JPH079360A - Chain cutting - Google Patents

Chain cutting

Info

Publication number
JPH079360A
JPH079360A JP15336793A JP15336793A JPH079360A JP H079360 A JPH079360 A JP H079360A JP 15336793 A JP15336793 A JP 15336793A JP 15336793 A JP15336793 A JP 15336793A JP H079360 A JPH079360 A JP H079360A
Authority
JP
Japan
Prior art keywords
chain
pin
operating body
receiving
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP15336793A
Other languages
Japanese (ja)
Inventor
Osamu Nagaoka
修 長岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP15336793A priority Critical patent/JPH079360A/en
Publication of JPH079360A publication Critical patent/JPH079360A/en
Pending legal-status Critical Current

Links

Landscapes

  • Hand Tools For Fitting Together And Separating, Or Other Hand Tools (AREA)

Abstract

PURPOSE:To provide a new chain cutting method which can properly cut and connect a chain simply without any skill. CONSTITUTION:The method is equipped with a first member 21 including a chain engaging groove which can engage a length of chain for several links therewith so as to hold it in such a way that it can not be moved at all in the longer direction, and with a second member 22 which is slidably engaged with the first member 21, but however can not be released to the direction perpendicularly intersected with the sliding direction. And a receiving fulcrum section 27 for a pin pull-out operation and a receiving fulcrum section 28 for a pin inserting operation are provided for the bottom surface of the chain engaging groove of the first member 21, and a screw operating body 42 for pulling the pin out provided with a plunger 42b for pulling the pin out at its tip end, and a screw operating body 43 provided with a pin insertion pressing section at its tip end are provided for an operation body hold section 40 in such a way that the respective bodies can be freely and threadedly advanced/retreated.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本願発明は、チエンをその途中で
分断し、あるいは接続するための工具である、チエン切
りに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a chain cutter, which is a tool for cutting or connecting chains in the middle thereof.

【0002】[0002]

【従来の技術および考案が解決しようとする課題】たと
えば、自転車において、前ギヤと後ギヤとの間を掛け回
される自転車用チエンを取り替えるには、まず、無端状
となっているチエンをその適当な部位で分断しなけれ
ば、このチエンを自転車から取り外すことができない。
また、新たなチエンを自転車に装着する場合において
も、有端状となって提供されるチエンを、前ギヤおよび
後ギヤを掛け回るようにしながら、適当なリンク数をも
って無端状に接続する必要がある。
2. Description of the Related Art For example, in a bicycle, in order to replace a bicycle chain that is wound around between a front gear and a rear gear, first, replace an endless chain. This chain cannot be removed from the bicycle unless it is cut at the appropriate location.
In addition, even when a new chain is mounted on the bicycle, it is necessary to connect the chain provided as an endless one with endless gears and endless connection with an appropriate number of links. is there.

【0003】さらに、経時的に延びが生じてしまう自転
車用チエンの長さを適当に調節するために、いったん、
無端状となって前ギヤと後ギヤとの間を掛け回されてい
るチエンを分断し、適当数のリンクを取り除いてから、
再び無端状に接続する必要がある。
Further, in order to properly adjust the length of the bicycle chain, which will be elongated over time,
After disconnecting the chain that is endless and running between the front gear and the rear gear and removing an appropriate number of links,
It is necessary to connect endlessly again.

【0004】図37および38に示すように、自転車用
チエンCは、左右の外リンクプレート1,1と、左右の
内リンクプレート2,2とを、ピン3によって連結して
構成される。上記ピン3にはまた、ローラ4が套挿され
る。外リンクプレート1の両端部、および内リンクプレ
ート2の両端部には、それぞれ、ピン挿入孔5,6が形
成されている。外リンクプレート1のピン挿入孔5は、
ピン3に対して締まりばめ勝手となっており、ローラ4
を左右の内リンクプレート2,2間に配するとともに、
左右の内リンクプレート2,2の外側に左右の外リンク
プレート1,1を、これら四つのンクプレートのピン挿
入孔5,5,6,6が一致するように保持しながら、こ
れら各ピン挿入孔5,5,6,6にピン3を連通挿する
ことにより、チエンCは連結される。この際、この外リ
ンクプレート1のピン挿入孔5と、上記のように挿入さ
れるピン3とは、圧入関係となっている。逆に、上記の
チエンCを分断するには、上記ピン3を軸方向に抜けば
よいことになる。
As shown in FIGS. 37 and 38, a bicycle chain C is constructed by connecting left and right outer link plates 1, 1 and left and right inner link plates 2, 2 by pins 3. A roller 4 is also inserted into the pin 3. Pin insertion holes 5 and 6 are formed at both ends of the outer link plate 1 and both ends of the inner link plate 2, respectively. The pin insertion hole 5 of the outer link plate 1 is
It is self-fitting with respect to pin 3 and roller 4
Is placed between the left and right inner link plates 2 and 2,
Insert the left and right outer link plates 1, 1 outside the left and right inner link plates 2, 2 while holding the pin insertion holes 5, 5, 6, 6 of these four link plates in alignment with each other. The chain C is connected by inserting the pin 3 into the holes 5, 5, 6, and 6. At this time, the pin insertion hole 5 of the outer link plate 1 and the pin 3 inserted as described above have a press-fitting relationship. On the contrary, in order to divide the chain C, it is sufficient to remove the pin 3 in the axial direction.

【0005】図36に、上記のようなチエンCの分断・
接続操作を行うための従来のチエン切り7を示す。この
従来のチエン切り7は、上ブロック部8と下ブロック部
9とを連結部10でつないだような形態をもつ本体7a
を備えている。上記連結部10は、上記上ブロック部8
および下ブロック部9に共通に設定した軸線11に対し
て側方に変位して配置されており、したがって、上記上
ブロック部8および下ブロック部9の間に所定間隔の空
間が形成されている。
FIG. 36 shows the division of chain C as described above.
The conventional chain cutting 7 for performing a connecting operation is shown. This conventional chain cutter 7 has a main body 7a having a structure in which an upper block portion 8 and a lower block portion 9 are connected by a connecting portion 10.
Is equipped with. The connecting portion 10 is the upper block portion 8
And the lower block portion 9 is arranged so as to be displaced laterally with respect to the axis 11 commonly set, so that a space with a predetermined interval is formed between the upper block portion 8 and the lower block portion 9. .

【0006】上記連結部10には、チエンCに係合して
その位置を規定するチエン保持片12が延出形成されて
いる。このチエン保持片12は、チエンCの内リンクプ
レート2,2間の空間に突入しうる厚みの板状を呈して
おり、かつ、チエンCのローラ4の外周を抱く半円弧状
の係合凹部13が形成されている。この係合凹部13を
形成する半円弧の中心は、上記上ブロック部8および下
ブロック部9に共通に設定された軸線11と一致するよ
うになされる。
A chain holding piece 12 that engages with the chain C and defines its position is extendedly formed on the connecting portion 10. The chain holding piece 12 has a plate-like shape having a thickness capable of protruding into the space between the inner link plates 2 and 2 of the chain C, and has a semi-arcuate engagement recess that surrounds the outer periphery of the roller 4 of the chain C. 13 is formed. The center of the semi-circular arc forming the engagement recess 13 is made to coincide with the axis 11 commonly set for the upper block portion 8 and the lower block portion 9.

【0007】上記上ブロック部8には、ピン押圧用プラ
ンジャ14を先端に有するネジ操作体15が、上記軸線
11方向に螺進退可能に螺合されている。上記ピン押圧
用プランジャ14の外径は、チエンCのピン3と同等か
それよりやや小径に設定される。また、このネジ操作体
15の基端部には、強力な回転操作力を付与することが
できるように軸直角方向に延びる回転操作ハンドル16
がスライド挿入されている。
A screw operating body 15 having a pin pressing plunger 14 at its tip is screwed onto the upper block portion 8 so as to be able to advance and retract in the direction of the axis 11. The outer diameter of the pin pressing plunger 14 is set to be equal to or slightly smaller than the pin 3 of the chain C. Further, at the base end portion of the screw operating body 15, a rotary operation handle 16 extending in the direction perpendicular to the axis so that a strong rotary operation force can be applied.
Has been slide-inserted.

【0008】一方、上記下ブロック部9には、上記チエ
ン保持片12に係合保持された状態のチエンCの外リン
クプレート1の外面を受支する圧力受支部17が形成さ
れており、かつ、チエンCから後述するように抜き出さ
れたピン3を逃がすためのピン逃げ溝18が形成されて
いる。
On the other hand, the lower block portion 9 is formed with a pressure receiving portion 17 for receiving the outer surface of the outer link plate 1 of the chain C engaged with and held by the chain holding piece 12. , A pin escape groove 18 for escaping the pin 3 extracted from the chain C as described later.

【0009】さらに、上記本体7aにはまた、上記操作
ハンドル16を介してネジ操作体15に対する回転力が
与えられても、この本体7aが回転しないように保持す
るための保持ハンドル19が側方に向けて延出状に設け
られている。
Further, the main body 7a is also provided with a holding handle 19 for holding the main body 7a so that the main body 7a does not rotate even if a rotational force is applied to the screw operating body 15 via the operating handle 16. It is provided in an extended shape toward.

【0010】チエンCを分断しようとする場合、分断し
ようとする部位に対応するローラ4が上記係合凹部13
に嵌まり込むようにして上記チエン保持片12に図37
に示すようにしてチエンCを保持させる。そして、上記
ネジ操作体15を回転させることによって先端のピン押
圧用プランジャ14を前進させる。ピン3は、上記プラ
ンジャ14によって強力な軸方向押力を受け、次第に、
図37の左方向に抜けてゆく。
When the chain C is to be cut, the roller 4 corresponding to the part to be cut is inserted into the engaging recess 13
37 into the chain holding piece 12 so that it is fitted into the chain holding piece 12.
Chain C is held as shown in FIG. Then, by rotating the screw operating body 15, the pin pressing plunger 14 at the tip is advanced. The pin 3 receives a strong axial pushing force by the plunger 14, and gradually,
It goes out to the left in FIG.

【0011】図37に示すように、ピン3が、右側の外
リンクプレート、左右の内リンクプレートを抜け、左側
の外リンクプレートにのみ嵌合している状態にいたる
と、ピン3を介した外リンクプレート1と内リンクプレ
ート2との間の連結関係が解け、チエンCを分断するこ
とができる。
As shown in FIG. 37, when the pin 3 passes through the outer link plate on the right side and the inner link plates on the left and right and is fitted only to the outer link plate on the left side, the pin 3 intervenes. The connection relationship between the outer link plate 1 and the inner link plate 2 is released, and the chain C can be divided.

