Aseismic structure of building

Info

Publication number
JPH09264049A
JPH09264049A JP7724996A JP7724996A JPH09264049A JP H09264049 A JPH09264049 A JP H09264049A JP 7724996 A JP7724996 A JP 7724996A JP 7724996 A JP7724996 A JP 7724996A JP H09264049 A JPH09264049 A JP H09264049A
Authority
JP
Japan
Prior art keywords
floor
steel pipe
column
building
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP7724996A
Other languages
Japanese (ja)
Inventor
Hiroyasu Takemura
寛恭 竹村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP7724996A priority Critical patent/JPH09264049A/en
Publication of JPH09264049A publication Critical patent/JPH09264049A/en
Pending legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

PROBLEM TO BE SOLVED: To ensure a required resistance without increasing the section of member of column and beam at a floor where installation of force-resistant wall and the like is limited. SOLUTION: A pilot is floor P being a space for parking or shops, and the like, at the first floor is constructed, and general floors R on the second or above floors where dwelling spaces and the like are constructed, all the structure being constructed of reinforced concrete structure. The structure of the pilot is floor P is mainly composed of a plurality of steel pipe built-in concrete structure type column 1 and a plurality of steel beams 2 layed between the columns 1. The column 1 extends upward to the midway of second floor with its lower end burried in the underground beam 3. A plurality of spiral reinforcement 6 are arranged at the upper and lower portions of a steel pipe 1a. In the pipe 1a, a column main reinforcement 5 of the second floor is inserted, and the lower end penetrates a through hole 4b of a horizontal diaphragm 4 in the steel pipe 1a and is fixed to the diaphragm 4.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、建物を支持する複
数の独立柱を主な架構要素として所定の大きさの吹き抜
け空間を構成するピロティ形式の建築物や、下階を駐車
場や店舗等として使用したり上階をレストランや展望室
等に使用すると共に一部の階を居室等のための一般階と
して使用するような複合形式の建築物等、一部に耐力壁
やブレース等の耐震要素が制約される階がある場合の建
築物の耐震架構に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure of a piloti type in which a plurality of independent columns supporting a building are used as main frame elements to form an atrium space of a predetermined size, a lower floor of a parking lot, a store, etc. Earthquake-resistant such as bearing walls and braces, such as a complex type building that uses the upper floor as a restaurant or an observation room and uses part of the floor as a general floor for living rooms, etc. It relates to the earthquake-resistant frame of a building when there are floors with restricted elements.

【0002】[0002]

【従来の技術】複合形式の建築物における、駐車場や店
舗等に使用される階(以下、ピロティ階と呼ぶ)は、所
定の大きさの吹き抜け空間を確保するために、耐力壁や
ブレース等の設置が制約される。
2. Description of the Related Art In a complex type building, a floor used for a parking lot, a store, etc. (hereinafter, referred to as a piloti floor) has a load-bearing wall, a brace, etc. in order to secure a void space of a predetermined size. Installation is restricted.

【0003】従って、上記のようなピロティ階を設ける
ことは、建築物自体の耐力が弱くなるため構造計画上,
好ましくない。特に、下階は上階の荷重を受けるため、
一階部分等にピロティ階を設定するときに顕著となり、
耐震上問題となる場合がある。
Therefore, since the proof strength of the building itself is weakened by providing the above-mentioned piloti floor, the structural plan
Not preferred. Especially, since the lower floor receives the load of the upper floor,
It becomes remarkable when setting the piloti floor on the first floor etc.,
It may cause a problem in earthquake resistance.

【0004】これに対し、従来においては、ピロティ階
に出来るだけ耐力壁を設けてもらい、必要な耐力を確保
するようにしていた。または、RC造やSRC造の複合
形式の建築物の場合に、一般階に比べて上記ピロティ階
の柱・梁の部材断面を大断面のRC造やSRC造に設計
すると共に、鋼材量を多くすることで、耐力の増大を図
っていた。
On the other hand, conventionally, the piloti floor was provided with a bearing wall as much as possible to ensure the required bearing strength. Alternatively, in the case of a composite building of RC structure or SRC structure, the member cross section of the pillar / beam on the above-mentioned Piloti floor is designed to be a RC or SRC structure with a large cross section compared with the general floor, and the amount of steel material is increased. By doing so, the yield strength was increased.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、上記の
ようにピロティ階に対し必要以上に耐力壁を設けること
は、連続する吹き抜け空間大きさや形状に制約が生じ、
当該ピロティ階の使い勝手が制約されるという問題があ
る。
However, if the Piloti floor is provided with more load bearing walls than necessary as described above, there are restrictions on the size and shape of the continuous blow-through space,
There is a problem that the usability of the pilotis floor is restricted.

