JPH09203205A - Pipe support tool for hollow slab construction and support fixing method - Google Patents

Pipe support tool for hollow slab construction and support fixing method

Info

Publication number
JPH09203205A
JPH09203205A JP3262196A JP3262196A JPH09203205A JP H09203205 A JPH09203205 A JP H09203205A JP 3262196 A JP3262196 A JP 3262196A JP 3262196 A JP3262196 A JP 3262196A JP H09203205 A JPH09203205 A JP H09203205A
Authority
JP
Japan
Prior art keywords
hollow slab
floor
pipe
floor surface
locking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP3262196A
Other languages
Japanese (ja)
Other versions
JP2953499B2 (en
Inventor
Tokutaro Futamura
徳太郎 二村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kurimoto Ltd
Original Assignee
Kurimoto Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kurimoto Ltd filed Critical Kurimoto Ltd
Priority to JP3262196A priority Critical patent/JP2953499B2/en
Publication of JPH09203205A publication Critical patent/JPH09203205A/en
Application granted granted Critical
Publication of JP2953499B2 publication Critical patent/JP2953499B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PROBLEM TO BE SOLVED: To fix a hollow slab pipe and enhance work efficiency and safety by limiting work only on the top of a floor surface form. SOLUTION: A projected lower half 34 of a locking nail 3, which is internally fitted in by driving a top-like metal fitting 2, is fixed at a desired position on the surfaces of a floor surface form. A refracted locking end 14 of a hanging support rod 12 is inserted into a locking hole 21 horizontally board in the top- like metal fitting 2 from a central bottom point of a semicircle-shaped receiving mount 11 of a support metal fitting 1, thereby fixing the whole metal fitting 1 together with a leg 13 on both sides. A hollow slab pipe P is loaded on the receiving mount 11 and tiles with an annealing wire 4, thereby fixing the hollow slab pipe only by work from the top side of the floor surface from F. After concrete placement, when the floor surface from is removed after the concrete is cured, the locking nail separated from the top-like metal fitting 2 is removed together with the floor surface form, thereby changing the construction to more efficient safer work.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は高層建築物などの構
築に対して多用される中空スラブ工法の改善に係る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an improvement of a hollow slab method which is frequently used for constructing high-rise buildings and the like.

【0002】[0002]

【従来の技術】中空スラブ工法は建築物の各階層の床面
を形成するときに適用する工法であり、床面用型枠を架
設した上で中空スラブ管を多数浮かした状態で並列さ
せ、その上からセメントスラーリを打設して中空スラブ
管を埋没させ、固化後に床面用型枠をコンクリート面か
ら剥離して取り除くことによって、軽量化された床面を
高能率で構築する手法として広く慣用化されている。こ
の工法においては、床面内に中空部を設けるために多数
の中空スラブ管を規則正しく型枠面上の中空位置に宙吊
りの浮いた状態で支持し、かつセメントスラリーを流入
したときでも、管が流勢に押されて移動しないように、
その位置で不動に固定しなければならない。そのために
中空スラブ工法においては中空スラブ管の支持と固定が
必須の手順となり、並列する管が多数に達することか
ら、所定の中空位置へ管を固定する作業性の優劣は、当
工法全体の日程に影響を与えるほどの重要な要素とな
る。
2. Description of the Related Art The hollow slab method is a method applied when forming the floor surface of each floor of a building, in which a plurality of hollow slab pipes are floated in parallel after the floor formwork is erected. It is widely used as a method for constructing a lightweight floor surface with high efficiency by placing a cement slurry on top of it and burying the hollow slab pipe, and after solidifying, removing the floor form from the concrete surface. It has been generalized. In this construction method, a large number of hollow slab pipes are regularly supported in a hollow position on the formwork surface in a floating state in order to provide a hollow portion in the floor surface, and even when the cement slurry flows in, the pipes Don't let the movement push you
It must be fixed immovably in that position. Therefore, in the hollow slab construction method, supporting and fixing of the hollow slab pipe is an essential procedure, and since a large number of pipes are arranged in parallel, the workability of fixing the pipes to a predetermined hollow position depends on the overall schedule of this construction method. Will be an important factor that will affect the.

【0003】中空スラブ管の支持と固定する工程に対し
て、その作業性と安全性を向上する目的で既に相当数の
従来技術が開発され、現に建築現場で実施されている。
その幾つかを引用すれば、図4に示す実公昭62−41
03号公報では、床面用型枠Fの所定の位置に穿孔した
透孔内へ、型枠の上部からネジ杆101の下端を挿通し
て支持部材102に螺着し、該支持部材102の上部に
支持杆103を螺着する。一方型枠から下方に突出する
下端には下方からナット104を螺合して係止し、この
支持杆や支持台105の上に中空スラブ管Pを載置して
帯体106で固定するという方式を提案している。
For the process of supporting and fixing the hollow slab pipe, a considerable number of conventional techniques have already been developed and are currently being implemented at the construction site in order to improve workability and safety.
Quoting some of them, the actual public sho 62-41 shown in FIG.
In JP 03, the lower end of the screw rod 101 is inserted from the upper part of the mold into a through hole formed at a predetermined position of the floor mold F, and is screwed to the support member 102. The support rod 103 is screwed onto the upper part. On the other hand, a nut 104 is screwed and locked from the lower end to the lower end protruding downward from the frame, and the hollow slab pipe P is placed on the support rod and the support base 105 and fixed by the strip body 106. Proposing a method.

