JPH08326069A - Method for constructing hollow deep basis using high tensile strength sheet - Google Patents

Method for constructing hollow deep basis using high tensile strength sheet

Info

Publication number
JPH08326069A
JPH08326069A JP13394495A JP13394495A JPH08326069A JP H08326069 A JPH08326069 A JP H08326069A JP 13394495 A JP13394495 A JP 13394495A JP 13394495 A JP13394495 A JP 13394495A JP H08326069 A JPH08326069 A JP H08326069A
Authority
JP
Japan
Prior art keywords
hole
inner mold
concrete
hollow
deep foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP13394495A
Other languages
Japanese (ja)
Inventor
Takuo Shigeno
拓郎 重野
Takayasu Iida
隆保 飯田
Hidetoshi Shimojima
英俊 下島
Isamu Saiga
勇 雑賀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chiyuuden Koji Kk
Chubu Electric Power Co Inc
Teijin Ltd
Toenec Corp
Original Assignee
Chiyuuden Koji Kk
Chubu Electric Power Co Inc
Teijin Ltd
Toenec Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chiyuuden Koji Kk, Chubu Electric Power Co Inc, Teijin Ltd, Toenec Corp filed Critical Chiyuuden Koji Kk
Priority to JP13394495A priority Critical patent/JPH08326069A/en
Publication of JPH08326069A publication Critical patent/JPH08326069A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE: To make it easy to dispose of excavated soil by filling a hollow part with the soil as excavated from a hole in a state where an inner mold having the hollow part forming a circumferential face by a high tensile strength sheet is disposed along the inner circumferential face of arrangement of a bar for the inner mold. CONSTITUTION: Arrangement of bars of a body is performed along the inner circumferential face of an excavated hole, the arrangement of the bars for an inner mold 10 is executed in the inside of the bars of the body, and concrete of a lower base is placed on the bottom part of the hole. Next, cylindrical inner molds 13 composed of a high tensile strength sheet are disposed along the inner circumferential part of the arrangement of the bars for the inner mold 10, the lower end part of the second stage inner mold 13 is overlapped on the first stage inner mold 13, and a hollow part of the first stage inner mold 13 is filled with the soil S as excavated from the hole. Concrete 17 is placed between the outer circumferential face of the inner mold 13 and the outer circumferential face of the hole. Next, the hollow part of the second and the third stage inner molds 13 is filled with the soil S as excavated from the hole, the concrete 17 is placed in a space between the outer circumferential faces of the second and the third stage inner molds 13 and the inner circumferential face of the hole and a concrete subslab is deposited on the upper end part thereof.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、送電鉄塔、あるいは橋
梁等を支える深礎基礎の工法に係り、詳しくは深礎基礎
を建設するときに出た土砂を中空部に詰めることができ
る中空深礎基礎の工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a deep foundation foundation for supporting a power transmission tower or a bridge. Regarding the construction method of the foundation foundation.

【0002】[0002]

【従来の技術】送電鉄塔、あるいは橋梁等を支えるため
の深礎基礎は一般に山岳地の斜面に建設されることが多
い。図14は、従来の深礎基礎51の外観図であり、こ
の従来の深礎基礎51は、中空部の無い充実型に建設さ
れている。その深礎基礎51を建設するため穴が掘削さ
れ、多量の土砂が出る。その土砂は、以前、建設場所の
斜面で処理されることが多かったが、出水等によりその
土砂が流れ落ちて周囲の自然環境を破壊する恐れがある
ため、現在では土砂を自然環境破壊の心配の無い平地等
まで運搬して処理している。
2. Description of the Related Art Generally, deep foundations for supporting power transmission towers or bridges are generally constructed on the slopes of mountainous areas. FIG. 14 is an external view of a conventional deep foundation foundation 51. The conventional deep foundation foundation 51 is constructed in a solid type without a hollow portion. A hole is excavated to construct the deep foundation 51, and a large amount of earth and sand comes out. Previously, the sediment was often treated on the slope of the construction site, but since it may run off due to flooding etc. and destroy the surrounding natural environment, it is now a concern to destroy the natural environment. It is transported to a flat land that does not exist and processed.

