JPH08311893A JP7138391A JP13839195A JPH08311893A JP H08311893 A JPH08311893 A JP H08311893A JP 7138391 A JP7138391 A JP 7138391A JP 13839195 A JP13839195 A JP 13839195A JP H08311893 A JPH08311893 A JP H08311893A
Authority
JP
Japan
Prior art keywords
pipe
wall body
trunk
pressure water
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP7138391A
Other languages
Japanese (ja)
Other versions
JP3577360B2 (en
Inventor
Akihiko Uozumi
昭彦 魚住
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP13839195A priority Critical patent/JP3577360B2/en
Publication of JPH08311893A publication Critical patent/JPH08311893A/en
Application granted granted Critical
Publication of JP3577360B2 publication Critical patent/JP3577360B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

PURPOSE: To quickly construct an underground wall body without requiring an earth retaining wall or concrete mold. CONSTITUTION: Guide walls 1 are erected in the opposite positions corresponding to both sides of an excavated hole in the ground surface. In the inside of these guide walls 1, at least one trunk-pipe 7 in which rotary bits 40 projected into the ground, turning shafts 9 for the rotary bits 40, an injection nozzle 41e for injecting high-pressure water into the ground, a high-pressure water pipe 10 for supplying high-pressure water to the injection nozzle 41e, a suction port 41c for sucking mud water, and a suction pipe 8 for sucking mud water through the suction port 41c are housed is inserted. A trunk-pipe 7 is advanced in the excavation hole being formed by the rotation of the rotary bits 40, the injection of high-pressure water, and the suction of mud water, and a wall body 2 that has been formed by placing concrete on the outside of the trunk-pipe 7 in the excavation hole is advanced into the ground.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、主として建造物の地下
部分の外壁等のコンクリート構造物を地中に構築する地
下壁体の構築法およびそれに用いるトランクパイプに関
するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention mainly relates to a method of constructing an underground wall body for constructing a concrete structure such as an outer wall of an underground portion of a building in the ground, and a trunk pipe used therefor.

【0002】[0002]

【従来の技術】従来の建造物の地下部分の施工法として
は、大きくわけて、(A)地下部分の外周に仮設の山留
壁を構築し、山留壁に囲まれた内部の地盤を掘削して建
築物の地下部分を構築する方法と、(B)建築物の地下
外壁を予め構築し、これを山留壁兼用として地下部分を
構築する方法とがある。
2. Description of the Related Art A conventional construction method for an underground portion of a building is broadly divided into (A) a temporary mountain retaining wall is constructed on the outer periphery of the underground portion, and an inner ground surrounded by the mountain retaining wall is constructed. There are a method of excavating and constructing an underground portion of the building, and a method of (B) constructing an underground outer wall of the building in advance and using this as a mountain retaining wall to construct the underground portion.

【0003】[0003]

【発明が解決しようとする課題】しかし、上記(A),
(B)のいずれの工法も、工費、工期、地下の外壁また
は山留壁としての必須要件である止水性、建築物周辺の
地盤や家屋に沈下等の悪影響を及ぼす等の施工上の安全
性、および杭打機、掘削機のような大型の重機を必要と
する等の作業性の面で、それぞれに何らかの問題点を含
んでいる。
However, the above (A),
All of the construction methods of (B), construction cost, construction period, waterproofness, which is an indispensable requirement for outer wall of underground or mountain retaining wall, and construction safety such as subsidence on the ground and houses around the building. In addition, there are some problems in terms of workability such as requiring large heavy equipment such as a pile driver and an excavator.

【0004】そこで、本発明は、山留め壁やコンクリー
ト型枠を必要とせずに、掘削穴の掘削作業と、コンクリ
ートの打設作業と、コンクリートが固まってできる壁体
の地下への沈降とを、同時に連続的に行えるようにし
て、工費、工期、止水性、安全性および作業性に優れた
地下壁体の構築法およびそれに用いるトランクパイプを
提供することを目的とする。
Therefore, the present invention does not require a retaining wall or a concrete formwork, and excavates a drilling hole, places concrete, and sinks a wall formed of concrete into the underground. It is an object of the present invention to provide a method for constructing an underground wall body, which is excellent in construction cost, construction period, water stoppage, safety and workability, and a trunk pipe used therefor, which can be simultaneously and continuously performed.

【0005】[0005]

【課題を解決するための手段】上記した目的を達成する
ために、請求項1に係る本発明の地下壁体の構築法は、
地下にコンクリート造の壁体を構築する工法であって、
地面に立設した相対向するガイド壁の間に、回転ビット
の回転軸、地中に高圧水を噴射する噴射ノズル、この噴
射ノズルに高圧水を供給する高圧水パイプ、泥水を吸引
する吸引口、およびこの吸引口からの泥水を吸い出す吸
引パイプを収納し、かつ、先端より回転ビットを突出さ
せた1つ以上のトランクパイプを挿入し、相対向する前
記ガイド壁の間における前記トランクパイプの外側にコ
ンクリートを打設して壁体を形成し、前記回転ビットの
回転、高圧水の噴射および泥水の吸引を行って地面に掘
削穴を形成しながら前記トランクパイプを内蔵した壁体
を掘削穴に進入させるようにした。
In order to achieve the above object, a method for constructing an underground wall body according to the present invention according to claim 1 is
A method of constructing a concrete wall in the basement,
Between the opposing guide walls standing on the ground, the rotary shaft of the rotary bit, the jet nozzle that jets high-pressure water into the ground, the high-pressure water pipe that supplies high-pressure water to this jet nozzle, and the suction port that sucks mud And a suction pipe for sucking muddy water from the suction port, and one or more trunk pipes having a rotary bit projecting from the tip thereof are inserted, and the outside of the trunk pipe between the guide walls facing each other. Concrete is poured into the wall to form a wall, and the rotary bit is rotated, high-pressure water is sprayed and muddy water is sucked to form a drill hole on the ground, while the wall containing the trunk pipe is used as a drill hole. I made it enter.

【0006】また、請求項2に係る地下壁体の構築法
は、請求項1におけるコンクリートに鉄筋を埋設するよ
うにした。さらに、請求項3に係る地下壁体の構築法
は、請求項1におけるコンクリートと掘削穴の内面との
間に掘削穴の崩壊を防ぐ保圧剤を注入するようにした。
Further, in the method for constructing the underground wall body according to the second aspect, the reinforcing bars are embedded in the concrete according to the first aspect. Further, in the method for constructing an underground wall body according to claim 3, a pressure-holding agent that prevents collapse of the excavation hole is injected between the concrete and the inner surface of the excavation hole according to claim 1.

【0007】さらにまた、請求項4に係る地下壁体の構
築法は、請求項1における掘削穴を上下方向に形成し、
打設されたコンクリートをそれ自身の重量により地中へ
沈降させるように設定し、さらに、コンクリートの側面
に沈降抑制部材を摩擦接触させて沈降速度を制御するよ
うにした。
Furthermore, a method for constructing an underground wall body according to a fourth aspect is to form the excavation hole in the first aspect in the vertical direction,
The poured concrete was set to sink into the ground by its own weight, and further, the sinking suppressing member was brought into frictional contact with the side surface of the concrete to control the sinking speed.

【0008】また、請求項5に係る地下壁体の構築法
は、請求項1における噴射ノズルおよび吸引口を有する
ベース部材と前記回転軸とを前記トランクパイプに着脱
自在に取り付け、地下壁体の構築後に、前記ベース部材
と、これに連結された高圧水パイプおよび吸引パイプ
と、回転軸とをトランクパイプから上方へ抜き出すよう
にした。
According to a fifth aspect of the present invention, there is provided a method for constructing an underground wall body, wherein the base member having the injection nozzle and the suction port according to the first aspect and the rotary shaft are detachably attached to the trunk pipe. After the construction, the base member, the high-pressure water pipe and the suction pipe connected to the base member, and the rotating shaft were extracted upward from the trunk pipe.

【0009】また、請求項6に係る地下壁体の構築法に
用いるトランクパイプは、地下に掘削穴を形成する装置
であって、先端から回転ビットを突出させ、この回転ビ
ットの回転軸、地中に高圧水を噴射する噴射ノズル、こ
の噴射ノズルに高圧水を供給する高圧水パイプ、泥水を
吸引する吸引口、および吸引口からの泥水を吸い出す吸
引パイプを収納している。
The trunk pipe used in the method for constructing an underground wall body according to claim 6 is a device for forming an excavation hole underground, and a rotary bit is projected from the tip, and the rotary shaft of the rotary bit and the ground An injection nozzle for injecting high-pressure water, a high-pressure water pipe for supplying high-pressure water to this injection nozzle, a suction port for sucking muddy water, and a suction pipe for sucking muddy water from the suction port are housed.

【0010】また、請求項7に係る地下壁体の構築法に
用いるトランクパイプは、請求項6の構成に加えて、噴
射ノズルおよび吸引口を有し、トランクパイプ内にその
基端部から挿入および抜出しが可能で、先端部に挿入さ
れたとき、前記回転ビットの回転軸をトランクパイプの
中心寄りに変位しないようにトライクパイプの壁面との
間で保持するベース部材を備えている。
A trunk pipe used in the method for constructing an underground wall body according to a seventh aspect has an injection nozzle and a suction port in addition to the structure of the sixth aspect, and is inserted into the trunk pipe from its base end. And a base member that holds the rotary shaft of the rotary bit with the wall surface of the trike pipe so as not to be displaced toward the center of the trunk pipe when the rotary bit is inserted into the distal end portion.

【0011】[0011]

【作用および効果】請求項1の地下壁体の構築法によれ
ば、地面における地下壁体を構築すべき場所に、相対向
するガイド壁を立設する。この両ガイド壁の間に、回転
ビットを先端から突出させたトランクパイプを挿入す
る。回転ビットを回転させて地中を掘削しながら、その
掘削により生じる土砂に、トランクパイプに収納した高
圧水パイプから噴射ノズルを介して高圧水を噴射すると
ともに、回転ビットによる土砂と水とを攪拌して泥水に
変える。この泥水は、トランクパイプに収納した吸引パ
イプに作用する吸引力により吸引口から吸引して外部に
排出する。それにより、掘削穴が円滑に徐々に堀り進め
られていく。
According to the construction method of the underground wall body of the first aspect, the guide walls facing each other are erected at the place on the ground where the underground wall body is to be constructed. A trunk pipe with a rotary bit protruding from the tip is inserted between the guide walls. While excavating the ground by rotating the rotating bit, high-pressure water is injected from the high-pressure water pipe housed in the trunk pipe through the injection nozzle into the earth and sand generated by the excavation, and the earth-sand and water are agitated by the rotating bit. Then change to muddy water. The muddy water is sucked from the suction port and discharged to the outside by the suction force acting on the suction pipe housed in the trunk pipe. As a result, the excavation hole is dug smoothly and gradually.

【0012】上記掘削穴の掘削作業と並行して、トラン
クパイプの外面側とガイド壁との間にコンクリートを打
設する。このコンクリートは固まって壁体となる。この
壁体は、掘削穴が堀り進められるに伴ってトランクパイ
プと共に掘削穴内に進入していく。壁体が進入するのに
伴って、トランクパイプの外面側とガイド壁との間に空
間ができ、その空間にコンクリートを打設する。それに
より、壁体は一体物として徐々に伸長されていく。この
工事を壁体が地中の所定深さに進入するまで継続する
と、所望の地下壁体が構築される。
In parallel with the excavation work of the excavation hole, concrete is placed between the outer surface side of the trunk pipe and the guide wall. This concrete solidifies into a wall. This wall body enters the excavation hole together with the trunk pipe as the excavation hole is dug forward. As the wall enters, a space is created between the outer surface side of the trunk pipe and the guide wall, and concrete is placed in the space. As a result, the wall body is gradually expanded as an integral body. If this construction is continued until the wall body reaches a predetermined depth in the ground, a desired underground wall body is constructed.

