JPH09256549A JP6293996A JP6293996A JPH09256549A JP H09256549 A JPH09256549 A JP H09256549A JP 6293996 A JP6293996 A JP 6293996A JP 6293996 A JP6293996 A JP 6293996A JP H09256549 A JPH09256549 A JP H09256549A
Authority
JP
Japan
Prior art keywords
frame
skeleton
unit
concrete
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP6293996A
Other languages
Japanese (ja)
Inventor
Takashi Takee
隆司 武江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP6293996A priority Critical patent/JPH09256549A/en
Publication of JPH09256549A publication Critical patent/JPH09256549A/en
Pending legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a frame unit capable of shortening the term of works of a concrete building structure and a method of construction. SOLUTION: These frames buried into the skeleton concrete of a concrete building structure are unitized by providing a large number of reinforcements 12, 13 arranged in a meshy shape as a whole by mutually crossing and joining the frames, and steel frames 11 connected to the reinforcements 12, 13 and used as the main skeletons and supports of these reinforcements. Since a large number of the reinforcements are united in such a frame unit, the steel frames 11 are employed as the main skeletons, and the mechanical strength of the unit is increased, and factory production is carried out. Since the units of upper and lower floors can be coupled by mutual steel frames in the unit and the steel frames bear the load of the upper floor as supports at that time, forms can be removed without waiting the solidification of the concrete of the lower floor. Accordingly, the term of works can be shortened.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、予め工場で生産し
て建築現場に運び込むことが可能な躯体用骨組みユニッ
トの構造、およびこのユニットを用いてコンクリート建
築構造物を建築する建築工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure of a frame frame unit that can be produced in a factory in advance and carried to a construction site, and a construction method for constructing a concrete building structure using this unit.

【0002】[0002]

【従来の技術】耐久性および耐火性に優れたコンクリー
ト建物は、柱、外壁、内壁、天井、床などの建物の躯体
がコンクリート構造となっており、このようなコンクリ
ート躯体には必ず金属製の骨組みが埋め込まれている。
金属製骨組みとしては、鉄骨構造と鉄筋構造が広く知ら
れている。
2. Description of the Related Art A concrete building having excellent durability and fire resistance has a concrete structure such as a pillar, an outer wall, an inner wall, a ceiling, and a floor, and such a concrete structure is always made of metal. The skeleton is embedded.
As a metal frame, a steel frame structure and a reinforcing bar structure are widely known.

【0003】鉄骨を用いた骨組み構造は柱や梁に鉄骨を
用いるものであり、予め工場にて鉄骨を建物の構造に合
わせて部分的に組み立ておき、これを建築現場に運んで
骨組みし、このように組み上がった鉄骨構造物に補強の
鉄筋などを配筋し、この骨組み構造物を型枠で囲い、こ
の型枠にコンクリートを流し込むようにしている。
A frame structure using a steel frame is one in which a steel frame is used for a pillar or a beam, and the steel frame is partially assembled in advance in accordance with the structure of the building at a factory, and this is carried to a construction site to be framed. In this way, reinforcing steel bars are laid in the assembled steel frame structure, the frame structure is surrounded by a frame, and concrete is poured into the frame.

【0004】一方、鉄筋を用いた骨組み構造は、工場ま
たは建築現場で鉄筋を切断、曲げなどの加工を行うとと
もに、これら多数の鉄筋を工場または建築現場で溶接や
結合により組み合わせて骨組みを作り、この骨組み構造
体を型枠で囲い、この型枠にコンクリートを流し込むよ
うにしている。
On the other hand, in the skeleton structure using reinforcing bars, the reinforcing bars are cut or bent at a factory or a construction site, and a large number of these reinforcing bars are combined by welding or joining at a factory or a construction site to form a skeleton. This frame structure is surrounded by a formwork, and concrete is poured into this formwork.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、従来の
鉄骨構造および鉄筋構造の建築工法は、現場の作業工期
が長いという欠点がある。すなわち、鉄骨構造および鉄
筋構造は、いずれの場合でも鉄骨または鉄筋からなる骨
組み構造体、つまり骨組みユニットを予め工場または現
場で作り、このような骨組みユニットを建築現場で組み
立てることにより躯体の骨組みが行え、よって骨組みの
工期は短くすることができる。
However, the conventional construction method of the steel frame structure and the reinforcing bar structure has a drawback that the work period of the site is long. That is, in any case, the steel frame structure and the reinforcing bar structure are made of a frame structure made of steel frame or reinforcing bar, that is, a frame unit is manufactured in advance at a factory or on site, and a frame frame can be formed by assembling such a frame unit at a construction site. Therefore, the construction period of the skeleton can be shortened.

【0006】一方、このような骨組みに対してコンクリ
ートを打設する方法は、下層階の躯体の骨組みを型枠で
囲い、この型枠に生コンクリートを流し込み、この流し
込んだコンクリートが乾くと型枠を外し、その後、上記
コンクリート打設が終わった下層階の上に、この上層階
の鉄骨構造または鉄筋構造の骨組みユニットを連結して
躯体の骨組みを行い、これら上昇階の骨組みが組み上が
ると、この上層階の骨組みを型枠で囲い、この型枠にコ
ンクリートを流し込んで乾燥させるようにしている。こ
のようにして、順次下層階から上層階に向けてコンクリ
ート躯体を積み上げていくという施工方法が用いられて
いる。
On the other hand, a method of placing concrete on such a frame is to enclose the frame of the skeleton of the lower floor with a formwork, pour fresh concrete into this formwork, and when the poured concrete dries, After that, on the lower floor where the concrete pouring is finished, the steel frame structure of the upper floor or the frame unit of the reinforcing bar structure is connected to perform the frame structure of the frame, and the frame of these rising floors is assembled, The frame of this upper floor is surrounded by a formwork, and concrete is poured into this formwork to dry. In this way, a construction method is used in which concrete skeletons are sequentially stacked from the lower floors to the upper floors.

【0007】しかし、従来のコンクリート打設方法は、
下層階のコンクリート打設が終了してコンクリートが乾
くまで待機しており、このコンクリートが固まってから
型枠を外すといった作業であるため、コンクリートが固
まるまでの時間が待機時間となる。
However, the conventional concrete pouring method is
Waiting until the concrete dries on the lower floors is completed and the concrete dries, and since this work involves removing the formwork after the concrete has set, the time until the concrete sets is the waiting time.

【0008】また、下層階のコンクリートが固まってか
ら型枠を外し、この後でこの下層階の躯体の上に上層階
の骨組みを行うので、上層階の骨組み工事中には上記外
した型枠を空地に保管しておく必要があり、型枠を保管
するための空地が必要になる。
[0008] Further, since the formwork is removed after the concrete on the lower floor is solidified, and after that, the skeleton of the upper floor is performed on the skeleton of the lower floor, so the above-mentioned formwork is removed during the skeleton construction of the upper floor. Must be stored in an open space, and an empty space for storing the formwork is required.

【0009】そして、上層階の骨組みが終わると上記空
地に保管されていた型枠を上層階へ運び、この型枠を上
層階の躯体の骨組みに取り付けてこれを囲い、この型枠
に生コンクリートを流し込むようにしているため、型枠
を空地に運んだり、保管場所から運び込むための労力お
よび運搬時間が多く必要になる。
[0009] Then, when the framework of the upper floor is finished, the formwork stored in the open space is carried to the upper floor, and the formwork is attached to the framework of the frame of the upper floor to enclose it. Since the mold is poured in, it requires a lot of labor and time for carrying the formwork to an open space or carrying it from a storage location.

【0010】すなわち、従来の工法は、各階層毎にコン
クリートを打込んでこれが固まるまで上層階の作業が行
えず、待ち時間がかかり、このため工期が長くなり、し
かも型枠の保管場所および保管場所への搬入や搬出に労
力や時間を要し、作業効率がよくないといった不具合が
ある。
That is, in the conventional construction method, it is impossible to perform the work on the upper floors until concrete is poured into each floor and the concrete is hardened, and it takes a long time to wait, and thus the construction period is prolonged, and the formwork storage place and storage are required. There is a problem that it takes labor and time to carry in and out of the place, and work efficiency is not good.

