JPH08246509A - Hydraulic control device for boom working machine - Google Patents

Hydraulic control device for boom working machine

Info

Publication number
JPH08246509A
JPH08246509A JP7054597A JP5459795A JPH08246509A JP H08246509 A JPH08246509 A JP H08246509A JP 7054597 A JP7054597 A JP 7054597A JP 5459795 A JP5459795 A JP 5459795A JP H08246509 A JPH08246509 A JP H08246509A
Authority
JP
Japan
Prior art keywords
pressure
boom
pump
load pressure
boom cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP7054597A
Other languages
Japanese (ja)
Inventor
Takahiro Kobayashi
隆博 小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobelco Construction Machinery Co Ltd
Kobe Steel Ltd
Original Assignee
Kobe Steel Ltd
Yutani Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobe Steel Ltd, Yutani Heavy Industries Ltd filed Critical Kobe Steel Ltd
Priority to JP7054597A priority Critical patent/JPH08246509A/en
Publication of JPH08246509A publication Critical patent/JPH08246509A/en
Pending legal-status Critical Current

Links

Landscapes

  • Operation Control Of Excavators (AREA)
  • Fluid-Pressure Circuits (AREA)

Abstract

PURPOSE: To prevent the slip-down of a boom, at least, when started and select and change various discharge pressure setting patterns for a pump. CONSTITUTION: The load pressure of a boom cylinder circuit A is detected by a pressure sensor 22 and the maximum values of the load pressures of other actuator circuits B, C, D are selected by high pressure selection valves 14, 14 and converted into electric signals by a pressure sensor 24, to feed these detected signals into a controller 23. A set pressure command signal is output from the controller 23 to an electromagnetically proportional pump pressure control valve 27.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は油圧ショベルやクレーン
等のブームを備えた作業機械の油圧制御装置に関するも
のである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a hydraulic control device for a work machine equipped with a boom such as a hydraulic excavator or a crane.

【0002】[0002]

【従来の技術】油圧ショベルを例にとって従来技術を説
明する。
2. Description of the Related Art A conventional technology will be described by taking a hydraulic excavator as an example.

【0003】油圧ショベルは、油圧アクチュエータとし
て、ブームを起伏させるブームシリンダ、アームを作動
させるアームシリンダと、バケットを駆動するバケット
シリンダと、上部旋回体を旋回させる旋回モータとを具
備し、これらを一つの油圧ポンプで駆動する1ポンプ方
式をとっている。
A hydraulic excavator comprises, as hydraulic actuators, a boom cylinder for hoisting a boom, an arm cylinder for operating an arm, a bucket cylinder for driving a bucket, and a swing motor for swinging an upper swing body. It uses a single pump system that is driven by two hydraulic pumps.

【0004】この1ポンプ方式をとる従来の油圧制御装
置を図3に示している。
FIG. 3 shows a conventional hydraulic control device which adopts this one-pump system.

【0005】同図において、Aはブームシリンダ1を駆
動するブームシリンダ回路、Bはアームシリンダ2を駆
動するアームシリンダ回路、Cは旋回モータ3を駆動す
る旋回モータ回路、Dはバケットシリンダ4を駆動する
バケットシリンダ回路で、これら各回路(アクチュエー
タ回路という)A,B,C,Dが一つの油圧ポンプ5に
パラレルに接続されている。
In the figure, A is a boom cylinder circuit that drives the boom cylinder 1, B is an arm cylinder circuit that drives the arm cylinder 2, C is a swing motor circuit that drives the swing motor 3, and D is a bucket cylinder 4. In the bucket cylinder circuit, the respective circuits (referred to as actuator circuits) A, B, C and D are connected to one hydraulic pump 5 in parallel.

【0006】各アクチュエータ回路A,B,C,Dに
は、油圧パイロット式のコントロールバルブ6,7,
8,9が設けられ、図示しないリモコン弁の操作により
これら各コントロールバルブ6〜9が切換わり作動して
各アクチュエータの作動が制御される。
Each actuator circuit A, B, C, D has a hydraulic pilot type control valve 6, 7,
8 and 9 are provided, and the operation of each actuator is controlled by switching and operating these control valves 6 to 9 by operating a remote control valve (not shown).

【0007】図中、10はポンプ吐出圧に応じてポンプ
吐出流量を制御するためのレギュレータである。
In the figure, 10 is a regulator for controlling the pump discharge flow rate according to the pump discharge pressure.

【0008】このような1ポンプ方式の油圧制御装置に
おいては、ポンプ吐出側にポンプ吐出圧を制御する油圧
パイロット式のポンプ圧制御弁(圧力制御弁)11を設
け、複数のアクチュエータが同時に操作される複合操作
時に、ポンプ吐出圧を、各アクチュエータ1〜4の要求
する圧力(負荷圧)の最高値以上の値に補償するポンプ
圧補償制御を行うようにしている。
In such a one-pump type hydraulic control device, a hydraulic pilot type pump pressure control valve (pressure control valve) 11 for controlling the pump discharge pressure is provided on the pump discharge side, and a plurality of actuators are operated simultaneously. During the combined operation described above, the pump pressure compensation control is performed to compensate the pump discharge pressure to a value equal to or higher than the maximum value of the pressure (load pressure) required by each actuator 1 to 4.

