JPH09302964A - Fixed construction of ceiling panel in unit room - Google Patents

Fixed construction of ceiling panel in unit room

Info

Publication number
JPH09302964A
JPH09302964A JP8123317A JP12331796A JPH09302964A JP H09302964 A JPH09302964 A JP H09302964A JP 8123317 A JP8123317 A JP 8123317A JP 12331796 A JP12331796 A JP 12331796A JP H09302964 A JPH09302964 A JP H09302964A
Authority
JP
Japan
Prior art keywords
ceiling panel
fixed
connecting member
edge
unit room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP8123317A
Other languages
Japanese (ja)
Inventor
Katsuhito Takahashi
勝仁 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP8123317A priority Critical patent/JPH09302964A/en
Publication of JPH09302964A publication Critical patent/JPH09302964A/en
Pending legal-status Critical Current

Links

Landscapes

  • Residential Or Office Buildings (AREA)

Abstract

PROBLEM TO BE SOLVED: To simply fix a ceiling panel within a short period of time from the inside of a unit room such as bathroom unit, etc. SOLUTION: After a plurality of posts 6 are erected on the circumferential edge section of a waterproof pan at specific intervals, joint members 8 are fixed over the neighborhood of the upper end edges of the posts 6, and fitting sections 51a formed in the end edges of a ceiling panel 5 are fitted to the joint members 8 to bear. Then, spring clips 9 are loaded over the end edge fitting sections 51a of the joint members 8 and ceiling panel 5, and the ceiling panel 5 is fixed to the posts 6.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、浴室ユニットなど
のユニットルームにおける天井パネルの固定構造に関す
るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure for fixing a ceiling panel in a unit room such as a bathroom unit.

【0002】[0002]

【従来の技術】従来より、集合住宅などにおいて、浴室
ユニットを設置することが行われている。この浴室ユニ
ット1は、図5に示すように、洗い場を形成した防水パ
ン2と、この防水パン2と一体の、もしくは、別体の浴
槽3と、防水パン2の周縁部に立設され、これらの防水
パン2および浴槽3の周囲を包囲して立設された壁パネ
ル4と、これらの壁パネル4によって形成された上方開
口部を覆う天井パネル5から構成されている。
2. Description of the Related Art Conventionally, bathroom units have been installed in apartment houses and the like. As shown in FIG. 5, this bathroom unit 1 is provided with a waterproof pan 2 forming a washing space, a bathtub 3 integral with or separate from the waterproof pan 2, and a standing part on the peripheral edge of the waterproof pan 2. The waterproof pan 2 and the bathtub 3 are surrounded by a wall panel 4 which is provided upright, and a ceiling panel 5 which covers an upper opening formed by the wall panels 4.

【0003】この浴室ユニット1は、通常、防水パン2
を設置し、ユニットの外側から壁パネル4をビス止めし
て固定するパネル工法で組み立てられている。この場
合、天井パネル5は、壁パネル4の上端折り曲げ部に載
置された後、その端縁と壁パネル4の端縁にわたってバ
ネクリップを装着することで壁パネル4に固定されてい
る。
[0003] The bathroom unit 1 is usually provided with a waterproof pan 2.
Is installed, and the wall panel 4 is assembled from the outside of the unit by screws. In this case, the ceiling panel 5 is fixed to the wall panel 4 by being mounted on the upper end bent portion of the wall panel 4 and then by mounting a spring clip over the edge and the edge of the wall panel 4.