【0004】図5(A)(B)に示す特公昭55−12
951号公報では、雌ネジ201と外周に複数のスリー
ブ202を屈曲自在に具えたボルト203よりなる拡張
栓204を下方へ向けて挿通して仮止めし、このボルト
203の上部外周に支持脚を螺着して支持脚先端の受け
具206の位置を固定する構成を提示し、床面用型枠F
の上側だけの作業によって中空スラブ管Pの支持固定が
可能となり、作業性が著しく向上したたと謳っている。
Japanese Patent Publication No. 55-12 shown in FIGS. 5 (A) and 5 (B).
According to Japanese Patent Publication No. 951), an expansion plug 204 made up of a bolt 203 having a female screw 201 and a plurality of sleeves 202 on its outer circumference that can be bent is inserted downward and temporarily fixed, and a support leg is attached to the upper outer circumference of the bolt 203. A structure for fixing the position of the receiving member 206 at the tip of the supporting leg by screwing is presented, and the floor surface form F
It is claimed that the workability is remarkably improved because the hollow slab pipe P can be supported and fixed only by the work above.

【0005】これに対して実開平4−55951号公報
の従来技術では図6に示すように管受け台301の中央
に垂下する係合杆302の下端が床面用型枠Fに穿孔し
た取付け孔を貫通して、なお下方に突出するだけの長さ
を具えてその先端は杆径よりも大きな多角形で形成して
いる。床面用型枠Fの上部でこの管受け台を正しい位置
に載置し、下部でこの突出する係合杆302の先端に長
孔を穿設した斜めの楔面を具えた係止部材303を填め
込み、打撃を加えて楔作用を働かせ、係合杆302を床
面用型枠F上の定位置に固定する構成を採っている。床
面用型枠Fの下面に楔作用を利用した固定金具を使用
し、床面用型枠F上面の管受け台を固定する発想は、他
に実公平7−8721号公報の技術もあり、従来の上下
にそれぞれ分れた部材を螺合する方式よりは、遥かに簡
便で作業性が高くなったと謳っている。
On the other hand, in the prior art of Japanese Utility Model Laid-Open No. 4-55951, as shown in FIG. 6, the lower end of the engaging rod 302 hanging down in the center of the pipe receiving base 301 is perforated in the floor surface form F. The tip is formed in a polygonal shape larger than the rod diameter, with a length sufficient to penetrate the hole and still project downward. The pipe pedestal is placed at the correct position on the upper portion of the floor surface form F, and the locking member 303 is provided with an oblique wedge surface having a long hole formed at the tip of the protruding engaging rod 302 at the lower portion. The engagement rod 302 is fixed to a fixed position on the floor surface form F by inserting the ball into the ball and exerting a wedge action by hitting. The idea of fixing the pipe pedestal on the upper surface of the floor surface formwork F by using a fixing metal fitting utilizing the wedge action on the lower surface of the floor surface formwork F is also disclosed in Japanese Utility Model Publication No. 7-8721. , It is said that it is much simpler and has higher workability than the conventional method of screwing separate upper and lower members.

【0006】[0006]

【発明が解決しようとする課題】以上のように引用した
従来技術は何れも中空スラブ管を床面用型枠F上の中空
位置に支持し固定する作業性の向上を図り、それぞれそ
れなりの効果を上げたものと認められるが、なお、現地
で実施する場合に課題を残していることも事実である。
作業性と安全性を向上する上で最も切実に求められる条
件は、どのような態様であれ、要するに床面用型枠の上
部だけの作業によって中空スラブ管を支持し固定できる
ことであり、これさえ実現できれば、作業性の改善、と
くに建築要員の不足が深刻な課題である今日、現地作業
の省力化が直接実現するから最も待望される技術的貢献
に繋がる。
In all of the prior arts cited above, the workability of supporting and fixing the hollow slab pipe in the hollow position on the floor surface form F is improved, and each has its own effect. Although it is recognized that it was raised, it is a fact that there are still problems when implementing it locally.
Whatever the most urgent requirement for improving workability and safety is that the hollow slab pipe can be supported and fixed only by the work of the upper part of the floor form, in any form. If it can be realized, improvement of workability, especially shortage of construction personnel is a serious issue, and labor saving of local work will be directly realized, which will lead to the long-awaited technical contribution.