【0012】実際上重要なことは、ネジ操作体15ない
しピン押圧用プランジャ14によるピン3の押圧を、図
37に示す状態で止めおくことである。仮にピン3が完
全に四つのリンクプレート1,1,2,2から抜け出て
しまうと、このチエンCを連結する際において、ピン3
を外リンクプレートのピン挿入孔5に挿入する作業がき
わめて厄介なものとなるからである。
In practice, what is important is to stop the pressing of the pin 3 by the screw operating body 15 or the pin pressing plunger 14 in the state shown in FIG. If the pin 3 is completely pulled out from the four link plates 1, 1, 2, 2, when connecting the chain C, the pin 3
This is because the work of inserting the pin into the pin insertion hole 5 of the outer link plate becomes extremely troublesome.

【0013】しかしながら、ピン3の抜け状態は、外部
から視認することができず、したがって、ある程度ピン
3を抜け動させた状態において、トライ・アンド・エラ
ーを繰り返しながら、少しずつネジ操作体15を螺進さ
せ、ピン3が左側の内リンクプレートを抜けた状態を確
認するという面倒な操作が必要である。
However, the disengaged state of the pin 3 cannot be visually recognized from the outside. Therefore, while the pin 3 is disengaged to some extent, the screw operating body 15 is gradually pushed while repeating trial and error. It is necessary to carry out a troublesome operation of screwing the pin 3 and confirming that the pin 3 has come out of the left inner link plate.

【0014】一方、チエンを連結する場合には、図38
に示すように、連結するべき外リンクプレート1,1間
に内リンクプレート2,2をこれらのピン挿入孔が一致
するように配置した状態で、上記ネジ操作体15を螺進
させてその先端のピン押圧用プランジャ14によってピ
ン3を挿入してゆく。
On the other hand, when connecting chains, FIG.
As shown in FIG. 3, with the inner link plates 2 and 2 arranged between the outer link plates 1 and 1 to be connected so that these pin insertion holes are aligned with each other, the screw operation body 15 is screwed to advance its tip. The pin 3 is inserted by the plunger 14 for pressing the pin.

【0015】図37のチエン分断操作時と、図38のチ
エン連結操作時とを比較すれば明らかなように、従来の
チエン切り7は、ピン押圧用プランジャ14によってピ
ン3を軸方向に押圧することによって、ピンの抜きおよ
び挿入の双方の操作を行おうとしているため、チエン切
り7の方向が、チエン分断操作時とチエン連結時とでは
逆になる。このことは、実際上、次のような不具合を生
じさせる。
As is clear from a comparison between the chain cutting operation of FIG. 37 and the chain connecting operation of FIG. 38, the conventional chain cutter 7 axially presses the pin 3 by the pin pressing plunger 14. By doing so, both the pulling-out operation and the inserting operation are attempted. Therefore, the direction of the chain cutting 7 is opposite between the chain cutting operation and the chain connecting operation. This causes the following problems in practice.

【0016】すなわち、チエンを分断しようとする時、
当然のことながら、このチエンCは無端状となってい
て、前ギヤと後ギヤとの間を掛け回されている。このよ
うな無端状のチエンCを分断する操作においては、図3
7に示すように、上記ネジ操作体15がチエンCの外
側、換言すると、自転車に関してその外側に位置してい
るので、かかる操作は比較的行いやすいが、図38に示
すチエン連結操作時においては、ネジ操作体15がチエ
ンCの内側、換言すると、自転車に関して内側に位置す
るため、その操作が非常に厄介なものになる。
That is, when trying to divide the chain,
As a matter of course, the chain C has an endless shape and is wound around between the front gear and the rear gear. In the operation of dividing the endless chain C as shown in FIG.
As shown in FIG. 7, since the screw operating body 15 is located outside the chain C, in other words, outside the chain C, such an operation is relatively easy to perform, but at the time of chain connecting operation shown in FIG. Since the screw operating body 15 is located inside the chain C, in other words, inside the bicycle C, its operation becomes very troublesome.

【0017】さらに、前述したように、ネジ操作体15
を回転させてその先端のネジ押圧用プランジャ14によ
って正しくピン3を軸方向に押圧するためには、チエン
Cを正しく上記チエン保持片12に係合保持させねばな
らない。プランジャ14によって与えられる比較的大き
な力に抗して、チエンCを上記のような正規位置に保持
させるためには、どうしても、チエンCそれ自体を上記
チエン保持片12に向けて押しつけておく必要がある。
この作業は、チエン切り本体7aを把持する作業者の指
によって行われるのであり、使用状態にあるチエンCが
油や泥によって汚れていることに鑑みると、作業者の手
指が汚れざるをえないということになる。
Further, as described above, the screw operating body 15
In order to rotate and to press the pin 3 in the axial direction correctly by the screw pressing plunger 14 at its tip, the chain C must be properly engaged and held by the chain holding piece 12. In order to hold the chain C in the normal position as described above against the relatively large force exerted by the plunger 14, it is inevitable that the chain C itself is pressed against the chain holding piece 12. is there.
This work is performed by the finger of the operator who holds the chain cutting main body 7a, and in view of the fact that the chain C in use is soiled with oil or mud, the hand of the operator must be soiled. It turns out that.

【0018】本願発明は、上述した事情のもとで考え出
されたものであって、より簡便かつ確実にチエンの分断
および連結操作をなしうる新たなチエン切りを提供する
ことをその課題としている。
The present invention was conceived under the above-mentioned circumstances, and its object is to provide a new chain cutting device capable of more simply and reliably performing chain cutting and connecting operations. .

【0019】[0019]

【課題を解決するための手段】上記の課題を解決するた
め、本願発明では、次の技術的手段を講じている。
In order to solve the above problems, the present invention takes the following technical means.

【0020】本願の請求項1に記載したチエン切りは、
次の構成を備える。
The chain cutter according to claim 1 of the present application is
It has the following configuration.

【0021】複数リンク分のチエンをその長手方向移動
不能に係合保持しうるチエン係合溝を有する第一部材
と、上記第一部材に対して上記チエン係合溝の延びる方
向にスライド係合することができ、スライド係合時、チ
エン係合溝の延びる方向と直交する方向に離脱不能な第
二部材とを備え、上記第一部材の上記チエン係合溝の底
面には、このチエン係合溝に係合されるチエンのピン位
置と対応して、ピン抜き操作用受支部と、ピン挿入操作
用受支部とが設けられており、上記第二部材には、上記
チエン係合溝の開口を覆う操作体保持部が形成されてお
り、この操作体保持部には、上記ピン抜き操作用受支部
あるいは上記ピン挿入操作用受支部と対向しうるように
して、ピン抜き用プランジャを先端に有するピン抜き用
ネジ操作体と、ピン挿入用押圧部を先端に有するピン挿
入用ネジ操作体とが、螺進退可能に螺合されている。
A first member having a chain engagement groove capable of engaging and holding chains of a plurality of links so as to be immovable in the longitudinal direction, and a slide engagement with respect to the first member in a direction in which the chain engagement groove extends. And a non-separable second member in a direction orthogonal to the extending direction of the chain engaging groove at the time of sliding engagement, and the chain engaging surface is provided on the bottom surface of the chain engaging groove of the first member. Corresponding to the pin position of the chain engaged with the mating groove, a pin removing operation receiving and supporting portion and a pin inserting operation receiving and supporting portion are provided, and the second member has the chain engaging groove An operating body holding portion for covering the opening is formed, and the operating body holding portion is provided with a pin removing plunger so that it can be opposed to the pin removing operation receiving portion or the pin inserting operating receiving portion. Pin removal screw operating body and pin A pin insertion screw operating body having a necessity pressing portion at the tip is screwed to be threadably advancing and retreating.

【0022】本願の請求項2に記載したチエン切りは、
上記請求項1のチエン切りにおいて、上記ピン抜き操作
用受支部は、チエンの外リンクプレートの外面を受支す
る受支面と、上記受支面から所定深さをもつ有底状のピ
ン収容孔とを備えて形成されている。
The chain cutter according to claim 2 of the present application is
2. The chain cutting device according to claim 1, wherein the pin-pulling operation receiving / supporting portion receives a receiving surface that receives the outer surface of the outer link plate of the chain, and a bottomed pin housing having a predetermined depth from the receiving / supporting surface. And a hole.

【0023】本願の請求項3に記載したチエン切りは、
上記請求項1または2のチエン切りにおいて、上記ピン
挿入操作用受支部は、チエンの外リンクプレートの外面
を受支する受支面と、この受支面に形成されたピン係合
凹部とを備えて形成されている。
The chain cutter according to claim 3 of the present application is
In the chain cutting according to claim 1 or 2, the pin insertion operation receiving / supporting portion has a receiving / receiving surface for receiving the outer surface of the outer link plate of the chain, and a pin engaging recess formed on the receiving / supporting surface. Is prepared.

【0024】本願の請求項4の記載したチエン切りは、
上記請求項1ないし3のチエン切りにおいて、上記ピン
抜き用ネジ操作体および上記ピン挿入用ネジ操作体の基
端部に、工具係合手段が形成されており、この工具係合
手段に所定の工具を係合させてこれらネジ操作体を回転
操作することができるようになっている。
The chain cutting described in claim 4 of the present application is
In the chain cutting according to any one of claims 1 to 3, a tool engaging means is formed at a base end portion of the pin removing screw operating body and the pin inserting screw operating body, and the tool engaging means has a predetermined shape. It is possible to rotate these screw operating bodies by engaging a tool.

【0025】さらに、本願の請求項5に記載したチエン
切りは、上記請求項1ないし4のチエン切りにおいて、
上記相互スライドしうる第一部材と第二部材とが、上記
ピン抜き操作用受支部と上記ピン抜き用ネジ操作体とが
相互に対向するスライド位置、および、上記ピン挿入操
作用受支部と上記ピン挿入用ネジ操作体とが相互に対向
するスライド位置において、節度感をもって係止される
ようになっている。
Further, the chain cutting according to claim 5 of the present application is the chain cutting according to any one of claims 1 to 4 above.
The first slide member and the second slide member, which are slidable with each other, have a slide position where the pin-pulling operation support portion and the pin-pulling screw operating body face each other, and the pin insertion operation support portion and At the slide position where the pin insertion screw operating body faces each other, the pin inserting screw operating body is locked with a sense of moderation.

【0026】[0026]

【発明の作用および効果】本願発明のチエン切りは、相
互にスライド係合しうる第一部材と第二部材とを基本的
に備え、上記第一部材のチエン係合溝に係合保持される
チエンに対し、上記第二部材の操作体保持部のピン抜き
用ネジ操作体、またはピン挿入用ネジ操作体によって、
ピン抜き力、あるいはピン挿入力を作用させることによ
り、チエンの分断、あるいはチエンの連結操作を行うこ
とができるようになっている。
The chain cutting device of the present invention basically comprises a first member and a second member which can be slidably engaged with each other, and is engaged and held in the chain engaging groove of the first member. With respect to the chain, by the pin operating screw operating body of the operating body holding portion of the second member or the pin operating screw operating body,
By applying a pin-pulling force or a pin-inserting force, the chain can be divided or the chain can be connected.