【0011】本発明はこのような事情にもとづきなされ
たもので、その目的とするのは、工期の短縮が可能にな
るコンクリート建築構造物の躯体用骨組みユニットおよ
びこれを用いた建築工法を提供しようとするものであ
る。
The present invention has been made in view of the above circumstances. An object of the present invention is to provide a skeleton unit for a skeleton of a concrete building structure and a construction method using the same, which can shorten the construction period. It is what

【0012】[0012]

【課題を解決するための手段】上記目的を達成するため
請求項1の発明は、相互に交差して接合されることによ
り全体としてメッシュ状に配筋された多数の鉄筋と;上
記鉄筋に接合され、これら鉄筋の主骨および支柱となる
鉄骨と;を具備したことを特徴とするコンクリート建築
構造物の躯体用骨組みユニットである。
In order to achieve the above-mentioned object, the invention of claim 1 is a plurality of reinforcing bars arranged in a mesh shape as a whole by being crossed with each other and bonded; And a steel frame serving as a main frame and a pillar of these reinforcing bars; and a skeleton unit for a skeleton of a concrete building structure.

【0013】請求項1の躯体用骨組みユニットは、多数
の鉄筋を組み合わせて接合してなるメッシュ状の構造物
に鉄骨を組み込んであるからこの鉄骨が主骨となり、こ
のメッシュ状躯体用骨組みユニットの機械的強度を高く
し、その組み立て形状を保持することができる。よっ
て、工場で保管しておいたり、建築現場に運ぶときに上
記躯体用骨組みユニットが変形することがないから、工
場生産することができる。このため、建物の柱、外壁、
内壁、天井、床などの部分ごとにまたは分割したパーツ
として標準化することもでき、現場での骨組み作業を大
幅に減少させることができる。
In the frame skeleton unit for a skeleton according to claim 1, since the steel skeleton is incorporated into a mesh-shaped structure formed by combining and joining a plurality of reinforcing bars, the steel skeleton serves as a main skeleton, The mechanical strength can be increased and the assembled shape can be retained. Therefore, the skeleton unit for the skeleton is not deformed when it is stored in the factory or is transported to the construction site, so that it can be manufactured in the factory. For this reason, the pillars of the building, the exterior walls,
It can be standardized for each part such as the inner wall, ceiling, floor, etc. or as divided parts, which can significantly reduce the skeleton work on site.

【0014】また、このような躯体用骨組みユニット
は、上下階層の躯体用骨組みユニットを鉄骨同士で連結
することができ、このとき鉄骨が支柱となって上層階の
荷重を支えるので下層階のコンクリートが固まるのを待
たずに型枠を外すことができる。したがって、コンクリ
ートの乾燥時間を待たずに上層階の骨組みを行うことが
でき、工期の短縮が可能になる。
[0014] Further, in such a frame skeleton unit, the frame skeleton units in the upper and lower layers can be connected to each other by steel frames. At this time, since the steel frames serve as columns to support the load of the upper floors, the concrete of the lower floors is supported. The formwork can be removed without waiting for the to set. Therefore, the skeleton of the upper floor can be constructed without waiting for the drying time of the concrete, and the construction period can be shortened.

【0015】請求項2の発明は、請求項1に記載のコン
クリート建築構造物の躯体用骨組みユニットにおいて、
上記鉄骨は、メッシュ状に配筋された上記鉄筋の部分か
ら上および下の少なくとも一方に突出していることを特
徴とするコンクリート建築構造物の躯体用骨組みユニッ
トである。
The invention according to claim 2 is the frame unit for a skeleton of a concrete building structure according to claim 1,
The steel frame is a frame skeleton unit for a skeleton of a concrete building structure, characterized in that the steel frame projects at least one of above and below from the portion of the reinforcing bar arranged in a mesh shape.

【0016】請求項2の躯体用骨組みユニットによれ
ば、鉄骨が鉄筋部分から上および下の少なくとも一方に
突出しているので、この突出部によって建物の基礎に連
結したり、上下の躯体用骨組みユニット相互を容易に連
結することができる。
According to the frame skeleton unit of claim 2, since the steel frame projects from the reinforcing bar portion to at least one of the upper and lower parts, it is connected to the foundation of the building by this projecting part or the upper and lower frame skeleton units. They can be easily connected to each other.

【0017】そして、上下の躯体用骨組みユニットの間
に間隔が生じるので、この間隔に床を構成することもで
きる。請求項3の発明は、請求項1に記載のコンクリー
ト建築構造物の躯体用骨組みユニットにおいて、窓を形
成する予定の箇所が開口されており、この開口部に窓取
り付け枠が上記鉄骨に固定されて配置されていることを
特徴とするコンクリート建築構造物の躯体用骨組みユニ
ットである。
Since a space is generated between the upper and lower frame skeleton units, the floor can be constructed at this space. According to a third aspect of the present invention, in the frame structure unit for a concrete building structure according to the first aspect, a portion where a window is to be formed is opened, and a window mounting frame is fixed to the steel frame in the opening. It is a skeleton unit for a skeleton of a concrete building structure, which is characterized by being arranged as follows.

【0018】請求項3の躯体用骨組みユニットによれ
ば、窓を形成する予定の開口部に窓取り付け枠が固定さ
れているから、窓取り付け枠を形成するための工期を短
縮できる。すなわち、従来の場合は、コンクリート打設
のときに窓用の開口部を形成し、その後にこの開口部の
内周面に木製の窓取り付け枠をモルタル止めし、この窓
取り付け枠にサッシを嵌め込んで取り付けるようにして
おり、このような作業は打込んだコンクリートが乾くの
を待って窓取り付け枠をモルタル止めする必要があり、
しかもモルタルが乾いた後で木製窓取り付け枠に窓用サ
ッシを嵌め込んで固定する必要があり、よってコンクリ
ートの乾燥時間およびモルタルの乾燥時間が待ち時間と
なるので工期が長くなる原因となっていた。
According to the frame skeleton unit of the third aspect, since the window mounting frame is fixed to the opening where the window is to be formed, the construction period for forming the window mounting frame can be shortened. That is, in the conventional case, an opening for a window is formed at the time of pouring concrete, then a wooden window mounting frame is mortared on the inner peripheral surface of this opening, and a sash is fitted to the window mounting frame. I am trying to install it in such a way that in such work it is necessary to wait for the driven concrete to dry and fix the window mounting frame with mortar,
Moreover, after the mortar has dried, it is necessary to fit and fix the window sash on the wooden window mounting frame, which causes a delay in the concrete drying time and the mortar drying time, which causes a longer construction period. .

【0019】これに対し、本発明の躯体用骨組みユニッ
トは、窓取り付け枠を鉄骨に取り付ける構造であるか
ら、工場または現場で予め窓取り付け枠を鉄骨に取り付
けておく、または骨組みが終了した後から鉄骨に取りつ
けることができ、よってコンクリートやモルタルが乾燥
するのを待つ必要がなく、この工期を大幅に短縮するこ
とができる。この場合、窓取り付け枠を鉄骨に取り付け
る構造であるから構成が簡単になる。
On the other hand, since the frame skeleton unit of the present invention has a structure in which the window attachment frame is attached to the steel frame, the window attachment frame is attached to the steel frame in advance at the factory or on site, or after the skeleton is completed. It can be attached to the steel frame, so there is no need to wait for the concrete or mortar to dry, and this construction period can be greatly shortened. In this case, the structure is simple because the window mounting frame is attached to the steel frame.