【0013】上記地下壁体の構築法では、回転ビットの
回転による掘削作業と、トランクパイプ外面側とガイド
壁間へのコンクリートの打設作業と、このコンクリート
が固まった壁体の地中への沈降とを、同時に連続的に行
うので、在来の地下壁体の構築工法に比較して大幅に工
期を短縮できる。また、従来工法における山留め壁や型
枠の製作が不要となるだけでなく、一対のガイド壁の間
にコンクリートを挿入して固まってできた壁体が沈降す
るごとに、この壁体の上面にコンクリートを順次打設し
て壁体を伸長させていくので、ガイド壁は、コンクリー
トを固まらせるのに必要な長さだけで済み、従来工法に
おける地下壁体の深さの全長にわたるコンクリート型枠
に比較して格段に小さなものでよいから、工事経費を大
幅に低減できる。したがって、工期の短縮と工事経費の
低減とによって大幅なコストダウンを達成できる。しか
も、地下壁体は一体物であるから、従来工法による山留
め壁などのように壁自体にすき間がないので、優れた止
水性や、土砂崩れを防止できる高い安全性が得られ、こ
の優れた地下壁体ができあがったのちに、地下壁体の内
部を掘削するので、全体の施工性も格段に向上する。さ
らに、杭打機、掘削機のような大型の重機を必要としな
いので、作業性もよい。
In the method for constructing the above-mentioned underground wall body, the excavation work by rotating the rotary bit, the placing work of the concrete between the outer surface side of the trunk pipe and the guide wall, and the construction of the wall body in which the concrete is solidified into the ground. Since settling and continuous are performed simultaneously, the construction period can be greatly shortened compared to the conventional construction method for underground walls. Moreover, not only does the production of mountain retaining walls and formwork in the conventional method become unnecessary, but also when the wall body formed by inserting concrete between the pair of guide walls sinks and settles on the upper surface of this wall body. Since concrete is sequentially poured to extend the wall, the guide wall only needs the length necessary to solidify the concrete, and it can be used as a concrete formwork over the entire length of the depth of the underground wall in the conventional method. Compared to the one that is much smaller, the construction cost can be greatly reduced. Therefore, a significant cost reduction can be achieved by shortening the construction period and reducing the construction cost. Moreover, since the underground wall is a unitary body, there is no gap in the wall itself like the mountain retaining wall made by the conventional construction method, so it has excellent waterproofness and high safety that can prevent landslides. Since the inside of the underground wall is excavated after the wall is completed, the overall workability is greatly improved. Furthermore, since large heavy equipment such as a pile driver and an excavator are not required, workability is also good.

【0014】請求項2の地下壁体の構築法によれば、コ
ンクリートに鉄筋を埋設するので、地下壁体の強度を高
めることができる。請求項3の地下壁体の構築法によれ
ば、コンクリートからなる壁体と掘削穴との間に保圧剤
を注入するので、掘削穴の穴壁を形成する土砂の崩壊を
保圧剤によって防ぐことができ、コンクリートが固まっ
てできる壁体を地中へ円滑に進入させることができる。
According to the method of constructing the underground wall body of the second aspect, since the reinforcing bars are embedded in the concrete, the strength of the underground wall body can be increased. According to the method of constructing an underground wall body of claim 3, since a pressure-holding agent is injected between the wall body made of concrete and the excavation hole, the pressure-preserving agent prevents the collapse of the earth and sand forming the hole wall of the excavation hole. It is possible to prevent it, and it is possible to allow a wall body formed by hardening concrete to smoothly enter the ground.

【0015】請求項4の地下壁体の構築法によれば、掘
削穴を上下方向に形成しているので、コンクリートが固
まってできた壁体は、回転ビットにより掘削穴が堀り進
められるのに伴って壁体自身の重量により自動的に掘削
穴内に沈降していく。また、壁体の沈降速度は沈降抑制
部材により制御できる。たとえば、先端部が壁体の側面
に接触するよう設けられたねじ棒をハンドルの操作によ
り進退させて、ねじ棒の壁体への押し付け力、つまり壁
体の摩擦力を調節することにより、壁体の沈降速度を任
意に制御できる。したがって、掘削すべき地盤の土質が
柔らかい場所では、摩擦接触力が大きくなるよう沈降抑
制部材を操作して壁体の沈降速度を抑制し、逆に土質が
固い場所では、摩擦接触力が小さくなるよう沈降抑制部
材を操作して壁体の沈降速度を促進する。それにより、
壁体の全体を均等な速度で沈降させることができる。
According to the method for constructing an underground wall body of claim 4, since the excavation hole is formed in the vertical direction, the excavation hole can be dug by the rotating bit in the wall body formed by hardening concrete. As a result, the weight of the wall itself automatically sinks into the drill hole. Further, the sedimentation speed of the wall body can be controlled by the sedimentation suppressing member. For example, a screw rod provided so that its tip portion comes into contact with the side surface of the wall body is advanced and retracted by operating the handle to adjust the pressing force of the screw rod against the wall body, that is, the frictional force of the wall body. The sedimentation rate of the body can be controlled arbitrarily. Therefore, in places where the soil to be excavated is soft, the sedimentation suppressing member is operated to increase the frictional contact force to suppress the sedimentation velocity of the wall, and conversely, in places where the soil is hard, the frictional contact force becomes smaller. The sedimentation suppressing member is operated to accelerate the sedimentation speed of the wall body. Thereby,
The entire wall can be settled at a uniform speed.

【0016】請求項5の地下壁体の構築法によれば、ト
ランクパイプにベース部材と回転軸とが着脱自在に取り
付けられ、さらに、ベース部材の噴射ノズルおよび吸引
口に高圧水パイプおよび吸引パイプが連結されているか
ら、ベース部材、高圧水パイプ、吸引パイプおよび回転
軸がトランクパイプに対し上方へ抜き出せるようになっ
ている。したがって、ベース部材、高圧水パイプ、吸引
パイプおよび回転軸は、地下壁体の構築の完了後にトラ
ンクパイプの上方へ抜き出して回収し、繰り返し使用で
きるので、極めて経済的であって工事コストを低減でき
る。
According to the method of constructing an underground wall body of claim 5, the base member and the rotary shaft are detachably attached to the trunk pipe, and the injection nozzle and the suction port of the base member are further attached to the high pressure water pipe and the suction pipe. Is connected, the base member, the high-pressure water pipe, the suction pipe, and the rotary shaft can be pulled out upward with respect to the trunk pipe. Therefore, the base member, the high-pressure water pipe, the suction pipe, and the rotary shaft can be extracted and collected above the trunk pipe after the completion of the construction of the underground wall body and can be repeatedly used, which is extremely economical and can reduce the construction cost. .

【0017】請求項6の地下壁体の構築法に用いるトラ
ンクパイプは、先端から回転ビットを突出させて、回転
ビットの回転軸、高圧水の噴射ノズル、この噴射ノズル
に高圧水を供給する高圧水パイプ、泥水の吸引口および
吸引口からの泥水を吸い出す吸引パイプを収納している
ので、このトランクパイプを両ガイド壁の間に挿入する
と、上記種々の部材を一挙にセットすることができ、地
下壁体の掘削作業とコンクリートの打設作業とを迅速に
開始できるとともに、それら部材は地下壁体の構築時に
打設されるコンクリートに対しトランクパイプによって
隔離して保護できる。
In the trunk pipe used in the method for constructing an underground wall body according to a sixth aspect of the present invention, a rotary bit is projected from the tip, a rotary shaft of the rotary bit, a high-pressure water jet nozzle, and high-pressure water for supplying high-pressure water to the jet nozzle. Since it contains a water pipe, a suction port for sucking muddy water and a suction pipe for sucking muddy water from the suction port, by inserting this trunk pipe between both guide walls, the above various members can be set at once, The excavation work of the underground wall and the placing work of the concrete can be started quickly, and the members can be protected by the trunk pipe against the concrete placed when the underground wall is constructed.

【0018】請求項7の地下壁体の構築法に用いるトラ
ンクパイプは、自体の噴射ノズルおよび吸引口に高圧水
パイプおよび吸引パイプがそれぞれ連結されたベース部
材をトランクパイプの先端部に挿入したときに、このベ
ース部材が回転軸をトランクパイプの中央寄りに変位し
ないようにトランクパイプの壁面との間で回転自在に保
持する。したがって、ベース部材を高圧水パイプおよび
吸引パイプによりトランクパイプから抜き出すと、回転
ビットの回転軸は、ベース部材による保持を解除される
ことから、トランクパイプの中心寄りに変位させて、ト
ランクパイプから抜き出すことができる。したがって、
回転ビットは、トランクパイプの幅よりも小さい範囲内
で可及的に大きな寸法に設定しても、地下壁体の完了後
にトランクパイプから抜き出すことができる。そのた
め、寸法の大きな回転ビットを用いて厚い地下壁体を形
成することもできる。
The trunk pipe used in the method for constructing a subterranean wall body according to claim 7 is such that when a base member in which a high-pressure water pipe and a suction pipe are respectively connected to a jet nozzle and a suction port of the trunk pipe is inserted into a tip portion of the trunk pipe. In addition, the base member rotatably holds the rotary shaft between itself and the wall surface of the trunk pipe so as not to be displaced toward the center of the trunk pipe. Therefore, when the base member is pulled out from the trunk pipe by the high-pressure water pipe and the suction pipe, the rotary shaft of the rotary bit is released from the holding by the base member, so that it is displaced toward the center of the trunk pipe and pulled out from the trunk pipe. be able to. Therefore,
The rotating bit can be pulled out of the trunk pipe after completion of the underground wall, even if the rotating bit is set to have a size as large as possible within a range smaller than the width of the trunk pipe. Therefore, it is possible to form a thick underground wall by using a rotating bit having a large size.

【0019】[0019]

【実施例】以下、本発明の好ましい実施例について図面
を参照しながら詳述する。図1は本発明の地下壁体の構
築法の実施に係る工事現場のイメージを示す一部切断し
た概略斜視図で、図2はその工事現場の全体を示す平面
図である。これらの図において、本発明の地下壁体の構
築法の概略について説明する。図2に示すように、地面
における地下壁体を構築すべき箇所に沿って、平面視で
矩形状の二重のガイド壁1,1が、互いの間に空間を持
たせて相対向して立設される。このガイド壁1は、図1
に示すように、鋼により断面L字形状に形成され、これ
らの立壁部1aの間隔は、構築すべき地下壁体2の厚み
に設定される。また、ガイド壁1の支持壁部1bは、地
面に設けられたコンクリートの仮設土間3の上に設置さ
れる。ガイド壁1の周囲には作業足場4が組み立てられ
る。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT A preferred embodiment of the present invention will be described in detail below with reference to the drawings. FIG. 1 is a partially cut-away schematic perspective view showing an image of a construction site relating to the implementation of the method for constructing an underground wall of the present invention, and FIG. 2 is a plan view showing the entire construction site. The outline of the method for constructing the underground wall body of the present invention will be described with reference to these drawings. As shown in FIG. 2, double guide walls 1, 1 having a rectangular shape in plan view face each other with a space between each other along a location on the ground where an underground wall body is to be constructed. Erected. This guide wall 1 is shown in FIG.
As shown in FIG. 5, the steel is formed into an L-shaped cross section, and the interval between the standing wall portions 1a is set to the thickness of the underground wall body 2 to be constructed. Further, the support wall portion 1b of the guide wall 1 is installed on the concrete temporary earth space 3 provided on the ground. A work scaffold 4 is assembled around the guide wall 1.

