JPH0841985A - Method of binding precast beam to column - Google Patents

Method of binding precast beam to column

Info

Publication number
JPH0841985A
JPH0841985A JP20588694A JP20588694A JPH0841985A JP H0841985 A JPH0841985 A JP H0841985A JP 20588694 A JP20588694 A JP 20588694A JP 20588694 A JP20588694 A JP 20588694A JP H0841985 A JPH0841985 A JP H0841985A
Authority
JP
Japan
Prior art keywords
beams
column
precast
steel material
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP20588694A
Other languages
Japanese (ja)
Inventor
Seiji Takeda
清二 竹田
Kikuo Kaji
喜久夫 加治
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fudo Kenken Kk
Original Assignee
Fudo Kenken Kk
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fudo Kenken Kk filed Critical Fudo Kenken Kk
Priority to JP20588694A priority Critical patent/JPH0841985A/en
Publication of JPH0841985A publication Critical patent/JPH0841985A/en
Pending legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

PURPOSE:To bind precast beams to a column by prestressing steel. CONSTITUTION:Longitudinal holes opened to the top ends of beams 1, 1 made of precast concrete are formed at the end parts of the beams 1, 1, and prestressing steel 5 disposed in a position between the beam backs at the end parts of beams 1, 1, piercing a column 2 is tension-fixed to the vertical wall faces of the longitudinal holes 3, 3 to bind the beams 1, 1 to the column 2. The precast beams 1 can be thereby bound to the column 2 by the prestressing steel 5 without enlarging the end parts of the beams 1, and the tension-fixing work of the prestressing steel 5 and hole filling work are facilitated so as to make construction efficiency desirable on the whole and to shorten a construction period.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明が属する技術分野】本発明は、プレキャスト梁と
柱の緊結方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for fastening precast beams and columns.

【0002】[0002]

【従来技術】本出願人会社では、先に、プレキャストコ
ンクリート造の梁と柱とを組み立てて建築物の躯体を形
成する際に、梁の端部の梁背の中間位置に開口を形成
し、柱を貫通して梁の端部の梁背中間部に配設したPC
鋼材を、前記開口の垂直壁面に緊張・定着することによ
り、梁と柱を緊結する方法を開発した(特開平4−24
7138号公報参照)。
2. Description of the Related Art In the applicant's company, first, when assembling a precast concrete beam and a column to form a building structure, an opening is formed at an intermediate position of the beam back at the end of the beam, A PC that penetrates the pillar and is placed between the backs of the beams at the ends of the beams
A method has been developed in which a beam and a column are tightly connected to each other by tensioning and fixing a steel material on the vertical wall surface of the opening (JP-A-4-24).
7138).

【0003】前記従来技術は、梁の端部の断面を増大し
ないで梁と柱をPC鋼材により緊結できる点でそれ以前
の技術より優れているものであるが、その難点は、開口
が横向きのため、PC鋼材を緊張・定着する作業や開口
にモルタル若しくはコンクリートを充填する作業が面倒
で、施工能率が良いと言えないことである。
The above-mentioned prior art is superior to the prior art in that the beam and the column can be tightly connected to each other by the PC steel material without increasing the cross section of the end portion of the beam, but the drawback is that the opening is laterally oriented. Therefore, the work of tensioning and fixing the PC steel material and the work of filling the opening with mortar or concrete are troublesome, and the work efficiency cannot be said to be good.

【0004】[0004]

【発明の目的】本発明は前記実情に鑑みて案出されたも
のであって、その目的は、梁の端部の断面を増大させず
に、PC鋼材でプレキャスト梁を柱に緊結することがで
き、しかも、施工能率が良好で、工期の短縮が期待でき
るプレキャスト梁と柱の緊結方法を提供することにあ
る。
SUMMARY OF THE INVENTION The present invention has been devised in view of the above circumstances, and an object thereof is to connect a precast beam to a column with a PC steel material without increasing the cross section of the end of the beam. Another object of the present invention is to provide a method of connecting precast beams and columns, which can be done and has good construction efficiency and which can be expected to shorten the construction period.