【0020】請求項4の発明は、請求項1ないし請求項
3の少なくとも1種の躯体用骨組みユニットを連結して
コンクリート建築構造物の下層階の骨組みをなし、この
下層階の各躯体用骨組みユニットを型枠で囲い、これら
型枠にコンクリートを流し込み、このコンクリートが乾
燥する間に上記下層階の各躯体用骨組みユニットの支柱
用鉄骨に上層階の各躯体用骨組みユニットの支柱用鉄骨
を連結して上層階の躯体の骨組みをし、この上層階の躯
体の骨組みが終わるとこの上層階の躯体用骨組みユニッ
トを型枠で囲み、この型枠にコンクリートを流し込むよ
うにしたことを特徴とするコンクリート建築構造物の建
築工法である。
According to a fourth aspect of the present invention, at least one frame skeleton unit according to any one of the first to third aspects is connected to form a skeleton of a lower floor of a concrete building structure, and each skeleton for the skeleton of the lower floor is constructed. Enclose the units with formwork, pour concrete into these formwork, and while the concrete dries, connect the support frame of each frame structure unit of the upper floor to the support frame of each frame structure unit of the lower floor above. The structure of the frame of the upper floor is then done, and when the frame of the frame of the upper floor is finished, the frame unit for the frame of the upper floor is surrounded by a formwork, and concrete is poured into this formwork. It is a construction method for concrete building structures.

【0021】請求項4の建築工法によれば、各躯体用骨
組みユニットが支柱となる鉄骨を備えていることから、
下層階の躯体用骨組みユニットの鉄骨に上層階の躯体用
骨組みユニットの鉄骨を連結すれば、上層階の躯体用骨
組みユニットは下層階の躯体用骨組みユニットによって
機械的に支持されるようになるため、下層階の骨組みに
打設したコンクリートが乾燥固化するのを待つことな
く、上層階の躯体の骨組み作業を行うことができる。し
たがって、下層階のコンクリートが固化するまでの待機
時間を削減することができ、工期の大幅な短縮が可能に
なる。
According to the construction method of claim 4, since each frame skeleton unit is provided with a steel frame serving as a pillar,
By connecting the steel frame of the upper frame skeleton unit to the steel frame of the lower skeleton frame unit, the upper skeleton frame unit will be mechanically supported by the lower skeleton frame unit. , It is possible to perform the skeleton work of the skeleton of the upper floors without waiting for the concrete placed in the skeletons of the lower floors to dry and solidify. Therefore, the waiting time until the concrete on the lower floors solidifies can be reduced, and the construction period can be greatly shortened.

【0022】請求項5の発明は、請求項4に記載のコン
クリート建築構造物の建築工法において、上層階の躯体
の骨組みが終わると、下層階から型枠を外し、この型枠
を吊上げ装置で吊り上げて上層階の躯体の骨組みユニッ
トに移し換えることを特徴とするコンクリート建築構造
物の建築工法である。
According to a fifth aspect of the present invention, in the method for constructing a concrete building structure according to the fourth aspect, when the skeleton of the skeleton of the upper floor is finished, the formwork is removed from the lower floor, and the formwork is lifted. It is a construction method for a concrete building structure, which is characterized by being lifted and transferred to a framed frame unit on the upper floor.

【0023】請求項5の建築工法によれば、上層階の躯
体の骨組みが終わると上記下層階のコンクリートの打ち
込みに用いた型枠を外して吊上げ装置で上層階に運び、
この型枠で上層階の躯体用骨組みユニットを囲んでこの
型枠にコンクリートを流し込むから、型枠は下層階から
上層階へと直接にかつ順次移し換えることができる。し
たがって、型枠を空地に保管して待機させる必要がなく
なり、保管用空地が不要であり、かつ型枠の空地への搬
入、搬出作業も不要になる。
According to the construction method of claim 5, when the skeleton of the skeleton of the upper floor is finished, the formwork used for driving the concrete of the lower floor is removed, and it is carried to the upper floor by a lifting device,
Since this formwork surrounds the frame skeleton unit on the upper floors and concrete is poured into this formwork, the formwork can be directly and sequentially transferred from the lower floors to the upper floors. Therefore, it is not necessary to store the formwork in an open space and wait it, a storage open space is unnecessary, and loading and unloading work of the formwork into the open space is also unnecessary.

【0024】[0024]

【発明の実施の形態】以下本発明について、図示する一
実施の形態にもとづき説明する。本実施の形態はマンシ
ョンの建築工法について説明するものであり、図1はマ
ンションの躯体となる外壁や中間仕切壁等に用いる壁用
骨組みユニットを示す図、図2は同じく躯体となる窓用
骨組みユニットを示す図である。
BEST MODE FOR CARRYING OUT THE INVENTION The present invention will be described below based on an embodiment shown in the drawings. The present embodiment describes a construction method of a condominium, and FIG. 1 is a view showing a frame skeleton unit used for an outer wall or an intermediate partition wall which is a skeleton of a condominium, and FIG. 2 is a skeleton for windows which is also a skeleton. It is a figure which shows a unit.

【0025】図1の壁用骨組みユニット1は、多数本の
鉄筋と、複数の鉄骨を組み合わせて構成されている。す
なわち、このユニット1の両端部にはそれぞれ形鋼や鋼
管または軽量形鋼、例えばH形鋼からなる鉄骨11,1
1が配置されており、これら鉄骨11,11はユニット
の主骨および支柱となる。これら鉄骨11,11間には
多数本の異形鉄筋からなる横筋12…がそれぞれ略平行
に掛け渡され、かつこれら横筋12…にはこれらと交差
して多数本の異形鉄筋からなる縦筋13…がそれぞれ略
平行に掛け渡されている。これら横筋12…と鉄骨1
1,11は相互に溶接されており、またそれぞれの横筋
12…と縦筋13…の交差部分も相互に溶接されてい
る。これにより上記横筋12…と縦筋13…は縦横に配
筋されているため全体として矩形の平板形をなし、かつ
メッシュ構造をなしている。
The wall frame unit 1 shown in FIG. 1 is constructed by combining a large number of reinforcing bars and a plurality of steel frames. That is, the steel frames 11 and 1 made of shaped steel, steel pipe or lightweight shaped steel, for example, H-shaped steel, are provided at both ends of the unit 1.
1 is arranged, and these steel frames 11 and 11 serve as a main frame and a pillar of the unit. A plurality of transverse bars 12 made up of deformed rebars are laid between the steel frames 11 and 11 in a substantially parallel manner, and the longitudinal bars 13 formed of a large number of deformed bars intersect with these transverse bars 12 ... Are laid in parallel with each other. These transverse lines 12 ... and steel frame 1
1 and 11 are welded to each other, and the intersections of the respective horizontal streaks 12 ... And the vertical streaks 13 ... As a result, the horizontal streaks 12 ... And the vertical streaks 13 ... are arranged in the vertical and horizontal directions, so that they have a rectangular flat plate shape as a whole and a mesh structure.

【0026】なお、鉄骨は、上記支柱となる鉄骨11,
11以外にも補強用に縦および横に他の鉄骨を取り付け
てもよい。また、横筋12…や縦筋13…にはあばら筋
や補強用鉄筋を必要に応じて接合してもよい。そして、
横筋12…と縦筋13…は単筋であっても複筋であって
もよいが、本例では複筋の例を示す。
The steel frame is made of the steel frame 11, which will be the pillars.
In addition to 11, other steel frames may be attached vertically and horizontally for reinforcement. Further, stirrup bars or reinforcing reinforcing bars may be joined to the horizontal bars 12 and the vertical bars 13 as required. And
The horizontal stripes 12 ... And the vertical stripes 13 ... May be single muscles or multiple muscles, but this example shows an example of multiple muscles.

【0027】このような鉄骨と鉄筋を組み合わさせて構
成された壁用骨組みユニット1は、上記鉄骨11,11
が主骨となってユニット全体の形状を保持しかつ強度を
高める役目を負っており、横筋12…および縦筋13を
構成する鉄筋がコンクリートと接合する主体部分となっ
ている。
The wall frame unit 1 constructed by combining the steel frame and the reinforcing bar as described above has the above-mentioned steel frames 11 and 11.
Serves as a main skeleton to maintain the shape of the entire unit and enhances the strength, and the reinforcing bars forming the horizontal bars 12 ... And the vertical bars 13 are the main parts to be joined with concrete.

【0028】支柱となる鉄骨11,11は上端および下
端の少なくとも一方が鉄筋部分から上方または下方に伸
びており、突出部11a、11bを構成している。な
お、一階部分に用いられる壁用骨組みユニット1は鉄骨
11,11から下方に伸びている下端突出部11bが建
物の基礎に連結されるようになっている。
At least one of an upper end and a lower end of each of the steel frames 11 and 11 serving as a pillar extends upward or downward from a reinforcing bar portion to form a protrusion 11a or 11b. In addition, the wall frame unit 1 used for the first floor portion is configured such that the lower end protruding portion 11b extending downward from the steel frames 11 and 11 is connected to the foundation of the building.