【0020】両ガイド壁1,1の間には、トランクパイ
プ7が一定間隔の配置で挿入される。トランクパイプ7
には、これの中央部に位置する吸引パイプ8と、両端側
に位置する一対の回転軸9と、吸引パイプ8に近接して
位置する高圧水パイプ10とが挿入される。回転軸9
は、下端部に後述する掘削用の回転ビットが設けられ、
図2に示すように、3本一組として駆動用モータ11か
らチェーン15および伝動軸12を介して回転力が伝達
されて、回転ビットを回転させる。高圧水パイプ10
は、高圧ポンプ13から配水管14を通じて供給される
高圧水を下端から噴射して、上記回転ビットの回転によ
る地盤の掘削により生じる土砂を泥水化する。吸引パイ
プ8は、バキュームポンプ17の駆動により上記泥水を
吸引する。その泥水はバキュームポンプ17の駆動によ
り連結管18を介して泥水槽19に送られる。泥水槽1
9は泥水を濾して水と土砂とに分離し、水を循環水槽2
0に送る。一方、土砂はベルトコンベア21によってポ
ッパー22まで搬送され、土砂運搬用ダンプトラック2
3に積み込まれて搬出される。
Trunk pipes 7 are inserted between the guide walls 1, 1 at regular intervals. Trunk pipe 7
The suction pipe 8 located at the center of the suction pipe 8, a pair of rotating shafts 9 located at both ends, and a high-pressure water pipe 10 located close to the suction pipe 8 are inserted into this. Rotating shaft 9
Is equipped with a rotary bit for excavation described below at the lower end,
As shown in FIG. 2, the rotational force is transmitted from the drive motor 11 via the chain 15 and the transmission shaft 12 as a set of three to rotate the rotary bit. High pressure water pipe 10
Injects high-pressure water supplied from the high-pressure pump 13 through the water distribution pipe 14 from the lower end to muddy the earth and sand generated by excavation of the ground by the rotation of the rotary bit. The suction pipe 8 sucks the muddy water by driving the vacuum pump 17. The muddy water is sent to the muddy water tank 19 through the connecting pipe 18 by driving the vacuum pump 17. Muddy water tank 1
9 muddy water is filtered and separated into water and earth and sand, and the water is circulated in the water tank 2.
Send to 0. On the other hand, the earth and sand is conveyed to the popper 22 by the belt conveyor 21, and the earth and sand transport dump truck 2
3 is loaded and unloaded.

【0021】また、循環水槽20には水供給タンク24
から水道水が補給され、この循環水槽20の水が上記高
圧水ポンプ13により吸い出される。矩形状に配設され
た上記一対のガイド壁1,1の間であってトランクパイ
プ7の外側の空間に、コンクリートポンプ車27から複
数本のコンクリート圧送管28を介して生コンクリート
が均等に送入される。コンクリートポンプ車27にはコ
ンクリートミキサ車29から生コンクリートが補給され
る。その他に、種々の制御や監視を行うためのコントロ
ールタワー、作業足場4などを吊り上げ搬送するタワー
クレーン31および後述の保圧剤を供給するための保圧
剤供給プラント32などが設けられている。
The circulating water tank 20 has a water supply tank 24.
The tap water is replenished from the circulating water tank 20, and the water in the circulating water tank 20 is sucked out by the high-pressure water pump 13. Fresh concrete is evenly sent from the concrete pump car 27 to the space between the pair of guide walls 1, 1 arranged in a rectangular shape and outside the trunk pipe 7 through the concrete pumping pipes 28. Be entered. The concrete pump truck 27 is supplied with fresh concrete from a concrete mixer truck 29. In addition, a control tower for performing various controls and monitoring, a tower crane 31 for hoisting and transporting the work scaffold 4, and a pressure-holding agent supply plant 32 for supplying a pressure-holding agent described later are provided.

【0022】つぎに、本発明の地下壁体の構築法の一実
施例に係る工法を図3および図4の工程図に基づいて説
明するとともに、必要に応じて随時に図5以下の図面を
参照しながら主要な構成を詳細に説明する。先ず、図3
(a)に示すように、地面における地下壁体2を構築す
べき場所に沿って浅い簡単な掘削用溝33を掘り、この
掘削用溝33の両側に沿って断面が倒置L字形状の仮設
土間3をコンクリート打ちにより構築する。例えば、掘
削用溝33は、図2に示した後設のガイド壁1,1の間
に位置するように、平面矩形状に堀り、その掘削用溝3
3の両側に沿って仮設土間3を構築する。仮設土間3の
対向する角部からは、一端部を仮設土間3に埋め込んで
支持した鉄筋のような仮止め部材37が突出される。
Next, a construction method according to an embodiment of the method for constructing an underground wall body of the present invention will be explained based on the process diagrams of FIGS. 3 and 4, and if necessary, the drawings of FIG. The main configuration will be described in detail with reference to the drawings. First, FIG.
As shown in (a), a shallow simple excavation groove 33 is dug along a place on the ground where the underground wall body 2 is to be constructed, and a temporary construction having an inverted L-shaped cross section along both sides of the excavation groove 33. The dirt floor 3 is constructed by concrete pouring. For example, the excavation groove 33 is dug in a plane rectangular shape so as to be located between the guide walls 1 and 1 which are provided later in FIG.
Construct a temporary soil space 3 along both sides of 3. From the opposing corners of the temporary earth space 3, a temporary fixing member 37, such as a reinforcing bar, having one end embedded and supported in the temporary earth space 3 is projected.

【0023】つぎに、図3(b)に示すように、生コン
クリートを受けるための鋼板製のシュー34を、これの
両側端部を仮止め部材37に溶接して、仮設土間3,3
間に架け渡して仮受け状態に取り付ける。また、上記ガ
イド壁1を、掘削用溝33の両側に沿って仮設土間3の
上面にH型鋼などの支持脚39を介在させて立設する。
さらに、上記トランクパイプ7をその下端部をシュー3
4に支持させて両ガイド壁1,1間に挿入し、このトラ
ンクパイプ7とガイド壁1との間に、格子状に組み立て
た鉄筋38を挿入してセットする。つづいて、(c)に
示すように、ガイド壁1に沿って作業足場4を組み立
て、上記高圧水パイプ10および吸引パイプ8を、トラ
ンクパイプ7内に挿入してそれらの下端部を後述の構成
により保持するとともに、上部を作業足場4を介して保
持する。一方、回転軸9は後述の構成によりトランクパ
イプ7内に挿入して回転自在に保持する。駆動用モータ
11は、作業足場4に支持させて設置するとともに、駆
動用モータ11を回転軸9に対し伝動可能に連結する。
さらに、吸引パイプ8および高圧水パイプ10には連結
管18および配水管14を配管する。この(b),
(c)の工程における主要な構成について、図5ないし
図7を参照しながら以下に詳述する。
Next, as shown in FIG. 3B, a shoe 34 made of a steel plate for receiving fresh concrete is welded to both sides of the shoe 34 to the temporary fixing members 37, and the temporary earth gaps 3, 3 are formed.
Install it in a temporary receiving state by bridging it in between. Further, the guide wall 1 is erected on both sides of the excavation groove 33 on the upper surface of the temporary earth 3 with supporting legs 39 such as H-shaped steel interposed.
Further, attach the trunk pipe 7 to the shoe 3 at the lower end thereof.
4 is supported and inserted between the guide walls 1 and 1. Between the trunk pipe 7 and the guide wall 1, the reinforcing bars 38 assembled in a lattice shape are inserted and set. Subsequently, as shown in (c), the working scaffold 4 is assembled along the guide wall 1, the high-pressure water pipe 10 and the suction pipe 8 are inserted into the trunk pipe 7, and their lower ends are described later. And the upper part is held via the work scaffold 4. On the other hand, the rotary shaft 9 is inserted into the trunk pipe 7 and rotatably held by the structure described later. The drive motor 11 is supported and installed on the work scaffold 4, and the drive motor 11 is connected to the rotating shaft 9 so as to be capable of being transmitted.
Further, a connecting pipe 18 and a water distribution pipe 14 are connected to the suction pipe 8 and the high-pressure water pipe 10. This (b),
The main structure in the step (c) will be described in detail below with reference to FIGS.

【0024】図5は地下壁体2の構築中間工程における
切断正面図で、図6はその一部破断した側面図、図7は
図6のA−A線断面図である。図5および図6に示すよ
うに、シュー34は、薄い鉄板により両ガイド壁1間に
嵌まり込むことのできる形状になっており、トランクパ
イプ7の取付孔が多数個配設されている。トランクパイ
プ7はこのシュー34の取付孔に嵌め込んで溶接により
固定されている。トランクパイプ7は、図7に示すよう
に、2枚の板材が突き合わせ固定されて、長円形状の断
面に形成されており、このトランクパイプ7内には、中
央部に吸引パイプ8が、両側部に回転軸9が、吸引パイ
プ8の近接位置に高圧水パイプ10がそれぞれ挿入され
ている。回転軸9の下端部には偏平な板状の回転ビット
40が装着されている。
FIG. 5 is a sectional front view in the intermediate construction process of the underground wall body 2, FIG. 6 is a side view with a part thereof broken, and FIG. 7 is a sectional view taken along the line AA of FIG. As shown in FIGS. 5 and 6, the shoe 34 has a shape that can be fitted between the guide walls 1 by a thin iron plate, and has a large number of mounting holes for the trunk pipe 7. The trunk pipe 7 is fitted in the mounting hole of the shoe 34 and fixed by welding. As shown in FIG. 7, the trunk pipe 7 has an oval-shaped cross section in which two plate members are abutted and fixed to each other. The trunk pipe 7 has a suction pipe 8 at the center and both sides. The rotary shaft 9 is inserted in the portion, and the high-pressure water pipe 10 is inserted in the vicinity of the suction pipe 8. A flat plate-shaped rotary bit 40 is attached to the lower end of the rotary shaft 9.

【0025】上記回転ビット40は、図6に明示するよ
うに、全体の幅D1が回転軸9を1本セットした状態の
トランクパイプ7の有効内幅D2よりも小さい形状を有
して、トランクパイプ7に対し抜き出し可能になってい
る。回転ビット40は、最大半径rを持つ左右非対称で
あり、その左右両端側縁の上部と下部に掘削歯40a,
40bがそれぞれ形成され、それにより、回転軸9によ
り回転されて地盤を掘削するときのバランスがとれるよ
うになっている。また、回転ビット40の中央部には、
柔らかい土質の掘削に際して、めり込みや噛み込みを防
止するためのつば40cが幅方向に形成されている。吸
引パイプ8および高圧水パイプ10の下端部にはベース
部材41が溶接により固着されている。このベース部材
41について、図8および図9を参照しながら詳述す
る。
As shown in FIG. 6, the rotary bit 40 has a shape in which the overall width D1 is smaller than the effective inner width D2 of the trunk pipe 7 in which one rotating shaft 9 is set. It can be pulled out from the pipe 7. The rotating bit 40 is asymmetrical with a maximum radius r, and has excavating teeth 40a on the upper and lower sides of its left and right end edges.
40b are respectively formed so that they can be rotated by the rotating shaft 9 to balance when excavating the ground. Also, in the center of the rotary bit 40,
A collar 40c is formed in the width direction to prevent biting and biting when excavating soft soil. A base member 41 is fixed to the lower ends of the suction pipe 8 and the high-pressure water pipe 10 by welding. The base member 41 will be described in detail with reference to FIGS. 8 and 9.

【0026】図8は図6の一部の拡大図で、図9(a)
は図7の一部の拡大図であり、(b)は(a)からベー
ス部材41を抜き出した状態を示し、その抜き出したベ
ース部材41を(c)に示す。図8において、ベース部
材41は、箱体部41aの上面に吸引パイプ8および高
圧水パイプ10が連通状態で溶接により固着されてお
り、箱体部41aの中央部に吸引パイプ8の取付孔から
末広がりとなった吸引通路41bが形成され、吸引通路
41bの下端が吸引口41cになっている。また、箱体
部41a内には、吸引通路41bの周囲を囲むようにし
て、高圧水パイプ10に連通する環状の流水室41dが
設けられ、この流水室41dの下面部に複数個の噴射ノ
ズル41eが形成されている。また、箱体部41aの上
面からは両側に保持片41fが延びており、保持片41
fの端部には回転軸9の外周面の約半分が嵌まる軸受用
切欠き41gが形成されている。
FIG. 8 is an enlarged view of a part of FIG. 6, and FIG.
FIG. 8 is an enlarged view of a part of FIG. 7, (b) shows a state in which the base member 41 is extracted from (a), and the extracted base member 41 is shown in (c). In FIG. 8, the base member 41 has the suction pipe 8 and the high-pressure water pipe 10 fixed to each other by welding on the upper surface of the box body 41a, and is attached to the center of the box body 41a from the attachment hole of the suction pipe 8. A suction passage 41b is formed so as to widen toward the end, and the lower end of the suction passage 41b serves as a suction port 41c. Further, an annular running water chamber 41d communicating with the high-pressure water pipe 10 is provided inside the box portion 41a so as to surround the suction passage 41b, and a plurality of injection nozzles 41e are provided on the lower surface of the running water chamber 41d. Has been formed. Further, holding pieces 41f extend from both sides of the upper surface of the box body portion 41a, and
A bearing notch 41g into which approximately half the outer peripheral surface of the rotary shaft 9 is fitted is formed at the end of f.