【0003】[0003]

【発明が解決しようとする課題】従来の深礎基礎51を
建設するための穴を掘削した土砂は、山岳地から自然環
境破壊の心配の無い平地等まで運搬して処理しなければ
ならないため、運搬と処理コストが嵩むうえ、最近は残
土捨て場を確保することが困難になっている。そこで本
発明では、深礎基礎建設時に出た土砂を詰めるための中
空部を有する中空深礎基礎を建設することにより、土砂
処理コストを大幅に下げるとともに、中空深礎基礎建設
のためのコンクリ−ト量を少なくして総合的な建設コス
トを低下させる高張力シ−トを用いた中空深礎基礎の工
法を提供することを解決すべき課題とするものである。
The earth and sand excavated in the hole for constructing the conventional deep foundation 51 must be transported from a mountainous area to a flat area or the like where there is no danger of natural environment destruction and treated. In addition to high transportation and treatment costs, it has recently become difficult to secure a dump site for waste soil. Therefore, in the present invention, by constructing a hollow deep foundation foundation having a hollow portion for filling the earth and sand generated during the construction of the deep foundation foundation, the sediment treatment cost is significantly reduced, and the concrete for the hollow deep foundation foundation is constructed. It is an object to be solved to provide a method of constructing a hollow deep foundation foundation using a high-tensile sheet that reduces the total amount of construction and reduces the total construction cost.

【0004】[0004]

【課題を解決するための手段】上記の課題を解決するた
めの高張力シ−トを用いた中空深礎基礎の工法は、掘削
された穴の内周面に沿って躯体配筋が施工され、更に前
記躯体配筋の内側に内型枠を支持するための内型枠用配
筋が施工されたあと、中空状に形成された高張力シ−ト
から成る内型枠を前記内型枠配筋の内周部に沿って配置
した状態で、前記内型枠の中空部に前記穴を掘削したと
きの土砂を詰め、更に、前記穴の内周面と前記内型枠の
外周面との間の空間にコンクリ−トを流し込んで硬化さ
せたあと、深礎基礎を所定の形状に形成することであ
る。
[Means for Solving the Problems] In order to solve the above problems, a hollow deep foundation foundation method using a high tension sheet is constructed by constructing a core structure along the inner peripheral surface of an excavated hole. Further, after the inner mold bar reinforcement for supporting the inner mold frame is constructed on the inside of the core bar arrangement, the inner mold frame made of a high-strength sheet formed in a hollow shape is formed into the inner mold frame. In a state of being arranged along the inner peripheral portion of the bar arrangement, the hollow portion of the inner formwork is filled with earth and sand when excavating the hole, and further, the inner peripheral surface of the hole and the outer peripheral surface of the inner formwork. After the concrete is poured into the space between them to cure it, the deep foundation is formed into a predetermined shape.

【0005】[0005]

【作用】上記の高張力シ−トを用いた中空深礎基礎の工
法により形成された中空部に、穴を掘削したときの土砂
を詰めることができるため、建設現場での土砂処理が容
易になり、且つ、中空部にはコンクリ−トの打ち込みが
不要であるため、従来の充実型の深礎基礎に比較してコ
ンクリ−トの使用量が少なくなる。
[Function] Since the hollow portion formed by the method of the hollow deep foundation foundation using the above-mentioned high-tensile sheet can be filled with the earth and sand when the hole is excavated, the earth and sand treatment at the construction site is facilitated. In addition, since it is not necessary to drive concrete into the hollow portion, the amount of concrete used is smaller than that of the conventional solid deep foundation.