【0004】一方、躯体側の間仕切りや外壁があって作
業者が入り込めない場合には、ユニット内部から壁パネ
ル4を取り付ける現地組み立て工法が採用されている。
すなわち、現地組み立て工法は、図4に示すように、ま
ず、防水パン2を設置し、この防水パン2の周縁部に間
隔をおいて複数本の支柱6を立設固定し、これらの支柱
6間に横フレーム7を掛け渡した後、防水パン2の周縁
部に壁パネル4を嵌め込み、支柱6および横フレーム7
にビスを介して固定する。そして、全ての壁パネル4を
固定した後、その上端縁に天井パネル5を載置し、それ
らの端縁部をビスを介して連結するものである(例え
ば、実開昭59−136853号公報参照)。
On the other hand, when there is a partition or an outer wall on the skeleton side and a worker cannot enter, an on-site assembling method of mounting the wall panel 4 from inside the unit is adopted.
That is, according to the on-site assembly method, as shown in FIG. 4, first, the waterproof pan 2 is installed, and a plurality of columns 6 are erected and fixed on the peripheral edge of the waterproof pan 2 at intervals. After straddling the horizontal frame 7 between them, the wall panel 4 is fitted to the peripheral edge of the waterproof pan 2, and the pillar 6 and the horizontal frame 7 are inserted.
Secure it with a screw. Then, after fixing all the wall panels 4, the ceiling panel 5 is placed on the upper edge thereof, and the edge portions thereof are connected via screws (for example, Japanese Utility Model Laid-Open No. Sho 59-136853). reference).

【0005】[0005]

【発明が解決しようとする課題】しかしながら、前述し
たパネル工法の場合には、天井パネルに形成された天井
点検口から天井裏の狭い空間に身を乗り出してバネクリ
ップを装着する作業が必要となり、作業性が低下する
他、安全性にも難があるとともに、天井裏に作業空間を
確保できない場合には、バネクリップの装着作業そのも
のが不可能となる。また、現地組み立て工法の場合に
は、天井パネルを固定するため、多数本のビスを打ち込
む作業が必要となり、作業が煩雑になるとともに、時間
がかかるという問題がある。
However, in the case of the panel construction method described above, it is necessary to lean out from the ceiling inspection port formed in the ceiling panel into a narrow space behind the ceiling and attach the spring clip, In addition to lowering workability, there is also a problem in safety, and when a work space cannot be secured behind the ceiling, the work of attaching the spring clip itself becomes impossible. Further, in the case of the on-site assembly method, since the ceiling panel is fixed, it is necessary to drive a large number of screws, which complicates the work and takes time.

【0006】本発明は、このような問題点に鑑みてなさ
れたもので、浴室ユニットなどのユニットルームの内部
側から天井パネルを簡単かつ短時間に固定することので
きるユニットルームにおける天井パネルの固定構造を提
供するものである。
The present invention has been made in view of the above problems, and the ceiling panel in a unit room can be fixed easily and in a short time from the inside of the unit room such as a bathroom unit. It provides the structure.

【0007】[0007]

【課題を解決するための手段】本発明は、防水パンの周
縁部に間隔をおいて立設された複数本の支柱と、これら
の支柱の上端縁近傍にわたって固定された連結部材と、
この連結部材と嵌合可能な嵌合部が少なくとも隣接する
三辺の端縁に形成された天井パネルからなり、天井パネ
ルの端縁嵌合部を連結部材に嵌合支持させるとともに、
連結部材と天井パネルの端縁嵌合部にわたってバネクリ
ップを装着することにより、天井パネルを固定すること
を特徴とするものである。
SUMMARY OF THE INVENTION According to the present invention, a plurality of columns are provided upright on the peripheral edge of a waterproof pan at intervals, and a connecting member fixed near the upper edge of these columns.
A fitting portion that can be fitted with this connecting member is a ceiling panel formed on at least three adjacent edges of the ceiling panel, and the edge fitting portion of the ceiling panel is fitted and supported by the connecting member,
The ceiling panel is fixed by mounting a spring clip over the connecting member and the edge fitting portion of the ceiling panel.

【0008】[0008]

【発明の実施の形態】以下、本発明の実施例の形態を図
面に基づいて説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0009】なお、説明の便宜上、図4および図5に示
した部材と同一の部材には、同一の符号を用いるものと
する。
For convenience of explanation, the same members as those shown in FIGS. 4 and 5 are designated by the same reference numerals.