【0007】その点から見れば、全ての従来技術は床面
用型枠Fの上下に作業員を配置し、双方が呼応した共同
作業が前提となっている。特に床面用型枠Fの下方の作
業は、作業員の脊高を考えれば床面用型枠F面(天井面
となる)に腕先が到底届かないから足場上の高所作業を
強いられ、作業自体が煩瑣で非能率な上、不安定で無理
な姿勢による作業は労働安全上でも万全を期し難く、安
全第一のスローガンに背く結果を誘発する可能性があ
る。特公昭55−12951号公報では床盤上のみの作
業によって事故を防止することを目的としているいる
が、床盤を挟んだ上下の作業のない限り、果たして管の
固定が可能なのかは疑問の余地が残る。
From this point of view, all the prior arts are premised on the joint work in which workers are arranged above and below the floor surface form F, and both respond to each other. In particular, for work below the floor formwork F, considering the spine of the worker, the arms of the floor formwork F surface (which becomes the ceiling surface) cannot reach the floor, so work on high places on the scaffold is strong. However, the work itself is cumbersome and inefficient, and work with an unstable and unreasonable posture is difficult to achieve in terms of occupational safety, and there is a possibility that it may lead to a result that violates the safety-first slogan. Japanese Patent Publication No. 55-12951 aims to prevent accidents by working only on the floor, but it is doubtful that the pipe can be fixed unless there is work above and below the floor. There is room for it.

【0008】本発明は以上の課題を解決するために部材
の構成が簡単であり、確実に床面用型枠上部側からの容
易な単純作業によってのみ中空スラブ管の支持と固定が
行なわれ、かつ、コンクリート打設後の処理のと再利用
も最も容易な中空スラブ工法の管支持固定器具と固定方
法の提供を目的とする。
In order to solve the above problems, the present invention has a simple structure of members, and the hollow slab pipe is surely supported and fixed only by an easy and simple operation from the upper side of the floor surface formwork. Moreover, it is an object of the present invention to provide a pipe support fixture and a fixture method of a hollow slab method, which is the easiest to treat and reuse after placing concrete.

【0009】[0009]

【課題を解決するための手段】本発明に係る中空スラブ
工法は、床面用型枠F上方へ所定の空間を隔てて中空ス
ラブ管Pを多数並べて所定の位置に支持固定し、コンク
リート打設、固化後に該床面用型枠Fを取り外して中空
床面を構築する工法であり、この工法に使用する器具と
しては、中空スラブ管Pの支持金物1が、両端を逆屈曲
した半円弧状の受け台11と、該受け台11の中央底点
を支えて垂下する支持杆12と、該支持杆12の両側で
対称的に垂下して床面用型枠F上に載置される2本の脚
体13とよりなり、該支持金物1を床面用型枠F上で固
定する部材が、ほぼ直方体状のコマ2と、該コマ内で垂
直方向へ嵌合する係止釘3とよりなり、コマ2は前記支
持杆12の下端を屈折した係止端14が挿通する横向き
の係止孔21と、前記係止釘31を内嵌する縦向きの凹
所22を穿孔し、係止釘3はコマ内に嵌入する上半部3
1に抜け止めスリーブ32を外装したことを構成上の特
徴とする。
In the hollow slab construction method according to the present invention, a large number of hollow slab pipes P are arranged above a floor frame F with a predetermined space therebetween, and are supported and fixed at a predetermined position, followed by concrete pouring. Is a construction method for removing the floor form F after solidification to construct a hollow floor surface. As a tool used in this construction method, the supporting metal 1 of the hollow slab pipe P has a semi-arcuate shape in which both ends are reversely bent. Of the pedestal 11, a support rod 12 that hangs down the center bottom point of the pedestal 11, and hangs symmetrically on both sides of the support rod 12 and placed on the floor form F 2 A member composed of a leg 13 of a book, for fixing the supporting metal 1 on the floor surface form F, is a substantially rectangular parallelepiped piece 2 and a locking nail 3 that fits vertically in the piece. The top 2 comprises a laterally-sided locking hole 21 through which a locking end 14 formed by bending the lower end of the support rod 12 is inserted, Puncturing the recess 22 of the vertical that fitted into the Kigakaritomekugi 31, Kakaritomekugi 3 half 3 over to fit into the frame
The constructional feature is that the retaining sleeve 32 is externally attached to the device 1.

【0010】この工法において、床面用型枠面上で中空
スラブ管Pを支持固定すべき所望の位置へ、ほぼ直方体
状のコマ2を打ち込んで内嵌した係止釘3の突出した下
半部34を固定し、該コマ2に穿孔した横向きの係止孔
21へ支持金物1の半円弧状の受け台11の中央底点か
ら垂下する支持杆12の屈折した係止端14を挿通し
て、前記受け台11の両側から垂下する2本の脚体13
と共に支持金具1全体を床面用型枠F上に固定し、前記
受け台11の上へ中空スラブ管Pを載置して両側の逆屈
曲した端部15に係合した番線4と共に拘束して中空ス
ラブ管Pを床面用型枠F上面側からの作業によってのみ
支持固定し、コンクリート打設、固化後に床面用型枠F
を剥脱するとき、前記コマ2から離脱した係止釘3を床
面用型枠Fと共に抜き去る手順を施工上の特徴とする。
In this construction method, the lower half of the locking nail 3 in which the substantially rectangular parallelepiped piece 2 is driven in is inserted into a desired position where the hollow slab pipe P should be supported and fixed on the floor surface of the formwork. The portion 34 is fixed, and the bent locking end 14 of the support rod 12 hanging from the central bottom point of the semi-circular pedestal 11 of the supporting metal 1 is inserted into the lateral locking hole 21 drilled in the top 2. And two legs 13 hanging from both sides of the cradle 11.
At the same time, the entire support metal fitting 1 is fixed on the floor surface form F, and the hollow slab pipe P is placed on the pedestal 11 and restrained together with the number wires 4 engaged with the oppositely bent ends 15 on both sides. The hollow slab pipe P is supported and fixed only by the work from the upper surface side of the floor surface form F, and after the concrete is placed and solidified, the floor surface form F
When peeling off, the feature of the construction is a procedure of removing the locking nail 3 separated from the top 2 together with the floor frame F.

