JPH0799073B2 - Rod moving device - Google Patents

Rod moving device

Info

Publication number
JPH0799073B2
JPH0799073B2 JP1007992A JP1007992A JPH0799073B2 JP H0799073 B2 JPH0799073 B2 JP H0799073B2 JP 1007992 A JP1007992 A JP 1007992A JP 1007992 A JP1007992 A JP 1007992A JP H0799073 B2 JPH0799073 B2 JP H0799073B2
Authority
JP
Japan
Prior art keywords
rod
elevator
boring
moving device
hanger device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1007992A
Other languages
Japanese (ja)
Other versions
JPH05195683A (en
Inventor
健一 市原
Original Assignee
株式会社利根
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社利根 filed Critical 株式会社利根
Priority to JP1007992A priority Critical patent/JPH0799073B2/en
Publication of JPH05195683A publication Critical patent/JPH05195683A/en
Publication of JPH0799073B2 publication Critical patent/JPH0799073B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、ボーリング作業におい
て、ロッド格納場所と櫓内の掘削施工場所との間でロッ
ドを移動するロッド移動装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a rod moving device for moving a rod between a rod storing place and an excavating construction place in a turret during boring work.

【0002】[0002]

【従来の技術】ボーリング作業は次のように行われる。
先ずロッドの供給は、ロッド移動装置によりロッド格納
場所から櫓内の掘削施工場所へロッドを移動する。この
場合、例えば長さ6mのロッドを3本接続したもの等、
あらかじめ適当な長さに接続して移動するのが通常であ
る。掘削施工場所へ移動したロッドを、既に地中に挿入
され、地上でロッドホルダ(チャックホルダ)により上
部を固定されているロッドに接続する。
2. Description of the Related Art Boring work is performed as follows.
First, to supply the rod, the rod moving device moves the rod from the rod storage location to the excavation construction location in the turret. In this case, for example, three rods with a length of 6 m are connected,
It is usual to move the device by connecting it to an appropriate length in advance. The rod that has been moved to the excavation site is connected to the rod that has already been inserted into the ground and whose top is fixed by the rod holder (chuck holder) on the ground.

【0003】櫓内には地中深く挿入したロッドの全重量
を支持することのできるエレベータ装置が備えられてお
り、このエレベータ装置にロッド頭部を掛け外して移し
替え、しかる後、ロッドホルダを解放し、エレベータ装
置で全重量を支えられたロッドを降下し、ボーリングマ
シンによって掘削する。
An elevator apparatus capable of supporting the entire weight of the rod inserted deep into the ground is provided in the turret. The rod head is detached from the elevator apparatus and transferred, and then the rod holder is mounted. The rod, which is released and fully supported by the elevator system, is lowered and drilled by a boring machine.

【0004】ロッドの回収は、エレベータ装置によりロ
ッドを所定の位置まで引き上げ、地中に残されたロッド
の上部を地上でロッドホルダにより固定する。しかる
後、ロッド頭部をエレベータ装置からロッド移動装置に
掛け外して移し替え、回収するロッドを地中に残された
ロッドから分離して、ロッド格納場所へ移動し、格納す
る。
In order to collect the rod, the rod is pulled up to a predetermined position by an elevator device, and the upper portion of the rod left in the ground is fixed on the ground by a rod holder. After that, the rod head is detached from the elevator device and transferred to the rod moving device, and the rod to be collected is separated from the rod left in the ground, moved to the rod storing place, and stored.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、従来の
ボーリング作業においては、ロッド移動装置とエレベー
タ装置との間でロッドを移し替える作業は、作業者が高
い櫓上で手作業によりロッドの掛け外しを行わなければ
ならず、極めて危険な作業であるという問題があった。
また、そのため、作業時間も長くかかり、特にボーリン
グ深度が深くなるに従って工期も増大した。
However, in the conventional boring work, the work of transferring the rod between the rod moving device and the elevator device requires the operator to manually hang the rod on a high turret. There was a problem that it had to be performed and was extremely dangerous work.
Therefore, the work time was long, and the construction period increased as the boring depth deepened.