【0027】チエンの分断操作にあたっては、第二部材
を取り外した第一部材のチエン係合溝に、チエンを、分
断するべき部位のピンがピン抜き操作用受支部に対応す
るようにして係合保持させる。そして、第二部材を第一
部材にスライド係合させ、このスライド位置をピン抜き
用ネジ操作体が上記チエンを挟んで上記ピン抜き操作用
受支部と対向するように調節する。そして、ピン抜き用
ネジ操作体を螺進させてその先端のピン抜き用プランジ
ャを前進させる。第一部材と第二部材とは、これらのス
ライド方向と直交する方向には離脱不能となっており、
チエンが保持されるチエン係合溝の底面にはチエンの外
リンクプレートを受け止めるピン抜き操作用受支部が形
成されているので、上記ピン抜き用プランジャによる押
圧力は、有効にピンを軸方向に圧し進める力として作用
する。こうして軸方向に圧し進められるピンが、一対の
内リンクプレートのピン挿入孔を抜けた時点で、チエン
は、実質的に分断される。
In the cutting operation of the chain, the chain is engaged with the chain engaging groove of the first member from which the second member has been removed so that the pin at the site to be cut corresponds to the pin-pulling operation receiving and supporting portion. Hold it. Then, the second member is slidably engaged with the first member, and the sliding position is adjusted so that the pin-pulling screw operation body faces the pin-pulling operation support portion with the chain interposed therebetween. Then, the pin removing screw operating body is screwed to advance the pin removing plunger at the tip thereof. The first member and the second member are inseparable in the direction orthogonal to these sliding directions,
The bottom of the chain engagement groove that holds the chain is formed with a pin-pulling operation support portion that receives the outer link plate of the chain, so that the pressing force of the pin-pulling plunger effectively pushes the pin in the axial direction. It acts as a force to push. In this way, the chain is substantially divided when the pin pushed in the axial direction passes through the pin insertion holes of the pair of inner link plates.

【0028】この場合、本願の請求項2に記載している
ように、ピン抜き操作用受支部に設けられる有底状のピ
ン収容孔の深さを、上記ピンがピン抜き操作用受支部側
の外リンクプレートにのみ嵌合している時点で、ピンの
先端がピン収容孔の底部に突き当たるように設定してお
くと、上記ピン抜き用ネジ操作体を上記ピンがピン収容
孔の底部に突き当たって操作抵抗力が増大するまで螺進
させるだけで、従来技術の項で説明したような、ピンが
一方の外リンクプレートにのみ嵌合している状態を得な
がら、チエンの分断状態を得ることができる。
In this case, as described in claim 2 of the present application, the depth of the bottomed pin accommodating hole provided in the pin-pulling operation receiving / supporting portion is set so that the pin is on the pin-pulling operation receiving / supporting portion side. If it is set so that the tip of the pin abuts the bottom of the pin accommodating hole when it is fitted only to the outer link plate of the Just by screwing until it abuts and the operation resistance increases, as described in the section of the prior art, the state in which the pin is fitted to only one outer link plate is obtained while the broken state of the chain is obtained. be able to.

【0029】従来例のチエン切りにおいては、かかる操
作を、トライ・アンド・エラーを繰り返しながら慎重に
行う必要があったが、本願発明のチエン切りによれば、
ピン抜き用ネジ操作体を締切りいっぱいまで螺進させる
だけで、外リンクプレートにピンが残った状態でのチエ
ン分断を達成することができるので、その作業性が著し
く向上させられることになる。
In the chain cutting of the conventional example, it was necessary to carefully perform such an operation while repeating the trial and error, but according to the chain cutting of the present invention,
By simply advancing the pin-pulling screw operation body to the full cut-off, it is possible to achieve chain division in the state where the pin remains on the outer link plate, so that the workability is significantly improved.

【0030】また、チエンCは、第一部材のチエン係合
溝内に係合保持されていて、操作中外部に露出すること
がないので、作業者は、第一部材と第二部材とがスライ
ド係合状態にある本願発明のチエン切りを保持し、所定
の工具で上記ピン抜き用ネジ操作体を螺進操作するだけ
でよく、従来例のように作業中手が汚れるといったこと
が少なくなる。
Further, since the chain C is engaged and held in the chain engagement groove of the first member and is not exposed to the outside during the operation, the operator can distinguish between the first member and the second member. It suffices to hold the chain cutter of the present invention in the slide engagement state and screw the pin removing screw operating body with a predetermined tool, and it is less likely that the hand will get dirty during work as in the conventional example. .

【0031】一方、分断状態にあるチエンを連結操作す
るにあたっては、第二部材を取り外した第一部材のチエ
ン係合溝に、チエンを、その連結するべき部位がピン挿
入操作用受支部と対応するようにして係合保持させる。
もちろん、このとき、一対の外リンクプレートの間に
は、ローラを挟持した一対の内リンクプレートを、これ
らのピン挿入孔が一致するように配置される。本願発明
においては、この場合のチエンの向きを、挿入するべき
ピンがチエン係合溝の底部側に位置するようにしてもよ
いし、チエン係合溝の開口側に位置するようにしてもよ
い。
On the other hand, when connecting the chain in the disconnected state, the chain should be connected to the chain engaging groove of the first member from which the second member has been removed, and the portion to which the chain should be connected corresponds to the pin insertion operation receiving / supporting portion. The engagement is held as described above.
Of course, at this time, between the pair of outer link plates, a pair of inner link plates sandwiching the rollers are arranged so that these pin insertion holes are aligned. In the present invention, the orientation of the chain in this case may be such that the pin to be inserted is located on the bottom side of the chain engagement groove or on the opening side of the chain engagement groove. .

【0032】次に、第二部材を第一部材に対してスライ
ド係合させ、そして、ピン挿入用ネジ操作体が上記ピン
挿入操作用受支部と対向するように上記第二部材のスラ
イド位置を選択する。そして、ピン挿入用ネジ操作体を
螺進させてゆくと、このピン挿入用ネジ操作体の先端の
ピン挿入用押圧部と、チエン係合溝の底部のピン挿入操
作用受支部との間隔が次第に狭まり、これによって、上
記ピンは、一対の外リンクプレートおよび一対の内リン
クプレートの各ピン挿入孔に連通挿されるように相対的
に前進させられる。
Next, the second member is slidably engaged with the first member, and the slide position of the second member is set so that the pin insertion screw operating body faces the pin insertion operation receiving and supporting portion. select. Then, when the pin insertion screw operating body is advanced, the gap between the pin insertion pressing portion at the tip of the pin insertion screw operating body and the pin insertion operating receiving portion at the bottom of the chain engagement groove is increased. The pin gradually narrows, whereby the pin is relatively advanced so as to be communicated with the pin insertion holes of the pair of outer link plates and the pair of inner link plates.

【0033】このように、本願発明においては、ピンを
挿入するにあたって、従来のように、ピン押圧用のプラ
ンジャをピン挿入にあたっても使用するのではなく、ピ
ン抜き用ネジ操作体とは別のピン挿入用ネジ操作体を用
い、その先端部のピン挿入用押圧部とチエン係合溝の底
部受支部との間隔を強制的に狭めることによって、実質
的にピン挿入操作を行うようにしている。したがって、
上述したように、チエンの連結操作をするにあたり、一
方の外リンクプレートにのみ嵌合した状態にあるピン
が、第一部材側にあっても、第二部材側にあっても、い
ずれの場合においてもこれを適正に挿入することができ
る。
As described above, according to the present invention, when inserting the pin, unlike the conventional case, the plunger for pressing the pin is not used for inserting the pin, but instead of the pin removing screw operating body. By using the insertion screw operation body and forcibly narrowing the interval between the pin insertion pressing portion at the tip end thereof and the bottom support portion of the chain engagement groove, the pin insertion operation is substantially performed. Therefore,
As described above, in performing the chain connecting operation, in either case, the pin that is fitted to only one outer link plate may be on the first member side or the second member side. This can also be inserted properly in.

【0034】このようなピン挿入によるチエン連結操作
においても、作業者の手が汚れることがないということ
は、上記のピン抜きによるチエン分断操作の場合と同様
であるが、チエンをいずれの方向にもセットすることが
できることにより、ピンの抜き方向と、ピンの挿入方向
とが逆になるにもかかわらず、同一の方向からの各ネジ
操作体の操作によって、ピン抜き操作とピン挿入操作と
を行うことができる。
The fact that the operator's hands are not soiled even in the chain connecting operation by inserting the pins is the same as in the chain disconnecting operation by the pin removal described above. Even if the pin withdrawal direction and the pin insertion direction are opposite, the pin withdrawal operation and the pin insertion operation can be performed by operating each screw operation body from the same direction. It can be carried out.

【0035】従来は、すでに説明したように、特にピン
挿入操作を、自転車に掛設されるべきチエンの内側から
行わねばならず、その作業が非常に困難であったが、本
願発明のチエン切りによれば、ピン挿入操作も、ピン抜
き操作と同様、たとえば、チエンの外方からの操作によ
って行うことができるようになったのであり、これによ
る作業性の向上も著しいものがある。
Conventionally, as already described, especially the pin insertion operation has to be performed from the inside of the chain to be hung on the bicycle, which is very difficult to perform. According to the above, the pin insertion operation can be performed, for example, by an operation from the outside of the chain, similarly to the pin removal operation, and the workability is significantly improved.

【0036】本願の請求項5に記載したチエン切りおい
ては、上記相互スライドしうる第一部材と第二部材と
を、所定のスライド位置で節度感をもって係止されるよ
うにして、上記のチエン分断、およびチエン連結操作の
作業性をさらに向上させている。すなわち、たとえば、
ディテント機構等により、第一部材と第二部材とを、ピ
ン抜き操作用受支部とピン抜き用ネジ操作体とが相互に
対向するスライド位置、および、上記ピン挿入操作用受
支部と上記ピン挿入用ネジ操作体とが相互に対向するス
ライド位置とが、簡便に選択できるようにしてあるので
あり、これによる作業性の著しい向上も期待することが
できる。
In the chain cutting device according to claim 5 of the present application, the mutually slidable first member and second member are engaged with each other at a predetermined sliding position with a moderation sensation. Workability of chain disconnection and chain connection operation is further improved. That is, for example,
The first member and the second member are slid by the detent mechanism or the like such that the pin-pulling operation receiving and supporting portion and the pin-pulling screw operating body face each other, and the pin inserting operation receiving and supporting portion and the pin inserting member. The sliding position where the screw operating body and the screw operating body face each other can be easily selected, and it is expected that the workability can be significantly improved.