【0027】回転軸9には、回転ビット40の近傍箇所
にリング状の係止部材42が挿通されて固定されてい
る。一方、トランクパイプ7の下端付近の内壁面の対向
箇所には、左右に一対ずつの係止片43,44が上下方
向に所定の間隔に配して、溶接により固定されている。
上方の係止片44の端部には、図9に示すように、回転
軸9の外周面の約半分が嵌まり込む軸受用切欠き44a
が形成されている。回転軸9は、係止部材42の近傍上
部の外周面に係止片44の切欠き44aとベース部材4
1の保持片41fの切欠き41gとが両側から嵌まり込
むことによって、両側から挟み込む状態で回転自在に保
持されている。なお、図8の高圧水パイプ10は、下端
をベース部材41に固着されているだけであって、トラ
ンクパイプ7内においてフリーの状態になっている。
A ring-shaped locking member 42 is inserted into and fixed to the rotary shaft 9 in the vicinity of the rotary bit 40. On the other hand, a pair of left and right engaging pieces 43, 44 are fixed by welding at a predetermined interval in the up-down direction at opposing positions on the inner wall surface near the lower end of the trunk pipe 7.
As shown in FIG. 9, a bearing notch 44a into which approximately half the outer peripheral surface of the rotary shaft 9 is fitted at the end of the upper locking piece 44.
Are formed. The rotary shaft 9 has a notch 44 a of the locking piece 44 and a base member 4 on the outer peripheral surface of the upper portion near the locking member 42.
By fitting the notch 41g of the first holding piece 41f from both sides, the one holding piece 41f is rotatably held while being sandwiched from both sides. The high-pressure water pipe 10 shown in FIG. 8 is only fixed at its lower end to the base member 41, and is free in the trunk pipe 7.

【0028】図3(b)の工程において、回転軸9、吸
引パイプ8および高圧水バイプ10をトランクパイプ7
内へ挿入して保持するに際しては、先ず、図8の回転軸
9をトランクパイプ7の中央部に対向させて回転ビット
40をトランクパイプ7内に挿入し、かつ回転ビット4
0をトランクパイプ7の下方に突出させたのちに、回転
軸9をトランクパイプ7の側方に寄せて、係合部材42
を両係止片43,44の間に挿入する。この場合、回転
ビット40がその形状から二つ同時にトランクパイプ7
内に挿入できないので、回転軸9を一本ずつトランクパ
イプ7内に挿入する。つづいて、吸引パイプ8および高
圧水パイプ10の各下端が連結されたベース部材41
を、両側の保持用切欠き41gをそれぞれ回転軸9に摺
動させながらトランクパイプ7内に挿入して下降させ、
保持片41fを上方の係止片44上に載置する手順で行
う。
In the step of FIG. 3B, the rotary shaft 9, the suction pipe 8 and the high pressure water pipe 10 are attached to the trunk pipe 7.
When inserting and holding the rotary bit 40 into the trunk pipe 7 with the rotary shaft 9 of FIG. 8 facing the central portion of the trunk pipe 7,
0 is made to project below the trunk pipe 7, and then the rotary shaft 9 is moved to the side of the trunk pipe 7 so that the engaging member 42
Is inserted between both locking pieces 43 and 44. In this case, the rotary bit 40 has two shapes at the same time because of its shape.
The rotary shafts 9 are inserted one by one into the trunk pipe 7 because they cannot be inserted inside. Next, a base member 41 in which the lower ends of the suction pipe 8 and the high-pressure water pipe 10 are connected to each other.
Is inserted into the trunk pipe 7 while sliding the holding notches 41g on both sides on the rotary shaft 9 respectively, and lowered.
The procedure is performed by placing the holding piece 41f on the upper locking piece 44.

【0029】それにより、吸引パイプ8および高圧水パ
イプ10はベース部材41を介してトランクパイプ7に
支持される。回転軸9は、係止片44の軸受用切欠き4
4aとベース部材41の軸受用切欠き41gとにより両
側から挟み込むように回転自在に保持されるとともに、
係止部材42が上下の係止片43,44に当たる範囲内
で上下動可能になっている。図6および図8では、回転
ビット40が掘削用溝33の地盤に当たって係止部材4
2が上方の係止片44に接触している状態を示してい
る。
As a result, the suction pipe 8 and the high-pressure water pipe 10 are supported by the trunk pipe 7 via the base member 41. The rotating shaft 9 includes the bearing notch 4 of the locking piece 44.
4a and the bearing notch 41g of the base member 41 are rotatably held so as to be sandwiched from both sides, and
The locking member 42 can move up and down within a range where it hits the upper and lower locking pieces 43, 44. In FIG. 6 and FIG. 8, the rotary bit 40 hits the ground of the excavation groove 33, and the locking member 4
2 is in contact with the upper locking piece 44.

【0030】再び図3(c)の工程にもどって説明す
る。上述のようにしてトランクパイプ7、吸引パイプ
8、回転軸9および高圧水パイプ10の設定が完了する
と、両ガイド壁1,1の間で、トランクパイプ7の外側
の空間に、コンクリート圧送管28を通じて生コンクリ
ートを挿入する。この生コンクリートは固まって自動的
に地下壁体2の一部である下端部分を形成する。生コン
クリートが固まった時点で、シュー34を仮設土間3に
支持させている仮止め部材37を、バーナーで焼き切る
などの手段で切断する。それにより、コンクリートの壁
体2は自重により下降して、回転ビット40が掘削用溝
33の地盤に当たる。この状態で駆動用モータ11が駆
動され、この駆動モータ11の回転が回転軸9を介して
回転ビット40に伝達され、回転ビット40が回転して
掘削用溝33の地盤を掘削する。
The process of FIG. 3C will be described again. When the setting of the trunk pipe 7, the suction pipe 8, the rotating shaft 9, and the high-pressure water pipe 10 is completed as described above, the concrete pressure feed pipe 28 is provided between the guide walls 1 and 1 in the space outside the trunk pipe 7. Insert the fresh concrete through. This green concrete solidifies and automatically forms a lower end portion which is a part of the underground wall body 2. When the ready-mixed concrete is solidified, the temporary fixing member 37 supporting the shoe 34 in the temporary soil 3 is cut by means such as burning with a burner. As a result, the concrete wall 2 descends by its own weight, and the rotary bit 40 hits the ground of the excavation groove 33. The drive motor 11 is driven in this state, and the rotation of the drive motor 11 is transmitted to the rotary bit 40 via the rotary shaft 9, and the rotary bit 40 rotates to excavate the ground in the excavation groove 33.

【0031】上記駆動用モータ11の駆動と同時に、図
2に示した高圧水ポンプ13、バキュームポンプ17が
駆動される。高圧水ポンプ13の駆動により循環水槽2
0から吸い出された高圧水は、配水管14、高圧水パイ
プ10、図8の流水室41dを通って、噴射ノズル41
eから地中に噴出される。この高圧水が回転ビット40
の掘削作用により生じた掘削土砂に噴きつけられるとと
もに、回転ビット40により攪拌されて、掘削土砂が泥
水に変えられる。この泥水は、図2のバキュームポンプ
17の作動により作用する吸引力によって、図8の吸引
口41cから吸い上げられ、吸引通路41bから吸引パ
イプ8および連結管18を通って泥水槽19に送られ
る。
Simultaneously with the driving of the driving motor 11, the high-pressure water pump 13 and the vacuum pump 17 shown in FIG. 2 are driven. Circulating water tank 2 driven by high-pressure water pump 13
The high-pressure water sucked out from 0 passes through the water distribution pipe 14, the high-pressure water pipe 10, and the running water chamber 41d of FIG.
It is ejected into the ground from e. This high-pressure water is a rotating bit 40
It is sprayed on the excavated earth and sand generated by the excavation action of the above, and is agitated by the rotary bit 40, so that the excavated earth and sand is converted into muddy water. This muddy water is sucked up from the suction port 41c of FIG. 8 by the suction force acting by the operation of the vacuum pump 17 of FIG. 2, and sent from the suction passage 41b to the muddy water tank 19 through the suction pipe 8 and the connecting pipe 18.

【0032】図3(d)に示すように、地下壁体2の重
量により下方への押し下げ力を受けた回転ビット40の
回転によって、掘削穴47が円滑に堀り進められてい
き、掘削穴47の深さが増していくに伴って、壁体2と
これに内蔵されたトランクパイプ7およびその内部の吸
引パイプ8および高圧水パイプ10も、掘削孔47内を
下方に進入していく。このようにして掘削穴47が堀り
進められていくのに伴って、トランクパイプ7、吸引パ
イプ8,高圧水パイプ10は、それぞれの上端部に他の
ものを順次接続して伸長されていき、かつ鉄筋38も順
次接続されるとともに、地下壁体2が沈降していくのに
伴って、両ガイド壁1,1の間であってトランクパイプ
7の外側に生コンクリートが継続的に送入されて順次固
まっていく。これにより、壁体2が徐々に伸長されてい
く。したがって、この構築法では、回転ビット40の回
転による掘削穴47の掘削作業と、トランクパイプ7の
外側と両ガイド壁1,1との間への生コンクリートの打
設作業と、この生コンクリートが固まった壁体2の地中
への沈降とを、同時に連続的に行うことができる。
As shown in FIG. 3 (d), the excavation hole 47 is smoothly dug by the rotation of the rotary bit 40 which receives the downward pressing force due to the weight of the underground wall 2, and the excavation hole 47 is smoothly advanced. As the depth of the wall 47 increases, the wall 2, the trunk pipe 7 incorporated therein, the suction pipe 8 and the high-pressure water pipe 10 inside the wall 2 also enter the inside of the excavation hole 47 downward. As the excavation hole 47 is dug in this way, the trunk pipe 7, the suction pipe 8, and the high-pressure water pipe 10 are extended by sequentially connecting other ones to their upper ends. Moreover, the reinforcing bars 38 are also sequentially connected, and as the underground wall 2 sinks, fresh concrete is continuously fed to the outside of the trunk pipe 7 between the guide walls 1 and 1. It is done and solidifies one by one. As a result, the wall body 2 is gradually expanded. Therefore, in this construction method, the excavation work of the excavation hole 47 by the rotation of the rotary bit 40, the pouring work of the fresh concrete between the outer side of the trunk pipe 7 and the both guide walls 1, 1 and this fresh concrete The solidified wall body 2 can be settled into the ground simultaneously and continuously.