【0009】なお、このような油圧制御装置において
は、負荷圧の変動に関係なく各アクチュエータ1〜4に
それぞれのコントロールバルブ6〜9の操作量に応じた
流量を供給するために、コントロールバルブ6〜9の入
口側と出口側の差圧を一定に保つ圧力補償弁12…が設
けられる。
In such a hydraulic control device, in order to supply a flow rate corresponding to the operation amount of each control valve 6-9 to each actuator 1-4 regardless of the fluctuation of the load pressure, the control valve 6 The pressure compensating valves 12 ... Which keep constant the differential pressure between the inlet side and the outlet side of .about.9 are provided.

【0010】ここで、従来の制御装置では、上記ポンプ
圧補償制御を行う手段として、図示のように各アクチュ
エータ回路A,B,C,Dの負荷圧をコントロールバル
ブ6〜9の負荷圧ポートから負荷圧検出管路13…に取
出し、この負荷圧のうち高圧側を複数の高圧選択弁(シ
ャトル弁)14…によって選択し、選択された最高の負
荷圧Pmをポンプ圧制御弁12のバネ側に供給し、ポン
プ吐出圧P0を、 P0=F(バネ力)+Pm に設定するようにしている。
Here, in the conventional control device, as a means for performing the pump pressure compensation control, the load pressure of each actuator circuit A, B, C, D is supplied from the load pressure ports of the control valves 6 to 9 as shown in the figure. The load pressure is detected in the load pressure detection pipe line 13, the high pressure side of the load pressure is selected by a plurality of high pressure selection valves (shuttle valves) 14, and the selected maximum load pressure Pm is set on the spring side of the pump pressure control valve 12. The pump discharge pressure P0 is set to P0 = F (spring force) + Pm.

【0011】[0011]

【発明が解決しようとする課題】ところが、上記構成に
よると、次のような欠点があった。
However, the above-mentioned configuration has the following drawbacks.

【0012】(i)各アクチュエータ回路A,B,C,
Dの負荷圧を負荷圧検出管路13…に取り込み、高圧選
択弁14…によって高圧値を選択する構成であるため、
この負荷圧検出管路13…の総管路容量が大きくなる。
(I) Each actuator circuit A, B, C,
Since the load pressure of D is taken into the load pressure detection pipes 13 ... And the high pressure value is selected by the high pressure selection valve 14 ...
The total pipeline capacity of the load pressure detection pipelines 13 ...

【0013】従って、同管路13…内の油の圧縮ボリュ
ームが大きく、かつ、油のリークも多くなるため、アク
チュエータ保持後の作動始めに、負荷側の油が同管路1
3…内に流入してアクチュエータが瞬間的にずり落ちる
現象が生じ、機械全体にショックを与える。
Therefore, since the compression volume of oil in the pipelines 13 ... Is large and the amount of oil leakage is large, the oil on the load side is removed from the pipelines 1 at the beginning of operation after holding the actuator.
The phenomenon that the actuator flows into the inside of the cylinder 3 and momentarily slides down, giving a shock to the entire machine.

【0014】とくに、ブームシリンダ1の場合、他のア
クチュエータと比較して格段に保持圧が高いため、この
ずり落ちが生じ易く、大きな問題となっていた。
In particular, in the case of the boom cylinder 1, since the holding pressure is much higher than that of other actuators, this slip-off easily occurs, which is a big problem.

【0015】(ii) 常に最高負荷圧Pmのみに基づい
てポンプ吐出圧P0を設定するため、 たとえばブーム起立・旋回の複合操作時に、ブーム
操作優先の見地からブームシリンダ1の負荷圧に基づい
てポンプ吐出圧を設定したいにもかかわらず、旋回モー
タ3の負荷圧の方が高いためにこの旋回モータ圧によっ
てポンプ吐出圧が決定されてしまい、 馬力一定制御を行う回路の場合、ポンプ吐出圧が高
くなると吐出流量が低下するため、高圧が不必要でしか
も大流量が要求される作業時に流量不足が生じ(とくに
ブームシリンダに起こり易い)、作業効率が悪くなる
等、ポンプ圧制御が一元的になり、制御の融通性が悪い
ものとなっていた。
(Ii) Since the pump discharge pressure P0 is always set only on the basis of the maximum load pressure Pm, for example, during a combined boom raising / turning operation, the pump is pumped based on the load pressure of the boom cylinder 1 from the viewpoint of boom operation priority. Although the discharge pressure is desired to be set, the pump discharge pressure is determined by this swing motor pressure because the load pressure of the swing motor 3 is higher, and in the case of a circuit that performs constant horsepower control, the pump discharge pressure is high. If this happens, the discharge flow rate will decrease, resulting in a lack of flow rate during work where high pressure is not required and a large flow rate is required (especially in the boom cylinder), resulting in poor work efficiency. The control flexibility was poor.