【0010】図1には、本発明のユニットルームにおけ
る天井パネルの固定構造の一実施形態が記載されてい
る。この実施形態における天井パネル5は、塩ビ鋼板5
1の裏面に裏打材である石膏ボード52を貼り合わせて
形成され、その塩ビ鋼板51の端縁は、コ字状に折曲さ
れて嵌合部51aに形成されている。そして、天井パネ
ル5を支柱6に対して固定するとともに、支柱6を安定
して自立させるため、支柱6,6の上端縁近傍にわたっ
て鋼板からなる連結部材8がビスを介して固定されてい
る。この連結部材8の上部は、支柱6の上端縁から突出
されて天井パネル5における塩ビ鋼板51の嵌合部51
aに嵌合され、天井パネル5を支持できるようになって
いる。
FIG. 1 shows an embodiment of a ceiling panel fixing structure in a unit room according to the present invention. The ceiling panel 5 in this embodiment is a vinyl chloride steel plate 5.
A gypsum board 52, which is a backing material, is attached to the back surface of No. 1 and an end edge of the vinyl chloride steel plate 51 is bent in a U shape to form a fitting portion 51a. Then, the ceiling panel 5 is fixed to the support pillar 6, and in order to stably support the support pillar 6 independently, a connecting member 8 made of a steel plate is fixed via screws over the vicinity of the upper edge of the support pillars 6, 6. The upper portion of the connecting member 8 is projected from the upper end edge of the column 6 to fit the fitting portion 51 of the vinyl chloride steel plate 51 in the ceiling panel 5.
It is fitted to a so that the ceiling panel 5 can be supported.

【0011】したがって、浴室ユニットなどのユニット
ルームを組み立てる場合は、まず、防水パン2を設置
し、この防水パン2の周縁部に間隔をおいて複数本の支
柱6を立設固定した後、支柱6の上端縁近傍に連結部材
8を支柱6,6にわたってビスを介して固定する。次い
で、天井パネル5を持ち上げ、その端縁嵌合部51aが
連結部材8に嵌合するように落とし込み、支持させる。
この後、これらの天井パネル5の端縁嵌合部51aと連
結部材8とにわたって複数個のバネクリップ9を間隔を
おいて装着し、天井パネル5を固定する。この際、バネ
クリップ9の装着作業は、浴室ユニット1の内部におい
て、支柱6と支柱6との間から行うことができる。
Therefore, when assembling a unit room such as a bathroom unit, first, the waterproof pan 2 is installed, and a plurality of pillars 6 are erected and fixed on the peripheral edge of the waterproof pan 2, and then the pillars are fixed. The connecting member 8 is fixed to the vicinity of the upper edge of 6 over the columns 6 and 6 with screws. Next, the ceiling panel 5 is lifted up, and its edge fitting portion 51a is dropped so as to fit the connecting member 8 and supported.
After that, a plurality of spring clips 9 are attached at intervals over the edge fitting portions 51a of the ceiling panel 5 and the connecting member 8 to fix the ceiling panel 5. At this time, the attachment work of the spring clip 9 can be performed from between the columns 6 between the columns 6 inside the bathroom unit 1.

【0012】この結果、天井パネル5を浴室ユニット1
の内部側から簡単かつ短時間に固定することができる。
As a result, the ceiling panel 5 is attached to the bathroom unit 1
It can be easily and quickly fixed from the inside.

【0013】天井パネル5の固定が終了すれば、天井パ
ネル5と防水パン2の周縁部間に、塩ビ鋼板41の裏面
に石膏ボード42を貼り合わせて形成された壁パネル4
を嵌め込んで固定する。この後、壁パネル4と天井パネ
ル5との突き合わせ部分にシリコンシーリング材を充填
し、密封すればよい。
When the fixing of the ceiling panel 5 is completed, the wall panel 4 formed by bonding the plaster board 42 to the back surface of the vinyl chloride steel plate 41 between the ceiling panel 5 and the peripheral portion of the waterproof pan 2.
Insert and fix. After that, the butting portion between the wall panel 4 and the ceiling panel 5 may be filled with a silicone sealing material and sealed.