【0011】この手順によって中空スラブ管を支持し固
定する作業を動作毎に見れば、床面用型枠Fの上面に所
定の中空スラブ管の配列を墨入れして罫書くなど管の位
置を明示し、基準通りの管支持固定位置も特定する。そ
の位置へコマの上面を槌打して金具内に嵌入し下半部3
4が下方へ突出している係止釘3を床面の上面内へ打ち
込み、固定したコマの係止孔21へ支持金具1の支持杆
12の先端の係止端14を挿通するだけで支持金具1が
所定の位置に固定する。支持金具1の受け台11の半円
弧面上に中空スラブ管Pを載置し、支持杆の両端部15
に係止した番線4を管の上方へ巻き回して固定すれば管
が固定する。すなわち作業はすべて床面用型枠Fの上面
側からだけに限られ、床面用型枠Fの下面側からの作業
が完全に消滅するので、作業の簡略化、能率化と、不安
定な高所作業の解消が実現しすべての課題を一挙に解決
する。
When the operation of supporting and fixing the hollow slab pipe by this procedure is seen for each operation, the position of the pipe is marked by marking a predetermined array of the hollow slab pipe on the upper surface of the floor form F and marking the lines. Clearly specify the pipe support fixed position as specified. Hammer the top surface of the top to that position and insert it into the metal fittings.
4 is driven into the upper surface of the floor by engaging the locking nail 3 protruding downward, and the locking end 14 at the tip of the support rod 12 of the supporting metal fitting 1 is inserted into the locking hole 21 of the fixed top piece. 1 fixed in place. The hollow slab pipe P is placed on the semi-circular surface of the pedestal 11 of the support fitting 1, and both ends 15 of the support rod are placed.
The pipe is fixed by winding and fixing the number wire 4 locked on the pipe. That is, all the work is limited to only from the upper surface side of the floor surface formwork F, and the work from the lower surface side of the floor surface formwork F is completely eliminated. Therefore, the work is simplified, streamlined, and unstable. Elimination of work in high places realizes all issues at once.

【0012】固定した中空スラブ管にはコンクリート打
設のときに上方へ押上げる浮力が当然加わるが、係止釘
3は下半部34が床面用型枠Fの内部へ打ち込まれて一
体的に係止していると共に、コマ2内に留まる上半部3
1は抜け止めスリーブ32に囲繞されて垂直方向へ押上
げる浮力に対抗するから、支持金具が浮力に負けて移動
することを防止して正しい位置に留まり、中空スラブ管
を不動の状態に拘束してコンクリートの固化するまでこ
の関係を維持し続ける。
The fixed hollow slab pipe is naturally subjected to a buoyancy force that pushes it upwards during concrete pouring, but the lower half portion 34 of the locking nail 3 is driven into the inside of the floor surface form F to form an integral body. The upper half 3 that is locked in the top and stays in the top 2
1 is surrounded by the retaining sleeve 32 and counters the buoyancy force that pushes it up in the vertical direction, so that the supporting metal fitting is prevented from moving due to the buoyancy force and stays in the correct position to restrain the hollow slab pipe in an immovable state. And keep this relationship until the concrete solidifies.

【0013】コンクリートが固化した後、床面用型枠F
を固化した床面(天井面)から取り外すと、床面用型枠
F内部へ打ち込まれた係止釘3も天井面に残ったコマか
ら離脱し、自動的に一緒に抜け出してくるから、特に天
井面から支持金物を取り外すための工作は不要であり、
現場における作業の単純化は労務時間の低減となって顕
著に現われる。
After the concrete is solidified, the floor form F
Since the locking nails 3 driven into the floor surface formwork F are detached from the tops remaining on the ceiling surface and automatically come out together when the is removed from the solidified floor surface (ceiling surface), No work is required to remove the supporting hardware from the ceiling surface,
The simplification of work in the field is conspicuous as the reduction of labor time.

【0014】請求項2および4について言えば、係止釘
3の上半部31の下端、すなわち床面用型枠F内へ打ち
込まれる境界付近に切込み33を刻設しているから、コ
ンクリート打設、固化後に打設面から該型枠を剥脱した
段階においては、型枠内に打ち込んだ係止釘の下半部3
4は残っているが、コマ内に留まっていた上半部31
(頭部)がコマから抜け出して露出している。ここで上
半部31を横方向から打撃すれば、前記の切込み33が
ノッチ作用を起こし突出部が打折し、床面用型枠Fの上
面は労せずして平滑となり、そのまま次の使用に供する
という特別の作用も発揮される。このようにコンクリー
ト打設後の処理と床面用型枠の再利用が最も簡便で人手
を費やさないことも課題解決をさらに助長する一因とな
ることは言うまでもない。
According to the second and fourth aspects, since the notch 33 is formed near the lower end of the upper half 31 of the locking nail 3, that is, near the boundary to be driven into the floor surface form F, the concrete hammering is performed. At the stage where the mold is peeled from the casting surface after installation and solidification, the lower half 3 of the locking nail driven into the mold
4 remains, but the upper half 31 that remained in the frame
(Head) is exposed from the frame. If the upper half portion 31 is hit from the lateral direction, the notch 33 causes a notch function and the protruding portion is broken, and the upper surface of the floor surface form F is smoothed without any effort, and is ready for the next use. The special effect of offering is also exhibited. It goes without saying that the treatment after the concrete is poured and the reuse of the floor formwork is the simplest and does not require manpower, which is one of the factors that further contributes to the solution of the problem.

【0015】[0015]

【発明の実施の形態】図1は本発明の実施形態を示す縦
断正面図であり、床面用型枠Fの上面に中空スラブ管P
を支持金具1で支持し、コマ2と係止釘3、番線4とで
位置を固定した状態である。図のように支持金具1の詳
細は中空スラブ管Pの下方外周面を支持する受け台1
1、受け台11の円弧部の底点に係合して床面用型枠F
上で垂直に支持する支持杆12、支持杆12の両サイド
に立設して安定的に管を支える脚体13とからなり、番
線4は受け台11の逆屈曲した端部15に係止して中空
スラブ管Pの上方外周面に巻き回して受け台と共に管の
位置を拘束する。
1 is a vertical sectional front view showing an embodiment of the present invention, in which a hollow slab pipe P is provided on the upper surface of a floor surface formwork F.
Is supported by the support fitting 1, and the position is fixed by the top 2, the locking nail 3, and the number wire 4. As shown in the figure, the details of the support fitting 1 are the pedestal 1 for supporting the lower outer peripheral surface of the hollow slab pipe P.
1, the floor frame F that engages with the bottom point of the arc of the pedestal 11
It consists of a support rod 12 which is vertically supported above, and legs 13 which stand upright on both sides of the support rod 12 and stably support the pipe, and the number wire 4 is locked to the reversely bent end portion 15 of the pedestal 11. The hollow slab pipe P is then wound around the upper outer peripheral surface to restrain the position of the pipe together with the pedestal.

【0016】支持杆12の下端はほぼ直角に屈折して係
止端14となり、係止端14がコマ2へ水平に穿孔した
係止孔21内へ挿通して係止される。コマ2は係止釘3
によって床面用型枠Fに固定されるが、図2(A)
(B)は使用前のコマの正面図と平面図を示したもので
ある。コマ2はその本体はほぼ直方体の合成樹脂製の箱
状体で形成し、側面中央を水平に貫通する係止孔21
と、両側で垂直に穿孔した凹所22を具えている。係止
釘の数は特に限定する必要はないが、通常は図から見て
前後左右に対称的に合計4本取付けた形態が望ましい。
コマ内に嵌入している係止釘のほぼ上半部31には抜け
止めスリーブ32を外装してあり、中空スラブ工法でセ
メントスラリーを流入するとき、その浮力を受けて係止
釘が床面用型枠Fから抜け出して浮上し、折角固定した
中空スラブ管の位置を狂わせることがないように図って
いる。
The lower end of the support rod 12 is bent substantially at a right angle to form a locking end 14, and the locking end 14 is inserted and locked in a locking hole 21 that is horizontally drilled in the top 2. Top 2 is locking nail 3
It is fixed to the formwork F for the floor by the method shown in FIG.
(B) is a front view and a plan view of the top before use. The main body of the top 2 is a box-shaped body made of a synthetic resin having a substantially rectangular parallelepiped shape, and has a locking hole 21 that horizontally penetrates through the center of the side surface.
And a recess 22 that is vertically perforated on both sides. The number of locking nails is not particularly limited, but it is usually desirable that a total of four symmetrically attached to the front, rear, left and right as viewed from the figure.
A retaining sleeve 32 is provided on the upper half 31 of the locking nail fitted in the frame, and when the cement slurry is flowed in by the hollow slab method, the locking nail receives the buoyancy and the floor surface of the locking nail is received. The hollow slab tube is fixed so that the hollow slab tube does not come out of the work form F and float up and the position is fixed.

【0017】図3は図1〜2とは係止釘3の形状の異な
る別の形態と作用を示したものである。この図はコンク
リート打設、固化後に床面用型枠Fを打設面から取り外
した状態を示し、図のように係止釘3の下半部34はそ
のまま進入した床面用型枠Fに連立ってコマから離れて
外れ、今までコマ内に嵌入していた上半部31が露出し
た状態で型枠面上に現われる。床面用型枠Fの剥離後に
突出した係止釘の上半部31を横からハンマーなどで槌
打すれば、切込み32がノッチ作用となって簡単に打折
し、床面用型枠Fの表面から取り除かれ、床面用型枠F
の表面は再使用するのに適した平滑面に再生する。
FIG. 3 shows another form and action of the locking nail 3 different from those of FIGS. This figure shows a state in which the floor form F has been removed from the placing surface after the concrete has been cast and solidified. As shown in the figure, the lower half 34 of the locking nail 3 has just entered the floor form F. The pieces continuously stand apart from the top and come off, and appear on the surface of the mold frame with the upper half portion 31 that has been fitted into the top until now exposed. If the upper half 31 of the locking nail that protrudes after the floor frame F is peeled off is hammered from the side with a hammer or the like, the notch 32 serves as a notch to easily fold and the floor frame F Formwork F for the floor, removed from the surface
The surface of is regenerated into a smooth surface suitable for reuse.

【0018】[0018]

【発明の効果】本発明は以上に述べたように中空スラブ
工法において従来技術では床面用型枠Fの上下での複数
の作業員による共同作業を廃絶し、単独の作業員による
床面用型枠上面だけに限った軽便な作業で中空スラブ管
の支持と固定ができるようになったから、現地作業の省
人化をもたらし、特に近年の建築関係の人手不足を解消
する効果が顕著である。また、作業の内容がハンマーな
どを使用した2〜3回の軽打で位置が固定するので、従
来技術に比べると所要の時間がきわめて短縮されて単純
動作でほとんど瞬時に完了し、従来の中空スラブ管の固
定工程に消費した工数は数分の一という単位で大幅な軽
減となる。
As described above, according to the present invention, in the hollow slab construction method, in the prior art, the collaborative work by a plurality of workers above and below the floor surface form F is eliminated, and the floor work by a single worker is eliminated. Since the hollow slab pipe can be supported and fixed only by the simple work on the upper surface of the formwork, the labor required for on-site work is reduced, and the effect of resolving the shortage of manpower related to construction in recent years is remarkable. . Also, since the position of the work is fixed by a few taps using a hammer or the like, the required time is extremely shortened compared to the prior art, and the operation is completed almost instantly with a simple operation. The man-hours consumed in the fixing process of the slab pipe are greatly reduced by a unit of a fraction.

【0019】また、従来技術に必要であった足場を組ん
で型枠の下面側から行なう高所作業が解消し、労働安全
の面での向上が著しいので、転落事故、骨折、腰部捻
挫、などに対する一切の懸念が払拭され、職場にもたら
す安心感や指示系統に対する信頼感などの醸成という好
影響も看過し難い効果の一つである。
Further, since the work at a high place from the lower surface side of the formwork by assembling the scaffolding necessary for the prior art is eliminated and the improvement in labor safety is remarkable, a fall accident, a fracture, a waist sprain, etc. One of the effects that can be overlooked is the positive impact that all concerns have been dispelled, and that a sense of security and a sense of trust in the instruction system brought to the workplace are created.

【0020】請求項2および4については、コンクリー
ト打設後、床面用型枠は当然次の工事に回送され再度使
用されるが、使用した後の表面が簡単な1動作によって
完全な平滑面に再生されるから、再使用までの段取りが
簡単で時間のロスがなく、手軽に床面用型枠の回転率を
高めて効率的な使用を保証する独特の効果が加えられ
る。ただし、この場合に型枠内に使用頻度に応じた数だ
けの係止釘の下半部がそのまま滞留していることは避け
られないから、寸法通りに型枠を切断するときなどにお
いては、事前にチェックしておく必要がある。
According to claims 2 and 4, the floor formwork is naturally transferred to the next construction and reused after the concrete is poured. However, the surface after use is completely smooth by one operation. Since it is regenerated, it is easy to set up before reuse, and there is no time loss, and the unique effect of easily increasing the rotation rate of the floor formwork to ensure efficient use is added. However, in this case, it is unavoidable that as many lower half parts of the locking nails as there are according to the frequency of use remain in the form, so when cutting the form according to the dimensions, It is necessary to check in advance.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施の形態を示す縦断正面図である。FIG. 1 is a vertical sectional front view showing an embodiment of the present invention.

【図2】同形態で使用するコマの正面図(A)と平面図
(B)とを例示する。
FIG. 2 illustrates a front view (A) and a plan view (B) of a top used in the same embodiment.

【図3】別の実施形態においてコンクリート打設後に取
り外した床面用型枠Fと係止釘3の状態を示す縦断正面
図である。
FIG. 3 is a vertical cross-sectional front view showing a state of a floor surface form F and locking nails 3 that have been removed after placing concrete in another embodiment.

【図4】従来技術の縦断正面図である。FIG. 4 is a vertical sectional front view of a conventional technique.