【0029】図2の窓用の骨組みユニット2は、同じく
多数本の鉄筋と、複数の鉄骨を組み合わせて構成されて
いる。すなわち、このユニット2の両端部にはそれぞれ
形鋼や鋼管または軽量形鋼、例えばH形鋼からなる鉄骨
21,21が設けられており、これら鉄骨21,21は
ユニットの主骨および支柱となる。これら鉄骨21,2
1間には多数本の異形筋からなる横筋22…がそれぞれ
略平行に掛け渡され、かつこれら横筋22…と交差して
多数本の縦筋23…がそれぞれ略平行に掛け渡されてい
る。これら横筋22…と各鉄骨21,21は溶接されて
おり、またこれら横筋22…と縦筋23…のそれぞれ交
差部分も相互に溶接されている。これにより上記横筋2
2…と縦筋23…は縦横に配筋され、全体として矩形の
平板形をなし、かつメッシュ構造をなしている。
The window frame unit 2 shown in FIG. 2 is also constructed by combining a large number of reinforcing bars and a plurality of steel frames. That is, at both ends of the unit 2, steel frames 21 and 21 made of shaped steel, steel pipe or lightweight shaped steel, for example, H-shaped steel are provided, and these steel frames 21 and 21 become the main frame and columns of the unit. . These steel frames 21,2
A large number of lateral streaks 22 ... Consisting of deformed muscles are spanned substantially parallel to each other, and a large number of longitudinal streaks 23 are spanned substantially parallel to the lateral streaks 22. The horizontal bars 22 ... And the respective steel frames 21, 21 are welded, and the intersections of the horizontal bars 22 ... And the vertical bars 23 ... Are also welded to each other. As a result, the horizontal line 2
2 and the vertical stripes 23 are arranged in the vertical and horizontal directions to form a rectangular flat plate shape and a mesh structure as a whole.

【0030】なお、鉄骨は、上記支柱となる鉄骨21,
21以外にも補強用に縦および横に他の鉄骨を取り付け
てもよい。また、横筋22…や縦筋23…にはあばら筋
や補強用鉄筋を必要に応じて接合してもよい。そして、
横筋22…と縦筋23…は単筋であっても複筋であって
もよいが、本例では複筋の例を示す。
The steel frame is made of the steel frame 21, which will be the pillar.
In addition to 21, other steel frames may be attached vertically and horizontally for reinforcement. Further, stirrup bars or reinforcing reinforcing bars may be joined to the horizontal bars 22 and the vertical bars 23, if necessary. And
The horizontal stripes 22 ... And the vertical stripes 23 ... May be single muscles or multiple muscles, but this example shows an example of multiple muscles.

【0031】このような鉄骨21,21と横筋22…お
よび縦筋23…からなる窓用ユニット2は、鉄骨21,
21が主骨となって全体の形状および強度を維持する役
目を負い、横筋22…および縦筋23を構成する鉄筋が
コンクリートと接合する主体部分となっている。
The window unit 2 including the steel frames 21 and 21, the horizontal bars 22 ... And the vertical bars 23 ...
The main rib 21 serves to maintain the overall shape and strength, and the reinforcing bars forming the horizontal bars 22 ... And the vertical bars 23 are main parts that join with concrete.

【0032】支柱となる鉄骨21,21は上端および下
端の少なくとも一方が鉄筋の主体部分から上方または下
方に伸びており、突出部21a、21bを構成してい
る。なお、一階部分に用いられる窓用骨組みユニット2
は鉄骨21,21の下端突出部21bが建物の基礎に連
結されるようになっている。
At least one of the upper end and the lower end of the steel frames 21 and 21 to be the columns extends upward or downward from the main portion of the reinforcing bar, and constitutes projecting portions 21a and 21b. The window frame unit 2 used for the first floor
The lower end protrusions 21b of the steel frames 21 and 21 are connected to the foundation of the building.

【0033】そして、この窓用骨組みユニット2は、窓
サッシが嵌め込まれる予定の箇所が開口25されてお
り、図2の場合は中央下部が開口されている。したがっ
て、この窓用骨組みユニット2は門型をなしている。
The window frame unit 2 has an opening 25 at the place where the window sash is to be fitted, and in the case of FIG. 2, the central lower part is opened. Therefore, the window frame unit 2 has a gate shape.

【0034】上記開口部25の内周面には全周に亘り窓
取り付け枠26が固定されている。窓取り付け枠26
は、図3に示すように、例えばリップ溝形軽量形鋼すな
わち軽量C形鋼からなり、鉄骨21に溶接された連結金
具27…に対してボルト28…等により固定されてい
る。このような窓取り付け枠26には図示しないサッシ
からなる窓枠が嵌め込まれて固定されるようになってい
る。
A window mounting frame 26 is fixed to the inner peripheral surface of the opening 25 over the entire circumference. Window mounting frame 26
As shown in FIG. 3, is made of, for example, a lip groove type lightweight section steel, that is, a lightweight C-section steel, and is fixed to connecting fittings 27 ... Welded to the steel frame 21 by bolts 28. A window frame made of a sash (not shown) is fitted into and fixed to the window mounting frame 26.

【0035】上記のような構成の壁用骨組みユニット1
および窓用骨組みユニット2は、それぞれ工場にて生産
することができる。工場で生産した場合、各壁用骨組み
ユニット1および窓用骨組みユニット2は、鉄骨11、
21を用いていることからこれら鉄骨11、21がユニ
ット1,2全体の平板形状を維持するとともに、強度を
補強している。すなわち、鉄筋のみを組み合わせた構造
体は強度的に劣り、外力を受けて変形しやすいが、これ
に鉄骨を接合して一体化することによりユニット1およ
び2の形状を維持することができる。そして、この鉄骨
11,21が外力を受け持ち、強度を高くしている。し
たがって、工場で生産したこれらユニット1,2をこの
ユニットの形状のまま工場に保管することができ、また
建築現場へ運搬する場合でも鉄骨11,21を備えてい
ることから運搬中に変形するなどの心配はない。
The frame skeleton unit 1 having the above structure
The window frame unit 2 can be manufactured at the factory. When produced in a factory, each of the wall frame unit 1 and the window frame unit 2 has a steel frame 11,
Since 21 is used, the steel frames 11 and 21 maintain the flat plate shape of the units 1 and 2 and reinforce the strength. That is, the structure in which only the reinforcing bars are combined is inferior in strength and is likely to be deformed by receiving an external force, but the shapes of the units 1 and 2 can be maintained by joining and integrating the steel frame. Then, the steel frames 11 and 21 take an external force to increase the strength. Therefore, these units 1 and 2 produced in the factory can be stored in the factory in the shape of this unit, and even when transported to the construction site, since the steel frames 11 and 21 are provided, they are deformed during transportation. I don't have to worry.

【0036】工場生産が可能であれば、大きさ、強度な
どを標準化することができ、現場作業を大幅に省略化す
ることができる。また、窓用骨組みユニット2は窓サッ
シが嵌め込まれる予定の開口25に、予め工場にてまた
は建築現場において、窓取り付け枠26を固定すること
ができるから現場作業が削減される。すなわち、従来の
場合は、コンクリートを打ち込むときに型枠で開口部を
形成し、コンクリートを打設した後に開口部の内周面に
木製の窓取り付け枠をモルタル止めし、この窓取り付け
枠にサッシを嵌め込んで取り付けるようにしており、こ
のような作業は打込んだコンクリートが乾くのを待って
工事する必要があり、しかもモルタルが乾いた後で木製
窓取り付け枠にサッシを嵌め込む必要があり、よってコ
ンクリートやモルタルの固化を待つ必要があるから工期
が長くなるという欠点になっていた。
If factory production is possible, size, strength, etc. can be standardized, and field work can be greatly omitted. Further, in the window frame unit 2, the window mounting frame 26 can be fixed to the opening 25 into which the window sash is to be fitted in advance at the factory or at the construction site, so that the site work can be reduced. That is, in the conventional case, when the concrete is driven in, an opening is formed by a formwork, and after the concrete is poured, a wooden window mounting frame is mortared on the inner peripheral surface of the opening and the sash is attached to this window mounting frame. It is necessary to wait for the poured concrete to dry before performing such work, and it is necessary to fit the sash into the wooden window mounting frame after the mortar has dried. Therefore, it was necessary to wait for the solidification of concrete or mortar, which meant that the construction period would be long.

