JPH0791099A - Beam supporting structure and its execution method - Google Patents

Beam supporting structure and its execution method

Info

Publication number
JPH0791099A
JPH0791099A JP25785093A JP25785093A JPH0791099A JP H0791099 A JPH0791099 A JP H0791099A JP 25785093 A JP25785093 A JP 25785093A JP 25785093 A JP25785093 A JP 25785093A JP H0791099 A JPH0791099 A JP H0791099A
Authority
JP
Japan
Prior art keywords
bracket
fixed
members
pillar
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP25785093A
Other languages
Japanese (ja)
Other versions
JP3198283B2 (en
Inventor
Nobuharu Iwami
宜春 岩見
Motoichi Iwami
源市 岩見
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Naigai Technica Co Ltd
Original Assignee
Naigai Technica Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Naigai Technica Co Ltd filed Critical Naigai Technica Co Ltd
Priority to JP25785093A priority Critical patent/JP3198283B2/en
Publication of JPH0791099A publication Critical patent/JPH0791099A/en
Application granted granted Critical
Publication of JP3198283B2 publication Critical patent/JP3198283B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PURPOSE:To prevent the deflection of an H-shaped steel and the deformation and buckling of a column, and to reduce manufacturing cost. CONSTITUTION:A bracket 50 is stuck fast to each side of a column 32, and an H-shaped steel 22 is arrangedly provided on the upper face of the bracket 50 through members 76, 77 or a steel plate 71 and a member 72. The H-shaped steel 22 and the bracket 50 are mutually bolted. In addition, the H-shaped steel 22 is severally connected and fixed to the members 76, 77 or 72 through a splice plate 75 and a fixing plate 73. Since the said members are composed mutually in one body, the supporting part of the H-shaped steel 22 is increased in structural strength, and the deformation and buckling of the column 32 can thereby be prevented. In addition, since the supporting point P of the H-shaped steel 22 is the tip of the bracket 50, the deflection of the H-shaped steel 22 can be reduced. The thickness of the H-shaped steel 22 can therefore be reduced for reducing manufacturing cost.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、立体駐車場のはりの支
持構造及びその施工方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a beam support structure for a multistory parking lot and a method of constructing the beam.

【0002】[0002]

【従来の技術】図39は従来のはりの支持構造を示し、
従来では、柱32間にH型鋼等のはり92を架橋する場
合に以下の方法で行っていた。すなわち、柱32の側面
に部材91を溶接等で固着し、クレーン等ではり92を
吊り、上記部材91の端面にはり92の端面を当接させ
る。そして、クレーンではり92を吊ったままの状態
で、部材91とはり92の両側の側面に跨がるように添
板93を当ててボルト94を螺着することで、部材91
とはり92とを連結固定する。
2. Description of the Related Art FIG. 39 shows a conventional beam support structure.
Conventionally, when the beam 92 such as H-shaped steel is bridged between the columns 32, the following method is used. That is, the member 91 is fixed to the side surface of the column 32 by welding or the like, the beam 92 is suspended by a crane or the like, and the end face of the beam 92 is brought into contact with the end face of the member 91. Then, while the beam 92 is being hung by the crane, the attachment plate 93 is applied to the member 91 and the beam 92 so as to straddle both side surfaces of the beam 92, and the bolt 94 is screwed to the member 91.
The beam 92 is connected and fixed.

【0003】また、クレーンではり92を吊ったまま、
部材91とはり92の上下面にそれぞれ固定板95を跨
がるように配置して、ボルト96によりはり92と部材
91とを連結固定する。このように部材91とはり92
とを添板93及び固定板95により連結固定されること
になる。そして、最後のボルト96を螺着し終わってか
らクレーンではり92を吊っているワイヤーを解除す
る。
Also, with the crane 92 hanging,
The member 91 and the beam 92 are arranged on the upper and lower surfaces of the member 91 so as to straddle the fixing plate 95, and the beam 92 and the member 91 are connected and fixed by the bolt 96. In this way, the member 91 and the beam 92
And are connected and fixed by the attachment plate 93 and the fixing plate 95. Then, after the last bolt 96 has been screwed, the wire that suspends the beam 92 is released by the crane.

【0004】従って、図39に示す従来例では、はり9
2を部材91に完全に連結固定するまで、クレーンによ
りワイヤーで吊っておかなければならず、組立の施工性
が非常に悪いという問題がある。また、はり92の架橋
作業が終わるまでクレーンを使用するため、クレーン車
輛の賃貸料が高くなり、ひいては建設コストが高くなる
という問題がある。
Therefore, in the conventional example shown in FIG. 39, the beam 9
There is a problem in that the workability of assembly is very poor, because the crane must be hung with a wire until the 2 is completely connected and fixed to the member 91. In addition, since the crane is used until the bridge work of the beam 92 is completed, there is a problem that the rent of the crane vehicle is high and the construction cost is high.

【0005】そこで、上記の問題を解決した工法とし
て、所謂イナズマ工法というのが提案されている。すな
わち、図40に示すように、柱32の側面に固着した部
材91とはり92の突き合わせの部分を段違いに形成
し、はり92の端部を部材91の先端の部分に載置する
ものである。そして、はり92と部材91との突き合わ
せ面の部分にそれぞれボルト止めを行うものである。
Therefore, a so-called lightning method has been proposed as a method for solving the above problems. That is, as shown in FIG. 40, the abutting portion of the member 91 fixed to the side surface of the column 32 and the beam 92 is formed in a stepped manner, and the end portion of the beam 92 is placed on the tip portion of the member 91. . Then, bolts are respectively attached to the abutting surfaces of the beam 92 and the member 91.

【0006】この場合、クレーンによりワイヤーで吊っ
たはり92を部材91の突き合わせの部分に載せて、1
本のボルト97をはり92と部材91に螺着するだけ
で、はり92の横方向の滑りを規制することができる。
そのため、1本のボルト97をはり92と部材91に螺
着するだけで、はり92は位置決めされることになっ
て、はり92からワイヤーを外すことができ、次のはり
92の架橋作業に移ることができる。
In this case, the beam 92 hung with a wire by a crane is placed on the abutting portion of the member 91, and
By simply screwing the bolt 97 of the book to the beam 92 and the member 91, the lateral slip of the beam 92 can be regulated.
Therefore, by simply screwing one bolt 97 to the beam 92 and the member 91, the beam 92 is positioned, the wire can be removed from the beam 92, and the next beam 92 is bridged. be able to.

【0007】このようにして図40に示すイナズマ工法
と言われる工法においては、クレーンによりはり92を
次々と架橋していくことができる。そして、部材91と
はり92とを残りのボルトにより螺着することで、はり
92を部材91に連結固定することができる。また、部
材91とはり92との上面、側面、下面等の突き合わせ
の部分を溶接することで、はり92を部材91に確実に
連結固定することができる。
In this way, in the construction method called the construction method shown in FIG. 40, the beam 92 can be successively bridged by a crane. Then, the beam 92 can be connected and fixed to the member 91 by screwing the member 91 and the beam 92 with the remaining bolts. Further, the beam 92 can be reliably connected and fixed to the member 91 by welding the abutting portions of the member 91 and the beam 92 such as the upper surface, the side surface, and the lower surface.

【0008】[0008]

【発明が解決しようとする課題】従って、図40に示す
方法では、作業性が非常に簡易となり、かつスムーズに
施工することができる。しかしながら、はり92に自動
車等による荷重がかかった場合、はり92の支持点Pは
柱32の中心部となる。従って、大きな荷重がはり92
に加わった場合には、はり92のたわみが大きくなると
いう問題があった。
Therefore, in the method shown in FIG. 40, the workability is very simple and the construction can be carried out smoothly. However, when a load such as an automobile is applied to the beam 92, the support point P of the beam 92 becomes the center of the column 32. Therefore, a large load is applied to the beam 92.
However, there is a problem that the deflection of the beam 92 becomes large.

【0009】また、柱32の側面に固着した部材91
に、単にはり92を連結固定しているだけでは、はり9
2に大きな荷重がかかった場合には、柱32に変形や座
屈が生じ易いという問題がある。更に、上記たわみを少
なくするためには、はり92を大きくしたり、鋼板の厚
みを厚くする必要があり、そのため、図40に示す従来
例では、コストが非常にアップするという問題があっ
た。
A member 91 fixed to the side surface of the pillar 32.
If the beam 92 is simply connected and fixed, the beam 9
When a large load is applied to 2, there is a problem that the column 32 is likely to be deformed or buckled. Further, in order to reduce the above-mentioned deflection, it is necessary to make the beam 92 large and to increase the thickness of the steel plate. Therefore, in the conventional example shown in FIG. 40, there is a problem that the cost is significantly increased.

【0010】本発明は上述の点に鑑みて提供したもので
あって、はりのたわみや、柱の座屈を防止し、しかもコ
ストダウンを図ることを目的としたはりの支持構造を提
供するものである。
The present invention has been made in view of the above points, and provides a beam support structure for the purpose of preventing the beam from bending and the columns from buckling, and further reducing the cost. Is.

【0011】[0011]

【課題を解決するための手段】請求項1記載のはりの支
持構造によれば、立設した柱32の側面にブラケット5
0を取着し、このブラケット50の基部の上面に固定用
の部材76を取着し、上記部材77の端面にはり22の
端面を当接させて該はり22を上記ブラケット50の上
面に固定し、上記はり22と部材76の両側の側面にそ
れぞれ跨がせた添板75により該はり22と部材76と
を連結固定し、はり22と部材76の上面に跨がせた固
定板73により該はり22と部材76とを連結固定した
ことを特徴としている。
According to the beam support structure of claim 1, the bracket 5 is provided on the side surface of the upright pillar 32.
0, the fixing member 76 is attached to the upper surface of the base of the bracket 50, and the end surface of the beam 22 is brought into contact with the end surface of the member 77 to fix the beam 22 to the upper surface of the bracket 50. Then, the beam 22 and the member 76 are connected and fixed by the attachment plates 75 which are laid across the side surfaces on both sides of the beam 22 and the member 76, respectively, and by the fixing plates 73 which are laid over the upper surfaces of the beam 22 and the member 76. The beam 22 and the member 76 are connected and fixed.

【0012】また、請求項2記載のはりの支持構造によ
れば、立設した柱32間に縦方向、横方向にそれぞれは
り22を架橋するようにしたはりの支持構造において、
四角円筒状の柱32の各側面にブラケット50をそれぞ
れ取着し、このブラケット50が交差する中心部分に固
定用の第1の部材76と第2の部材77とを略十字状に
固定し、上記各部材76,77の端面に縦方向、横方向
の各はり22の端面を当接させて該はり22を上記ブラ
ケット50の上面にそれぞれ固定し、上記はり22と部
材76,77の両側の側面にそれぞれ跨がせた添板75
により該はり22と部材76,77とをそれぞれ連結固
定し、はり22と部材76,77の上面に跨がせた固定
板73により該はり22と部材76,77とをそれぞれ
連結固定したことを特徴としている。
According to the beam support structure of the second aspect, in the beam support structure, the beams 22 are bridged in the longitudinal direction and the transverse direction between the columns 32 which are erected.
The bracket 50 is attached to each side surface of the square cylindrical pillar 32, and the fixing first member 76 and the second member 77 are fixed in a substantially cross shape at the center portion where the bracket 50 intersects, The end faces of the beams 22 in the vertical and horizontal directions are brought into contact with the end faces of the members 76 and 77 to fix the beams 22 to the upper surface of the bracket 50, respectively. Saddle plate 75 on each side
The beam 22 and the members 76 and 77 are connected and fixed by means of, respectively, and the beam 22 and the members 76 and 77 are connected and fixed by means of a fixing plate 73 extending over the upper surfaces of the beam 22 and the members 76 and 77, respectively. It has a feature.

【0013】更に、請求項3記載のはりの支持構造によ
れば、立設した柱32間に縦方向、横方向にそれぞれは
り22を架橋するようにしたはりの支持構造において、
四角円筒状の柱32の各側面にブラケット50をそれぞ
れ取着し、このブラケット50が交差する部分の上面に
鉄板71を載置して該鉄板71と各ブラケット50とを
それぞれ連結固定し、この鉄板71の中心部分に固定用
の第1の部材76と第2の部材77とを略十字状に固定
し、上記各部材76,77の端面に縦方向、横方向の各
はり22の端面を当接させて該はり22を上記ブラケッ
ト50の上面にそれぞれ固定し、上記はり22と部材7
6,77の両側の側面にそれぞれ跨がせた添板75によ
り該はり22と部材76,77とをそれぞれ連結固定
し、はり22と部材76,77の上面に跨がせた固定板
73により該はり22と部材76,77とをそれぞれ連
結固定したことを特徴としている。
Further, according to the beam support structure of the third aspect, in the beam support structure, the beams 22 are bridged in the longitudinal direction and the lateral direction between the columns 32 which are erected.
The bracket 50 is attached to each side surface of the square cylindrical column 32, and the iron plate 71 is placed on the upper surface of the portion where the bracket 50 intersects, and the iron plate 71 and each bracket 50 are connected and fixed. The first fixing member 76 and the second fixing member 77 are fixed to the central portion of the iron plate 71 in a substantially cross shape, and the end faces of the beams 22 in the vertical and horizontal directions are attached to the end faces of the members 76 and 77. The beams 22 are brought into contact with each other to fix the beams 22 to the upper surface of the bracket 50, respectively.
The beam 22 and the members 76 and 77 are connected and fixed to each other by the attachment plates 75 that are provided on both side surfaces of the beams 6 and 77, respectively, and by the fixing plate 73 that is provided on the upper surfaces of the beam 22 and the members 76 and 77. The beam 22 and the members 76 and 77 are connected and fixed, respectively.

【0014】請求項4記載のはりの支持構造によれば、
立設した柱32間に縦方向、横方向にそれぞれはり22
を架橋するようにしたはりの支持構造において、四角円
筒状の柱32の各側面にブラケット50をそれぞれ取着
し、このブラケット50が交差する部分の上面に鉄板7
1を載置して該鉄板71と各ブラケット50とをそれぞ
れ連結固定し、この鉄板71の中心部分に柱32を配設
し、柱32の各側面に固定用の部材72を当接させて該
部材を鉄板71の上面にそれぞれ載置すると共に、各部
材72を柱32の側面と鉄板71の上面にそれぞれ固着
し、上記各部材72の端面に縦方向、横方向の各はり2
2の端面を当接させて該はり22を上記ブラケット50
の上面にそれぞれ固定し、上記はり22と部材72の両
側の側面にそれぞれ跨がせた添板75により該はり22
と部材72とをそれぞれ連結固定し、はり22と部材7
2の上面に跨がせた固定板73により該はり22と部材
72とをそれぞれ連結固定したことを特徴としている。
According to the beam support structure of claim 4,
Beams 22 are erected vertically and horizontally between the columns 32 that are erected.
In the beam support structure in which the brackets are bridged, the brackets 50 are attached to the respective side surfaces of the square cylindrical column 32, and the iron plate 7 is attached to the upper surface of the intersection of the brackets 50.
1 is mounted and the iron plate 71 and each bracket 50 are respectively connected and fixed, the pillar 32 is disposed in the central portion of the iron plate 71, and the fixing member 72 is brought into contact with each side surface of the pillar 32. The members are placed on the upper surface of the iron plate 71, and the members 72 are fixed to the side surfaces of the columns 32 and the upper surface of the iron plate 71, and the beams 2 in the vertical and horizontal directions are attached to the end faces of the members 72.
The beam 22 is attached to the bracket 50 by bringing the end surfaces of the bracket 2 into contact with each other.
The beam 22 is fixed to the upper surface of the beam 22 and is attached to the beam 22 by the attachment plates 75 which are laid across the side surfaces on both sides of the beam 22 and the member 72, respectively.
And the member 72 are connected and fixed respectively, and the beam 22 and the member 7 are connected.
It is characterized in that the beam 22 and the member 72 are connected and fixed by a fixing plate 73 extending over the upper surface of 2.

【0015】また、請求項5記載のはりの支持構造によ
れば、立設した柱32間に縦方向、横方向にそれぞれは
り22を架橋するようにしたはりの支持構造において、
四角円筒状の柱32の高さ方向の略中央の各側面にブラ
ケット50をそれぞれ取着し、柱32の周囲のブラケッ
ト50の上面に鉄板71を固定し、柱32の各側面に固
定用の部材72を当接させて該部材を鉄板71の上面に
それぞれ載置すると共に、各部材72を柱32の側面と
鉄板71の上面にそれぞれ固着し、上記各部材72の端
面に縦方向、横方向の各はり22の端面を当接させて該
はり22を上記ブラケット50の上面にそれぞれ固定
し、上記はり22と部材72の両側の側面にそれぞれ跨
がせた添板75により該はり22と部材72とをそれぞ
れ連結固定し、はり22と部材72の上面に跨がせた固
定板73により該はり22と部材72とをそれぞれ連結
固定したことを特徴としている。
According to the beam support structure of the fifth aspect, in the beam support structure, the beams 22 are bridged in the vertical direction and the horizontal direction between the upright columns 32, respectively.
The bracket 50 is attached to each side surface of the square cylindrical pillar 32 substantially at the center in the height direction, the iron plate 71 is fixed to the upper surface of the bracket 50 around the pillar 32, and the bracket 50 is fixed to each side surface of the pillar 32. The members 72 are brought into contact with each other and placed on the upper surface of the iron plate 71, and the members 72 are fixed to the side surfaces of the columns 32 and the upper surface of the iron plate 71, respectively. The beam 22 is fixed to the upper surface of the bracket 50 by abutting the end faces of the beams 22 in the respective directions, and the beam 22 is fixed to the beam 22 by the attachment plates 75 that are laid across the side faces of the beam 22 and the member 72 on both sides. It is characterized in that the member 72 is connected and fixed to each other, and the beam 22 and the member 72 are connected and fixed to each other by a fixing plate 73 extending over the upper surfaces of the beam 22 and the member 72, respectively.