【0006】本発明は上記の点に鑑みてなされたもの
で、ボーリング作業におけるロッドの供給、回収を自動
的に、安全且つ容易に行なうことのできるロッド移動装
置を提供することを目的とする。
The present invention has been made in view of the above points, and an object of the present invention is to provide a rod moving device which can automatically and safely and easily perform the supply and recovery of rods in boring work.

【0007】[0007]

【課題を解決するための手段】上記目的を達成するため
に本発明は、ボーリング掘削に用いるロッドの上部を係
止して3次元方向に移動自在な係止部を備え、該ロッド
をロッド格納場所と掘削を行う櫓内の施工場所との間で
移動するロッド移動装置において、前記係止部には前記
ロッドを吸着する進退可能な吸着部材が設けられている
ことを特徴とするものである。
In order to achieve the above object, the present invention is provided with a locking portion which locks an upper portion of a rod used for boring excavation and is movable in a three-dimensional direction. In a rod moving device that moves between a place and a construction place in a turret for excavation, the engaging portion is provided with an advancing / retreating adsorbing member that adsorbs the rod. .

【0008】[0008]

【作用】上記構成によると、ロッド供給の際には、格納
場所に例えば斜めに立てかけられているロッドに、係止
部の進退可能な吸着部材を近づけ、吸着部材を作動させ
てロッドを吸着し、引き寄せて係止部に係止させること
ができる。また、移動中も吸着部材の作動によりロッド
を固定することができる。また、掘削施工場所でロッド
をエレベータ装置に移し替えるときも、エレベータ装置
のロッド支持部をロッドに係合し、吸着部材を解放する
ことにより、容易にロッドの掛け外しが行える。また、
ロッド回収の際は、エレベータ装置に支持されたロッド
を係止部に係止して、吸着部材を作動させてロッドを吸
着固定し、エレベータ装置からロッド移動装置に移し替
えたロッドをそのまま格納場所に移動して、吸着部材を
解放することにより、容易にロッドを格納することがで
きる。そして、これらの作業を自動的に行うことができ
る。
According to the above construction, when the rod is supplied, the suction member whose locking portion can move forward and backward is brought close to the rod leaning against the storage location, for example, diagonally, and the suction member is operated to suck the rod. , Can be pulled and locked to the locking portion. Also, the rod can be fixed by the operation of the suction member even during movement. Also, when the rod is transferred to the elevator apparatus at the excavation construction site, the rod supporting portion of the elevator apparatus is engaged with the rod and the suction member is released, so that the rod can be easily hooked and unhooked. Also,
When recovering the rod, lock the rod supported by the elevator device to the locking part, operate the adsorption member to adsorb and fix the rod, and transfer the rod transferred from the elevator device to the rod moving device to the storage place as it is. The rod can be easily retracted by moving to and releasing the suction member. Then, these operations can be automatically performed.

【0009】[0009]

【実施例】以下、本発明のロッド移動装置の一実施例を
図面を参照して説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the rod moving device of the present invention will be described below with reference to the drawings.

【0010】先ず、図3及び図4において、地面1上に
立設された櫓2の基部中心にはボーリングマシン3が設
けられており、ボーリングマシン3によって垂直方向に
例えば長さ6mの3本のロッド4を連結したものがボー
リングされる。
First, in FIGS. 3 and 4, a boring machine 3 is provided at the center of the base of a turret 2 erected on the ground 1, and the boring machine 3 vertically extends, for example, three boils with a length of 6 m. The rod 4 of which is connected is bored.

【0011】櫓2内にはロッド4の格納部5が設けられ
ており、例えば8本×8本の配列で64本のロッド4が
隔壁6、7に立てかけられて格納されている。また櫓2
の上部には図1に示すロッド係止部材としてのハンガー
装置8を移動可能に支持する1対のガイドレール9が、
水平方向に平行に設けられている。
A storage portion 5 for the rods 4 is provided in the turret 2, and for example, 64 rods 4 are stored leaning against the partition walls 6 and 7 in an arrangement of 8 × 8 rods. Again tower 2
A pair of guide rails 9 for movably supporting the hanger device 8 as a rod locking member shown in FIG.
It is provided parallel to the horizontal direction.