【0006】[0006]

【実施例】次に、本発明の実施例を図面を参照しながら
説明する。図1は、送電鉄塔、あるいは橋梁等を支える
中空深礎基礎1の断面図である。図1に示すように、中
空深礎基礎1には中空部2が形成されており、中空深礎
基礎1の建設に際して、予め穴を掘削したときの土砂S
を中空部2に詰めることができるようになっている。以
下、この中空深礎基礎1を建設する工法について図2〜
図13を参照しながら説明する。
Embodiments of the present invention will now be described with reference to the drawings. FIG. 1 is a sectional view of a hollow deep foundation 1 that supports a power transmission tower or a bridge. As shown in FIG. 1, a hollow portion 2 is formed in a hollow deep foundation foundation 1, and when constructing the hollow deep foundation foundation 1, earth and sand S when a hole is previously drilled
Can be packed in the hollow portion 2. The construction method for constructing this hollow deep foundation 1 is shown in Figure 2 below.
This will be described with reference to FIG.

【0007】図1に示すような中空深礎基礎1を所定の
位置に建設するため、図2に示すような円柱形の穴Hが
掘削される。尚、図示はしていないが、穴Hが掘削され
たあと、穴Hの内周面の崩れを防止する擁護部材が、穴
Hの内周面に沿って配設される。上記のように、穴Hが
掘削されたあと、図3に示すようにセパレ−タ−3で穴
Hの内周面との間に所要の空隙を設けた状態で、躯体配
筋4が穴Hの内周面に沿って施工され、更に、下部ベ−
スコンクリ−ト6(図4参照)の配筋となるベ−ス筋5
が施工される。尚、上記セパレ−タ−3は、躯体配筋4
の回りに十分、躯体コンクリ−トが回るように躯体配筋
4と穴Hの内周面との間の空隙を確保するものである。
In order to construct the hollow deep foundation 1 as shown in FIG. 1 at a predetermined position, a cylindrical hole H as shown in FIG. 2 is drilled. Although not shown, after the hole H is excavated, a protective member that prevents the inner peripheral surface of the hole H from collapsing is disposed along the inner peripheral surface of the hole H. As described above, after the hole H has been excavated, as shown in FIG. 3, with the required space provided between the hole H and the inner peripheral surface of the hole H by the separator 3, It is installed along the inner peripheral surface of H, and the lower base
Base muscle 5 serving as the reinforcement of concrete 6 (see FIG. 4)
Will be constructed. In addition, the above-mentioned separator 3 is the body reinforcement 4
The space between the body arranging bar 4 and the inner peripheral surface of the hole H is secured so that the skeleton concrete can rotate sufficiently around.

【0008】次に、図4に示すように穴Hの底部に下部
ベ−スコンクリ−ト6を打ち込む。更に、図5に示すよ
うに、ライナ−プレ−ト7と打継目鉄筋8とを下部ベ−
スコンクリ−ト6が固まらない間に設置する。このライ
ナ−プレ−ト7は、後述する内型枠13の下部を位置決
めするとともに、内型枠用配筋10の下部を支持するた
めに設けられる。
Next, as shown in FIG. 4, a lower base concrete 6 is driven into the bottom of the hole H. Further, as shown in FIG. 5, the liner plate 7 and the joint reinforcement 8 are connected to the lower base.
Install it while the concrete 6 does not harden. The liner plate 7 is provided for positioning the lower part of the inner mold form 13 described later and for supporting the lower part of the inner mold bar arrangement 10.

【0009】上記内型枠用配筋10は、縦筋10Aとフ
−プ筋10Bとから成り、サポ−ト金具11を介して擁
護部材に固定されている。従って内型枠用配筋10はサ
ポ−ト金具11により支持されている。
The inner formwork bar arrangement 10 is composed of a vertical bar 10A and a hoop bar 10B, and is fixed to a supporting member via a support metal fitting 11. Therefore, the inner mold bar arrangement 10 is supported by the support fitting 11.