【0006】また、上記のように部材断面が大きくなる
ことは、ピロティ階の架構を構成する梁成が大きく当該
階の階高が高くなり、建築物のコストアップに繋がる。
また、柱部材が大きくなることは、ピロティ階の使用面
積が減少する。このため、建築物の用途上で制約が生
じ、設計上好ましくない。
Further, the large member cross section as described above results in a large beam forming the frame of the piloti floor, which increases the floor height of the floor, which leads to an increase in the cost of the building.
In addition, the larger pillar member reduces the use area of the piloti floor. For this reason, there are restrictions on the use of the building, which is not preferable in terms of design.

【0007】さらに、大断面部材に対応してピロティ階
に使用される鋼材量や鉄筋量が著しく多くなり、現場作
業に手間が掛かる他、コストアップに繋がる。本発明
は、上記のような問題点に着目してなされたもので、耐
力壁等の設置が制約されるピロティ階の柱梁の部材断面
を大きくすることなく、所望の耐力を確保可能な耐震架
構を提供することを課題としている。
Further, the amount of steel material and the amount of reinforcing steel used in the piloti floor corresponding to a large cross-section member becomes remarkably large, which requires time and labor for on-site work and leads to an increase in cost. The present invention has been made in view of the above problems, and it is possible to secure a desired proof strength without increasing the member cross section of the pillar beam of the Piloti floor where the installation of the proof wall is restricted. The challenge is to provide a frame.

【0008】[0008]

【課題を解決するための手段】上記課題を解決するため
に、本発明のうち請求項1に記載された建築物の耐震架
構は、ピロティ形式や複合形式の建築物における耐力壁
やブレースの設置が制約される階の架構を、充填鋼管コ
ンクリート造の柱と耐火被覆を施した鉄骨梁とで構成し
たことを特徴としている。
In order to solve the above-mentioned problems, the earthquake-resistant structure of a building according to claim 1 of the present invention has a structure in which a load-bearing wall or a brace is installed in a building of a piloti type or a composite type. It is characterized in that the frame of the floor where is constrained is composed of columns of filled steel tube concrete and steel beams with fireproof coating.

【0009】上記充填鋼管コンクリート造の柱は、高耐
力や高靱性を有する高性能部材であり、鉄骨鉄筋コンク
リート造の柱や鉄筋コンクリート造の柱に比べて、部材
断面を小さくしても所望の強度や変形性能を確保するこ
とができる。
The above-mentioned filled steel pipe concrete column is a high-performance member having high yield strength and high toughness, and has a desired strength and strength even if the cross section of the member is smaller than that of a steel frame reinforced concrete column or a reinforced concrete column. Deformation performance can be secured.

【0010】従って、耐力壁やブレースなどの設置が制
約される階の柱部材として、充填鋼管コンクリート造の
柱を使用することで、所望の耐力や靱性を確保しつつ、
使用面積等の制限を緩和可能となる。
Therefore, by using the filled steel pipe concrete pillar as the pillar member of the floor where the installation of the bearing wall and the brace is restricted, while securing the desired bearing strength and toughness,
It is possible to relax restrictions on the area used.

【0011】また、この充填鋼管コンクリート造の柱
は、鉄骨鉄筋コンクリート造の柱を構築する場合に比べ
て現場施工の手間を省くことも可能となる。また、梁を
耐火被覆することで、隣接階との間の延焼防止等の耐火
性能上からみて有利な構造となる。ここで、上記充填鋼
管コンクリート造の柱は、鋼管の中にコンクリートが充
填されているので熱容量が大きく、必ずしも耐火被覆を
施す必要はない。
Further, this filled steel tube concrete structure column can save time and labor of construction on the site as compared with the case of constructing a steel frame reinforced concrete structure column. In addition, fire-resistant coating of the beam provides an advantageous structure in view of fire resistance such as fire spread prevention between adjacent floors. Here, since the steel pipe is filled with concrete, the column of the above-mentioned filled steel pipe concrete structure has a large heat capacity and does not necessarily require a fireproof coating.

【0012】次に、請求項2に記載した発明は、請求項
1に記載される構成に対し、上記充填鋼管コンクリート
造の柱における、他の架構要素との接合部若しくはその
近傍を、スパイラル筋又はリング筋で補強したことを特
徴としている。
Next, the invention described in claim 2 is different from the structure described in claim 1 in that a spiral stirrer is formed at a joint with another frame element or in the vicinity thereof, in the column of the filled steel pipe concrete structure. Alternatively, it is characterized by being reinforced with ring reinforcement.

【0013】これにより、最も大きな応力が負荷される
他の架構要素との接合部若しくはその近傍が、スパイラ
ル筋等で補強されるので、最も応力が掛かる接合部の局
部変形に対する抵抗が大きくなり、変形性能が向上す
る。この結果、更に上記耐震架構の耐力や靱性が増大す
る。
As a result, since the joint portion with other frame elements to which the largest stress is applied or the vicinity thereof is reinforced by the spiral streaks, etc., the resistance against the local deformation of the joint portion with the greatest stress increases, Deformation performance is improved. As a result, the proof strength and toughness of the seismic frame are further increased.