【0012】図1は本実施例の要部を示すもので、1対
のガイドレール9にはビーム10の両端が矢印A−Aで
示す方向に移動自在に装着されている。またビーム10
にはアーム11が矢印B−B方向に移動自在に設けられ
ており、アーム11にはハンガー装置8が矢印C−Cで
示す垂直方向に移動自在に取り付けられている。
FIG. 1 shows an essential part of this embodiment, and both ends of a beam 10 are mounted on a pair of guide rails 9 so as to be movable in the directions shown by arrows A--A. Beam 10
The arm 11 is provided movably in the arrow BB direction, and the hanger device 8 is attached to the arm 11 movably in the vertical direction shown by the arrow CC.

【0013】さらにハンガー装置8には吸着部材12が
矢印D−Dで示す水平方向に移動可能に装着されてお
り、吸着部材12の先端には断面がV字状の電磁石13
が設けられている。そしてビーム10、アーム11、ハ
ンガー装置8及び吸着部材12はそれぞれ図示しない駆
動源によって移動駆動され、各駆動源及び電磁石13は
図示しない制御装置によって遠隔制御される。
Further, an adsorption member 12 is attached to the hanger device 8 so as to be movable in the horizontal direction indicated by an arrow DD, and an electromagnet 13 having a V-shaped cross section is provided at the tip of the adsorption member 12.
Is provided. Then, the beam 10, the arm 11, the hanger device 8 and the suction member 12 are moved and driven by a driving source (not shown), and the driving source and the electromagnet 13 are remotely controlled by a controller (not shown).

【0014】ハンガー装置8の電磁石13が進退する側
の下部には、電磁石13に設けられたV字溝と同じ方向
にU字状のフック部14が設けられている。そしてフッ
ク部14にロッド4の首部が嵌合し、連結部15が係止
されるようになっている。
A U-shaped hook portion 14 is provided in the lower part of the hanger device 8 on the side where the electromagnet 13 advances and retracts, in the same direction as the V-shaped groove provided in the electromagnet 13. Then, the neck portion of the rod 4 is fitted into the hook portion 14, and the connecting portion 15 is locked.

【0015】図2に、櫓内の掘削施工場所に設けられ、
連結されたロッド4の重量を支持して昇降するエレベー
タ装置21を示す。エレベータ装置21はハンガー装置
8のフック部14に対向するU字溝22が形成された支
持部材23と、支持部材23を1対のワイヤ24を介し
て揺動可能に連結する昇降部材25と、支持部材23を
矢印E−Eで示す方向に揺動させるエレベータ開放装置
26とから構成されている。
In FIG. 2, the excavation work site is provided in the turret,
The elevator apparatus 21 which raises / lowers while supporting the weight of the connected rod 4 is shown. The elevator device 21 includes a support member 23 in which a U-shaped groove 22 facing the hook portion 14 of the hanger device 8 is formed, and an elevating member 25 that connects the support member 23 via a pair of wires 24 in a swingable manner. The elevator opening device 26 is configured to swing the support member 23 in the direction indicated by the arrow EE.

【0016】エレベータ開放装置26はシリンダ27に
よって矢印F−Fで示す方向に進退するロッド28と、
ロッド28の先端に回転自在に設けられたローラ29と
から構成されている。そしてロッド28が突出してロー
ラ29がワイヤ24を押して支持部材23を揺動させる
ことにより、支持部材23をロッド4から離脱させるよ
うになっている。
The elevator opening device 26 includes a rod 28 which is moved forward and backward by a cylinder 27 in a direction indicated by an arrow FF,
The roller 29 is rotatably provided at the tip of the rod 28. Then, the rod 28 protrudes and the roller 29 pushes the wire 24 to swing the support member 23, whereby the support member 23 is separated from the rod 4.

【0017】次に図5ないし図8を参照して本実施例の
動作を説明する。図5及び図6はロッド4を施工場所に
供給する場合を示し、図7及び図8はロッド4を回収す
る場合を示す。
Next, the operation of this embodiment will be described with reference to FIGS. 5 and 6 show a case where the rod 4 is supplied to the construction site, and FIGS. 7 and 8 show a case where the rod 4 is recovered.