【0010】図6に示すように、高張力シ−ト12から
成る円筒状の内型枠13が内型枠用配筋10に沿って下
ろされる。この際、内型枠13はロ−プ14により吊り
下げられ、下端部がライナ−プレ−ト7に入り込んで位
置決めされる。そのあと、内型枠13は上記ロ−プ14
を用いて上端部が内型枠用配筋10に固縛される。尚、
上記高張力シ−ト12は、アラミド繊維、炭素繊維、ポ
リエチレン繊維、ポリアリレ−ト繊維、又はポリエステ
ル繊維が用いられ、これらの繊維を破断伸度5%以下で
織物にする。そして高張力シ−ト12の織曲がり構造に
よる伸度も15%以下、望ましくは10%以下にする。
(JIS L 1096に基づく測定による) 高張力シ−ト12は、樹脂、例えば塩化ビニ−ル、合成
ゴム、ウレタン等を、基布の片面又は両面にコ−ティン
グ、トッピング、ディッピング加工し、防水性を持たせ
たものである。高張力シ−ト12は伸度も15%以下で
あり、また、80Kg/3cm以上の強度(JIS L
1096に基づく測定による)を有しているため、後
述するように、穴Hを掘削したときの土砂Sが詰められ
ても、その圧力により破損することはない。
As shown in FIG. 6, a cylindrical inner mold 13 comprising a high tension sheet 12 is lowered along the inner mold bar arrangement 10. At this time, the inner formwork 13 is suspended by the rope 14 and the lower end portion thereof enters the liner plate 7 and is positioned. After that, the inner formwork 13 is moved to the above-mentioned rope 14
The upper end is fastened to the inner mold bar arrangement 10 by using. still,
As the high-tensile sheet 12, aramid fiber, carbon fiber, polyethylene fiber, polyarylate fiber, or polyester fiber is used, and these fibers are woven at a breaking elongation of 5% or less. The elongation of the high tension sheet 12 due to the curved structure is also 15% or less, preferably 10% or less.
The high-tensile sheet 12 (measured according to JIS L 1096) is waterproof by coating a resin such as vinyl chloride, synthetic rubber, urethane, etc. on one or both sides of the base cloth, coating, topping, and dipping. It has a certain nature. The high tensile sheet 12 has an elongation of 15% or less and a strength of 80 kg / 3 cm or more (JIS L
1096) (according to the measurement based on 1096), even if the soil S when the hole H is excavated is packed, it will not be damaged by the pressure thereof, as will be described later.

【0011】次に、図7に示すように、別のロ−プ15
を用いて、第2段目の内型枠13を穴Hに挿入する。こ
の際、第2段目の内型枠13は、下端部が第1段目の内
型枠13と約1m重ね合った位置に配設され、上端部が
ロ−プ15を用いて内型枠用配筋10に固縛される。
Next, as shown in FIG. 7, another rope 15 is provided.
Is used to insert the second inner mold 13 into the hole H. At this time, the inner mold 13 of the second stage is arranged at a position where the lower end overlaps with the inner mold 13 of the first stage by about 1 m, and the upper end uses the rope 15 to form the inner mold 13. It is fixed to the frame reinforcing bar 10.

【0012】次に、図8に示すように、第1段目の内型
枠13の中空部に、穴Hを掘削したときの土砂Sを詰め
る。この際、高張力シ−ト12は、前述のように伸度が
低く且つ強度が高いため、土砂Sの圧力により破損する
ことはない。次に、図9に示すように第1段目の内型枠
13の外周面と穴Hの内周面との間の空間にコンクリ−
ト17を流し込んで固化させる。この工程において、流
し込まれたコンクリ−ト17は、前述のライナ−プレ−
ト7により、第1段目の内型枠13の下側から中空部に
流れ込むことが防止される。
Next, as shown in FIG. 8, the hollow portion of the first inner mold 13 is filled with earth and sand S when the hole H is excavated. At this time, since the high-tensile sheet 12 has low elongation and high strength as described above, it is not damaged by the pressure of the earth and sand S. Next, as shown in FIG. 9, a concrete is formed in the space between the outer peripheral surface of the first-stage inner mold 13 and the inner peripheral surface of the hole H.
Pour 17 to solidify. In this step, the concrete 17 poured into the above-mentioned liner plate is used.
The gutter 7 prevents the inner mold 13 of the first stage from flowing into the hollow portion from below.