【0037】以上のように、本願発明のチエン切りは、
従来例に比較し、作業者の手指を油等で汚すことなく、
より簡便かつ確実、迅速にチエンの分断操作および連結
操作を行うことができるようになる。
As described above, the chain cutting of the present invention is
Compared with the conventional example, without contaminating the fingers of the operator with oil,
It becomes possible to perform the chain cutting operation and the connecting operation more simply, reliably and quickly.

【0038】[0038]

【実施例の説明】以下、本願発明の好ましい実施例を、
図1ないし図35を参照して、具体的に説明する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The preferred embodiments of the present invention will be described below.
A specific description will be given with reference to FIGS. 1 to 35.

【0039】本願発明のチエン切り20は、相互にスラ
イド係合しうる第一部材21と第二部材22とを基本的
に備えている。第一部材21は、図3ないし図6に示す
ように、互いに平行状に対向する立て壁部23,23
と、底壁部24との内面によって形成されるチエン係合
溝25を備えている。このチエン係合溝25は、上方お
よび長手方向両端部が開放している。このチエン係合溝
25の各立て壁部23,23の内面には、図4の平面図
に示すように、チエンの側面視形状とほぼ対応した波形
断面の凹凸26がチエンの複数ピッチ分等間隔に形成さ
れており、これらの凹凸26に合わせるようにしてチエ
ンCをこのチエン係合溝25に上方から保持させること
により、このチエンCは、長手方向への移動が不可能と
なる。
The chain cutter 20 of the present invention basically comprises a first member 21 and a second member 22 which can be slidably engaged with each other. As shown in FIGS. 3 to 6, the first member 21 has vertical wall portions 23, 23 facing each other in parallel.
And a chain engagement groove 25 formed by the inner surface of the bottom wall portion 24. The chain engagement groove 25 is open at both upper and longitudinal ends. As shown in the plan view of FIG. 4, on the inner surfaces of the vertical wall portions 23, 23 of the chain engagement groove 25, as shown in the plan view of FIG. The chains C are formed at intervals, and by holding the chains C in the chain engagement grooves 25 from above so as to match the projections and recesses 26, the chains C cannot move in the longitudinal direction.

【0040】上記チエン係合溝25の底壁部24は上下
方向に所定の厚みをもっており、この底壁部24の内面
に、複数の受支部材27,28,29が埋設されてい
る。本実施例においては、上記チエン係合溝25に係合
保持される複数リンク分のチエンCにおける、ピン3の
位置と対応するようにして、三個の受支部材27,2
8,29が設けられている。
The bottom wall portion 24 of the chain engaging groove 25 has a predetermined thickness in the vertical direction, and a plurality of support members 27, 28, 29 are embedded in the inner surface of the bottom wall portion 24. In this embodiment, the three receiving and supporting members 27, 2 are arranged so as to correspond to the position of the pin 3 in the chain C for a plurality of links engaged and held in the chain engaging groove 25.
8, 29 are provided.

【0041】図4および図6において左側に表れている
受支部材27は、ピン抜き操作用受支部27aを形成す
るための受支部材であって、図6にその断面が表れてい
るように、チエン係合溝25の底面から若干突出してチ
エンの外リンクプレートの外面を受支する環状の受支面
27bと、その中央に穿設された所定深さのピン収容孔
27cとを備えている。なお、このピン収容孔27cの
受支面27bからの深さは、後述するように、ピン抜き
操作をする場合に、軸方向に押し出されてこのピン収容
孔27c内に入り込むピン3がこのピン収容孔27cの
底面に当接させられたとき、当該ピン3が受支面27b
に接する外リンクプレート1にのみ嵌合することになる
ように設定される。
The receiving and supporting member 27 shown on the left side in FIGS. 4 and 6 is a receiving and supporting member for forming the pin removing operation receiving and supporting portion 27a, and its cross section is shown in FIG. An annular support surface 27b that slightly protrudes from the bottom surface of the chain engagement groove 25 to support the outer surface of the outer link plate of the chain, and a pin accommodating hole 27c having a predetermined depth formed in the center thereof. There is. As will be described later, the depth of the pin accommodating hole 27c from the bearing surface 27b is such that when the pin is removed, the pin 3 is pushed out in the axial direction and enters the pin accommodating hole 27c. When the pin 3 is brought into contact with the bottom surface of the accommodation hole 27c, the pin 3 receives the support surface 27b.
It is set so that it will be fitted only to the outer link plate 1 in contact with.

【0042】図4および図6において中央に表れている
受支部材28は、ピン挿入操作用受支部28aを形成す
るべき受支部材であり、チエン係合溝25の底面から所
定高さ突出する環状の受支面28bとその中央に形成さ
れた浅状のピン係合凹部28cとを備えている。
The receiving and supporting member 28 shown in the center of FIGS. 4 and 6 is a receiving and supporting member for forming the pin insertion operation receiving and supporting portion 28a, and projects from the bottom surface of the chain engaging groove 25 by a predetermined height. It has an annular bearing surface 28b and a shallow pin engaging recess 28c formed in the center thereof.

【0043】そして、図4および図6において右側に表
れている受支部材29は、特殊なピンを挿入する場合に
用いるものであって、チエン係合溝25の底面から所定
高さ突出する環状の受支面29aと、その中央に軸方向
に貫通するピン逃げ孔29bとが形成されている。
The receiving and supporting member 29 appearing on the right side in FIGS. 4 and 6 is used for inserting a special pin, and has an annular shape protruding from the bottom surface of the chain engaging groove 25 by a predetermined height. A bearing surface 29a and a pin escape hole 29b penetrating in the axial direction are formed in the center thereof.

【0044】上記のようなチエン係合溝25を構成する
一対の対向する立て壁部23,23および、底壁部24
と一体に、各立て壁部23,23の外面に対して一定間
隔を隔てて位置する一対のカバー壁30,30が、上記
底壁部24の下端から延出形成されている。図5によく
表れているように、上記立て壁部23,23の外面下端
部には、内方に段落ちさせられた係合段部31が形成さ
れている。
A pair of facing wall portions 23, 23 and a bottom wall portion 24 which constitute the chain engaging groove 25 as described above are opposed to each other.
A pair of cover walls 30, 30 that are located at a constant distance from the outer surface of each of the standing wall portions 23, 23 are integrally formed with the bottom wall portion 24 and extend from the lower end of the bottom wall portion 24. As well shown in FIG. 5, an engagement step portion 31 is formed at the lower end portion of the outer surface of the vertical wall portions 23, 23 so as to be stepped inward.

【0045】さらに、図3に表れているように、一方の
カバー壁30の上縁には、上記ピン抜き操作用受支部2
7aの位置を示す「OUT」との表示を付した指標32
と、上記ピン挿入操作用受支部28aの位置を示す「I
N」との表示を付した指標33と、上記特殊なピン挿入
用の受支部29aの位置を示すための「IN* 」との表
示を付した指標34とが設けられている。
Further, as shown in FIG. 3, at the upper edge of the one cover wall 30, the pin removing operation supporting portion 2 is provided.
Index 32 with a display of "OUT" indicating the position of 7a
And "I" indicating the position of the pin insertion operation receiving and supporting portion 28a.
An index 33 labeled “N” and an index 34 labeled “IN * ” for indicating the position of the special pin insertion receiving and supporting portion 29a are provided.

【0046】さらに、上記の各指標32,33,34が
形成されているカバー壁30には、切り込み35を形成
することによって弾性的に変位可能とした舌片36を設
け、この舌片36の内面に係合凸部37を形成してい
る。
Further, a tongue piece 36 that is elastically displaceable by forming a notch 35 is provided on the cover wall 30 on which the above-mentioned indicators 32, 33 and 34 are formed. Engagement protrusions 37 are formed on the inner surface.

【0047】この係合凸部37は、第一部材21に対し
てスライド係合しうる後述する第二部材22に設けた複
数個の係合凹部38と協働して、第一部材21と第二部
材22とを、所定の相互スライド位置において、節度感
をもって係止する役割を果たすものである。
The engagement protrusion 37 cooperates with a plurality of engagement recesses 38 formed in the second member 22 described later, which can be slidably engaged with the first member 21, and cooperates with the first member 21. The second member 22 plays a role in locking the second member 22 at a predetermined mutual sliding position with a sense of moderation.

【0048】なお、上記第一部材21は、基本的には強
化樹脂を成形することによって形成されるが、各受支部
材27,28,29は工具鋼等の硬質金属によって形成
される。
The first member 21 is basically formed by molding a reinforced resin, but the bearing members 27, 28, 29 are formed of hard metal such as tool steel.

【0049】一方、上記第二部材22は、図7ないし図
10に示すように、第一部材21における一対の立て壁
部23,23の外面に沿って延びる一対の対向壁部3
9,39と、この対向壁部39,39の上端どうしをつ
なぐように位置する操作体保持部40とを有する断面略
下開きコ字状を呈している。上記一対の対向壁部39,
39の厚みは、上記第一部材21における各立て壁部2
3,23とカバー壁30,30とのなす隙間と同等とな
っており、かつ各対向壁部39,39の下端部は、内向
きに屈曲させられて係合部41が形成されている。そし
て、この第二部材22は、全体として、上記第一部材2
1の長さと同じ長さをもっており、また、強化樹脂を成
形することによって形成することができる
On the other hand, as shown in FIGS. 7 to 10, the second member 22 has a pair of opposed wall portions 3 extending along the outer surfaces of the pair of vertical wall portions 23, 23 of the first member 21.
It has a substantially downwardly open U-shaped cross section having 9, 39 and an operating body holding portion 40 positioned so as to connect the upper ends of the facing wall portions 39, 39. The pair of opposed wall portions 39,
The thickness of 39 is the thickness of each standing wall portion 2 in the first member 21.
The gap between the cover walls 3 and 23 and the cover walls 30 and 30 is equal, and the lower end portions of the opposing wall portions 39 and 39 are bent inward to form the engaging portions 41. And this 2nd member 22 is the said 1st member 2 as a whole.
It has the same length as 1 and can be formed by molding a reinforced resin.

【0050】上記第一部材21と第二部材22とは、横
方向にスライド係合させられて組み合わすことができ
る。係合状態において、図10に表れているように、第
二部材22の上記各対向壁部39,39が、第一部材2
1における各立て壁部23,23の外面とカバー壁3
0,30との間の隙間に入り込み、かつ、第二部材22
の各対向壁部39,39の下端に形成した係合部41
が、第一部材21側の係合段部31に係合して、係合状
態において両部材21,22が、そのスライド方向と直
交する方向には離脱不能となる。
The first member 21 and the second member 22 can be combined by being slidably engaged in the lateral direction. In the engaged state, as shown in FIG. 10, each of the facing wall portions 39, 39 of the second member 22 has the first member 2
1, the outer surface of each standing wall portion 23, 23 and the cover wall 3
The second member 22 is inserted into the gap between 0 and 30 and
Engaging portions 41 formed at the lower ends of the opposing wall portions 39, 39 of
However, by engaging with the engagement step portion 31 on the first member 21 side, both members 21 and 22 cannot be disengaged in the direction orthogonal to the sliding direction in the engaged state.