【0018】先ず、図5のステップ101において、ハ
ンガー装置8を前進させ、格納されているロッド4の頭
部の近くに位置させる。次にステップ102において、
図6(a)に示すようにハンガー装置8のフック部14
内にロッド4を位置合わせし、吸着部材12を突出させ
て電磁石13に通電し、吸着部材12にロッド4を吸着
させる。次にステップ103において図6(b)に示す
ように吸着部材12を後退させ、ロッド4をフック部1
4内に完全に嵌合係止する。
First, in step 101 of FIG. 5, the hanger device 8 is moved forward and positioned near the head of the stored rod 4. Then in step 102,
As shown in FIG. 6A, the hook portion 14 of the hanger device 8
The rod 4 is aligned inside, the attracting member 12 is projected, and the electromagnet 13 is energized to attract the rod 4 to the attracting member 12. Next, in step 103, the suction member 12 is retracted as shown in FIG.
Fully fit and lock in 4.

【0019】次にステップ104において、図6(c)
に示すようにハンガー装置8を最上部まで上昇させ、ス
テップ105においてハンガー装置8を既に地中にボー
リング施工されているロッド4の上部まで移動させる。
次にステップ106において、図6(d)に示すように
ハンガー装置8を下降させ、図6(e)に示すようにロ
ッド4どうしを当接させ、新たに供給したロッド4の上
部の連結部15をフック部14から離脱させる。次にス
テップ107において、図6(f)に示すようにロッド
4を回転し、連結部のねじ接続を行なう。そしてステッ
プ108において、図6(g)に示すようにハンガー装
置8を最下位まで下げる。
Next, in step 104, FIG.
As shown in (4), the hanger device 8 is raised to the uppermost position, and in step 105, the hanger device 8 is moved to the upper part of the rod 4 which has already been bored in the ground.
Next, in step 106, the hanger device 8 is lowered as shown in FIG. 6D, the rods 4 are brought into contact with each other as shown in FIG. 15 is detached from the hook portion 14. Next, in step 107, the rod 4 is rotated as shown in FIG. 6 (f), and the connecting portion is screwed. Then, in step 108, the hanger device 8 is lowered to the lowest position as shown in FIG.

【0020】次にステップ109において、図6(g)
に示すようにエレベータ開放装置26のロッド28を矢
印F方向に後退させ、ステップ110において、図6
(h)に示すようにエレベータ21の支持部材23を矢
印E方向に回動させて、ロッド4の上端に支持部材23
のU字溝22を嵌合する。その後、ハンガー装置8は矢
印A方向に退避する。
Next, in step 109, FIG.
As shown in FIG. 6, the rod 28 of the elevator opening device 26 is retracted in the direction of arrow F, and in step 110, as shown in FIG.
As shown in (h), the support member 23 of the elevator 21 is rotated in the direction of arrow E so that the support member 23 is attached to the upper end of the rod 4.
The U-shaped groove 22 of is fitted. Then, the hanger device 8 retracts in the direction of arrow A.

【0021】次にステップ111においてエレベータ2
1を上昇させてロッドに緊張度を与えた状態で、ステッ
プ112においてボーリングマシン3に設けられたロッ
ドホルダ30を開き、その後直ちにステップ113にお
いてロッド巻上げを停止する。そしてステップ114に
おいて、図6(i)に示すようにエレベータ21を下降
してボーリングを行なう。
Next, in step 111, the elevator 2
In the state where 1 is raised to give the tension to the rod, the rod holder 30 provided in the boring machine 3 is opened in step 112, and immediately after that, the rod winding is stopped in step 113. Then, in step 114, as shown in FIG. 6 (i), the elevator 21 is lowered to perform boring.