【0013】次に、図10に示すように第3段目の内型
枠13をロ−プ16を用いて穴Hに挿入する。この際、
第3段目の内型枠13は、下端部が第2段目の内型枠1
3と約1.2m重ね合った位置に配設され、上端部がロ
−プ16を用いて内型枠用配筋10に固縛される。
Next, as shown in FIG. 10, the inner formwork 13 of the third stage is inserted into the hole H using the rope 16. On this occasion,
The lower end of the third-stage inner mold 13 has the second-stage inner mold 1
3 is disposed at a position where it overlaps about 1.2 m, and the upper end thereof is fixed to the inner formwork bar arrangement 10 by using the rope 16.

【0014】次に、図11に示すように、第2段目、第
3段目の内型枠13の中空部に、穴Hを掘削したときの
土砂Sを詰める。そして図12に示すように第2段目、
第3段目の内型枠13の外周面と穴Hの内周面との間の
空間にコンクリ−ト17を流し込んで固化させる。
Next, as shown in FIG. 11, the hollow S of the second and third stages of the inner formwork 13 is filled with earth and sand S when the hole H is excavated. Then, as shown in FIG. 12, the second stage,
The concrete 17 is poured into the space between the outer peripheral surface of the third inner mold 13 and the inner peripheral surface of the hole H to be solidified.

【0015】次に、図13に示すように、上端部に捨て
コンクリ−ト18を打って、躯体部19の施工を完了す
る。この躯体部19の施工が完了したあと、図1に示す
ような形状を有する中空深礎基礎1の全体を完成させ
る。
Then, as shown in FIG. 13, the discard concrete 18 is struck at the upper end portion to complete the construction of the skeleton portion 19. After the construction of the body portion 19 is completed, the entire hollow deep foundation 1 having the shape as shown in FIG. 1 is completed.

【0016】このように、内型枠13の形状を自在に変
えることのできる強力で安価な高張力シ−ト12を用い
て中空深礎基礎1を建設することができるため、その建
設コストが安くなり、且つ穴Hを掘削したときの土砂S
を中空深礎基礎1の中空部2に埋め戻すことができるた
め、従来のように土砂を遠くの処理場まで運ぶ必要がな
くなり、残土の処理コストを大幅に引き下げることがで
きる。また、穴H内での作業量が極めて少ないため、複
数の作業者が入り難い比較的直径の小さな深礎基礎でも
建設が可能になる。また、高張力シ−ト12から成る複
数の内型枠13を用い、上方向にラップ部を設けるだけ
で穴Hの深さに容易に対応することができる。
As described above, since the hollow deep foundation 1 can be constructed by using the strong and inexpensive high tension sheet 12 capable of freely changing the shape of the inner form 13, the construction cost thereof can be reduced. It becomes cheaper and the earth and sand S when excavating the hole H
Since it can be backfilled in the hollow portion 2 of the hollow deep foundation 1, it is not necessary to carry the earth and sand to a distant treatment site as in the conventional case, and the treatment cost of the residual soil can be significantly reduced. Further, since the amount of work in the hole H is extremely small, it is possible to construct a deep foundation with a relatively small diameter that is difficult for a plurality of workers to enter. Further, the depth of the hole H can be easily dealt with by using a plurality of inner molds 13 composed of the high-tension sheet 12 and providing a lap portion in the upward direction.

【0017】[0017]