【0051】図10に表れているように、第一部材21
と第二部材22とが相互係合状態にあるとき、第二部材
22の操作体保持部40は、第一部材21のチエン係合
溝25の上部開口を覆うように位置する。この操作体保
持部40は、上下方向にある程度の肉厚をもっており、
次の二つのネジ操作体42,42が組み込まれる。
As shown in FIG. 10, the first member 21
And the second member 22 are in the mutually engaged state, the operating body holding portion 40 of the second member 22 is positioned so as to cover the upper opening of the chain engagement groove 25 of the first member 21. The operating body holding portion 40 has a certain thickness in the vertical direction,
The following two screw operating bodies 42, 42 are incorporated.

【0052】図7および図9において左側に示されてい
るネジ操作体42は、ピン抜き用ネジ操作体であり、上
記操作体保持部40に上下方向に貫通するように設けら
れたネジ孔44に螺合される雄ネジ部42aの下端部
に、ピン抜き用プランジャ42bが取付けられて構成さ
れている。このピン抜き用プランシャ42bは、チエン
のピン3と同等もしくはそれよりやや小さな外径をもっ
ており、好ましくは、上記雄ネジ部42aに対して相対
軸転できるように連結される。上記雄ネジ部42aの上
端には、六角孔状の工具係合孔42cが形成されてい
る。
A screw operating body 42 shown on the left side in FIGS. 7 and 9 is a pin removing screw operating body, and a screw hole 44 provided in the operating body holding portion 40 so as to vertically penetrate therethrough. A male pin 42a is screwed into the lower end of the male pin 42a, and a pin removing plunger 42b is attached to the lower end. The pin removing plunger 42b has an outer diameter equal to or slightly smaller than that of the chain pin 3, and is preferably connected to the male screw portion 42a so as to be rotatable relative to the male screw portion 42a. A hexagonal hole-shaped tool engaging hole 42c is formed at the upper end of the male screw portion 42a.

【0053】一方、図7および図9において右側に示さ
れているネジ操作体43は、ピン挿入用ネジ操作体であ
り、上記ピン抜き用ネジ操作体42と同じく、操作体保
持部40に上下方向に貫通するように形成されたネジ孔
45に螺合される雄ネジ部43aと、この雄ネジ部43
aの下端部に形成されたピン挿入用押圧部43bとを備
えて形成されている。本実施例において上記ピン挿入用
押圧部43bは、ピン挿入操作において、チエンの外リ
ンクプレート1の外面を押圧することと、ピン3それ自
体を都合よく押圧することの双方が可能なように、図9
に表れているように、ピンの外径よりも大径の環状押圧
面43b’の内側にピン係合用凹部43b”が形成され
た形態となっている。そして、このピン挿入用ネジ操作
体43においても、その雄ネジ部43aの上端には、六
角孔状の工具係合孔43cが形成されている。
On the other hand, the screw operating body 43 shown on the right side in FIGS. 7 and 9 is a pin inserting screw operating body, and is the same as the pin removing screw operating body 42 in the operating body holding portion 40. A male screw portion 43a screwed into a screw hole 45 formed so as to penetrate in the direction, and the male screw portion 43.
and a pin insertion pressing portion 43b formed at the lower end of a. In the present embodiment, the pin insertion pressing portion 43b is capable of both pressing the outer surface of the outer link plate 1 of the chain and conveniently pressing the pin 3 itself in the pin insertion operation. Figure 9
As shown in FIG. 5, the pin engaging recess 43b ″ is formed inside the annular pressing surface 43b ′ having a diameter larger than the outer diameter of the pin. Also in the above, a hexagonal hole-shaped tool engagement hole 43c is formed at the upper end of the male screw portion 43a.

【0054】この第二部材22の一方の対向壁部39の
外面には、図7に示すように、上記ピン抜き用ネジ操作
体42の位置を示すための、「OUT」との表示を付し
た指標46と、上記ピン挿入用ネジ操作体43の位置を
示すための、「IN」との表示を付した指標47とが、
組合せ状態における上記第一部材21のカバー壁30の
上縁と隣接するようにして設けられている。
As shown in FIG. 7, the outer surface of one of the facing wall portions 39 of the second member 22 is provided with an indication "OUT" for indicating the position of the pin removing screw operating body 42. The index 46 and the index 47 labeled “IN” for indicating the position of the pin insertion screw operating body 43 are
It is provided so as to be adjacent to the upper edge of the cover wall 30 of the first member 21 in the combined state.

【0055】図11ないし図13に示すように、第一部
材側の「OUT」の指標32と、第二部材側の「OU
T」の指標46とが合う位置に第一部材21および第二
部材22をスライドさせると、第一部材21のチエン係
合溝25の底部における上記ピン抜き操作用受支部27
aと上記第二部材22側のピン抜き用ネジ操作体42と
が同一軸線上に対応して位置することになる。
As shown in FIGS. 11 to 13, the "OUT" index 32 on the first member side and the "OU" on the second member side.
When the first member 21 and the second member 22 are slid to a position where the index 46 of “T” is aligned, the pin-pulling operation support 27 at the bottom of the chain engagement groove 25 of the first member 21.
a and the pin removing screw operating body 42 on the side of the second member 22 are positioned correspondingly on the same axis.

【0056】同様に、図14ないし図16に示すよう
に、第一部材側の「IN」の指標33と第二部材側の
「IN」の指標47とが合うように第一部材21および
第二部材22をスライドさせると、第一部材21のチエ
ン係合溝25の底部のピン挿入操作用受支部28aと、
第二部材22側のピン挿入用ネジ操作体43とが、同一
軸線上に対応して位置することになる。
Similarly, as shown in FIGS. 14 to 16, the first member 21 and the first member 21 and the second member side are aligned so that the "IN" index 33 and the second member side "IN" index 47 are aligned. When the second member 22 is slid, a pin insertion operation receiving and supporting portion 28a at the bottom of the chain engagement groove 25 of the first member 21,
The pin insertion screw operating body 43 on the second member 22 side is positioned correspondingly on the same axis.

【0057】また、第二部材22の上記対向壁部39の
外面には、前述したように第一部材21のカバー壁30
の内面に形成した係合突部37と協働し、この係合突部
37が弾性的に係入して第一部材21および第二部材2
2のスライド方向の相互位置決め作用を行う複数個の係
合凹部38が設けられている。本実施例においてこの係
合凹部38は、四か所設けられている。すなわち、第一
部材21および第二部材22がその端部が揃う通常状態
としての第一の状態と、上述した「OUT」どうしが合
う第二の状態と、上述した「IN」どうしが合う第三の
状態と、第一部材側の「IN* 」と第二部材側の「I
N」が合う第四の状態との四つの状態が、節度感をもっ
て規定されるのである。
As described above, the cover wall 30 of the first member 21 is provided on the outer surface of the facing wall portion 39 of the second member 22.
Of the first member 21 and the second member 2 in cooperation with the engaging protrusion 37 formed on the inner surface of the
There are provided a plurality of engagement recesses 38 that perform the mutual positioning action in the two sliding directions. In this embodiment, the engaging recesses 38 are provided at four places. That is, the first state as a normal state in which the ends of the first member 21 and the second member 22 are aligned, the second state in which the above-mentioned "OUT" s meet, and the second state in which the above-mentioned "IN" s meet. Three states, "IN * " on the first member side and "I" on the second member side
The four states, that is, the fourth state in which "N" is matched, are defined with a sense of moderation.

【0058】さて、本実施例のチエン切り20において
は、上記ピン抜き用ネジ操作体42および上記ピン挿入
用ネジ操作体43は、それぞれ、その上端に形成された
六角孔状の工具係合孔42c,43cに六角軸状の工具
48を係合させ、かかる工具を回転させて操作される
が、本実施例では、上記六角軸状工具48もまた、次の
ようにして、都合よく付属させられている。
Now, in the chain cutting 20 of this embodiment, the pin removing screw operating body 42 and the pin inserting screw operating body 43 are respectively hexagonal hole-shaped tool engaging holes formed at the upper ends thereof. The hexagonal shaft-shaped tool 48 is engaged with 42c and 43c and is operated by rotating the tool. In the present embodiment, the hexagonal shaft-shaped tool 48 is also conveniently attached as follows. Has been.

【0059】図17ないし21に表れているように、こ
の工具48は、上記操作体保持部40と同様の形態をも
つようなデザイン形成をして、第二部材22の操作体保
持部40に対する一体感がでるように成された把持部4
9の下面中央に、六角軸状の工具ピース48aをインサ
ート成形して大略構成されている。これに対応して、上
記第二部材22における操作体保持部40の上面中央に
は、上記工具ピース48bが入り込みうる挿入孔50が
形成されている。上記操作体保持部40の上面における
各ネジ操作体螺合部の頂面には、環状の凸部51,51
がそれぞれ形成されており、上記把持部49の下面両端
部に形成した凹部52が上記各環状凸部51,51に嵌
合するとともに、上記工具ピース48aが上記工具挿入
孔50に挿入されることにより、上記工具48は、上記
操作体保持部40の上部に一体的に積み重なるようにし
て、付属させられる。こうして工具48が付属させられ
ている状態において、操作体保持部40と、工具48に
おける把持部49が、デザイン上一体感をもっているこ
とは、上述したとおりである。
As shown in FIGS. 17 to 21, the tool 48 is designed so as to have the same form as the operating body holding portion 40, and the second member 22 is attached to the operating body holding portion 40. Gripping portion 4 formed so as to provide a sense of unity
A hexagonal shaft-shaped tool piece 48a is generally insert-molded in the center of the lower surface of 9. Correspondingly, an insertion hole 50 into which the tool piece 48b can be inserted is formed at the center of the upper surface of the operation body holding portion 40 of the second member 22. On the top surface of each screw operation body screwing portion on the upper surface of the operation body holding portion 40, annular convex portions 51, 51 are provided.
And the recesses 52 formed at both ends of the lower surface of the grip portion 49 are fitted into the annular projections 51, 51, and the tool piece 48a is inserted into the tool insertion hole 50. Thus, the tools 48 are attached to the upper portion of the operation body holding portion 40 so as to be integrally stacked. As described above, the operating body holding portion 40 and the gripping portion 49 of the tool 48 have a feeling of unity in design when the tool 48 is attached.