【0014】ところで、前述した実施形態においては、
平板状の連結部材8を用いたが、連結部材8が天井パネ
ル5の端縁嵌合部51aに嵌合して天井パネル5を支持
できればよく、任意の形状に形成することができる。例
えば、図2に示すように、支柱6の上端縁に載置できる
ように、L字状に折曲して垂直片81と水平片82を形
成し、水平片82から立ち上げて天井パネル5の端縁嵌
合部51aに嵌合して支持できるように折り返し部83
を形成してもよい。また、図3に示すように、L字状に
折曲して垂直片81と水平片82を形成するとともに、
水平片82から立ち上げて天井パネル5の端縁嵌合部5
1aを載置可能な載置片84を形成してもよい。
By the way, in the above-described embodiment,
Although the flat plate-shaped connecting member 8 is used, the connecting member 8 may be fitted in the edge fitting portion 51a of the ceiling panel 5 to support the ceiling panel 5, and may be formed in any shape. For example, as shown in FIG. 2, a vertical piece 81 and a horizontal piece 82 are formed by bending into an L shape so that the ceiling panel 5 can be placed on the upper end edge of the column 6. The folded-back portion 83 so that it can be fitted into and supported by the edge fitting portion 51a of the
May be formed. Further, as shown in FIG. 3, the vertical piece 81 and the horizontal piece 82 are formed by bending them into an L shape, and
The edge fitting portion 5 of the ceiling panel 5 is raised from the horizontal piece 82.
You may form the mounting piece 84 which can mount 1a.

【0015】なお、天井を2枚の天井パネル5を接続し
て形成する場合は、その塩ビ鋼板51の端縁嵌合部51
aは、隣接する三辺の端縁に形成すればよい。
When the ceiling is formed by connecting two ceiling panels 5, the edge fitting portion 51 of the vinyl chloride steel plate 51 is formed.
It suffices to form a on the edges of three adjacent sides.

【0016】また、前述した実施形態においては、浴室
ユニット1における天井パネル5の固定構造を例示した
が、その他のユニットルーム、例えば、シャワールーム
やトイレルームなどに採用することもできる。
Further, in the above-mentioned embodiment, the fixing structure of the ceiling panel 5 in the bathroom unit 1 is exemplified, but it may be adopted in other unit rooms such as a shower room and a toilet room.

【0017】[0017]

【発明の効果】以上のように本発明によれば、防水パン
の周縁部に間隔をおいて立設された複数本の支柱と、こ
れらの支柱の上端縁近傍にわたって固定された連結部材
と、この連結部材と嵌合可能な嵌合部が少なくとも隣接
する三辺の端縁に形成された天井パネルからなり、天井
パネルの端縁嵌合部を連結部材に嵌合支持させるととも
に、連結部材と天井パネルの端縁嵌合部にわたってバネ
クリップを装着することにより、天井パネルを固定する
ことから、天井パネルをユニットルームの内部側から簡
単かつ短時間に固定することができる。
As described above, according to the present invention, a plurality of stanchions which are erected at intervals on the peripheral edge of the waterproof pan, and a connecting member fixed near the upper end edges of these stanchions, A fitting portion that can be fitted with the connecting member is a ceiling panel formed on at least three adjacent edges of the ceiling panel. The end fitting portion of the ceiling panel is fitted and supported by the connecting member, and Since the ceiling panel is fixed by mounting the spring clip over the edge fitting portion of the ceiling panel, the ceiling panel can be easily and quickly fixed from the inside of the unit room.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明のユニットルームにおける天井パネルの
固定構造の一実施形態を一部省略して示す断面図であ
る。
FIG. 1 is a sectional view showing an embodiment of a ceiling panel fixing structure in a unit room with a part of the structure omitted.

【図2】本発明のユニットルームにおける天井パネルの
固定構造の他の実施形態を一部省略して示す断面図であ
る。
FIG. 2 is a cross-sectional view partially omitting another embodiment of the ceiling panel fixing structure in the unit room of the present invention.

【図3】本発明のユニットルームにおける天井パネルの
固定構造のもう一つの実施形態を一部省略して示す断面
図である。
FIG. 3 is a cross-sectional view showing another embodiment of the ceiling panel fixing structure in the unit room of the present invention with a part of it omitted.