【0033】トランクパイプ7、吸引パイプ8,高圧水
パイプ10はいずれも同様の接続手段で順次接続される
ので、ここでは代表として、トランクパイプ7の接続例
を図10を参照しながら説明する。トランクパイプ7
は、その本体部7aの外径とほぼ同じ内径を有する大径
部7bが一端部に一体形成されており、大径部7bを下
方に向けた状態で順次接続されていく。また、トランク
パイプ7の両端部には、取付孔7dを有する取付片7c
が両側部から外方に突出して固定されている。したがっ
て、図10(a)に示すように、双方の取付片7cを対
向させた状態で突き合わせて、(b)に示すように、下
方の本体部7aの上端部を上方の大径部7b内に挿入す
ると、双方の取付片7cが重ね合わされ、かつ取付孔7
dが合致するので、この合致した取付孔7dにボルト
(図示せず)を挿通してナット(図示せず)をねじ込ん
で締めつけることにより、上下のトランクパイプ7が連
通状態に接続される。
Since the trunk pipe 7, the suction pipe 8 and the high-pressure water pipe 10 are all sequentially connected by the same connecting means, a connection example of the trunk pipe 7 will be described here as a representative with reference to FIG. Trunk pipe 7
Is integrally formed at one end with a large diameter portion 7b having an inner diameter substantially the same as the outer diameter of the body portion 7a, and the large diameter portion 7b is sequentially connected with the large diameter portion 7b facing downward. Further, mounting pieces 7c having mounting holes 7d are provided at both ends of the trunk pipe 7.
Is fixed by protruding outward from both sides. Therefore, as shown in FIG. 10 (a), the two mounting pieces 7c are butted against each other, and the upper end portion of the lower main body portion 7a is placed in the upper large diameter portion 7b as shown in FIG. 10 (b). And the mounting holes 7c are overlapped with each other,
Since d matches, the upper and lower trunk pipes 7 are connected in a communicating state by inserting a bolt (not shown) into the fitted mounting hole 7d and screwing a nut (not shown) into place.

【0034】なお、回転軸9の接続については、図示し
ていないが、接続すべき回転軸9を、対向する各端部に
設けた雄ねじと雌ねじの結合により仮接続したのちに、
頭部が外部に突出しない固定ピンを、回転軸9の側方か
ら挿入して互いに固定する手段を用いる。このような接
続手段を用いるのは、吸引パイプ8や高圧水パイプ10
のトランクパイプ7への挿入および抜き出しに際して、
吸引パイプ8と高圧水パイプ10の下端に固着したベー
ス部材41を回転軸9の外面に摺動させる必要があるの
で、回転軸9の外面に部材を突出させることができない
ためである。
Although the rotation shaft 9 is not shown in the drawing, the rotation shaft 9 to be connected is temporarily connected by coupling male and female screws provided at opposite ends, and
A means for inserting fixing pins whose head does not project to the outside from the side of the rotary shaft 9 and fixing them to each other is used. Such connecting means is used for the suction pipe 8 and the high pressure water pipe 10.
When inserting into and removing from the trunk pipe 7,
This is because the base member 41 fixed to the lower ends of the suction pipe 8 and the high-pressure water pipe 10 needs to be slid on the outer surface of the rotating shaft 9, so that the member cannot be projected on the outer surface of the rotating shaft 9.

【0035】ところで、地下壁体2の厚さは両方のガイ
ド壁1,1の間隔により決定され、一方、掘削孔47の
幅は回転ビット40の最大半径rと配置間隔とにより決
定される。したがって、壁体2の厚さよりも小さな幅と
ならない掘削孔47を形成しようとすれば、図7に明示
するように、回転ビット40の最大半径rの2倍2r
を、構築すべき壁体2の厚さTよりも大きくし、かつ、
隣接する回転ビット40を、これらによる掘削範囲が一
部で重なるよう配置しなければならない。そのため、掘
削孔47は地下壁体2の両側にはみ出した状態に余分に
形成されることになり、地下壁体2と掘削孔47との間
に空間が生じる。
By the way, the thickness of the underground wall body 2 is determined by the distance between the two guide walls 1, 1, while the width of the drill hole 47 is determined by the maximum radius r of the rotary bit 40 and the arrangement distance. Therefore, if it is attempted to form the excavation hole 47 having a width smaller than the thickness of the wall body 2, as clearly shown in FIG.
Is greater than the thickness T of the wall 2 to be constructed, and
Adjacent rotary bits 40 must be arranged so that the excavation areas by them partially overlap. Therefore, the excavation hole 47 is additionally formed in a state of protruding to both sides of the underground wall body 2, and a space is created between the underground wall body 2 and the excavation hole 47.

【0036】そこで、図5に示すように、シュー34
に、壁体2と掘削孔47との空間の下端部を閉塞するダ
ンパー45を回転自在に取り付ける。このダンパー45
は、壁体2が掘削穴47内に沈降する際に、掘削穴47
の側面に擦れて自動的に回動され、2点鎖線の開放状態
から実線の閉塞状態となる。そののちに、図2の保圧剤
供給プラント32から供給管48を介して供給される保
圧剤49が、図5の仮設土間3とガイド壁1との間から
壁体2と掘削孔47との空間に注入される。この保圧剤
49としては、たとえば粘土を水に溶かしたベントナイ
トが用いられ、空間に充満した保圧剤49によって掘削
穴47の側面の土砂の崩壊を防止する。
Therefore, as shown in FIG.
A damper 45, which closes the lower end of the space between the wall 2 and the excavation hole 47, is rotatably attached to the. This damper 45
When the wall body 2 sinks into the excavation hole 47,
It is automatically rotated by rubbing against the side surface of the solid line from the open state of the two-dot chain line to the closed state of the solid line. After that, the pressure-holding agent 49 supplied from the pressure-holding agent supply plant 32 of FIG. 2 via the supply pipe 48 is transferred from the space between the temporary earth 3 and the guide wall 1 of FIG. Is injected into the space with. As the pressure-holding agent 49, for example, bentonite in which clay is dissolved in water is used, and the pressure-holding agent 49 filling the space prevents the collapse of the soil on the side surface of the excavation hole 47.

【0037】また、上述のように、隣接する回転ビット
40は、これらによる掘削範囲が一部で重なるよう配置
されるので、トランスミッション50内の駆動機構によ
って互いに衝突しないよう回転制御される。すなわち、
駆動用モータ11は一定時間、たとえば30秒毎に正,
逆方向に交互に回転方向を変えて回転するよう駆動制御
されており、この駆動用モータ11の回転は、一つのト
ランクパイプ7内の2本の回転軸9に対して一定時間ご
とに交互に互いに異なる方向に回転させるよう伝達され
る。この隣接する2本の回転軸9を互いに異なる方向に
回転させる理由は、もし同一方向に回転させると、両回
転軸9を完全に同期させる精密な制御が必要になるから
である。つぎに、このトランスミッション50の駆動機
構について図11を参照しながら説明する。
Further, as described above, since the adjacent rotary bits 40 are arranged so that the excavation ranges by them partially overlap, the rotation mechanism is controlled by the drive mechanism in the transmission 50 so as not to collide with each other. That is,
The drive motor 11 is positive at a fixed time, for example, every 30 seconds,
The drive control is performed so that the rotation direction is alternately changed to the opposite direction, and the rotation of the drive motor 11 is alternately performed with respect to the two rotation shafts 9 in one trunk pipe 7 at regular intervals. It is transmitted to rotate in different directions. The reason why the two adjacent rotary shafts 9 are rotated in mutually different directions is that if they are rotated in the same direction, precise control for completely synchronizing both rotary shafts 9 is required. Next, the drive mechanism of the transmission 50 will be described with reference to FIG.

【0038】図11(a)はトランスミッション50の
内部構造を示す正面図で、(b)は(a)のB−B線断
面図、(c)は(a)のC−C線断面図である。これら
の図において、上記回転軸9には、図5の駆動用モータ
11からチェーン15および伝動軸12を介して回転力
を受けるために、図9(a)に示す軸方向の歯部9aが
上端部周面に形成されている。伝動軸12の回転は、伝
動軸12に同心状に固定された駆動用笠歯車51から受
動用笠歯車52に伝達され、この笠歯車52と一体回転
する第1の平歯車53、および第2の平歯車54を介し
て、回転軸9に噛み合う第3の平歯車55に伝達され
る。それにより、回転軸9は伝動軸12の回転力を受け
て高速回転される。なお、伝動軸12は駆動用モータ1
1により一定時間(たとえば30秒)毎に正,逆方向に
交互に回転されるが、両笠歯車51,52は、その歯形
がラチェット形状に形成されて、伝動軸12が一方向に
回転する時のみ噛み合って一体回転し、かつ他方向に回
転するときには空回りする。スプリング58は受動用笠
歯車52が空回りするときに、この歯車52が軸方向に
退避するのを許すためのもである。
FIG. 11A is a front view showing the internal structure of the transmission 50, FIG. 11B is a sectional view taken along line BB of FIG. 11A, and FIG. 11C is a sectional view taken along line CC of FIG. is there. In these figures, the rotating shaft 9 is provided with an axial tooth portion 9a shown in FIG. 9 (a) in order to receive a rotational force from the drive motor 11 of FIG. 5 via the chain 15 and the transmission shaft 12. It is formed on the peripheral surface of the upper end portion. The rotation of the transmission shaft 12 is transmitted from the driving bevel gear 51 concentrically fixed to the transmission shaft 12 to the passive bevel gear 52, and the first spur gear 53 and the second spur gear 53 that rotate integrally with the bevel gear 52. Is transmitted to the third spur gear 55 that meshes with the rotating shaft 9 via the spur gear 54 of. As a result, the rotating shaft 9 is rotated at high speed by receiving the rotating force of the transmission shaft 12. The transmission shaft 12 is the drive motor 1
1, the toothed shape of both bevel gears 51 and 52 is formed in a ratchet shape, and the transmission shaft 12 rotates in one direction. It meshes only when it rotates and rotates integrally, and when it rotates in the other direction, it idles. The spring 58 also serves to allow the gear 52 to retract in the axial direction when the passive bevel gear 52 spins.

【0039】上記トランスミッション50には、固い岩
盤を掘削する場合に、回転ビット40を上下に振動させ
ながら回転させるための機構が、上述の回転軸9の駆動
機構と共に設けられているので、この構成について説明
する。伝動軸12の回転は、この伝動軸12に同心状に
固定された第4の平歯車59から減速用の第5の平歯車
60に伝達され、この第5の平歯車60と一体回転する
小径の第6の平歯車61が、楕円形状のカムローラ63
と一体回転するよう設けられた第7の平歯車62に噛み
合っている。また、第7の平歯車62の回転は、同一径
の第8および第9の平歯車64,67を介して、第7の
平歯車62と同一径の第10の平歯車68に伝達され、
この平歯車68が第7の平歯車62と同一速度で回転す
る。この第10の平歯車68には上記カムローラ63と
同一のカムローラ69が同軸に設けられている。すなわ
ち、一対のカムローラ63,69が伝動軸12の回転を
受けて同一回転数で回転するようになっている。
The transmission 50 is provided with a mechanism for rotating the rotary bit 40 while vertically vibrating it when excavating a solid rock together with the drive mechanism for the rotary shaft 9 described above. Will be described. The rotation of the transmission shaft 12 is transmitted from a fourth spur gear 59 concentrically fixed to the transmission shaft 12 to a fifth spur gear 60 for speed reduction, and a small diameter which rotates integrally with the fifth spur gear 60. The sixth spur gear 61 is an elliptical cam roller 63.
Meshes with a seventh spur gear 62 provided so as to rotate integrally therewith. The rotation of the seventh spur gear 62 is transmitted to the tenth spur gear 68 having the same diameter as the seventh spur gear 62 via the eighth and ninth spur gears 64 and 67 having the same diameter,
The spur gear 68 rotates at the same speed as the seventh spur gear 62. A cam roller 69, which is the same as the cam roller 63, is coaxially provided on the tenth spur gear 68. In other words, the pair of cam rollers 63, 69 receives the rotation of the transmission shaft 12 and rotates at the same rotational speed.