【発明の効果】以上のように本発明によれば、掘削され
た穴の内周面に沿って躯体配筋が施工され、更に前記躯
体配筋の内側に内型枠を支持する内型枠用配筋が施工さ
れたあと、高張力シ−トで周面が形成された中空部を有
する内型枠を前記内型枠用配筋の内周部に沿って配置し
た状態で、前記内型枠の中空部に前記穴を掘削したとき
の土砂を詰め、更に、前記穴の内周面と前記内型枠の外
周面との間の空間にコンクリ−トを流し込んで硬化させ
たあと、深礎基礎を所定の形状に形成することができる
ため、次のような効果がある。 (1)中空深礎基礎の建設現場で出た土砂は、中空部に
埋め戻すことができるため、土砂の処理コストを極めて
少なくすることができる。 (2)中空部にはコンクリ−トを打ち込む必要が無いた
め、コンクリ−トの使用量を少なくすることができる。 (3)複数の作業者が入り難い直径の小さな深礎基礎で
も建設が可能である。 (4)安価な高張力シ−トで内型枠を構成することがで
きるため、内型枠のコストが極めて安くなる。
As described above, according to the present invention, the internal formwork is constructed along the inner peripheral surface of the excavated hole, and the inner formwork supports the inner formwork inside the structural body reinforcement. After the reinforcing bar is constructed, the inner mold having a hollow portion whose peripheral surface is formed by a high-tensile sheet is arranged along the inner peripheral part of the inner mold bar, After filling the hollow portion of the mold with earth and sand when excavating the hole, further, after pouring a concrete into the space between the inner peripheral surface of the hole and the outer peripheral surface of the inner mold to cure, Since the deep foundation can be formed into a predetermined shape, the following effects can be obtained. (1) Since the earth and sand generated at the construction site of the hollow deep foundation can be backfilled in the hollow portion, the earth and sand treatment cost can be extremely reduced. (2) Since it is not necessary to drive concrete into the hollow portion, the amount of concrete used can be reduced. (3) It is possible to build a deep foundation with a small diameter that is difficult for multiple workers to enter. (4) Since the inner mold can be constructed with an inexpensive high-tensile sheet, the cost of the inner mold becomes extremely low.

【図面の簡単な説明】[Brief description of drawings]

【図1】中空深礎基礎の断面図である。1 is a cross-sectional view of a hollow deep foundation.

【図2】中空深礎基礎の建設工程説明図である。FIG. 2 is an explanatory view of a construction process of a hollow deep foundation.

【図3】中空深礎基礎の建設工程説明図である。FIG. 3 is an explanatory view of a construction process of a hollow deep foundation.

【図4】中空深礎基礎の建設工程説明図である。FIG. 4 is an explanatory view of a construction process of a hollow deep foundation.

【図5】中空深礎基礎の建設工程説明図である。FIG. 5 is a diagram illustrating a construction process of a hollow deep foundation.

【図6】中空深礎基礎の建設工程説明図である。FIG. 6 is an explanatory view of a construction process of a hollow deep foundation.

【図7】中空深礎基礎の建設工程説明図である。FIG. 7 is an explanatory view of a construction process of a hollow deep foundation.

【図8】中空深礎基礎の建設工程説明図である。FIG. 8 is an explanatory view of a construction process of a hollow deep foundation.

【図9】中空深礎基礎の建設工程説明図である。FIG. 9 is an explanatory view of a construction process of a hollow deep foundation.

【図10】中空深礎基礎の建設工程説明図である。FIG. 10 is an explanatory diagram of a construction process of a hollow deep foundation.

【図11】中空深礎基礎の建設工程説明図である。FIG. 11 is an explanatory diagram of a construction process of a hollow deep foundation.

【図12】中空深礎基礎の建設工程説明図である。FIG. 12 is an explanatory view of the construction process of the hollow deep foundation.

【図13】中空深礎基礎の建設工程説明図である。FIG. 13 is an explanatory view of a construction process of a hollow deep foundation.

【図14】従来の深礎基礎の外観図である。FIG. 14 is an external view of a conventional deep foundation.