【0037】これに対し、本実施例の窓用骨組みユニッ
ト2は、工場または現場で既に窓取り付け枠26を窓用
骨組みユニット2に取り付けておくことができるから、
コンクリートやモルタルが乾燥するのを待つ必要がな
く、この工期を大幅に短縮することができる。
On the other hand, in the window frame unit 2 of this embodiment, the window mounting frame 26 can be already attached to the window frame unit 2 at the factory or on site.
There is no need to wait for concrete or mortar to dry, and this construction period can be greatly shortened.

【0038】窓用骨組みユニット2は鉄骨21,21を
備えているから、この鉄骨21,21を用いて窓取り付
け枠26を取り付けることができ、よって予め工場また
は現場で取り付けることができるとともに、構造も簡単
である。
Since the window frame unit 2 is provided with the steel frames 21 and 21, the window frame 26 can be mounted by using the steel frames 21 and 21. Therefore, the window frame 26 can be preliminarily installed in the factory or in the field, and the structure can be provided. Is also easy.

【0039】なお、窓取り付け枠26は各階層の骨組み
が終わった後、もしくはコンクリートの打設が終了した
後窓用骨組みユニット2の鉄骨21,21に取り付ける
ようにしてもよく、この場合もコンクリートやモルタル
の固化を待つ必要がなく、工期の短縮が可能になる。
The window mounting frame 26 may be mounted on the steel frames 21 and 21 of the window frame unit 2 after the skeletons of the respective layers are finished or after the concrete has been cast. There is no need to wait for the solidification of mortar and mortar, and the construction period can be shortened.

【0040】このような壁用骨組みユニット1および窓
用骨組みユニット2を用いてマンションの建築工事をす
る手順を、図4以下の図面にもとづき説明する。図4
は、所定数の壁用骨組みユニット1および窓用骨組みユ
ニット21を組み合わせて一階の骨組みを終えた状態を
示す斜視図であり、これら壁用骨組みユニット1…およ
び窓用骨組みユニット2…は、予め工場で生産され、ト
ラックで建築現場に運ばれてクレーンなどで吊上げら
れ、所定の位置に配置される。
A procedure for constructing a condominium by using the wall frame unit 1 and the window frame unit 2 will be described with reference to FIGS. FIG.
FIG. 3 is a perspective view showing a state in which a predetermined number of wall frame units 1 and window frame units 21 have been combined to complete the first floor frame, and these wall frame units 1 ... And window frame units 2 ... It is produced in a factory in advance, transported by truck to a construction site, hoisted by a crane, etc., and placed at a predetermined position.

【0041】これら壁用骨組みユニット1…および窓用
骨組みユニット2…は、図示しない建物の基礎に立設さ
れている。建物は、周知の通り建築前に基礎工事をして
あり、この基礎に躯体を建ち上げていくものであるか
ら、上記一階部分の壁用骨組みユニット1…および窓用
骨組みユニット2…は基礎に固定される。この場合、支
柱となる鉄骨11…,21…の下端突出部11b,21
bが基礎に植設されている図示しないアンカーボルト、
および必要に応じてベースプレート、サイドアングルま
たははかま板などを用いて連結される。これによりこれ
ら壁用骨組みユニット1…および窓用骨組みユニット2
…は基礎に立ち上げて取り付けられる。
The wall frame unit 1 ... and the window frame unit 2 ... are erected on the foundation of a building (not shown). As is well known, the building has been subjected to foundation work before construction, and the skeleton is to be built on this foundation. Therefore, the above-mentioned first floor wall frame unit 1 ... and window frame unit 2 ... Fixed to. In this case, the lower end protrusions 11b and 21 of the steel frames 11 ...
Anchor bolt (not shown) in which b is planted in the foundation,
And, if necessary, they are connected by using a base plate, a side angle or a hammer plate. As a result, these wall frame units 1 ... And window frame units 2
... is set up on the foundation and attached.

【0042】このような一階部分の躯体の骨組みが終わ
ると、これら壁用骨組みユニット1…および窓用骨組み
ユニット2…に、図5に示すように型枠3…,4…を組
み付け、これら型枠3,4で壁用骨組みユニット1…お
よび窓用骨組みユニット2…を囲う。型枠3…,4…は
周知のものでよいから説明を省略するが、鋼製型枠や軽
量アルミ(合金を含む)型枠を用いるのがよい。
When the skeleton of the skeleton of the first floor is finished, as shown in FIG. 5, molds 3 ..., 4 ... Are assembled to the wall skeleton unit 1 ... And the window skeleton unit 2. The frame frames 3 and 4 surround the wall frame unit 1 ... And the window frame unit 2. Description of the molds 3 ..., 4 ... Is omitted because they are well known, but it is preferable to use steel molds or lightweight aluminum (including alloy) molds.

【0043】型枠3,4の組み付けが終わると、これら
型枠3,4内に生コンクリートを流し込む。コンクリー
ト打設の後、コンクリートが乾き切らないうちに、二階
部分の骨組みを始める。二階部分は、一階の各壁用骨組
みユニット1および窓用骨組みユニット2にそれぞれ二
階の躯体となる壁用骨組みユニット1および窓用骨組み
ユニット2を連結して積み重ねる。この場合、図6、図
7、図8に示すように、一階の各壁用骨組みユニット1
および窓用骨組みユニット2からそれぞれ上向きに突出
している鉄骨11,21の上端突出部11a、21a
に、二階の躯体となる壁用骨組みユニット1および窓用
骨組みユニット2からそれぞれ下向きに突出している鉄
骨11,21の下端突出部11b、21bを連結するこ
とにより連結される。これにより、二階の壁用骨組みユ
ニット1および窓用骨組みユニット2はそれぞれ一階の
壁用骨組みユニット1および窓用骨組みユニット2に位
置決めして固定される。
When the assembling of the molds 3 and 4 is completed, ready-mixed concrete is poured into these molds 3 and 4. After pouring the concrete, before the concrete has dried up, start framing the second floor. In the second floor portion, the wall skeletal unit 1 and the window skeletal unit 2 on the first floor are connected to the wall skeletal unit 1 and the window skeletal unit 2 on the first floor, respectively. In this case, as shown in FIGS. 6, 7, and 8, the skeleton unit 1 for each wall on the first floor
And upper end projecting portions 11a and 21a of the steel frames 11 and 21 projecting upward from the window frame unit 2 respectively.
Are connected by connecting the lower end projecting portions 11b and 21b of the steel frames 11 and 21 projecting downward from the wall skeletal unit 1 and the window skeletal unit 2 which are the second-level skeletons, respectively. As a result, the wall skeletal unit 1 and the window skeletal unit 2 on the second floor are positioned and fixed to the wall skeletal unit 1 and the window skeletal unit 2 on the first floor, respectively.

【0044】このようにして一階の壁用骨組みユニット
1および窓用骨組みユニット2にそれぞれ二階の壁用骨
組みユニット1および窓用骨組みユニット2を連結して
積み重ねた場合、二階の壁用骨組みユニット1および窓
用骨組みユニット2の荷重は一階の壁用骨組みユニット
1および窓用骨組みユニット2のそれぞれ鉄骨11,2
1で支持されるようになる。このため、一階部分に打設
したコンクリートが完全に固化しなくても、2階部分の
荷重が一階部分のコンクリート部分に加わるのを防止す
ることができる。逆にいえば、一階の壁用骨組みユニッ
ト1および窓用骨組みユニット2の鉄骨11,21が二
階の荷重を支えるので、一階部分のコンクリートの固化
を待たなくても二階の躯体の骨組み工事を開始すること
ができる。よって、工期の短縮が可能になる。
When the wall skeletal unit 1 for windows and the skeletal unit 2 for windows on the first floor are connected and stacked in this way, respectively, the skeletal frame unit 1 for windows and the skeletal frame units 2 for windows are stacked. 1 and the window frame unit 2 are loaded by the steel frames 11 and 2 of the wall frame unit 1 and the window frame unit 2 on the first floor, respectively.
It will be supported by 1. Therefore, it is possible to prevent the load on the second floor from being applied to the concrete portion on the first floor even if the concrete cast on the first floor does not completely solidify. Conversely, since the steel frames 11 and 21 of the wall skeletal unit 1 for the first floor and the skeletal unit 2 for windows support the load of the second floor, the skeleton construction of the skeleton of the second floor does not have to wait for the concrete on the first floor to solidify. Can start. Therefore, the work period can be shortened.