【0022】ロッド4のボーリングが完了すると、ステ
ップ115において、図6(j)に示すようにロッドホ
ルダ30を締め、ステップ116においてエレベータ2
1をロッド4から離脱させる。そしてステップ117に
おいて、図6(k)に示すようにエレベータ21を上昇
させ、ステップ118においてエレベータ開放装置26
を前進させて初期状態に復帰する。
When the boring of the rod 4 is completed, in step 115, the rod holder 30 is tightened as shown in FIG.
1 is disengaged from the rod 4. Then, in step 117, the elevator 21 is raised as shown in FIG. 6 (k), and in step 118, the elevator opening device 26.
To return to the initial state.

【0023】上記のステップ101ないしステップ11
8をくりかえすことにより、ロッド4の供給及びボーリ
ング施工が行なわれる。なお、最後のロッド4がねじ接
合され、ボーリング施工が不要の場合は、ステップ10
8の後にステップ119においてハンガー装置8をロッ
ド4から離脱させ、ステップ120において待機位置に
移動させる。
Steps 101 to 11 above
By repeating step 8, the rod 4 is supplied and boring is performed. If the last rod 4 is screwed and boring is not required, step 10
After step 8, the hanger device 8 is disengaged from the rod 4 in step 119, and is moved to the standby position in step 120.

【0024】次に図7及び図8を参照してロッド回収動
作を説明する。まずステップ201において、図8
(a)に示すようにロッド4をエレベータ21により上
昇させた後、ステップ202においてロッドホルダ30
を締める。次にステップ203において、図8(b)に
示すようにハンガー装置8を最下位において前進させ、
ハンガー装置8のフック部14内にロッド4を嵌合す
る。次にステップ204において、図8(c)に示すよ
うにロッド4の首部を引っかけているエレベータ21を
下降させ、さらにステップ205においてエレベータ開
放装置26を前進させて、エレベータ21をロッド4か
ら離脱する。
Next, the rod collecting operation will be described with reference to FIGS. 7 and 8. First, in step 201, as shown in FIG.
After raising the rod 4 by the elevator 21 as shown in FIG.
Tighten. Next, at step 203, the hanger device 8 is advanced to the lowest position as shown in FIG.
The rod 4 is fitted into the hook portion 14 of the hanger device 8. Next, in step 204, as shown in FIG. 8C, the elevator 21 hooking the neck of the rod 4 is lowered, and in step 205, the elevator opening device 26 is advanced to separate the elevator 21 from the rod 4. .

【0025】次にステップ206において、図8(d)
に示すようにハンガー装置8を上昇させ、ステップ20
7において、図8(e)に示すように連結部15のねじ
結合を解除する。その後ステップ208において、図8
(f)に示すようにハンガー装置8を上昇させ、ステッ
プ209においてハンガー装置8がロッド4を吊した状
態で、ロッド4の格納部5の位置まで移動させる。この
間、吸着部材12の電磁石を作動させてロッド4の上端
近傍に吸着させて固定しておく。ロッド4の格納位置ま
できたら、ステップ210においてロッド4を降下させ
る。
Next, in step 206, FIG.
Raise the hanger device 8 as shown in step 20,
7, the screw connection of the connecting portion 15 is released as shown in FIG. Then, in step 208, FIG.
As shown in (f), the hanger device 8 is raised, and in step 209, the hanger device 8 suspends the rod 4 and moves it to the position of the storage portion 5 of the rod 4. During this time, the electromagnet of the attracting member 12 is operated to attract and fix the rod 4 near the upper end of the rod 4. When the storage position of the rod 4 is reached, the rod 4 is lowered in step 210.

【0026】次にステップ211において、図8(g)
に示すように吸着部材12を突出させてロッド4を押
し、格納部5の隔壁6、7に立てかける。次にステップ
212において電磁石を解放するとともに吸着部材12
を引き込ませ、ステップ213においてハンガー装置8
を後退させ、さらにステップ214においてハンガー装
置8を所定の位置に移動する。
Next, in step 211, FIG.
As shown in FIG. 5, the suction member 12 is projected and the rod 4 is pushed to lean against the partition walls 6 and 7 of the storage unit 5. Next, in step 212, the electromagnet is released and the attracting member 12
The hanger device 8 in step 213.
Is moved backward, and in step 214, the hanger device 8 is moved to a predetermined position.