【0040】一方、両カムローラ63,69の下方には
振動板70が上下動自在に保持された状態で配置されて
おり、この振動板70にはその下面に一対の受動ローラ
71が設けられている。両受動ローラ71の上面部は、
振動板70の連通孔(図示せず)を通じて振動板70の
上面側に突出されているとともに、振動板70とミッシ
ョンケースCSとの間に設けられて振動板70を上方に
付勢するスプリング72により、対応するカムローラ6
3,69に押し付けられている。それにより、振動板7
0はカムローラ63,69の回転を受動ローラ71で受
けて上下方向に振動する。また、振動板70の下面に
は、円形のグリップローラ73と楕円形のグリップロー
ラ74とが回転軸9の両側に位置して回転自在に取付ら
れている。円形のグリップローラ73は常に回転軸9の
歯部9aに接触しているが、楕円形のグリップローラ7
4は、回転したときに間欠的に回転軸9の歯部9aに接
触する。
On the other hand, a vibrating plate 70 is arranged below both cam rollers 63 and 69 in a state of being held so as to be vertically movable. The vibrating plate 70 is provided with a pair of passive rollers 71 on its lower surface. There is. The upper surface of both passive rollers 71 is
A spring 72 that protrudes to the upper surface side of the diaphragm 70 through a communication hole (not shown) of the diaphragm 70 and that is provided between the diaphragm 70 and the mission case CS and urges the diaphragm 70 upward. The corresponding cam roller 6
It is pressed against 3,69. Thereby, the diaphragm 7
0 receives the rotation of the cam rollers 63 and 69 by the passive roller 71 and vibrates up and down. Further, a circular grip roller 73 and an elliptical grip roller 74 are rotatably attached to the lower surface of the vibration plate 70 so as to be located on both sides of the rotary shaft 9. Although the circular grip roller 73 is always in contact with the tooth portion 9a of the rotary shaft 9, the elliptical grip roller 7
4 contacts intermittently with the tooth part 9a of the rotating shaft 9 when rotating.

【0041】つぎに、両グリップローラ73,74に回
転力を伝達する機構について説明する。円形のグリップ
ローラ73は、回転軸9に噛み合った第3の平歯車55
と同軸に設けられ、回転軸9に対し常時接触して同一回
転されている。一方、伝動軸12の回転は、第11の平
歯車77、これと同軸に設けられた小径の第12の歯車
78、第13の平歯車79、これと同軸に設けられた小
径の第14の平歯車80、第15の平歯車81、これと
同軸に設けられた小径の第16の歯車82、第17の歯
車83、第18の歯車84を介して減速されて第19の
歯車87に伝達され、この第19の歯車87に同軸に設
けられた楕円形のグリップローラ74が低速回転され
る。
Next, a mechanism for transmitting the rotational force to both grip rollers 73, 74 will be described. The circular grip roller 73 includes a third spur gear 55 that meshes with the rotary shaft 9.
It is provided coaxially with and is always in contact with the rotating shaft 9 and is rotated in the same direction. On the other hand, the rotation of the transmission shaft 12 is caused by rotation of the eleventh spur gear 77, a small diameter twelfth gear 78 coaxially provided therewith, a thirteenth spur gear 79, and a small diameter fourteenth gear coaxially provided therewith. The spur gear 80, the fifteenth spur gear 81, the small-diameter sixteenth gear 82, the seventeenth gear 83, and the eighteenth gear 84 provided coaxially therewith are decelerated and transmitted to the nineteenth gear 87. Then, the elliptical grip roller 74 provided coaxially with the nineteenth gear 87 is rotated at a low speed.

【0042】したがって、低速回転する楕円形のグリッ
プローラ74は一回転する間に回転軸9に2回接触し、
そのときに、回転軸9に常時接触して回転している円形
のグリップローラ73と共に回転軸9を両側から挟みつ
ける。それにより、振動板70の上下振動力が両グリッ
プローラ73,74により回転軸9に伝達され、回転軸
9が回転ビット40と共に周期的に上下振動される。こ
こで、第3の平歯車55および第19の平歯車87の回
転軸92,93は、図11(c)に示すように、断面十
字形状に形成されて、対応するグリップローラ73,7
4の受軸94,97に対し一体回転し、かつ軸方向に摺
動自在に係合しているので、上下動するグリップローラ
73,74に対し対応する平歯車55,87の回転を支
障なく伝達できる。この回転軸9の振動は、上述のよう
に、固い岩盤を掘削する場合にのみ行われる。柔らかい
地盤の場合には、図11(b)の切換ハンドル98を操
作し、第5の平歯車60を変位させて第4の平歯車54
との噛み合いを解除し、伝動軸12の回転がグリップロ
ーラ74に伝達されないようにする。
Therefore, the elliptical grip roller 74 rotating at a low speed contacts the rotating shaft 9 twice during one rotation,
At that time, the rotary shaft 9 is sandwiched from both sides together with the circular grip roller 73 which is always in contact with the rotary shaft 9 and is rotating. As a result, the vertical vibration force of the vibration plate 70 is transmitted to the rotary shaft 9 by both grip rollers 73 and 74, and the rotary shaft 9 is periodically vertically vibrated together with the rotary bit 40. Here, the rotating shafts 92 and 93 of the third spur gear 55 and the nineteenth spur gear 87 are formed in a cross shape in cross section as shown in FIG.
Since it rotates integrally with the four receiving shafts 94 and 97 and is slidably engaged in the axial direction, the rotation of the spur gears 55 and 87 corresponding to the vertically moving grip rollers 73 and 74 is not hindered. Can communicate. The vibration of the rotating shaft 9 is performed only when excavating a solid rock as described above. In the case of soft ground, the switching handle 98 of FIG. 11B is operated to displace the fifth spur gear 60 to move the fourth spur gear 54.
And the rotation of the transmission shaft 12 is prevented from being transmitted to the grip roller 74.

【0043】また、図11(a)の第1の平歯車53と
同軸に設けられた小径の第20の平歯車88に大径の第
21の平歯車89が噛み合っている。回転変更用ハンド
ル90を操作すると、第3の平歯車55は、回転軸9に
噛み合った状態を保持しながら矢印で示すように移動し
て、第1の平歯車54から離脱して第21の平歯車89
に噛み合い、伝動軸12から回転軸9に回転を伝達する
歯車機構のギヤ比が変えられる。このギヤ比は、掘削穴
47を掘る地盤の土質に応じて適宜設定できるようにな
っている。
A large-diameter 21st spur gear 89 meshes with a small-diameter 20th spur gear 88 provided coaxially with the first spur gear 53 of FIG. 11A. When the rotation changing handle 90 is operated, the third spur gear 55 moves as indicated by the arrow while maintaining the state of meshing with the rotating shaft 9, and is disengaged from the first spur gear 54 to move to the 21st spur gear. Spur gear 89
The gear ratio of the gear mechanism that meshes with the gear mechanism for transmitting rotation from the transmission shaft 12 to the rotary shaft 9 can be changed. This gear ratio can be appropriately set according to the soil quality of the ground where the excavation hole 47 is dug.

【0044】また、図1のコントロールタワー30で
は、大きな平面矩形状に構築されていく壁体2の全体が
ほぼ均等に沈降されていくように種々の制御が行われ
る。壁体2の沈降に際しては、壁体2の重量と衝撃力の
和が、壁体2に作用する浮力と摩擦力および下端に受け
る半力との和とがほぼ等しくなるようにバランスを保ち
ながら、壁体2の全体を、例えば0.2m/hのゆっく
りした速度で徐々に沈降させるよう制御する。上記の壁
体2への衝撃力としては、たとえば上述の回転ビット4
0に与える上下振動などである。壁体2にはガイド壁1
および掘削穴47の穴壁により摩擦力が作用するが、そ
の他に、図5および図6に示すように、ガイド壁1に設
けた摩擦力調整ハンドル99を回転操作してねじ棒99
aを進退させ、このねじ棒99aの先端による壁体2へ
の押圧力、つまり摩擦力を調節できるようになってい
る。壁体2の沈降速度は、掘削能力、作業所要時間およ
び生コンクリートの硬化時間など考慮して決定される。
Further, in the control tower 30 of FIG. 1, various controls are performed so that the entire wall body 2 constructed in a large flat rectangular shape is settled down substantially uniformly. When the wall body 2 sinks, the balance of the weight and impact force of the wall body 2 is maintained so that the sum of the buoyant force acting on the wall body 2, the frictional force, and the half force received at the lower end becomes substantially equal. The entire wall body 2 is controlled so as to gradually settle at a slow speed of 0.2 m / h, for example. The impact force on the wall 2 is, for example, the above-mentioned rotary bit 4
Vertical vibration given to 0. The wall 2 has a guide wall 1
Further, the frictional force acts on the hole wall of the excavation hole 47. In addition, as shown in FIGS. 5 and 6, the frictional force adjusting handle 99 provided on the guide wall 1 is rotated to operate the screw rod 99.
It is possible to adjust the pressing force applied to the wall 2 by the tip of the screw rod 99a, that is, the frictional force, by advancing and retracting a. The sedimentation speed of the wall body 2 is determined in consideration of the excavation capacity, the required work time, the setting time of the ready-mixed concrete, and the like.

【0045】さらに、コントロールタワー30での壁体
2の沈降制御について詳述する。沈降制御のためのデー
タとしては、回転ビット40の負荷に相当する駆動用モ
ータ11の電流値や深度計の測定値などを用いる他に、
図5に示すように、軸力計100を鉄筋38の中途に結
束して取り付けるとともに、この軸力計100のコード
線101を外部に引き出して測定器(図示せず)に接続
し、測定器で得た測定値を用いる。ここで、壁体2に
は、地盤の固さに応じて上方への押し上げ力が作用する
ので、上記測定器の測定値は、壁体2の内部応力、つま
り地盤の固さのデータとなる。
Further, the sinking control of the wall 2 in the control tower 30 will be described in detail. As the data for sedimentation control, in addition to using the current value of the drive motor 11 corresponding to the load of the rotary bit 40, the measurement value of the depth gauge, and the like,
As shown in FIG. 5, the axial force meter 100 is bound and attached in the middle of the reinforcing bar 38, and the cord wire 101 of the axial force meter 100 is pulled out to be connected to a measuring instrument (not shown). Use the measurement value obtained in. Here, since the pushing force to the upper direction acts on the wall 2 in accordance with the hardness of the ground, the measured value of the above measuring device becomes the internal stress of the wall 2, that is, the data of the hardness of the ground. .

【0046】そして、地盤が柔らかい土質であるなどの
条件により壁体2の沈降速度を抑制したい場合には、
(a)摩擦力調整ハンドル99を操作してねじ棒99a
を壁体2へ強く押し付ける、(b)壁体2の沈降の大き
い箇所に設置されている駆動用モータ11、高圧ポンプ
13またはバキュームポンプ17をそれぞれ、回転ビッ
ト40の回転数、高圧水の噴射水量または泥水の吸引量
がそれぞれ低下するよう設定するか、あるいはそれらの
運転を一時停止する、(c)回転ビット40を幅D1の
小さいものに交換する、などの手段を用いる。なお、幅
D1の狭い回転ビット40を用いるのは、図7に示した
掘削穴47と壁体2との空間を小さくして、土砂の壁体
2に作用する摩擦力を、接触面積S1の増大分だけ大き
くするためである。
When it is desired to suppress the sedimentation velocity of the wall 2 under the condition that the ground is soft soil, etc.,
(A) Operate the friction force adjustment handle 99 to operate the screw rod 99a.
(B) The drive motor 11, the high-pressure pump 13 or the vacuum pump 17 installed at a location where the sinking of the wall 2 is large, respectively. The amount of water or the amount of suction of muddy water is set to decrease, or the operation thereof is temporarily stopped, or (c) the rotating bit 40 is replaced with a small one having a width D1. The use of the rotating bit 40 having a narrow width D1 reduces the space between the excavation hole 47 and the wall body 2 shown in FIG. 7 to reduce the frictional force acting on the earth and sand wall body 2 to the contact area S1. This is because the increase is increased.