【0045】上記のようにして二階の躯体の骨組み、す
なわち二階の壁用骨組みユニット1および窓用骨組みユ
ニット2の組付けが終わると、二階の壁用骨組みユニッ
ト1および窓用骨組みユニット2のそれぞれ鉄骨11,
21の上端突出部11a、21aに、図9に示すような
吊上げ装置、例えば遠隔操作型ホイストクレーン30を
取り付ける。ホイストクレーン30はレール31に沿っ
て走行可能であり、このレール31を鉄骨11,21の
上端突出部11a、21aに連結する。そして、ホイス
トクレーン30の下端に吊り下げたフック32を一階に
設置されている型枠3,4に引っ掛け、型枠3,4の荷
重をホイストクレーン30で受け持つ。この状態で型枠
3,4の結合を外し、自由になった型枠3,4をホイス
トクレーン30で吊持する。遠隔操作によりホイストク
レーン30をレール31に沿って右移動および左移動さ
せると、型枠3、4は一階のコンクリートから剥がれ、
かつ遠隔操作でホイストクレーン30を巻上げると型枠
3、4は上昇されて二階の高さまで上昇される。ホイス
トクレーン30をレール31に沿って左移動および右移
動させると、型枠3、4は二階の骨組み、つまり壁用骨
組みユニット1および窓用骨組みユニット2に接近す
る。したがって、これら型枠3,4を結合してこれら型
枠3、4で壁用骨組みユニット1および窓用骨組みユニ
ット2を囲うことができる。この状態が図10に示され
ている。
When the second frame skeleton frame, that is, the second floor wall frame unit 1 and the window frame unit 2 are assembled as described above, the second floor wall frame unit 1 and the window frame unit 2 are respectively assembled. Steel frame 11,
A hoisting device as shown in FIG. 9, for example, a remote-controlled hoist crane 30 is attached to the upper end projecting portions 11 a and 21 a of 21. The hoist crane 30 can travel along a rail 31 and connects the rail 31 to the upper end protruding portions 11a and 21a of the steel frames 11 and 21. Then, the hook 32 hung at the lower end of the hoist crane 30 is hooked on the molds 3 and 4 installed on the first floor, and the hoist crane 30 bears the load of the molds 3 and 4. In this state, the forms 3 and 4 are uncoupled, and the released forms 3 and 4 are suspended by the hoist crane 30. When the hoist crane 30 is moved rightward and leftward along the rail 31 by remote control, the molds 3 and 4 are peeled off from the concrete on the first floor,
Further, when the hoist crane 30 is hoisted by remote control, the formwork 3 and 4 are raised to the height of the second floor. When the hoist crane 30 is moved leftward and rightward along the rail 31, the forms 3 and 4 approach the second-level frame, that is, the wall frame unit 1 and the window frame unit 2. Therefore, it is possible to combine the molds 3 and 4 and surround the wall frame unit 1 and the window frame unit 2 with these molds 3 and 4. This state is shown in FIG.

【0046】このような型枠3,4内に生コンクリート
を流し込めば、二階部分のコンクリート打設が行われ
る。そして、上記のように、一階の打設コンクリートか
ら型枠3,4を外すときは、一階部分のコンクリートの
中には鉄骨11,21が入っているからこれら鉄骨1
1,12で荷重を支えており、よってコンクリートが充
分固まっていなくてもコンクリートに大きな荷重がかか
るのを防止することができる。このため、コンクリート
が充分固まっていなくても型枠3,4を外すことがで
き、コンクリートの固化を待って型枠3,4を外す必要
がないからコンクリートの固化のための待機時間が不要
になる。この点からも工期の短縮ができる。
By pouring ready-mixed concrete into the molds 3 and 4 as described above, concrete is placed on the second floor. Then, as described above, when removing the formwork 3, 4 from the cast concrete on the first floor, since the steel frames 11, 21 are contained in the concrete on the first floor portion,
Since the load is supported by 1 and 12, it is possible to prevent a large load from being applied to the concrete even if the concrete is not sufficiently hardened. Therefore, the molds 3 and 4 can be removed even if the concrete is not sufficiently hardened, and it is not necessary to wait for the solidification of the concrete to remove the molds 3 and 4, so that the waiting time for the solidification of the concrete is unnecessary. Become. From this point as well, the construction period can be shortened.

【0047】むしろ、コンクリートが充分乾燥しないう
ちに型枠3,4を外してやれば、コンクリートの外面が
剥き出しになるから乾燥を促し、固化が早められる。こ
のようにすれば、型枠3,4は一階から二階へと直接に
移し換えることができ、したがって、型枠3,4を空地
に保管して待機させる必要がなくなり、保管用空地が不
要であり、かつ一階のコンクリートから外された型枠
3,4を空地への搬入したり、また空地の型枠3,4を
搬出して二階に吊り上げるなどの作業も不要になる。
Rather, if the molds 3 and 4 are removed before the concrete is sufficiently dried, the outer surface of the concrete is exposed, so that the drying is promoted and the solidification is accelerated. In this way, the molds 3 and 4 can be directly transferred from the first floor to the second floor, and therefore, it is not necessary to store the molds 3 and 4 in an open space and to wait, and an empty space for storage is unnecessary. Moreover, it is not necessary to carry in the molds 3 and 4 removed from the concrete on the first floor to the open space, and to carry out the molds 3 and 4 from the open space and lift them up to the second floor.

【0048】そして、二階部分のコンクリート打設中
に、一階部分の床工事を並行して進めることができる。
床を図示しないPCプレートで構成する場合は、予め工
場で生産したPCプレートを現場に運び込んで一階部分
に敷設すればよい。また、床を図示しないコンクリート
打設で工事する場合でも、上記二階部分のコンクリート
打設中に一階部分の床を工事することができ、例えば鉄
骨および鉄筋からなる床用骨組みユニット(図示しな
い)を敷設し、これにコンクリートを打設するができ
る。
Then, the floor construction on the first floor can be carried out in parallel while the concrete is being placed on the second floor.
When the floor is composed of a PC plate (not shown), the PC plate produced in the factory in advance may be brought to the site and laid on the first floor. Further, even when the floor is constructed by concrete pouring (not shown), the floor on the first floor can be constructed during concrete pouring on the second floor, for example, a floor frame unit (not shown) made of steel frame and rebar. Can be laid and concrete can be placed on it.

【0049】また、二階部分のコンクリート打設中に、
一階部分の窓の窓取り付け枠26に図示しないサッシか
らなる窓枠を取り付けて窓の工事を並行して行うことも
できる。
Also, during concrete pouring on the second floor,
It is also possible to attach a window frame made of a sash (not shown) to the window attachment frame 26 of the window on the first floor to perform the window construction in parallel.

【0050】上記のようにして、順次、下層階から上層
階へ建築を進めることができ、各階層の工期を短縮する
ことができるとともに、上層階の工事中に下層階の種々
の工事を並行して行うこともでき、作業効率が向上す
る。
As described above, the construction can be sequentially advanced from the lower floors to the upper floors, the construction period of each floor can be shortened, and various constructions of the lower floors can be performed in parallel during the construction of the upper floors. It can also be carried out and work efficiency is improved.