【0016】請求項6記載のはりの支持構造によれば、
請求項4又は請求項5記載のはりの支持構造の柱32の
上部に、請求項1又は請求項2又は請求項3記載のはり
の支持構造を組み合わせたことを特徴としている。
According to the beam support structure of claim 6,
The beam support structure according to claim 1 or claim 2 or claim 3 is combined with the upper portion of the column 32 of the beam support structure according to claim 4 or claim 5.

【0017】請求項7記載のはりの支持構造によれば、
架橋しているはりの位置より上方の柱32の厚みを、下
方の柱32の厚みより薄くしたことを特徴としている。
According to the beam support structure of claim 7,
The pillar 32 above the bridged beam is thinner than the pillar 32 below.

【0018】請求項8記載のはりの支持部の施工方法に
よれば、四角円筒状の柱32の上部に予め工場において
ブラケット501 を固着して柱32を略T字型に形成す
ると共に、上記ブラケット501 の上面に固定用の部材
76,77を略十字状に固着し、施工現場において上記
略T字型の柱32を立設し、その後第2のブラケット5
2 を柱32の両側の側面にそれぞれ固定して該柱32
の上部を略十字状に形成し、上記各部材76,77の端
面に縦方向、横方向の各はり22の端面を当接させて該
はり22を上記ブラケット50の上面にそれぞれ固定
し、上記はり22と部材76,77の両側の側面にそれ
ぞれ跨がせた添板75により該はり22と部材76,7
7とをそれぞれ連結固定し、はり22と部材76,77
の上面に跨がせた固定板73により該はり22と部材7
6,77とをそれぞれ連結固定するようにしたことを特
徴としている。
According to the method of constructing the beam supporting portion of the eighth aspect, the bracket 50 1 is preliminarily fixed to the upper portion of the square cylindrical column 32 at the factory to form the column 32 into a substantially T-shape. the members 76 and 77 for fixing to the upper surface of the bracket 50 1 is secured to a substantially cross shape, erected pillars 32 of the generally T-shaped in construction site, then the second bracket 5
0 2 is fixed to both side surfaces of the pillar 32 to fix the pillar 32.
Is formed in a substantially cross shape, and the end faces of the respective beams 22 in the vertical and horizontal directions are brought into contact with the end faces of the respective members 76, 77 to fix the beam 22 to the upper face of the bracket 50, respectively. The beam 22 and the members 76, 7 are provided by the attachment plates 75 that are laid across the side surfaces of the beam 22 and the members 76, 77, respectively.
7 and 7 are connected and fixed respectively, and the beam 22 and the members 76 and 77 are connected.
The beam 22 and the member 7 are fixed to each other by a fixing plate 73 extending over the upper surface of the
The feature is that 6 and 77 are connected and fixed respectively.

【0019】請求項9記載のはりの支持部の施工方法に
よれば、四角円筒状の柱32の上部に予め工場において
ブラケット501 を固着して柱32を略T字型に形成す
ると共に、上記ブラケット501 の上面に固定用の部材
76,77を略十字状に固着し、上記柱32の中間部に
内ダイヤを形成する際にブラケット501 及び平板状の
鉄板71を一体に固着すると共に、上記鉄板71の上面
に固着した固定用の第3の部材72の端面を柱32の各
側面に固着し、施工現場において上記略T字型の柱32
を立設し、その後第2のブラケット502 を柱32の上
部及び中間部における両側の側面にそれぞれ固定して該
柱32の上部及び中間部を略十字状に形成し、上記各部
材76,77,72の端面に縦方向、横方向の各はり2
2の端面を当接させて該はり22を上記ブラケット50
の上面にそれぞれ固定し、上記はり22と部材76,7
7,72の両側の側面にそれぞれ跨がせた添板75によ
り該はり22と部材76,77,72とをそれぞれ連結
固定し、はり22と部材76,77,72の上面に跨が
せた固定板73により該はり22と部材76,77,7
2とをそれぞれ連結固定するようにしたことを特徴とし
ている。
According to the method of constructing the beam support portion of the ninth aspect, the bracket 50 1 is fixed to the upper portion of the square cylindrical column 32 in advance at the factory to form the column 32 into a substantially T-shape. Fixing members 76 and 77 are fixed to the upper surface of the bracket 50 1 in a substantially cross shape, and the bracket 50 1 and the flat iron plate 71 are integrally fixed when forming an inner diamond in the middle portion of the pillar 32. At the same time, the end surface of the third fixing member 72 fixed to the upper surface of the iron plate 71 is fixed to each side surface of the column 32, and the substantially T-shaped column 32 is installed at the construction site.
And the second bracket 50 2 is fixed to the side surfaces on both sides of the upper and middle portions of the column 32 to form the upper and intermediate portions of the column 32 in a substantially cross shape. Vertical and horizontal beams 2 on the end faces of 77 and 72
The beam 22 is attached to the bracket 50 by bringing the end surfaces of the bracket 2 into contact with each other.
Fixed to the upper surface of each of the
The beam 22 and the members 76, 77 and 72 are connected and fixed by the attachment plates 75 which are laid across the side surfaces of the members 7 and 72, respectively. The beam 22 and the members 76, 77, 7 are fixed by the fixing plate 73.
The feature is that 2 and 2 are connected and fixed respectively.

【0020】[0020]

【作用】請求項1記載のはりの支持構造によれば、はり
22をブラケット50間に載置するだけではり22が落
下するのを防止できて、はり22をブラケット50に1
本のボルトで止めるだけではり22の横方向のずれを防
止できる。従って、1本のボルトを止めるだけではり2
2を吊っているクレーンからのワイヤーを外すことがで
きて、クレーンは次のはり22の施工作業に移れて組立
作業性を向上させることができる。また、柱32、ブラ
ケット50、はり22が、固定用の部材76、添板7
5、固定板73により支持構造が一体化されることにな
り、はり22に加わる荷重が大きくても構造耐力が大き
くなって柱32が変形や座屈するのを防止することがで
きる。また、はり22に荷重がかかった場合でも、はり
22と部材76とを溶接しなくても開かず、構造耐力を
強化することができる。更に、はり22を支持する支持
点Pがブラケット50の先端部分となって、はり22の
両側における支持点Pの間隔が短くなって、大きな荷重
が加わってもはり22のたわみ量を非常に少なくするこ
とができる。従って、はり22のたわみを少なくするこ
とができるので、加わる荷重に対する許容範囲内ではり
22の大きさを小さくして重量を軽くしたり、はり22
の鋼板の厚みを薄くすることができ、そのため、コスト
ダウンを図ることができる。したがって、はり22の大
きさを小さくして重量を軽くした場合には、はり22の
輸送コスト、はり22のメッキ処理におけるコストを下
げることができ、立体駐車場全体では、大幅にコストを
削減することができる。また、はり22の先端が自由端
とした場合には、はり22の支持点Pがブラケット50
の先端部分となるために、はり22のたわみを少なくす
ることができる。
According to the beam support structure of the first aspect, it is possible to prevent the beam 22 from dropping only by placing the beam 22 between the brackets 50, and the beam 22 is attached to the bracket 50.
The horizontal displacement of the beam 22 can be prevented only by fixing it with a bolt. Therefore, it is only necessary to stop one bolt.
The wire from the crane suspending 2 can be removed, and the crane can move to the next construction work of the beam 22 to improve the assembly workability. In addition, the pillar 32, the bracket 50, and the beam 22 are fixed to the fixing member 76 and the attachment plate 7.
5. Since the support structure is integrated by the fixing plate 73, even if the load applied to the beam 22 is large, the structural proof strength is large and the column 32 can be prevented from being deformed or buckled. Further, even when a load is applied to the beam 22, the beam 22 and the member 76 do not open even if they are not welded, and the structural yield strength can be enhanced. Further, the support point P that supports the beam 22 becomes the tip portion of the bracket 50, and the distance between the support points P on both sides of the beam 22 becomes short, so that the deflection amount of the beam 22 is extremely small even if a large load is applied. can do. Therefore, since the deflection of the beam 22 can be reduced, the size of the beam 22 can be reduced to reduce the weight or the beam 22 within the allowable range for the applied load.
It is possible to reduce the thickness of the steel sheet, so that the cost can be reduced. Therefore, when the size of the beam 22 is reduced to reduce the weight, the transportation cost of the beam 22 and the cost of the plating process of the beam 22 can be reduced, and the cost can be significantly reduced in the entire multilevel parking lot. be able to. Further, when the tip of the beam 22 is a free end, the support point P of the beam 22 is at the bracket 50.
Since it is the tip portion of the beam, the deflection of the beam 22 can be reduced.

【0021】請求項2記載のはりの支持構造によれば、
はり22をブラケット50間に載置するだけではり22
が落下するのを防止できて、はり22をブラケット50
に1本のボルトで止めるだけではり22の横方向のずれ
を防止できる。従って、1本のボルトを止めるだけでは
り22を吊っているクレーンからのワイヤーを外すこと
ができて、クレーンは次のはり22の施工作業に移れて
組立作業性を向上させることができる。また、柱32、
ブラケット50、はり22が、固定用の部材76,7
7、添板75、固定板73により支持構造が略十字形に
一体化されることになり、はり22に加わる荷重が大き
くても構造耐力が大きくなり、また荷重が他のはり22
に分散されることで、柱32が変形や座屈するのを防止
することができる。また、はり22に荷重がかかった場
合でも、はり22と部材76,77とを溶接しなくても
開かず、構造耐力を強化することができる。更に、はり
22を支持する支持点Pがブラケット50の先端部分と
なって、はり22の両側における支持点Pの間隔が短く
なって、大きな荷重が加わってもはり22のたわみ量を
非常に少なくすることができる。従って、はり22のた
わみを少なくすることができるので、加わる荷重に対す
る許容範囲内ではり22の大きさを小さくして重量を軽
くしたり、はり22の鋼板の厚みを薄くすることがで
き、そのため、コストダウンを図ることができる。した
がって、はり22の大きさを小さくして重量を軽くした
場合には、はり22の輸送コスト、はり22のメッキ処
理におけるコストを下げることができ、立体駐車場全体
では、大幅にコストを削減することができる。また、は
り22の先端が自由端とした場合には、はり22の支持
点Pがブラケット50の先端部分となるために、はり2
2のたわみを少なくすることができる。
According to the beam support structure of claim 2,
If the beam 22 is placed between the brackets 50, the beam 22
Can be prevented from falling, and the beam 22 can be attached to the bracket 50.
It is possible to prevent the beam 22 from being displaced in the lateral direction only by fixing it with one bolt. Therefore, it is possible to remove the wire from the crane that suspends the beam 22 by only stopping one bolt, and the crane can move to the next work of constructing the beam 22 to improve the assembly workability. Also, the pillar 32,
The bracket 50 and the beam 22 are fixed members 76, 7
7, the supporting plate 75 and the fixing plate 73 integrate the supporting structure into a substantially cross shape, so that the structural proof stress increases even if the load applied to the beam 22 is large, and the load is different from the other beam 22.
The pillar 32 can be prevented from being deformed or buckled. Further, even when a load is applied to the beam 22, the beam 22 and the members 76 and 77 do not open even if they are not welded, and the structural yield strength can be enhanced. Further, the support point P that supports the beam 22 becomes the tip portion of the bracket 50, and the distance between the support points P on both sides of the beam 22 becomes short, so that the deflection amount of the beam 22 is extremely small even if a large load is applied. can do. Therefore, since the deflection of the beam 22 can be reduced, the size of the beam 22 can be reduced to reduce the weight and the thickness of the steel plate of the beam 22 can be reduced within the allowable range for the applied load. Therefore, the cost can be reduced. Therefore, when the size of the beam 22 is reduced to reduce the weight, the transportation cost of the beam 22 and the cost of the plating process of the beam 22 can be reduced, and the cost can be significantly reduced in the entire multilevel parking lot. be able to. Further, when the tip of the beam 22 is a free end, the support point P of the beam 22 is the tip portion of the bracket 50, and therefore the beam 2
The deflection of 2 can be reduced.

【0022】また、請求項3記載のはりの支持構造によ
れば、はり22をブラケット50間に載置するだけでは
り22が落下するのを防止できて、はり22をブラケッ
ト50に1本のボルトで止めるだけではり22の横方向
のずれを防止できる。従って、1本のボルトを止めるだ
けではり22を吊っているクレーンからのワイヤーを外
すことができて、クレーンは次のはり22の施工作業に
移れて組立作業性を向上させることができる。また、柱
32、ブラケット50、はり22が、鉄板71、固定用
の部材76,77、添板75、固定板73により支持構
造が略十字形に一体化されることになり、はり22に加
わる荷重が大きくても構造耐力が大きくなり、また荷重
が他のはり22に分散されることで、柱32が変形や座
屈するのを防止することができる。また、はり22に荷
重がかかった場合でも、はり22と部材76,77とを
溶接しなくても開かず、構造耐力を強化することができ
る。更に、はり22を支持する支持点Pがブラケット5
0の先端部分となって、はり22の両側における支持点
Pの間隔が短くなって、大きな荷重が加わってもはり2
2のたわみ量を非常に少なくすることができる。従っ
て、はり22のたわみを少なくすることができるので、
加わる荷重に対する許容範囲内ではり22の大きさを小
さくして重量を軽くしたり、はり22の鋼板の厚みを薄
くすることができ、そのため、コストダウンを図ること
ができる。したがって、はり22の大きさを小さくして
重量を軽くした場合には、はり22の輸送コスト、はり
22のメッキ処理におけるコストを下げることができ、
立体駐車場全体では、大幅にコストを削減することがで
きる。また、はり22の先端が自由端とした場合には、
はり22の支持点Pがブラケット50の先端部分となる
ために、はり22のたわみを少なくすることができる。
According to the beam support structure of the third aspect, it is possible to prevent the beam 22 from dropping only by placing the beam 22 between the brackets 50, and the beam 22 is attached to the bracket 50 only once. It is possible to prevent the lateral displacement of the beam 22 only by fixing it with a bolt. Therefore, it is possible to remove the wire from the crane that suspends the beam 22 by only stopping one bolt, and the crane can move to the next work of constructing the beam 22 to improve the assembly workability. Further, the support structure of the pillar 32, the bracket 50, and the beam 22 is integrated into a substantially cross shape by the iron plate 71, the fixing members 76 and 77, the addition plate 75, and the fixing plate 73, and is added to the beam 22. Even if the load is large, the structural yield strength is large, and the load is distributed to the other beams 22, so that the column 32 can be prevented from being deformed or buckled. Further, even when a load is applied to the beam 22, the beam 22 and the members 76 and 77 do not open even if they are not welded, and the structural yield strength can be enhanced. Further, the support point P that supports the beam 22 is attached to the bracket 5.
Since the distance between the support points P on both sides of the beam 22 is shortened due to the end portion of 0, the beam 2 is applied even if a large load is applied.
The amount of deflection of 2 can be made very small. Therefore, since the deflection of the beam 22 can be reduced,
Within the allowable range for the applied load, the size of the beam 22 can be reduced to reduce the weight, and the thickness of the steel plate of the beam 22 can be reduced, so that the cost can be reduced. Therefore, when the size of the beam 22 is reduced to reduce the weight, the transportation cost of the beam 22 and the cost of plating the beam 22 can be reduced.
Costs can be significantly reduced for the entire multi-storey car park. If the tip of the beam 22 is a free end,
Since the support point P of the beam 22 is the tip portion of the bracket 50, the deflection of the beam 22 can be reduced.

