JPH0849215A - Cable structure of suspension bridge - Google Patents

Cable structure of suspension bridge

Info

Publication number
JPH0849215A
JPH0849215A JP20290694A JP20290694A JPH0849215A JP H0849215 A JPH0849215 A JP H0849215A JP 20290694 A JP20290694 A JP 20290694A JP 20290694 A JP20290694 A JP 20290694A JP H0849215 A JPH0849215 A JP H0849215A
Authority
JP
Japan
Prior art keywords
main
pair
suspension bridge
cable
stay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP20290694A
Other languages
Japanese (ja)
Inventor
Hiroki Arai
祐基 荒居
Takeshi Tanimoto
健 谷本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Heavy Industries Ltd
Original Assignee
Sumitomo Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Heavy Industries Ltd filed Critical Sumitomo Heavy Industries Ltd
Priority to JP20290694A priority Critical patent/JPH0849215A/en
Publication of JPH0849215A publication Critical patent/JPH0849215A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE:To improve the wind resistance stability of a suspension bridge by diagonally spreading over horizontal stays or membrane members between a pair of main cables to heighten the torsional rigidity of the suspension bridge. CONSTITUTION:Horizontal stays 21 formed of a noncompression resistance member such as carbon fiber reinforced plastics or a compression resistance member such as a bar material are diagonally spread over between a pair of right and left main cables 5. The installation position of the stay 21 is severally set up to be near the 1/4 point of a center span distance and the center of a side span. In the case of the stay formed of the noncompression resistance member, a space adjusting member formed of the compression resistance member is provided between cables 5 in a direction perpendicular to the cable for preventing the displacement of the cable 5 in the case wherein initial tension is introduced into the stay 21. In addition, as occasion demands, a net structure or a film structure is used instead of the stay 21 for making the cable structure lighter. Thus the torsional rigidity of the main cable 5 and a stiffening girder 7 is reinforced to improve the number of torsional vibrations for controlling the lowering of limited wind velocity of a bent torsional flutter. The wind resistance stability of a long bridge can thereby be improved.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は吊橋のケーブル構造にか
かるもので、とくに吊橋のねじれ振動数を上昇させ、耐
風安定性を向上させることができる吊橋のケーブル構造
に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a suspension bridge cable structure, and more particularly to a suspension bridge cable structure capable of increasing the torsional frequency of the suspension bridge and improving wind resistance stability.

【0002】[0002]

【従来の技術】従来の吊橋について図15にもとづき概
説する。図15は、基本的な吊橋1の概略側面図であ
り、吊橋1は、一対の主塔基礎部2と、この主塔基礎部
2にそれぞれ起立して設けた一対の主塔3と、一対のア
ンカレッジ4と、主ケーブル5と、吊り材としてのハン
ガーロープ6と、補剛桁7と、を有する。
2. Description of the Related Art A conventional suspension bridge will be outlined with reference to FIG. FIG. 15 is a schematic side view of a basic suspension bridge 1. The suspension bridge 1 includes a pair of main tower foundations 2, a pair of main towers 3 provided upright on the main tower foundations 2, and a pair of main towers 3. An anchorage 4, a main cable 5, a hanger rope 6 as a suspending material, and a stiffening girder 7.

【0003】主塔基礎部2は、橋を架け渡そうとして対
岸を見る橋軸方向において所要の間隔(支間あるいはス
パン、主径間あるいは中央径間もしくはセンタースパ
ン)をあけて設けたもので、主ケーブル5は、橋軸方向
において一般的には左右両側にそれぞれ1本以上を主塔
3に架け渡すとともに、一対のアンカレッジ4にそれぞ
れその両端を固定してある。
The main tower foundation 2 is provided with a required space (a span or a span, a main span or a central span or a center span) in the bridge axial direction looking at the opposite bank to bridge the bridge. In general, one or more main cables 5 are laid on the left and right sides of the main tower 3 in the bridge axis direction, and both ends are fixed to a pair of anchorages 4.

【0004】補剛桁7は、主ケーブル5から複数本のハ
ンガーロープ6によりこれを吊り下げてあり、一般的に
は箱桁あるいはトラス構造を採用し、吊橋1全体の剛性
を補完する。
The stiffening girder 7 is suspended from the main cable 5 by a plurality of hanger ropes 6. Generally, a box girder or truss structure is adopted to complement the rigidity of the entire suspension bridge 1.

【0005】こうした構成の吊橋1において、一般に吊
橋1の中央径間あるいは側径間が長径間化すると、吊橋
1全体のねじれ剛性が低下し、ねじれの固有振動数が小
さくなるため、曲げねじれフラッターの限界風速が低下
する傾向がある。
In the suspension bridge 1 having such a structure, generally, if the center span or the side span of the suspension bridge 1 becomes longer, the torsional rigidity of the suspension bridge 1 as a whole lowers and the natural frequency of torsion becomes smaller, so that the bending torsion flutter. Limit wind speed tends to decrease.

【0006】吊橋1においては、曲げねじれフラッター
の発生は、吊橋1を破壊にいたらしめる重大な問題であ
り、その限界風速を向上させることは、長径間を有する
吊橋1の耐風設計において最も注意を有する重要な課題
である。
In the suspension bridge 1, the occurrence of bending and twisting flutter is a serious problem that causes the suspension bridge 1 to be destroyed, and improving the critical wind speed is the most important consideration in the wind resistant design of the suspension bridge 1 having a long span. It is an important issue to have.

【0007】曲げねじれフラッターの限界風速Vcrは、
Selbergによって式(1)のような近似式が提案
されている。すなわち、 Vcr=38.12・K・(B/2)-1/2・(m・Θ)1/4・ωt・ (1−(ωb/ωt21/2 (1) 「K」は断面形状の差異に起因する補正係数で風胴実験
などによりこれを求める。「B」は橋幅、「m」は橋の
単位長さあたりの質量、「Θ」は橋の単位長さあたりの
極慣性モーメント、「ωb」は鉛直たわみ固有円振動
数、「ωt」はねじれ固有円振動数である。
The limit wind speed V cr of bending and twisting flutter is
An approximate formula such as formula (1) has been proposed by Selberg. That, V cr = 38.12 · K · (B / 2) -1/2 · (m · Θ) 1/4 · ω t · (1- (ω b / ω t) 2) 1/2 (1 ) “K” is a correction coefficient due to the difference in cross-sectional shape, which is obtained by wind tunnel experiments. "B" is the bridge width, "m" is the mass per unit length of the bridge, "Θ" is the polar moment of inertia per unit length of the bridge, "ω b " is the vertical deflection natural circular frequency, and "ω t "Is the torsional natural circular frequency.

【0008】従来の吊橋1の耐風設計においては、とく
にωtの部分を上昇させるような耐風安定性の向上を目
的とした積極的なねじれ振動数の向上策は取られていな
い。すなわち従来の耐風設計においては、静的な応力照
査により各部材断面を決定し、そこから桁断面のねじれ
剛性を算定して、ねじれ振動数を求め、そののち、諸量
を相似させた縮尺模型による風胴実験を実施して、空力
的に安定な断面を見いだす、つまり式(1)の補正係数
Kが大なる断面を見いだすという手順により耐風設計が
行われている。
In the conventional wind-resistant design of the suspension bridge 1, no positive measures for improving the torsional frequency have been taken for the purpose of improving the wind-resistant stability such as increasing the ω t part. That is, in the conventional wind resistant design, each member cross section is determined by static stress inspection, the torsional rigidity of the girder cross section is calculated from that, the torsional frequency is obtained, and then the scale model with similar quantities is calculated. The wind-resistant design is performed by the procedure of finding a section that is aerodynamically stable, that is, finding a section with a large correction coefficient K in the equation (1), by carrying out a wind tunnel experiment by.