【0051】なお、下層階の鉄骨11,12の上端突出
部11a,21aと、上層階の鉄骨11,12の下端突
出部11b,21bを連結した場合、下層階と上層階の
鉄筋部分の間に隙間が生じるが、この隙間には下層階と
上層階を仕切る床(天井)を敷設することができる。
When the upper end projecting portions 11a and 21a of the steel frames 11 and 12 on the lower floors and the lower end projecting portions 11b and 21b of the steel frames 11 and 12 on the upper floors are connected to each other, between the reinforcing bar portions of the lower floor and the upper floors. Although there is a gap in the floor, a floor (ceiling) that separates the lower floor and the upper floor can be laid in this gap.

【0052】なお、上記実施の形態はマンションを建築
する場合について説明したが、本発明はこれに限らず、
一般家屋の建築や、その他の建築構造物に適用可能であ
る。また、吊上げ装置はホイストクレーンに限らず、ト
ラッククレーンなどを用いてよく、また操作方法も遠隔
操作式に限らず、手動操作であってもよい。
In the above embodiment, the case of building a condominium was described, but the present invention is not limited to this.
It is applicable to general house construction and other building structures. Further, the hoisting device is not limited to a hoist crane, a truck crane or the like may be used, and the operation method is not limited to a remote operation type, and may be a manual operation.

【0053】[0053]

【発明の効果】以上説明した通り請求項1の発明によれ
ば、多数の鉄筋を組み合わせて接合してなるメッシュ状
の構造物に鉄骨を組み込んであるから、躯体用骨組みユ
ニットの機械的強度を高くなり、工場で保管しておいた
り、建築現場に運ぶときに躯体用骨組みユニットが変形
することがなく、よって工場生産することができる。工
場生産できる場合は、建物の柱、外壁、内壁、天井、床
などの部分ごとにまたは分割したパーツとして標準化す
ることもでき、特に現場での骨組み作業を大幅に削減す
ることができる。また、このような躯体用骨組みユニッ
トは、鉄骨が支柱となって上層階の荷重を支えるので下
層階のコンクリートが固まるのを待たずに型枠を外すこ
とができる。したがって、コンクリートの乾燥時間を待
たずに上層階の骨組みを行うことができる。このような
ことから工期の大幅な短縮が可能になる。
As described above, according to the first aspect of the invention, since the steel frame is incorporated in the mesh-shaped structure formed by combining and joining a large number of reinforcing bars, the mechanical strength of the skeleton unit for the body is improved. It is expensive and can be manufactured at the factory without being deformed when it is stored in the factory or transported to the construction site. If it can be manufactured in a factory, it can be standardized for each part of the building such as pillars, outer walls, inner walls, ceilings, floors, or as divided parts, and in particular, skeleton work on site can be significantly reduced. Further, in such a frame skeleton unit, since the steel frame serves as a pillar to support the load of the upper floor, the formwork can be removed without waiting for the concrete of the lower floor to solidify. Therefore, the frame of the upper floor can be constructed without waiting for the drying time of the concrete. Because of this, the construction period can be greatly shortened.

【0054】請求項2の発明によれば、鉄骨が鉄筋部分
から上および下の少なくとも一方に突出しているので、
この突出部によって建物の基礎に連結したり、上下の躯
体用骨組みユニット相互を容易に連結することができ
る。
According to the invention of claim 2, since the steel frame projects from the reinforcing bar portion to at least one of the upper side and the lower side,
By this projecting portion, it is possible to connect to the foundation of the building or to easily connect the upper and lower frame skeleton units to each other.

【0055】請求項3の発明によれば、窓を形成する予
定の開口部に窓取り付け枠が固定されているから、従来
のようにコンクリートやモルタルが乾燥するのを待つ必
要がなく、窓取り付け枠を形成するための工期を大幅に
短縮することができる。この場合、窓取り付け枠を鉄骨
に取り付ける構造であるから構成が簡単になる。
According to the third aspect of the invention, since the window mounting frame is fixed to the opening where the window is to be formed, there is no need to wait for the concrete or mortar to dry as in the conventional case, and the window mounting is not necessary. The construction period for forming the frame can be significantly shortened. In this case, the structure is simple because the window mounting frame is attached to the steel frame.

【0056】請求項4の発明による建築工法によれば、
各躯体用骨組みユニットが支柱となる鉄骨を備えている
から、鉄骨同士を連結することにより上層階の躯体用骨
組みユニットが下層階の躯体用骨組みユニットによって
機械的に支持されるようになり、下層階の骨組みに打設
したコンクリートが乾燥固化するのを待つことなく、上
層階の躯体の骨組み作業を行うことができる。したがっ
て、下層階のコンクリートが固化するまでの待機時間を
削減することができ、工期の大幅な短縮が可能になる。
According to the construction method of the invention of claim 4,
Since each frame skeleton unit is provided with a steel frame that serves as a pillar, connecting the steel frames enables the frame skeleton unit on the upper floor to be mechanically supported by the frame skeleton unit on the lower floor, and the lower layer. It is possible to carry out the skeleton work of the skeleton of the upper floor without waiting for the concrete cast into the skeleton of the floor to dry and solidify. Therefore, the waiting time until the concrete on the lower floors solidifies can be reduced, and the construction period can be greatly shortened.

【0057】請求項5の発明による建築工法によれば、
上層階の躯体の骨組みが終わると上記下層階のコンクリ
ートの打ち込みに用いた型枠を外して吊上げ装置で上層
階に運び、この型枠で上層階の躯体用骨組みユニットを
囲んでこの型枠にコンクリートを流し込むから、型枠は
下層階から上層階へと直接にかつ順次移し換えることが
できる。したがって、型枠を空地に保管して待機させる
必要がなくなり、保管用空地が不要であり、かつ型枠の
空地への搬入、搬出作業も不要になる。
According to the construction method of the invention of claim 5,
When the skeleton of the skeleton of the upper floor is finished, remove the formwork used for driving the concrete of the lower story above and carry it to the upper story with a lifting device, and enclose the skeleton unit for the skeleton of the upper story with this formwork Since the concrete is poured, the formwork can be directly and sequentially transferred from the lower floors to the upper floors. Therefore, it is not necessary to store the formwork in an open space and wait it, a storage open space is unnecessary, and loading and unloading work of the formwork into the open space is also unnecessary.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施の形態に係る壁用骨組みユニッ
トを示し、(A)図は正面図、(B)図は上面図、
(C)図は側面図。
1A and 1B show a wall frame unit according to an embodiment of the present invention, in which FIG. 1A is a front view and FIG. 1B is a top view.
(C) The figure is a side view.

【図2】同実施の形態の窓用骨組みユニットを示し、
(A)図は正面図、(B)図は上面図、(C)図は側面
図。
FIG. 2 shows the frame unit for window of the same embodiment,
(A) is a front view, (B) is a top view, and (C) is a side view.

【図3】図2の III−III 線に沿う拡大した断面図。FIG. 3 is an enlarged sectional view taken along line III-III in FIG.

【図4】図1の壁用骨組みユニットおよび図2の窓用骨
組みユニットを用いたマンションの建築工法を示し、一
階部分の骨組みが完成した状態の斜視図。
FIG. 4 is a perspective view showing a construction method of a condominium using the wall frame unit of FIG. 1 and the window frame unit of FIG.

【図5】一階部分の骨組みに型枠を取り付けた状態の斜
視図。
FIG. 5 is a perspective view showing a state in which a frame is attached to the framework of the first floor portion.

【図6】二階部分の骨組みが完成した状態の斜視図。FIG. 6 is a perspective view showing a state in which the skeleton of the second floor is completed.

【図7】二階部分の壁用骨組みユニットが連結された状
態の斜視図。
FIG. 7 is a perspective view showing a state in which the wall skeletal unit of the second floor portion is connected.

【図8】二階部分の窓用骨組みユニットが連結された状
態の斜視図。
FIG. 8 is a perspective view showing a state in which the window frame units of the second floor are connected.

【図9】型枠を一階から二階に移し換える状態を説明す
る図。
FIG. 9 is a diagram illustrating a state in which the formwork is transferred from the first floor to the second floor.

【図10】二階部分の骨組みに型枠を取り付けた状態の
斜視図。
FIG. 10 is a perspective view showing a state in which a mold is attached to the framework of the second floor.

