipes are connected by a connecting member, and further adjacent An upper flange made of a steel plate is provided on the outer periphery of the upper end of the jacket sheath pipe, and an annular bottom made of a steel plate is provided slightly below the upper flange. In order to temporarily secure the jacket, which is provided with a flange and is provided with a required number of vertical reinforcing ribs between the upper and lower flanges of the receiving part of the girder, is lifted by a crane and transported to the installation site on the water. At the positions corresponding to the jacket sheath pipes at the plurality of temporary fixing positions set in advance, the temporary fixing support piles made of H-shaped steel are driven into the water bottom in advance, and the upper ends thereof are projected above the water surface. A jacket in which the temporary fixing support pile is inserted into the jacket sheath pipe at the temporary fixing position while suspending the jacket on the temporary fixing support pile and the lower end of the jacket sheath pipe is provided on the temporary fixing support pile. The support pile is supported on a bracket for temporary fixing, and in this state, a supporting pile made of H-shaped steel is lifted by a crane of a work boat for pile driving and inserted into a jacket sheath pipe other than the temporary fixing position of the jacket. After driving into the bottom of the water by a pile driver, a pair of front and rear pile fixing hardware having a vertical pile fixing surface on the upper flange is fixed by bolts, and both flanges of the supporting pile contacting the opposite pile fixing surfaces. Each of which is fastened and fixed by bolts, the surplus portion of the support pile protruding above the pile fixing metal piece is cut, and the temporary fixing support pile is further fixed to the pile fixing member in the same manner as the support pile. H, wherein a jacket method of water erection structure by the supporting piles of H-beams, characterized in that the fastening bolted by hardware
Jacket construction method for floating structures using shaped steel support piles.
JP22721995A 1995-08-11 1995-08-11 Method of jacket construction of water-surface erected structure by h-steel bearing pile Pending JPH0953217A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22721995A JPH0953217A (en) 1995-08-11 1995-08-11 Method of jacket construction of water-surface erected structure by h-steel bearing pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22721995A JPH0953217A (en) 1995-08-11 1995-08-11 Method of jacket construction of water-surface erected structure by h-steel bearing pile

Publications (1)

Publication Number Publication Date
JPH0953217A true JPH0953217A (en) 1997-02-25

Family

ID=16857370

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22721995A Pending JPH0953217A (en) 1995-08-11 1995-08-11 Method of jacket construction of water-surface erected structure by h-steel bearing pile

Country Status (1)

Country Link
JP (1) JPH0953217A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004285735A (en) * 2003-03-24 2004-10-14 Kouchi Marutaka:Kk Method of constructing temporary landing bridge by using truss frame
JP2006045838A (en) * 2004-08-03 2006-02-16 Taisei Corp On-water structure and method of constructing the same
JP2007132046A (en) * 2005-11-09 2007-05-31 Jfe Engineering Kk Composite rigid-frame bridge
CN109356021A (en) * 2018-11-27 2019-02-19 中铁六局集团有限公司 Temporary rest pier waterborne and its construction method
CN111535158A (en) * 2020-05-14 2020-08-14 中国五冶集团有限公司 Temporary buttress for installing box girder pushing equipment and construction method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004285735A (en) * 2003-03-24 2004-10-14 Kouchi Marutaka:Kk Method of constructing temporary landing bridge by using truss frame
JP2006045838A (en) * 2004-08-03 2006-02-16 Taisei Corp On-water structure and method of constructing the same
JP4574273B2 (en) * 2004-08-03 2010-11-04 大成建設株式会社 Water structure and its construction method
JP2007132046A (en) * 2005-11-09 2007-05-31 Jfe Engineering Kk Composite rigid-frame bridge
JP4548311B2 (en) * 2005-11-09 2010-09-22 Jfeエンジニアリング株式会社 Abutment structure of composite ramen bridge
CN109356021A (en) * 2018-11-27 2019-02-19 中铁六局集团有限公司 Temporary rest pier waterborne and its construction method
CN111535158A (en) * 2020-05-14 2020-08-14 中国五冶集团有限公司 Temporary buttress for installing box girder pushing equipment and construction method thereof

Similar Documents

Publication Publication Date Title
KR101614253B1 (en) Cantilever construction method of temporary bridge
JP5097313B2 (en) Suspended scaffold and its installation method
JP2017190607A (en) Erection method of simple temporary bridge
US5474399A (en) Open cutting by floor slab braced retaining wall
JPH0953217A (en) Method of jacket construction of water-surface erected structure by h-steel bearing pile
JP2002088779A (en) Jacket structure and method for setting jacket structure
JP4033871B2 (en) How to build a bridge girder
JPH0953223A (en) Bearing-pile mounting structure of jacket for constructing water-surface erection structure
JP3735273B2 (en) How to install underwater foundation
JP3321138B2 (en) Joint structure for steel pile and method of building steel pile
JP4014050B2 (en) Steel pipe temporary facility construction method
JP2928106B2 (en) Rebar basket used for underground continuous wall method
JP3117385B2 (en) Fixing method of steel pier and footing
JP2006125055A (en) Shaft constructing method
JPH08100464A (en) Joint structure and work execution method for structure using it
JP2001172916A (en) Corrugated synthetic floor slab
JP3849234B2 (en) Reinforced concrete underground outer wall construction method
JP2516118B2 (en) Concrete block for offshore construction
JP7470010B2 (en) Method for constructing underground structure and lifting jig
JPH10331568A (en) Steel segment piece with concrete placed in hollow part thereof and method for constructing sunk body using the same
JP2002088777A (en) Method for connecting jacket structure to pile, and pipe expanding apparatus for use in the method
JPH0711620A (en) Construction method of artificial ground
JP2008223391A (en) Repair reinforcement method for existing quay wall and its repair reinforcement structure
JP2000017642A (en) Working method for pile head portion of diagonally assembled pile
JPH09158192A (en) Coffering and steel structure for coffering