【0023】更に、請求項4記載のはりの支持構造によ
れば、はり22をブラケット50間に載置するだけては
り22が落下するのを防止できて、はり22をブラケッ
ト50に1本のボルトで止めるだけではり22の横方向
のずれを防止できる。従って、1本のボルトを止めるだ
けではり22を吊っているクレーンからのワイヤーを外
すことができて、クレーンは次のはり22の施工作業に
移れて組立作業性を向上させることができる。また、柱
32、ブラケット50、はり22が、鉄板71、固定用
の部材72、添板75、固定板73により支持構造が略
十字形に一体化されることになり、はり22に加わる荷
重が大きくても構造耐力が大きくなり、また荷重が他の
はり22に分散されることで、柱32が変形や座屈する
のを防止することができる。また、はり22に荷重がか
かった場合でも、はり22と部材72とを溶接しなくて
も開かず、構造耐力を強化することができる。更に、は
り22を支持する支持点Pがブラケット50の先端部分
となって、はり22の両側における支持点Pの間隔が短
くなって、大きな荷重が加わってもはり22のたわみ量
を非常に少なくすることができる。従って、はり22の
たわみを少なくすることができるので、加わる荷重に対
する許容範囲内ではり22の大きさを小さくして重量を
軽くしたり、はり22の鋼板の厚みを薄くすることがで
き、そのため、コストダウンを図ることができる。した
がって、はり22の大きさを小さくして重量を軽くした
場合には、はり22の輸送コスト、はり22のメッキ処
理におけるコストを下げることができ、立体駐車場全体
では、大幅にコストを削減することができる。また、は
り22の先端が自由端とした場合には、はり22の支持
点Pがブラケット50の先端部分となるために、はり2
2のたわみを少なくすることができる。
Further, according to the beam support structure of the fourth aspect, it is possible to prevent the beam 22 from dropping only by placing the beam 22 between the brackets 50, and the beam 22 is attached to the bracket 50 only once. It is possible to prevent the lateral displacement of the beam 22 only by fixing it with a bolt. Therefore, it is possible to remove the wire from the crane that suspends the beam 22 by only stopping one bolt, and the crane can move to the next work of constructing the beam 22 to improve the assembly workability. Further, the support structure of the pillar 32, the bracket 50, and the beam 22 is integrated into a substantially cross shape by the iron plate 71, the fixing member 72, the attachment plate 75, and the fixing plate 73, and the load applied to the beam 22 is increased. Even if it is large, the structural yield strength is large, and the load is distributed to the other beams 22, so that the column 32 can be prevented from being deformed or buckled. Further, even when a load is applied to the beam 22, the beam 22 and the member 72 do not open without welding, and the structural yield strength can be enhanced. Further, the support point P that supports the beam 22 becomes the tip portion of the bracket 50, and the distance between the support points P on both sides of the beam 22 becomes short, so that the deflection amount of the beam 22 is extremely small even if a large load is applied. can do. Therefore, since the deflection of the beam 22 can be reduced, the size of the beam 22 can be reduced to reduce the weight and the thickness of the steel plate of the beam 22 can be reduced within the allowable range for the applied load. Therefore, the cost can be reduced. Therefore, when the size of the beam 22 is reduced to reduce the weight, the transportation cost of the beam 22 and the cost of the plating process of the beam 22 can be reduced, and the cost can be significantly reduced in the entire multilevel parking lot. be able to. Further, when the tip of the beam 22 is a free end, the support point P of the beam 22 is the tip portion of the bracket 50, and therefore the beam 2
The deflection of 2 can be reduced.

【0024】請求項5記載のはりの支持構造によれば、
はり22をブラケット50間に載置するだけではり22
が落下するのを防止できて、はり22をブラケット50
に1本のボルトで止めるだけではり22の横方向のずれ
を防止できる。従って、1本のボルトを止めるだけでは
り22を吊っているクレーンからのワイヤーを外すこと
ができて、クレーンは次のはり22の施工作業に移れて
組立作業性を向上させることができる。また、柱32、
ブラケット50、はり22が、鉄板71、固定用の部材
72、添板75、固定板73により支持構造が略十字形
に一体化されることになり、はり22に加わる荷重が大
きくても構造耐力が大きくなり、また荷重が他のはり2
2に分散されることで、柱32が変形や座屈するのを防
止することができる。また、はり22に荷重がかかった
場合でも、はり22と部材72とを溶接しなくても開か
ず、構造耐力を強化することができる。更に、はり22
を支持する支持点Pがブラケット50の先端部分となっ
て、はり22の両側における支持点Pの間隔が短くなっ
て、大きな荷重が加わってもはり22のたわみ量を非常
に少なくすることができる。そのため、建物の構造を3
階建てとした場合にも、2階部分のはり22の支持部分
の構造耐力を大きくすることができ、3階建てにも十分
に対応することができる。また、はり22のたわみを少
なくすることができるので、加わる荷重に対する許容範
囲内ではり22の大きさを小さくして重量を軽くした
り、はり22の鋼板の厚みを薄くすることができ、その
ため、コストダウンを図ることができる。したがって、
はり22の大きさを小さくして重量を軽くした場合に
は、はり22の輸送コスト、はり22のメッキ処理にお
けるコストを下げることができ、立体駐車場全体では、
大幅にコストを削減することができる。また、はり22
の先端が自由端とした場合には、はり22の支持点Pが
ブラケット50の先端部分となるために、はり22のた
わみを少なくすることができる。
According to the beam support structure of claim 5,
If the beam 22 is placed between the brackets 50, the beam 22
Can be prevented from falling, and the beam 22 can be attached to the bracket 50.
It is possible to prevent the beam 22 from being displaced in the lateral direction only by fixing it with one bolt. Therefore, it is possible to remove the wire from the crane that suspends the beam 22 by only stopping one bolt, and the crane can move to the next work of constructing the beam 22 to improve the assembly workability. Also, the pillar 32,
The support structure of the bracket 50 and the beam 22 is integrated into a substantially cross shape by the iron plate 71, the fixing member 72, the addition plate 75, and the fixing plate 73, and the structural strength is high even if the load applied to the beam 22 is large. Becomes larger and the load is higher than other beams 2
By being dispersed into 2, the columns 32 can be prevented from being deformed or buckled. Further, even when a load is applied to the beam 22, the beam 22 and the member 72 do not open without welding, and the structural yield strength can be enhanced. In addition, beam 22
The support point P that supports the beam is the tip portion of the bracket 50, and the distance between the support points P on both sides of the beam 22 is shortened, so that the deflection amount of the beam 22 can be extremely reduced even when a large load is applied. . Therefore, the structure of the building is 3
Even in the case of a story, the structural strength of the supporting portion of the beam 22 on the second floor can be increased, and it is possible to sufficiently deal with a story of three stories. Further, since the deflection of the beam 22 can be reduced, the size of the beam 22 can be reduced to reduce the weight and the thickness of the steel plate of the beam 22 can be reduced within the allowable range for the applied load. Therefore, the cost can be reduced. Therefore,
If the size of the beam 22 is reduced to reduce the weight, the transportation cost of the beam 22 and the plating process cost of the beam 22 can be reduced.
The cost can be reduced significantly. Also, the beam 22
When the tip of the beam is a free end, the support point P of the beam 22 is the tip portion of the bracket 50, so that the deflection of the beam 22 can be reduced.

【0025】請求項6記載のはりの支持構造によれば、
2階部分のはり22の支持部分の構造耐力を大きくする
ことができ、3階建てにも十分に対応することができ
る。
According to the beam support structure of claim 6,
The structural strength of the supporting portion of the beam 22 on the second floor can be increased, and it is possible to sufficiently deal with the third floor.

【0026】請求項7記載のはりの支持構造によれば、
下方と比べて上方の階にかかる荷重が少ないので、許容
範囲内で柱32の厚みを薄くすることでコストダウンを
図ることができるものである。
According to the beam support structure of claim 7,
Since the load applied to the upper floor is smaller than that to the lower floor, the cost can be reduced by reducing the thickness of the pillar 32 within the allowable range.

【0027】請求項8記載のはりの支持部の施工方法に
よれば、予め工場において柱32の上部にブラケット5
1 と部材76,77とを固着しておくので、このブラ
ケット501 及び部材76,77を固着した略T字型の
柱32を施工現場で立設し、クレーンではり22を吊っ
てそのまま載置してブラケット501 や部材76,77
等に連結固定することで、迅速に施工を行うことができ
る。また、予め工場等において柱32の上部にブラケッ
ト501 や部材76,77を取着して略T字型としてい
るので、ブラケット50を十字状に配設した場合と比べ
て、この柱32をそのT字型とした形でメッキ工場、塗
装工場等への搬入、搬出等の輸送時、また、施工現場へ
の輸送時においては、柱32を並設してトラックに積載
することができる。従って、柱32が嵩張らないのでト
ラックへの積載量を法定限度内まででき、多くの柱32
を積載して輸送することができ、輸送コストを大幅に削
減できる。そのため、結果として建築物、あるいは立体
駐車場等の全体のコストを大幅に低下させることができ
る。また、柱32の保管時において単に柱32を並設し
て保管できるので、ブラケット50を十字状にした場合
と比べて保管場所が大幅に少なくて済み、保管場所に伴
う経費を削減できてコストダウン化を図ることができ
る。更には、メッキ工場において柱32をメッキ槽に入
れてメッキする場合にも、柱32をT字型としているた
め、同時に多くの柱32をメッキ槽に入れることがで
き、メッキ処理量が多くでき、コストダウン化を図るこ
とができる。
According to the method of constructing the beam supporting portion according to the eighth aspect, the bracket 5 is previously attached to the upper portion of the pillar 32 in the factory.
Since 0 1 and the members 76 and 77 are fixed to each other, the substantially T-shaped pillar 32 to which the bracket 50 1 and the members 76 and 77 are fixed is erected at the construction site, and the crane 22 is used to suspend the beam 22 as it is. bracket 50 is placed 1 and members 76 and 77
By connecting and fixing to etc., it is possible to perform construction quickly. Further, since a substantially T-shape by attaching the brackets 50 1 and members 76 and 77 at the top of the column 32 in advance factory or the like, as compared with the case of disposing the bracket 50 in a cross shape, the posts 32 In the T-shaped form, the pillars 32 can be arranged in parallel and loaded on a truck at the time of transportation such as loading and unloading to a plating factory, a coating factory, or the like, and at the time of transportation to a construction site. Therefore, since the columns 32 are not bulky, the loading capacity on the truck can be kept within the legal limit, and many columns 32
Can be loaded and transported, and the transportation cost can be significantly reduced. Therefore, as a result, the overall cost of the building or the multistory parking lot can be significantly reduced. In addition, since the columns 32 can be simply arranged side by side when the columns 32 are stored, the number of storage locations can be significantly reduced as compared with the case where the bracket 50 is formed in a cross shape, and the costs associated with the storage locations can be reduced and the cost can be reduced. It can be downsized. Furthermore, even when the pillars 32 are placed in the plating tank and plated at the plating factory, since the pillars 32 are T-shaped, many pillars 32 can be put in the plating tank at the same time, and the plating amount can be increased. Therefore, cost reduction can be achieved.

【0028】請求項9記載のはりの支持部の施工方法に
よれば、予め工場において柱32の上部や中間部にブラ
ケット501 と部材76,77,72とを固着しておく
ので、このブラケット501 及び部材76,77,72
を固着した略T字型の柱32を施工現場で立設し、クレ
ーンではり22を吊ってそのまま載置してブラケット5
1 や部材76,77,72等に連結固定することで、
3階建ての立体駐車場を迅速に施工できる。また、予め
工場等において柱32の上部にブラケット501 や部材
76,77を取着して略T字型としているので、ブラケ
ット50を十字状に配設した場合と比べて、この柱32
をそのT字型とした形でメッキ工場、塗装工場等への搬
入、搬出等の輸送時、また、施工現場への輸送時におい
ては、柱32を並設してトラックに積載することができ
る。従って、柱32が嵩張らないのでトラックへの積載
量を法定限度内まででき、多くの柱32を積載して輸送
することができ、輸送コストを大幅に削減できる。その
ため、結果として建築物、あるいは立体駐車場等の全体
のコストを大幅に低下させることができる。また、柱3
2の保管時において単に柱32を並設して保管できるの
で、ブラケット50を十字状にした場合と比べて保管場
所が大幅に少なくて済み、保管場所に伴う経費を削減で
きてコストダウン化を図ることができる。更には、メッ
キ工場において柱32をメッキ槽に入れてメッキする場
合にも、柱32をT字型としているため、同時に多くの
柱32をメッキ槽に入れることができ、メッキ処理量が
多くでき、コストダウン化を図ることができる。
According to the method of constructing the beam supporting portion according to the ninth aspect, the bracket 50 1 and the members 76, 77, 72 are fixed to the upper and middle portions of the pillar 32 in advance in the factory. 50 1 and member 76,77,72
A substantially T-shaped pillar 32 to which is firmly attached is erected at a construction site, and the crane 22 is used to hang the beam 22 and mount it as it is.
By connecting and fixing 0 1 and members 76, 77, 72, etc.,
A three-story multi-storey car park can be constructed quickly. Further, since a substantially T-shape by attaching the brackets 50 1 and members 76 and 77 at the top of the column 32 in advance factory or the like, as compared with the case of disposing the bracket 50 in a cross shape, the posts 32
In the form of its T-shape, the columns 32 can be installed side by side and loaded on a truck at the time of transportation such as loading and unloading to a plating factory, a coating factory, etc., and at the time of transportation to a construction site. . Therefore, since the pillars 32 are not bulky, the loading amount on the truck can be within the legal limit, and many pillars 32 can be loaded and transported, and the transportation cost can be significantly reduced. Therefore, as a result, the overall cost of the building or the multistory parking lot can be significantly reduced. Also, pillar 3
Since the columns 32 can be simply arranged side by side during the storage of 2, the storage place can be significantly reduced compared to the case where the bracket 50 is formed in a cross shape, and the cost associated with the storage place can be reduced to reduce the cost. Can be planned. Furthermore, even when the pillars 32 are placed in the plating tank and plated at the plating factory, since the pillars 32 are T-shaped, many pillars 32 can be put in the plating tank at the same time, and the plating amount can be increased. Therefore, cost reduction can be achieved.

【0029】[0029]

【実施例】以下、本発明の実施例を図面を参照して説明
する。図11は本発明を適用した立体駐車場の要部破断
斜視図を示し、柱32の上部の側面にブラケット50を
固着して柱32の上部を略十字形状にしている。そし
て、この略十字形状にした柱32の上部にH型鋼22を
縦方向、横方向にそれぞれ架橋し、この縦方向、横方向
のH型鋼22にて囲まれた水平面上の空間内に床パネル
本体1が敷設されるようになっている。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 11 is a fragmentary perspective view of a main part of a multi-storey parking lot to which the present invention is applied, in which a bracket 50 is fixed to a side surface of an upper portion of a pillar 32 so that the upper portion of the pillar 32 has a substantially cross shape. Then, the H-shaped steel 22 is bridged in the vertical and horizontal directions on the upper portion of the substantially cross-shaped column 32, and the floor panel is placed in the space on the horizontal plane surrounded by the H-shaped steel 22 in the vertical and horizontal directions. The main body 1 is laid.

【0030】次に、上記柱32の上部におけるH型鋼2
2の支持構造について詳述する。図2に示すように、四
角円筒形の柱32の上部には、柱32の幅よりも幅広と
し、断面が略コ字型で略逆山型のブラケット501 が覆
設されて、柱32の上部とブラケット501 とが溶接さ
れ、ブラケット501 が柱32の上部に固着されるよう
になっている。また、鋼板からなるブラケット501
両側の側面には略コ字型の固定片54が溶接等で固着さ
れている。
Next, the H-shaped steel 2 on the upper portion of the column 32
The support structure 2 will be described in detail. As shown in FIG. 2, a bracket 50 1 having a width that is wider than the width of the pillar 32 and a substantially U-shaped cross section and a substantially inverted mountain shape is provided on the upper portion of the square cylindrical pillar 32. And the bracket 50 1 are welded to each other so that the bracket 50 1 is fixed to the upper part of the column 32. Furthermore, on side surfaces on both sides of the bracket 50 1 made of steel plate fixing piece 54 of substantially U-shape is fixed by welding or the like.

【0031】ブラケット501 の両側の側面にそれぞれ
上記固定片54を介して取り付けられるブラケット50
2 は断面が略コ字型に形成されていて、固定片54とブ
ラケット502 の基部側に穿設した穴を介してボルトに
よりブラケット502 が固定片54に固定される。従っ
て、ブラケット502 はブラケット501 の側面にそれ
ぞれ固定されることになる。また、ボルト止めと共に、
溶接によりブラケット502 を固定するようにしても良
い。
The brackets 50 1 are attached to both side surfaces of the bracket 50 1 via the fixing pieces 54, respectively.
2 in cross-section have been formed in a substantially U-shaped, bracket 50 2 is fixed to the fixing piece 54 by bolts through the holes bored in the base portion of the fixing piece 54 and the bracket 50 2. Therefore, the brackets 50 2 are fixed to the side surfaces of the brackets 50 1 , respectively. Also, with bolts,
The bracket 50 2 may be fixed by welding.