【0047】一方、固い地盤などの条件により壁体2の
沈降速度を促進したい場合には、上記(a)〜(c)の
手段を上述とは逆に設定する他に、図5の回転ビット4
0の上下振動や保圧剤49の液面の低下などを行う。こ
の保圧剤49の液面を低下させると、壁体2が保圧剤4
9から受ける浮力が低下して壁体2が沈降し易くなる。
また、壁体2の沈降を促進したい箇所のバキュームポン
プ17のみを局部的に運転して、泥水による壁体2への
押し上げ力を低下させる手段を用いることもできる。
On the other hand, when it is desired to accelerate the settling speed of the wall body 2 under conditions such as hard ground, the above-mentioned means (a) to (c) are set in the reverse order to the above, and the rotating bit of FIG. Four
The vertical vibration of 0 and the liquid level of the pressure-holding agent 49 are reduced. When the liquid surface of the pressure-holding agent 49 is lowered, the wall body 2 moves to the pressure-holding agent 4
The buoyancy received from 9 decreases and the wall 2 easily sinks.
It is also possible to use a means for locally operating only the vacuum pump 17 at a position where it is desired to promote the sedimentation of the wall 2 to reduce the pushing force of the muddy water onto the wall 2.

【0048】また、壁体2が障害物に当たって沈降が停
止したときには、トランクパイプ7の上部に補強用鉄板
を取り付け、バイブロハンマーを用いて前記補強用鉄板
を振動させることにより、壁体2に局部的に振動を与え
て沈降を促進する。吸引パイプ8内の泥水による詰まり
を防止するためには、掘削土質や掘削深度などに応じて
噴射ノズル41eからの高圧水の噴射水量を加減して、
泥水を作る水と土砂の混合比を調節する。たとえば、吸
引パイプ8が詰まり易い場合には高圧水の噴射水量を増
大する。さらに、壁体2の沈降を促進するための上述の
何れの手段を用いても壁体2の沈降が不可能となった場
合には、上から別の破砕棒を挿入して壁体2の下方の地
盤を破砕する。壁体2が全体的に沈降不可能になったと
き、壁体2で囲まれた内方地盤を別途、ショベルカーな
どで掘削する。このとき、対向する壁体2にH型鋼のよ
うな切り梁を架け渡して内方に倒れないよう補強する。
When the wall 2 hits an obstacle and the sedimentation is stopped, a reinforcing iron plate is attached to the upper part of the trunk pipe 7 and the vibrating hammer is used to vibrate the reinforcing iron plate so that the wall 2 is locally localized. Vibration is applied to accelerate sedimentation. In order to prevent clogging of the suction pipe 8 due to muddy water, the amount of high-pressure water jetted from the jet nozzle 41e is adjusted according to excavation soil quality, excavation depth, etc.
Adjust the mixing ratio of water and sediment to make muddy water. For example, if the suction pipe 8 is easily clogged, the amount of high-pressure water sprayed is increased. Further, when the wall body 2 cannot be settled by using any of the above-described means for promoting the settling of the wall body 2, another crushing rod is inserted from above to insert the crushing rod into the wall body 2. Crush the ground below. When the wall body 2 cannot be settled as a whole, the inner ground surrounded by the wall body 2 is separately excavated by a shovel car or the like. At this time, a cut beam such as an H-shaped steel is laid across the opposing wall body 2 to reinforce it so that it does not fall inward.

【0049】上述のように、回転ビット40の回転によ
る掘削穴47の掘削作業と、トランクパイプ7の外面側
と両ガイド壁1,1との間への生コンクリートの打設作
業と、この生コンクリートが固まってできた壁体2の地
中への沈降とを継続的に行うことによって、図4(e)
に示すように、地下壁体2が地中の所定深さまで構築さ
れると、駆動用モータ11および高圧水ポンプ13の運
転を停止する。そして、(f)に示すように、バキュー
ムポンプ17(図1)のみを部分的に運転して、壁体2
の下端と地盤との間に存在するスライム(残土などの堀
りかす)を吸引パイプ8により吸い上げて排出する。
As described above, the excavation work of the excavation hole 47 by the rotation of the rotary bit 40, the placing work of the fresh concrete between the outer surface side of the trunk pipe 7 and both the guide walls 1, 1 and the raw work. By continuously performing the settling of the wall body 2 formed by solidifying concrete into the ground, FIG.
As shown in, when the underground wall 2 is built to a predetermined depth in the ground, the driving motor 11 and the high-pressure water pump 13 are stopped. Then, as shown in (f), only the vacuum pump 17 (FIG. 1) is partially operated, and the wall 2
The slime (a ditch such as residual soil) existing between the lower end of the ground and the ground is sucked up by the suction pipe 8 and discharged.

【0050】上記スライム処理が終了すると、例えば1
0本おきのトランクパイプ7から、図6の吸引パイプ8
および高圧水パイプ10をこれらの下端に固着したベー
ス部材41と共に引き上げたのちに、回転軸9をこの下
端の回転ビット40と共に引き上げる。この空になった
トランクパイプ7内に、図4(g)に示すように、コン
クリート供給管102を挿通させて、コンクリート圧送
管28からコンクリート供給管102を介してトランク
パイプ7および壁体2と地盤との空間にサポートコンク
リート103を打設する。このサポートコンクリート1
03は壁体2の仮支持用の部材として機能する。
When the slime process is completed, for example, 1
Every 0 trunk pipes 7 to the suction pipe 8 of FIG.
After the high-pressure water pipe 10 is pulled up together with the base member 41 fixed to these lower ends, the rotary shaft 9 is pulled up together with the rotary bit 40 at the lower end. As shown in FIG. 4 (g), the concrete supply pipe 102 is inserted into the empty trunk pipe 7 so that the trunk pipe 7 and the wall body 2 are separated from the concrete pressure pipe 28 through the concrete supply pipe 102. Support concrete 103 is placed in the space with the ground. This support concrete 1
03 functions as a member for temporarily supporting the wall body 2.

【0051】なお、上述の吸引パイプ8、高圧水パイプ
10、ベース部材41および回転軸40をトランクパイ
プ7から引き抜く場合、先ず、図8のベース部材41の
両側の軸受用切欠き41gを回転軸40に摺動させなが
ら吸引パイプ8および高圧水パイプ10をトランクパイ
プ7から引き抜き、いずれか一方の回転軸9を、図9
(c)に矢印で示すように、回転ビット41をトランク
パイプ7の中央部に寄せてから引き上げ、他方の回転軸
9を同様にして引き上げる手順で行う。
When the suction pipe 8, the high-pressure water pipe 10, the base member 41 and the rotary shaft 40 are pulled out from the trunk pipe 7, first, the bearing notches 41g on both sides of the base member 41 shown in FIG. The suction pipe 8 and the high-pressure water pipe 10 are pulled out from the trunk pipe 7 while sliding on 40, and one of the rotary shafts 9 is moved to the position shown in FIG.
As indicated by the arrow in (c), the rotary bit 41 is moved to the center of the trunk pipe 7 and then pulled up, and the other rotary shaft 9 is similarly pulled up.

【0052】残りのすべてのトランクパイプ7から吸引
パイプ8、高圧水パイプ10、ベーズ部材41および回
転軸40を引き抜いて、同様の手順で、図4(h)に示
すように、根固めコンクリート103Aを打設し、地下
壁体2の構築が完了する。そののちに、作業足場4やガ
イド壁を解体し、地下壁体2で囲まれた内部の掘削作業
を行う。この掘削作業は、止水と土砂崩れの完全な防止
機能を有する地下壁体2の完了後に行うので、全体の施
工性が格段に向上する。
The suction pipe 8, the high-pressure water pipe 10, the baze member 41 and the rotary shaft 40 are pulled out from all the remaining trunk pipes 7 and, in the same manner as shown in FIG. And the construction of the underground wall 2 is completed. After that, the work scaffold 4 and the guide wall are disassembled, and excavation work inside the underground wall body 2 is performed. Since this excavation work is performed after completion of the underground wall body 2 having a function of completely stopping water and preventing landslides, the overall workability is significantly improved.

【0053】また、上記の地下壁体2の構築法は、従来
工法のような杭打ち作業や大型の重機が不要であること
から、狭隘な敷地への地下壁体2の構築、または大口径
の杭や橋脚などの工事に利用することが可能である。さ
らに、図12に示すように、止水工事無しで行う水上ス
テージ104からの水中壁107の施工や、図13に示
すように、推進用ジャッキを併用しての比較的短いトン
ネルの施工にも利用することが可能である。
In addition, since the above-mentioned construction method of the underground wall body 2 does not require pile driving work and large heavy equipment unlike the conventional construction method, the construction of the underground wall body 2 on a narrow site or a large diameter It can be used for construction work such as piles and bridge piers. Further, as shown in FIG. 12, for construction of the underwater wall 107 from the water stage 104 without water stop construction, and for construction of a relatively short tunnel using a jack for propulsion as shown in FIG. It is possible to use.

【0054】すなわち、水中壁107の施工では、図1
2(a)に示すように、水上ステージ104上に上記実
施例と同様のガイド壁1を設けて、このガイド壁1間に
流し込んだ生コンクリートが固まってから、このコンク
リート壁を懸垂装置109で吊り下げながら水中に徐々
に沈降させていき、回転ビット40が海底などの地盤に
当たった時点で回転ビット40を回転させて、地盤を掘
削しながらコンクリート壁を地中に進入させ、止水機能
を有する水中壁107を構築する。
That is, in the construction of the underwater wall 107, as shown in FIG.
As shown in FIG. 2 (a), a guide wall 1 similar to that in the above-described embodiment is provided on the water stage 104, and after the raw concrete poured between the guide walls 1 is solidified, the concrete wall is suspended by the suspension device 109. Gradually settle in the water while suspending, and when the rotary bit 40 hits the ground such as the seabed, rotate the rotary bit 40 to allow the concrete wall to enter the ground while excavating the ground, and the water stopping function. Construct an underwater wall 107 having

【0055】一方、トンネルの施工に当たっては、トン
ネルを掘る箇所に大きめの環状のガイド壁110を構築
し、このガイド壁110内に型枠状のガイド体111を
周囲に空間を存して配置し、この環状の空間内に、前述
と同様の吸引パイプ、回転軸および高圧水パイプを収納
した複数のトランクパイプ7を所定の間隔で挿入する。
そして、回転ビット40を回転させて掘削しながら、ト
ランクパイプ7の外側であってガイド壁110とガイド
体111との空間内に生コンクリートを流し込み、この
生コンクリートが固まってできた大きな筒状の壁体2
を、補強部材112を介して推進用ジャッキ108で押
圧して掘削穴内に水平に進入させていく。この工法は、
ビルディング間の地下道のような比較的距離の短いトン
ネルの掘削工法として好適である。
On the other hand, when constructing a tunnel, a large annular guide wall 110 is constructed at the place where the tunnel is to be dug, and a formwork-shaped guide body 111 is arranged in the guide wall 110 with a space around it. A plurality of trunk pipes 7 accommodating the suction pipe, the rotary shaft, and the high-pressure water pipe similar to those described above are inserted into the annular space at predetermined intervals.
Then, while rotating the rotary bit 40 to excavate, fresh concrete is poured into the space between the guide wall 110 and the guide body 111 outside the trunk pipe 7, and the raw concrete is solidified into a large cylindrical shape. Wall 2
Is pushed by the jack 108 for propulsion through the reinforcing member 112 to horizontally enter the excavation hole. This method is
It is suitable as an excavation method for tunnels with a relatively short distance such as underpasses between buildings.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の地下壁体の構築法の実施に係る工事現
場のイメージを示す一部切断した概略斜視図である。
FIG. 1 is a partially cutaway schematic perspective view showing an image of a construction site relating to implementation of a method for constructing an underground wall body of the present invention.

【図2】同上の工事現場の全体を示す概略平面図であ
る。
FIG. 2 is a schematic plan view showing the entire construction site of the above.

【図3】本発明の地下壁体の構築法の一実施例に係る前
半の工程図で、(a)は仮設土間の構築工程、(b)は
種々の建設部材の設定工程、(c)は運転開始工程、
(d)は構築中間工程である。
FIG. 3 is a process diagram of the first half according to an embodiment of a method for constructing an underground wall body of the present invention, where (a) is a construction process between temporary soils, (b) is a setting process of various construction members, and (c). Is the start-up process,
(D) is an intermediate construction process.