【0016】そこで本発明は、少なくともブームの作動
始めのずり落ちを防止できるとともに、ポンプ吐出圧の
設定パタ―ンを種々選択・変更することができるブーム
作業機械の油圧制御装置を提供するものである。
Therefore, the present invention provides at least a hydraulic control device for a boom working machine capable of preventing the boom from slipping off at the beginning of operation and being able to select and change various setting patterns of pump discharge pressure. is there.

【0017】[0017]

【課題を解決するための手段】請求項1の発明は、次の
構成を具備するものである。
The invention according to claim 1 has the following construction.

【0018】(A)ブームシリンダの作動を制御するブ
ームシリンダ回路と、旋回モータの作動を制御する旋回
モータ回路を含む複数のアクチュエータ回路が一つの油
圧ポンプにパラレルに接続されていること。
(A) A plurality of actuator circuits including a boom cylinder circuit for controlling the operation of the boom cylinder and a swing motor circuit for controlling the operation of the swing motor are connected in parallel to one hydraulic pump.

【0019】(B)この各アクチュエータ回路の負荷圧
を検出する負荷圧検出手段を具備し、このうち、少なく
とも上記ブームシリンダ回路の負荷圧検出手段として、
圧力を電気信号に変換する圧力センサが用いられている
こと。
(B) A load pressure detecting means for detecting the load pressure of each actuator circuit is provided, and at least the load pressure detecting means for the boom cylinder circuit is
A pressure sensor that converts pressure into an electrical signal is used.

【0020】(C)上記油圧ポンプの吐出圧を制御する
電磁比例式のポンプ圧制御弁が設けられていること。
(C) An electromagnetic proportional pump pressure control valve for controlling the discharge pressure of the hydraulic pump is provided.

【0021】(D)上記負荷圧検出手段からの検出信号
に基づいて上記ポンプ圧制御弁に対する設定圧指令信号
を出力するコントローラを具備すること。
(D) A controller for outputting a set pressure command signal to the pump pressure control valve based on a detection signal from the load pressure detecting means.

【0022】請求項2の発明は、請求項1の構成におい
て、ブームシリンダがブーム起立側に操作されたことを
検出するブーム起立検出手段と、旋回モータが旋回操作
されたことを検出する旋回検出手段とが設けられ、コン
トローラが、これら両検出手段の検出信号に基づきブー
ム起立・旋回の複合操作時にブームシリンダ回路の負荷
圧を基準としてポンプ圧制御弁に対する設定圧指令信号
を出力するように構成されたものである。
According to a second aspect of the present invention, in the structure of the first aspect, boom raising detection means for detecting that the boom cylinder has been operated to the boom raising side, and swing detection for detecting that the turning motor has been turned. Means is provided, and the controller outputs a set pressure command signal to the pump pressure control valve based on the load pressure of the boom cylinder circuit as a reference during the combined boom raising / turning operation based on the detection signals of these detection means. It was done.

【0023】請求項3の発明は、請求項1の構成におい
て、ブームシリンダがブーム倒伏側に操作されたことを
検出するブーム倒伏検出手段と、旋回モータが操作され
たことを検出する旋回検出手段とが設けられ、コントロ
ーラが、これら両検出手段の検出信号に基づきブーム倒
伏・旋回の複合操作時にブームシリンダ回路および旋回
モータ回路の負荷圧の平均値を基準としてポンプ圧制御
弁に対する設定圧指令信号を出力するように構成された
ものである。
According to a third aspect of the present invention, in the structure of the first aspect, boom fall detection means for detecting that the boom cylinder has been operated toward the boom fall side, and swing detection means for detecting that the swing motor has been operated. Based on the detection signals of these detection means, the controller sets the command signal for the pump pressure control valve to the pump pressure control valve based on the average load pressure of the boom cylinder circuit and the swing motor circuit during the combined operation of the boom collapse and swing. Is configured to output.

【0024】[0024]

【作用】上記構成によると、少なくともブームシリンダ
回路の負荷圧を、従来のような高圧選択弁ではなく圧力
センサによって検出するため、ブームシリンダ回路につ
いては、負荷圧検出管路が独立し、かつその管路容積が
小さくなる。
According to the above construction, at least the load pressure of the boom cylinder circuit is detected by the pressure sensor instead of the conventional high pressure selection valve. Therefore, in the boom cylinder circuit, the load pressure detection pipeline is independent and The pipe volume becomes smaller.

【0025】従って、同管路内の油の圧縮ボリュームが
小さく、リークも少なくなるため、保持後、作動始めの
ブームの瞬間的なずり落ちを防止することができる。
Therefore, the compression volume of the oil in the conduit is small and the leakage is also small, so that it is possible to prevent the momentary sliding down of the boom at the beginning of operation after holding.

【0026】また、負荷圧検出手段からの検出信号をコ
ントローラに送り込み、このコントローラから電磁比例
式のポンプ圧制御弁に設定圧指令信号を出力するため、
複合操作時のアクチュエータの組合せ等に応じてコント
ローラでの処理内容を異ならせることにより、ポンプ吐
出圧の設定パタ―ンを種々選択・変更することができ
る。
Further, since the detection signal from the load pressure detecting means is sent to the controller and the controller outputs the set pressure command signal to the electromagnetic proportional pump pressure control valve,
The setting pattern of the pump discharge pressure can be variously selected and changed by changing the processing content in the controller according to the combination of actuators in the combined operation.