【図4】ユニットルームを現地組み立て工法で施工する
場合の説明図である。
FIG. 4 is an explanatory diagram of a case where a unit room is constructed by an on-site assembly method.

【図5】浴室ユニットを示す斜視図である。FIG. 5 is a perspective view showing a bathroom unit.

【符号の説明】[Explanation of symbols]

1 浴室ユニット(ユニットルーム) 4 壁パネル 5 天井パネル 51 塩ビ鋼板 51a 端縁嵌合部 52 石膏ボード 6 支柱 8 連結部材 9 バネクリップ DESCRIPTION OF SYMBOLS 1 Bathroom unit (unit room) 4 Wall panel 5 Ceiling panel 51 PVC steel sheet 51a Edge fitting part 52 Gypsum board 6 Strut 8 Connecting member 9 Spring clip

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 防水パンの周縁部に間隔をおいて立設さ
れた複数本の支柱と、これらの支柱の上端縁近傍にわた
って固定された連結部材と、この連結部材と嵌合可能な
嵌合部が少なくとも隣接する三辺の端縁に形成された天
井パネルからなり、天井パネルの端縁嵌合部を連結部材
に嵌合支持させるとともに、連結部材と天井パネルの端
縁嵌合部にわたってバネクリップを装着することによ
り、天井パネルを固定することを特徴とするユニットル
ームにおける天井パネルの固定構造。
1. A plurality of stanchions which are erected at intervals on the peripheral edge of a waterproof pan, a connecting member fixed near the upper end edges of these stanchions, and a fitting fittable with the connecting members. Part is composed of a ceiling panel formed on at least three adjacent edges, and the edge fitting portion of the ceiling panel is fitted and supported by the connecting member, and the spring extends over the edge fitting portion of the connecting member and the ceiling panel. A ceiling panel fixing structure in a unit room, characterized in that a ceiling panel is fixed by attaching a clip.
JP8123317A 1996-05-17 1996-05-17 Fixed construction of ceiling panel in unit room Pending JPH09302964A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8123317A JPH09302964A (en) 1996-05-17 1996-05-17 Fixed construction of ceiling panel in unit room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8123317A JPH09302964A (en) 1996-05-17 1996-05-17 Fixed construction of ceiling panel in unit room

Publications (1)

Publication Number Publication Date
JPH09302964A true JPH09302964A (en) 1997-11-25

Family

ID=14857569

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8123317A Pending JPH09302964A (en) 1996-05-17 1996-05-17 Fixed construction of ceiling panel in unit room

Country Status (1)

Country Link
JP (1) JPH09302964A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020090848A (en) * 2018-12-06 2020-06-11 株式会社明工 Fixing structure of bathroom ceiling panel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020090848A (en) * 2018-12-06 2020-06-11 株式会社明工 Fixing structure of bathroom ceiling panel

Similar Documents

Publication Publication Date Title
JPH102006A (en) Fence structure of building
JPH09302964A (en) Fixed construction of ceiling panel in unit room
JP2563754Y2 (en) Built-in frame of sanitary equipment room
JPS6224682Y2 (en)
JP3193849B2 (en) Unit room ceiling structure
JP3810869B2 (en) Entrance fence unit and its mounting method
JPH0328117Y2 (en)
JPH0118733Y2 (en)
JPH0144691Y2 (en)
JPH10169219A (en) Ceiling panel fixing structure
JPH0583151U (en) Curtain board mounting structure
JPH0726517Y2 (en) Hanging wall support device
JPH043073Y2 (en)
JPS6136645Y2 (en)
JPH10245915A (en) Wall panel connecting structure of bathroom unit
JPH0750526Y2 (en) Prefabricated ceiling structure
JPH047791B2 (en)
JPH0328116Y2 (en)
JPH0640760Y2 (en) Wall panels
JPH0755985Y2 (en) Bathtub with washbasin
JP2569724Y2 (en) Unit bus wall panel mounting structure
JPH09119151A (en) Waterproof pan structure
JPH0249861A (en) Wall structure for bathroom
JP3966980B2 (en) Panel articulated wall structure
JP3353695B2 (en) Bathroom wall structure

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20040128