【0005】[0005]

【発明の構成】本発明のプレキャスト梁と柱の緊結方法
の構成上の特徴は、プレキャストコンクリート造の梁の
端部に、梁の天端に開口する縦穴を形成し、柱を貫通し
て梁の端部の梁背中間部に配設したPC鋼材を、前記縦
穴の垂直壁面に緊張,定着して、梁を柱に緊結する点に
ある。
The constructional feature of the method for binding a precast beam and a column according to the present invention is that a vertical hole opening at the top end of the beam is formed at the end of the beam of precast concrete, and the beam penetrates through the column. The point is that the PC steel material disposed between the backs of the beams at the ends of the above is tensioned and fixed to the vertical wall surface of the vertical hole, and the beams are tightly connected to the columns.

【0006】なお、本発明では、柱はプレキャストコン
クリート造と場所打ちコンクリート造の何れでもよい。
In the present invention, the columns may be either precast concrete or cast-in-place concrete.

【0007】[0007]

【図面による発明の具体的説明】本発明の一実施態様の
説明図である図1において、1は梁、2は柱であり、梁
1と柱2は共にプレキャストコンクリート造である。
DETAILED DESCRIPTION OF THE INVENTION FIG. 1 is an explanatory view of an embodiment of the present invention. In FIG. 1, 1 is a beam, 2 is a column, and both beams 1 and 2 are made of precast concrete.

【0008】梁1の端部の端面から適宜距離離れた位置
に、天端に開口する縦穴3が形成され、この縦穴3と端
面との間のコンクリート内にはPC鋼材挿通用のシース
(図示省略)が埋設され、また、柱2には前記梁1のシ
ースに連通するシース(図示省略)が柱2を横断して埋
設されている。
A vertical hole 3 is formed at the top end of the beam 1 at an appropriate distance from the end face of the beam 1, and a sheath for inserting a PC steel material (shown in the figure) is provided in the concrete between the vertical hole 3 and the end face. (Omitted) is embedded, and a sheath (not shown) communicating with the sheath of the beam 1 is embedded in the pillar 2 across the pillar 2.

【0009】梁1と柱2を接続するときは、図示のよう
に、柱2の両側面に取り付けた仮設金具4(又は支保
工)の上にそれぞれ梁1の端部を載せて、柱2の両側に
梁1,1を架設し、連通する梁1,1と柱2の前記シー
ス内にPC鋼材5を挿通し、その両端を両側の梁1の各
縦穴3の垂直壁面に緊張した状態で定着する。
When connecting the beam 1 and the column 2, the ends of the beam 1 are respectively placed on the temporary metal fittings 4 (or supporting works) attached to both side surfaces of the column 2 as shown in the drawing. The beams 1 and 1 are installed on both sides of the column, and the PC steel material 5 is inserted into the sheath of the beams 1 and 1 and the column 2 that communicate with each other, and both ends thereof are tensioned to the vertical wall surface of each vertical hole 3 of the beams 1 on both sides. Fix with.

【0010】この際、梁1の中央部(両側の縦穴3,3
間の部分)にもシース(図示省略)を埋設して、PC鋼
材5を一方の梁1の内部に押し込んでおき、梁1,1の
架設後、引き出すようにすると、PC鋼材5の挿通が容
易であり、また、PC鋼材5の緊張は縦穴3に入る大き
さの小型ジヤッキを用いて行うことができる。
At this time, the central portion of the beam 1 (vertical holes 3, 3 on both sides)
If a sheath (not shown) is embedded also in the portion (between), the PC steel material 5 is pushed into the inside of one beam 1, and after the beams 1 and 1 are erected, the PC steel material 5 can be inserted. It is easy, and the tension of the PC steel material 5 can be performed using a small jack having a size that fits in the vertical hole 3.

【0011】なお、梁1を柱2の一側のみに接続する場
合は、PC鋼材5の一端は柱2の側面に定着することに
なる。
When the beam 1 is connected to only one side of the pillar 2, one end of the PC steel material 5 is fixed to the side surface of the pillar 2.