【0027】この場合、請求項2の構成によると、ブー
ム起立・旋回の複合操作時に、ブームシリンダの負荷圧
を基準にしてポンプ吐出圧を設定するため、ブームシリ
ンダの必要流量を確保したブーム優先での複合操作を行
うことができる。
In this case, according to the second aspect of the invention, the pump discharge pressure is set on the basis of the load pressure of the boom cylinder during the combined boom raising / turning operation. You can perform complex operations in.

【0028】一方、請求項3の構成によると、たとえば
バケットを地面に押しつけながら旋回する均し作業のよ
うなブーム倒伏・旋回の複合操作時に、ブームシリンダ
の負荷圧と旋回モータの負荷圧の平均値を基準にしてポ
ンプ吐出圧を設定するため、ブーム倒伏および旋回の両
動作ともバランス良く行わせることができる。
On the other hand, according to the third aspect of the present invention, the average load pressure of the boom cylinder and the load pressure of the swing motor is averaged during a combined operation of boom collapse / swing, such as a leveling work in which the bucket is swung while pressing it against the ground. Since the pump discharge pressure is set based on the value, both boom fall and turn operations can be performed in good balance.

【0029】[0029]

【実施例】本発明の実施例を図1,2によって説明す
る。
Embodiments of the present invention will be described with reference to FIGS.

【0030】図1に示す油圧制御装置において、図3に
示す従来の制御装置と同一部分には同一符号を付して示
し、その重複説明を省略する。
In the hydraulic control system shown in FIG. 1, the same parts as those of the conventional control system shown in FIG.

【0031】ブームシリンダ回路Aにおけるコントロー
ルバルブ6の負荷圧ポートに負荷圧検出管路21が接続
され、同管路21に取り込まれたブームシリンダ負荷圧
PBが圧力センサ(以下、負荷圧センサという)22に
より電気信号に変換されてコントローラ23に送られる
ようになっている。
A load pressure detecting pipe 21 is connected to the load pressure port of the control valve 6 in the boom cylinder circuit A, and the boom cylinder load pressure PB taken into the pipe 21 is a pressure sensor (hereinafter referred to as a load pressure sensor). It is adapted to be converted into an electric signal by 22 and sent to the controller 23.

【0032】一方、アームシリンダ回路B、旋回モータ
回路C、バケットシリンダ回路Dの負荷圧はそれぞれ負
荷圧検出回路13…に取り込まれて高圧選択弁(シャト
ル弁)14,14により高圧値が選択され、選択された
負荷圧の最高値(以下、最高負荷圧という)P1が圧力
センサ24により電気信号に変換されてコントローラ2
3に送られる。
On the other hand, the load pressures of the arm cylinder circuit B, the swing motor circuit C and the bucket cylinder circuit D are respectively taken into the load pressure detection circuits 13 ... And the high pressure values are selected by the high pressure selection valves (shuttle valves) 14, 14. The maximum value of the selected load pressure (hereinafter referred to as the maximum load pressure) P1 is converted into an electric signal by the pressure sensor 24, and the controller 2
Sent to 3.

【0033】また、ブームシリンダ回路Aにおけるコン
トロールバルブ6のブーム起立側パイロット圧Pb1、
および旋回モータ回路Cの負荷圧PSがそれぞれ圧力セ
ンサ25,26によって検出され、電気信号に変換され
てコントローラ23に送られるようになっている。
Further, the boom raising side pilot pressure Pb1 of the control valve 6 in the boom cylinder circuit A,
The load pressure PS of the swing motor circuit C is detected by the pressure sensors 25 and 26, converted into an electric signal and sent to the controller 23.

【0034】さらに、ポンプ吐出側に電磁比例式のポン
プ圧制御弁(圧力制御弁)27が設けられ、このポンプ
圧制御弁27によってポンプ5の吐出圧が設定される。
Further, an electromagnetic proportional pump pressure control valve (pressure control valve) 27 is provided on the pump discharge side, and the pump pressure control valve 27 sets the discharge pressure of the pump 5.

【0035】コントローラ23は、各センサ22,2
4,25,26からの検出信号PB,P1,Pb1,P
Sに基づいて設定圧Puを演算し、ポンプ圧制御弁27
にこの設定圧Puの指令信号(電流)を出力する。
The controller 23 includes the sensors 22, 2
Detection signals PB, P1, Pb1, P from 4, 25, 26
The set pressure Pu is calculated based on S, and the pump pressure control valve 27
The command signal (current) of the set pressure Pu is output to.