【0014】次に、請求項3に記載した発明は、請求項
1又は請求項2に記載された構成に対し、上記充填鋼管
コンクリート造の柱を、対象とする階から隣接階の途中
位置まで延在させることを特徴としている。
Next, the invention described in claim 3 is different from the structure described in claim 1 or 2 in that the pillar of the filled steel pipe concrete structure is provided from the target floor to an intermediate position on the adjacent floor. The feature is that it is extended.

【0015】これにより、対象とする階と、その階に隣
接する階の架構とが一体的に接合される。この結果、上
記のように一部の階の柱を充填鋼管コンクリート造の柱
としても、隣接する階との間の力の伝達が円滑に行われ
て、建築物全体の耐震性を損なうことが防止される。
As a result, the target floor and the frame of the floor adjacent to the floor are integrally joined. As a result, even if some of the columns on the floors are made of filled steel tube concrete as described above, the force transmission between the adjacent floors is smoothly performed, and the earthquake resistance of the entire building may be impaired. To be prevented.

【0016】[0016]

【発明の実施の形態】次に、本発明の実施の形態を図面
に基づき説明する。本実施の形態の建築物は複合形式の
建築物であって、マンションやオフィスの場合は、図1
及び図6に示すように、一階部分が駐車場や店舗等のた
めの空間となってピロティ階Pを構成し、上階(二階以
上)が、居室や事務所等が設けられる一般階Rであって
鉄筋コンクリート造の壁やブレース等の耐震要素が多い
構造となっている。なお、具体的には、上記図1は、一
階部分が荷捌きスペース等を構成し、上階部分が倉庫や
事務所を構成する例を図示する。また、図6は、一階部
分が駐車場や店舗等を構成し、上階部分が居住空間を構
成する共同住宅を示している。
Next, embodiments of the present invention will be described with reference to the drawings. The building of the present embodiment is a complex type building, and in the case of a condominium or office, FIG.
And as shown in FIG. 6, the first floor becomes a space for parking lots, shops, etc. to form a piloti floor P, and the upper floor (second floor or higher) is a general floor R where living rooms, offices, etc. are provided. However, it has a structure with many seismic elements such as reinforced concrete walls and braces. In addition, specifically, FIG. 1 illustrates an example in which the first floor portion constitutes a handling space and the like, and the upper floor portion constitutes a warehouse or an office. FIG. 6 shows an apartment house in which the first floor constitutes a parking lot, a store, etc., and the upper floor constitutes a living space.

【0017】上記ピロティ階Pの架構は、図2に示すよ
うに、上下に延在する複数の充填鋼管コンクリート造の
柱1と、その柱1間に横架される複数の鉄骨梁2を主な
構成要素して構成される。
As shown in FIG. 2, the structure of the above-mentioned Piloti floor P is mainly composed of a plurality of vertically-extending filled steel pipe concrete columns 1 and a plurality of steel beams 2 which are horizontally stretched between the columns 1. It is composed of various components.

【0018】上記充填鋼管コンクリート造の柱1は、架
構要素としての地中梁3に下端部が埋設されて上方に延
び、一般階Rを構成する2階部分の途中位置まで延びて
いる。図2中、2はスタッドボルトであって、本柱1と
地中梁3との一体性を増大するためのものである。ま
た、3aは地中梁鉄筋を示している。
The pillar 1 of the filled steel tube concrete structure is embedded in the underground beam 3 as a frame element so that its lower end portion is embedded and extends upward to an intermediate position of the second floor portion constituting the general floor R. In FIG. 2, reference numeral 2 denotes a stud bolt for increasing the integrity of the main pillar 1 and the underground beam 3. Moreover, 3a has shown the underground beam reinforcement.

【0019】その充填鋼管コンクリート造の柱1は、断
面矩形の鋼管1a内にコンクリート1bが充填されて構
成される。これにより、本柱1は、コンクリート1bが
鋼管1aによって拘束されるため、つまりタガが嵌めら
れている状態(コンファインド効果)になっているた
め、当該コンクリート1bにとっては、その強度が上昇
すると共に脆性的破壊が発生しにくくなり、また、鋼管
1aにとっては局部座屈が発生しくくなっている。この
結果、本柱1は、高耐力及び高靱性を有する。
The filled steel pipe concrete pillar 1 is constructed by filling a steel pipe 1a having a rectangular cross section with concrete 1b. Thereby, since the concrete 1b is restrained by the steel pipe 1a, that is, the hull is fitted (confined effect), the main pillar 1 increases its strength for the concrete 1b. Brittle fracture is less likely to occur, and local buckling is less likely to occur for the steel pipe 1a. As a result, the main pillar 1 has high yield strength and high toughness.