【図4】同上に続く後半の工程図で、(e)は地下壁体
の構築完了状態、(f)はスライム処理工程、(g)は
サポートコンクリートの打設工程、(h)は工事完了状
態である。
FIG. 4 is a process diagram of the latter half of the above, in which (e) is a completed state of the underground wall, (f) is a slime treatment process, (g) is a support concrete placing process, and (h) is construction completion. It is in a state.

【図5】同上における構築中間工程の詳細を示す要部の
縦断正面図である。
FIG. 5 is a vertical cross-sectional front view of essential parts showing details of the intermediate construction process in the above.

【図6】同上の要部の一部破断した側面図であるFIG. 6 is a partially cutaway side view of the main part of the above.

【図7】図6のA−A線断面図である。FIG. 7 is a sectional view taken along line AA of FIG. 6;

【図8】図6の一部の拡大図である。FIG. 8 is an enlarged view of a portion of FIG.

【図9】(a)は図7の一部の拡大図、(b)は(a)
からベース部材を除去した状態の切断平面図、(c)は
(a)におけるベース部材の平面図である。
9 (a) is an enlarged view of a part of FIG. 7, and FIG. 9 (b) is (a).
FIG. 3C is a plan view of the base member in FIG. 3A in which the base member is removed from FIG.

【図10】同上の地下壁体の構築法に用いるトランクパ
イプの接続を示し、(a)は接続前の正面図、(b)は
接続状態の縦断面図である。
FIG. 10 shows a connection of a trunk pipe used in the method for constructing an underground wall body in the same as above, (a) is a front view before connection, and (b) is a longitudinal sectional view in a connected state.

【図11】(a)は図5のトランスミッションの内部構
造を示す正面図、(b)は(a)のB−B線断面図、
(c)は(a)のC−C線断面図である。
11A is a front view showing the internal structure of the transmission of FIG. 5, FIG. 11B is a sectional view taken along line BB of FIG.
(C) is the CC sectional view taken on the line (a).

【図12】本発明の地下壁体の構築法を水中壁の構築に
適用した場合を示し、(a )は運転開始状態の縦断面
図、(b)は施工完了状態の縦断面図である。
FIG. 12 shows a case where the method for constructing an underground wall body of the present invention is applied to the construction of an underwater wall, (a) is a longitudinal sectional view of an operation start state, and (b) is a longitudinal sectional view of a construction completed state. .

【図13】本発明の地下壁体の構築法をトンネルの構築
に適用した場合を示す縦断面図である。
FIG. 13 is a longitudinal sectional view showing a case where the method for constructing an underground wall body of the present invention is applied to construct a tunnel.

【符号の説明】[Explanation of symbols]

1…ガイド壁、2…地下壁体、7…トランクパイプ、8
…吸引パイプ、9…回転軸、10…高圧水パイプ、38
…鉄筋、40…回転ビット、41…ベース部材、41c
…吸引口、41e…噴射ノズル、47…掘削穴、49…
保圧剤、99…摩擦力調整ハンドル(沈降抑制部材)。
1 ... Guide wall, 2 ... Underground wall, 7 ... Trunk pipe, 8
... Suction pipe, 9 ... Rotating shaft, 10 ... High pressure water pipe, 38
... Reinforcing bar, 40 ... Rotating bit, 41 ... Base member, 41c
... Suction port, 41e ... Injection nozzle, 47 ... Drilling hole, 49 ...
Pressure-holding agent, 99 ... Friction force adjusting handle (sedimentation suppressing member).

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 地下にコンクリート造の壁体を構築する
工法であって、 地面に立設した相対向するガイド壁1,1の間に、回転
ビット40の回転軸9、地中に高圧水を噴射する噴射ノ
ズル41e、この噴射ノズル41eに高圧水を供給する
高圧水パイプ10、泥水を吸引する吸引口41c、およ
びこの吸引口41cからの泥水を吸い出す吸引パイプ8
を収納し、かつ、先端より回転ビット40を突出させた
1つ以上のトランクパイプ7を挿入し、 相対向する前記ガイド壁1,1の間における前記トラン
クパイプ7の外側にコンクリートを打設して壁体2を形
成し、 前記回転ビット40の回転、高圧水の噴射および泥水の
吸引を行って地面に掘削穴47を形成しながら前記トラ
ンクパイプ7を内蔵した壁体2を掘削穴47に進入させ
る地下壁体の構築法。
1. A method of constructing a concrete wall body underground, wherein a rotating shaft 9 of a rotating bit 40 and high-pressure water in the ground are provided between guide walls 1 and 1 standing upright on the ground. A jet nozzle 41e for jetting water, a high-pressure water pipe 10 for supplying high-pressure water to the jet nozzle 41e, a suction port 41c for sucking mud, and a suction pipe 8 for sucking mud from the suction port 41c.
, And one or more trunk pipes 7 with the rotary bit 40 protruding from the tip are inserted, and concrete is placed outside the trunk pipes 7 between the guide walls 1 and 1 facing each other. To form the wall body 2, and the rotation bit 40 is rotated, high-pressure water is jetted, and muddy water is sucked to form the excavation hole 47 on the ground, while the wall body 2 having the trunk pipe 7 built therein is formed in the excavation hole 47. How to construct an underground wall to enter.
【請求項2】 請求項1において、前記コンクリートに
鉄筋38を埋設する地下壁体の構築法。
2. The method for constructing an underground wall body according to claim 1, wherein a reinforcing bar 38 is embedded in the concrete.
【請求項3】 請求項1において、前記コンクリートと
掘削穴47の内面との間に掘削穴47の崩壊を防ぐ保圧
剤49を注入する地下壁体の構築法。
3. The method for constructing an underground wall body according to claim 1, wherein a pressure-holding agent 49 for preventing collapse of the excavation hole 47 is injected between the concrete and the inner surface of the excavation hole 47.
【請求項4】 請求項1において、掘削穴47は上下方
向に形成され、打設されたコンクリートをそれ自身の重
量により地中へ沈降させるように設定し、さらに、コン
クリートの側面に沈降抑制部材99aを摩擦接触させて
沈降速度を制御する地下壁体の構築法。
4. The excavation hole 47 according to claim 1, wherein the excavation hole 47 is formed in a vertical direction so that the cast concrete is settled into the ground due to its own weight. A method for constructing an underground wall body in which 99a is brought into frictional contact to control the sedimentation velocity.
【請求項5】 請求項1において、前記噴射ノズル41
eおよび吸引口41cを有するベース部材41と前記回
転軸9とを前記トランクパイプ7に着脱自在に取り付
け、 地下壁体2の構築後に、前記ベース部材41と、これに
連結された高圧水パイプ10および吸引パイプ8と、回
転軸9とを、トランクパイプ7から上方へ抜き出す地下
壁体の構築法。
5. The injection nozzle 41 according to claim 1,
e and a base member 41 having a suction port 41c and the rotating shaft 9 are detachably attached to the trunk pipe 7, and after the basement wall 2 is constructed, the base member 41 and the high-pressure water pipe 10 connected thereto. And the construction method of the underground wall body in which the suction pipe 8 and the rotating shaft 9 are extracted upward from the trunk pipe 7.
【請求項6】 地下に掘削穴47を形成する装置であっ
て、 先端から回転ビット40を突出させ、この回転ビット4
0の回転軸9、地中に高圧水を噴射する噴射ノズル41
e、この噴射ノズル41eに高圧水を供給する高圧水パ
イプ10、泥水を吸引する吸引口41c、および吸引口
41cからの泥水を吸い出す吸引パイプ8を収納したト
ランクパイプ7。
6. A device for forming an excavation hole 47 underground, wherein a rotary bit 40 is projected from the tip, and the rotary bit 4 is provided.
0 rotary shaft 9, jet nozzle 41 for jetting high-pressure water into the ground
e, a trunk pipe 7 containing a high-pressure water pipe 10 for supplying high-pressure water to the jet nozzle 41e, a suction port 41c for sucking muddy water, and a suction pipe 8 for sucking muddy water from the suction port 41c.
【請求項7】 請求項6において、さらに、前記噴射ノ
ズル41eおよび吸引口41cを有し、トランクパイプ
7内にその基端部から挿入および抜出しが可能で、先端
部に挿入されたとき、前記回転ビット40の回転軸9を
トランクパイプ7の中心寄りに変位しないようにトラン
パイプ7の壁面との間で保持するベース部材41を備え
たトランクパイプ。
7. The method according to claim 6, further comprising the injection nozzle 41e and the suction port 41c, which can be inserted into and removed from the trunk pipe 7 from its proximal end portion, and when inserted into the distal end portion, A trunk pipe provided with a base member 41 for holding the rotary shaft 9 of the rotary bit 40 between the rotary pipe 9 and the wall surface of the trans pipe 7 so as not to be displaced toward the center of the trunk pipe 7.
JP13839195A 1995-05-12 1995-05-12 Construction method of underground wall and trunk pipe used for it Expired - Fee Related JP3577360B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13839195A JP3577360B2 (en) 1995-05-12 1995-05-12 Construction method of underground wall and trunk pipe used for it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13839195A JP3577360B2 (en) 1995-05-12 1995-05-12 Construction method of underground wall and trunk pipe used for it

Publications (2)

Publication Number Publication Date
JPH08311893A true JPH08311893A (en) 1996-11-26
JP3577360B2 JP3577360B2 (en) 2004-10-13

Family

ID=15220853

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13839195A Expired - Fee Related JP3577360B2 (en) 1995-05-12 1995-05-12 Construction method of underground wall and trunk pipe used for it

Country Status (1)

Country Link
JP (1) JP3577360B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117145389A (en) * 2023-10-31 2023-12-01 山东港口烟台港集团有限公司 Foundation impact type drilling device for ocean engineering construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117145389A (en) * 2023-10-31 2023-12-01 山东港口烟台港集团有限公司 Foundation impact type drilling device for ocean engineering construction
CN117145389B (en) * 2023-10-31 2024-04-12 山东港口烟台港集团有限公司 Foundation impact type drilling device for ocean engineering construction

Also Published As

Publication number Publication date
JP3577360B2 (en) 2004-10-13

Similar Documents

Publication Publication Date Title
US4696607A (en) Slurry trench method and apparatus for constructing underground walls
EP0563472B1 (en) Excavator and methods of use thereof
US6485234B2 (en) Apparatus and method for making cylindrical columns
KR20080112453A (en) A ground improvement method of construction
JP5281213B1 (en) Core material and soil cement continuous wall method using the same
JP3577360B2 (en) Construction method of underground wall and trunk pipe used for it
JP4796197B2 (en) Ground improvement body construction apparatus and ground improvement body construction method
JP3158053U (en) Ground improvement body construction equipment
JP2576046B2 (en) Method of forming cured soil
JP3471742B2 (en) Continuous underground wall construction method
JPH06341140A (en) Construction method by which column-wall holes are bored within approximate line by 10-700mm from boundary by intermittent work and continuous wall, connection wall, butt-joint wall, superposed wall, and cut-off wall are erected by use of the hole, and these walls
JP2002371586A (en) Construction equipment for underground continuous wall
KR20160109395A (en) Agitating road for excavating using soil earth cement mixing method and mixing agitator using the same
JP2000104246A (en) Constructing method of erath retaining wall and tree- axle auger excavator used for its method
JP2001173351A (en) Excavation method and device
JPH0868047A (en) Method for forming soil hardened body
JP2021169749A (en) Ground improvement method of pile drawing hole
JPH08177078A (en) Construction of continuous earth retaining wall
JP4072019B2 (en) Drilling machine
KR100784159B1 (en) Cantilevered retaining cutting wall
JP2020084524A (en) Method for constructing underground structure
JPH0230807A (en) Execution of cast-in-place concrete piling work
JPH07113225B2 (en) Pillar pile excavator
JPH0633455A (en) Bearing pile formation method and device therefor
JPS60141920A (en) Method of constructing underground continuous wall

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040322

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040330

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040519

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040706

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040712

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090716

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090716

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100716

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100716

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110716

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120716

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130716

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees