JPH08246814A - Combined cycle generation plant using refuse incinerator - Google Patents

Combined cycle generation plant using refuse incinerator

Info

Publication number
JPH08246814A
JPH08246814A JP7047497A JP4749795A JPH08246814A JP H08246814 A JPH08246814 A JP H08246814A JP 7047497 A JP7047497 A JP 7047497A JP 4749795 A JP4749795 A JP 4749795A JP H08246814 A JPH08246814 A JP H08246814A
Authority
JP
Japan
Prior art keywords
steam
exhaust heat
turbine
refuse incinerator
recovery boiler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP7047497A
Other languages
Japanese (ja)
Other versions
JP3774487B2 (en
Inventor
Misao Kizaki
崎 操 鬼
Susumu Ozawa
澤 進 小
Takayuki Akihara
原 隆 幸 秋
Toshihisa Kiyokuni
國 寿 久 清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP04749795A priority Critical patent/JP3774487B2/en
Publication of JPH08246814A publication Critical patent/JPH08246814A/en
Application granted granted Critical
Publication of JP3774487B2 publication Critical patent/JP3774487B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/12Heat utilisation in combustion or incineration of waste
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/16Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
    • Y02P80/15On-site combined power, heat or cool generation or distribution, e.g. combined heat and power [CHP] supply

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

PURPOSE: To obtain a combined cycle generation plant which uses refuse incinerators and which can effectively use excessive steam at fluctuation of a steam rate, and containing operation of a steam turbine in starting and stopping the gas turbine CONSTITUTION: Steam generated by a refuse incinerator 1 is heated by an exhaust heat recovery boiler 2 using exhaust heat of a gas turbine, and supplied to a steam turbine 11. In such a combined cycle generation plant using a waste incinerator, a main steam inlet nozzle of the steam turbine 11 is divided into a high temperature steam inlet nozzle 26a and a low temperature steam inlet nozzle 26b. A main steam passage is branched into systems 25a, 25b respectively connected with the high temperature steam inlet nozzle and the low temperature steam inlet nozzle. Changeover valves 27a, 27b operated for supplying the steam to one of the two systems corresponding to the steam temperature are arranged on the main steam system.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、ごみ焼却炉で発生した
蒸気をガスタービンの排熱を利用する排熱回収ボイラで
加熱した後、蒸気タービンに供給するようにしたごみ焼
却炉利用コンバインドサイクル発電プラントに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a combined cycle using a refuse incinerator, in which steam generated in the refuse incinerator is heated by an exhaust heat recovery boiler utilizing exhaust heat of a gas turbine and then supplied to the steam turbine. Power generation plant.

【0002】[0002]

【従来の技術】一般に、ごみ焼却炉を利用した発電設備
では、清掃工場の所内電力を賄うことのみを目的として
計画されており、発電に使用する蒸気量以外の余剰蒸気
は蒸気タービンをバイパスさせ復水器などに回収するこ
とが行なわれており、ごみが有するエネルギーは必ずし
も有効利用されていない。
2. Description of the Related Art Generally, a power generation facility using a refuse incinerator is designed only to cover the electric power in a wastewater treatment plant. Excess steam other than the amount of steam used for power generation must bypass the steam turbine. Energy is collected in a condenser and other sources, and the energy contained in waste is not always effectively utilized.

【0003】しかしながら、近年の逼迫する電力需要に
対応するとともに二酸化炭素の排出量の抑制を目的と
し、大型分散型電源として蒸気量の全量を発電に利用し
たり、一歩進めてより高効率をめざして、ガスタービン
とその排熱を利用する排熱回収ボイラと蒸気タービン設
備をもつコンバインドサイクルプラントとすることが多
くなってきている。
However, for the purpose of responding to the recent tight power demand and suppressing the emission of carbon dioxide, the whole amount of steam is used for power generation as a large-scale distributed power source, or one step further is aimed at higher efficiency. As a result, a combined cycle plant including a gas turbine, an exhaust heat recovery boiler that uses the exhaust heat of the gas turbine, and a steam turbine facility has been increasingly used.

【0004】図12は、ごみ焼却炉1で発生した蒸気で
発電するようにしたプラントにガスタービンの排熱を利
用する排熱回収ボイラを組合わせたコンバインドサイク
ル発電プラントの概略系統図であって、上記ごみ焼却炉
1で発生した蒸気が排熱回収ボイラ2に供給されそこで
過熱されるようにしてある。
FIG. 12 is a schematic system diagram of a combined cycle power generation plant in which an exhaust heat recovery boiler for utilizing exhaust heat of a gas turbine is combined with a plant for generating electric power with steam generated in the refuse incinerator 1. The steam generated in the waste incinerator 1 is supplied to the exhaust heat recovery boiler 2 and superheated there.

【0005】すなわち、上記排熱回収ボイラ2にはガス
タービン3の排ガスダクト4が接続されており、ガスタ
ービン3の排ガスが上記排ガスダクト4を介して排熱回
収ボイラ2に供給されるとともに、排熱回収ボイラ2内
には節炭器5、蒸発器6、及び過熱器7が設けられ、そ
の過熱器7に上記ごみ焼却炉1の主蒸気管8が接続され
ている。
That is, an exhaust gas duct 4 of a gas turbine 3 is connected to the exhaust heat recovery boiler 2, and the exhaust gas of the gas turbine 3 is supplied to the exhaust heat recovery boiler 2 via the exhaust gas duct 4. A coal economizer 5, an evaporator 6, and a superheater 7 are provided in the exhaust heat recovery boiler 2, and the main steam pipe 8 of the refuse incinerator 1 is connected to the superheater 7.

【0006】しかして、ごみ焼却炉1で発生した蒸気
は、上記過熱器7でガスタービン3からの排ガスと熱交
換して過熱された後、主蒸気止め弁9及び蒸気加減弁1
0を経て蒸気タービン11に供給される。蒸気タービン
11に供給された蒸気はそこで仕事を行ない発電機12
を作動させ、一方蒸気タービン11で仕事を行なった蒸
気は復水器13で復水された後、復水ポンプ14及び給
水管15を介して前記ごみ焼却炉1に還流される。
The steam generated in the refuse incinerator 1 is heat-exchanged with the exhaust gas from the gas turbine 3 in the superheater 7 to be superheated, and then the main steam stop valve 9 and the steam control valve 1
It is supplied to the steam turbine 11 via 0. The steam supplied to the steam turbine 11 performs work there and the generator 12
On the other hand, the steam that has performed work in the steam turbine 11 is condensed in the condenser 13 and then returned to the waste incinerator 1 via the condensate pump 14 and the water supply pipe 15.

【0007】上記給水管15には復水ポンプ14の下流
側からボイラ給水管16が分岐導出されており、そのボ
イラ給水管15がボイラ給水ポンプ17を介して前記節
炭器5に接続されている。節炭器5には蒸気ドラム18
が接続されており、その蒸気ドラム18には蒸発器6が
接続され、循環ポンプ19によって蒸気ドラム18内の
給水が蒸発器6に供給されるようにしてある。
A boiler water supply pipe 16 is branched from the downstream side of the condensate pump 14 to the water supply pipe 15, and the boiler water supply pipe 15 is connected to the economizer 5 via a boiler water supply pump 17. There is. The steam drum 18 is installed in the economizer 5.
Is connected to the vapor drum 18, and the evaporator 6 is connected to the vapor drum 18. The circulating pump 19 supplies the feed water in the vapor drum 18 to the evaporator 6.

【0008】したがって、復水ポンプ14によって給水
管15に送給された給水の一部はボイラ給水管16を経
て節炭器5で予熱された後蒸気ドラム18に流入し、さ
らに蒸発器6で加熱される。そして、そこで発生した蒸
気が前記主蒸気管8内のごみ焼却炉1で発生した蒸気と
合流される。
Therefore, a part of the feed water fed to the feed pipe 15 by the condensate pump 14 is preheated in the economizer 5 through the boiler feed pipe 16 and then flows into the steam drum 18, and further in the evaporator 6. Be heated. Then, the steam generated there merges with the steam generated in the refuse incinerator 1 in the main steam pipe 8.

【0009】一方、前記主蒸気管8には主蒸気止め弁9
の上流側からタービンバイパス系20が分岐導出され、
減圧弁21及び減温器22を介して余剰蒸気を復水器1
3に放出するようにしてある。
On the other hand, a main steam stop valve 9 is attached to the main steam pipe 8.
Turbine bypass system 20 is branched from the upstream side of
Excess steam is condensed into the condenser 1 via the pressure reducing valve 21 and the temperature reducer 22.
It is designed to be released at 3.

【0010】ところで、上記ごみ焼却炉を利用するコン
バインドサイクルプラントにおけるガスタービン発電設
備はピーク電力需要に協力するため、昼間のみ運用し夜
間は停止することが要求され、連続運転よりもDSS
(Daily Start Stop)運転またはWSS(Weekly Start
Stop)運転の運用となることが一般的である。
By the way, since the gas turbine power generation equipment in the combined cycle plant using the above-mentioned refuse incinerator cooperates with the peak power demand, it is required to operate only during the daytime and stop at nighttime.
(Daily Start Stop) operation or WSS (Weekly Start)
(Stop) operation is generally used.

【0011】また、ごみ焼却炉の蒸気温度は排ガス温度
と腐食の関係から安全な範囲としては150〜330℃
程度に限定される。したがってごみ発電の蒸気タービン
蒸気条件としては、ほぼ200〜300℃程度に設定す
るのが一般的である。
The steam temperature of the refuse incinerator is 150 to 330 ° C. as a safe range from the relationship between exhaust gas temperature and corrosion.
Limited to the extent. Therefore, it is general to set the steam turbine steam condition for waste power generation to about 200 to 300 ° C.

【0012】上記ごみ焼却炉利用のコンバインドサイク
ルプラントは、ごみ焼却炉からの蒸気(約200〜30
0℃程度の蒸気温度)をさらにガスタービンの排熱を利
用する排熱回収ボイラから発生する蒸気と合流させた
後、排熱回収ボイラの過熱器で約400〜500℃程度
の蒸気に加熱して蒸気タービンに導き運転するが、夜間
等はガスタービンを停止し、ごみ焼却炉からの蒸気(約
200〜300℃程度の蒸気温度)を上記蒸気タービン
に導き運転するため、昼・夜間の運用において、蒸気条
件の異なる2種類の主蒸気を同一の主蒸気系統によって
蒸気タービンに導き運転する必要がある。
The above combined cycle plant using the refuse incinerator has the steam (about 200 to 30) from the refuse incinerator.
Steam temperature of about 0 ° C) is further merged with the steam generated from the exhaust heat recovery boiler that uses the exhaust heat of the gas turbine, and then heated to about 400 to 500 ° C steam by the superheater of the exhaust heat recovery boiler. The gas turbine is stopped at night and the steam from the refuse incinerator (steam temperature of about 200 to 300 ° C) is guided to the steam turbine for operation at night and night. In the above, it is necessary to guide two types of main steams having different steam conditions to the steam turbine by the same main steam system for operation.

【0013】ところが、この場合には昼間から夜間への
切替え運転の時、ガスタービンを夜間停止することで、
蒸気タービンの主蒸気温度が約400〜500℃程度の
蒸気温度から約200〜300℃程度の蒸気温度へ瞬時
(約1〜2分)で変化するため、ガスタービンと排熱回
収ボイラの負荷を蒸気タービン入口温度許容変化率に準
じて減少させた後に、ガスタービンを停止させざるを得
ない。そのため、停止に要する時間が約50〜70分程
度と長くなる。また、ガスタービン非常停止時は一旦蒸
気タービンを停止して再起動する手順を踏んでいた。
However, in this case, by stopping the gas turbine at night during the switching operation from daytime to nighttime,
Since the main steam temperature of the steam turbine changes from the steam temperature of about 400 to 500 ° C to the steam temperature of about 200 to 300 ° C instantaneously (about 1 to 2 minutes), the load on the gas turbine and the exhaust heat recovery boiler is increased. The gas turbine must be stopped after the steam turbine inlet temperature is reduced according to the allowable rate of change. Therefore, the time required for stopping becomes long, about 50 to 70 minutes. In addition, when the gas turbine was in emergency stop, the steam turbine was once stopped and restarted.

【0014】一方、ごみ焼却炉からの蒸気量は、ごみの
投入量やごみ質の変化などによって瞬間的に変動するた
め、その変動蒸気量は蒸気タービンに流入されず、蒸気
タービンをバイパスして復水器へ回収することが多い。
また、ごみ焼却炉利用発電プラントを計画した時点の、
ごみ焼却量、ごみ発熱量は将来的には必ず増加し、ごみ
焼却炉からの蒸気量も増加する。
On the other hand, since the amount of steam from the refuse incinerator fluctuates instantaneously due to changes in the amount of refuse input and the quality of refuse, the fluctuating amount of steam does not flow into the steam turbine and bypasses the steam turbine. Often collected in a condenser.
In addition, at the time of planning the power plant using refuse incinerator,
The amount of waste incinerated and the amount of heat generated by waste will surely increase in the future, and the amount of steam from the waste incinerator will also increase.

【0015】しかし、計画時において蒸気タービン流入
蒸気量は決定されているため、蒸気量の増加分は復水器
へバイパスさせて回収している。
However, since the amount of steam flowing into the steam turbine has been determined at the time of planning, the increase in the amount of steam is bypassed to the condenser and recovered.

【0016】[0016]

【発明が解決しようとする課題】上述のようにごみ焼却
炉を利用するコンバインドサイクル発電プラントは、運
用面からみると余剰小電力を電力会社へ売電する場合と
卸電気事業のように全量売電する場合があり、安定した
電源設備として機能しなくてはならないことと、DSS
及びWSS運転に対応することにより、起動・停止運転
の繰返しによって生じる機器の熱疲労による寿命低下を
軽減させる必要がある。また、未利用エネルギーの有効
利用・高効率化という観点から設置される発電プラント
であるにもかかわらず、瞬時のごみ蒸気量変化、将来の
ごみ焼却量、ごみ発熱量の変動による蒸気量の増加を有
効利用できない等の問題がある。
As described above, the combined cycle power plant using the refuse incinerator, when viewed from the operation side, sells the surplus small power to the electric power company and sells the whole amount like the wholesale electric power business. In some cases, DSS may function as a stable power supply facility and DSS.
In addition, it is necessary to reduce the life reduction due to thermal fatigue of the equipment caused by the repeated start / stop operation by supporting the WSS operation and the WSS operation. In addition, despite the fact that the power plant is installed from the viewpoint of effective use and high efficiency of unused energy, the amount of steam increases due to instantaneous changes in the amount of waste steam, future incineration of waste, and fluctuations in the heat value of waste. There is a problem such as not being able to use effectively.

【0017】一方、運転方法として、従来は蒸気タービ
ンを運転しておいて、後にガスタービンを起動する場
合、ガスタービンは8〜15分程度で100%負荷まで
到達するため、排熱回収ボイラで過熱された主蒸気温度
が急激に上昇する。さらにプラント運転中にガスタービ
ンがトリップした場合は排熱がなくなるため、排熱回収
ボイラからの主蒸気温度が急激に降下し蒸気タービン温
度変化許容値を越える。したがって、一旦蒸気タービン
も停止させ再起動させなければならない等の問題があ
る。
On the other hand, as an operating method, when the steam turbine is conventionally operated and the gas turbine is started later, the gas turbine reaches a 100% load in about 8 to 15 minutes, so that the exhaust heat recovery boiler is used. The temperature of the superheated main steam rises sharply. Furthermore, if the gas turbine trips during plant operation, exhaust heat is lost, so the temperature of the main steam from the exhaust heat recovery boiler drops sharply and exceeds the steam turbine temperature change allowable value. Therefore, there is a problem that the steam turbine must be stopped and restarted once.

【0018】また、DSS、WSSの運用をする場合、
蒸気タービンにおいては昼・夜間の運用で蒸気条件の異
なる2種類の主蒸気を同一ラインで蒸気タービンに供給
させるため、熱応力に対する蒸気タービンの構造上の対
応が必要となる。しかも、ごみ焼却場に隣接されるため
機器配置は極力コンパクトにすることが必要となる。
When operating DSS and WSS,
In a steam turbine, two types of main steam with different steam conditions are supplied to the steam turbine in the same line during daytime and nighttime operations, so it is necessary to take structural measures against the thermal stress. Moreover, it is necessary to make the equipment arrangement as compact as possible because it is adjacent to the refuse incinerator.

【0019】本発明はこのような点に鑑み、蒸気量の変
動時においても余剰蒸気を有効利用することができ、上
記運用時においても蒸気タービンの運転を継続すること
ができ、機器配置もコンパクトにできるごみ焼却炉利用
コンバインドサイクル発電プラントを得ることを目的と
する。
In view of the above points, the present invention makes it possible to effectively use the surplus steam even when the amount of steam changes, to continue the operation of the steam turbine during the above operation, and to arrange the equipment compactly. The purpose is to obtain a combined cycle power plant using a waste incinerator that can be used.

【0020】[0020]

【課題を解決するための手段】第1の発明は、ごみ焼却
炉で発生した蒸気をガスタービンの排熱を利用する排熱
回収ボイラで加熱した後、蒸気タービンに供給するよう
にしたごみ焼却炉利用コンバインドサイクル発電プラン
トにおいて、蒸気タービンの主蒸気入口ノズル部を高温
蒸気入口ノズル部と低温蒸気入口ノズル部に2分割する
とともに、主蒸気系統を上記高温蒸気入口ノズル部と低
温蒸気入口ノズル部にそれぞれ接続された2つの系統に
分岐し、その両系統にそれぞれ蒸気温度に対応して上記
2つの系統のいずれか一方に蒸気を供給する切替え弁を
設けたことを特徴とする。
A first aspect of the present invention is to incinerate waste, wherein steam generated in a refuse incinerator is heated by an exhaust heat recovery boiler utilizing exhaust heat of a gas turbine and then supplied to the steam turbine. In a combined cycle power plant using a furnace, the main steam inlet nozzle part of the steam turbine is divided into a high temperature steam inlet nozzle part and a low temperature steam inlet nozzle part, and the main steam system is divided into the high temperature steam inlet nozzle part and the low temperature steam inlet nozzle part. And a switching valve for supplying steam to either one of the two systems depending on the steam temperature.

【0021】第2の発明は、上記排熱回収ボイラに排ガ
スを導入する排ガスダクトに、排熱回収ボイラをバイパ
スして排ガスを流通させる排ガスバイパス装置を設ける
とともに、排熱回収ボイラに導入される排ガス量を制御
するダンパを設けたことを特徴とする。
[0021] In a second aspect of the present invention, an exhaust gas duct for introducing exhaust gas into the exhaust heat recovery boiler is provided with an exhaust gas bypass device for bypassing the exhaust heat recovery boiler and circulating the exhaust gas, and is introduced into the exhaust heat recovery boiler. It is characterized in that a damper for controlling the amount of exhaust gas is provided.

【0022】また、第3の発明は、排熱回収ボイラと蒸
気タービンを結ぶ主蒸気系統に蒸気ヘッダーまたはアキ
ュームレータを設けるとともに、上記ごみ焼却炉で発生
した蒸気を排熱回収ボイラをバイパスして直接上記蒸気
ヘッダーまたはアキュームレータに導く排熱回収ボイラ
バイパス系統を設けたことを特徴とする。
A third aspect of the invention is to install a steam header or an accumulator in the main steam system connecting the exhaust heat recovery boiler and the steam turbine, and to directly bypass the exhaust heat recovery boiler with the steam generated in the refuse incinerator. An exhaust heat recovery boiler bypass system leading to the steam header or the accumulator is provided.

【0023】さらに、第4の発明は、排熱回収ボイラに
助燃用のパイロットバーナを設けたことを特徴とする。
Furthermore, the fourth invention is characterized in that the exhaust heat recovery boiler is provided with a pilot burner for auxiliary combustion.

【0024】第5の発明は、上記排熱回収ボイラの過熱
器の中間段から抽気し、その抽気を蒸気タービンの中間
段落に供給するようにしたことを特徴とする。
A fifth aspect of the invention is characterized in that air is extracted from an intermediate stage of the superheater of the exhaust heat recovery boiler and the extracted air is supplied to an intermediate stage of the steam turbine.

【0025】また、第6の発明は、ごみ焼却炉で発生し
た蒸気の一部を減圧器を介して蒸気タービンの中間段落
に供給するようにしたことを特徴とする。
The sixth invention is characterized in that a part of the steam generated in the refuse incinerator is supplied to the intermediate stage of the steam turbine through the pressure reducer.

【0026】第7の発明は、ごみ焼却炉発生蒸気量及び
蒸気加減弁の開度に対応して蒸気タービン入口蒸気圧の
圧力設定値を変更する前圧制御装置を設けたことを特徴
とする。
A seventh invention is characterized in that a pre-pressure control device for changing the pressure set value of the steam pressure at the steam turbine inlet is provided in accordance with the amount of steam generated by the refuse incinerator and the opening of the steam control valve. .

【0027】さらに第8の発明は、ガスタービン、発電
機及び蒸気タービンを一軸上に配設し、ガスタービンと
発電機、及び発電機と蒸気タービンとをそれぞれ自動嵌
脱装置を介して連結したことを特徴とする。
Furthermore, in the eighth aspect of the present invention, the gas turbine, the generator and the steam turbine are arranged on one axis, and the gas turbine and the generator, and the generator and the steam turbine are connected to each other through an automatic fitting / removing device. It is characterized by

【0028】[0028]

【作用】第1の発明においては、昼夜間の主蒸気温度が
異なる場合でも、その温度に対応して主蒸気系統及び主
蒸気入口ノズル部を選択切り替えることにより、蒸気タ
ービンを停止させることなく運転を継続することができ
る。
According to the first aspect of the invention, even if the main steam temperature at daytime and nighttime are different, the main steam system and the main steam inlet nozzle are selectively switched according to the temperature, so that the steam turbine can be operated without being stopped. Can continue.

【0029】また第2の発明においては、ガスタービン
起動時及び停止時にダンパの開度を調整し、排熱回収ボ
イラに流入する排ガス量を調整する。これによって蒸気
タービン入口温度の急変を抑えることができ、蒸気ター
ビンを一度停止することなくガスタービンを起動・停止
することができる。
In the second aspect of the invention, the opening degree of the damper is adjusted at the time of starting and stopping the gas turbine, and the amount of exhaust gas flowing into the exhaust heat recovery boiler is adjusted. As a result, it is possible to suppress a sudden change in the steam turbine inlet temperature, and it is possible to start and stop the gas turbine without stopping the steam turbine once.

【0030】第3の発明は、ガスタービン起動時及び停
止時に排熱回収ボイラバイパス系統への主蒸気の流量が
調整され、蒸気タービン入口温度の急変が抑えられる。
したがって、ガスタービン非常停止時においても蒸気タ
ービンの運転が継続可能となる。
According to a third aspect of the invention, the flow rate of main steam to the exhaust heat recovery boiler bypass system is adjusted at the time of starting and stopping the gas turbine, and a sudden change in the steam turbine inlet temperature can be suppressed.
Therefore, the operation of the steam turbine can be continued even during the gas turbine emergency stop.

【0031】さらに第4の発明は、ガスタービン起動・
停止時及びガスタービントリップ時に、パイロットバー
ナを点消火するとともに、パイロットバーナへの燃料供
給量を調整する。しかして、蒸気タービンの入口蒸気温
度の急変を抑えることができ、蒸気タービンの継続運転
が可能となる。
Furthermore, a fourth aspect of the invention is to start a gas turbine.
Extinguish the pilot burner at the time of stoppage and gas turbine trip, and adjust the fuel supply amount to the pilot burner. As a result, a sudden change in the steam temperature at the inlet of the steam turbine can be suppressed, and continuous operation of the steam turbine becomes possible.

【0032】また第5の発明は、ガスタービン起動時及
び停止時に過熱器の中間段からの抽気を蒸気タービンの
中間段落に供給することができる。したがって、この場
合も蒸気タービンをトリップさせることなく継続運転が
可能となる。
Further, in the fifth aspect of the present invention, the extraction air from the intermediate stage of the superheater can be supplied to the intermediate stage of the steam turbine at the time of starting and stopping the gas turbine. Therefore, also in this case, continuous operation can be performed without tripping the steam turbine.

【0033】第6の発明は、ごみ焼却炉から発生した蒸
気が蒸気タービンの最大呑込み量以上になった場合、そ
の余剰蒸気が蒸気タービンの中間段落に供給される。し
たがって、ごみ焼却炉からの蒸気を有効に利用できる。
According to a sixth aspect of the invention, when the steam generated from the refuse incinerator exceeds the maximum swallowing amount of the steam turbine, the surplus steam is supplied to the intermediate paragraph of the steam turbine. Therefore, the steam from the refuse incinerator can be effectively used.

【0034】さらに、第7の発明は、ごみ焼却炉からの
蒸気量により蒸気タービンの前圧制御の設定値が変更さ
れる。したがって、ごみ焼却炉発生蒸気が増加した場合
でもタービンバイパスで復水器に逃がすことなく発生蒸
気の有効活用が図れる。
Furthermore, in the seventh aspect of the invention, the set value for the pre-pressure control of the steam turbine is changed depending on the amount of steam from the refuse incinerator. Therefore, even if the amount of steam generated in the waste incinerator increases, the steam generated can be effectively utilized without being released to the condenser by the turbine bypass.

【0035】また、第8の発明のように構成することに
より、設置スペースの省力化が図れる。
Further, by constructing as in the eighth invention, it is possible to save the installation space.

【0036】[0036]

【実施例】以下、図1乃至図11を参照して本発明の実
施例について説明する。なお図中図1と同一部分につい
ては同一符号を付しその詳細な説明は省略する。
Embodiments of the present invention will be described below with reference to FIGS. In the figure, the same parts as those in FIG. 1 are designated by the same reference numerals and detailed description thereof will be omitted.

【0037】図1において、ごみ焼却炉1で発生した蒸
気を蒸気タービン11に導く主蒸気管8が排熱回収ボイ
ラ2の過熱器7の下流側において2つの蒸気管25a,
25bに分岐されており、その各蒸気管25a,25b
の先端が蒸気タービン11の互いに2分割された主蒸気
入口ノズル部に接続されている。
In FIG. 1, a main steam pipe 8 for guiding the steam generated in the refuse incinerator 1 to the steam turbine 11 is provided with two steam pipes 25a, 25a, 25b on the downstream side of the superheater 7 of the exhaust heat recovery boiler 2.
25b, and each of the steam pipes 25a, 25b
Is connected to the main steam inlet nozzle part of the steam turbine 11 which is divided into two parts.

【0038】すなわち、蒸気タービン11の主蒸気入口
ノズル部は、蒸気温度が高温の場合にもできる限り絞る
必要がないようにした高温蒸気入口ノズル部26aと、
低温の蒸気を導入し得る低温蒸気入口ノズル部26bに
2分割されており、蒸気管25aが高温蒸気入口ノズル
部26aに接続され、蒸気管25bが低温蒸気入口ノズ
ル部26bに接続されている。そして、両蒸気管25
a,25bにそれぞれ切替弁27a,27b、主蒸気止
め弁9a,9b、蒸気加減弁10a,10bが設けられ
ている。
That is, the main steam inlet nozzle portion of the steam turbine 11 has a high temperature steam inlet nozzle portion 26a which does not need to be throttled as much as possible even when the steam temperature is high.
It is divided into two parts, a low temperature steam inlet nozzle part 26b capable of introducing low temperature steam, a steam pipe 25a is connected to the high temperature steam inlet nozzle part 26a, and a steam pipe 25b is connected to the low temperature steam inlet nozzle part 26b. And both steam pipes 25
Switching valves 27a and 27b, main steam stop valves 9a and 9b, and steam control valves 10a and 10b are provided on a and 25b, respectively.

【0039】しかして、昼間の運用においては切替弁2
7aが開、切替弁27bが閉とされ、ごみ焼却炉1で発
生した主蒸気がガスタービン3の運転により発生する排
ガスを利用する排熱回収ボイラ2で高温化された後、主
蒸気止め弁9a及び蒸気加減弁10aを経て、高温蒸気
入口ノズル部26aから蒸気タービン11に導入され
る。
However, in the daytime operation, the switching valve 2
After 7a is opened and the switching valve 27b is closed, the main steam generated in the refuse incinerator 1 is heated in the exhaust heat recovery boiler 2 that uses the exhaust gas generated by the operation of the gas turbine 3, and then the main steam stop valve It is introduced into the steam turbine 11 from the high temperature steam inlet nozzle portion 26a via 9a and the steam control valve 10a.

【0040】一方、夜間の運用においてはガスタービン
3とその排ガスを利用する排熱回収ボイラ2が停止され
るため排熱回収ボイラ2から出る蒸気温度が低温とな
る。そのため、切替弁27a,27bが切替えられ、切
替弁27aが閉、切替弁27bが開とされ、低温の主蒸
気は上記切替弁27b、主蒸気止め弁9b及び蒸気加減
弁10bを経て、低温蒸気入口ノズル部26bから蒸気
タービン11に導入される。
On the other hand, in the nighttime operation, the gas turbine 3 and the exhaust heat recovery boiler 2 utilizing the exhaust gas thereof are stopped, so that the steam temperature emitted from the exhaust heat recovery boiler 2 becomes low. Therefore, the changeover valves 27a and 27b are changed over, the changeover valve 27a is closed and the changeover valve 27b is opened, and the low-temperature main steam passes through the changeover valve 27b, the main steam stop valve 9b, and the steam control valve 10b to obtain the low-temperature steam. It is introduced into the steam turbine 11 from the inlet nozzle portion 26b.

【0041】したがって、昼間運用から夜間運用への切
替え時においても、蒸気加減弁を大幅に絞るような作動
をさせる必要もなく蒸気タービン入口温度の急変に対応
することができる。したがって、ガスタービン3が非常
停止した場合でも切替弁27a,27bの操作により蒸
気タービン11の運転を継続することができる。すなわ
ち、昼・夜間における2種類の主蒸気をそれぞれの体積
流量に見合った昼夜間用の2系統の主蒸気ラインを介し
て蒸気タービンに導入することができる。
Therefore, even at the time of switching from daytime operation to nighttime operation, it is possible to cope with a sudden change in the steam turbine inlet temperature without the need to perform an operation that greatly narrows the steam control valve. Therefore, the operation of the steam turbine 11 can be continued by operating the switching valves 27a and 27b even when the gas turbine 3 is in an emergency stop. That is, the two types of main steam for day and night can be introduced into the steam turbine through the two main steam lines for day and night corresponding to the respective volumetric flow rates.

【0042】しかも、この場合には冬期等の夜間時に排
熱回収ボイラ2が停止した状態においても、その中をご
み焼却炉1で発生した蒸気が流通するので、排熱回収ボ
イラ2の凍結防止効果を奏する。
Moreover, in this case, even if the exhaust heat recovery boiler 2 is stopped at night during winter, steam generated in the waste incinerator 1 flows through it, so that the exhaust heat recovery boiler 2 is prevented from freezing. Produce an effect.

【0043】なお、上記実施例においては主蒸気管が排
熱回収ボイラ2より下流側で分岐したものを示したが、
図2に示すように、排熱回収ボイラ2の上流側で分岐さ
せてもよい。この場合には、夜間運用時に圧力損失が大
きな排熱回収ボイラ2を介さずに直接蒸気を蒸気タービ
ン11に導入させることができ、その分効率アップを図
ることができる。
In the above embodiment, the main steam pipe is branched from the exhaust heat recovery boiler 2 on the downstream side.
As shown in FIG. 2, it may be branched on the upstream side of the exhaust heat recovery boiler 2. In this case, the steam can be directly introduced into the steam turbine 11 without going through the exhaust heat recovery boiler 2 which has a large pressure loss during nighttime operation, and the efficiency can be increased accordingly.

【0044】図3は、本発明の他の実施例であり、ガス
タービン3に接続されている排ガスダクト4に排熱回収
ボイラ2をバイパスする排ガスバイパスダクト28が設
けられている。そして、上記排ガスバイパスダクト28
と排熱回収ボイラ2への通路の分岐点に上記排熱回収ボ
イラ2方向の排ガスダクト4及び排ガスバイパスダクト
28への開口面積を制御するダンパ29が設けられてお
り、排熱回収ボイラ2の出口温度を検出するボイラ出口
温度検出器30による検出温度によってモータ31が作
動され、そのモータ31によりダンパ29の開度が制御
されるようにしてある。
FIG. 3 shows another embodiment of the present invention, in which an exhaust gas duct 4 connected to the gas turbine 3 is provided with an exhaust gas bypass duct 28 for bypassing the exhaust heat recovery boiler 2. Then, the exhaust gas bypass duct 28
A damper 29 for controlling the opening area of the exhaust heat recovery boiler 2 in the direction of the exhaust heat recovery boiler 2 and the exhaust gas bypass duct 28 is provided at the branch point of the path to the exhaust heat recovery boiler 2. The motor 31 is operated by the temperature detected by the boiler outlet temperature detector 30 which detects the outlet temperature, and the opening of the damper 29 is controlled by the motor 31.

【0045】ところで、ごみ焼却炉1及び蒸気タービン
11のみで運転されている状態で、ガスタービン3を起
動する場合、そのままガスタービン3を起動した場合に
はごみ焼却炉1からの蒸気がガスタービン3の排ガスに
よって排熱回収ボイラ2で過熱されるため、蒸気タービ
ン入口温度が急速に上昇することとなり、蒸気タービン
温度変化率を越えることとなり、蒸気タービンとしては
多大な熱応力が発生し好ましくない。また、停止する場
合も同様に、ガスタービン3の排熱が瞬時になくなるた
め同様なことが発生する。
By the way, when the gas turbine 3 is started in a state where only the refuse incinerator 1 and the steam turbine 11 are operated, when the gas turbine 3 is started as it is, the steam from the refuse incinerator 1 is converted into the gas turbine. Since the exhaust gas of No. 3 overheats in the exhaust heat recovery boiler 2, the steam turbine inlet temperature rapidly rises, which exceeds the steam turbine temperature change rate, and a large thermal stress is generated for the steam turbine, which is not preferable. . Similarly, when the gas turbine 3 is stopped, the exhaust heat of the gas turbine 3 disappears instantaneously, and the same thing occurs.

【0046】そこで、本実施例においては、ガスタービ
ン3の起動により排熱回収ボイラ2の出口部の蒸気温度
が上昇すると、それに応じてダンパ29が排ガスバイパ
スダクト28への開口が広くなるように作動され、ガス
タービンの排ガスの一部が排ガスバイパスダクト28を
介して排出され、蒸気タービン入口温度の急速な上昇が
防止される。そして、ボイラ出口温度検出器30で蒸気
温度をみながら排熱回収ボイラ2へのガス量が次第に多
くなるようにダンパ29の開度が制御され、蒸気タービ
ン11に問題ない上昇率で排熱回収ボイラ出口蒸気温度
が上昇される。
Therefore, in this embodiment, when the steam temperature at the outlet of the exhaust heat recovery boiler 2 rises due to the activation of the gas turbine 3, the damper 29 correspondingly widens the opening to the exhaust gas bypass duct 28. When activated, part of the exhaust gas of the gas turbine is discharged through the exhaust gas bypass duct 28, and a rapid rise in the steam turbine inlet temperature is prevented. Then, the opening of the damper 29 is controlled so that the amount of gas to the exhaust heat recovery boiler 2 gradually increases while observing the steam temperature with the boiler outlet temperature detector 30, and the exhaust heat recovery at the steam turbine 11 at a rising rate without any problem. Boiler outlet steam temperature is raised.

【0047】一方、ガスタービン3を停止させる場合
も、ガスタービン3が運転中に排熱回収ボイラ2への排
ガス流量が次第に少なくなるようにダンパ29を或一定
の降下率で閉動作させていき、ごみ焼却炉1からの蒸気
と排熱回収ボイラ出口蒸気温度が略同程度の蒸気温度と
なった時点でガスタービン3が停止される。このように
して、蒸気タービンの入口温度を常に所定の温度変化率
を越えることがないように制御でき、蒸気タービンの継
続運転を可能とする。
On the other hand, even when the gas turbine 3 is stopped, the damper 29 is closed at a constant descent rate so that the flow rate of exhaust gas to the exhaust heat recovery boiler 2 gradually decreases while the gas turbine 3 is operating. The gas turbine 3 is stopped when the steam temperature from the waste incinerator 1 and the steam temperature at the exhaust heat recovery boiler outlet become substantially the same. In this way, the inlet temperature of the steam turbine can be controlled so as not to always exceed a predetermined temperature change rate, and continuous operation of the steam turbine is enabled.

【0048】図4にダンパ開度とボイラ蒸気温度の関係
を示す。
FIG. 4 shows the relationship between the damper opening and the boiler steam temperature.

【0049】図5は本発明のさらに他の実施例を示す図
であり、排熱回収ボイラ2と蒸気タービン11とを結ぶ
主蒸気管8の途中にはヘッダまたはアキュームレータ3
3が設けられており、排熱回収ボイラ2で過熱された蒸
気が一旦上記ヘッダまたはアキュームレータ33に導入
され、そこから蒸気タービン11に導入されるようにし
てある。
FIG. 5 is a view showing still another embodiment of the present invention. A header or accumulator 3 is provided in the middle of the main steam pipe 8 connecting the exhaust heat recovery boiler 2 and the steam turbine 11.
3 is provided so that the steam superheated in the exhaust heat recovery boiler 2 is once introduced into the header or accumulator 33, and then introduced into the steam turbine 11.

【0050】また、ごみ焼却炉1の出口部と上記ヘッダ
またはアキュームレータ33間には、排熱回収ボイラ2
をバイパスする排熱回収ボイラバイパス管34が設けら
れており、その排熱回収ボイラバイパス管34、排熱回
収ボイラ2の主蒸気入口部及び排熱回収ボイラ出口部に
は、蒸気タービン入口蒸気温度を検出する温度検出器3
5の検出信号によって制御されるバイパス弁36、排熱
回収ボイラ入口弁37及び排熱回収ボイラ出口弁38が
設けられている。
Further, between the outlet of the refuse incinerator 1 and the header or accumulator 33, the exhaust heat recovery boiler 2 is provided.
An exhaust heat recovery boiler bypass pipe 34 that bypasses the exhaust heat recovery boiler bypass pipe 34, the exhaust heat recovery boiler bypass pipe 34, the main steam inlet part of the exhaust heat recovery boiler 2 and the exhaust heat recovery boiler outlet part are provided. Temperature detector 3 for detecting
A bypass valve 36, an exhaust heat recovery boiler inlet valve 37, and an exhaust heat recovery boiler outlet valve 38, which are controlled by the detection signal of No. 5, are provided.

【0051】しかして、ガスタービン停止でごみ焼却炉
1と蒸気タービン11のみで運転される場合は、ごみ焼
却炉1からの蒸気は排熱回収ボイラ2を介せず、排熱回
収ボイラバイパス管34、ヘッダまたはアキュームレー
タ33を介して蒸気タービン11に導入される。
When the gas turbine is stopped and only the refuse incinerator 1 and the steam turbine 11 are operated, the steam from the refuse incinerator 1 does not go through the exhaust heat recovery boiler 2 but the exhaust heat recovery boiler bypass pipe. 34, a header or an accumulator 33 to be introduced into the steam turbine 11.

【0052】そこで、上記状態からガスタービン3を起
動する場合には、排熱回収ボイラ入口弁37及び排熱回
収ボイラ出口弁38が開方向に制御され、ごみ焼却炉1
からの蒸気が排熱回収ボイラ2に導かれる。この場合、
上記排熱回収ボイラ入口弁34、排熱回収ボイラ出口弁
38及びバイパス弁36は蒸気タービン入口蒸気温度を
検出する温度検出器35の検出信号に応じ、蒸気タービ
ン入口蒸気の温度変化率が規定値以下となるように開度
調整される。したがって、これによって蒸気タービン入
口温度の急変を抑えることができ、ガスタービン3を蒸
気タービン11の入口蒸気温度の急変を考慮して起動す
る必要がなく起動時間を短縮することができる。
Therefore, when the gas turbine 3 is started from the above state, the exhaust heat recovery boiler inlet valve 37 and the exhaust heat recovery boiler outlet valve 38 are controlled in the opening direction, and the refuse incinerator 1
The steam from is introduced to the exhaust heat recovery boiler 2. in this case,
The exhaust heat recovery boiler inlet valve 34, the exhaust heat recovery boiler outlet valve 38, and the bypass valve 36 have a temperature change rate of the steam turbine inlet steam that is a prescribed value according to a detection signal of a temperature detector 35 that detects the steam temperature at the steam turbine inlet. The opening is adjusted so as to be as follows. Therefore, it is possible to suppress a sudden change in the steam turbine inlet temperature, and it is not necessary to start the gas turbine 3 in consideration of the sudden change in the inlet steam temperature of the steam turbine 11, and it is possible to shorten the starting time.

【0053】また、通常運転状態からガスタービン3を
停止する場合、そのガスタービン停止とともに排熱回収
ボイラ出口蒸気温度は急速に低下するが、蒸気は一旦ヘ
ッダまたはアキュームレータ33により蒸気タービン入
口蒸気温度の急速な低下を緩和することができ、蒸気タ
ービン11の熱応力を低減することができる。また、通
常運転時にガスタービン3がトリップした場合も同様に
蒸気タービン入口蒸気温度の急速な低下を緩和でき、蒸
気タービン11をトリップさせることなく、運転を継続
することができる。
Further, when the gas turbine 3 is stopped from the normal operation state, the exhaust heat recovery boiler outlet steam temperature is rapidly lowered with the stop of the gas turbine, but the steam is once changed by the header or the accumulator 33 to the steam turbine inlet steam temperature. The rapid decrease can be mitigated, and the thermal stress of the steam turbine 11 can be reduced. Also, when the gas turbine 3 trips during normal operation, the rapid decrease in steam temperature at the steam turbine inlet can be similarly mitigated, and the operation can be continued without tripping the steam turbine 11.

【0054】図6は本発明の他の実施例を示す図であ
り、排熱回収ボイラ2内にはパイロットバーナ40が設
けられている。一方、蒸気タービン11の蒸気入口部に
は蒸気タービン入口蒸気温度を検出する温度検出器35
が設けられており、その温度検出器35からの検出信号
によって、上記パイロットバーナ40用の燃料調整弁4
1の開度が制御されるようにしてある。
FIG. 6 is a view showing another embodiment of the present invention, and a pilot burner 40 is provided in the exhaust heat recovery boiler 2. On the other hand, a temperature detector 35 for detecting the steam temperature at the steam inlet of the steam turbine 11 is provided at the steam inlet of the steam turbine 11.
Is provided, and the fuel control valve 4 for the pilot burner 40 is provided by a detection signal from the temperature detector 35.
The opening degree of 1 is controlled.

【0055】しかして、ごみ焼却炉1及び蒸気タービン
11のみで運転されている状態からガスタービン3を起
動する場合には、そのガスタービン3の起動前に、上記
パイロットバーナ40を点火し、燃料調整弁41で燃料
を調整して蒸気タービンに問題ない上昇率で排熱回収ボ
イラ出口蒸気温度を上昇させる。そして、蒸気温度がガ
スタービン運転時の温度付近まで到達した時点で、ガス
タービン3を起動する。このようにしてガスタービン3
が起動されたら排ガスの増加に伴ない排熱回収ボイラ出
口蒸気温度が規定値となるようにパイロットバーナ40
の燃料を調整し、排熱回収ボイラ2の熱源をパイロット
バーナ40からガスタービン排ガスに切り替える。この
ようにしてガスタービン起動時の蒸気タービン入口蒸気
温度の急変を抑えることができ、蒸気タービンの多大な
熱応力を防止することができる。
When the gas turbine 3 is started from the state where only the refuse incinerator 1 and the steam turbine 11 are operated, the pilot burner 40 is ignited before starting the gas turbine 3 and the fuel is burned. The adjustment valve 41 adjusts the fuel to increase the exhaust heat recovery boiler outlet steam temperature at an increase rate that does not cause a problem in the steam turbine. Then, the gas turbine 3 is started at the time when the steam temperature reaches the vicinity of the temperature during gas turbine operation. In this way, the gas turbine 3
When the engine is started, the pilot burner 40 is controlled so that the exhaust heat recovery boiler outlet steam temperature becomes the specified value as the exhaust gas increases.
Is adjusted to switch the heat source of the exhaust heat recovery boiler 2 from the pilot burner 40 to the gas turbine exhaust gas. In this way, it is possible to suppress a sudden change in the steam temperature at the steam turbine inlet when the gas turbine is started, and it is possible to prevent a great amount of thermal stress in the steam turbine.

【0056】通常運転状態からガスタービン3を停止す
る場合も、同様にガスタービン停止前にパイロットバー
ナ40を点火し、ガスタービン3の停止に伴ない、蒸気
タービン入口蒸気温度変化率が許容値内になるように、
パイロットバーナ40の燃料を調整することにより、蒸
気タービン11の多大な熱応力を防止でき、蒸気タービ
ン11をトリップさせることなく運転を継続することが
できる。なお、パイロットバーナ40はガスタービント
リップで点火することでなく、通常運転時に点火してお
いてもよい。
When the gas turbine 3 is stopped from the normal operating state, similarly, the pilot burner 40 is ignited before the gas turbine is stopped, and with the stop of the gas turbine 3, the steam turbine inlet steam temperature change rate is within the allowable value. To be
By adjusting the fuel of the pilot burner 40, it is possible to prevent a large amount of thermal stress in the steam turbine 11, and it is possible to continue the operation without tripping the steam turbine 11. The pilot burner 40 may be ignited during normal operation instead of being ignited by the gas turbine trip.

【0057】図7は本発明のさらに他の実施例を示す図
であり、排熱回収ボイラ2の過熱器7から蒸気タービン
11に蒸気を供給する主蒸気管8には排熱回収ボイラ出
口弁42を設けるとともに、上記過熱器7の中間段と蒸
気タービン11の中間段落とが混圧系統43によって接
続されており、その混圧系統43には排熱回収ボイラ中
段出口弁44及び減圧弁45が設けられている。
FIG. 7 is a diagram showing still another embodiment of the present invention. An exhaust heat recovery boiler outlet valve is provided in the main steam pipe 8 for supplying steam from the superheater 7 of the exhaust heat recovery boiler 2 to the steam turbine 11. 42 is provided, and the intermediate stage of the superheater 7 and the intermediate stage of the steam turbine 11 are connected by a mixed pressure system 43, and the mixed pressure system 43 has an exhaust heat recovery boiler middle stage outlet valve 44 and a pressure reducing valve 45. Is provided.

【0058】ところで、前述のように通常の運転中か
ら、ガスタービン3を停止する場合には、ガスタービン
3の排熱がなくなるため、蒸気タービン入口温度が急速
に降下することになり、蒸気タービン温度変化率を越え
ることとなり、蒸気タービン11としては多大な熱応力
を発生し好ましくない。
By the way, as described above, when the gas turbine 3 is stopped during the normal operation, the exhaust heat of the gas turbine 3 is lost, so that the inlet temperature of the steam turbine is rapidly lowered, and the steam turbine is cooled. The rate of temperature change is exceeded, and the steam turbine 11 is not preferable because a large amount of thermal stress is generated.

【0059】そこで、本実施例においては、通常運転時
にガスタービン3がトリップした場合には排熱回収ボイ
ラ出口弁42を閉じ排熱回収ボイラ中段出口弁44を開
く。しかして、ごみ焼却炉1からの蒸気は過熱器7の中
間段から減圧弁45を介して蒸気タービン11の中間段
落に導入される。したがって、蒸気タービン11は上記
中間段落に供給された蒸気によって回転駆動することが
でき、運転を継続させることができる。
Therefore, in this embodiment, when the gas turbine 3 trips during normal operation, the exhaust heat recovery boiler outlet valve 42 is closed and the exhaust heat recovery boiler middle stage outlet valve 44 is opened. Then, the steam from the refuse incinerator 1 is introduced from the intermediate stage of the superheater 7 to the intermediate stage of the steam turbine 11 via the pressure reducing valve 45. Therefore, the steam turbine 11 can be rotationally driven by the steam supplied in the above intermediate paragraph, and the operation can be continued.

【0060】図8は、本発明のさらに他の実施例を示す
図であり、ごみ焼却炉1から蒸気を排熱回収ボイラ2に
導入する主蒸気管8の途中から混圧蒸気管46が分岐導
出され、その混圧蒸気管46が、調節弁47、混圧蒸気
止め弁48及び混圧蒸気加減弁49を介して蒸気タービ
ン11の中間段落に接続されている。そして、上記調節
弁47の上流側には圧力検出器50が設けられており、
その圧力検出器50により検出された、ごみ焼却炉1で
発生した蒸気圧信号によって上記調節弁47が制御され
るようにしてある。
FIG. 8 is a view showing still another embodiment of the present invention, in which the mixed pressure steam pipe 46 branches from the middle of the main steam pipe 8 for introducing steam from the refuse incinerator 1 into the exhaust heat recovery boiler 2. The mixed pressure steam pipe 46, which is led out, is connected to an intermediate paragraph of the steam turbine 11 via a control valve 47, a mixed pressure steam stop valve 48, and a mixed pressure steam control valve 49. A pressure detector 50 is provided on the upstream side of the control valve 47,
The control valve 47 is controlled by the vapor pressure signal generated in the refuse incinerator 1 detected by the pressure detector 50.

【0061】しかして、蒸気タービン11の入口蒸気量
が蒸気タービン最大呑み込み量を越え、主蒸気圧力が上
昇すると、これが圧力検出器50によって検出され、調
節弁50が開かれる。したがって、余剰蒸気が混圧蒸気
止め弁48及び混圧蒸気加減弁49を介して蒸気タービ
ン11に導入され、余剰蒸気の活用が図られる。
When the amount of steam entering the steam turbine 11 exceeds the maximum swallowing amount of the steam turbine and the main steam pressure rises, this is detected by the pressure detector 50 and the control valve 50 is opened. Therefore, the excess steam is introduced into the steam turbine 11 via the mixed pressure steam stop valve 48 and the mixed pressure steam control valve 49, and the excess steam is utilized.

【0062】また、通常運転時からガスタービン停止時
には、主蒸気止め弁9を閉とし、混圧蒸気系統すなわち
混圧蒸気管46から蒸気タービンの中間段落に蒸気を供
給することに切り替えることで蒸気タービンの運転を継
続することができる。
Further, when the gas turbine is stopped during the normal operation, the main steam stop valve 9 is closed and the mixed pressure steam system, that is, the mixed pressure steam pipe 46 is switched to supply steam to an intermediate stage of the steam turbine. The turbine can continue to operate.

【0063】図9は本発明のさらに他の実施例を示す図
であり、ごみ焼却炉1からの蒸気量が蒸気タービンの計
画値以上に増加した場合に対応するため、蒸気タービン
11の前圧を調整する前圧制御装置51が設けられてい
る。
FIG. 9 is a diagram showing still another embodiment of the present invention. In order to deal with the case where the amount of steam from the refuse incinerator 1 increases above the planned value of the steam turbine, the front pressure of the steam turbine 11 is increased. There is provided a pre-pressure control device 51 for adjusting.

【0064】すなわち、排熱回収ボイラ2で加熱された
蒸気を蒸気タービン11に導入する主蒸気管8には、そ
の主蒸気の流量を検出する流量検出器52及び圧力検出
器53が設けられるとともに、蒸気加減弁10にはその
開度検出器54が設けられている。上記流量検出器5
2、及び開度検出器54からの検出信号はそれぞれ前圧
制御装置51の関数発生器55に入力され、そこで蒸気
タービン11に流入する蒸気量及び蒸気加減弁10の開
度に応じて、図10に示すように蒸気タービンの前圧の
設定値が変更され、その設定値と圧力検出器53で検出
される圧力とによって蒸気タービンの前圧が制御され
る。
That is, the main steam pipe 8 for introducing the steam heated by the exhaust heat recovery boiler 2 into the steam turbine 11 is provided with a flow rate detector 52 and a pressure detector 53 for detecting the flow rate of the main steam. The steam control valve 10 is provided with an opening detector 54 thereof. Flow rate detector 5
2 and the detection signals from the opening degree detector 54 are input to the function generator 55 of the front pressure control device 51, respectively, and the amount of steam flowing into the steam turbine 11 and the opening degree of the steam control valve 10 are changed according to the figure. As shown in 10, the set value of the pre-pressure of the steam turbine is changed, and the pre-pressure of the steam turbine is controlled by the set value and the pressure detected by the pressure detector 53.

【0065】しかして、ごみ焼却炉1からの蒸気が増加
し、蒸気タービン11の蒸気加減弁10が規定開度に到
達したら蒸気タービン前圧制御の設定値が上げられ、タ
ービンバイパス系統から復水器13に逃げる蒸気量が制
限される。したがって、ごみ焼却炉からの蒸気の有効活
用が図られる。
However, when the steam from the refuse incinerator 1 increases and the steam control valve 10 of the steam turbine 11 reaches the specified opening, the set value of the steam turbine pre-pressure control is increased and the condensate is recovered from the turbine bypass system. The amount of steam that escapes to the vessel 13 is limited. Therefore, the steam from the refuse incinerator can be effectively used.

【0066】図11は、上述の如きプラントにおけるガ
スタービン3、発電機12及び蒸気タービン11の配置
関係を示す図であり、ガスタービン3、発電機12及び
蒸気タービン11が同一軸上に配置されており、ガスタ
ービン3と発電機12が自動嵌脱装置56によって連結
され、また発電機12と蒸気タービン11が自動嵌脱装
置57によって連結されている。しかして、この場合、
図1等に示すようにガスタービン3と蒸気タービン11
とを別軸にするものに比し、設置スペースを狭くするこ
とができ、設置スペースの省力化を図ることができる。
FIG. 11 is a diagram showing a positional relationship between the gas turbine 3, the generator 12 and the steam turbine 11 in the plant as described above. The gas turbine 3, the generator 12 and the steam turbine 11 are arranged on the same axis. That is, the gas turbine 3 and the generator 12 are connected by the automatic fitting and removing device 56, and the generator 12 and the steam turbine 11 are connected by the automatic fitting and removing device 57. And in this case,
As shown in FIG. 1 etc., the gas turbine 3 and the steam turbine 11
The installation space can be made narrower and the installation space can be saved as compared with the case where the and are separately provided.

【0067】[0067]

【発明の効果】本発明は上述のように構成したので、ご
み質、量の変化にも十分対応することができ、ごみ焼却
炉から発生する蒸気を有効にエネルギーとして利用する
ことができる。しかも昼・夜の運用の変化時、ガスター
ビン非常停止時にも蒸気タービン入口蒸気温度変化の緩
和ができ、蒸気タービン運転を継続することができる。
また、一軸に設置した場合には設置スペースの省力化も
図ることができる。
EFFECTS OF THE INVENTION Since the present invention is configured as described above, it is possible to sufficiently cope with changes in the quality and quantity of refuse, and the steam generated from the refuse incinerator can be effectively used as energy. Moreover, the steam turbine inlet steam temperature change can be alleviated even when the operation changes between day and night, or during a gas turbine emergency stop, and the steam turbine operation can be continued.
In addition, when it is installed on a single axis, the installation space can be saved.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明のごみ焼却炉利用コンバインドサイクル
発電プラントの一実施例を示す図。
FIG. 1 is a diagram showing an embodiment of a combined cycle power plant using a refuse incinerator of the present invention.

【図2】図1の他の実施例を示す図。FIG. 2 is a diagram showing another embodiment of FIG.

【図3】本発明の他の実施例を示す図。FIG. 3 is a diagram showing another embodiment of the present invention.

【図4】ダンパ開度とボイラ出口蒸気温度変化説明図。FIG. 4 is an explanatory diagram of changes in damper opening and steam temperature at a boiler outlet.

【図5】本発明のさらに他の実施例を示す図。FIG. 5 is a diagram showing still another embodiment of the present invention.

【図6】本発明の他の実施例を示す図。FIG. 6 is a diagram showing another embodiment of the present invention.

【図7】本発明の他の実施例を示す図。FIG. 7 is a diagram showing another embodiment of the present invention.

【図8】図7の他の実施例を示す図。FIG. 8 is a diagram showing another embodiment of FIG.

【図9】本発明のさらに他の実施例を示す図。FIG. 9 is a diagram showing still another embodiment of the present invention.

【図10】前圧制御装置の圧力設定値変更説明図。FIG. 10 is an explanatory diagram of changing the pressure set value of the front pressure control device.

【図11】ガスタービン等の配置の一例を示す図。FIG. 11 is a diagram showing an example of arrangement of a gas turbine and the like.

【図12】従来のごみ焼却炉利用コンバインドサイクル
発電プラントの概略系統図。
FIG. 12 is a schematic system diagram of a conventional combined cycle power plant using a refuse incinerator.

【符号の説明】[Explanation of symbols]

1 ごみ焼却炉 2 排熱回収ボイラ 3 ガスタービン 7 過熱器 8 主蒸気管 9,9a,9b 主蒸気止め弁 10,10a,10b 蒸気加減弁 13 復水器 20 タービンバイパス系 26a 高温蒸気入口ノズル部 26b 低温蒸気入口ノズル部 27a,27b 切替弁 28 排ガスバイパスダクト 29 ダンパ 30 ボイラ出口温度検出器 33 ヘッダまたはアキュームレータ 34 排熱回収ボイラバイパス管 37 排熱回収ボイラ入口弁 38,42 排熱回収ボイラ出口弁 40 パイロットバーナ 44 排熱回収ボイラ中段出口弁 46 混圧蒸気管 47 調節弁 51 前圧制御装置 55 関数発生器 56,57 自動嵌脱装置 1 Waste incinerator 2 Exhaust heat recovery boiler 3 Gas turbine 7 Superheater 8 Main steam pipe 9, 9a, 9b Main steam stop valve 10, 10a, 10b Steam control valve 13 Condenser 20 Turbine bypass system 26a High temperature steam inlet nozzle part 26b Low temperature steam inlet nozzle 27a, 27b Switching valve 28 Exhaust gas bypass duct 29 Damper 30 Boiler outlet temperature detector 33 Header or accumulator 34 Exhaust heat recovery boiler bypass pipe 37 Exhaust heat recovery boiler inlet valve 38,42 Exhaust heat recovery boiler outlet valve 40 Pilot Burner 44 Exhaust Heat Recovery Boiler Middle Stage Outlet Valve 46 Mixed Pressure Steam Pipe 47 Control Valve 51 Pre-Pressure Control Device 55 Function Generator 56, 57 Automatic Fitting Device

───────────────────────────────────────────────────── フロントページの続き (72)発明者 清 國 寿 久 神奈川県横浜市鶴見区末広町2丁目4番地 株式会社東芝京浜事業所内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Hisashi Kiyokuni 2-4 Suehiro-cho, Tsurumi-ku, Yokohama-shi, Kanagawa Toshiba Keihin Office

Claims (9)

【特許請求の範囲】[Claims] 【請求項1】ごみ焼却炉で発生した蒸気をガスタービン
の排熱を利用する排熱回収ボイラで加熱した後、蒸気タ
ービンに供給するようにしたごみ焼却炉利用コンバイン
ドサイクル発電プラントにおいて、蒸気タービンの主蒸
気入口ノズル部を高温蒸気入口ノズル部と低温蒸気入口
ノズル部に2分割するとともに、主蒸気系統を上記高温
蒸気入口ノズル部と低温蒸気入口ノズル部にそれぞれ接
続された2つの系統に分岐し、その両系統にそれぞれ蒸
気温度に対応して上記2つの系統のいずれか一方に蒸気
を供給する切替え弁を設けたことを特徴とする、ごみ焼
却炉利用コンバインドサイクル発電プラント。
1. A steam turbine in a combined cycle power plant using a refuse incinerator, wherein steam generated in the refuse incinerator is heated by an exhaust heat recovery boiler that uses exhaust heat of a gas turbine and then supplied to the steam turbine. The main steam inlet nozzle part is divided into a high temperature steam inlet nozzle part and a low temperature steam inlet nozzle part, and the main steam system is branched into two systems respectively connected to the high temperature steam inlet nozzle part and the low temperature steam inlet nozzle part. A combined cycle power plant using a refuse incinerator, characterized in that a switching valve for supplying steam to either one of the two systems corresponding to the steam temperature is provided in both systems.
【請求項2】低温蒸気入口ノズル部に接続された主蒸気
系統を排熱回収ボイラの上流側で分岐させたことを特徴
とする、請求項1記載のごみ焼却炉利用コンバインドサ
イクル発電プラント。
2. The combined cycle power plant using a refuse incinerator according to claim 1, wherein the main steam system connected to the low temperature steam inlet nozzle section is branched on the upstream side of the exhaust heat recovery boiler.
【請求項3】ごみ焼却炉で発生した蒸気をガスタービン
の排熱を利用する排熱回収ボイラで加熱した後、蒸気タ
ービンに供給するようにしたごみ焼却炉利用コンバイン
ドサイクル発電プラントにおいて、上記排熱回収ボイラ
に排ガスを導入する排ガスダクトに、排熱回収ボイラを
バイパスして排ガスを流通させる排ガスバイパス装置を
設けるとともに、排熱回収ボイラに導入される排ガス量
を制御するダンパを設けたことを特徴とする、ごみ焼却
炉利用コンバインドサイクル発電プラント。
3. In a combined cycle power plant using a refuse incinerator, the steam generated in the refuse incinerator is heated by an exhaust heat recovery boiler that uses the exhaust heat of a gas turbine and then supplied to the steam turbine. In the exhaust gas duct that introduces the exhaust gas into the heat recovery boiler, an exhaust gas bypass device that bypasses the exhaust heat recovery boiler and circulates the exhaust gas is installed, and a damper that controls the amount of exhaust gas that is introduced into the exhaust heat recovery boiler is installed. The feature is a combined cycle power plant using a refuse incinerator.
【請求項4】ごみ焼却炉で発生した蒸気をガスタービン
の排熱を利用する排熱回収ボイラで加熱した後、蒸気タ
ービンに供給するようにしたごみ焼却炉利用コンバイン
ドサイクル発電プラントにおいて、排熱回収ボイラと蒸
気タービンを結ぶ主蒸気系統に蒸気ヘッダーまたはアキ
ュームレータを設けるとともに、上記ごみ焼却炉で発生
した蒸気を排熱回収ボイラをバイパスして直接上記蒸気
ヘッダーまたはアキュームレータに導く排熱回収ボイラ
バイパス系統を設けたことを特徴とする、ごみ焼却炉利
用コンバインドサイクル発電プラント。
4. Exhaust heat in a combined cycle power plant using a refuse incinerator, wherein steam generated in the refuse incinerator is heated by an exhaust heat recovery boiler that uses exhaust heat of a gas turbine and then supplied to a steam turbine. A steam header or accumulator is installed in the main steam system that connects the recovery boiler and the steam turbine, and the steam generated in the waste incinerator bypasses the exhaust heat recovery boiler and directly leads to the steam header or accumulator. A combined cycle power plant using a refuse incinerator, characterized in that
【請求項5】ごみ焼却炉で発生した蒸気をガスタービン
の排熱を利用する排熱回収ボイラで加熱した後、蒸気タ
ービンに供給するようにしたごみ焼却炉利用コンバイン
ドサイクル発電プラントにおいて、排熱回収ボイラに助
燃用のパイロットバーナを設けたことを特徴とする、ご
み焼却炉利用コンバインドサイクル発電プラント。
5. Exhaust heat in a combined cycle power plant using a refuse incinerator, wherein steam generated in the refuse incinerator is heated by an exhaust heat recovery boiler utilizing exhaust heat of a gas turbine and then supplied to a steam turbine. A combined cycle power plant using a refuse incinerator, which is equipped with a pilot burner for supporting combustion in the recovery boiler.
【請求項6】ごみ焼却炉で発生した蒸気をガスタービン
の排熱を利用する排熱回収ボイラで加熱した後、蒸気タ
ービンに供給するようにしたごみ焼却炉利用コンバイン
ドサイクル発電プラントにおいて、上記排熱回収ボイラ
の過熱器の中間段から抽気し、その抽気を蒸気タービン
の中間段落に供給するようにしたことを特徴とする、ご
み焼却炉利用コンバインドサイクル発電プラント。
6. In a combined cycle power plant using a refuse incinerator, the steam generated in the refuse incinerator is heated by an exhaust heat recovery boiler using the exhaust heat of a gas turbine, and then supplied to the steam turbine. A combined cycle power plant using a refuse incinerator characterized by extracting air from an intermediate stage of a superheater of a heat recovery boiler and supplying the extracted air to an intermediate stage of a steam turbine.
【請求項7】ごみ焼却炉で発生した蒸気をガスタービン
の排熱を利用する排熱回収ボイラで加熱した後、蒸気タ
ービンに供給するようにしたごみ焼却炉利用コンバイン
ドサイクル発電プラントにおいて、上記ごみ焼却炉で発
生した蒸気の一部を減圧器を介して蒸気タービンの中間
段落に供給するようにしたことを特徴とする、ごみ焼却
炉利用コンバインドサイクル発電プラント。
7. A refuse incinerator combined cycle power plant, wherein steam generated in a refuse incinerator is heated by an exhaust heat recovery boiler utilizing exhaust heat of a gas turbine and then supplied to a steam turbine. A combined cycle power plant using a refuse incinerator, characterized in that a part of steam generated in the incinerator is supplied to an intermediate stage of a steam turbine through a pressure reducer.
【請求項8】ごみ焼却炉で発生した蒸気をガスタービン
の排熱を利用する排熱回収ボイラで加熱した後、蒸気タ
ービンに供給するようにしたごみ焼却炉利用コンバイン
ドサイクル発電プラントにおいて、ごみ焼却炉発生蒸気
量及び蒸気加減弁の開度に対応して蒸気タービン入口蒸
気圧の圧力設定値を変更する前圧制御装置を設けたこと
を特徴とする、ごみ焼却炉利用コンバインドサイクル発
電プラント。
8. A refuse incinerator in a combined cycle power plant, wherein steam generated in the refuse incinerator is heated by an exhaust heat recovery boiler utilizing exhaust heat of a gas turbine and then supplied to the steam turbine. A combined cycle power plant using a refuse incinerator, comprising a pre-pressure control device that changes a pressure set value of steam pressure at a steam turbine inlet in accordance with the amount of steam generated by the furnace and the opening of a steam control valve.
【請求項9】ガスタービン、発電機及び蒸気タービンを
一軸上に配設し、ガスタービンと発電機、及び発電機と
蒸気タービンとをそれぞれ自動嵌脱装置を介して連結し
たことを特徴とする、請求項1乃至8のいずれかに記載
のごみ焼却炉利用コンバインドサイクル発電プラント。
9. A gas turbine, a generator and a steam turbine are arranged on one axis, and the gas turbine and the generator, and the generator and the steam turbine are connected to each other through an automatic fitting / removing device. A combined cycle power plant using a refuse incinerator according to any one of claims 1 to 8.
JP04749795A 1995-03-07 1995-03-07 Combined cycle power plant Expired - Fee Related JP3774487B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP04749795A JP3774487B2 (en) 1995-03-07 1995-03-07 Combined cycle power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP04749795A JP3774487B2 (en) 1995-03-07 1995-03-07 Combined cycle power plant

Publications (2)

Publication Number Publication Date
JPH08246814A true JPH08246814A (en) 1996-09-24
JP3774487B2 JP3774487B2 (en) 2006-05-17

Family

ID=12776756

Family Applications (1)

Application Number Title Priority Date Filing Date
JP04749795A Expired - Fee Related JP3774487B2 (en) 1995-03-07 1995-03-07 Combined cycle power plant

Country Status (1)

Country Link
JP (1) JP3774487B2 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1122421A (en) * 1997-06-30 1999-01-26 Hitachi Ltd Refuse incinerating power plant
JP2010019233A (en) * 2008-07-14 2010-01-28 Kobe Steel Ltd Power generation facility
JP2014088812A (en) * 2012-10-30 2014-05-15 Takuma Co Ltd Operational method for urban refuse incineration plant with steam turbine power generation device and calculation controller for adjusting steam pressure of steam turbine inlet
EP2865853A1 (en) 2013-10-23 2015-04-29 Mitsubishi Hitachi Power Systems, Ltd. Combined cycle plant
CN105317482A (en) * 2015-12-03 2016-02-10 中国能源建设集团天津电力建设有限公司 Starting method of combined cycle unit
JP2016148317A (en) * 2015-02-13 2016-08-18 株式会社タクマ Power generation facility utilizing heat recovery from combustion exhaust gas
JPWO2016103382A1 (en) * 2014-12-25 2017-09-21 三菱重工コンプレッサ株式会社 Combined cycle plant
JP2017166812A (en) * 2016-03-16 2017-09-21 ゼネラル エレクトリック テクノロジー ゲゼルシャフト ミット ベシュレンクテル ハフツングGeneral Electric Technology GmbH System and method for heating component of waste heat recovery steam generator
KR20180110106A (en) * 2016-02-19 2018-10-08 가부시키가이샤 고베 세이코쇼 Array recovery device and binary power generation device
CN110513164A (en) * 2019-08-06 2019-11-29 中国电力工程顾问集团华东电力设计院有限公司 A kind of waste incineration and generating electricity system
CN111075523A (en) * 2018-10-22 2020-04-28 马勒国际有限公司 Waste heat utilization device, in particular for an internal combustion engine of a motor vehicle

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5158234U (en) * 1974-10-30 1976-05-07
JPS6114455A (en) * 1984-06-29 1986-01-22 Takuma Co Ltd Exhaust heat recovery plant
JPH05288324A (en) * 1992-04-07 1993-11-02 Kumagai Gumi Co Ltd Energy recycling device
JPH05321611A (en) * 1992-05-13 1993-12-07 Osaka Gas Co Ltd Refuse power plant
JPH074603A (en) * 1993-06-16 1995-01-10 Kawasaki Heavy Ind Ltd Refuse incinerating power-plant
JPH0783005A (en) * 1993-09-10 1995-03-28 Kawasaki Heavy Ind Ltd Compound refuse power generation plant

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5158234U (en) * 1974-10-30 1976-05-07
JPS6114455A (en) * 1984-06-29 1986-01-22 Takuma Co Ltd Exhaust heat recovery plant
JPH05288324A (en) * 1992-04-07 1993-11-02 Kumagai Gumi Co Ltd Energy recycling device
JPH05321611A (en) * 1992-05-13 1993-12-07 Osaka Gas Co Ltd Refuse power plant
JPH074603A (en) * 1993-06-16 1995-01-10 Kawasaki Heavy Ind Ltd Refuse incinerating power-plant
JPH0783005A (en) * 1993-09-10 1995-03-28 Kawasaki Heavy Ind Ltd Compound refuse power generation plant

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1122421A (en) * 1997-06-30 1999-01-26 Hitachi Ltd Refuse incinerating power plant
JP2010019233A (en) * 2008-07-14 2010-01-28 Kobe Steel Ltd Power generation facility
JP2014088812A (en) * 2012-10-30 2014-05-15 Takuma Co Ltd Operational method for urban refuse incineration plant with steam turbine power generation device and calculation controller for adjusting steam pressure of steam turbine inlet
EP2865853A1 (en) 2013-10-23 2015-04-29 Mitsubishi Hitachi Power Systems, Ltd. Combined cycle plant
JPWO2016103382A1 (en) * 2014-12-25 2017-09-21 三菱重工コンプレッサ株式会社 Combined cycle plant
JP2016148317A (en) * 2015-02-13 2016-08-18 株式会社タクマ Power generation facility utilizing heat recovery from combustion exhaust gas
CN105317482A (en) * 2015-12-03 2016-02-10 中国能源建设集团天津电力建设有限公司 Starting method of combined cycle unit
KR20180110106A (en) * 2016-02-19 2018-10-08 가부시키가이샤 고베 세이코쇼 Array recovery device and binary power generation device
CN108699999A (en) * 2016-02-19 2018-10-23 株式会社神户制钢所 Heat extraction and recovery device and Two-way Cycle power generator
US10711993B2 (en) 2016-02-19 2020-07-14 Kobe Steel, Ltd. Exhaust heat recovery device and binary electricity generation device
JP2017166812A (en) * 2016-03-16 2017-09-21 ゼネラル エレクトリック テクノロジー ゲゼルシャフト ミット ベシュレンクテル ハフツングGeneral Electric Technology GmbH System and method for heating component of waste heat recovery steam generator
CN111075523A (en) * 2018-10-22 2020-04-28 马勒国际有限公司 Waste heat utilization device, in particular for an internal combustion engine of a motor vehicle
CN110513164A (en) * 2019-08-06 2019-11-29 中国电力工程顾问集团华东电力设计院有限公司 A kind of waste incineration and generating electricity system

Also Published As

Publication number Publication date
JP3774487B2 (en) 2006-05-17

Similar Documents

Publication Publication Date Title
KR100592144B1 (en) Apparatus and methods for supplying auxiliary steam in a combined cycle system
US6339926B1 (en) Steam-cooled gas turbine combined power plant
CA2309058C (en) Method for closed-loop output control of a steam power plant, and a steam power plant
US7509794B2 (en) Waste heat steam generator
US20110225972A1 (en) Method for Operating a Waste Heat Steam Generator
JP2000161014A5 (en)
JPH08246814A (en) Combined cycle generation plant using refuse incinerator
JP4117517B2 (en) Coal gasification combined power plant and its operation control device.
US6651440B2 (en) Steam cooling apparatus for gas turbine
JP4905941B2 (en) Waste heat recovery boiler and its steam pressure control method
EP1273768B1 (en) Operation method for combined plant
JPH074603A (en) Refuse incinerating power-plant
JPS6291703A (en) Steaming preventive device for fuel economizer
JPH11148603A (en) Controller for coal/residual oil gassifying combined power generation plant
JP3133183B2 (en) Combined cycle power plant
WO1999015765A1 (en) Cooling steam control method for combined cycle power generation plants
JP2971629B2 (en) Waste heat recovery boiler
JPH02163402A (en) Compound electric power plant and its operation
JP2637194B2 (en) Combined plant startup bypass system and its operation method
JPS62162808A (en) Fuel-economizer steaming preventive device for thermal powerboiler system
JPH0335562B2 (en)
JPH05240402A (en) Method of operating waste heat recovery boiler
JPH051508A (en) Operation of flexible cogeneration plant
JPH06265103A (en) Discharged gas recombustion type combined cycle power generating plant
JPH0619201B2 (en) How to stop the exhaust heat recovery boiler

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050308

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050823

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20051024

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060214

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060220

LAPS Cancellation because of no payment of annual fees