【0009】吊橋1のねじれ剛性を向上させる手法とし
て、補剛桁の桁幅や桁高を大きくする方法(結果的に式
(1)の(m・Θ)1/4の部分を大きくすることにな
る)があるが、それにともなう極端な質量(重量)の増
加は経済性において問題がある。
As a method for improving the torsional rigidity of the suspension bridge 1, a method of increasing the girder width and girder height of the stiffening girder (resulting in increasing the (m · Θ) 1/4 portion of the formula (1) However, the extreme increase in mass (weight) associated therewith is problematic in economic efficiency.

【0010】吊橋1のねじれ剛性を向上させる手法とし
て、トラス補剛桁で横断断面積を大きくすることが有用
であるとの提案がなされているが、極端な断面積の増加
は重量の増加をともなうものであり、経済性の問題が残
る。
As a method of improving the torsional rigidity of the suspension bridge 1, it has been proposed that it is useful to increase the cross-sectional area of the truss stiffener girder, but an extreme increase of the cross-sectional area causes an increase in weight. It is accompanied by a problem of economy.

【0011】なお中小規模の吊橋では、図16および図
17に示すように、補剛桁7からストームケーブルハン
ガー8を介して主塔3の側方の専用アンカレッジ9にス
トームケーブル10を取り付けることにより耐風安定性
を向上させているが、一般に定量的な効果の把握が困難
であり、長大橋には採用されていない。
In a small-to-medium-sized suspension bridge, as shown in FIGS. 16 and 17, a storm cable 10 is attached to a dedicated anchorage 9 on the side of the main tower 3 from a stiffening girder 7 via a storm cable hanger 8. The wind resistance stability is improved by, but it is generally difficult to grasp the quantitative effect and it is not adopted for long bridges.

【0012】また図示のように、支間中央部において斜
め吊り材(センターダイアゴナルステイ)11を設ける
こと、あるいは主塔3の頂部ないし基部から斜め吊り線
(斜めケーブル)12を設けることなどによって、ねじ
れ剛性を高め、補剛桁7や主ケーブル5を補強した二次
的な耐風ケーブル構造もある。
Further, as shown in the drawing, twisting is provided by providing an oblique suspending member (center diagonal stay) 11 at the center of the span or by providing an oblique suspending wire (oblique cable) 12 from the top or the base of the main tower 3. There is also a secondary wind resistant cable structure in which the rigidity is increased and the stiffening girder 7 and the main cable 5 are reinforced.

【0013】さらに、通常の吊橋のケーブルシステムに
加えて、斜めケーブルや斜めハンガーを組み合わせたケ
ーブル構造も提案されている。たとえば図18に示すケ
ーブル構造は、斜めハンガー13を用いた、いわゆるセ
バーン型のケーブル構造を示すもので、主ケーブル5と
補剛桁7との間のハンガーロープとして斜めハンガー1
3を用いている。
Further, in addition to the ordinary suspension bridge cable system, a cable structure combining diagonal cables and diagonal hangers has been proposed. For example, the cable structure shown in FIG. 18 is a so-called severn type cable structure using the diagonal hanger 13, and the diagonal hanger 1 is used as a hanger rope between the main cable 5 and the stiffening girder 7.
3 is used.

【0014】図19に示すケーブル構造は、斜めハンガ
ー14を主ケーブル5と補剛桁7との間に網目状に張っ
てある。
In the cable structure shown in FIG. 19, a slanted hanger 14 is stretched in a mesh shape between the main cable 5 and the stiffening girder 7.

【0015】図20に示すケーブル構造は、斜めケーブ
ル15を主塔3の頂部あるいは中段から補剛桁7に向か
って取り付けてある。
In the cable structure shown in FIG. 20, an oblique cable 15 is attached from the top or middle of the main tower 3 toward the stiffening girder 7.

【0016】図21に示すケーブル構造は、単一のモノ
ケーブル16に斜めのハンガーロープ6を補剛桁7の両
端に斜めに張ってこれを吊り下げ、全体のねじれ剛性を
高めようとしている。
In the cable structure shown in FIG. 21, a slanted hanger rope 6 is diagonally stretched to both ends of a stiffening girder 7 on a single monocable 16 and is hung to increase the torsional rigidity of the whole.

【0017】図22に示すケーブル構造は、鉛直に吊る
すハンガーロープ6とは別に、相反する主ケーブル5と
補剛桁7の桁端とを結ぶ対角ステイ17を設置すること
により、全体のねじれ剛性を高めようとしている。
In the cable structure shown in FIG. 22, apart from the hanger rope 6 hung vertically, the diagonal stay 17 connecting the opposite main cable 5 and the girder end of the stiffening girder 7 is installed, so that the entire twist Trying to increase rigidity.

【0018】[0018]

【発明が解決しようとする課題】本発明は以上のような
諸問題にかんがみなされたもので、左右一対の主ケーブ
ルの橋軸方向における互いに逆方向の移動を抑制するこ
とによって補剛桁あるいは吊橋全体のねじれを防止可能
であり、吊橋のねじれ振動数を上昇させ、曲げねじれフ
ラッターに対する耐風安定性を向上可能な吊橋のケーブ
ル構造を提供することを課題とする。
SUMMARY OF THE INVENTION The present invention has been made in view of the above problems, and a stiffening girder or a suspension bridge is provided by suppressing the movement of a pair of left and right main cables in opposite directions in the bridge axis direction. An object of the present invention is to provide a cable structure for a suspension bridge that can prevent the entire twist, increase the torsion frequency of the suspension bridge, and improve wind resistance stability against bending and twist flutter.

【0019】さらに、本発明は、Selbergによる
近似的な前記式(1)における、曲げねじれフラッター
の限界風速Vcrの向上に寄与する5つのパラメーターの
うち、(B/2)-1/2・(m・Θ)1/4などをあまり大
きくせずに(つまり吊り橋の重量化を回避して)、ωt
の向上(結果的に(1−(ωb/ωt21/2も大きくな
る)が可能な吊橋のケーブル構造を提供することを課題
とする。
Further, according to the present invention, among the five parameters contributing to the improvement of the limit wind speed V cr of the bending and twisting flutter in the approximate expression (1) by Selberg, (B / 2) −1 / 2 · (M · Θ) 1/4, etc. should not be made too large (that is, avoid the weight of the suspension bridge), and ω t
It is an object of the present invention to provide a suspension bridge cable structure capable of improving the above (as a result, (1- (ω b / ω t ) 2 ) 1/2 also increases).

【0020】また、本発明は、吊橋の長大化にともなう
ねじれ振動数の低下、およびこの低下にともなう曲げね
じれフラッターの限界風速の低下を抑制可能な、所定の
ねじれ剛性を得ることができるようにした吊橋のケーブ
ル構造を提供することを課題とする。
Further, according to the present invention, it is possible to obtain a predetermined torsional rigidity capable of suppressing the decrease in the torsional frequency due to the lengthening of the suspension bridge and the decrease in the limit wind speed of the bending torsional flutter due to this decrease. An object of the present invention is to provide a cable structure of a suspended bridge.

【0021】[0021]

【課題を解決するための手段】すなわち本発明は、補剛
桁のねじれ剛性を高めるよりもケーブル構造全体のねじ
れ剛性を高めてねじれ振動数を上昇させること、および
ねじれ振動数を上昇させるために一対の主ケーブルの間
に対角状に水平ステイあるいは膜部材を架け渡すことに
着目したもので、第一の発明は、橋軸方向において所要
の支間をもって設けた一対の主塔基礎部と、この主塔基
礎部にそれぞれ起立して設けた一対の主塔と、上記橋軸
方向においてこの主塔に架け渡すとともに一対のアンカ
レッジにそれぞれその両端を固定した一対の主ケーブル
と、を有する吊橋のケーブル構造であって、上記一対の
主ケーブルの間に対角状に張り渡した複数本の水平ステ
イを有するとともに、この水平ステイは、少なくとも上
記主塔の間の中央径間の1/4点付近にこれを設けたこ
とを特徴とする吊橋のケーブル構造である。
That is, according to the present invention, in order to increase the torsional frequency by increasing the torsional rigidity of the entire cable structure rather than increasing the torsional rigidity of the stiffening girder, and to increase the torsional frequency. Focusing on diagonally bridging horizontal stays or membrane members between a pair of main cables, the first invention is a pair of main tower foundations provided with a required span in the bridge axis direction, Suspension bridge having a pair of main towers provided upright on the main tower foundation portion, and a pair of main cables that bridge the main tower in the bridge axial direction and have both ends fixed to a pair of anchorages. And a plurality of horizontal stays extending diagonally between the pair of main cables, the horizontal stays being provided at least in the center between the main towers. A cable structure suspension bridge, characterized in that a direct vicinity quarter point between.