【0020】さらに、上記柱の鋼管1a内におけるパネ
ルゾーン部には、力の伝達性を良くするために、それぞ
れ水平ダイヤフラム4が配設されている。その各水平ダ
イヤフラム4の中央には、図3に示すように、コンクリ
ート打設用の穴4aが開口している。また、隣接階であ
る二階の柱部に近い水平ダイヤフラム4には、当該2階
の柱部材を構成する柱主筋5を貫通可能な貫通孔4bが
複数,開設されている。なお、図3中、7は、二階部分
に設けられる耐力壁(戸境壁)を示している。
Further, horizontal diaphragms 4 are provided in the panel zones of the steel pipes 1a of the columns in order to improve the force transmission. As shown in FIG. 3, a hole 4a for pouring concrete is opened at the center of each horizontal diaphragm 4. In addition, a plurality of through holes 4b are formed in the horizontal diaphragm 4 close to the pillar on the second floor, which is the adjacent floor, so as to be able to penetrate the pillar main bar 5 that constitutes the pillar member on the second floor. In addition, in FIG. 3, 7 has shown the bearing wall (doorway wall) provided in the second floor part.

【0021】また、上記鋼管1a内における、地中梁3
との接合部上側位置、及び鉄骨梁2との接合部下側位置
には、それぞれスパイラル筋6が配設されて、最も大き
い応力が負荷される部分が補強されて靱性が増大し、も
って局部変形が防止される。
Further, the underground beam 3 in the steel pipe 1a.
Spiral muscles 6 are arranged at the upper position of the joint with and the lower position of the joint with the steel beam 2, and the portion to which the largest stress is applied is reinforced and the toughness is increased, which results in local deformation. Is prevented.

【0022】上記充填鋼管コンクリート造の柱1の上部
(一階と二階との境界位置)に対し、鉄骨梁2が接合し
て水平に横架されている。本実施の形態では、鉄骨梁2
は、図4に示すように、H形鋼から構成されている。そ
のH形鋼は、コンクリート8で被覆されることで所定の
耐火性を有している。
A steel beam 2 is joined horizontally to the upper portion (boundary position between the first floor and the second floor) of the above-mentioned filled steel tubular concrete structure column 1. In the present embodiment, the steel beam 2
Is made of H-section steel, as shown in FIG. The H-section steel has a predetermined fire resistance by being coated with concrete 8.

【0023】ここで、9は、上記コンクリート8に埋設
された梁主筋又は補助筋であるが、この鉄筋9は被覆す
るコンクリート8を支持するだけのものであるので、そ
の端部は上記鋼管1aに接合されている必要はない。ま
た、10はスタラップ筋である。
Here, 9 is a beam main reinforcing bar or auxiliary reinforcing bar embedded in the concrete 8, but since this reinforcing bar 9 only supports the concrete 8 to be covered, its end portion is the steel pipe 1a. Need not be joined to. Further, 10 is a stirrup muscle.

【0024】また、上記鋼管1a内に、一般階Rである
二階部分の柱主筋5が上側から挿入され、その下端部
は、上記鋼管1a内の水平ダイヤフラム4の貫通孔4b
を貫通して配筋されて当該水平ダイヤフラム4に定着さ
れている。ここで、図2では、一番上の水平ダイヤフラ
ム4にのみ貫通孔4bを設けて柱主筋5を貫通させてい
るが、これに限定されず、その下の水平ダイヤフラム4
にも貫通孔4bを設けて柱主筋5を貫通させて更に一体
性を持たせてもよい。そして、ピロティ塊の上部柱の応
力が大きい場合は、上述のように、上記隣接階の柱主筋
5は、上記充填鋼管コンクリート造の柱1の鋼管1a内
に設けられる水平ダイヤフラム4の一部を貫通して配筋
されるように構成する。また、比較的応力が小さい場合
は、隣接階の途中位置まで延在させた鋼管1a内に柱主
筋5をとどめるようにしてもよい。
Further, the column main bar 5 of the second floor portion which is the general floor R is inserted into the steel pipe 1a from the upper side, and the lower end portion thereof is through hole 4b of the horizontal diaphragm 4 in the steel pipe 1a.
Is pierced through and is fixed to the horizontal diaphragm 4. Here, in FIG. 2, the through hole 4b is provided only in the uppermost horizontal diaphragm 4 to penetrate the column main bar 5, but the present invention is not limited to this, and the horizontal diaphragm 4 below it is not limited thereto.
Alternatively, the through hole 4b may be provided to penetrate the column main bar 5 to further enhance the integrity. When the stress of the upper pillar of the Pilotis mass is large, as described above, the pillar main bar 5 on the adjacent floor is a part of the horizontal diaphragm 4 provided in the steel pipe 1a of the pillar 1 of the filled steel pipe concrete structure. It is configured to penetrate and be arranged. Further, when the stress is relatively small, the column main bar 5 may be retained in the steel pipe 1a extending to an intermediate position on the adjacent floor.