【0032】また、ブラケット50(501 ,502
の両側の下部は剛性を高めるために、それぞれ内側に折
曲している。これにより、ブラケット50にて支持され
るH型鋼22に大きな荷重がかかってもブラケット50
が変形しないものである。また、ブラケット501 の側
面は、柱32内に設けてある内ダイヤの機能を持たせる
ようにしたものであり、これにより、H型鋼22に加わ
る荷重を他方に分散させて、柱32の支持部の変形や、
柱32の座屈の防止を図っている。
Further, the brackets 50 (50 1 , 50 2 )
The lower parts on both sides are bent inward to increase rigidity. As a result, even if a large load is applied to the H-shaped steel 22 supported by the bracket 50, the bracket 50
Does not deform. The side surface of the bracket 50 1 is one which is adapted to have a diamond functions among which is provided in the pillar 32, thereby, by dispersing a load applied to H-section steel 22 to the other, the support pillar 32 Deformation of the part,
The buckling of the column 32 is prevented.

【0033】なお、一方のブラケット501 は、予め工
場等で固着されており、柱32の上部は略T字型として
いる。そして、施工現場において、他方の一対のブラケ
ット502 を、柱32を立設してから固着するものであ
る。また、後述する部材76,77(図4参照)も工場
でブラケット501 の上面に溶接にて一体化されてい
る。部材76,77同士も溶接にて固着されている。こ
のように一体化することで支持部の剛性を高めているも
のである。
One of the brackets 50 1 is fixed in advance in a factory or the like, and the upper portion of the pillar 32 has a substantially T-shape. Then, at the construction site, the other pair of brackets 50 2 are fixed after the pillar 32 is erected. Further, members 76 and 77 (see FIG. 4), which will be described later, are integrally welded to the upper surface of the bracket 50 1 at the factory. The members 76 and 77 are also fixed to each other by welding. By thus integrating, the rigidity of the support portion is increased.

【0034】ここで、予めブラケット501 や部材7
6,77を柱32に固着しているのは、他方のブラケッ
ト502 を固着せずに、ブラケット501 だけて固着す
ると柱32が略T字状となり、メッキ工場、施工現場へ
の輸送時におけるトラックへの積載量がトラックの許容
範囲まで多く積載することができ、コストダウンを図る
ことができるからである。また、柱32の保管時におい
ても、保管場所のスペースが少なくて済み、少ないスペ
ースで多くの柱32を保管することができ、管理が容易
となるからである。
Here, the bracket 50 1 and the member 7 are previously prepared.
6, 77 are fixed to the pillar 32 when the other bracket 50 2 is not fixed and only the bracket 50 1 is fixed, the pillar 32 becomes a substantially T shape, and is transported to a plating factory or a construction site. This is because the amount of cargo to be loaded onto the truck can be increased up to the allowable range of the truck, and the cost can be reduced. Further, even when the columns 32 are stored, the space of the storage place is small, and many columns 32 can be stored in a small space, which facilitates management.

【0035】更に、柱32の上部にブラケット501
部材76,77を溶接等により一体化しておくことで、
施工現場においてH型鋼22等の他の部材との結合を溶
接ではなく、ボルト止めにて行えるからである。これ
は、施工現場で溶接を行うと、メッキした部分が剥がれ
てしまい、その処理を行う必要があり、このメッキ対策
処理の数をできる限り少なくするためである。また、上
述のように柱32の上部を略T字型としておくことで、
柱32をメッキ槽に浸ける場合に、多くの柱32を同時
にメッキ処理を行うことができ、被メッキ物の重量と時
間とで決まるメッキ費用のコストの削減を行うことがで
きるからである。
Further, the brackets 50 1 and
By integrating the members 76 and 77 by welding or the like,
This is because the H-shaped steel 22 and other members can be joined at the construction site by bolting instead of welding. This is because when welding is performed at the construction site, the plated portion is peeled off and it is necessary to perform the treatment, and the number of treatments against the plating is reduced as much as possible. In addition, as described above, by making the upper portion of the pillar 32 into a substantially T shape,
This is because when the pillars 32 are immersed in the plating tank, many pillars 32 can be plated at the same time, and the cost of plating, which is determined by the weight and time of the object to be plated, can be reduced.

【0036】次に、柱32に固着したブラケット50へ
のH型鋼22の施工方法について説明する。まず、図2
及び図4に示すように、予め工場で一方のブラケット5
1 、及び断面を略H型とした部材76,77を溶接等
で固着した柱32を立設し、施工現場において、図3に
示すように、他方の一対のブラケット502 を固定片5
4を介してボルト止めや溶接等で連結固定する。
Next, a method of applying the H-shaped steel 22 to the bracket 50 fixed to the column 32 will be described. First, FIG.
And as shown in FIG. 4, one of the brackets 5 is pre-set at the factory.
0 1 and a column 32 having members 76 and 77 having a substantially H-shaped cross section secured by welding or the like is erected, and at the construction site, as shown in FIG. 3, the other pair of brackets 50 2 is fixed to the fixing piece 5.
Connect via 4 and fix by bolting or welding.

【0037】なお、図3ではブラケット501 の上面に
部材76,77を一体化していない図であるが、これ
は、ブラケット50の構造が分かり易いように便宜上部
材76,77を削除したものである。したがって実際に
はブラケット501 の上面には上述したように部材7
6,77が溶接にて十字状に一体化構造となっている。
Although the members 76 and 77 are not integrated with the upper surface of the bracket 50 1 in FIG. 3, the members 76 and 77 are removed for the sake of clarity so that the structure of the bracket 50 can be easily understood. is there. Member 7 as actually therefore above the upper surface of the bracket 50 1
6,77 are welded to form a cross-shaped integrated structure.

【0038】次に、図4に示すように、部材77とブラ
ケット502 とをボルトにて固着する。次に、図5に示
すように、縦方向、横方向のH型鋼22をブラケット5
0の上面にそれぞれ載置すると共に、H型鋼22の端面
を部材76,77の端面に当接させる。そして、H型鋼
22とブラケット50とをボルトにて固定する。
Next, as shown in FIG. 4, the member 77 and the bracket 50 2 are fixed to each other with bolts. Next, as shown in FIG. 5, the H-shaped steel 22 in the vertical direction and the horizontal direction is attached to the bracket 5
0 and the end faces of the H-shaped steel 22 are brought into contact with the end faces of the members 76 and 77, respectively. Then, the H-shaped steel 22 and the bracket 50 are fixed with bolts.

【0039】なお、H型鋼22はクレーンのワイヤーに
て吊設させて架橋されるものであり、H型鋼22とブラ
ケット50に1本のボルトを止めるだけで、H型鋼22
の横方向のズレを規制することができる。従って、H型
鋼22とブラケット50とを1か所だけボルト止めすれ
ば、ワイヤーをH型鋼22から外し、他のH型鋼22の
施工作業に以降することができる。また、ワイヤーが外
されたH型鋼22は、その他の作業者がボルトにて連結
固定の作業を行う。また、先に、クレーンでH型鋼22
を仮止めしておき、最後にH型鋼22をブラケット50
に確実にボルトにて固定するようにしても良い。
The H-section steel 22 is suspended by a wire of a crane to be cross-linked, and the H-section steel 22 and the bracket 50 can be secured by only one bolt.
It is possible to regulate the lateral displacement of the. Therefore, if the H-section steel 22 and the bracket 50 are bolted at only one place, the wire can be removed from the H-section steel 22 and the work for constructing another H-section steel 22 can be performed. Further, the H-shaped steel 22 from which the wire is removed is connected and fixed by another worker with bolts. In addition, first, the H-shaped steel 22 with a crane
Is temporarily fixed, and finally the H-shaped steel 22 is attached to the bracket 50.
It may be securely fixed with a bolt.

【0040】次に、H型鋼22と部材76,77とに跨
がらせて該H型鋼22と部材76,77の両側の面に添
板75をそれぞれ当ててボルト止めを行い、H型鋼22
と部材76,77とをそれぞれ連結固定する。そして、
図6に示すように、H型鋼22と部材76,77との上
面に固定板73をおき、該固定板73と部材76,77
とはボルトにて連結固定し、H型鋼22と固定板73と
は溶接にて固着する。
Next, the H-shaped steel 22 and the members 76 and 77 are straddled, and the attachment plates 75 are respectively applied to the both side surfaces of the H-shaped steel 22 and the members 76 and 77 for bolting.
And the members 76 and 77 are connected and fixed, respectively. And
As shown in FIG. 6, a fixing plate 73 is placed on the upper surfaces of the H-shaped steel 22 and the members 76 and 77, and the fixing plate 73 and the members 76 and 77 are arranged.
Are connected and fixed by bolts, and the H-shaped steel 22 and the fixing plate 73 are fixed by welding.

【0041】ここで、H型鋼22及び部材76,77と
固定板73との連結固定において、H型鋼22と固定板
73とは溶接にて行い、また部材76,77と固定板7
3とはボルトにて行っているのは以下の理由による。す
なわち、H型鋼22の上面は床面の一部となり、その上
に自動車のタイヤが載るために、ボルトの上でパワース
テアリングによりハンドルを切ってタイヤを動かした場
合に、ボルトによりタイヤに亀裂が入るのを防止する必
要がある。そこで、本来はボルトを使用せずに溶接にて
固着する方が良い。
Here, in connecting and fixing the H-shaped steel 22 and the members 76 and 77 to the fixed plate 73, the H-shaped steel 22 and the fixed plate 73 are welded together, and the members 76 and 77 and the fixed plate 7 are connected.
The reason why 3 is used with bolts is as follows. That is, the upper surface of the H-section steel 22 becomes a part of the floor surface, and the tire of the automobile is placed on it. Therefore, when the steering wheel is turned by the power steering on the bolt to move the tire, the bolt cracks the tire. It is necessary to prevent entry. Therefore, it is better to fix by welding without using bolts.

【0042】しかし、柱32はもちろんH型鋼22や部
材76,77等は防錆のためにメッキしているので、溶
接を行うとメッキが剥がれてしまう。そのため、溶接に
て連結固定した場合には、現場での溶接後のメッキ処理
対策を施さなければならない。また、溶接の場合より
も、ボルトにて連結固定する方が施工が迅速化できるこ
とになる。そこで、ボルトを使用した場合には、ボルト
の頭が滑らかな車にやさしいボルト、例えばナベボルト
を用いて、タイヤに亀裂が入るのを防止するようにして
いる。
However, since the H-shaped steel 22, the members 76, 77, and the like, as well as the column 32, are plated for rust prevention, the plating will peel off when welding is performed. Therefore, when connecting and fixing by welding, it is necessary to take a plating treatment measure after welding at the site. Further, the construction can be speeded up by connecting and fixing with bolts rather than welding. Therefore, when the bolts are used, a car-friendly bolt having a smooth head, for example, a pan bolt is used to prevent the tire from cracking.

【0043】なお、固定板73と部材76,77との固
着も溶接で行い、ボルトの頭を突出しないようにしても
良い。またタイヤに亀裂が入らない頭の丸いあるいは偏
平なボルトを用いてH型鋼22と固定板73とをボルト
止めを行うようにしても良い。
The fixing plate 73 and the members 76 and 77 may be fixed to each other by welding so that the head of the bolt does not project. Alternatively, the H-shaped steel 22 and the fixing plate 73 may be bolted to each other using a round or flat bolt that does not crack the tire.

【0044】上記の場合は、2階建ての立体駐車場の場
合であったが、3階建てとした場合の柱32とH型鋼2
2との組立は次のようにして行う。なお、図7〜図10
に示すように、3階部分の柱32とH型鋼22との組立
は先の場合と同様であるので、2階部分(図7〜図10
における下側の図)について説明する。
In the above case, it was a case of a two-story multi-storey car park, but in the case of a three-story parking lot, the columns 32 and the H-shaped steel
Assembly with 2 is performed as follows. 7 to 10
As shown in FIG. 7, the assembling of the pillar 32 and the H-shaped steel 22 in the third floor portion is the same as in the previous case, so that the second floor portion (see FIGS.
The lower diagram in FIG.

【0045】まず、図7に示すように、ブラケット50
を柱32取着するのは先の場合と同様である。次に、図
7に示すようにブラケット50の上面に八角形状の鉄板
71をボルトにて固定し、図8に示すように、その鉄板
71の上に柱32を固定し、その柱32の下部側面に端
面を当接させて断面をT字型とした部材72を鉄板71
上に載置する。そして、部材72を柱32の側面及び鉄
板71の上面にそれぞれ溶接して部材72を固着する。
First, as shown in FIG. 7, the bracket 50
The column 32 is attached in the same manner as in the previous case. Next, as shown in FIG. 7, the octagonal iron plate 71 is fixed to the upper surface of the bracket 50 with bolts, and the pillar 32 is fixed on the iron plate 71 as shown in FIG. A member 72 having a T-shaped cross section with its end face abutted against the side surface is attached to the iron plate 71.
Place on top. Then, the member 72 is welded to the side surface of the column 32 and the upper surface of the iron plate 71 to fix the member 72.

【0046】次に、図9に示すようにH型鋼22をブラ
ケット50の上面に載置し、H型鋼22の端面を部材7
2の端面に当接する。そして、図9及び図10に示すよ
うに、部材72の端面にH型鋼22の端面を当接配置し
た後に、部材72とH型鋼22との両側の側面に添板7
5を跨がるように沿わせてボルト止めを行う。更に、H
型鋼22と部材72との上面に固定板73を跨がるよう
におき、該固定板73と部材72とはボルトにて連結固
定し、H型鋼22と固定板73とは溶接にて固着する。
Next, as shown in FIG. 9, the H-shaped steel 22 is placed on the upper surface of the bracket 50, and the end surface of the H-shaped steel 22 is attached to the member 7.
Abut on the end face of 2. Then, as shown in FIGS. 9 and 10, after the end surface of the H-shaped steel 22 is placed in contact with the end surface of the member 72, the attachment plate 7 is attached to the side surfaces on both sides of the member 72 and the H-shaped steel 22.
Bolt along 5 Furthermore, H
The fixing plate 73 is placed on the upper surfaces of the shaped steel 22 and the member 72 so as to straddle, the fixing plate 73 and the member 72 are connected and fixed by bolts, and the H-shaped steel 22 and the fixing plate 73 are fixed by welding. .

【0047】ここで、H型鋼22と固定板73との固定
をボルト止めしないのは、上述と同様にH型鋼22の上
の固定板73に自動車のタイヤが載る可能性があり、固
定板73の上面でパワーステアリングによりハンドルを
切ってタイヤを動かした場合に、ボルトによりタイヤに
亀裂が入ることになる。そこで、上記と同様に本実施例
でもH型鋼22と固定板73との固定は、固定板73の
周囲の部分で溶接を行い、H型鋼22の上面に固定板7
3上には突起物を突出しないようにしている。
Here, the reason why the fixation between the H-shaped steel 22 and the fixing plate 73 is not bolted is that the tire of the automobile may be mounted on the fixing plate 73 on the H-shaped steel 22 in the same manner as described above. When the steering wheel is turned by power steering and the tire is moved on the upper surface of the vehicle, the bolt will crack the tire. Therefore, similarly to the above, in this embodiment as well, the H-shaped steel 22 and the fixing plate 73 are fixed to each other by welding around the fixing plate 73, and the fixing plate 7 is fixed on the upper surface of the H-shaped steel 22.
The protrusions are not projected on the upper part 3.

【0048】なお、本実施例では、床パネル本体1に降
った雨水を後述するように樋体等を用いて柱32内に流
し込むようにしているので、先の実施例における上側の
柱32の下面に位置する鉄板71の部分には排水用の穴
を穿孔している。
In this embodiment, since rainwater that has fallen on the floor panel body 1 is poured into the column 32 by using a gutter body or the like as will be described later, the upper column 32 of the previous example is not provided. A hole for drainage is formed in the portion of the iron plate 71 located on the lower surface.

【0049】また、先の実施例では、2階部分の柱32
の上に3階部分の柱32を置いて固定するようにした
が、長い1本の柱32を用いて3階建ての立体駐車場を
構成する場合には、以下のように行う。すなわち、図8
に示すように、柱32の高さ方向の略中央部分(2階部
分)と上部とに支持部を形成するが、柱32の途中には
内ダイヤを形成する必要から、その箇所に内ダイヤと共
に鉄板71を溶接にて介装し、また、柱32の各側面に
部材72を溶接にて固着して一体化する。柱32の上部
は上述したのと同様に、ブラケット501 及び部材7
6,77を溶接にて一体化する。
In the previous embodiment, the pillar 32 of the second floor portion is used.
The pillars 32 of the third floor are placed and fixed on the above, but in the case of constructing a three-story multi-storey parking lot using one long pillar 32, the procedure is as follows. That is, FIG.
As shown in FIG. 3, a support portion is formed at the substantially central portion (second floor portion) in the height direction of the pillar 32 and the upper portion, but since it is necessary to form an inner diamond in the middle of the pillar 32, the inner diamond is formed at that location. At the same time, the iron plate 71 is interposed by welding, and the members 72 are fixed to each side surface of the column 32 by welding to be integrated. The upper portion of the pillar 32 is similar to the above-described bracket 50 1 and the member 7
6,77 are integrated by welding.