【0012】前記作業後、適宜段階で、縦穴3にモルタ
ル若しくはコンクリートを充填して縦穴3を埋めるが、
この作業を床スラブのトップコンクリート6の打設と同
時に行うと能率的である。
After the above work, the vertical hole 3 is filled with mortar or concrete at a proper stage to fill the vertical hole 3.
It is efficient to perform this work at the same time when the top concrete 6 of the floor slab is placed.

【0013】柱2が場所打ちコンクリート造の場合は、
図2に示すように、下階の柱2’を階高より梁背だけ低
く造成し、その上に梁1の端部を載せて両側の梁1,1
を架設した後、柱・梁接合部7に、梁1,1に埋設した
シースに連通するシースを配設してコンクリートを打設
するが、この際、縦穴3の部分を残して、床スラブのト
ップコンクリート6も同時に打設する。
When the pillar 2 is made of cast-in-place concrete,
As shown in FIG. 2, a pillar 2'of the lower floor is formed lower than the floor height by a beam height, and the end of the beam 1 is placed on the pillar 2'and the beams 1 and 1 on both sides.
After erection, a concrete structure is placed in the column / beam joint 7 by placing a sheath that communicates with the sheath embedded in the beams 1 and 1, and at this time, leaving the vertical hole 3 portion, the floor slab. Top concrete 6 will also be placed at the same time.

【0014】柱・梁接合部7のコンクリートが硬化して
から、柱2がプレキャストの場合と同じ態様でPC鋼材
5の緊張・定着を行い、その後、縦穴3内とその上方の
床スラブのトップコンクリート6の打ち残し部分に同時
にコンクリートを充填する。
After the concrete of the column-beam joint 7 is hardened, the PC steel material 5 is tensioned and fixed in the same manner as when the column 2 is precast, and then the top of the floor slab in the vertical hole 3 and above it. The unfilled portion of the concrete 6 is simultaneously filled with concrete.

【0015】なお、前述のPC鋼材5による緊結に加え
て、梁の下端主筋と上端主筋による接続も行うのが一般
的であるが、この点は本発明の要旨外なので、その説明
は省略する。
Incidentally, in addition to the above-mentioned tight binding with the PC steel material 5, it is general to connect the lower end main bar and the upper end main bar of the beam, but this point is outside the scope of the present invention, and the description thereof will be omitted. .

【0016】[0016]

【発明の効果】本発明は以上のようなものであるから、
次のような諸効果が期待できる。前述の従来技術の場
合と同様に、梁の端部の断面を増大させないで、PC鋼
材によりプレキャスト梁を柱に緊結できる。梁の天端
に開口する縦穴内でPC鋼材の緊張・定着を行うので、
開口が横向きの場合に比べてPC鋼材の緊張・定着作業
が容易である。穴埋めのためのモルタル若しくはコン
クリートの充填を型枠なしで、しかも、上方から落とし
込んで行うことができるので、開口が横向きの場合に比
べて穴埋め作業が簡単かつ容易である。全体として施
工能率が良好で工期を短縮できる。
Since the present invention is as described above,
The following effects can be expected. As in the case of the prior art described above, the precast beam can be fastened to the column by the PC steel material without increasing the cross section of the end portion of the beam. Since the PC steel material is tensioned and fixed in the vertical hole that opens at the top of the beam,
Tensioning and fixing work of PC steel is easier than when the opening is sideways. Since the filling of mortar or concrete for filling holes can be performed without a formwork and by dropping from above, the filling operation is easier and easier than when the openings are oriented horizontally. Overall construction efficiency is good and the construction period can be shortened.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施態様を説明するための側面図で
ある。
FIG. 1 is a side view for explaining an embodiment of the present invention.

【図2】図1のA−A線拡大断面図である。FIG. 2 is an enlarged sectional view taken along line AA of FIG.

【図3】本発明の別の実施態様を説明するための側面図
である。
FIG. 3 is a side view for explaining another embodiment of the present invention.

【図4】図3のB−B線拡大断面図である。FIG. 4 is an enlarged sectional view taken along line BB of FIG.