【0060】さらに本実施例における上記工具48の把
持部49には、次のような工夫が施されている。この把
持部49の頂面中央に、六角孔状の係合孔53を設ける
とともに、この係合孔53に係合しうる共通の六角軸部
をもつ複数の工具ピース54を、上記把持部40に設け
た収容穴内に挿入保持させているのである。かかる工具
ピース54としては、プラスドライバピース、マイナス
ドライバピース、太さの異なる六角軸工具ピースが選択
されている。また、把持部49の上面に挿入保持される
各工具ピース54の不用意な脱落を防止するために、イ
ンテグラルヒンジ55を介して開閉するカバー56,5
6が設けられている。
Further, the gripping portion 49 of the tool 48 in this embodiment is modified as follows. A hexagonal hole-shaped engagement hole 53 is provided in the center of the top surface of the grip portion 49, and a plurality of tool pieces 54 having a common hexagonal shaft portion that can be engaged with the engagement hole 53 are provided on the grip portion 40. It is inserted and held in the accommodation hole provided in the. As the tool piece 54, a plus driver piece, a minus driver piece, or a hexagonal axis tool piece having a different thickness is selected. Further, in order to prevent the tool pieces 54 inserted and held on the upper surface of the grip portion 49 from being accidentally dropped, the covers 56 and 5 which are opened and closed via the integral hinge 55.
6 is provided.

【0061】次に、上記の構成をもつ本実施例のチエン
切り20の使用方法を説明する。
Next, a method of using the chain cutting device 20 of the present embodiment having the above structure will be described.

【0062】「チエン分断操作」"Chain cutting operation"

【0063】自転車用の無端チエンCをその適部で分断
する操作は、次のようにして行われる。まず、図22お
よび図23に示すように、第一部材21と第二部材22
とを分離し、第一部材21のチエン係合溝25におけ
る、ピン抜き操作用受支部(「OUT」の指標32の位
置)27に、分断に際して抜き操作をするべきピン3が
位置するように、チエンCを上記チエン係合溝25に係
合保持させる。チエン係合溝25は、チエンの側面視と
対応した凹凸26が形成されているから、このようにチ
エン係合溝25に係合保持させたチエンCは、もはや係
合溝25の長手方向に相対動することができず、これに
よって、抜き操作するべきピン3の位置が決まる。
The operation of dividing the bicycle endless chain C at its proper portion is performed as follows. First, as shown in FIGS. 22 and 23, the first member 21 and the second member 22
So that the pin 3 to be pulled out at the time of cutting is located in the pin pulling operation receiving and supporting portion (position of the index 32 of “OUT”) 27 in the chain engaging groove 25 of the first member 21. , C is engaged and held in the chain engagement groove 25. Since the unevenness 26 corresponding to the side view of the chain is formed in the chain engaging groove 25, the chain C engaged and held in the chain engaging groove 25 in this way is no longer in the longitudinal direction of the engaging groove 25. They cannot move relative to each other, which determines the position of the pin 3 to be removed.

【0064】次いで、図24および図25に示すよう
に、上記第一部材21に対して、第二部材22をスライ
ド係合させ、両部材の「OUT」の指標32,46どう
しが合うように相互のスライド位置を合わせる。本実施
例においては、「OUT」の指標32,46どうしが合
うと、その位置が節度感をもって保持され、不用意にず
れることがないことは、上述したとおりである。
Next, as shown in FIGS. 24 and 25, the second member 22 is slidably engaged with the first member 21 so that the “OUT” indexes 32 and 46 of both members are aligned with each other. Align the slide positions of each other. As described above, in the present embodiment, when the “OUT” indexes 32 and 46 are matched with each other, their positions are held with a sense of moderation and are not inadvertently displaced.

【0065】この状態において、図26に示すように、
ピン抜き用ネジ操作体42を、上記工具48を用いて回
転させで螺進させる。そうすると、強大な力をもってこ
のピン抜き用ネジ操作体42の先端部のプランシャ42
bがピン3を反対方向、すなわちチエン係合溝25の底
壁方向に押し出す。やがてこのようにして押し出される
ピン3は、図27に示すように、ピン抜き操作用受支部
27に設けたピン収容孔27cの底面に当接してそれ以
上の抜け動が阻止される。この時点で、ピン3は、図2
7に表れているように、チエン係合溝25側の外リンク
プレート1のピン挿入孔5にのみわずかに嵌合している
状態となる。
In this state, as shown in FIG.
The pin removing screw operating body 42 is rotated by using the tool 48 to be screwed. Then, with a great force, the plunger 42 at the tip of the screw operating body for pin removal 42
b pushes the pin 3 in the opposite direction, that is, toward the bottom wall of the chain engagement groove 25. As shown in FIG. 27, the pin 3 pushed out in this manner abuts the bottom surface of the pin accommodating hole 27c provided in the pin-pulling-out receiving and supporting portion 27 to prevent the pin 3 from further pulling out. At this point, pin 3 is
As shown in FIG. 7, the pin insertion hole 5 of the outer link plate 1 on the side of the chain engagement groove 25 is slightly fitted.

【0066】この状態において、ピン3は、その一部が
外リンクプレート1のピン挿入孔5に嵌合した状態であ
るといえども、内リンクプレート2との関連が解かれて
いるので、チエンCは、実質的にこの部で分断されたこ
とになる。上記ピン抜き用ネジ操作体42を螺退させて
プランシャ42bと各リンクプレート間の干渉を解き、
第二部材22をスライドさせて第一部材21から取り外
し、チエンCを上記チエン係合溝25から抜き去ると、
チエンCを引っ張れば、上記ピン3が抜けた部分でチエ
ンは分断される。
In this state, even though a part of the pin 3 is fitted in the pin insertion hole 5 of the outer link plate 1, the relationship with the inner link plate 2 is broken, so that the chain 3 C is substantially divided in this part. The pin-pulling screw operating body 42 is screwed back to release the interference between the plunger 42b and each link plate,
When the second member 22 is slid and removed from the first member 21, and the chain C is removed from the chain engagement groove 25,
When the chain C is pulled, the chain is divided at the part where the pin 3 is removed.

【0067】チエンの分断操作、換言すると、ピンの抜
き操作をするにあたり、ピン3を完全に抜きさるのでは
なく、その一部が一方の外リンクプレート1のピン挿入
孔5に嵌入した状態に残しておくことが、続いてチエン
Cを連結操作をする上で重要であることはすでに述べた
とおりであるが、かかるピン3を外リンクプレート1に
残した状態でチエンCを分断する操作を、本願発明で
は、上記ピン抜き用ネジ操作体42を締切いっぱいまで
螺進させるだけで、微妙なトライ・アンド・エラー等の
煩雑な操作をすることなく、誰にでも簡単に行うことが
できるのである。
When the chain cutting operation, in other words, the pin removing operation, the pin 3 is not completely removed but a part of the pin 3 is fitted into the pin insertion hole 5 of the outer link plate 1. Although it is already described that it is important to leave the chain C connected to the chain C, it is necessary to divide the chain C with the pin 3 left on the outer link plate 1. In the invention of the present application, it is possible to easily perform it by simply screwing the pin-pulling screw operating body 42 to the full deadline, without any complicated operation such as delicate trial and error. is there.

【0068】「チエン連結操作」"Chain connection operation"

【0069】上記のようにして分断された状態にあるチ
エンCを再び連結する操作は、次のようにして行われ
る。
The operation of re-connecting the chain C separated as described above is carried out as follows.

【0070】第二部材22を取り外した状態において、
図28および図29に示すように、第一部材21の上記
チエン係合溝25に、ピン3が抜け状態で一部付属する
外リンクプレート1と、これと対向する外リンクプレー
トとの間に、ローラ4を挟持した状態での一対の内リン
クプレート2,2を入り込ませた状態で、これらチエン
Cを、チエン係合溝25に係合保持させる。ただし、上
記挿入するべきピン3が、チエン係合溝25におけるピ
ン挿入操作用受支部28aと対応するようにするのはい
うまでもない。この場合、第一部材21の「IN」との
指標33の位置に、上記挿入するべきピン3が位置する
ようにして、簡単にチエンCのチエン係合溝25への保
持操作を行うことができる。
With the second member 22 removed,
As shown in FIGS. 28 and 29, between the outer link plate 1 partially attached to the chain engagement groove 25 of the first member 21 with the pin 3 removed and the outer link plate facing the outer link plate 1. , The chain C is engaged and held in the chain engagement groove 25 in a state where the pair of inner link plates 2 and 2 with the rollers 4 sandwiched therein are inserted. However, it goes without saying that the pin 3 to be inserted corresponds to the pin insertion operation receiving and supporting portion 28a in the chain engagement groove 25. In this case, the pin 3 to be inserted is located at the position of the index 33 with “IN” of the first member 21, so that the holding operation of the chain C in the chain engaging groove 25 can be easily performed. it can.

【0071】なお、図29においては、挿入するべきピ
ン3が、チエン係合溝25の底面側に位置するようにチ
エンCを係合保持させているが、これとは逆に、挿入す
るべきピン3がチエン係合溝25の開口側に位置するよ
うにチエンCを係合保持させてもよい。
In FIG. 29, the chain C is engaged and held so that the pin 3 to be inserted is located on the bottom surface side of the chain engaging groove 25. Conversely, the chain C should be inserted. The chain C may be engaged and held so that the pin 3 is located on the opening side of the chain engagement groove 25.

【0072】ただし、図29に示す方向にチエンCを係
合保持させる方が、後述するピン挿入用ネジ操作体43
によるピン挿入操作を、上述したピン抜き操作と同じ方
向から行うことができるので都合がよい。
However, if the chain C is engaged and held in the direction shown in FIG.
It is convenient that the pin insertion operation by can be performed from the same direction as the above-mentioned pin removal operation.

【0073】上記したようなチエンCの係合保持を行っ
た後、図30に示すように、第一部材21に対して第二
部材22をスライド係合させる。そして、図31に示す
ように両部材21,21の「IN」の指標33,47ど
うしが合うように両部材21,22の位置を合わせる。
この場合においても、かかる位置調節後の状態は、節度
感をもって保持されるのは上述したとおりである。
After engaging and holding the chain C as described above, the second member 22 is slidably engaged with the first member 21 as shown in FIG. Then, as shown in FIG. 31, the positions of both members 21 and 22 are aligned so that the “IN” indexes 33 and 47 of both members 21 and 21 are aligned.
Even in this case, the state after such position adjustment is held with a sense of moderation as described above.

【0074】次いで、図32および図33に示すように
ピン挿入用ネジ操作体43を、工具48を用いて回転さ
せ、螺進させる。そうすると、このピン挿入用ネジ操作
体43は、外リンクプレート1の外面を次第に押圧す
る。すなわち、このピン挿入用ネジ操作体43の先端押
圧部43bと、チエン係合溝25の底部のピン挿入操作
用受支部28aとの間隔が、強制的に圧し縮められる。
このときの押圧力は、結果的に、上記ピン挿入用受支部
28aの係合凹部28cに一端が係止されたピン3を、
各リンクプレート1,1,2,2のピン挿入孔5,5,
6,6に連通挿させる力として作用し、やがて、このピ
ン3は、すべてのリンクプレート1,1,2,2に連通
挿され、これによって、分断状態にあったチエンCは、
このピン3によって連結されることになる。
Next, as shown in FIGS. 32 and 33, the pin insertion screw operating body 43 is rotated by using a tool 48 and screwed. Then, the pin insertion screw operating body 43 gradually presses the outer surface of the outer link plate 1. That is, the distance between the tip pressing portion 43b of the pin insertion screw operating body 43 and the pin insertion operation receiving and supporting portion 28a at the bottom of the chain engagement groove 25 is forcibly pressed and shortened.
As a result, the pressing force at this time causes the pin 3 whose one end is locked in the engaging concave portion 28c of the pin inserting receiving and supporting portion 28a,
Pin insertion holes 5, 5, of each link plate 1, 1, 2, 2
The pin 3 is inserted into all the link plates 1, 1, 2 and 2 so that the chain C, which is in a divided state, is
It will be connected by this pin 3.