【図5】別の従来技術の固定前(A)と固定後(B)を
示す縦断正面図である。
FIG. 5 is a vertical sectional front view showing another prior art before (A) and after (B) fixing.

【図6】さらに別の従来技術の縦断正面図である。FIG. 6 is a vertical sectional front view of still another conventional technique.

【符号の説明】[Explanation of symbols]

1 支持金具 2 コマ 3 係止釘 4 番線 11 受け台 12 支持杆 13 脚体 14 係止端(支持杆) 15 端部(受け台) 21 係止孔 22 凹所 31 上半部 32 抜け止めスリーブ 33 切込み 34 下半部 F 床面用型枠 P 中空スラブ管 1 Supporting bracket 2 Top 3 Locking nail 4th line 11 Cradle 12 Support rod 13 Support rod 13 Leg 14 Locking end (supporting rod) 15 End (cage) 21 Locking hole 22 Recess 31 Upper half 32 Locking sleeve 33 Cut 34 Lower half F Formwork for floor P Hollow slab pipe

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 床面用型枠Fの上方へ所定の空間を隔て
て中空スラブ管Pを多数並べて所定の位置に支持固定
し、コンクリート打設、固化後に該床面用型枠Fを取り
外して中空床面を構築する中空スラブ工法において、中
空スラブ管Pの支持金物1は、両端を逆屈曲した半円弧
状の受け台11と、該受け台11の中央底点を支えて垂
下する支持杆12と、該支持杆12の両側で対称的に垂
下して床面用型枠F上に載置される2本の脚体13とよ
りなり、該支持金物1を床面用型枠F上で固定する部材
は、ほぼ直方体状のコマ2と、該コマ内で垂直方向へ嵌
合する係止釘3とよりなり、コマ2は前記支持杆12の
下端を屈折した係止端14が挿通する横向きの係止孔2
1と、前記係止釘3を内嵌する縦向きの凹所22を穿孔
し、係止釘3はコマ内に嵌入する上半部31は抜け止め
スリーブ32を外装したことを特徴とする中空スラブ工
法用の管支持固定器具。
1. A plurality of hollow slab pipes P are arranged above a floor-form frame F with a predetermined space therebetween to support and fix the hollow slab pipe P at a predetermined position, and after the concrete is poured and solidified, the floor-frame mold F is removed. In the hollow slab construction method for constructing a hollow floor surface, the support metal 1 of the hollow slab pipe P has a semi-arcuate pedestal 11 with opposite ends bent backward, and a support that hangs while supporting the center bottom point of the pedestal 11. It is composed of a rod 12 and two legs 13 symmetrically hanging down on both sides of the support rod 12 and placed on the floor form F. The member to be fixed above is composed of a substantially rectangular parallelepiped piece 2 and a locking nail 3 that fits vertically in the frame. The top 2 has a locking end 14 formed by bending the lower end of the support rod 12. Sideways locking hole 2 for insertion
1 and a vertically oriented recess 22 into which the locking nail 3 is fitted, and the locking nail 3 is fitted in the top. The upper half 31 is covered with a retaining sleeve 32. Pipe support fixture for slab method.
【請求項2】 請求項1において係止釘3に外装したス
リーブ32の下端付近に打設後の破断用の切込み33を
刻設したことを特徴とする中空スラブ工法用の管支持固
定方法。
2. The method for supporting and fixing a pipe for a hollow slab construction method according to claim 1, wherein a notch 33 for breaking after driving is engraved in the vicinity of a lower end of a sleeve 32 which is covered with the locking nail 3.
【請求項3】 床面用型枠F上方へ所定の空間を隔てて
中空スラブ管Pを多数並べて所定の位置に支持固定し、
コンクリート打設、固化後に該床面用型枠Fを取り外し
て中空床面を構築する中空スラブ工法において、床面用
型枠面上で中空スラブ管Pを支持固定すべき所望の位置
へ、ほぼ直方体状のコマ2を打ち込んで該コマ2に内嵌
した係止釘3の突出した下半部34を固定し、該コマ2
に穿孔した横向きの係止孔21へ、支持金物1の半円弧
状の受け台11の中央底点から垂下する支持杆12の屈
折した係止端14を挿通して、前記受け台11の両側か
ら垂下する2本の脚体13と共に、支持金具1全体を床
面用型枠F上に固定し、前記受け台11の上へ中空スラ
ブ管Pを載置して両側の逆屈曲した端部15に係合した
番線4と共に拘束して、中空スラブ管Pを床面用型枠F
上面側からの作業によってのみ支持固定し、コンクリー
ト打設、固化後に床面用型枠Fを剥脱するとき、前記コ
マ2から離脱した係止釘3を床面用型枠Fと共に抜き去
ることを特徴とする中空スラブ工法用の管支持固定方
法。
3. A plurality of hollow slab pipes P are arrayed above a floor surface form F with a predetermined space therebetween, and are supported and fixed at a predetermined position.
In the hollow slab construction method of constructing a hollow floor surface by removing the floor surface formwork F after concrete placement and solidification, the hollow slab pipe P is almost supported at a desired position on the floor surface formwork surface. A rectangular parallelepiped piece 2 is driven in to fix the protruding lower half portion 34 of the locking nail 3 fitted in the piece 2,
The bent locking ends 14 of the supporting rods 12 hanging from the central bottom points of the semi-circular arc-shaped receiving bases 11 of the supporting hardware 1 are inserted into the laterally extending locking holes 21 formed on the both sides of the receiving bases 11. The supporting bracket 1 as a whole is fixed on the floor surface form F together with the two legs 13 that hang down from it, and the hollow slab pipe P is placed on the pedestal 11 and both ends are reversely bent. The hollow slab pipe P is constrained together with the number wire 4 which engages with the hollow pipe 15, and the floor surface form F
When the floor form F is to be peeled off after being fixed and cast by concrete only by working from the upper surface side, the locking nails 3 detached from the top 2 should be pulled out together with the floor form F. A method for supporting and fixing pipes for the hollow slab construction method.
【請求項4】 請求項3において、係止釘3の突出した
下半部34の上端付近に切込み33を刻設して床面用型
枠内へ打ち込んで固定し、コンクリート打設、固化後に
コマ2から離脱した係止釘3を床面用型枠Fと共に抜き
去った後、該型枠面上に突出した上半部31を打折して
取り除くことを特徴とする中空スラブ工法用の管支持固
定方法。
4. The method according to claim 3, wherein a notch 33 is engraved in the vicinity of the upper end of the lower half portion 34 of the locking nail 3 and is driven and fixed in the floor formwork, and after concrete pouring and solidification. A pipe for a hollow slab construction method, characterized in that the locking nail 3 separated from the top 2 is pulled out together with the floor surface formwork F, and then the upper half part 31 protruding above the formwork surface is bent and removed. Support fixing method.
JP3262196A 1996-01-26 1996-01-26 Pipe support fixture and method for hollow slab construction Expired - Lifetime JP2953499B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3262196A JP2953499B2 (en) 1996-01-26 1996-01-26 Pipe support fixture and method for hollow slab construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3262196A JP2953499B2 (en) 1996-01-26 1996-01-26 Pipe support fixture and method for hollow slab construction