【0025】このように、一階部分の柱1を構成する鋼
管1aが、二階部分の途中まで延在していると共に、二
階部分の柱主筋5が、鋼管1a内に水平ダイヤフラム4
を貫通するように配設されることで、一階の充填鋼管コ
ンクリート造の柱1と、上階の鉄筋コンクリート造の柱
とが一体的に接続される。この結果、ピロティ階Pの架
構と隣接する一般階Rの架構との間の力の伝達が、円滑
に行われるようになっている。
As described above, the steel pipe 1a constituting the pillar 1 of the first floor portion extends to the middle of the second floor portion, and the column main bar 5 of the second floor portion has the horizontal diaphragm 4 inside the steel pipe 1a.
By arranging so as to penetrate through, the pillar 1 of the filled steel pipe concrete structure on the first floor and the pillar of the reinforced concrete structure on the upper floor are integrally connected. As a result, the force is smoothly transmitted between the frame of the Piloti floor P and the frame of the adjacent general floor R.

【0026】図2中、11は2階部分の柱部に配された
フープ筋(又はスパイラル筋)を示している。また、2
階部分などの上階部分には、図2では図示していない
が、耐力壁(戸境壁)7が設けられることで、鉄筋コン
クリート造の柱であっても架構上必要な耐力が確保され
る。
In FIG. 2, reference numeral 11 denotes a hoop muscle (or spiral muscle) arranged on the column portion of the second floor. Also, 2
Although not shown in FIG. 2 in the upper floor portion such as the floor portion, a bearing wall (boundary wall) 7 is provided to secure the bearing strength necessary for the frame even if it is a reinforced concrete pillar. .

【0027】上記のような構成の建築物では、一階部分
に吹き抜けの広い空間を確保するため、耐力壁やブレー
スの設置が制約される場合であっても、柱として充填鋼
管コンクリート造の柱1を採用することで、柱1の部材
断面を上階の鉄筋コンクリート造の柱とほぼ同じ大きさ
に設定しても所望の耐力や靱性が確保できる。
In the building having the above-described structure, in order to secure a wide open space on the first floor, even if the installation of load bearing walls or braces is restricted, a pillar made of filled steel pipe concrete is used as the pillar. By adopting No. 1, the desired proof strength and toughness can be secured even if the member cross-section of the pillar 1 is set to have substantially the same size as the reinforced concrete pillar on the upper floor.

【0028】即ち、必要な耐力を確保しても、1階部分
の使用面積の減少や吹き抜け空間の形状等に対する制約
を緩和することができる。また、本充填鋼管コンクリー
ト造の柱1は、予め水平ダイヤフラム4やスパイラル筋
6が配筋された鋼管1aを現場で立設して、コンクリー
ト1bを充填するだけで構築されるので、本柱1を採用
しても現場施工の手間が多くなることもない。
That is, even if the required proof stress is secured, it is possible to reduce the use area of the first floor portion and alleviate the restrictions on the shape of the blow-through space. Further, since the column 1 made of the concrete of the filled steel pipe concrete is constructed by just standing up the steel pipe 1a on which the horizontal diaphragm 4 and the spiral streak 6 are laid in advance and filling the concrete 1b, Even if it is adopted, there is no need to increase the on-site construction work.

【0029】特に、本実施の形態の充填鋼管コンクリー
ト造の柱1は、剪断荷重等を一番受ける他の架構要素
(基礎や梁等)との接合部近傍にスパイラル筋6が配筋
されているので、本柱1の靱性がさらに増加して接合部
での大地震等による局部変形が防止される。
Particularly, in the filled steel tube concrete pillar 1 of the present embodiment, the spiral reinforcement 6 is arranged in the vicinity of the joint with other frame elements (such as foundations and beams) that are most subjected to shear load. Therefore, the toughness of the main pillar 1 is further increased and local deformation due to a large earthquake or the like at the joint is prevented.

【0030】さらにまた、当該充填鋼管コンクリート造
の柱1を二階部分の途中まで延設し、二階部分の柱主筋
5が水平ダイヤフラム4を貫通するように配筋して定着
しているので、当該充填鋼管コンクリート造の柱1と上
階(一般階)の柱とが一体的に接続される。これによ
り、一部の階の柱として充填鋼管コンクリート造の柱1
を採用しても、隣接階の架構との間の力の伝達が円滑に
行われるようになり、これによっても大地震等による局
部変形が防止される。
Furthermore, since the column 1 made of the filled steel pipe concrete is extended to the middle of the second floor portion, and the column main bar 5 of the second floor portion is arranged and fixed so as to penetrate the horizontal diaphragm 4, The pillar 1 of the filled steel pipe concrete structure and the pillar of the upper floor (general floor) are integrally connected. As a result, the pillars made of filled steel pipe concrete are used as pillars on some floors.
Even if adopted, the force can be smoothly transmitted between the frames on the adjacent floors, and this also prevents local deformation due to a large earthquake or the like.