【0036】このコントローラ23は、ブーム・旋回の
複合操作時には、ブームシリンダ負荷圧PB、またはこ
のシリンダ負荷圧PBと旋回負荷圧PSの平均値を基準
として設定圧Puを演算・出力し、それ以外には最高負
荷圧P1に基づいて設定圧Puを演算・出力する。
This controller 23 calculates and outputs the set pressure Pu based on the boom cylinder load pressure PB or the average value of the cylinder load pressure PB and the swing load pressure PS during the combined boom / swing operation, and otherwise. , The set pressure Pu is calculated and output based on the maximum load pressure P1.

【0037】この作用を図2によって説明すると、制御
開始とともに各センサ22,24,25,26によって
検出された圧力PB,P1,PS,Pb1,が読み込ま
れ(ステップ1)、ステップ2でPb1>0か否か、す
なわちブームシリンダ用コントロールバルブ6がブーム
起立側に操作されたか否か、またステップ3でPS>0
か否か、すなわち旋回モータ3が作動しているか否かが
それぞれ判断される。
This operation will be described with reference to FIG. 2. When the control is started, the pressures PB, P1, PS, Pb1 detected by the sensors 22, 24, 25, 26 are read (step 1), and in step 2, Pb1> 0, that is, whether or not the boom cylinder control valve 6 has been operated to the boom erection side, and in step 3 PS> 0
It is determined whether or not, that is, whether or not the turning motor 3 is operating.

【0038】この両ステップ2,3でYESの場合、つ
まりブーム起立・旋回の複合操作時には、ステップ4で Pu=PB+α により、設定圧Puが、ブームシリンダ負荷圧PBを基
準にして同負荷圧PBよりαだけ高い値に決定され、ポ
ンプ圧制御弁27に出力される。
If YES in both steps 2 and 3, that is, in the combined operation of raising and turning the boom, in step 4, the set pressure Pu is equal to the load pressure PB based on the boom cylinder load pressure PB by Pu = PB + α. The value is determined to be higher by α and output to the pump pressure control valve 27.

【0039】一方、ステップ3でNOの場合、つまり旋
回操作が行われていない場合には、ステップ5でブーム
シリンダ負荷圧PBが最高負荷圧P1よりも高いか否か
が判断され、YES(PB>P1)の場合はステップ6
で、NO(PB<P1)の場合はステップ7で、それぞ
れ設定圧PuがPBまたはP1以上の値(PB+α、ま
たはP1+α)として求められる。
On the other hand, if NO in step 3, that is, if the turning operation is not performed, it is determined in step 5 whether the boom cylinder load pressure PB is higher than the maximum load pressure P1 and YES (PB > P1), step 6
If NO (PB <P1), the set pressure Pu is obtained as a value (PB + α or P1 + α) not less than PB or P1 in step 7.

【0040】また、ステップ2でNOの場合、つまりブ
ーム起立操作が行われていない場合は、ステップ8でP
B>0か(ブームシリンダ1が作動しているか否か=ブ
ーム倒伏操作か否か)が判断され、NOの場合には、ブ
ーム操作が行われていないため、ステップ7で設定圧P
uが、 Pu=P1+α によって求められる。
If NO at step 2, that is, if boom raising operation is not performed, at step 8, P
It is determined whether B> 0 (whether or not the boom cylinder 1 is operating = whether or not the boom is being lowered), and if NO, it means that the boom operation is not performed, and therefore the set pressure P is set in step 7.
u is determined by Pu = P1 + α.

【0041】一方、ステップ8でYES、つまりブーム
倒伏操作がされていると判断された場合は、さらにステ
ップ9でPS>0か否か(旋回操作されているか否か)
が判断される。
On the other hand, if YES in step 8, that is, if it is determined that the boom laying down operation is performed, whether PS> 0 is further satisfied in step 9 (whether or not the turning operation is performed).
Is judged.

【0042】ここでYES、つまりブーム倒伏・旋回の
複合操作であると判別されると、ステップ10で設定圧
Puが、 Pu=(PS+PB)/2+α により、旋回負荷圧PSとブームシリンダ負荷圧PBの
平均値を基準とした値として求められる。
If YES, that is, if it is determined that the operation is the combined operation of boom fall and turn, the set pressure Pu is set to Pu = (PS + PB) / 2 + α in step 10 and the swing load pressure PS and the boom cylinder load pressure PB are obtained. It is calculated as a value based on the average value of.

【0043】なお、ステップ9でNO(非旋回)の場合
は、ステップ5に移行する。
If NO in step 9 (non-turning), the process proceeds to step 5.

【0044】このように、ブームシリンダ回路Aの負荷
圧PBを負荷圧センサ22によって検出するため、この
ブームシリンダ回路Aの負荷圧検出管路21が他の負荷
圧検出管路13…から独立し、その管路容積が小さくな
る。
As described above, since the load pressure PB of the boom cylinder circuit A is detected by the load pressure sensor 22, the load pressure detection conduit 21 of the boom cylinder circuit A is independent of the other load pressure detection conduits 13 ... , The pipe volume becomes smaller.

【0045】従って、負荷圧検出管路21内の油の圧縮
ボリュームが小さく、かつ油のリークも少なくなるた
め、ブームの保持後、作動し始めにブームシリンダ側の
油が負荷検出管路21内に流入すること、すなわちブー
ムの瞬間的なずり落ちが防止される。
Therefore, the compression volume of the oil in the load pressure detecting pipe line 21 is small and the oil leak is also small. Therefore, after the boom is held, the oil on the boom cylinder side starts to operate in the load detecting pipe line 21. Flow into the air, that is, a momentary slip of the boom is prevented.

【0046】また、ブーム起立・旋回の複合操作時に、
大流量を必要とするブームシリンダ負荷圧を基準にして
ポンプ吐出圧Puを設定するため、旋回圧に基づいてポ
ンプ圧を設定する場合のように、旋回始動時の高い旋回
圧に基づいてポンプ吐出流量が少なくなり、ブームシリ
ンダの流量が不足するという不都合がなくなる。
Further, during the combined operation of raising and turning the boom,
Since the pump discharge pressure Pu is set based on the boom cylinder load pressure that requires a large flow rate, the pump discharge is set based on the high swing pressure at the start of swing, as in the case where the pump pressure is set based on the swing pressure. The flow rate decreases, and the inconvenience of insufficient flow rate in the boom cylinder is eliminated.

【0047】すなわち、油圧ショベルにおいてこの複合
操作時に良好とされるブーム優先での操作を行うことが
できる。
That is, in the hydraulic excavator, it is possible to perform the boom-priority operation, which is considered good at the time of this composite operation.

【0048】一方、ブーム倒伏・旋回の複合操作時に
は、シリンダ負荷圧PBと旋回負荷圧PSの平均値を基
準としてポンプ吐出圧Puを設定するため、負荷圧が低
いブーム倒伏動作と、負荷圧は高くなるが基本的に流量
制御(スピード制御)を行いたい旋回動作をバランス良
く行わせることができる。
On the other hand, in the combined operation of boom collapse / swing, since the pump discharge pressure Pu is set with the average value of the cylinder load pressure PB and the swing load pressure PS as a reference, the boom collapse operation with a low load pressure and the load pressure are Although it is higher, it is possible to basically perform a well-balanced swiveling operation for which flow rate control (speed control) is desired.

【0049】他の実施例 (1)上記実施例では、他のアクチュエータと比較して
保持圧が格段に高く、作動始めのずり落ちが起こり易い
ブームシリンダ1についてのみ圧力センサ22によって
負荷圧を検出する構成をとったが、他のアクチュエータ
についても必要に応じて圧力センサによって負荷圧を検
出するようにしてもよい。
Other Embodiments (1) In the above embodiments, the holding pressure is much higher than that of other actuators, and the load pressure is detected by the pressure sensor 22 only for the boom cylinder 1 which is liable to slip off at the beginning of operation. However, the pressure sensor may detect the load pressure of other actuators as necessary.

【0050】また、本発明は、上記実施例で例示した油
圧ショベルに限らず、クレーン等、ブームを備えた作業
機械に広く適用することができ、この適用される作業機
械に応じて圧力センサによる負荷圧の検出対象をブーム
シリンダを含めて選択すればよい。
Further, the present invention is not limited to the hydraulic excavators exemplified in the above embodiments, but can be widely applied to work machines equipped with a boom such as a crane, and pressure sensors can be used according to the applied work machines. It is sufficient to select the load pressure detection target including the boom cylinder.

【0051】(2)上記実施例では、ポンプ吐出圧を、
ブーム・旋回の複合操作時にはブームシリンダ負荷圧等
を基準として設定し、それ以外は最高負荷圧に基づいて
設定する場合を例示したが、このポンプ吐出圧の設定パ
タ―ンは、作業の種類や作業機械の種類等に応じて種々
選択することができる。
(2) In the above embodiment, the pump discharge pressure is
In the combined operation of boom and swing, the boom cylinder load pressure is set as a reference, and the other settings are set based on the maximum load pressure.The setting pattern of pump discharge pressure depends on the type of work and work. Various selections can be made according to the type of work machine.

【0052】[0052]

【発明の効果】上記のように本発明によるときは、少な
くともブームシリンダ回路の負荷圧を、従来のような高
圧選択弁ではなく圧力センサによって検出する構成とし
たから、ブームシリンダ回路については負荷圧検出管路
が独立し、かつ管路容積が小さくなる。
As described above, according to the present invention, at least the load pressure of the boom cylinder circuit is detected by the pressure sensor instead of the conventional high pressure selection valve. The detection conduits are independent and the conduit volume is small.

【0053】従って、この負荷検出管路内の油の圧縮ボ
リュームが小さく、リークも少なくなるため、保持後、
作動始めにブームシリンダ側の油が同管路内に流入する
現象、すなわちブームの瞬間的なずり落ちを防止するこ
とができる。
Therefore, since the compression volume of the oil in the load detecting pipe is small and the leak is also small, after the holding,
It is possible to prevent a phenomenon in which oil on the boom cylinder side flows into the pipeline at the beginning of operation, that is, a momentary slipping of the boom.

【0054】また、上記圧力センサを含む負荷圧検出手
段からの検出信号をコントローラに送り込み、このコン
トローラから電磁比例式のポンプ圧制御弁に設定圧指令
信号を出力するため、複合操作時のアクチュエータの組
合せ等に応じてコントローラでの処理内容を異ならせる
ことにより、ポンプ吐出圧の設定パタ―ンを種々選択・
変更することができる。
Further, the detection signal from the load pressure detecting means including the pressure sensor is sent to the controller, and the controller outputs the set pressure command signal to the electromagnetic proportional pump pressure control valve. By changing the processing contents in the controller according to the combination etc., various setting patterns of pump discharge pressure can be selected.
Can be changed.

【0055】この場合、請求項2の発明によると、ブー
ム起立・旋回の複合操作時に、ブームシリンダの負荷圧
を基準にしてポンプ吐出圧を設定するため、ブームシリ
ンダの必要流量を確保したブーム優先での複合操作を行
うことができる。
In this case, according to the second aspect of the invention, the pump discharge pressure is set on the basis of the load pressure of the boom cylinder during the combined operation of raising and turning the boom. You can perform complex operations in.

【0056】一方、請求項3の発明によると、たとえば
バケットを地面に押しつけながら旋回する地均し作業の
ようなブーム倒伏・旋回の複合操作時に、ブームシリン
ダの負荷圧と旋回モータの負荷圧の平均値を基準にして
ポンプ吐出圧を設定するため、ブーム倒伏および旋回の
両動作ともバランス良く行わせることができる。
On the other hand, according to the third aspect of the present invention, the load pressure of the boom cylinder and the load pressure of the swing motor can be reduced during a combined operation of boom collapse and swing such as leveling work in which the bucket is swung while pressing it against the ground. Since the pump discharge pressure is set based on the average value, both boom fall and turn operations can be performed with good balance.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施例にかかる油圧制御装置の構成を
示す図である。
FIG. 1 is a diagram showing a configuration of a hydraulic control device according to an embodiment of the present invention.

【図2】同装置の作用を説明するためのフローチャート
である。
FIG. 2 is a flowchart for explaining the operation of the device.

【図3】従来の油圧制御装置の構成を示す図である。FIG. 3 is a diagram showing a configuration of a conventional hydraulic control device.

【符号の説明】[Explanation of symbols]

A ブームシリンダ回路 B アームシリンダ回路 C 旋回モータ回路 D バケットシリンダ回路 1 ブームシリンダ 2 アームシリンダ 3 旋回モータ 4 バケットシリンダ 5 油圧ポンプ 6,7,8,9 コントロールバルブ 11… 圧力補償弁 27 ポンプ圧制御弁 22 ブームシリンダ負荷圧を検出する圧力センサ 23 コントローラ 25 ブーム起立検出用の圧力センサ 26 旋回モータ負荷圧を検出する圧力センサ A boom cylinder circuit B arm cylinder circuit C swing motor circuit D bucket cylinder circuit 1 boom cylinder 2 arm cylinder 3 swing motor 4 bucket cylinder 5 hydraulic pump 6, 7, 8, 9 control valve 11 ... pressure compensation valve 27 pump pressure control valve 22 Pressure Sensor for Detecting Boom Cylinder Load Pressure 23 Controller 25 Pressure Sensor for Boom Standing Detection 26 Pressure Sensor for Detecting Swing Motor Load Pressure