【0022】第二の発明は、橋軸方向において所要の支
間をもって設けた一対の主塔基礎部と、この主塔基礎部
にそれぞれ起立して設けた一対の主塔と、上記橋軸方向
においてこの主塔に架け渡すとともに一対のアンカレッ
ジにそれぞれその両端を固定した一対の主ケーブルと、
を有する吊橋のケーブル構造であって、上記一対の主ケ
ーブルの間に対角状に張り渡した複数本の水平ステイを
有するとともに、この水平ステイは、上記主塔と上記ア
ンカレッジとの間の側径間にこれを設けたことを特徴と
する吊橋のケーブル構造である。
A second invention is a pair of main tower foundations provided with a required span in the bridge axis direction, a pair of main towers standing upright on the main tower foundations, and in the bridge axis direction. A pair of main cables with both ends fixed to a pair of anchorages while spanning this main tower,
A cable structure of a suspension bridge having, having a plurality of horizontal stays extending diagonally between the pair of main cables, the horizontal stays between the main tower and the anchorage The cable structure of the suspension bridge is characterized in that it is provided between the side diameters.

【0023】上記水平ステイは、少なくとも上記主塔近
傍にこれを設けることができる。
The horizontal stay can be provided at least near the main tower.

【0024】上記水平ステイのほかに、上記一対の主ケ
ーブルの間に直角に張り渡した抗圧縮部材からなる間隔
調整材を設けることができる。
In addition to the horizontal stay, a space adjusting member composed of an anti-compression member stretched at a right angle between the pair of main cables can be provided.

【0025】第三の発明は、橋軸方向において所要の支
間をもって設けた一対の主塔基礎部と、この主塔基礎部
にそれぞれ起立して設けた一対の主塔と、上記橋軸方向
においてこの主塔に架け渡すとともに一対のアンカレッ
ジにそれぞれその両端を固定した一対の主ケーブルと、
を有する吊橋のケーブル構造であって、上記一対の主ケ
ーブルの間に張り渡した膜部材を有することを特徴とす
る吊橋のケーブル構造である。
A third invention is a pair of main tower foundations provided with a required span in the bridge axis direction, a pair of main towers standing upright on the main tower foundation, and in the bridge axis direction. A pair of main cables with both ends fixed to a pair of anchorages while spanning this main tower,
A cable structure for a suspension bridge having: a suspension bridge having a membrane member stretched between the pair of main cables.

【0026】[0026]

【作用】本発明による吊橋のケーブル構造においては、
一対の主ケーブルの間に対角状に水平ステイあるいは膜
部材を張り渡したので、吊橋のねじれに際して、主ケー
ブルがその長さ方向に伸縮あるいは互いに逆方向に移動
しようとするのを抑制し、吊橋全体のねじれ剛性を高め
ることができる。したがって、吊橋のねじれ振動数を上
昇させ、曲げねじれフラッターに対する耐風安定性を向
上させることができる。
In the cable structure of the suspension bridge according to the present invention,
Since the horizontal stays or membrane members are stretched diagonally between the pair of main cables, when the suspension bridge is twisted, the main cables are restrained from expanding or contracting in the length direction or from moving in opposite directions, The torsional rigidity of the entire suspension bridge can be increased. Therefore, the torsional frequency of the suspension bridge can be increased, and the wind resistance stability against bending and torsion flutter can be improved.

【0027】[0027]

【実施例】つぎに本発明の第1の実施例による吊橋のケ
ーブル構造を図1ないし図3にもとづき説明する。ただ
し以下の説明において、図15ないし図22と同様の部
分には同一符号を付し、その詳述はこれを省略する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, a cable structure of a suspension bridge according to a first embodiment of the present invention will be described with reference to FIGS. However, in the following description, the same parts as those in FIGS. 15 to 22 are designated by the same reference numerals, and the detailed description thereof will be omitted.

【0028】図1は、第1の実施例による吊橋20の概
略斜視図であって、吊橋20においては、風上および風
下の左右一対の主ケーブル5の間に、水平ステイ21を
対角状に、かつ所定の範囲にわたって張り渡してある。
FIG. 1 is a schematic perspective view of a suspension bridge 20 according to the first embodiment. In the suspension bridge 20, a horizontal stay 21 is diagonally arranged between a pair of left and right main cables 5 on the upwind side and the leeward side. And over a predetermined range.

【0029】水平ステイ21の材質としては、ケーブル
もしくは炭素繊維強化プラスチックなどによる非抗圧縮
部材、あるいは棒材などによる抗圧縮部材など、いずれ
もこれを採用することができる。
The material of the horizontal stay 21 may be a non-compression member such as a cable or carbon fiber reinforced plastic, or an anti-compression member such as a rod member.

【0030】図2は、水平ステイ21の主ケーブル5へ
の取付け位置を示す要部斜視図であって、ハンガーロー
プ6の取付け点と干渉しないように、水平ステイ21の
取付けバンド22を各取付け点の間に位置させてある。
FIG. 2 is a perspective view of a main part showing a mounting position of the horizontal stay 21 to the main cable 5. The mounting bands 22 of the horizontal stay 21 are mounted so as not to interfere with the mounting points of the hanger rope 6. It is located between the dots.

【0031】図3は、水平ステイ21を取り付ける主ケ
ーブル5を上方から見た平面図であって、水平ステイ2
1どうしを一対の主ケーブル5の間の空間において必ず
しも互いに交差させる必要はなく、図中実線で示すよう
に、単純なジグザグ模様を描くように取り付けてもよ
い。
FIG. 3 is a plan view of the main cable 5 to which the horizontal stay 21 is attached as seen from above.
The ones do not necessarily have to intersect each other in the space between the pair of main cables 5, and may be attached so as to draw a simple zigzag pattern as shown by the solid line in the figure.

【0032】また主ケーブル5の間に任意の設置角度θ
を持って水平ステイ21を取り付けるにあたり、この設
置角度θが45度から小さくなるほど(たとえば25度
前後)ねじれ剛性の強化をより向上させることができ
る。
An arbitrary installation angle θ is provided between the main cables 5.
When the horizontal stay 21 is attached while holding, the reinforcement of the torsional rigidity can be further improved as the installation angle θ becomes smaller than 45 degrees (for example, around 25 degrees).

【0033】ただし、水平ステイ21の材質としてケー
ブルもしくは炭素繊維強化プラスチックなどによる非抗
圧縮部材を採用した場合には、水平ステイ21自体にた
わみが発生してくるので、抗圧縮部材による間隔調整材
が必要である(後述する図4を参照)。
However, when a non-compressive member made of a cable or carbon fiber reinforced plastic is used as the material of the horizontal stay 21, the horizontal stay 21 itself is bent, so that the interval adjusting material by the anti-compressive member is used. Are required (see FIG. 4 described later).

【0034】また、図中仮想線で示すように、水平ステ
イ21は、主ケーブル5への取付け位置において隣の水
平ステイ21と離れてこれを取り付けてもよく、取付け
形態は任意にこれを選択可能である。
Further, as shown by the phantom line in the figure, the horizontal stay 21 may be mounted separately from the adjacent horizontal stay 21 at the mounting position on the main cable 5, and the mounting form is arbitrarily selected. It is possible.

【0035】なお図1に示すように、水平ステイ21の
設置位置は、後述するように中央径間の距離をLCとす
れば、LC/4点付近および側径間中央付近が望まし
い。ただし、中央径間中央付近や側径間端部付近におい
て水平ステイ21が建築限界を侵す範囲以外であれば、
その効果に応じて設置位置および設置長さは、これを自
由に選択することができる。
As shown in FIG. 1, it is desirable that the horizontal stay 21 be installed near LC / 4 points and near the center of the side span, where LC is the distance between the center spans, as will be described later. However, in the vicinity of the center span center and near the side span ends, the horizontal stay 21 is outside the range where the building limit is violated.
The installation position and installation length can be freely selected according to the effect.