【0050】上記の一体化は予め工場で組み立ててお
き、その状態でメッキ工場へ輸送、メッキ槽でのメッキ
処理、メッキ工場からの輸送、保管、施工現場への輸送
を行うようにしている。なお、メッキ槽でのメッキ処理
や、トラックでの輸送の場合に、柱32の支持部同士が
当たって幅を取らないように、柱32を長手方向に少し
ずらすことで、重量の許容限度範囲内で多くの柱32を
トラックで輸送でき、また、メッキ処理を行うことがで
きる。
The above integration is preassembled in a factory, and in that state, it is transported to a plating factory, plated in a plating tank, transported from the plating factory, stored, and transported to a construction site. In the case of plating in a plating tank or transporting by truck, the columns 32 are slightly shifted in the longitudinal direction so that the support portions of the columns 32 do not hit each other and take a width, so that the allowable weight limit range is increased. Many pillars 32 can be transported by truck within and plated.

【0051】そして、施工現場において、他方のブラケ
ット502 をボルトにて固定し、ブラケット50の上面
にH型鋼22を載置して上述と同様に連結固定して、支
持部を一体化構造とし、構造耐力を上げている。
Then, at the construction site, the other bracket 50 2 is fixed with bolts, the H-shaped steel 22 is placed on the upper surface of the bracket 50, and is fixedly connected in the same manner as described above, so that the supporting portion has an integrated structure. , The structural strength is increased.

【0052】図1はこのようにして構成された支持部の
断面図を示している。なお、3階部分(RF)の支持部
には鉄板71を使用していないが、2階部分と同様に鉄
板71を用いて構成しても良い。また、3階部分は、柱
32の上部にブラケット501 を覆設する形となってい
るが、2階部分の場合と同様な構成で柱32の上面とH
型鋼22の上面とを面一となるような構成にしても良
い。
FIG. 1 shows a cross-sectional view of the supporting portion thus constructed. Although the iron plate 71 is not used for the support portion of the third floor portion (RF), the iron plate 71 may be used similarly to the second floor portion. In addition, the third floor portion has a shape in which the bracket 50 1 is provided on the upper portion of the pillar 32, but with the same structure as the second floor portion, the upper surface of the pillar 32 and the H
The configuration may be such that the upper surface of the shape steel 22 is flush with the upper surface.

【0053】また、柱32の各側面にそれぞれブラケッ
トを設けた場合について説明したが、柱32の1つの側
面だけブラケットを設けて、このブラケットの上面に固
定したH型鋼22の先端を自由端として構成するように
しても良い。更に、単に対向する柱32間に架橋したH
型鋼22を支持する場合にも本発明を適用することがで
きるものである。
The case where the brackets are provided on the respective side surfaces of the column 32 has been described. However, the bracket is provided on only one side surface of the column 32, and the tip of the H-shaped steel 22 fixed to the upper surface of the bracket is used as a free end. It may be configured. Furthermore, H that is simply bridged between the columns 32 facing each other
The present invention can be applied to the case of supporting the shaped steel 22.

【0054】ここで、図1において、支持部におけるH
型鋼22の荷重に対する支持点Pは、ブラケット50の
先端となり、そのため、対向する柱32間では、支持点
Pのスパンが短くなり、大きな荷重に対してH型鋼22
のたわみを少なくすることができる。また、2階部分に
おいてH型鋼22は、それぞれ部材72を介して柱32
及び他のH型鋼22と略十字形に一体化されているた
め、鉄板71やブラケット50と共にH型鋼22に加わ
る荷重を分散させることができて、H型鋼22のたわみ
を少なくすると共に、柱32が変形や座屈するのを防止
することができる。
Here, in FIG. 1, H in the support portion is
The supporting point P for the load of the shaped steel 22 is the tip of the bracket 50, so that the span of the supporting point P becomes short between the columns 32 facing each other, and the H-shaped steel 22 for the large load.
It is possible to reduce the deflection. Further, in the second floor portion, the H-section steel 22 is connected to the columns 32 through the members 72, respectively.
Since it is integrated with the other H-shaped steel 22 in a substantially cross shape, the load applied to the H-shaped steel 22 together with the iron plate 71 and the bracket 50 can be dispersed, the deflection of the H-shaped steel 22 can be reduced, and the column 32 Can be prevented from being deformed or buckled.

【0055】また、3階部分において、鉄板71を用い
た場合は上述したように、H型鋼22のたわみを少なく
したり、柱32の変形や座屈を防止することができる。
鉄板71を用いない場合でも、柱32の部分は略十字形
に一体化されているため、H型鋼22のたわみを少なく
でき、また柱32の変形や座屈も防止することができ
る。更に、ブラケット50によりH型鋼22の支持点P
の間隔が短くなるため、H型鋼22にかかる荷重とたわ
み量の許容範囲内においてH型鋼22の大きさを小さく
して重量を軽くしたり、H型鋼22の厚さを薄くするこ
とができる。従って、全体として非常にコストダウン化
を図ることができる。
When the iron plate 71 is used in the third floor portion, as described above, it is possible to reduce the deflection of the H-shaped steel 22 and prevent the column 32 from being deformed or buckled.
Even when the iron plate 71 is not used, the column 32 is integrally formed in a substantially cross shape, so that the H-shaped steel 22 can be less bent and the column 32 can be prevented from being deformed or buckled. Furthermore, the support point P of the H-shaped steel 22 is fixed by the bracket 50.
Since the space between the H-shaped steels 22 is shortened, the size of the H-shaped steels 22 can be reduced to reduce the weight and the thickness of the H-shaped steels 22 can be reduced within the allowable range of the load and the amount of deflection applied to the H-shaped steels 22. Therefore, the cost can be significantly reduced as a whole.

【0056】ここで、図1の場合と、従来の図39及び
図40の場合と比較すると、図1の場合の方がH型鋼2
2の大きさを小さくしているのが良く分かる。したがっ
て、H型鋼22の重量を軽くすることができ、H型鋼2
2の輸送コスト、重量と時間から決められるメッキ費用
のコストを大幅に削減することができるものである。
Here, comparing the case of FIG. 1 with the conventional cases of FIG. 39 and FIG. 40, the case of FIG.
It can be seen clearly that the size of 2 is reduced. Therefore, the weight of the H-section steel 22 can be reduced, and the H-section steel 2
It is possible to drastically reduce the cost of the transportation cost of 2 and the plating cost determined by the weight and the time.

【0057】また、特に2階部分の支持部では、H型鋼
22が略十字形に一体化されているために、構造耐力が
増加し、そのため、柱32の変形や座屈に対しての強度
を向上させることができる。そのため、3階部分では、
構造耐力の許容範囲内で柱32の鋼板の厚みを薄くする
ことができ、コストダウンを図ることができる。
Further, especially in the support portion of the second floor, the H-shaped steel 22 is integrated in a substantially cross shape, so that the structural proof stress increases, and therefore the strength against the deformation and buckling of the column 32 is increased. Can be improved. Therefore, on the 3rd floor,
It is possible to reduce the thickness of the steel plate of the column 32 within the allowable range of the structural yield strength, and to reduce the cost.

【0058】次に、上記のようにして施工されたH型鋼
22で囲まれる水平面上の空間に敷設される床パネル本
体1の構成について説明する。図12は床パネル本体1
の斜視図を示し、また、図13は上記床パネル本体1の
破断斜視図を示している。図13において、左右の断面
を略コ字型とした縦枠2と、前後の板状の側板3と、上
記縦枠2の内側に架橋した複数の横棧4とで枠本体5を
構成している。
Next, the construction of the floor panel body 1 laid in the space on the horizontal plane surrounded by the H-shaped steel 22 constructed as described above will be explained. FIG. 12 shows the floor panel body 1
FIG. 13 is a perspective view of the floor panel body 1 shown in FIG. In FIG. 13, a frame body 5 is constituted by a vertical frame 2 having left and right cross-sections in a substantially U-shape, front and rear plate-like side plates 3, and a plurality of horizontal ledges 4 bridged inside the vertical frame 2. ing.

【0059】縦枠2の内側の上部には固定板9が複数溶
接等で固着され、その固定板9の下面に断面を略コ字型
とした横棧4の上端部が溶接等で固着されている。ま
た、各斜めに位置する固定板9間にはブレス8が溶接等
で連結されており、枠本体5の剛性を確保している。
尚、縦枠2と側板3の端部はそれぞれ溶接等により固着
されている。
A plurality of fixing plates 9 are fixed to the upper part of the inside of the vertical frame 2 by welding or the like, and an upper end portion of a horizontal slat 4 having a substantially U-shaped cross section is fixed to the lower surface of the fixing plate 9 by welding or the like. ing. Further, the brace 8 is connected by welding or the like between the fixing plates 9 that are diagonally positioned to ensure the rigidity of the frame body 5.
The ends of the vertical frame 2 and the side plate 3 are fixed to each other by welding or the like.

【0060】上記枠本体5の上面には図13に示すよう
なプレート6,7が覆設されるようになっており、その
長さ寸法、幅、枚数は立体駐車場の大きさや柱間の寸法
により適宜変更して単品としての床パネル本体1を形成
するようになっている。本実施例では、両側に覆設する
6枚のプレート6と、中央に敷設する1枚のプレート7
とを用いて床パネル本体1を構成している。
Plates 6 and 7 as shown in FIG. 13 are provided on the upper surface of the frame body 5, and the length, width, and number of the plates are the size of the multi-story parking lot and the space between pillars. The floor panel body 1 as a single item is formed by appropriately changing the size. In this embodiment, six plates 6 are provided on both sides and one plate 7 is provided at the center.
And are used to form the floor panel body 1.

【0061】上記プレート6は、図15及び図16に示
すように、断面を略コ字型としてその両側の側片は両側
に下降する傾斜片10,11とし、一方の傾斜片11の
端部からは側方へ突出する平坦部12を一体に形成して
いる。更に、プレート6の上記平坦部12の端部からは
断面を略U字状にした樋状部13を一体に形成してい
る。なお、このプレート6の樋状部13の断面形状は、
U字状に限らず、コ字型やV字型に形成しても良い。
As shown in FIGS. 15 and 16, the plate 6 has a substantially U-shaped cross section, and side pieces on both sides thereof are inclined pieces 10 and 11 which descend to both sides. A flat portion 12 protruding laterally is integrally formed therewith. Further, a gutter-shaped portion 13 having a substantially U-shaped cross section is integrally formed from the end of the flat portion 12 of the plate 6. The cross-sectional shape of the trough-shaped portion 13 of the plate 6 is
The shape is not limited to the U-shape, but may be a U-shape or a V-shape.

【0062】枠本体5の中央に覆設するプレート7は、
図15に示すように断面形状を略コ字型に形成してお
り、その両側の側片は両側に下降する傾斜片14として
いる。また、枠本体5の横棧4の両側の上端部には上記
プレート6の樋状部13を受ける受け部15(図13参
照)を切り欠き形成しており、この受け部15の形状
は、樋状部13の形状に合わせて略U字状に形成してあ
る。なお、上記プレート6,7の上面には自動車のタイ
ヤのスリップ防止用の突起が長手方向全長にわたって多
数連続して突設してある。
The plate 7 covering the center of the frame body 5 is
As shown in FIG. 15, the cross-sectional shape is formed in a substantially U shape, and the side pieces on both sides thereof are inclined pieces 14 that descend to both sides. A receiving portion 15 (see FIG. 13) for receiving the trough-like portion 13 of the plate 6 is cut out at the upper end portions on both sides of the horizontal rod 4 of the frame body 5, and the shape of the receiving portion 15 is It is formed in a substantially U-shape in accordance with the shape of the gutter-shaped portion 13. In addition, on the upper surfaces of the plates 6 and 7, a large number of projections for preventing slipping of automobile tires are continuously provided over the entire length in the longitudinal direction.

【0063】ここで、プレート6を敷設する場合には、
図13及び図15に示すように、枠本体5の両側から樋
状部13を内側に向けて配設する。この時、図16に示
すように、プレート6の一方の傾斜片10を縦枠2の上
片17の上面に載置し、プレート6の樋状部13は横棧
4の受け部15により受けられることで、プレート6は
横方向に位置決めされることになる。また、プレート6
の両端は側板3の上端の内側に一体に形成した載置片1
6(図14参照)の上に載置されることになる。尚、側
板3の上記載置片16は、プレート6,7の敷設枚数に
応じてその同じ数だけ形成されている。
Here, when laying the plate 6,
As shown in FIGS. 13 and 15, the gutter-shaped portions 13 are arranged from both sides of the frame body 5 so as to face inward. At this time, as shown in FIG. 16, one inclined piece 10 of the plate 6 is placed on the upper surface of the upper piece 17 of the vertical frame 2, and the gutter-shaped portion 13 of the plate 6 is received by the receiving portion 15 of the horizontal rod 4. As a result, the plate 6 is laterally positioned. Also, plate 6
Both ends of the mounting piece 1 are integrally formed inside the upper end of the side plate 3.
6 (see FIG. 14). The above-mentioned placing pieces 16 of the side plate 3 are formed by the same number according to the number of plates 6 and 7 laid.

【0064】次に、更に内側のプレート6を敷設する場
合は、図16に示すように、プレート6の傾斜片10を
隣接するプレート6(既に先に敷設したプレート6)の
平坦部12の上面に載置し、該プレート6の樋状部13
は上記と同様に横棧4の受け部15に配設する。また、
プレート6の両端部は、側板3の載置片16上に載置す
る。プレート6の敷設はこれを順次繰り返して行う。
Next, when laying the inner plate 6 further, as shown in FIG. 16, the inclined piece 10 of the plate 6 is placed on the upper surface of the flat portion 12 of the adjacent plate 6 (the plate 6 already laid previously). Placed on the gutter 13 of the plate 6
Is arranged in the receiving portion 15 of the horizontal shaft 4 in the same manner as described above. Also,
Both ends of the plate 6 are mounted on the mounting pieces 16 of the side plate 3. The plate 6 is laid by sequentially repeating this.

【0065】そして、枠本体5の中央は、図15に示す
ように、両プレート6の樋状部13が対向する形とな
り、両プレート6の平坦部12にプレート7の両側の傾
斜片14を載置して敷設することで、枠本体5にプレー
ト6,7が敷設されることになる。そして、これにより
床パネル本体1が形成される。なお、プレート6,7間
は、平坦部12と傾斜片10,11,14とで途中の複
数箇所で溶接等で固着され、また、プレート6,7の端
部は側板3の載置片16とでそれぞれ溶接等で固着され
る。また、各部材を溶接した連結固定して形成した床パ
ネル本体1は、溶融亜鉛メッキ等のメッキ処理が行わ
れ、防錆を施している。
At the center of the frame body 5, as shown in FIG. 15, the gutter-shaped portions 13 of both plates 6 face each other, and the inclined portions 14 on both sides of the plate 7 are attached to the flat portions 12 of both plates 6. By placing and laying, the plates 6 and 7 are laid on the frame body 5. Then, the floor panel body 1 is formed by this. In addition, between the plates 6 and 7, the flat portion 12 and the inclined pieces 10, 11 and 14 are fixed by welding or the like at a plurality of points on the way, and the ends of the plates 6 and 7 are placed on the mounting piece 16 of the side plate 3. And are fixed by welding or the like. The floor panel body 1 formed by welding and fixing the respective members is subjected to plating treatment such as hot dip galvanization to prevent rust.

【0066】ここで、各隣接するプレート6,7間の傾
斜片10,11,14により形成される溝を雨水を排水
させるための排水溝19としている。従って、雨水を排
水させるための断面を略V字型の排水溝19が隣接する
プレート6,7間に形成されることになり、床パネル本
体1の上面に降った雨水を効率良く排水させることがで
きる。また、上記排水溝19内の雨水は、隣接するプレ
ート6,7間の平坦部12と傾斜片10との間の隙間に
流れ、この流れた雨水はプレート6の樋状部13に流れ
落ちる。従って、この床パネル本体1の上面に降った雨
水は、排水溝19及び樋状部13により下の階に落ちる
ことなく排水されることになる。
Here, the groove formed by the inclined pieces 10, 11 and 14 between the adjacent plates 6 and 7 is used as a drain groove 19 for draining rainwater. Therefore, a cross section for draining rainwater is formed between the adjacent plates 6 and 7 with a substantially V-shaped drain groove 19, and the rainwater that has fallen on the upper surface of the floor panel body 1 can be drained efficiently. You can Further, the rainwater in the drain groove 19 flows into the gap between the flat portion 12 between the adjacent plates 6 and 7 and the inclined piece 10, and the rainwater that flows down flows down to the gutter-shaped portion 13 of the plate 6. Therefore, the rainwater that has fallen on the upper surface of the floor panel body 1 will be drained by the drain groove 19 and the gutter 13 without falling to the lower floor.