【0027】一方、エレベータ21は、ステップ205
からステップ215にうつり、ステップ215において
エレベータ21を下降させ、ステップ216においてエ
レベータ開放装置26を後退させて、ステップ217に
おいてロッド4をエレベータ21の支持部材23のU字
溝22に嵌合セットして、ステップ201にもどる。
On the other hand, the elevator 21 uses the step 205.
To step 215, the elevator 21 is lowered in step 215, the elevator opening device 26 is retracted in step 216, and the rod 4 is fitted and set in the U-shaped groove 22 of the support member 23 of the elevator 21 in step 217. , Return to step 201.

【0028】本実施例によれば、ロッド4の供給及び回
収を櫓2の下で遠隔操作ですべて処理することができ
る。またハンガー装置8に設けられてロッド4を吸着す
る電磁石13は、吸着には強いが滑りには弱いので、ロ
ッド4を電磁石13で吸着した状態でロッド4を回転
し、連結部15のねじの脱着を容易に行なうことができ
る。さらにロッド4を格納部5内に立てかけておくだけ
で容易にロッド4の供給及び格納を行なうことができ、
特別の格納装置を必要としない。
According to this embodiment, the supply and the recovery of the rod 4 can all be processed remotely under the turret 2. Further, since the electromagnet 13 provided on the hanger device 8 for adsorbing the rod 4 is strong against adsorption but weak against sliding, the rod 4 is rotated while the rod 4 is adsorbed by the electromagnet 13, and the screw of the connecting portion 15 Desorption can be easily performed. Further, the rod 4 can be easily supplied and stored simply by leaning the rod 4 in the storage section 5,
No special enclosure required.

【0029】なお吸着部材は電磁石に限定されず、他の
部材、例えば永久磁石であってもよい。
The attracting member is not limited to the electromagnet and may be another member such as a permanent magnet.

【0030】[0030]

【発明の効果】以上説明したように、本発明のロッド移
動装置によれば、ロッド係止部に進退可能な吸着部材を
設けて、ロッドの供給、回収を行なうようにしたので、
ボーリング作業におけるロッドの供給、回収を遠隔操作
によりすべて自動的に安全且つ容易に処理することがで
きる。そのため、工期も短縮される。
As described above, according to the rod moving apparatus of the present invention, the rod engaging portion is provided with the adsorbing member capable of advancing and retracting, so that the rod is supplied and recovered.
The supply and recovery of rods in boring work can be automatically and safely handled by remote control. Therefore, the construction period can be shortened.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例の構成を示す斜視図である。FIG. 1 is a perspective view showing the configuration of an embodiment of the present invention.

【図2】本実施例のボーリング作業においてロッドを支
持するエレベータの構成を示す斜視図である。
FIG. 2 is a perspective view showing a configuration of an elevator that supports a rod in a boring operation of the present embodiment.

【図3】本実施例の用いられるボーリング櫓の構成を示
す正面図である。
FIG. 3 is a front view showing the configuration of a boring turret used in this embodiment.

【図4】図3の平面図である。FIG. 4 is a plan view of FIG.

【図5】本実施例のロッド供給動作を示すフロー図であ
る。
FIG. 5 is a flow chart showing a rod supply operation of the present embodiment.

【図6】図5に示すロッド供給動作の説明図である。FIG. 6 is an explanatory view of the rod supply operation shown in FIG.

【図7】本実施例のロッド回収動作を示すフロー図であ
る。
FIG. 7 is a flow chart showing a rod collecting operation of the present embodiment.

【図8】図7に示すロッド回収動作の説明図である。FIG. 8 is an explanatory view of the rod collecting operation shown in FIG. 7.