【0031】ここで、上記実施の形態では、耐力壁の設
置が制限される駐車場、店舗、荷捌き等に使用されるピ
ロティ階Pを、一階部分に設計した場合について説明し
ているが、図5に示すように、中間階や最上階にピロテ
ィ階Pを設ける場合にも適用できる。
Here, in the above embodiment, the case where the piloti floor P used for parking lots, stores, handling, etc. where the installation of load bearing walls is restricted is designed on the first floor is explained. As shown in FIG. 5, it is also applicable to the case where the piloti floor P is provided on the middle floor or the top floor.

【0032】この場合には、隣接階との境界部である上
下部分にコンクリートで被覆した鉄骨梁2が設けられ
る。また、例えば、中間階をピロティ階Pとした場合に
は、充填鋼管コンクリート造の柱1を、隣接する上階ば
かりでなく、隣接する下階の途中位置まで延在させて、
上下の隣接階との一体性を確保する。これにより、大地
震力が入力されたりしても、上下両隣接階との接合部で
の局所変形の発生が防止される。
In this case, the steel beam 2 covered with concrete is provided in the upper and lower portions which are the boundary with the adjacent floor. Further, for example, when the middle floor is the piloti floor P, the pillar 1 made of the filled steel pipe concrete is extended not only to the adjacent upper floor but also to an intermediate position of the adjacent lower floor,
Ensure unity with the adjacent floors above and below. As a result, even if a large earthquake force is input, the occurrence of local deformation at the joint between the upper and lower adjacent floors is prevented.

【0033】また、上記鋼管1a内にスパイラル筋6の
代わりに複数のリング筋を鋼管1aの軸に沿って配筋し
てもよい。但し、スパイラル筋6の方が配筋が容易であ
る。また、上記実施の形態では、三階建て以上の複合形
式の建築物を例に説明しているが、ピロティ形式の二階
建ての建築物に適用しても構わない。もっとも、本発明
に基づく架構構造は、高層の建築物になるほど有用であ
る。
Further, instead of the spiral reinforcement 6, a plurality of ring reinforcements may be arranged along the axis of the steel pipe 1a in the steel pipe 1a. However, the spiral muscle 6 is easier to arrange. Further, in the above-described embodiment, a complex type building having three or more floors is described as an example, but the present invention may be applied to a two-story building of the piloti type. However, the frame structure based on the present invention is useful for a high-rise building.

【0034】また、必ずしも鋼管1a内にスパイラル筋
6を配筋しなくてもよい。また、上記説明では、一般階
の架構は、鉄筋コンクリート造としているが、鉄筋鉄骨
コンクリート造であってもよいし、両者の複合構造の架
構であってもよい。
Further, the spiral reinforcement 6 does not necessarily have to be arranged in the steel pipe 1a. In addition, in the above description, the frame on the general floor is made of reinforced concrete, but it may be made of reinforced steel frame concrete or a composite structure of both.

【0035】また、上記鋼管1aの断面形状は、矩形に
限定されず円形等であってもよい。
Further, the sectional shape of the steel pipe 1a is not limited to a rectangular shape and may be a circular shape or the like.

【0036】[0036]

【発明の効果】以上説明してきたように、本発明の建築
物の耐震架構を採用すると、意匠上,耐力壁が設けられ
ないか制約される階が一部にある場合でも、その階の柱
梁架構に所定の剛性が確保される。特に、必要以上に耐
力壁を設けることなく且つ架構部材の断面を大きくする
ことなく、柱の耐力や靱性の増強が図られて変形性能に
優れた架構を構成可能となる。
As described above, when the earthquake-resistant frame structure of the building of the present invention is adopted, even if there is a floor where the bearing wall is not provided or is constrained due to the design, the pillar of that floor A predetermined rigidity is secured in the beam frame. In particular, it is possible to construct a frame with excellent deformability by increasing the proof stress and toughness of the column without providing unnecessary load bearing walls and without increasing the cross section of the frame member.

【0037】即ち、一部の階に耐力壁が設けられないか
制約される場合であっても、大地震力に耐え得る耐力や
靱性を持たせることが可能となる。このとき、請求項2
に記載した発明を採用すると、部材断面を大きくするこ
となく柱の靱性の増強を更に図ることができる。
That is, even if a bearing wall is not provided or restricted on some floors, it is possible to provide bearing strength and toughness capable of withstanding a large earthquake force. At this time, claim 2
When the invention described in (1) is adopted, the toughness of the column can be further enhanced without increasing the member cross section.