【0036】なお、水平ステイ21の設置位置および区
間は、後述するように、吊橋ねじれ振動数の上昇に影響
するパラメーターとなる。
The installation position and section of the horizontal stay 21 are parameters that affect the increase in the torsional vibration frequency of the suspension bridge, as will be described later.

【0037】水平ステイ21は、建築限界を侵さない高
い位置でこれを設置することができるので、道路を通行
する車両の視界障害となることもない。
Since the horizontal stay 21 can be installed at a high position that does not violate the building limit, it does not obstruct the visibility of vehicles passing through the road.

【0038】また、既設の吊橋1において耐風安定性に
問題が発生した場合、主ケーブル5に水平ステイ21の
取付けバンド22を設置するだけで、水平ステイ21を
容易に後付けすることができるとともに、水平ステイ2
1は、従来の技術と組み合わせてこれを使用することも
可能である。
When a problem occurs in wind stability in the existing suspension bridge 1, the horizontal stay 21 can be easily retrofitted by simply installing the attachment band 22 of the horizontal stay 21 on the main cable 5. Horizontal stay 2
1 can also be used in combination with conventional techniques.

【0039】図16および図17に示したセンターダイ
アゴナルステイ11を設けるような従来のケーブル構造
とは異なり、吊橋20においては長径間吊橋の設計にお
いて最も重要となる橋軸直角方向における風荷重の影響
を受けることがない。
Unlike the conventional cable structure in which the center diagonal stay 11 shown in FIGS. 16 and 17 is provided, in the suspension bridge 20, the influence of wind load in the direction perpendicular to the bridge axis, which is the most important in the design of the long span suspension bridge. Never receive.

【0040】従来の吊橋のケーブル構造のほとんどは、
いわゆる古典的なたわみ度理論あるいは膜理論にもとづ
く吊橋面内(橋軸方向と鉛直方向とで作られる面内)の
事象を示したものであるが、本発明における水平ステイ
21は、吊橋面外の左右一対の主ケーブル5を含む面内
の事象に関するもので、電算機による立体骨組みモデル
を用いたモード解析によって初めて得られたものであ
る。
Most of the conventional suspension bridge cable structures are
The phenomenon of the horizontal stay 21 in the present invention is shown outside the surface of the suspension bridge based on the so-called classical flexure theory or the membrane theory, which shows the phenomenon in the surface of the suspension bridge (in the plane formed by the axial direction of the bridge and the vertical direction). The present invention relates to an in-plane event including the pair of left and right main cables 5 of No. 1 and is obtained for the first time by a modal analysis using a three-dimensional frame model by a computer.

【0041】モード解析によれば、水平ステイ21の引
っ張り抵抗および圧縮抵抗が作用しているため、水平ス
テイ21としてケーブルなどの非抗圧縮材を使用する場
合には、初期張力を導入しておく必要がある。
According to the modal analysis, since the tensile resistance and the compression resistance of the horizontal stay 21 are acting, when the non-compressible material such as a cable is used as the horizontal stay 21, the initial tension is introduced. There is a need.

【0042】すなわち図4は、本発明の第2の実施例に
よる吊橋30の概略斜視図であって、水平ステイ21を
ケーブル材などにより構成した場合に、主ケーブル5間
に抗圧縮材などによる間隔調整材31を直角方向に設け
て、水平ステイ21の初期張力による主ケーブル5の変
位を防止可能としている。
That is, FIG. 4 is a schematic perspective view of a suspension bridge 30 according to a second embodiment of the present invention. When the horizontal stay 21 is made of a cable material or the like, an anti-compression material or the like is used between the main cables 5. The space adjusting member 31 is provided in the right angle direction to prevent the main cable 5 from being displaced by the initial tension of the horizontal stay 21.

【0043】図5は、本発明の第3の実施例(第三の発
明)による吊橋40の概略斜視図であって、主ケーブル
5の橋軸方向逆対称振動を拘束するものとして、水平ス
テイ21の代わりに網構造物あるいは膜構造物による膜
部材41を設置してある。
FIG. 5 is a schematic perspective view of a suspension bridge 40 according to a third embodiment (third invention) of the present invention, in which a horizontal stay is used as a means for restraining antisymmetric vibration of the main cable 5 in the bridge axis direction. Instead of 21, a membrane member 41 made of a net structure or a membrane structure is installed.

【0044】こうした膜部材41の採用により、主ケー
ブルのねじれ防止機構を軽量化することが可能である
が、設計の単純化の上では、水平ステイ21の方が取扱
いに便利である。
By adopting such a film member 41, it is possible to reduce the weight of the twisting prevention mechanism of the main cable, but the horizontal stay 21 is easier to handle in terms of simplification of the design.

【0045】以下、本発明による吊橋のケーブル構造の
作用を説明する。図6は、水平ステイ21を設けていな
い通常の吊橋1と、水平ステイ21を設置した本発明の
吊橋20のねじれ対称一次振動モード図であって、図示
のように、補剛桁7のねじれモード、主ケーブル5の橋
軸方向モード(X軸)、主ケーブル5の鉛直モード(Y
軸)、主ケーブル5の水平(橋軸直角方向)モード(Z
軸)の各成分を示している。なお、主ケーブル5モード
図の実線および点線は、それぞれ左および右の主ケーブ
ル5を示す。
The operation of the suspension bridge cable structure according to the present invention will be described below. FIG. 6 is a torsional symmetric primary vibration mode diagram of the normal suspension bridge 1 without the horizontal stay 21 and the suspension bridge 20 of the present invention with the horizontal stay 21 installed. As shown, the torsion of the stiffening girder 7 is shown. Mode, main cable 5 bridge axis direction mode (X axis), main cable 5 vertical mode (Y
Axis), main cable 5 horizontal (direction perpendicular to the bridge axis) mode (Z
Each component of (axis) is shown. The solid and dotted lines in the main cable 5 mode diagram indicate the left and right main cables 5, respectively.

【0046】なお、図6の「水平ステイ設置長48%」
とは、中央径間の長さをLC、側径間の長さをLSとし
たときに、橋長(LC+2LS)に対する水平ステイ2
1の長さの割合を言うもので、「設置長48%」とは具
体的に、左右の主塔3から支間中央部に向かってそれぞ
れ0.24LCの長さの水平ステイ21を設けるととも
に、左右の主塔3から支間中央部とは反対に側径間に向
かってそれぞれ0.48LSの長さの水平ステイ21を
設けている。
Incidentally, "horizontal stay installation length 48%" in FIG.
Is the horizontal stay 2 for the bridge length (LC + 2LS), where LC is the center span and LS is the side span.
The term "installation length 48%" specifically refers to the horizontal stays 21 each having a length of 0.24 LC from the left and right main towers 3 toward the center of the span, and Horizontal stays 21 each having a length of 0.48 LS are provided from the left and right main towers 3 toward the side spans opposite to the center portion of the support.

【0047】図6において、主ケーブル5の挙動に着目
すると、補剛桁7がねじれ対称振動するとき、水平ステ
イ21を設けていない場合に、一対の主塔3付近の主ケ
ーブル5は橋軸方向(X軸方向)に逆位相で振動するこ
とがわかる。水平ステイ21は、この主ケーブル5の逆
対称振動を拘束する作用をする。
Referring to the behavior of the main cable 5 in FIG. 6, when the stiffening girder 7 vibrates torsionally and symmetrically, when the horizontal stay 21 is not provided, the main cable 5 near the pair of main towers 3 is connected to the bridge shaft. It can be seen that vibration occurs in the opposite direction in the direction (X-axis direction). The horizontal stay 21 acts to restrain the antisymmetric vibration of the main cable 5.

【0048】すなわち、水平ステイ21(あるいは膜部
材41)は、主ケーブル5の橋軸方向における逆対称振
動を拘束して吊橋20全体をねじれにくくすることがわ
かる。
That is, it is understood that the horizontal stay 21 (or the film member 41) restrains the antisymmetric vibration of the main cable 5 in the bridge axis direction and makes the entire suspension bridge 20 difficult to be twisted.

【0049】この結果、主ケーブル5は橋軸方向に逆位
相に振動しにくくなり、補剛桁7はねじれ振動しにくく
なって、ねじれ振動数が上昇する。
As a result, the main cable 5 is less likely to vibrate in the opposite phase in the bridge axis direction, the stiffening girder 7 is less susceptible to torsional vibration, and the torsional frequency is increased.

【0050】また、水平ステイ21は、主ケーブル5の
橋軸方向逆対称振動を拘束するとともに、主ケーブル5
の鉛直逆対称振動(補剛桁7にとってはねじれ振動)を
も抑え込む作用がある。
The horizontal stay 21 restrains the antisymmetric vibration of the main cable 5 in the bridge axis direction, and
The vertical anti-symmetric vibration (for the stiffening girder 7) is also suppressed.

【0051】図7は、水平ステイ21の第1のパターン
の設置状態を吊橋20全体について描き、設置長24%
の水平ステイ21の設置位置による相違を見いだそうと
する説明図で、図中右方の表はねじれ振動数および水平
ステイ21を設けていない場合とのねじれ振動数比(ね
じれ振動数上昇率)を示す。なお、「EA」は水平ステ
イ21の伸び剛性である。
FIG. 7 illustrates the installation state of the first pattern of the horizontal stays 21 for the entire suspension bridge 20 with an installation length of 24%.
In an explanatory diagram for trying to find a difference depending on the installation position of the horizontal stay 21, the table on the right side of the figure shows the torsional frequency and the torsional frequency ratio (ratio of increase in torsional frequency) compared with the case where the horizontal stay 21 is not provided. Show. Note that “EA” is the extension rigidity of the horizontal stay 21.

【0052】図8は、図7に対応して、水平ステイ21
の設置位置と、ねじれ振動数との関係を示した説明図で
あって、図では中央径間の左側半分のみを描いてあり、
水平ステイ21は、斜線で示した範囲にわたって対称的
に右側半分の主ケーブル5にもこれを設けてあるものと
し(すなわち、左側半分に主塔3間のスパンLCの12
%、右側半分に12%)、水平ステイ21を設けていな
い場合のねじれ振動数を1.0としてある。
FIG. 8 corresponds to FIG. 7 and has a horizontal stay 21.
It is an explanatory view showing the relationship between the installation position and the torsional frequency, and in the figure, only the left half of the center span is drawn,
In the horizontal stay 21, the main cable 5 in the right half is symmetrically provided over the range shown by the diagonal lines (that is, the span LC between the main towers 3 is 12 in the left half).
%, 12% in the right half), and the torsional frequency is 1.0 when the horizontal stay 21 is not provided.

【0053】図7および図8から、水平ステイ21の設
置長さを同じとした場合に、ねじれ振動数比が最大とな
る設置位置、つまり水平ステイ21が最も効率的に効く
位置は、主塔3の間のスパンをLCとすれば、LC/4
の点付近であることがわかる。
From FIGS. 7 and 8, when the installation lengths of the horizontal stays 21 are the same, the installation position where the torsional frequency ratio is maximum, that is, the position where the horizontal stays 21 work most efficiently is the main tower. If the span between 3 is LC, then LC / 4
It can be seen that it is near the point.

【0054】図9は、図7と同様に、水平ステイ21の
第2のパターンの設置状態を吊橋20全体について描
き、主塔3から水平ステイ21の設置長を変えた場合の
相違を見いだそうとする説明図である。
Similar to FIG. 7, FIG. 9 illustrates the installation state of the second pattern of the horizontal stays 21 for the entire suspension bridge 20 and tries to find a difference when the installation length of the horizontal stays 21 from the main tower 3 is changed. FIG.

【0055】図10は、図9に対応して、水平ステイ2
1の設置区間長と吊橋ねじれ対称一次振動の振動数との
関係を示すグラフで、主塔3から水平ステイ21を所定
長さだけ設置した場合を示す。なお水平ステイ21のヤ
ング係数としては、ストランドロープを想定し、E=
1.4×107(tf/m2)とし、「EcAc」は主ケ
ーブル5の伸び剛性である。図中、横軸は水平ステイ2
1の設置区間長を橋長で除した値であり、縦軸はねじれ
振動数の上昇率(ねじれ振動数比)であり、設置長0%
(水平ステイ21の設置なし)の振動数を1.0として
いる。
FIG. 10 corresponds to FIG. 9 and has a horizontal stay 2
1 is a graph showing the relationship between the installation section length of 1 and the frequency of torsional symmetrical primary vibration of a suspension bridge, showing the case where the horizontal stay 21 is installed from the main tower 3 by a predetermined length. As the Young's modulus of the horizontal stay 21, assuming a strand rope, E =
1.4 × 10 7 (tf / m 2 ), “EcAc” is the elongation rigidity of the main cable 5. In the figure, the horizontal axis is the horizontal stay 2.
1 is the value obtained by dividing the installation section length by the bridge length, the vertical axis is the rate of increase in torsional frequency (torsion frequency ratio), and the installation length is 0%.
The frequency of vibration (without installing the horizontal stay 21) is set to 1.0.

【0056】図9および図10から、水平ステイ21の
設置によるねじれ振動数の上昇は明かであり、主塔3の
近傍に水平ステイ21を設置した場合に、設置区間長は
わずかな区間であっても効果は大きく現れ、設置長の増
加とともに振動数は漸増する傾向があることがわかる。
From FIGS. 9 and 10, the increase in the torsional frequency due to the installation of the horizontal stay 21 is clear, and when the horizontal stay 21 is installed near the main tower 3, the installation section length is a short section. However, the effect is significant, and it can be seen that the frequency tends to gradually increase as the installation length increases.

【0057】また、水平ステイ21のケーブルの伸び剛
性EAがねじれ振動数の上昇に寄与するひとつのパラメ
ーターとなっており、この伸び剛性が高いほど振動数の
上昇効果は大きいことがわかる。
Further, the elongation rigidity EA of the cable of the horizontal stay 21 is one parameter that contributes to the increase of the torsional frequency, and it is understood that the higher the elongation rigidity, the greater the effect of increasing the frequency.

【0058】図11は、水平ステイ21の第3のパター
ンの設置状態を吊橋20全体について描き、水平ステイ
21を中央径間の1/4点付近に設置した場合の設置長
を変えた場合の相違を見いだそうとする説明図である。
図12は、図11と同様に、水平ステイ21の第4のパ
ターンの設置状態を吊橋20全体について描き、水平ス
テイ21を中央径間の1/4点付近に設置した場合であ
って、主塔3から側径間にも水平ステイ21を設置した
場合の相違を見いだそうとする説明図である。
FIG. 11 shows the installation state of the third pattern of the horizontal stays 21 for the entire suspension bridge 20, and shows the case where the installation length is changed when the horizontal stays 21 are installed near the quarter point of the center span. It is explanatory drawing which tries to find a difference.
As in FIG. 11, FIG. 12 shows the installation state of the fourth pattern of the horizontal stays 21 for the entire suspension bridge 20, and shows the case where the horizontal stays 21 are installed in the vicinity of the quarter point of the center span. It is explanatory drawing which tries to discover the difference at the time of installing the horizontal stay 21 also between the tower 3 and a side diameter.

【0059】図13は、水平ステイ21を中央径間の1
/4点付近に設置した場合の設置長と、ねじれ振動数比
との関係(ねじれ振動数上昇効果)を示すグラフであ
り、主塔3の部分から水平ステイ21を設けた図9の場
合と同様に、水平ステイ21は、水平ステイ21を中央
径間の1/4点付近に設置した場合には、わずかな設置
長であってもねじれ振動数比の上昇に寄与する効果は大
きく、設置長の増加にともなってねじれ振動数上昇率
(ねじれ振動数比)は漸増する。
In FIG. 13, the horizontal stay 21 has a center span 1
Fig. 10 is a graph showing the relationship between the installation length and the torsional frequency ratio (the effect of increasing the torsional frequency) when installed near / 4 points, as compared to the case of Fig. 9 in which the horizontal stay 21 is provided from the main tower 3 portion. Similarly, when the horizontal stay 21 is installed near the quarter point of the center span, the horizontal stay 21 has a great effect of increasing the torsional frequency ratio even with a small installation length. As the length increases, the rate of increase in torsional frequency (ratio of torsional frequencies) gradually increases.

【0060】ただし、側径間に水平ステイ21を設けな
い場合(図11)と、側径間に水平ステイ21を設けた
場合(図12)とでは、水平ステイ21を設けた前者の
場合の方がねじれ振動数比の増加は大きいことがわか
る。
However, the case where the horizontal stay 21 is not provided between the side diameters (FIG. 11) and the case where the horizontal stay 21 is provided between the side diameters (FIG. 12) are It can be seen that the increase in the torsional frequency ratio is larger.

【0061】図14は、水平ステイ21の第5のパター
ンの設置状態を吊橋20全体について描き、水平ステイ
21の側径間への設置が与える影響を見いだそうとする
説明図である。
FIG. 14 is an explanatory diagram for describing the installation state of the fifth pattern of the horizontal stays 21 for the entire suspension bridge 20 in order to find the influence of the installation of the horizontal stays 21 on the side span.

【0062】図示の結果のうち、とくにおよび、
および、およびから判明するように、側径間に水
平ステイ21を設けることにより、主塔3のねじれ剛性
を高める効果があり、ねじれ振動数を上昇させることが
できる。
Of the results shown, in particular and
As can be seen from and and, by providing the horizontal stays 21 between the side diameters, there is an effect of increasing the torsional rigidity of the main tower 3, and the torsional frequency can be increased.

【0063】また、とくにおよび、およびか
ら、側径間に水平ステイ21を設置する場合には、側径
間の中央部より主塔3近傍に設置した方が効果がある。
In particular, when the horizontal stay 21 is installed between the side diameters, it is more effective to install the horizontal stay 21 in the vicinity of the main tower 3 than in the central portion between the side diameters.

【0064】さらに、とくにおよび、およびか
ら判明するように、中央径間の主塔3近傍に水平ステイ
21を設置する場合には、側径間に水平ステイ21を設
けることによるねじれ振動数の上昇効果は小さい。
Further, as will be apparent from (1) and (2) and (2), when the horizontal stay 21 is installed near the main tower 3 with the center span, the torsion frequency is increased by providing the horizontal stay 21 between the side spans. The effect is small.

【0065】[0065]

【発明の効果】以上のように本発明によれば、従来の補
剛桁における補強構造、あるいは主ケーブルとハンガー
ロープとが形成する面内での補強構造とは別に、一対の
主ケーブルが構成する面内において水平ステイあるいは
膜部材などを架け渡すことにより、主ケーブルないし補
剛桁のねじれ剛性を増強し、ねじれ振動数を向上させる
ようにしたので、曲げねじれフラッターの限界風速の低
下を抑えて、長大化する吊橋に対しても耐風安定性を向
上させることができる。
As described above, according to the present invention, a pair of main cables is constructed in addition to the conventional reinforcing structure in the stiffening girder or in-plane reinforcing structure formed by the main cable and the hanger rope. The horizontal stay or the membrane member is bridged in the plane to increase the torsional rigidity of the main cable or stiffening girder and improve the torsional frequency, thus suppressing the reduction of the critical wind speed of the bending and torsion flutter. As a result, the wind resistance stability can be improved even for a suspension bridge that becomes longer.

【0066】[0066]

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の第1の実施例による吊橋20の概略斜
視図である。
FIG. 1 is a schematic perspective view of a suspension bridge 20 according to a first embodiment of the present invention.

【図2】同、水平ステイ21の主ケーブル5への取付け
位置を示す要部斜視図である。
FIG. 2 is a perspective view of relevant parts showing a mounting position of the horizontal stay 21 on the main cable 5.

【図3】同、水平ステイ21を取り付ける主ケーブル5
を上方から見た平面図である。
FIG. 3 is a main cable 5 to which the horizontal stay 21 is attached.
It is the top view which looked at from above.

【図4】本発明の第2の実施例による吊橋30の概略斜
視図である。
FIG. 4 is a schematic perspective view of a suspension bridge 30 according to a second embodiment of the present invention.

【図5】本発明の第3の実施例(第三の発明)による吊
橋40の概略斜視図である。
FIG. 5 is a schematic perspective view of a suspension bridge 40 according to a third embodiment (third invention) of the present invention.

【図6】本発明の水平ステイ21を設置した吊橋20、
および水平ステイ21を設けていない通常の吊橋1のね
じれ対称一次振動モード図である。
FIG. 6 is a suspension bridge 20 in which a horizontal stay 21 of the present invention is installed,
3 is a torsion-symmetric primary vibration mode diagram of a normal suspension bridge 1 not provided with a horizontal stay 21. FIG.

【図7】本発明において、水平ステイ21の第1のパタ
ーンの設置状態を吊橋20全体について描き、設置長2
4%の水平ステイ21の設置位置による相違を見いだそ
うとする説明図である。
In the present invention, the installation state of the first pattern of the horizontal stay 21 is drawn for the entire suspension bridge 20, and the installation length is 2
It is explanatory drawing which tries to discover the difference by the installation position of 4% of horizontal stays 21.

【図8】同、図7に対応して、水平ステイ21の設置位
置と、ねじれ振動数との関係を示した説明図である。
8 is an explanatory diagram showing the relationship between the installation position of the horizontal stay 21 and the torsional frequency, corresponding to FIG.

【図9】本発明において、水平ステイ21の第2のパタ
ーンの設置状態を吊橋20全体について描き、主塔3か
ら水平ステイ21の設置長を変えた場合の相違を見いだ
そうとする説明図である。
FIG. 9 is an explanatory diagram illustrating the installation state of the second pattern of the horizontal stays 21 for the entire suspension bridge 20 in the present invention in order to find the difference when the installation length of the horizontal stays 21 from the main tower 3 is changed. .

【図10】同、図9に対応して、水平ステイ21の設置
区間長と吊橋ねじれ対称一次振動の振動数との関係を示
すグラフで、主塔3から水平ステイ21を所定長さだけ
設置した場合を示す。
FIG. 10 is a graph showing the relationship between the installation section length of the horizontal stay 21 and the frequency of torsional symmetrical primary vibration of the suspension bridge corresponding to FIG. 9, and the horizontal stay 21 is installed from the main tower 3 for a predetermined length. The case is shown.

【図11】本発明において、水平ステイ21の第3のパ
ターンの設置状態を吊橋20全体について描き、水平ス
テイ21を中央径間の1/4点付近に設置した場合の設
置長を変えた場合の相違を見いだそうとする説明図であ
る。
FIG. 11 is a view illustrating a state in which the third pattern of the horizontal stays 21 is installed for the entire suspension bridge 20 in the present invention, and the installation length is changed when the horizontal stays 21 are installed near the quarter point of the center span. It is explanatory drawing which tries to find the difference of.

【図12】同、図11と同様に水平ステイ21の第4の
パターンの設置状態を吊橋20全体について描き、水平
ステイ21を中央径間の1/4点付近に設置した場合で
あって、主塔3から側径間にも水平ステイ21を設置し
た場合の相違を見いだそうとする説明図である。
FIG. 12 is a drawing showing the installation state of the fourth pattern of the horizontal stays 21 for the entire suspension bridge 20 in the same manner as in FIG. 11, and when the horizontal stays 21 are installed near the quarter point of the center span, It is explanatory drawing which tries to discover the difference at the time of installing the horizontal stay 21 also from the main tower 3 to a side span.

【図13】本発明において、水平ステイ21を中央径間
の1/4点付近に設置した場合の設置長と、ねじれ振動
数比との関係(ねじれ振動数上昇効果)を示すグラフで
ある。
FIG. 13 is a graph showing the relationship between the installation length and the torsional vibration frequency ratio (the effect of increasing the torsional vibration frequency) when the horizontal stay 21 is installed in the vicinity of the quarter point of the center diameter in the present invention.

【図14】本発明において、水平ステイ21の第5のパ
ターンの設置状態を吊橋20全体について描き、水平ス
テイ21の側径間への設置が与える影響を見いだそうと
する説明図である。
FIG. 14 is an explanatory diagram illustrating the installation state of the fifth pattern of the horizontal stays 21 for the entire suspension bridge 20 in order to find the effect of the installation of the horizontal stays 21 between the side spans in the present invention.

【図15】従来からの基本的な吊橋1の概略側面図であ
る。
FIG. 15 is a schematic side view of a conventional basic suspension bridge 1.

【図16】同、ストームケーブル10、センターダイア
ゴナルステイ11、斜めケーブル12を取り付けたケー
ブル構造の概略側面図である。
FIG. 16 is a schematic side view of the cable structure to which the storm cable 10, the center diagonal stay 11, and the diagonal cable 12 are attached.

【図17】同、ストームケーブル10、センターダイア
ゴナルステイ11、斜めケーブル12を取り付けたケー
ブル構造の概略側面図である。
FIG. 17 is a schematic side view of the cable structure to which the storm cable 10, the center diagonal stay 11, and the diagonal cable 12 are attached.

【図18】同、斜めハンガー13を用いた、いわゆるセ
バーン型のケーブル構造の概略側面図である。
FIG. 18 is a schematic side view of a so-called severn type cable structure using the diagonal hanger 13 of the same.

【図19】同、斜めハンガー14を主ケーブル5と補剛
桁7との間に網目状に張ったケーブル構造の概略側面図
である。
FIG. 19 is a schematic side view of a cable structure in which the diagonal hanger 14 is stretched in a mesh shape between the main cable 5 and the stiffening girder 7.

【図20】同、斜めケーブル15を主塔3の頂部あるい
は中段から補剛桁7に向かって取り付けたケーブル構造
の概略側面図である。
FIG. 20 is a schematic side view of a cable structure in which the diagonal cable 15 is attached from the top or middle of the main tower 3 toward the stiffening girder 7.

【図21】同、単一のモノケーブル16に斜めのハンガ
ーロープ6を補剛桁7の両端に斜めに張ったケーブル構
造の概略側面図である。
FIG. 21 is a schematic side view of a cable structure in which diagonal hanger ropes 6 are diagonally stretched on both ends of a stiffening girder 7 on a single mono cable 16.

【図22】同、相反する主ケーブル5と補剛桁7の桁端
とを結ぶ対角ステイ17を設置したケーブル構造の概略
側面図である。
FIG. 22 is a schematic side view of a cable structure in which diagonal stays 17 connecting opposite main cables 5 and stiffening girder ends are installed.

【符号の説明】[Explanation of symbols]

1 吊橋 2 一対の主塔基礎部 3 一対の主塔 4 一対のアンカレッジ 5 主ケーブル 6 ハンガーロープ(吊り材) 7 補剛桁 8 ストームケーブルハンガー 9 専用アンカレッジ 10 ストームケーブル 11 斜め吊り材(センターダイアゴナルステイ) 12 斜め吊り線(斜めケーブル) 13 斜めハンガー 14 斜めハンガー 15 斜めケーブル 16 モノケーブル 17 対角ステイ 20 吊橋(第1の実施例) 21 水平ステイ 22 水平ステイ21の取付けバンド 30 吊橋(第2の実施例) 31 抗圧縮材などによる間隔調整材 40 吊橋(第3の実施例、第三の発明) 41 膜部材 1 Suspension Bridge 2 Pair of Main Tower Foundation 3 Pair of Main Tower 4 Pair of Anchorage 5 Main Cable 6 Hanger Rope (Suspending Material) 7 Stiffening Girder 8 Storm Cable Hanger 9 Exclusive Anchorage 10 Storm Cable 11 Diagonal Suspending Material (Center) Diagonal stay 12 Diagonal suspension line (diagonal cable) 13 Diagonal hanger 14 Diagonal hanger 15 Diagonal cable 16 Mono cable 17 Diagonal stay 20 Suspension bridge (first embodiment) 21 Horizontal stay 22 Mounting band for horizontal stay 21 Suspension bridge (No. 1) Example of 2) 31 Space adjusting material such as anti-compression material 40 Suspension bridge (third example, third invention) 41 Membrane member

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 橋軸方向において所要の支間をもって
設けた一対の主塔基礎部と、 この主塔基礎部にそれぞれ起立して設けた一対の主塔
と、 前記橋軸方向においてこの主塔に架け渡すとともに一対
のアンカレッジにそれぞれその両端を固定した一対の主
ケーブルと、を有する吊橋のケーブル構造であって、 前記一対の主ケーブルの間に対角状に張り渡した複数本
の水平ステイを有するとともに、 この水平ステイは、少なくとも前記主塔の間の中央径間
の1/4点付近にこれを設けたことを特徴とする吊橋の
ケーブル構造。
1. A pair of main tower foundations provided with a required span in the bridge axis direction, a pair of main towers standing upright on the main tower foundation, and the main towers in the bridge axis direction. A cable structure of a suspension bridge having a pair of main cables that are both bridged and fixed to a pair of anchorages, and a plurality of horizontal stays stretched diagonally between the pair of main cables. In addition, the horizontal stay is provided at least in the vicinity of the quarter point of the center distance between the main towers, and the horizontal stay is provided in the cable structure of the suspension bridge.
【請求項2】 橋軸方向において所要の支間をもって
設けた一対の主塔基礎部と、 この主塔基礎部にそれぞれ起立して設けた一対の主塔
と、 前記橋軸方向においてこの主塔に架け渡すとともに一対
のアンカレッジにそれぞれその両端を固定した一対の主
ケーブルと、を有する吊橋のケーブル構造であって、 前記一対の主ケーブルの間に対角状に張り渡した複数本
の水平ステイを有するとともに、 この水平ステイは、前記主塔と前記アンカレッジとの間
の側径間にこれを設けたことを特徴とする吊橋のケーブ
ル構造。
2. A pair of main tower foundations provided with a required span in the bridge axis direction, a pair of main towers standing upright on the main tower foundation, and the main towers in the bridge axis direction. A cable structure of a suspension bridge having a pair of main cables that are bridged together and fixed at both ends to a pair of anchorages, and a plurality of horizontal stays stretched diagonally between the pair of main cables. The horizontal stay is provided with a lateral diameter between the main tower and the anchorage, and the cable structure of the suspension bridge.
【請求項3】 前記水平ステイは、少なくとも前記主
塔近傍にこれを設けたことを特徴とする請求項2記載の
吊橋のケーブル構造。
3. The cable structure for a suspension bridge according to claim 2, wherein the horizontal stay is provided at least near the main tower.
【請求項4】 前記水平ステイのほかに、前記一対の
主ケーブルの間に直角に張り渡した抗圧縮部材からなる
間隔調整材を設けたことを特徴とする請求項1あるいは
請求項2のいずれか一方に記載の吊橋のケーブル構造。
4. In addition to the horizontal stay, a space adjusting member made of an anti-compression member stretched at a right angle between the pair of main cables is provided. Cable structure of suspension bridge described on either side.
【請求項5】 橋軸方向において所要の支間をもって
設けた一対の主塔基礎部と、 この主塔基礎部にそれぞれ起立して設けた一対の主塔
と、 前記橋軸方向においてこの主塔に架け渡すとともに一対
のアンカレッジにそれぞれその両端を固定した一対の主
ケーブルと、を有する吊橋のケーブル構造であって、 前記一対の主ケーブルの間に張り渡した膜部材を有する
ことを特徴とする吊橋のケーブル構造。
5. A pair of main tower foundations provided with a required span in the bridge axis direction, a pair of main towers standing upright on the main tower foundation, and the main towers in the bridge axis direction. It is a cable structure of a suspension bridge having a pair of main cables which are bridged and fixed at both ends to a pair of anchorages, wherein the suspension bridge has a membrane member stretched between the pair of main cables. Suspension bridge cable structure.
JP20290694A 1994-08-05 1994-08-05 Cable structure of suspension bridge Pending JPH0849215A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20290694A JPH0849215A (en) 1994-08-05 1994-08-05 Cable structure of suspension bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20290694A JPH0849215A (en) 1994-08-05 1994-08-05 Cable structure of suspension bridge

Publications (1)

Publication Number Publication Date
JPH0849215A true JPH0849215A (en) 1996-02-20

Family

ID=16465146

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20290694A Pending JPH0849215A (en) 1994-08-05 1994-08-05 Cable structure of suspension bridge

Country Status (1)

Country Link
JP (1) JPH0849215A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103088750A (en) * 2013-01-24 2013-05-08 东南大学 Especial-big span suspension bridge of uniparted hyperboloid space rope net main cable and construction method thereof
CN103835237A (en) * 2014-03-04 2014-06-04 浙江省交通规划设计研究院 Anti-slip cable saddle structure for suspension bridges
CN104818665A (en) * 2015-04-27 2015-08-05 中国石油天然气管道工程有限公司 Long-span pipeline suspension bridge wind resisting method
CN104846747A (en) * 2015-05-19 2015-08-19 长安大学 Self-anchored suspension bridge boom tensioning technology based on self-equilibrium system
CN105002823A (en) * 2015-06-09 2015-10-28 吉林省银河水利水电新技术设计有限公司 Method for resisting wind vibration of light large-span bridge surfaces by adopting damping cables
CN105220615A (en) * 2015-09-15 2016-01-06 同济大学 A kind of vibration absorber suppressing large-span suspension bridge suspension rod wind-induced vibration
CN107313349A (en) * 2017-07-11 2017-11-03 德阳天元重工股份有限公司 Bilateral hoist cable arranges shaping pin joint formula cord clip
CN108978436A (en) * 2018-09-21 2018-12-11 广西大学 Space truss suspension bridge
CN109000880A (en) * 2018-07-16 2018-12-14 西南交通大学 A kind of Tower Bridge wake flow causes the flow tunnel testing device of tower week hoist cable vibration
CN109815588A (en) * 2019-01-24 2019-05-28 东南大学 A kind of main cable alignment construction method of the three-tower suspension bridge of main spans such as not
CN110130199A (en) * 2019-05-24 2019-08-16 重庆交通大学 A kind of bridge
CN110373998A (en) * 2019-06-05 2019-10-25 长江勘测规划设计研究有限责任公司 Support device and application method for the forming of Spatial cable systems main rope of suspension bridge
CN112962420A (en) * 2021-02-07 2021-06-15 上海市政工程设计研究总院(集团)有限公司 Suspension bridge and construction method
CN114016373A (en) * 2021-12-10 2022-02-08 江苏交通工程咨询监理有限公司 Pedestrian suspension bridge of hillside anchoring type space cable system
CN114635372A (en) * 2022-03-21 2022-06-17 武汉理工大学 Multi-tower suspension bridge reinforcing structure for overcoming middle tower effect

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103088750A (en) * 2013-01-24 2013-05-08 东南大学 Especial-big span suspension bridge of uniparted hyperboloid space rope net main cable and construction method thereof
CN103835237A (en) * 2014-03-04 2014-06-04 浙江省交通规划设计研究院 Anti-slip cable saddle structure for suspension bridges
CN104818665A (en) * 2015-04-27 2015-08-05 中国石油天然气管道工程有限公司 Long-span pipeline suspension bridge wind resisting method
CN104846747A (en) * 2015-05-19 2015-08-19 长安大学 Self-anchored suspension bridge boom tensioning technology based on self-equilibrium system
CN105002823A (en) * 2015-06-09 2015-10-28 吉林省银河水利水电新技术设计有限公司 Method for resisting wind vibration of light large-span bridge surfaces by adopting damping cables
CN105002823B (en) * 2015-06-09 2016-08-17 吉林省银河水利水电新技术设计有限公司 A kind of method using damping cable anti-light long-span bridge floor wind to shake
CN105220615A (en) * 2015-09-15 2016-01-06 同济大学 A kind of vibration absorber suppressing large-span suspension bridge suspension rod wind-induced vibration
CN107313349B (en) * 2017-07-11 2024-01-26 德阳天元重工股份有限公司 Pin-connected cable clamp for double-side sling arranging and forming
CN107313349A (en) * 2017-07-11 2017-11-03 德阳天元重工股份有限公司 Bilateral hoist cable arranges shaping pin joint formula cord clip
CN109000880A (en) * 2018-07-16 2018-12-14 西南交通大学 A kind of Tower Bridge wake flow causes the flow tunnel testing device of tower week hoist cable vibration
CN108978436A (en) * 2018-09-21 2018-12-11 广西大学 Space truss suspension bridge
CN109815588B (en) * 2019-01-24 2022-02-11 东南大学 Main cable linear construction method of unequal main span three-tower suspension bridge
CN109815588A (en) * 2019-01-24 2019-05-28 东南大学 A kind of main cable alignment construction method of the three-tower suspension bridge of main spans such as not
CN110130199A (en) * 2019-05-24 2019-08-16 重庆交通大学 A kind of bridge
CN110373998A (en) * 2019-06-05 2019-10-25 长江勘测规划设计研究有限责任公司 Support device and application method for the forming of Spatial cable systems main rope of suspension bridge
CN110373998B (en) * 2019-06-05 2024-04-12 长江勘测规划设计研究有限责任公司 Supporting device for forming main cable of suspension bridge of space cable system and using method
CN112962420A (en) * 2021-02-07 2021-06-15 上海市政工程设计研究总院(集团)有限公司 Suspension bridge and construction method
CN114016373A (en) * 2021-12-10 2022-02-08 江苏交通工程咨询监理有限公司 Pedestrian suspension bridge of hillside anchoring type space cable system
CN114635372A (en) * 2022-03-21 2022-06-17 武汉理工大学 Multi-tower suspension bridge reinforcing structure for overcoming middle tower effect

Similar Documents

Publication Publication Date Title
JPH0849215A (en) Cable structure of suspension bridge
US5513408A (en) Frame structured bridge
WO2005121456A1 (en) Cable stayed suspension bridge making combined use of one-box and two-box girders
US4665578A (en) Streamlined box girder type suspension bridge
AU2021105110A4 (en) Stay Cable Combined Vibration Damping Device and Method
JPH09111716A (en) Suspension bridge eccentrically loading during storm
JP3476198B2 (en) Suspension method of bridge girder in suspension bridge
JP4362020B2 (en) Seismic structure of suspension bridge and seismic reinforcement method
KR101251298B1 (en) Precast segment fixing the connection member of closed structure and method constructing a stress ribbon bridge therewith
JP2635756B2 (en) Suspension bridge with damping mechanism
JPH09302614A (en) Suspension bridge
JP2001193013A (en) Edge box girder bridge
JPH1171712A (en) Cable stayed bridge
JPH01214608A (en) Damping method for vortex excitation caused in bridge main tower
JP3430690B2 (en) Suspension bridge
JP3148464B2 (en) Suspension scaffold for cable erection
JPH09137408A (en) Suspension bridge
CN113374105B (en) Common-mass multi-frequency tuning mass damping device and parameter design method thereof
JPH1129908A (en) Vibration control method of suspension bridge girder, and the suspension bridge
CN215714562U (en) Pendulum type multidirectional multiple-tuning mass damper
JPH0693603A (en) Beam structure by use of inverted arched member and slantingly extended structure and arched member thereof
JPH07207619A (en) Main tower of long bridge provided with laterally extended beam and side cable
JP3664858B2 (en) Damping structure for cable suspension bridge construction
JPH11343608A (en) Vibration control structure of bridge
JP2898205B2 (en) Damping cable