Publications (2)

Publication Number Publication Date
JPH09203205A true JPH09203205A (en) 1997-08-05
JP2953499B2 JP2953499B2 (en) 1999-09-27

Family

ID=12363932

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3262196A Expired - Lifetime JP2953499B2 (en) 1996-01-26 1996-01-26 Pipe support fixture and method for hollow slab construction

Country Status (1)

Country Link
JP (1) JP2953499B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100508532B1 (en) * 2002-10-23 2005-08-17 주식회사 용마엔지니어링 Structure of Bridge with Hollow Slab and Constructing Method Thereof
JP2018021404A (en) * 2016-08-05 2018-02-08 大成建設株式会社 Wet type floating floor construction method and void fixing structure in the method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100508532B1 (en) * 2002-10-23 2005-08-17 주식회사 용마엔지니어링 Structure of Bridge with Hollow Slab and Constructing Method Thereof
JP2018021404A (en) * 2016-08-05 2018-02-08 大成建設株式会社 Wet type floating floor construction method and void fixing structure in the method

Also Published As

Publication number Publication date
JP2953499B2 (en) 1999-09-27

Similar Documents

Publication Publication Date Title
US5146720A (en) Pipe stabilizer
CN112144854A (en) Anchor pulling type section steel overhanging support operation scaffold combined system and construction method
CN215253499U (en) Scaffold device
JPH09203205A (en) Pipe support tool for hollow slab construction and support fixing method
US4043087A (en) Method and means for supporting an elevated concrete wall panel form
CN208650505U (en) The integrated template type attachment device of lifting platform
CN114508231B (en) Quick combination construction method for I-steel component
KR200410232Y1 (en) Guide Rail Fixing Apparatus of Sliding Foam
CA2073503C (en) A method for installing a collar and a conduit collar
KR200322141Y1 (en) Temporary apparatus support structure for pier of bridge
CN217581295U (en) But reuse's assembled post positioner
JP3083750U (en) Separator for fixed spacing for building
CN218406592U (en) Movable I-steel dismantlement platform that encorbelments
JP3061176B2 (en) Tube fixing member and fixing method of hollow slab method
KR200201596Y1 (en) A supporter for form construction
CN216740012U (en) Concrete supporting beam
CN221461753U (en) Building construction frame
CN107630554B (en) Rapid construction device and method for floor slab
KR200219475Y1 (en) A clamp device for safety porch of gang form of construct
KR100458945B1 (en) temporary bracket for construction of precast concrete beam bridge and the installation method using the same
JPH0270822A (en) Temporary post erection method and device
JPS638260B2 (en)
JP3053847U (en) Rebar assembly equipment
KR100778298B1 (en) A structure and the method for mounting a safety net
KR960008845Y1 (en) Safety railing for constructing a building

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080716

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080716

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090716

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090716

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100716

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110716

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110716

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120716

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120716

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130716

Year of fee payment: 14

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term