【0067】床パネル本体1の側板3の上部には、図1
4に示すように、上記排水溝19に対応して該排水溝1
9からの雨水を外部に排水させるための略V字型の切欠
部20が排水溝19の数だけ形成されている。また、上
記樋状部13に対応して、該樋状部13からの雨水を外
部に排水させるための穴21が同様に複数穿孔されてい
る。従って、床パネル本体1の上面に落ちた雨水は、排
水溝19及び切欠部20、また、樋状部13及び穴21
を介して外部に排水されるものである。
The upper part of the side plate 3 of the floor panel body 1 is shown in FIG.
As shown in FIG. 4, the drain groove 1 corresponds to the drain groove 19.
Substantially V-shaped notches 20 for draining rain water from the outside to the outside are formed by the number of drain grooves 19. Corresponding to the gutter-shaped portion 13, a plurality of holes 21 for draining rainwater from the gutter-shaped portion 13 to the outside are similarly punched. Therefore, the rainwater that has fallen onto the upper surface of the floor panel body 1 is drainage groove 19 and notch 20, as well as gutter-shaped portion 13 and hole 21.
The water is drained to the outside via.

【0068】床パネル本体1自体の雨水の流れは、以下
の如くである。すなわち、雨が降った場合には、隣接す
るプレート6,7の隙間から樋状部13に流れ、この樋
状部13に流れた雨水は側板3の穴21から外部へ排水
される。また、同時に隣接するプレート6,7間で形成
される排水溝19に雨水が流れ、側板3の切欠部20か
ら外部へ排水されることになる。特に、大雨の場合で
も、排水溝19が床パネル本体1の上面に形成された形
となっているために、該排水溝19及び切欠部20を介
して雨水を効率良く外部に排水することができるもので
ある。
The flow of rainwater on the floor panel body 1 itself is as follows. That is, when it rains, it flows from the gap between the adjacent plates 6 and 7 to the gutter-shaped portion 13, and the rainwater that has flowed into the gutter-shaped portion 13 is drained to the outside from the hole 21 of the side plate 3. At the same time, rainwater flows into the drain groove 19 formed between the adjacent plates 6 and 7, and is drained to the outside from the notch 20 of the side plate 3. In particular, even in the case of heavy rain, since the drainage groove 19 is formed on the upper surface of the floor panel body 1, rainwater can be efficiently drained to the outside through the drainage groove 19 and the notch 20. It is possible.

【0069】次に、横方向、縦方向にH型鋼を架橋し
て、そのH型鋼の水平面上の空間部分に上記床パネル本
体1を敷設する方法について説明する。まず、図16に
示すように、H型鋼22と床パネル本体1との連結固定
について説明する。図16において、床パネル本体1が
ボルト23で連結固定されるH型鋼22の部分には、略
コ字型に形成した連結金具25が配置されるようになっ
ている。すなわち、H型鋼22の左右の開口面側の部分
に上記連結金具25が配置され、つまり、この連結金具
25がH型鋼22の上下片の間の開口面側に位置され
る。
Next, a method of bridging the H-section steel in the horizontal and vertical directions and laying the floor panel body 1 in the space on the horizontal plane of the H-section steel will be described. First, as shown in FIG. 16, connecting and fixing the H-shaped steel 22 and the floor panel body 1 will be described. In FIG. 16, a substantially U-shaped connecting fitting 25 is arranged at a portion of the H-shaped steel 22 to which the floor panel main body 1 is connected and fixed by a bolt 23. That is, the connecting fittings 25 are arranged on the left and right opening surface side portions of the H-shaped steel 22, that is, the connecting fittings 25 are located on the opening surface side between the upper and lower pieces of the H-shaped steel 22.

【0070】そして、床パネル本体1の縦枠2の側面に
穿孔した上下2個の挿通孔26(図14参照)と、連結
金具25の上下2個の挿通孔(図示せず)、及びH型鋼
22の上下2個の挿通孔(図示せず)にボルト23を図
16に示すようにそれぞれ挿通する。この挿通したボル
ト23にナット24をそれぞれ螺着して締め付けること
で、床パネル本体1の縦枠2を連結金具25を介してH
型鋼22に連結固定する。ここで、1つの床パネル本体
1をH型鋼22間の空間部分に敷設する場合には、他方
の縦枠2も図16と同様にH型鋼22に連結すること
で、床パネル本体1はH型鋼22に連結固定されること
になる。なお、床パネル本体1の長手方向の端部と、直
接連結固定されないH型鋼22との間には雨水を落下さ
せるために、少しの隙間をあけておく。
Then, two upper and lower insertion holes 26 (see FIG. 14) formed in the side surface of the vertical frame 2 of the floor panel main body 1, two upper and lower insertion holes (not shown) of the connecting fitting 25, and H The bolts 23 are respectively inserted into the upper and lower two insertion holes (not shown) of the shape steel 22 as shown in FIG. The nuts 24 are screwed and tightened to the inserted bolts 23, respectively, so that the vertical frame 2 of the floor panel main body 1 is connected to the H
It is connected and fixed to the shape steel 22. Here, when one floor panel main body 1 is laid in the space between the H-shaped steels 22, the other vertical frame 2 is also connected to the H-shaped steel 22 as in FIG. It will be connected and fixed to the shape steel 22. A small gap is provided between the longitudinal end of the floor panel body 1 and the H-shaped steel 22 that is not directly connected and fixed in order to drop rainwater.

【0071】次に、H型鋼22の間に複数の床パネル本
体1を連結固定する場合には、以下のようにして行う。
床パネル本体1の端部の連結固定は、図19に示す板状
のH型鋼22に溶接で固定された連結金具27により行
う。つまり、図6に示すH型鋼22が横方向(X方向)
のH型鋼22であるとすれば、図19に示すのが縦方向
(Y方向)のH型鋼22であり、この縦方向に固着され
た連結金具27を挟んで両側の床パネル本体1を連結固
定するものである。
Next, when a plurality of floor panel main bodies 1 are connected and fixed between the H-shaped steels 22, it is carried out as follows.
The connection and fixing of the end portion of the floor panel body 1 is performed by the connection fitting 27 fixed to the plate-shaped H-shaped steel 22 shown in FIG. 19 by welding. That is, the H-shaped steel 22 shown in FIG. 6 is in the lateral direction (X direction).
19 is the H-shaped steel 22 in the vertical direction (Y direction), and the floor panel bodies 1 on both sides are connected with the connecting metal fittings 27 fixed in the vertical direction sandwiched therebetween. It is something that is fixed.

【0072】すなわち、ボルトを図14に示す床パネル
本体1の挿通孔26、図19に示す連結金具27の挿通
孔27a及び隣接する床パネル本体1の挿通孔26に挿
通し、図16の場合と同様にボルト及びナットにて連結
固定する。床パネル本体1の他方の端部の固定も同じで
ある。また、床パネル本体1の縦枠2の途中には、ボル
トを挿通して連結するための穴28が図13に示すよう
に穿孔されており、この穴28を介して図17に示すよ
うに両床パネル本体1の内側部分を連結固定するもので
ある。
That is, the bolt is inserted into the insertion hole 26 of the floor panel body 1 shown in FIG. 14, the insertion hole 27a of the connecting fitting 27 shown in FIG. 19 and the insertion hole 26 of the adjacent floor panel body 1 in the case of FIG. Connect and fix with bolts and nuts in the same manner as in. The same applies to fixing the other end of the floor panel body 1. Further, a hole 28 for inserting and connecting a bolt is bored in the middle of the vertical frame 2 of the floor panel main body 1 as shown in FIG. 13, and as shown in FIG. The inner part of both floor panel bodies 1 is connected and fixed.

【0073】すなわち、図17に示すように、隣接する
床パネル本体1の縦枠2の間に板材29を介装し、この
板材29を介して両縦枠2をボルト30及びナット31
にて固定することで、隣接する床パネル本体1を連結固
定することができる。
That is, as shown in FIG. 17, a plate member 29 is interposed between the vertical frames 2 of the floor panel main bodies 1 adjacent to each other, and the vertical frames 2 are attached to the bolts 30 and the nuts 31 through the plate member 29.
By fixing the floor panel main bodies 1 adjacent to each other, the adjacent floor panel main bodies 1 can be connected and fixed.

【0074】ここで、H型鋼22間に複数の床パネル本
体1を上記のように敷設した場合には、床パネル本体1
間の隙間から雨水が落下しないようにコーキング材を介
装させるようにしている。これにより隣接する床パネル
本体1間からの雨水の落下を防止することができる。
When a plurality of floor panel bodies 1 are laid between the H-shaped steels 22 as described above, the floor panel body 1
Caulking material is inserted to prevent rainwater from falling through the gap. As a result, it is possible to prevent rainwater from falling between the adjacent floor panel bodies 1.

【0075】また、図11に示すように、上記床パネル
本体1からの雨水を受ける樋体33が縦方向、横方向の
H型鋼22の下面にそれぞれ配設されている。この樋体
33により床パネル本体1の左右の端部が、前後の切欠
部20や穴21からの雨水を受けるようになっている。
Further, as shown in FIG. 11, the gutters 33 for receiving rainwater from the floor panel body 1 are arranged on the lower surface of the H-shaped steel 22 in the vertical and horizontal directions, respectively. The gutter body 33 allows the left and right ends of the floor panel body 1 to receive rainwater from the front and rear cutouts 20 and holes 21.

【0076】図18に上記樋体33をH型鋼22に取り
付けた状態を示す。図示するように、樋体33をH型鋼
22の下面に配置し、略L型の取付金具34の先端をH
型鋼22の下片35の上面に係止し、他端を樋体33の
上面に係止して、該取付金具34及び樋体33にボルト
36を挿通し、ナット37にて螺着することで、樋体3
3がH型鋼22に下面に固定されることになる。なお、
樋体33の断面形状は図示するものに限らず、断面をコ
字型に形成しても良い。
FIG. 18 shows a state in which the gutter body 33 is attached to the H-shaped steel 22. As shown in the figure, the gutter body 33 is arranged on the lower surface of the H-shaped steel 22, and the tip of the substantially L-shaped mounting bracket 34 is set to H-shaped.
Locking on the upper surface of the lower piece 35 of the shaped steel 22 and locking the other end on the upper surface of the gutter body 33, inserting the bolt 36 into the mounting metal fitting 34 and the gutter body 33, and screwing with the nut 37. So gutter 3
3 is fixed to the lower surface of the H-shaped steel 22. In addition,
The cross-sectional shape of the gutter body 33 is not limited to that shown in the figure, and the cross section may be formed in a U-shape.

【0077】このように、床パネル本体1からの雨水を
上記樋体33にて受けるようになっており、更に、この
樋体33からの雨水を排水させる排水システムについて
説明する。すなわち、図11及び図20に示すように、
上記樋体33からの雨水を受けるための第3の樋体49
が上記ブラケット50の下面側に配設されている。ブラ
ケット50の下面は柱32側にかけて下降する傾斜面と
なっており、この傾斜面に沿わせて上記第3の樋体49
を取り付けるようにしている。
In this way, the rainwater from the floor panel body 1 is received by the gutter body 33, and a drainage system for draining the rainwater from the gutter body 33 will be described. That is, as shown in FIGS. 11 and 20,
Third gutter 49 for receiving rainwater from the gutter 33
Is disposed on the lower surface side of the bracket 50. The lower surface of the bracket 50 is an inclined surface that descends toward the column 32 side, and along the inclined surface, the third gutter body 49 is provided.
I am trying to attach.

【0078】図21は上記第3の樋体49の斜視図を示
し、鉄製で形成されたこの第3の樋体49は上面を開口
した断面がコ字型に形成されている。図20に示すよう
に、下面側が斜めに形成されたブラケット50の下面に
第3の樋体49が固定具55,56を介して取り付けら
れるようになっている。第3の樋体49の一端が樋体3
3の下方に位置し、他端が柱32の側面側に位置して、
且つ柱32の周囲に取り付けられた第4の樋体51の上
方に位置している。
FIG. 21 is a perspective view of the third gutter body 49. The third gutter body 49 made of iron has a U-shaped cross section with an open upper surface. As shown in FIG. 20, the third gutter body 49 is attached to the lower surface of the bracket 50 whose lower surface side is formed obliquely via the fixtures 55 and 56. One end of the third gutter 49 is a gutter 3
3, the other end is located on the side surface side of the pillar 32,
Moreover, it is located above the fourth gutter body 51 mounted around the pillar 32.

【0079】上記第4の樋体51は、図22に示すよう
に、コ字型の2つの半割体51a,51bで構成され、
それぞれの半割体51a,51bの断面はL型に形成さ
れている。そして、柱32の回りに半割体51a,51
bの端面を突き合わせることで、図23に示すように、
柱32の周囲に容器状の第4の樋体51が取着されるこ
とになる。なお、第4の樋体51の半割体51a,51
b同士、及び柱32との取着は、溶接等で固着するよう
にして、第4の樋体51内に第3の樋体49から流れ落
ちた雨水が漏れない構造としている。
As shown in FIG. 22, the fourth gutter 51 is composed of two U-shaped halves 51a and 51b.
The respective halves 51a and 51b have an L-shaped cross section. Then, around the pillar 32, the half-split bodies 51a, 51
By abutting the end faces of b, as shown in FIG.
The container-shaped fourth gutter body 51 is attached around the column 32. In addition, the halves 51a, 51 of the fourth gutter 51
The b and the column 32 are attached to each other by welding or the like so that rainwater flowing down from the third gutter 49 does not leak into the fourth gutter 51.

【0080】また、上記第4の樋体51を取り付ける柱
32の部分の各側面には複数(本実施例では2つ)の排
水穴52が穿孔されており、この排水穴52を介して第
4の樋体51内の雨水を柱32内に排水するようにして
いる。ここで、柱32の外面及び内面は、防錆のために
溶融亜鉛メッキが施されており、柱32の中に雨水を流
しても水分による錆の発生はない。
A plurality (two in this embodiment) of drainage holes 52 are drilled on each side surface of the column 32 to which the fourth gutter body 51 is attached. The rainwater in the gutter body 51 of No. 4 is drained into the pillar 32. Here, the outer surface and the inner surface of the column 32 are galvanized for rust prevention, and even if rainwater is poured into the column 32, rust due to moisture does not occur.

【0081】また、柱32の下端には図11に示すよう
に、柱32内に流れ落ちた雨水を外部に排水するための
排水孔53が形成してある。この排水孔53は柱32の
1つの側面に形成しているが、2面や各側面に形成して
も良い。柱32の基部の近傍の地面に排水溝を形成して
雨水を流すようにしても良く、また、地面に直接流すよ
うにして、立体駐車場の要所や周囲に形成した溝に雨水
を流すようにしても良い。
Further, as shown in FIG. 11, a drain hole 53 is formed at the lower end of the column 32 for draining rainwater that has flowed down into the column 32 to the outside. Although the drain holes 53 are formed on one side surface of the column 32, they may be formed on two surfaces or each side surface. A drainage groove may be formed in the ground in the vicinity of the base of the pillar 32 to allow rainwater to flow. Alternatively, the rainwater may be flowed directly to the ground to flow rainwater into a groove formed in or around a multi-storey parking lot. You may do it.

【0082】図11においては、H型鋼22の間には3
つの床パネル本体1が配設されるようになっており、隣
接する床パネル本体1の間には上述したように雨水が漏
れるのを防止するためにコーキング材が介装されるよう
になっている。床パネル本体1の上面に降った雨水は、
上述と同様に床パネル本体1の切欠部20や穴21から
床パネル本体1の端部側に排水されることになる。中央
の床パネル本体1から排水される雨水は、H型鋼22の
下面に配設した樋体33に流れ落ちる。また、両側の床
パネル本体1から排水される雨水は、一部は樋体33に
流れ落ち、残り、つまりH型鋼22側の部分の雨水は直
接第3の樋体49に流れ落ちる。
In FIG. 11, there are 3 spaces between the H-shaped steels 22.
Two floor panel bodies 1 are arranged, and caulking material is interposed between the adjacent floor panel bodies 1 to prevent rainwater from leaking as described above. There is. Rainwater that has fallen on the top of the floor panel body 1
Similarly to the above, the water is drained from the cutout portion 20 and the hole 21 of the floor panel body 1 to the end portion side of the floor panel body 1. Rainwater drained from the central floor panel body 1 flows down to the gutter body 33 arranged on the lower surface of the H-shaped steel 22. Further, a part of the rainwater drained from the floor panel main bodies 1 on both sides flows down to the gutter body 33, and the rest, that is, the rainwater on the H-shaped steel 22 side part flows directly to the third gutter body 49.

【0083】また、床パネル本体1の長手方向のH型鋼
22側の部分からの雨水は、樋体33や第3の樋体49
に流れ落ちる。このようにして樋体33に流れ落ちた雨
水は第3の樋体49に流れ、第3の樋体49を介して柱
32の周囲に取り付けた第4の樋体51に流れる。そし
て、第4の樋体51の雨水は排水穴52を介して柱32
内に流れ落ちる。更に、柱32内に流れ落ちた雨水は、
柱32の下部の排水孔53から排水されることになる。
Rainwater from the portion of the floor panel body 1 on the H-shaped steel 22 side in the longitudinal direction is supplied to the gutter body 33 and the third gutter body 49.
Run down to. The rainwater that has flown down to the gutter body 33 in this way flows to the third gutter body 49, and then flows to the fourth gutter body 51 mounted around the column 32 via the third gutter body 49. Then, the rainwater of the fourth gutter body 51 is passed through the drain hole 52 and the pillar 32.
It flows in. Furthermore, the rainwater that has flowed down into the pillar 32 is
It will be drained from the drain hole 53 in the lower part of the pillar 32.