【0038】また、請求項3に記載した発明を採用する
と、一部の階に充填鋼管コンクリート造の柱を採用して
も、隣接階との一体性が確保されて、大地震力等による
接合部での局所変形が防止される。この結果、一部に耐
力壁が設けられないか制約される階があっても、建築物
全体に所望の耐力や靱性が確保されるという効果があ
る。
Further, when the invention according to claim 3 is adopted, even if the columns of the filled steel pipe concrete construction are adopted in some of the floors, the integrity with the adjacent floors is ensured, and the joining by the large earthquake force or the like is ensured. Local deformation at the part is prevented. As a result, even if there is a floor where a load bearing wall is not provided or there is a restriction, a desired yield strength and toughness are ensured for the entire building.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施の形態に係る建築物を示す概略図
である。
FIG. 1 is a schematic diagram showing a building according to an embodiment of the present invention.

【図2】本発明の実施の形態に係る耐震架構を示す断面
図である。
FIG. 2 is a cross-sectional view showing the earthquake-resistant frame according to the embodiment of the present invention.

【図3】本発明の実施の形態に係る鋼管内の水平ダイヤ
フラムを示す上面図である。
FIG. 3 is a top view showing a horizontal diaphragm in the steel pipe according to the embodiment of the present invention.

【図4】本発明の実施の形態に係る鉄骨梁を示す縦断面
図である。
FIG. 4 is a vertical sectional view showing a steel frame beam according to the embodiment of the present invention.

【図5】本発明の実施の形態に係る建築物の別の例を示
す概略図である。
FIG. 5 is a schematic view showing another example of the building according to the embodiment of the present invention.

【図6】本発明の実施の形態に係る建築物の別の例を示
す概略図である。
FIG. 6 is a schematic view showing another example of the building according to the embodiment of the present invention.

【符号の説明】[Explanation of symbols]

P ピロティ R 一般階 1 充填鋼管コンクリート造の柱 1a 鋼管 1b コンクリート 2 鉄骨梁 3 地中梁(他の架構要素) 4 水平ダイヤフラム 4b 貫通孔 5 柱主筋 6 スパイラル筋 P Piloti R General floor 1 Filled steel pipe Concrete column 1a Steel pipe 1b Concrete 2 Steel beam 3 Underground beam (other frame elements) 4 Horizontal diaphragm 4b Through hole 5 Column main bar 6 Spiral reinforcement

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 ピロティ形式や複合形式の建築物におけ
る耐力壁やブレースの設置が制約される階の架構を、充
填鋼管コンクリート造の柱と耐火被覆を施した鉄骨梁と
で構成したことを特徴とする建築物の耐震架構。
1. The structure of a floor in which the installation of load bearing walls and braces in a Piloti-type or composite-type building is restricted is made up of columns of filled steel pipe concrete and steel beams with fireproof coating. Seismic frame of the building.
【請求項2】 上記充填鋼管コンクリート造の柱におけ
る、他の架構要素との接合部若しくはその近傍を、スパ
イラル筋又はリング筋で補強したことを特徴とする請求
項1に記載された建物の耐震架構。
2. The seismic resistance of a building according to claim 1, characterized in that, in the column of the filled steel pipe concrete structure, a joint portion with another frame element or the vicinity thereof is reinforced by a spiral reinforcement or a ring reinforcement. Frame.
【請求項3】 上記充填鋼管コンクリート造の柱を、対
象とする階から隣接階の途中位置まで延在させることを
特徴とする請求項1又は請求項2に記載された建物の耐
震架構。
3. The seismic-resistant frame structure for a building according to claim 1 or 2, characterized in that the pillar of the filled steel tube concrete structure is extended from a target floor to an intermediate position on an adjacent floor.
JP7724996A 1996-03-29 1996-03-29 Aseismic structure of building Pending JPH09264049A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7724996A JPH09264049A (en) 1996-03-29 1996-03-29 Aseismic structure of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7724996A JPH09264049A (en) 1996-03-29 1996-03-29 Aseismic structure of building

Publications (1)

Publication Number Publication Date
JPH09264049A true JPH09264049A (en) 1997-10-07

Family

ID=13628593

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7724996A Pending JPH09264049A (en) 1996-03-29 1996-03-29 Aseismic structure of building

Country Status (1)