【0075】ピン挿入用ネジ操作体43を螺退させてチ
エンCとの干渉を完全に解いた上で、第二部材22をス
ライドさせて第一部材21から外し、チエン係合溝25
から取り出されたチエンCは、連結された状態となる。
After the pin insertion screw operating body 43 is screwed back to completely eliminate the interference with the chain C, the second member 22 is slid to be removed from the first member 21, and the chain engaging groove 25
The chain C taken out from is in a connected state.

【0076】上記からわかるように、本願発明のチエン
切り20を用いたチエン分断操作、およびチエン連結操
作は、第一部材21のチエン係合溝25内にチエンCを
係合保持させ、このチエン係合溝25を覆い隠すように
して第一部材21と組み合わされた第二部材22の各ネ
ジ操作体42,43を螺進させることによって行うの
で、最も力を必要とする段階において、作業者は、なん
らチエンCに直接手を触れる必要がない。
As can be seen from the above, in the chain cutting operation and chain connecting operation using the chain cutter 20 of the present invention, the chain C is engaged and held in the chain engaging groove 25 of the first member 21, and the chain C is engaged. Since it is performed by screwing the respective screw operating bodies 42, 43 of the second member 22 combined with the first member 21 so as to cover the engagement groove 25, the operator at the stage where the most force is required. Does not need to touch Chien C directly.

【0077】また、好ましい実施例においては、チエン
抜き用ネジ操作体42を単に締切いっぱいまで螺進させ
るだけで、ピン3の一部が一方の外リンクプレートのピ
ン挿通孔に嵌入した状態で、チエンの実質的な分断を行
うことができ、誰にでも簡単に、適正なチエン分断操作
を行うことができる。
Further, in a preferred embodiment, by simply screwing the chain-pulling screw operating body 42 to the full deadline, a part of the pin 3 is fitted into the pin insertion hole of one outer link plate, The chain can be virtually divided, and anyone can easily perform an appropriate chain division operation.

【0078】さらに、本願発明のチエン切りでは、ピン
抜き操作と、ピン挿入操作とを、別のネジ操作体42,
43を用いて行うようにしており、ピン挿入操作におい
ては、ピン挿入操作用ネジ操作体43と、第一部材21
のチエン係合溝25の底部との間隔を縮小することによ
って、ピンの挿入力を得ているので、ピン3を、チエン
のいずれの方向から挿入する場合においても対応するこ
とができる。このことは換言すると、ピン抜き操作と、
ピン挿入操作とを、同一方向からのネジ操作体42,4
3に対する操作を行うことによって実現できることを意
味し、これによる作業性の改善は著しいものとなる。
Further, in the chain cutting of the present invention, the pin removing operation and the pin inserting operation are performed by different screw operating bodies 42,
43, and in the pin insertion operation, the pin insertion operation screw operating body 43 and the first member 21.
Since the pin insertion force is obtained by reducing the distance between the bottom of the chain engagement groove 25 and the pin 3, the pin 3 can be inserted from any direction. This means in other words
The pin insertion operation is the same as the screw operation bodies 42, 4 from the same direction
This means that it can be realized by performing the operation for No. 3, and the workability is significantly improved by this.

【0079】以上の結果、本願発明のチエン切りによれ
ば、誰にでも簡単に、チエンの分断および連結操作を、
適正に行うことができ、また、不用意に作業者の手指が
汚れるといったことがなくなる。
As a result of the above, according to the chain cutting of the present invention, anyone can easily perform the chain cutting and connecting operations.
This can be done properly, and the hands of the operator will not be carelessly soiled.

【0080】さらに、本実施例においては、図34およ
び図35に示すように、各ネジ操作体42,43を操作
するための工具48を、都合よく第二部材22に付属さ
せており、自転車の修理あるいは部品交換等に必要最少
限の工具ピースを、この工具における把持部49に収納
させている。したがって、本実施例のチエン切り20
は、単にチエンの分断および連結操作をするための工具
だけではなく、自転車の修理あるいはメインテナンスの
ための最小限必要な工具を揃えた工具セットとしても機
能することなり、非常に利便性の高いものとなる。な
お、工具セットとしての使用方法は、図34および図3
5に参考的に示される。
Further, in the present embodiment, as shown in FIGS. 34 and 35, a tool 48 for operating the screw operating bodies 42 and 43 is conveniently attached to the second member 22, and The minimum tool pieces required for repair or replacement of parts are stored in the grip portion 49 of this tool. Therefore, the chain cutting 20 of the present embodiment
Is not only a tool for disconnecting and connecting chains, it also functions as a tool set with the minimum necessary tools for bicycle repair or maintenance, which is very convenient. Becomes Note that the usage as a tool set is shown in FIG. 34 and FIG.
5 for reference.

【0081】もちろん、本願発明の範囲は上述した実施
例に限定されるものではない。実施例では、自転車用チ
エンの分断および連結を前提として説明したが、同一の
形態をもつチエンであれば、用途に限定されないあらゆ
るチエンの分断・連結操作具として用いることができ
る。
Of course, the scope of the present invention is not limited to the above embodiments. Although the embodiments have been described on the premise that the bicycle chain is divided and connected, any chain having the same configuration can be used as a cutting / connecting operation tool for any chain that is not limited to the intended use.

【0082】また、第一部材および第二部材の具体的に
形状は、種々変形可能である。
Further, the concrete shapes of the first member and the second member can be variously modified.

【図面の簡単な説明】[Brief description of drawings]

【図1】本願発明の一実施例にかかるチエン切りの全体
斜視図である。
FIG. 1 is an overall perspective view of a chain cutter according to an embodiment of the present invention.

【図2】図1のII−II線に沿う断面図である。FIG. 2 is a sectional view taken along line II-II in FIG.

【図3】上記チエン切りを構成する第一部材の正面図で
ある。
FIG. 3 is a front view of a first member forming the chain cutting.

【図4】図3のIV−IV線に沿う平面図である。FIG. 4 is a plan view taken along the line IV-IV in FIG.

【図5】図4のV−V線に沿う断面図である。5 is a cross-sectional view taken along the line VV of FIG.

【図6】図5のVI−VI線に沿う断面図である。6 is a sectional view taken along line VI-VI in FIG.

【図7】上記チエン切りを構成する第二部材の正面図で
ある。
FIG. 7 is a front view of a second member forming the chain cutting.

【図8】図7のVIII−VIII線に沿う断面図である。8 is a cross-sectional view taken along the line VIII-VIII of FIG.

【図9】図8のIX−IX線に沿う断面図である。9 is a sectional view taken along line IX-IX in FIG.

【図10】上記チエン切りを構成する第一部材と第二部
材とをスライド連結させた際の断面図である。
FIG. 10 is a cross-sectional view when the first member and the second member forming the chain cutting are slid and connected.

【図11】上記チエン切りにおいてチエン分断操作をす
る際の第一部材と第二部材との相互スライド位置を示す
正面図である。
FIG. 11 is a front view showing a mutual sliding position of the first member and the second member when performing a chain cutting operation in the chain cutting.

【図12】図11のXII −XII 線に沿う断面図である。12 is a sectional view taken along line XII-XII in FIG.

【図13】図12のXIII−XIII線に沿う断面図である。13 is a sectional view taken along line XIII-XIII in FIG.

【図14】上記チエン切りにおいてチエン連結操作をす
る際の第一部材と第二部材との相互スライド位置を示す
正面図である。
FIG. 14 is a front view showing a mutual sliding position of the first member and the second member when performing a chain connecting operation in the chain cutting.

【図15】図14のXV−XV線に沿う断面図である。15 is a sectional view taken along line XV-XV in FIG.

【図16】図15のXVI −XVI 線に沿う断面図である。16 is a sectional view taken along line XVI-XVI in FIG.

【図17】上記チエン切りに属する工具の正面図であ
る。
FIG. 17 is a front view of a tool belonging to the chain cutter.

【図18】図17のXVIII −XVIII 線に沿う下面図であ
る。
FIG. 18 is a bottom view taken along line XVIII-XVIII in FIG.

【図19】図18のXIX −XIV 線に沿う断面図である。19 is a sectional view taken along line XIX-XIV in FIG.

【図20】図19のXX−XX線に沿う断面図である。20 is a cross-sectional view taken along the line XX-XX in FIG.

【図21】図19のXXI −XXI 線に沿う断面図である。21 is a cross-sectional view taken along line XXI-XXI of FIG.

【図22】上記チエン切りを用いたチエン分断操作の説
明図であり、第一部材のチエン保持部にチエンを保持さ
せた状態を示す。
FIG. 22 is an explanatory diagram of a chain cutting operation using the chain cutting, showing a state in which the chain holding portion of the first member holds the chain.

【図23】図22の要部拡大図である。FIG. 23 is an enlarged view of a main part of FIG. 22.

【図24】上記チエン切りを用いたチエン分断操作の説
明図であり、図22に示す状態に続いて、第一部材と第
二部材とをスライド係合させようとしている状態を示
す。
FIG. 24 is an explanatory diagram of a chain cutting operation using the chain cutting, showing a state in which the first member and the second member are being slid and engaged following the state shown in FIG. 22.

【図25】上記チエン切りを用いたチエン分断操作の説
明図であり、図24に示す状態に続いて、第一部材と第
二部材とを所定の相互スライド関係とした状態を示す。
FIG. 25 is an explanatory diagram of a chain cutting operation using the chain cutting, showing a state in which the first member and the second member are brought into a predetermined mutual sliding relationship subsequent to the state shown in FIG. 24.

【図26】上記チエン切りを用いたチエン分断操作の説
明図であり、図25に示す状態に続いて、ピン抜き用ネ
ジ操作体を工具を用いて螺進させている状態を示す。
26 is an explanatory view of a chain cutting operation using the chain cutting, showing a state in which the pin-pulling screw operating body is screwed using a tool following the state shown in FIG. 25.

【図27】図26に示す状態での上記チエン切りの内部
を示す断面図である。
FIG. 27 is a cross-sectional view showing the inside of the chain cut in the state shown in FIG. 26.