【符号の説明】[Explanation of symbols]

1 中空深礎基礎 2 中空部 4 躯体配筋 6 下部ベ−スコンクリ−ト 10 内型枠用配筋 12 高張力シ−ト 13 内型枠 17 コンクリ−ト 19 躯体部 H 穴 S 土砂 1 Hollow deep foundation 2 Hollow part 4 Body arrangement 6 Lower base concrete 10 Inner form forming reinforcement 12 High tensile sheet 13 Inner form 17 concrete 19 Body H hole S earth and sand

───────────────────────────────────────────────────── フロントページの続き (72)発明者 重野 拓郎 愛知県名古屋市熱田区横田二丁目3番24号 中部電力株式会社中央送変電建設所内 (72)発明者 飯田 隆保 愛知県名古屋市港区千年三丁目1番32号 株式会社ト−エネック本店別館内 (72)発明者 下島 英俊 愛知県名古屋市港区遠若町三丁目7番1号 中電工事株式会社遠若分室内 (72)発明者 雑賀 勇 大阪府大阪市中央区南本町一丁目6番7号 帝人株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Takuro Shigeno, Inventor Takuro Shigeno, 2-3-24 Yokota, Atsuta-ku, Nagoya, Aichi Chubu Electric Power Co., Inc. Chuo Electric Power Transmission and Substation (72) Inventor, Takaho Iida, Millennial, Minato-ku, Aichi Toenec Co., Ltd. Main Building Annex, 3-chome 1-32 (72) Inventor Hidetoshi Shimojima 3-7-1, Enwaka-cho, Minato-ku, Nagoya-shi, Aichi Chuden Construction Co., Ltd. Isamu Teijin Limited, 1-6-7 Minamihonmachi, Chuo-ku, Osaka-shi, Osaka

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 掘削された穴の内周面に沿って躯体配筋
が施工され、更に前記躯体配筋の内側に内型枠を支持す
る内型枠用配筋が施工されたあと、高張力シ−トで周面
が形成された中空部を有する内型枠を前記内型枠用配筋
の内周部に沿って配置した状態で、前記内型枠の中空部
に前記穴を掘削したときの土砂を詰め、更に、前記穴の
内周面と前記内型枠の外周面との間の空間にコンクリ−
トを流し込んで硬化させたあと、深礎基礎を所定の形状
に形成することを特徴とする高張力シ−トを用いた中空
深礎基礎の工法。
1. A core reinforcement is constructed along the inner peripheral surface of the excavated hole, and an inner form reinforcement for supporting the inner form is further provided inside the core reinforcement, and then the height is increased. Excavating the hole in the hollow part of the inner mold with the inner mold having a hollow part whose peripheral surface is formed by a tension sheet is arranged along the inner peripheral part of the inner form rebar. The soil is filled with the soil, and the space between the inner peripheral surface of the hole and the outer peripheral surface of the inner formwork is further concreted.
A method for constructing a hollow deep foundation using a high-tensile sheet, characterized in that the deep foundation is formed into a predetermined shape after it is poured and cured.
【請求項2】 躯体配筋の施工後に穴の底部にコンクリ
−トを流し込んで下部ベ−スコンクリ−トを施工する工
程において、高張力シ−トから成る内型枠の下部を位置
決めするとともに、後の工程において、穴の内周面と内
型枠の外周面との間の空間にコンクリ−トを流し込んだ
ときに、そのコンクリ−トが内型枠の下部に流れ込まな
いようにするための位置決め部材を下部ベ−スコンクリ
−ト面に設置することを特徴とする請求項1記載の高張
力シ−トを用いた中空深礎基礎の工法。
2. In the step of pouring concrete into the bottom of the hole to construct a lower base concrete after construction of the body reinforcement, while positioning the lower portion of the inner formwork made of high-tensile sheet, In a later process, when the concrete is poured into the space between the inner peripheral surface of the hole and the outer peripheral surface of the inner mold, the concrete is prevented from flowing into the lower part of the inner mold. The method for constructing a hollow deep foundation using a high-tensile sheet according to claim 1, wherein the positioning member is installed on the lower base concrete surface.
【請求項3】 高張力シ−トは、アラミド繊維、炭素繊
維、ポリエチレン繊維、ポリアリレ−ト繊維、又はポリ
エステル繊維が用いられ、伸度は15%以下で、強度が
80Kg/3cm以上であることを特徴とする請求項1
又は請求項2記載の高張力シ−トを用いた中空深礎基礎
の工法。
3. The high-strength sheet is made of aramid fiber, carbon fiber, polyethylene fiber, polyarylate fiber, or polyester fiber, and has an elongation of 15% or less and a strength of 80 kg / 3 cm or more. Claim 1 characterized by the above-mentioned.
Alternatively, a method for constructing a hollow deep foundation using the high-tensile sheet according to claim 2.
JP13394495A 1995-05-31 1995-05-31 Method for constructing hollow deep basis using high tensile strength sheet Pending JPH08326069A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13394495A JPH08326069A (en) 1995-05-31 1995-05-31 Method for constructing hollow deep basis using high tensile strength sheet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13394495A JPH08326069A (en) 1995-05-31 1995-05-31 Method for constructing hollow deep basis using high tensile strength sheet