【0084】(実施例2)次に、図24〜図27を参照
してブラケット50の他の実施例について説明する。図
24に示すように、本実施例におけるブラケット50
は、2種類のブラケット50a,50bからなり、それ
ぞれ2個1組として柱32の側面に対向して配設される
ようになっている。また、本実施例におけるブラケット
50の下面を先の実施例と同様に柱32側に下降する傾
斜面として形成している。なお、床パネル本体1やH型
鋼22の下面側に配設した樋体33、及び柱32の構造
は図11の場合と同様である。
(Embodiment 2) Next, another embodiment of the bracket 50 will be described with reference to FIGS. As shown in FIG. 24, the bracket 50 in this embodiment.
Is composed of two types of brackets 50a and 50b, and is arranged so as to face the side surface of the column 32 as a set of two brackets. Further, the lower surface of the bracket 50 in this embodiment is formed as an inclined surface descending to the column 32 side as in the previous embodiment. The structures of the gutter body 33 and the column 32 arranged on the lower surface side of the floor panel body 1 and the H-shaped steel 22 are the same as those in the case of FIG. 11.

【0085】まず、一方のブラケット50aについて説
明する。ブラケット50aは下面が開口し断面が略コ字
型に形成され、ブラケット50aの両側を略コ字型に折
曲して上面が開口した第5の樋体57を一体に形成して
いる。ここで、第5の樋体57を構成する部材57aが
ブラケット50aとの一体化部材であり、この部材57
aを折曲して第5の樋体57を形成している。また、第
5の樋体57を構成する他の部材57b,57cは溶接
等で後付けしてブラケット50aを構成している。
First, the one bracket 50a will be described. The bracket 50a has an open lower surface and a substantially U-shaped cross section. The bracket 50a is integrally formed with a fifth gutter 57 whose upper surface is opened by bending both sides of the bracket 50a into a substantially U-shape. Here, the member 57a that constitutes the fifth gutter body 57 is an integrated member with the bracket 50a.
A is bent to form a fifth gutter 57. Further, the other members 57b and 57c forming the fifth gutter 57 are attached later by welding or the like to form the bracket 50a.

【0086】従って、上記第5の樋体57はブラケット
50の下面と同様に傾斜して形成されており、ブラケッ
ト50の下面からは第5の樋体57が垂下しないように
している。よって、第5の樋体57がブラケット50の
下面より突出しないので、第5の樋体57が邪魔になら
ず、自動車の屋根に第5の樋体57が接触するようなこ
とがない。特に、背の高い自動車の屋根の端は丸みを帯
びているので、柱32の外面に縦樋を有していないの
と、且つブラケット50及び第5の樋体57の下面が柱
32側に下降して傾斜しているために、背の高い自動車
の屋根がブラケット50や第5の樋体57に接触せずに
うまく自動車を柱32側に近接して駐車させることがで
きる。
Therefore, the fifth gutter body 57 is formed to be inclined like the lower surface of the bracket 50, and the fifth gutter body 57 is prevented from hanging down from the lower surface of the bracket 50. Therefore, since the fifth gutter body 57 does not project from the lower surface of the bracket 50, the fifth gutter body 57 does not get in the way and the fifth gutter body 57 does not come into contact with the roof of the vehicle. Particularly, since the roof of a tall automobile has a rounded end, the outer surface of the pillar 32 does not have a vertical gutter, and the lower surfaces of the bracket 50 and the fifth gutter 57 are located on the pillar 32 side. Since the roof of a tall automobile does not contact the bracket 50 and the fifth gutter body 57, the automobile can be parked in close proximity to the pillar 32 side because the roof is lowered and inclined.

【0087】ブラケット50aの基部側の下面には略V
字型の部材62が溶接等で固着され、その内部を雨水を
一時的に溜める凹所59としている。また、ブラケット
50aの先端側の面にも後面板63が設けられていて、
H型鋼22の下面側の樋体33から流れ落ちる雨水がブ
ラケット50a内に落ちないようにして、第5の樋体5
7に雨水をガイドするようになっている。そして、第5
の樋体57に流れる雨水をブラケット50a内の凹所5
9内に流れ込ませるための第1の穴58をブラケット5
0aの両側面にそれぞれ穿孔している。
The bottom surface of the bracket 50a on the base side is substantially V-shaped.
A character-shaped member 62 is fixed by welding or the like, and the inside thereof is formed as a recess 59 for temporarily collecting rainwater. Further, a rear surface plate 63 is also provided on the front end side surface of the bracket 50a,
The rainwater flowing from the gutter body 33 on the lower surface side of the H-shaped steel 22 is prevented from falling into the bracket 50a, and the fifth gutter body 5 is provided.
It is designed to guide rainwater to 7. And the fifth
Rainwater flowing in the gutter body 57 of the recess 5 in the bracket 50a
The first hole 58 for allowing it to flow into the bracket 5
Each side of 0a is perforated.

【0088】また、凹所59を形成する部材62の前面
板60には凹所59内の雨水を柱32内に流すための第
2の穴61が複数(本実施例では2つ)穿孔されてい
る。そして、この第2の穴61に対応して柱32の側面
にも先の実施例と同様の排水穴52が穿孔してある。な
お、柱32の下部の排水孔53の構造は図11の場合と
同様なので説明は省略する。
Further, the front plate 60 of the member 62 forming the recess 59 is provided with a plurality of second holes 61 (two in this embodiment) for allowing rainwater in the recess 59 to flow into the column 32. ing. Corresponding to the second hole 61, a drain hole 52 similar to that in the previous embodiment is also formed on the side surface of the column 32. Note that the structure of the drain hole 53 below the pillar 32 is the same as that in the case of FIG.

【0089】ブラケット50aは柱32の側面に穴5
2,61を対応させてそのブラケット50aの基部の周
囲を溶接等で固着してブラケット50aを固着させる。
この時、部材57b側は開放しているが、他方のブラケ
ット50bのように閉塞させるようにしても良い。本実
施例では、上記の部分を開放して柱32の側面及び連結
板64とで閉塞して雨水が漏れないようにしている。
The bracket 50a has a hole 5 on the side surface of the pillar 32.
2, 61 are made to correspond to each other and the periphery of the base of the bracket 50a is fixed by welding or the like to fix the bracket 50a.
At this time, the member 57b side is open, but it may be closed like the other bracket 50b. In this embodiment, the above-mentioned portion is opened and closed by the side surface of the column 32 and the connecting plate 64 to prevent rainwater from leaking.

【0090】すなわち、図24に示すように、平板状の
連結板64の両側の側片65をやや内側に折曲し、その
側片65を第5の樋体57の先端側に図25及び図26
に示すように挿入配置して溶接等で連結固定している。
また、連結板64の両側の側片65には雨水を通過させ
るための穴66が穿孔してある。更に、連結板64の中
央片の外側にはコ字型の固定片67が溶接等で固着して
ある。
That is, as shown in FIG. 24, the side pieces 65 on both sides of the flat plate-like connecting plate 64 are bent slightly inward, and the side pieces 65 are placed on the tip side of the fifth gutter body 57 as shown in FIG. FIG. 26
It is inserted and arranged as shown in FIG.
Further, holes 66 for allowing rainwater to pass through are formed in the side pieces 65 on both sides of the connecting plate 64. Further, a U-shaped fixing piece 67 is fixed to the outside of the central piece of the connecting plate 64 by welding or the like.

【0091】なお、連結板64は柱32内に設けてある
内ダイヤの機能を持たせたものであり、内ダイヤの他に
この連結板64によりH型鋼22、柱32、ブラケット
50にかかる荷重を分散させる機能を持たせるようにし
たものである。
The connecting plate 64 has the function of an inner diamond provided in the pillar 32. The load applied to the H-shaped steel 22, the pillar 32, and the bracket 50 by the connecting plate 64 in addition to the inner diamond. It has a function to disperse.

【0092】この固定片67は他方のブラケット50b
をボルト等で連結するものであり、該固定片67の各辺
にはボルト挿通用の穴が複数穿孔されている。また、連
結板64の下部には柱32の排水穴52に対応した排水
用の穴68が穿設されている。
This fixing piece 67 is the other bracket 50b.
Are connected by bolts or the like, and a plurality of holes for inserting bolts are formed on each side of the fixing piece 67. Further, a drainage hole 68 corresponding to the drainage hole 52 of the column 32 is formed in the lower portion of the connecting plate 64.

【0093】次に、他方のブラケット50bについて説
明する。本ブラケット50bは先のブラケット50aと
は基本的には同じ構造であり、後付けする部材の構成に
より少し異なった構造となっている。すなわち、折曲し
て第5の樋体57を構成する部材57a、部材57cは
同じであり、ブラケット50a内に凹所59を形成する
部材57dと、部材57a及び部材57dを連結して雨
水を漏らさないようにするための部材57eとの構造が
異なっている。他の構成はブラケット50aの場合と同
様であるので、同様の機能を有する部品ないし箇所には
同じ番号を付して説明は省略する。
Next, the other bracket 50b will be described. The present bracket 50b has basically the same structure as the previous bracket 50a, but has a slightly different structure depending on the structure of members to be attached later. That is, the members 57a and 57c that are bent to form the fifth gutter body 57 are the same, and the member 57d that forms the recess 59 in the bracket 50a is connected to the members 57a and 57d to collect rainwater. The structure of the member 57e for preventing leakage is different. Since other configurations are the same as those of the bracket 50a, parts or portions having the same function are denoted by the same reference numerals and description thereof will be omitted.

【0094】なお、ブラケット50bの基部の各辺には
連結板64と連結固定するためのボルト挿通用の穴が複
数穿設されている。また、ブラケット50a,50bの
上面に穿設してある複数の穴は、H型鋼22を固定する
ための穴である。
A plurality of holes for inserting bolts for connecting and fixing the connecting plate 64 are formed on each side of the base of the bracket 50b. Further, the plurality of holes formed in the upper surfaces of the brackets 50 a and 50 b are holes for fixing the H-shaped steel 22.

【0095】ここで、工場において柱32に連結板64
と一対のブラケット50a,50aを溶接等で固着して
おき、現場において他方の一対のブラケット50b,5
0bを溶接等で固着する。図25はこのようにしてブラ
ケット50を柱32に固着した状態の平面図を示してい
る。
Here, in the factory, the connecting plate 64 is attached to the pillar 32.
And the pair of brackets 50a, 50a are fixed to each other by welding or the like, and the other pair of brackets 50b, 5a at the site.
0b is fixed by welding or the like. FIG. 25 shows a plan view of the state where the bracket 50 is fixed to the column 32 in this way.

【0096】図26はブラケット50aと柱32との接
合部分の断面図を示し、また、図27はブラケット50
bと柱32との接合部分の断面図を示している。この図
26及び図27を用いて雨水の排水の流れを説明する。
なお、床パネル本体1から樋体33までの雨水の流れ
(排水)は先の実施例と同じなので説明は省略する。
FIG. 26 is a sectional view of the joint portion between the bracket 50a and the column 32, and FIG. 27 is the bracket 50.
The sectional view of the joining part of b and the pillar 32 is shown. The drainage flow of rainwater will be described with reference to FIGS. 26 and 27.
The flow (drainage) of rainwater from the floor panel body 1 to the gutter body 33 is the same as that in the previous embodiment, and the description thereof will be omitted.

【0097】図26において、樋体33からの雨水はブ
ラケット50aの先端部に流れ落ち、ブラケット50a
の両側の第5の樋体57に流れる。そして、第5の樋体
57内に流れ込んだ雨水は連結板64の穴66とブラケ
ット50aの第1の穴58を介してブラケット50a内
の凹所59内に流れ込む。凹所59内に流れ込んだ雨水
は、前面板60の第2の穴61、柱32の側面の排水穴
52を介して柱32内に流れ落ちる。そして、柱32内
に流れ落ちた雨水は先の実施例(図11参照)と同様に
柱32の下部の排水孔53から外部へ排水される。
In FIG. 26, rainwater from the gutter body 33 flows down to the tip of the bracket 50a, and the bracket 50a
Flows to the fifth gutter 57 on both sides of. Then, the rainwater that has flowed into the fifth gutter 57 flows into the recess 59 in the bracket 50a through the hole 66 in the connecting plate 64 and the first hole 58 in the bracket 50a. The rainwater that has flowed into the recess 59 flows down into the column 32 through the second hole 61 of the front plate 60 and the drain hole 52 on the side surface of the column 32. Then, the rainwater that has flowed down into the pillar 32 is drained to the outside from the drain hole 53 in the lower portion of the pillar 32 as in the previous embodiment (see FIG. 11).

【0098】また、他方のブラケット50bに流れた雨
水は図27に示すように、第5の樋体57を流れ、第1
の穴58を介してブラケット50b内の凹所59内に流
れ込む。凹所59内に流れ込んだ雨水は、前面板60の
第2の穴61、連結板64の穴68、柱32の排水穴5
2を介して柱32内に流れ落ちる。
Further, the rainwater flowing to the other bracket 50b flows to the first trough 57 as shown in FIG.
Through the holes 58 into the recess 59 in the bracket 50b. The rainwater that has flowed into the recess 59 is the second hole 61 of the front plate 60, the hole 68 of the connecting plate 64, and the drain hole 5 of the pillar 32.
Through 2 into column 32.

【0099】(実施例3)次に、一体に樋体を設けたブ
ラケット50の他の実施例について図28及び図29を
参照して説明する。先の実施例のブラケット50(図2
4参照)では、その下面は開口し、該ブラケット50の
両側にだけ第5の樋体57を形成して雨水を柱32内に
ガイドしていたが、本実施例では、図28に示すよう
に、ブラケット50の下面の開口面にも断面を略コ字型
とした第6の樋体69を配設したものである。また、他
の構成は先の実施例(図24)と同じなので説明は省略
し、要旨の部分について詳述する。なお、第6の樋体6
9は鉄製であり、ブラケット50にボルト等で固定され
るようになっている。
(Embodiment 3) Next, another embodiment of the bracket 50 integrally provided with the gutter body will be described with reference to FIGS. 28 and 29. The bracket 50 of the previous embodiment (FIG. 2
4), the lower surface thereof is opened, and the fifth gutter 57 is formed only on both sides of the bracket 50 to guide the rainwater into the column 32. However, in this embodiment, as shown in FIG. In addition, the sixth gutter body 69 having a substantially U-shaped cross section is also arranged on the opening surface of the lower surface of the bracket 50. Since the other structure is the same as that of the previous embodiment (FIG. 24), the description thereof will be omitted and the gist will be described in detail. The sixth gutter 6
9 is made of iron and is fixed to the bracket 50 with bolts or the like.

【0100】すなわち、H型鋼22の下面の樋体33か
らのほとんどの雨水を上記第6の樋体69により凹所5
9内に流し、凹所59内から上述と同様に柱32内に流
し落とすようにしている。また、ブラケット50の両側
に一体に形成した第5の樋体57は、樋体33からの雨
水の一部や、図11に示すようにH型鋼22に隣接する
床パネル本体1からの雨水を受けるようにしている。
That is, most of the rainwater from the gutter 33 on the lower surface of the H-shaped steel 22 is recessed by the sixth gutter 69.
It is made to flow into the column 9 and from the recess 59 into the column 32 as described above. Further, the fifth gutter body 57 formed integrally on both sides of the bracket 50 collects a part of the rainwater from the gutter body 33 or the rainwater from the floor panel body 1 adjacent to the H-shaped steel 22 as shown in FIG. I am trying to receive it.

【0101】なお、H型鋼22の下面に配設している樋
体33は、ブラケット50が存在するために、柱32の
近傍まで配設することができず、そのため、H型鋼22
に隣接する床パネル本体1から落下する雨水を受ける必
要があるからである。
The gutter body 33 arranged on the lower surface of the H-section steel 22 cannot be arranged near the column 32 due to the presence of the bracket 50.
This is because it is necessary to receive rainwater falling from the floor panel body 1 adjacent to the floor panel body 1.

【0102】ブラケット50の側面の第5の樋体57の
雨水は先の実施例と同様に連結板64の穴66、ブラケ
ット50の第1の穴58を介して凹所59内に流入す
る。そして、凹所59内の雨水は第2の穴61、排水穴
52を介して柱32内に流れ落ちる。なお、図29は柱
32とブラケット50との接合部分を示す平面図であ
る。
Rainwater in the fifth gutter 57 on the side surface of the bracket 50 flows into the recess 59 through the hole 66 of the connecting plate 64 and the first hole 58 of the bracket 50 as in the previous embodiment. Then, the rainwater in the recess 59 flows down into the column 32 through the second hole 61 and the drain hole 52. Note that FIG. 29 is a plan view showing a joint portion between the pillar 32 and the bracket 50.