Country Link
JP (1) JPH09264049A (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000027299A (en) * 1998-07-08 2000-01-25 Koichi Minami Column structure
JP2000034780A (en) * 1998-07-17 2000-02-02 Maeda Corp Column structure
JP2000282578A (en) * 1999-01-27 2000-10-10 Maeda Corp Structure of column
JP2000345614A (en) * 1999-06-04 2000-12-12 Kajima Corp Reinforced concrete building having pilotis, and its building method
JP2006342510A (en) * 2005-06-07 2006-12-21 Takenaka Komuten Co Ltd Multi-story shear wall
JP2008013973A (en) * 2006-07-04 2008-01-24 East Japan Railway Co Structure and method of joining concrete-filled steel pipe member and reinforced concrete member
JP2009002006A (en) * 2007-06-20 2009-01-08 Shimizu Corp Structure of column for composite structural building
JP2015096685A (en) * 2013-11-15 2015-05-21 株式会社竹中工務店 Base-isolating device joint structure
JP2016011509A (en) * 2014-06-27 2016-01-21 清水建設株式会社 Joining structure of mutual columns and building
JP2018096071A (en) * 2016-12-12 2018-06-21 大成建設株式会社 Composite building
CN108316514A (en) * 2018-03-12 2018-07-24 华南理工大学 A kind of Self-resetting prefabricated assembled concrete waves wall and its assembly method
JP2019100156A (en) * 2017-12-07 2019-06-24 株式会社竹中工務店 Structure
JP2019138137A (en) * 2018-02-05 2019-08-22 清水建設株式会社 Junction structure of cft column and rc column
CN111519749A (en) * 2020-03-24 2020-08-11 中国化学工程第三建设有限公司 Construction method for steel structure of pipe gallery in frame
JP2020169442A (en) * 2019-04-01 2020-10-15 清水建設株式会社 Method for evaluating rigidity of joint structure between columns
JP2020204257A (en) * 2020-09-15 2020-12-24 大成建設株式会社 Composite building
CN114525848A (en) * 2020-11-23 2022-05-24 鹏鼎控股(深圳)股份有限公司 Combined workshop

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000027299A (en) * 1998-07-08 2000-01-25 Koichi Minami Column structure
JP2000034780A (en) * 1998-07-17 2000-02-02 Maeda Corp Column structure
JP2000282578A (en) * 1999-01-27 2000-10-10 Maeda Corp Structure of column
JP4491099B2 (en) * 1999-01-27 2010-06-30 前田建設工業株式会社 Column structure
JP2000345614A (en) * 1999-06-04 2000-12-12 Kajima Corp Reinforced concrete building having pilotis, and its building method
JP2006342510A (en) * 2005-06-07 2006-12-21 Takenaka Komuten Co Ltd Multi-story shear wall
JP2008013973A (en) * 2006-07-04 2008-01-24 East Japan Railway Co Structure and method of joining concrete-filled steel pipe member and reinforced concrete member
JP2009002006A (en) * 2007-06-20 2009-01-08 Shimizu Corp Structure of column for composite structural building
JP2015096685A (en) * 2013-11-15 2015-05-21 株式会社竹中工務店 Base-isolating device joint structure
JP2016011509A (en) * 2014-06-27 2016-01-21 清水建設株式会社 Joining structure of mutual columns and building
JP2018096071A (en) * 2016-12-12 2018-06-21 大成建設株式会社 Composite building
JP2019100156A (en) * 2017-12-07 2019-06-24 株式会社竹中工務店 Structure
JP2019138137A (en) * 2018-02-05 2019-08-22 清水建設株式会社 Junction structure of cft column and rc column
CN108316514A (en) * 2018-03-12 2018-07-24 华南理工大学 A kind of Self-resetting prefabricated assembled concrete waves wall and its assembly method
JP2020169442A (en) * 2019-04-01 2020-10-15 清水建設株式会社 Method for evaluating rigidity of joint structure between columns
CN111519749A (en) * 2020-03-24 2020-08-11 中国化学工程第三建设有限公司 Construction method for steel structure of pipe gallery in frame
JP2020204257A (en) * 2020-09-15 2020-12-24 大成建設株式会社 Composite building
CN114525848A (en) * 2020-11-23 2022-05-24 鹏鼎控股(深圳)股份有限公司 Combined workshop
CN114525848B (en) * 2020-11-23 2024-01-05 鹏鼎控股(深圳)股份有限公司 Combined workshop

Similar Documents

Publication Publication Date Title
JPH09264049A (en) Aseismic structure of building
KR101767677B1 (en) Compisite column structure for steel and concrete
JP4247496B2 (en) Seismic reinforcement structure
JP4689386B2 (en) Building with seismic isolation piloti floor
JP2015040381A (en) Building
JP4423640B2 (en) Building structure
JP5711897B2 (en) Seismic strengthening method and seismic strengthening frame for existing buildings
JP3849447B2 (en) High-rise building frame structure
JPH10266341A (en) Framed structure of steel frame construction building
JP5873194B2 (en) Seismic strengthening method and seismic strengthening frame for existing buildings
JP3754612B2 (en) housing complex
CN210134558U (en) Board frame integrated inner wallboard structure and building
JP2000179180A (en) Apartment house
JP2009155868A (en) Building structure
CN210216801U (en) Board-frame integrated wallboard structure with large opening structure and building
JP2003193698A (en) Building for multiple purpose
CN210597715U (en) Board frame integrated wallboard framework structure with large opening and building
JP2000104334A (en) Building structure skeleton
JP6631895B1 (en) Building seismic facilities using wires, etc.
JP3397749B2 (en) Seismic frame structure
JP7120700B2 (en) Structure
JP6448832B1 (en) Seismic reinforcement structure of building
JP2001329610A (en) Skeleton structure of building
JPH10306614A (en) Base isolation structure of building employing mega-structure and flat slab
JPH10219819A (en) Structure of multiple dwelling house