【符号の説明】[Explanation of symbols]

1…壁用骨組みユニット 2…窓用骨組みユニット 3,4…型枠 11,21…鉄骨 11a,11b,21a,21b…突出部 12,22…横筋 13,23…縦筋 25…開口部 26…窓取り付け枠 30…ホイストクレーン 31…レール 32…フック 1 ... Wall frame unit 2 ... Window frame unit 3, 4 ... Formwork 11, 21 ... Steel frame 11a, 11b, 21a, 21b ... Projection part 12, 22 ... Horizontal line 13,23 ... Vertical line 25 ... Opening part 26 ... Window mounting frame 30 ... Hoist crane 31 ... Rail 32 ... Hook

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 相互に交差して接合されることにより全
体としてメッシュ状に配筋された多数の鉄筋と;上記鉄
筋に接合され、これら鉄筋の主骨および支柱となる鉄骨
と;を具備したことを特徴とするコンクリート建築構造
物の躯体用骨組みユニット。
1. A large number of reinforcing bars which are arranged in a mesh shape as a whole by being crossed and connected to each other; and a steel frame which is connected to the reinforcing bars and serves as a main frame and a pillar of these reinforcing bars. A skeleton unit for the skeleton of a concrete building structure, which is characterized in that
【請求項2】 請求項1に記載のコンクリート建築構造
物の躯体用骨組みユニットにおいて、 上記鉄骨は、メッシュ状に配筋された上記鉄筋の部分か
ら上および下の少なくとも一方に突出していることを特
徴とするコンクリート建築構造物の躯体用骨組みユニッ
ト。
2. The skeleton unit for a skeleton of a concrete building structure according to claim 1, wherein the steel frame projects at least one of above and below from a portion of the reinforcing bar arranged in a mesh shape. A skeleton unit for the skeleton of a characteristic concrete building structure.
【請求項3】 請求項1に記載のコンクリート建築構造
物の躯体用骨組みユニットにおいて、 窓を形成する予定の箇所が開口されており、この開口部
に窓取り付け枠が上記鉄骨に固定されて配置されている
ことを特徴とするコンクリート建築構造物の躯体用骨組
みユニット。
3. The skeleton unit for a skeleton of a concrete building structure according to claim 1, wherein a portion where a window is to be formed is opened, and a window mounting frame is fixed to the steel frame and arranged in the opening. A skeleton unit for the skeleton of a concrete building structure, which is characterized by being
【請求項4】 請求項1ないし請求項3の少なくとも1
種の躯体用骨組みユニットを複数連結してコンクリート
建築構造物の下層階の骨組みをなし、この下層階の各躯
体用骨組みユニットを型枠で囲い、これら型枠にコンク
リートを流し込み、このコンクリートが乾燥する間に上
記下層階の各躯体用骨組みユニットの支柱用鉄骨に上層
階の各躯体用骨組みユニットの支柱用鉄骨を連結して上
層階の躯体の骨組みをし、この上層階の躯体の骨組みが
終わると型枠で上層階の躯体用骨組みユニットを囲み、
この型枠にコンクリートを流し込むようにしたことを特
徴とするコンクリート建築構造物の建築工法。
4. At least one of claims 1 to 3.
Multiple skeleton units for different frame structures are connected to form the skeleton for the lower floors of a concrete building structure, each frame skeleton unit for the lower floors is surrounded by a formwork, and concrete is poured into these formworks, and this concrete dries. In the meantime, the steel frames for the columns of each frame structure unit on the lower floor are connected to the steel frames for the columns of the frame structure unit for each frame on the upper floor to form the frame structure of the frame for the upper floor, and the frame structure of the frame for the upper floor is When finished, surround the upper frame skeleton unit with the formwork,
A concrete building structure construction method, characterized in that concrete is poured into this formwork.
【請求項5】 請求項4に記載のコンクリート建築構造
物の建築工法において、 上層階の躯体の骨組みが終わると、下層階の躯体用骨組
みユニットから型枠を外し、この型枠を吊上げ装置で吊
り上げて上層階の躯体の骨組みユニットに移し換えるこ
とを特徴とするコンクリート建築構造物の建築工法。
5. The method for constructing a concrete building structure according to claim 4, wherein when the skeleton of the skeleton of the upper floor is finished, the form is removed from the skeleton unit for the skeleton of the lower floor, and the form is lifted by a lifting device. A construction method for a concrete building structure, characterized by being lifted and transferred to a framed frame unit on the upper floor.
JP6293996A 1996-03-19 1996-03-19 Frame unit for building frame of concrete building structure and method of construction using frame unit thereof Pending JPH09256549A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6293996A JPH09256549A (en) 1996-03-19 1996-03-19 Frame unit for building frame of concrete building structure and method of construction using frame unit thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6293996A JPH09256549A (en) 1996-03-19 1996-03-19 Frame unit for building frame of concrete building structure and method of construction using frame unit thereof

Publications (1)

Publication Number Publication Date
JPH09256549A true JPH09256549A (en) 1997-09-30

Family

ID=13214782

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6293996A Pending JPH09256549A (en) 1996-03-19 1996-03-19 Frame unit for building frame of concrete building structure and method of construction using frame unit thereof

Country Status (1)

Country Link
JP (1) JPH09256549A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110295668A (en) * 2019-06-19 2019-10-01 郑州东方钢结构装饰有限公司 Low layer assembled steel concrete structural construction and its construction method
CN111851328A (en) * 2020-07-06 2020-10-30 海门市帕源路桥建设有限公司 Modular, standardized prefabricating and assembling construction process for box culvert concrete structural steel bars
CN114319847A (en) * 2022-01-12 2022-04-12 曾立成 Combined formwork for steel structure construction

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110295668A (en) * 2019-06-19 2019-10-01 郑州东方钢结构装饰有限公司 Low layer assembled steel concrete structural construction and its construction method
CN110295668B (en) * 2019-06-19 2023-12-15 郑州东方钢结构装饰有限公司 Low-rise assembled steel concrete structure building and construction method thereof
CN111851328A (en) * 2020-07-06 2020-10-30 海门市帕源路桥建设有限公司 Modular, standardized prefabricating and assembling construction process for box culvert concrete structural steel bars
CN111851328B (en) * 2020-07-06 2021-08-27 海门市帕源路桥建设有限公司 Modular, standardized prefabricating and assembling construction process for box culvert concrete structural steel bars
CN114319847A (en) * 2022-01-12 2022-04-12 曾立成 Combined formwork for steel structure construction

Similar Documents

Publication Publication Date Title
JP2002089043A (en) Reinforced concrete structure and construction method for steel framed reinforced concrete, structure
US5369930A (en) Method of manufacturing a hollow core, concrete building panel
JPH09256549A (en) Frame unit for building frame of concrete building structure and method of construction using frame unit thereof
CN214364235U (en) Assembled steel sheet compound shear wall body structure
JPH02300439A (en) Prefabricating method
JPH0893137A (en) Precast post serving as form and construction method therefor
JP2009299346A (en) Construction method of building
JPH084196A (en) Panel for building
JPH11247288A (en) Column-beam main bar pre-assembled hollow precast concrete column unit and column constructing method using this column unit
CN220414582U (en) Precast concrete bay window, precast wall body, precast room module and modularized building
JP3044113B2 (en) Building construction method
JPH084195A (en) Panel for building
JP2643641B2 (en) Building method using PC members
JPH0949264A (en) Constructing method for reinforced concrete framework and structure, and member therefor
JPH06104993B2 (en) Construction method of steel pipe precast concrete columns
JPH02120441A (en) Precast concrete wall panel and constructing wall therewith
CN111827531A (en) Construction method of cast-in-place composite heat insulation system of prefabricated heat insulation external formwork
JP2727263B2 (en) Formwork unit construction method
JPH0528248Y2 (en)
CN116145875A (en) Novel reinforced truss concrete superposed hollow floor system and implementation method thereof
JPH09256631A (en) Construction method of building reinforced concrete wall
JPS59173441A (en) Steel frame reinforced concrete structure and construction thereof
JPH0681476A (en) Building method for concrete structure
JPH0715177B2 (en) How to build a reinforced concrete structure
JPH09228380A (en) Manufacture of panel joining type caisson and panel joining type caisson