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 次の構成を具備することを特徴とするブ
ーム作業機械の油圧制御装置。 (A)ブームシリンダの作動を制御するブームシリンダ
回路と、旋回モータの作動を制御する旋回モータ回路と
を含む複数のアクチュエータ回路が一つの油圧ポンプに
パラレルに接続されていること。 (B)この各アクチュエータ回路の負荷圧を検出する負
荷圧検出手段を具備し、このうち、少なくとも上記ブー
ムシリンダ回路の負荷圧検出手段として、圧力を電気信
号に変換する圧力センサが用いられていること。 (C)上記油圧ポンプの吐出圧を制御する電磁比例式の
ポンプ圧制御弁が設けられていること。 (D)上記負荷圧検出手段からの検出信号に基づいて上
記ポンプ圧制御弁に対する設定圧指令信号を出力するコ
ントローラを具備すること。
1. A hydraulic control device for a boom work machine, comprising: (A) A plurality of actuator circuits including a boom cylinder circuit that controls the operation of the boom cylinder and a swing motor circuit that controls the operation of the swing motor are connected in parallel to one hydraulic pump. (B) A load pressure detecting means for detecting the load pressure of each actuator circuit is provided, and a pressure sensor for converting pressure into an electric signal is used as at least the load pressure detecting means for the boom cylinder circuit. thing. (C) An electromagnetic proportional pump pressure control valve for controlling the discharge pressure of the hydraulic pump is provided. (D) A controller for outputting a set pressure command signal to the pump pressure control valve based on a detection signal from the load pressure detecting means.
【請求項2】 請求項1記載のブーム作業機械の油圧制
御装置において、ブームシリンダがブーム起立側に操作
されたことを検出するブーム起立検出手段と、旋回モー
タが操作されたことを検出する旋回検出手段とが設けら
れ、コントローラが、これら両検出手段の検出信号に基
づきブーム起立・旋回の複合操作時にブームシリンダ回
路の負荷圧を基準としてポンプ圧制御弁に対する設定圧
指令信号を出力するように構成されたことを特徴とする
ブーム作業機械の油圧制御装置。
2. The hydraulic control device for a boom working machine according to claim 1, wherein boom raising detection means detects that the boom cylinder is operated to the boom raising side, and turning that detects that the turning motor is operated. A detection means is provided so that the controller outputs a set pressure command signal to the pump pressure control valve based on the load pressure of the boom cylinder circuit during the combined boom raising / turning operation based on the detection signals of both detection means. A hydraulic control device for a boom work machine characterized by being configured.
【請求項3】 請求項1記載のブーム作業機械の油圧制
御装置において、ブームシリンダがブーム倒伏側に操作
されたことを検出するブーム倒伏検出手段と、旋回モー
タが操作されたことを検出する旋回検出手段とが設けら
れ、コントローラが、これら両検出手段の検出信号に基
づきブーム倒伏・旋回の複合操作時にブームシリンダ回
路および旋回モータ回路の負荷圧の平均値を基準として
ポンプ圧制御弁に対する設定圧指令信号を出力するよう
に構成されたことを特徴とするブーム作業機械の油圧制
御装置。
3. The hydraulic control device for a boom work machine according to claim 1, wherein boom fall detection means for detecting that the boom cylinder has been operated to the boom fall side, and swing for detecting that the swing motor has been operated. Based on the detection signals of these detection means, the controller sets the set pressure for the pump pressure control valve based on the average value of the load pressure of the boom cylinder circuit and the swing motor circuit during the combined operation of boom collapse and swing. A hydraulic control device for a boom working machine, which is configured to output a command signal.
JP7054597A 1995-03-14 1995-03-14 Hydraulic control device for boom working machine Pending JPH08246509A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7054597A JPH08246509A (en) 1995-03-14 1995-03-14 Hydraulic control device for boom working machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7054597A JPH08246509A (en) 1995-03-14 1995-03-14 Hydraulic control device for boom working machine

Publications (1)

Publication Number Publication Date
JPH08246509A true JPH08246509A (en) 1996-09-24

Family

ID=12975151

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7054597A Pending JPH08246509A (en) 1995-03-14 1995-03-14 Hydraulic control device for boom working machine

Country Status (1)

Country Link
JP (1) JPH08246509A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009185909A (en) * 2008-02-06 2009-08-20 Bosch Rexroth Corp Directional control valve
CN109563696A (en) * 2017-05-09 2019-04-02 日立建机株式会社 Work machine
WO2021004397A1 (en) * 2019-07-09 2021-01-14 中国矿业大学 Large flow valve-pump joint control emulsion pump station and control method therefor

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009185909A (en) * 2008-02-06 2009-08-20 Bosch Rexroth Corp Directional control valve
CN109563696A (en) * 2017-05-09 2019-04-02 日立建机株式会社 Work machine
US10968604B2 (en) 2017-05-09 2021-04-06 Hitachi Construction Machinery Co., Ltd. Work machine
CN109563696B (en) * 2017-05-09 2021-05-07 日立建机株式会社 Working machine
WO2021004397A1 (en) * 2019-07-09 2021-01-14 中国矿业大学 Large flow valve-pump joint control emulsion pump station and control method therefor

Similar Documents

Publication Publication Date Title
US7059125B2 (en) Hydraulic controller for construction machine
EP1798346B1 (en) Control device for hydraulic drive machine
EP0644335A1 (en) Hydraulic drive for hydraulic work machine
JP5785714B2 (en) Swing motor control method for hydraulic system for excavator of open center system
WO1995004227A1 (en) Hydraulic device for a working machine
US9920780B2 (en) Slewing drive apparatus for construction machine
EP2215342B1 (en) Process for electro-hydraulic circuits and systmes involving excavator boom-swing power management
EP1830066B1 (en) Hydraulic control apparatus of working machine
JPH07208404A (en) Equipment and method of controlling engine and pump of hydraulic type construction equipment
EP3505688B1 (en) System for controlling construction machinery and method for controlling construction machinery
JPH0276904A (en) Hydraulic drive device
EP2503067B1 (en) Hydraulic pump control device and control method for construction machinery
JPH11303147A (en) Controller for hydraulic drive machine
JP3606976B2 (en) Hydraulic control system for hydraulic working machine
JP2578371B2 (en) Displacement control device for variable displacement pump
US11060261B2 (en) Slewing hydraulic work machine
JPH08246509A (en) Hydraulic control device for boom working machine
JP3491940B2 (en) Control device for variable displacement hydraulic pump
JP2002265187A (en) Revolution control device
JP2009155022A (en) Control device for hydraulic winch
JPH06280814A (en) Drive control device for fluid pressure actuator
JP3705886B2 (en) Hydraulic drive control device
JPH0384202A (en) Hydraulic driving unit for construction machine
JPH0978635A (en) Hydraulic combined flow circuit
JPH09158903A (en) Flow control device for hydraulic actuator