【符号の説明】[Explanation of symbols]

1:梁、2:柱、2’:柱、3:縦穴、4:架設金具、
5:PC鋼材、6:トップコンクリート、7:柱・梁接
合部。
1: beam, 2: pillar, 2 ': pillar, 3: vertical hole, 4: installation metal fitting,
5: PC steel, 6: top concrete, 7: pillar-beam joint.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 プレキャストコンクリート造の梁の端部
に、梁の天端に開口する縦穴を形成し、柱を貫通して梁
の端部の梁背中間部に配設したPC鋼材を、前記縦穴の
垂直壁面に緊張・定着して、梁を柱に緊結することを特
徴とするプレキャスト梁と柱の緊結方法。
1. A PC steel material having a vertical hole formed at the end of a beam of precast concrete and opening at the top of the beam, the PC steel material penetrating through the column and disposed in the beam back space at the end of the beam. Tightening and fixing on the vertical wall of the vertical hole to fasten the beam to the column.
JP20588694A 1994-07-28 1994-07-28 Method of binding precast beam to column Pending JPH0841985A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20588694A JPH0841985A (en) 1994-07-28 1994-07-28 Method of binding precast beam to column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20588694A JPH0841985A (en) 1994-07-28 1994-07-28 Method of binding precast beam to column

Publications (1)

Publication Number Publication Date
JPH0841985A true JPH0841985A (en) 1996-02-13

Family

ID=16514363

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20588694A Pending JPH0841985A (en) 1994-07-28 1994-07-28 Method of binding precast beam to column

Country Status (1)

Country Link
JP (1) JPH0841985A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010068745A (en) * 2000-01-08 2001-07-23 이원호 PC shell beam method
JP2003313945A (en) * 2002-04-23 2003-11-06 Kajima Corp Damper, doubling as torsel material, for frame of concrete construction
CN108532749A (en) * 2018-04-04 2018-09-14 湖南大学 High ductility prestressing force assembly concrete beam-column connection and its construction method
CN113006272A (en) * 2021-02-01 2021-06-22 中建科技集团有限公司 Assembly type prestressed concrete frame system and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010068745A (en) * 2000-01-08 2001-07-23 이원호 PC shell beam method
JP2003313945A (en) * 2002-04-23 2003-11-06 Kajima Corp Damper, doubling as torsel material, for frame of concrete construction
CN108532749A (en) * 2018-04-04 2018-09-14 湖南大学 High ductility prestressing force assembly concrete beam-column connection and its construction method
CN113006272A (en) * 2021-02-01 2021-06-22 中建科技集团有限公司 Assembly type prestressed concrete frame system and construction method

Similar Documents

Publication Publication Date Title
JPH09209451A (en) Joint construction of up and down columns with beam and joint method
JPH0841985A (en) Method of binding precast beam to column
JP2520354B2 (en) Construction method of precast concrete beams and columns, and earthquake-resistant walls using them
JPH06212691A (en) Construction of building
JPH11190068A (en) Building structure
JP2000345719A (en) Reinforcing method of through opening in existing bearing wall
JP4660810B2 (en) Boundary beam damper
JP2641836B2 (en) Precast prestressed concrete U-beam
JPH0949331A (en) Construction method of concrete building and construction member
JP2003161044A (en) Method for installing base-isolation device in existing column
JP2977367B2 (en) Precast concrete block foundation for modular buildings
JP3760609B2 (en) Leg anchorage of steel columns
JPH101956A (en) Underground construction method for building
JPH0673203U (en) Beam-column joint structure
JP2972673B2 (en) Capital in pillar and its construction method
JP2998450B2 (en) Connection method between PC beam and column
JPH02272125A (en) Method of connecting steel-framed reinforced precast concrete column and steel-framed beam
JPS63181816A (en) Constituent material for underground beam
JP2001132266A (en) Installation structure of very soft panel damper in precast rc construction structure and its installing method
JP2579944Y2 (en) Load-bearing wall assembly structure
JPH08218670A (en) Silo pilaster member and silo structure constructing method
JPH10325212A (en) Precast column body for constituting steel encased reinforced concrete column
JPS5846970B2 (en) Connection method between RC columns, Pca girders in the column direction, and cast-in-place girders in the span direction
JP2002275913A (en) Foundation structure of building and building
JP3138982B2 (en) Building with mixed structure and its construction method