Publications (1)

Publication Number Publication Date
JPH08326069A true JPH08326069A (en) 1996-12-10

Family

ID=15116725

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13394495A Pending JPH08326069A (en) 1995-05-31 1995-05-31 Method for constructing hollow deep basis using high tensile strength sheet

Country Status (1)

Country Link
JP (1) JPH08326069A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008119879A1 (en) * 2007-03-30 2008-10-09 Rautaruukki Oyj Bedrock foundation
JP2015227543A (en) * 2014-05-30 2015-12-17 東京電力株式会社 Hollow caisson type pile foundation and construction method thereof
CN114444958A (en) * 2022-02-08 2022-05-06 中国电建集团西北勘测设计研究院有限公司 Liquefaction grade division method based on liquefaction index and liquefaction degree

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008119879A1 (en) * 2007-03-30 2008-10-09 Rautaruukki Oyj Bedrock foundation
JP2015227543A (en) * 2014-05-30 2015-12-17 東京電力株式会社 Hollow caisson type pile foundation and construction method thereof
CN114444958A (en) * 2022-02-08 2022-05-06 中国电建集团西北勘测设计研究院有限公司 Liquefaction grade division method based on liquefaction index and liquefaction degree

Similar Documents

Publication Publication Date Title
US5826387A (en) Pier foundation under high unit compression
CN101691751B (en) Construction method for making ultra-long artificial excavating pile penetrate cave and ultra-long pile penetrating cave
CN106968256A (en) Foundation ditch assembled steel trestle construction method
CN108505805A (en) Large-scale cast-in-place pond and its construction method are split in expansion reinforcing band control
CN110847020B (en) Steel pipe pile bridge end and construction method
CN105804089A (en) Locally-deepened supporting and protecting system used after original deep foundation pit is constructed and construction method of system
CN210597399U (en) Post-cast strip structure applied to basement outer wall
JPH0953396A (en) Covering structure of underground cavity, and covering method thereof
JP3625892B2 (en) Construction method of underground structure using precast concrete column
CN205576934U (en) Part increases ramus profundus watch box system behind former deep foundation pit construction
JPH08326069A (en) Method for constructing hollow deep basis using high tensile strength sheet
JP3037912B2 (en) Power transmission tower foundation construction method and pillar formwork
CN108978697B (en) Terrace template system and construction method
JPS58127836A (en) Construction of foundation structure for structure using foundation pile
JP2001246346A (en) Landfill stock equipment for waste
CN214993930U (en) Well body reinforcing structure of working well with supporting system
CN217629966U (en) Face semi-reverse construction method foundation ditch inner support structure of large-span of subway
JPH09184116A (en) Construction method of snowslide/falling stone guard fence and the fence
CN212223887U (en) Movable post-cast strip pouring frame
CN215629919U (en) Use RJP stake to consolidate foundation ditch and compromise structure of biography power area
JP4964032B2 (en) Side wall and method for constructing side wall
JPH03144014A (en) Geotextile integral with fixing part and steep slope banking using thereof
JPH10237886A (en) Method for constructing underground tank
JPH10231527A (en) Deep foundation construction for steel tower
JPH0726405B2 (en) Method for constructing hollow concrete structure in the ground

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050118

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050208

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20050614