【図28】上記チエン切りを用いたチエン連結操作の説
明図であり、第一部材のチエン保持部にチエンを保持さ
せた状態を示す。
FIG. 28 is an explanatory view of a chain connecting operation using the chain cutting, showing a state in which the chain is held by the chain holding portion of the first member.

【図29】図28に示す状態での第一部材の内部を示す
断面図である。
FIG. 29 is a cross-sectional view showing the inside of the first member in the state shown in FIG. 28.

【図30】上記チエン切りに用いたチエン連結操作の説
明図であり、図28に示す状態を続いて、第一部材に第
二部材をスライド係合させようとしている状態を示す。
FIG. 30 is an explanatory diagram of a chain connecting operation used for the chain cutting, showing a state in which the second member is about to be slidably engaged with the first member, following the state shown in FIG. 28.

【図31】上記チエン切りを用いたチエン連結操作の説
明図であり、図30に示す状態に続いて、第一部材と第
二部材とを所定の相互スライド関係とした状態を示す。
FIG. 31 is an explanatory diagram of a chain connecting operation using the chain cutting, showing a state in which the first member and the second member are brought into a predetermined mutual sliding relationship subsequent to the state shown in FIG. 30.

【図32】上記チエン切りを用いたチエン連結操作の説
明図であり、図31に示す状態に続いて、ピン挿入用ネ
ジ操作体を工具を用いて螺進させている状態を示す。
32 is an explanatory diagram of a chain connecting operation using the chain cutting, showing a state in which the pin insertion screw operating body is screwed using a tool, following the state shown in FIG. 31. FIG.

【図33】図32に示す状態での上記チエン切りの内部
を示す断面図である。
FIG. 33 is a cross-sectional view showing the inside of the chain cut in the state shown in FIG. 32.

【図34】上記チエン切りに付属する工具の工具セット
としての使用方法を示す斜視図である。
FIG. 34 is a perspective view showing how to use the tool attached to the chain cutter as a tool set.

【図35】上記チエン切りに付属する工具の工具セット
としての使用方法を示す斜視図である。
FIG. 35 is a perspective view showing how to use the tool attached to the chain cutter as a tool set.

【図36】従来例のチエン切りの斜視図である。FIG. 36 is a perspective view of a chain cutter of a conventional example.

【図37】従来例のチエン切りを用いたチエン分断操作
を説明するための一部断面平面図である。
FIG. 37 is a partial cross-sectional plan view for explaining the chain cutting operation using the chain cutting of the conventional example.

【図38】従来例のチエン切りを用いたチエン連結操作
を説明するための一部断面平面図である。
FIG. 38 is a partial cross-sectional plan view for explaining a chain connecting operation using a chain cutter of the conventional example.

【符号の説明】[Explanation of symbols]

C チエン 1 外リンクプレート 2 内リンクプレート 3 ピン 20 チエン切り 21 第一部材 22 第二部材 27a ピン抜き操作用受支部 27b 受支面 27c ピン収容孔 28a ピン挿入操作用受支部 28b 受支面 40 操作体保持部 42 ピン抜き用ネジ操作体 42b ピン抜き用プランジャ 42c 工具係合孔(工具係合手段) 43 ピン挿入用ネジ操作体 43c 工具係合孔(工具係合手段) 48 工具 C Chain 1 Outer link plate 2 Inner link plate 3 Pin 20 Chain cutting 21 First member 22 Second member 27a Pin receiving operation receiving portion 27b Pin receiving surface 27c Pin receiving hole 28a Pin inserting receiving portion 28b Receptive surface 40 Operation body holding part 42 Pin removal screw operation body 42b Pin removal plunger 42c Tool engagement hole (tool engagement means) 43 Pin insertion screw operation body 43c Tool engagement hole (tool engagement means) 48 Tool

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 複数リンク分のチエンをその長手方向移
動不能に係合保持しうるチエン係合溝を有する第一部材
と、 上記第一部材に対して上記チエン係合溝の延びる方向に
スライド係合することができ、スライド係合時、チエン
係合溝の延びる方向と直交する方向に離脱不能な第二部
材とを備え、 上記第一部材の上記チエン係合溝の底面には、このチエ
ン係合溝に係合されるチエンのピン位置と対応して、ピ
ン抜き操作用受支部と、ピン挿入操作用受支部とが設け
られており、 上記第二部材には、上記チエン係合溝の開口を覆う操作
体保持部が形成されており、この操作体保持部には、上
記ピン抜き操作用受支部あるいは上記ピン挿入操作用受
支部と対向しうるようにして、ピン抜き用プランジャを
先端に有するピン抜き用ネジ操作体と、ピン挿入用押圧
部を先端に有するピン挿入用ネジ操作体とが、螺進退可
能に螺合されていることを特徴とする、チエン切り。
1. A first member having a chain engagement groove capable of engaging and holding chains of a plurality of links so as to be immovable in the longitudinal direction, and a slide member in a direction in which the chain engagement groove extends with respect to the first member. A second member which can be engaged and cannot be disengaged in the direction orthogonal to the extending direction of the chain engaging groove at the time of sliding engagement, and the bottom surface of the chain engaging groove of the first member is A pin removing operation receiving and supporting portion and a pin inserting operation receiving and supporting portion are provided corresponding to the pin position of the chain engaged with the chain engaging groove, and the second member has the chain engaging operation. An operating body holding portion is formed to cover the opening of the groove, and the operating body holding portion can be opposed to the pin removing operation receiving / supporting portion or the pin inserting operation receiving / supporting portion so that the pin removing plunger is provided. With a pin removal screw operating body that has a A chain cutting device, characterized in that a pin insertion screw operating body having a pin insertion pressing portion at its tip is screwed so as to be able to advance and retract.
【請求項2】 上記ピン抜き操作用受支部は、チエンの
外リンクプレートの外面を受支する受支面と、上記受支
面から所定深さをもつ有底状のピン収容孔とを備えて形
成されている、請求項1のチエン切り。
2. The pin-pulling operation receiving / supporting portion includes a receiving / supporting surface that supports the outer surface of the outer link plate of the chain, and a bottomed pin receiving hole having a predetermined depth from the receiving / supporting surface. The chain cutter according to claim 1, which is formed as follows.
【請求項3】 上記ピン挿入操作用受支部は、チエンの
外リンクプレートの外面を受支する受支面と、この受支
面に形成されたピン係合凹部とを備えて形成されてい
る、請求項1または2のチエン切り。
3. The pin insertion operation receiving / supporting portion is formed by including a receiving / supporting surface that supports the outer surface of the outer link plate of the chain, and a pin engaging recess formed in the receiving / supporting surface. , The chain cutting according to claim 1 or 2.
【請求項4】 上記ピン抜き用ネジ操作体および上記ピ
ン挿入用ネジ操作体の基端部には、工具係合手段が形成
されており、この工具係合手段に所定の工具を係合させ
てこれらネジ操作体を回転操作することができるように
なっている、請求項1ないし3のいずれかのチエン切
り。
4. A tool engaging means is formed at a base end portion of the pin removing screw operating body and the pin inserting screw operating body, and a predetermined tool is engaged with the tool engaging means. The chain cutter according to any one of claims 1 to 3, wherein the screw operation body can be rotated and operated.
【請求項5】 上記相互スライドしうる第一部材と第二
部材とは、上記ピン抜き操作用受支部と上記ピン抜き用
ネジ操作体とが相互に対向するスライド位置、および、
上記ピン挿入操作用受支部と上記ピン挿入用ネジ操作体
とが相互に対向するスライド位置において、節度感をも
って係止されるようになっている、請求項1ないし4の
いずれかのチエン切り。
5. The mutually slidable first member and second member are slide positions at which the pin-pulling operation support portion and the pin-pulling screw operation body face each other, and
5. The chain cutting device according to claim 1, wherein the pin insertion operation receiving and supporting portion and the pin insertion screw operating body are engaged with a sense of moderation at a sliding position where they are opposed to each other.
JP15336793A 1993-06-24 1993-06-24 Chain cutting Pending JPH079360A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15336793A JPH079360A (en) 1993-06-24 1993-06-24 Chain cutting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15336793A JPH079360A (en) 1993-06-24 1993-06-24 Chain cutting

Publications (1)

Publication Number Publication Date
JPH079360A true JPH079360A (en) 1995-01-13

Family

ID=15560909

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15336793A Pending JPH079360A (en) 1993-06-24 1993-06-24 Chain cutting

Country Status (1)

Country Link
JP (1) JPH079360A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08229756A (en) * 1994-12-29 1996-09-10 Daido Kogyo Co Ltd Cutting and connecting device for chain
CN109226662A (en) * 2018-10-12 2019-01-18 邱国盛 A kind of assembly chain cropper
CN109530610A (en) * 2018-11-28 2019-03-29 安徽省绩溪县飞奔链传动有限公司 A kind of chain cutting device
DE102020101342B4 (en) 2019-04-23 2022-02-24 Louis Chuang chain tool

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08229756A (en) * 1994-12-29 1996-09-10 Daido Kogyo Co Ltd Cutting and connecting device for chain
CN109226662A (en) * 2018-10-12 2019-01-18 邱国盛 A kind of assembly chain cropper
CN109530610A (en) * 2018-11-28 2019-03-29 安徽省绩溪县飞奔链传动有限公司 A kind of chain cutting device
DE102020101342B4 (en) 2019-04-23 2022-02-24 Louis Chuang chain tool
US11458529B2 (en) 2019-04-23 2022-10-04 Louis Chuang Chain tool

Similar Documents

Publication Publication Date Title
KR960005341B1 (en) Lock handle device withdrawal rotation type door
US7858219B2 (en) Locking mechanism of battery pack
US4174648A (en) Punch retainer
US9447905B2 (en) Pipe connector
US7571517B2 (en) Multi-function tool handle
CA2559868C (en) Re-keyable lock cylinder
FR2877975A1 (en) LOCK BARREL WHICH CAN BE CHANGED TO CLEAR.
EP1836027A2 (en) Ratchet wrench with socket quick release mechanism
JPH079360A (en) Chain cutting
US11896092B2 (en) Bracelet link
AU2013206185A1 (en) Tool for stripping electric cables
US20210215272A1 (en) Pipe clamp
CN211258144U (en) Puzzle lock
JP3431361B2 (en) Chain disconnection connection device
CN211115263U (en) Case buckle lock
US4711012A (en) Apparatus and method for installing gutter drops on rain gutters
US20020043752A1 (en) Bench vice
CN211500102U (en) Idle running formula pickproof door lock device
EP0636459A1 (en) Chain assembly/disassembly
DE102020002859A1 (en) Separable adapter and method of separation
CN208051776U (en) Speeder wrench
CN220800012U (en) Blade replacement tool
CN110670977A (en) Puzzle lock
CN110593670A (en) Case buckle lock
EP1097028B1 (en) Tool with self-locking grip, interchangeable head-pieces and clamp for fastening to a work bench