【符号の説明】[Explanation of symbols]

1 地面 2 櫓 3 ボーリングマシン 4 ロッド 5 ロッド格納部 6、7 隔壁 8 ハンガー装置(係止部) 9 ガイドレール 10 ビーム 11 アーム 12 吸着部材 13 電磁石 14 フック部 15 連結部 21 エレベータ装置 22 U字溝 23 支持部材 24 ワイヤ 25 昇降部材 26 エレベータ開放装置 27 シリンダ 28 ロッド 29 ローラ DESCRIPTION OF SYMBOLS 1 Ground 2 Turret 3 Boring machine 4 Rod 5 Rod storage part 6, 7 Partition wall 8 Hanger device (locking part) 9 Guide rail 10 Beam 11 Arm 12 Adsorption member 13 Electromagnet 14 Hook part 15 Connecting part 21 Elevator device 22 U-shaped groove 23 Support Member 24 Wire 25 Elevating Member 26 Elevator Opening Device 27 Cylinder 28 Rod 29 Roller

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 ボーリング掘削に用いるロッドの上部を
係止して3次元方向に移動自在な係止部を備え、該ロッ
ドをロッド格納場所と掘削を行う櫓内の施工場所との間
で移動するロッド移動装置において、前記係止部には前
記ロッドを吸着する進退可能な吸着部材が設けられてい
ることを特徴とするロッド移動装置。
1. A locking portion that locks an upper portion of a rod used for boring excavation and is movable in three dimensions, and moves the rod between a rod storage location and a construction location in a turret for excavation. In the rod moving device described above, an advancing / retreating suction member that sucks the rod is provided in the locking portion.
【請求項2】 前記吸着部材は電磁石からなる請求項1
記載のロッド移動装置。
2. The attracting member comprises an electromagnet.
The rod moving device described.
JP1007992A 1992-01-23 1992-01-23 Rod moving device Expired - Lifetime JPH0799073B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1007992A JPH0799073B2 (en) 1992-01-23 1992-01-23 Rod moving device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1007992A JPH0799073B2 (en) 1992-01-23 1992-01-23 Rod moving device

Publications (2)

Publication Number Publication Date
JPH05195683A JPH05195683A (en) 1993-08-03
JPH0799073B2 true JPH0799073B2 (en) 1995-10-25

Family

ID=11740347

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1007992A Expired - Lifetime JPH0799073B2 (en) 1992-01-23 1992-01-23 Rod moving device

Country Status (1)

Country Link
JP (1) JPH0799073B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0614744D0 (en) * 2006-07-25 2006-09-06 Ohs Group Ltd Racking module
EP1953334B1 (en) * 2007-01-08 2016-11-09 National Oilwell Varco, L.P. A pipe handling system and method
JP6357063B2 (en) * 2014-09-30 2018-07-11 株式会社竹中土木 Non-widening AGF construction method, ground improvement structure by the construction method, and jig used in the construction method

Also Published As

Publication number Publication date
JPH05195683A (en) 1993-08-03

Similar Documents

Publication Publication Date Title
US4765401A (en) Apparatus for handling well pipe
US4696207A (en) Well pipe handling machine
US3913754A (en) Portable drill pipe magazine
KR950014369B1 (en) Method for raising external rods
CN107575225B (en) Gas height is dashed forward the unattended automatic driving system in tunnel
CN109915048A (en) The handling method and drilling machine of automatic loading and unloading boring rod set, drilling rod
CN109138897B (en) Well head centering device and well repair equipment with same
SU1713442A3 (en) Drilling machine
CN114837434B (en) A install auxiliary device fast for glass curtain wall
JPH0799073B2 (en) Rod moving device
CN113982360A (en) Electric pole mounting integrated machine
JPH10278037A (en) Apparatus and method for drilling
JP6639869B2 (en) Bowling robot
JP3823298B2 (en) Slope drilling equipment
JP3076530B2 (en) Perforation device and perforation method
CN217264172U (en) Hoisting clamp and hoisting system
JP4187863B2 (en) Lock bolt insertion device
JP3806731B2 (en) Slope drilling method
JP3933212B2 (en) Air control circuit for direct acting pantograph device
JP2596662B2 (en) Drilling rig
CN214292986U (en) Movable electric hammer lifting support
JP2596496B2 (en) Beam shaft attachment / detachment device
JP2909654B2 (en) Method and apparatus for attaching exterior curtain wall
JPH07238774A (en) Detachable device for double pipe type trill tool
JP2005312783A (en) Bobbin replacement device for sewing machine