【0103】ここで、本実施例では、ブラケット50の
内部に第6の樋体69を固定しているので、ブラケット
50自体の剛性を先の実施例の場合よりも更に高めるこ
とができる。
Here, in this embodiment, since the sixth gutter body 69 is fixed inside the bracket 50, the rigidity of the bracket 50 itself can be further enhanced as compared with the case of the previous embodiment.

【0104】(実施例4)次に、ブラケット50に一体
に折曲形成した第5の樋体57の別の実施例を図30及
び図31を参照して説明する。本実施例では図示するよ
うにブラケット50の両側に一体に形成する第5の樋体
57を断面形状をV字型に形成したものである。従っ
て、第5の樋体57の断面形状をV字型とすることで、
第5の樋体57を形成する場合、折曲加工が1回で済む
ものである。先の実施例では第5の樋体57の断面形状
をコ字型としていたので、折曲加工が2回必要であった
が、本実施例の場合では、折曲加工が1回なので、加工
工程が簡素化され、生産性の向上を図ることができる。
(Embodiment 4) Next, another embodiment of the fifth gutter body 57 formed integrally with the bracket 50 by bending will be described with reference to FIGS. 30 and 31. In this embodiment, as shown in the drawing, the fifth gutters 57 integrally formed on both sides of the bracket 50 are formed in a V-shaped cross section. Therefore, by making the cross-sectional shape of the fifth gutter 57 V-shaped,
In the case of forming the fifth gutter body 57, only one bending process is required. In the previous embodiment, the fifth gutter 57 had a U-shaped cross-section, and therefore, the bending process needed to be performed twice, but in the case of the present embodiment, the bending process is performed once. The process is simplified and the productivity can be improved.

【0105】また、本実施例も同様であるが、第5の樋
体57を折曲加工する箇所はブラケット50の基部側を
除いた箇所であり、基部には図30に示すような部材7
0を溶接等で後付けするようにしている。なお、図30
では便宜上第5の樋体57をブラケット50の一方側だ
け記載しているが、第5の樋体57はブラケット50の
両側に形成される。
Further, as in this embodiment, the fifth gutter body 57 is bent at a portion except the base portion side of the bracket 50, and the base portion is provided with a member 7 as shown in FIG.
0 is attached later by welding or the like. Note that FIG.
Although the fifth gutter body 57 is shown only on one side of the bracket 50 for convenience, the fifth gutter body 57 is formed on both sides of the bracket 50.

【0106】また、本実施例では連結板64の形状も先
の実施例とは少し異なり、両側の側片65の部分を略Z
字型に折曲して形成し、図31に示すように、連結板6
4の側片65がブラケット50の基部側の側面に全体に
当接するようにしている。なお、雨水の排水の流れは先
の実施例と同じなので説明は省略する。また、図31は
柱32とブラケット50との接合部分を示す平面図であ
る。
Further, in this embodiment, the shape of the connecting plate 64 is slightly different from that of the previous embodiment, and the side pieces 65 on both sides are substantially Z-shaped.
As shown in FIG. 31, the connecting plate 6 is formed by bending it into a letter shape.
The side piece 65 of No. 4 entirely contacts the side surface of the bracket 50 on the base side. Note that the drainage flow of rainwater is the same as in the previous embodiment, so a description thereof will be omitted. Further, FIG. 31 is a plan view showing a joint portion between the pillar 32 and the bracket 50.

【0107】次に、第5の樋体57の断面をV字型に折
曲形成したブラケット50の場合の柱32とH型鋼22
との組立工程を図32〜図35に示す。図32に示すよ
うに、予め工場で連結板64及び一方のブラケット50
aを溶接等で固着した柱32を立設し、現場において、
他方のブラケット50bを固定片67を介してボルト止
めや溶接等で連結固定する。以降の組立工程は、先の実
施例における図7〜図10の場合と同様なので、その説
明は省略する。
Next, the pillar 32 and the H-shaped steel 22 in the case of the bracket 50 in which the cross section of the fifth gutter 57 is bent and formed in a V shape.
32 to 35 show the assembling process of and. As shown in FIG. 32, the connecting plate 64 and one bracket 50 are preliminarily factory-set.
On the site, the pillar 32, in which a is fixed by welding, is erected,
The other bracket 50b is connected and fixed via a fixing piece 67 by bolting or welding. The subsequent assembling process is the same as that in the case of FIGS. 7 to 10 in the previous embodiment, and the description thereof will be omitted.

【0108】ここで、図36は、立体駐車場の全体の骨
組みを示す図であり、柱32の上部にブラケット50を
取着して横方向、縦方向にH型鋼22を架橋し、それぞ
れ固定した状態である。また、図37は3階の部分ま
で、H型鋼22をブラケット50に載置してそれぞれ連
結固定した状態である。更に、図38に示すように、2
階部分及び3階部分の側部に自動車が落ちるのを防止す
るために防護柵74をそれぞれ取り付けるようにしてい
る。
Here, FIG. 36 is a view showing the entire frame of the multi-storey parking lot. The bracket 50 is attached to the upper part of the pillar 32, and the H-shaped steel 22 is bridged in the lateral and vertical directions and fixed respectively. It is in the state of having done. Further, FIG. 37 shows a state in which the H-shaped steel 22 is placed on the bracket 50 and connected and fixed up to the third floor. Further, as shown in FIG.
Protective fences 74 are attached to the sides of the floor and the third floor to prevent the vehicle from falling.

【0109】なお、図36〜図38においては、床パネ
ル本体1を敷設していない状態の図であるが、床パネル
本体1は上述したようにH型鋼22にボルトにて取り付
けられる。また、2階部分、3階部分のH型鋼22の下
面には樋体33が取り付けられ、ブラケット50の第6
の樋体68、第5の樋体57に上記樋体33から雨水が
流れ、更に、柱32内に雨水を流し込むようにしてい
る。
36 to 38, the floor panel main body 1 is not laid, but the floor panel main body 1 is attached to the H-shaped steel 22 with bolts as described above. Further, a gutter body 33 is attached to the lower surface of the H-shaped steel 22 on the second floor and the third floor, and the sixth trough of the bracket 50 is attached.
The rainwater flows from the gutter body 33 into the gutter body 68 and the fifth gutter body 57, and further, the rainwater is poured into the pillar 32.

【0110】3階部分から柱32内に流れ込んだ雨水
は、鉄板71に穿孔した穴(図示せず)を介して下の柱
32内に落とすようにしている。また、予め工場で2階
部分と3階部分との柱32を連結しておく場合には、2
階部分の箇所に予め排水用の穴をあけておく。なお、こ
の穴は内ダイヤに設けておいても良い。
Rainwater flowing from the third floor into the pillar 32 is dropped into the lower pillar 32 through a hole (not shown) formed in the iron plate 71. If the pillars 32 on the second and third floors are connected in advance at the factory,
Pre-drain holes for drainage on the floor. Note that this hole may be provided in the inner diamond.

【0111】尚、本実施例では、3階の立体駐車場の場
合について説明したが、2階、3階に限らず、3階以上
の立体駐車場の場合にも適用できる。また、本実施例で
は、はりの支持構造について立体駐車場の場合について
説明したが、一般の建築物のはりの支持構造についても
本発明を適用することができるものである。
In this embodiment, the case of the multilevel parking lot on the third floor has been described, but the present invention is not limited to the multilevel parking lot on the second and third floors, but can be applied to the multilevel parking lot on the third floor and above. In addition, in the present embodiment, the beam support structure has been described in the case of a multilevel parking lot, but the present invention can be applied to a beam support structure of a general building.

【0112】[0112]

【発明の効果】請求項1記載のはりの支持構造によれ
ば、はりをブラケット間に載置するだけではりが落下す
るのを防止できて、はりをブラケットに1本のボルトで
止めるだけではりの横方向のずれを防止できる。従っ
て、1本のボルトを止めるだけではりを吊っているクレ
ーンからのワイヤーを外すことができて、クレーンは次
のはりの施工作業に移れて組立作業性を向上させること
ができる。また、柱、ブラケット、はりが、固定用の部
材、添板、固定板により支持構造が一体化されることに
なり、はりに加わる荷重が大きくても構造耐力が大きく
なって柱が変形や座屈するのを防止することができる。
また、はりに荷重がかかった場合でも、はりと部材とを
溶接しなくても開かず、構造耐力を強化することができ
る。更に、はりを支持する支持点がブラケットの先端部
分となって、はりの両側における支持点の間隔が短くな
って、大きな荷重が加わってもはりのたわみ量を非常に
少なくすることができる。従って、はりのたわみを少な
くすることができるので、加わる荷重に対する許容範囲
内ではりの大きさを小さくして重量を軽くしたり、はり
の鋼板の厚みを薄くすることができ、そのため、コスト
ダウンを図ることができる。したがって、はりの大きさ
を小さくして重量を軽くした場合には、はりの輸送コス
ト、はりのメッキ処理におけるコストを下げることがで
き、立体駐車場全体では、大幅にコストを削減すること
ができる。また、はりの先端が自由端とした場合には、
はりの支持点がブラケットの先端部分となるために、は
りのたわみを少なくすることができる。
According to the beam support structure of the first aspect, it is possible to prevent the beam from falling by merely placing the beam between the brackets, and to secure the beam to the bracket with only one bolt. It is possible to prevent lateral displacement of the grip. Therefore, it is possible to remove the wire from the crane that suspends the beam by simply stopping one bolt, and the crane can move to the next beam construction work to improve the assembly workability. In addition, the pillars, brackets, and beams will be integrated into the support structure by the fixing member, the attachment plate, and the fixing plate. Even if the load applied to the beams is large, the structural resistance will be large and the columns will not be deformed or seated. It is possible to prevent bending.
Further, even when a load is applied to the beam, it does not open even if the beam and the member are not welded, and the structural yield strength can be enhanced. Further, the supporting point for supporting the beam serves as the tip portion of the bracket, and the distance between the supporting points on both sides of the beam becomes short, so that the deflection amount of the beam can be extremely reduced even when a large load is applied. Therefore, since the deflection of the beam can be reduced, the size of the beam can be reduced to reduce the weight and the thickness of the steel plate of the beam can be reduced within the allowable range for the applied load, thus reducing the cost. Can be achieved. Therefore, when the size of the beam is reduced and the weight is reduced, the cost of transporting the beam and the cost of plating the beam can be reduced, and the cost can be significantly reduced in the entire multistory parking lot. . If the tip of the beam is a free end,
Since the support point of the beam is the tip portion of the bracket, the deflection of the beam can be reduced.

【0113】請求項2記載のはりの支持構造によれば、
はりをブラケット間に載置するだけではりが落下するの
を防止できて、はりをブラケットに1本のボルトで止め
るだけではりの横方向のずれを防止できる。従って、1
本のボルトを止めるだけではりを吊っているクレーンか
らのワイヤーを外すことができて、クレーンは次のはり
の施工作業に移れて組立作業性を向上させることができ
る。また、柱、ブラケット、はりが、固定用の部材、添
板、固定板により支持構造が略十字形に一体化されるこ
とになり、はりに加わる荷重が大きくても構造耐力が大
きくなり、また荷重が他のはりに分散されることで、柱
が変形や座屈するのを防止することができる。また、は
りに荷重がかかった場合でも、はりと部材とを溶接しな
くても開かず、構造耐力を強化することができる。更
に、はりを支持する支持点がブラケットの先端部分とな
って、はりの両側における支持点の間隔が短くなって、
大きな荷重が加わってもはりのたわみ量を非常に少なく
することができる。従って、はりのたわみを少なくする
ことができるので、加わる荷重に対する許容範囲内では
りの大きさを小さくして重量を軽くしたり、はりの鋼板
の厚みを薄くすることができ、そのため、コストダウン
を図ることができる。したがって、はりの大きさを小さ
くして重量を軽くした場合には、はりの輸送コスト、は
りのメッキ処理におけるコストを下げることができ、立
体駐車場全体では、大幅にコストを削減することができ
る。また、はりの先端が自由端とした場合には、はりの
支持点がブラケットの先端部分となるために、はりのた
わみを少なくすることができる。
According to the beam support structure of claim 2,
The beam can be prevented from dropping only by placing the beam between the brackets, and the lateral displacement of the beam can be prevented only by fixing the beam to the bracket with one bolt. Therefore, 1
The wire from the crane that suspends the beam can be removed simply by stopping the bolt of the book, and the crane can move to the next beam construction work to improve the assembly workability. In addition, the supporting structure of the pillar, bracket, and beam is integrated into a substantially cross shape by the fixing member, the attachment plate, and the fixing plate, and the structural yield strength increases even if the load applied to the beam is large. By distributing the load to other beams, it is possible to prevent the columns from being deformed or buckled. Further, even when a load is applied to the beam, it does not open even if the beam and the member are not welded, and the structural yield strength can be enhanced. Furthermore, the support point that supports the beam becomes the tip part of the bracket, and the distance between the support points on both sides of the beam becomes shorter,
Even if a large load is applied, the amount of deflection of the beam can be extremely reduced. Therefore, since the deflection of the beam can be reduced, the size of the beam can be reduced to reduce the weight and the thickness of the steel plate of the beam can be reduced within the allowable range for the applied load, thus reducing the cost. Can be achieved. Therefore, when the size of the beam is reduced and the weight is reduced, the cost of transporting the beam and the cost of plating the beam can be reduced, and the cost can be significantly reduced in the entire multistory parking lot. . Further, when the tip of the beam is a free end, the supporting point of the beam is the tip portion of the bracket, so that the deflection of the beam can be reduced.

【0114】また、請求項3記載のはりの支持構造によ
れば、はりをブラケット間に載置するだけではりが落下
するのを防止できて、はりをブラケットに1本のボルト
で止めるだけではりの横方向のずれを防止できる。従っ
て、1本のボルトを止めるだけではりを吊っているクレ
ーンからのワイヤーを外すことができて、クレーンは次
のはりの施工作業に移れて組立作業性を向上させること
ができる。また、柱、ブラケット、はりが、鉄板、固定
用の部材、添板、固定板により支持構造が略十字形に一
体化されることになり、はりに加わる荷重が大きくても
構造耐力が大きくなり、また荷重が他のはりに分散され
ることで、柱が変形や座屈するのを防止することができ
る。また、はりに荷重がかかった場合でも、はりと部材
とを溶接しなくても開かず、構造耐力を強化することが
できる。更に、はりを支持する支持点がブラケットの先
端部分となって、はりの両側における支持点の間隔が短
くなって、大きな荷重が加わってもはりのたわみ量を非
常に少なくすることができる。従って、はりのたわみを
少なくすることができるので、加わる荷重に対する許容
範囲内ではりの大きさを小さくして重量を軽くしたり、
はりの鋼板の厚みを薄くすることができ、そのため、コ
ストダウンを図ることができる。したがって、はりの大
きさを小さくして重量を軽くした場合には、はりの輸送
コスト、はりのメッキ処理におけるコストを下げること
ができ、立体駐車場全体では、大幅にコストを削減する
ことができる。また、はりの先端が自由端とした場合に
は、はりの支持点がブラケットの先端部分となるため
に、はりのたわみを少なくすることができる。
According to the beam support structure of the third aspect, it is possible to prevent the beam from dropping by merely placing the beam between the brackets, and to secure the beam to the bracket with only one bolt. It is possible to prevent lateral displacement of the grip. Therefore, it is possible to remove the wire from the crane that suspends the beam by simply stopping one bolt, and the crane can move to the next beam construction work to improve the assembly workability. In addition, the pillars, brackets, and beams are integrated into a substantially cruciform support structure by the iron plate, fixing members, attachment plates, and fixing plates, and the structural yield strength increases even if the load applied to the beams is large. Also, the load is distributed to the other beams, so that the column can be prevented from being deformed or buckled. Further, even when a load is applied to the beam, it does not open even if the beam and the member are not welded, and the structural yield strength can be enhanced. Further, the supporting point for supporting the beam serves as the tip portion of the bracket, and the distance between the supporting points on both sides of the beam becomes short, so that the deflection amount of the beam can be extremely reduced even when a large load is applied. Therefore, since the deflection of the beam can be reduced, the size of the beam can be reduced to reduce the weight within the allowable range for the applied load,
It is possible to reduce the thickness of the steel plate of the beam, which leads to cost reduction. Therefore, when the size of the beam is reduced and the weight is reduced, the cost of transporting the beam and the cost of plating the beam can be reduced, and the cost can be significantly reduced in the entire multistory parking lot. . Further, when the tip of the beam is a free end, the supporting point of the beam is the tip portion of the bracket, so that the deflection of the beam can be reduced.

【0115】更に、請求項4記載のはりの支持構造によ
れば、はりをブラケット間に載置するだけではりが落下
するのを防止できて、はりをブラケットに1本のボルト
で止めるだけではりの横方向のずれを防止できる。従っ
て、1本のボルトを止めるだけではりを吊っているクレ
ーンからのワイヤーを外すことができて、クレーンは次
のはりの施工作業に移れて組立作業性を向上させること
ができる。また、柱、ブラケット、はりが、鉄板、固定
用の部材、添板、固定板により支持構造が略十字形に一
体化されることになり、はりに加わる荷重が大きくても
構造耐力が大きくなり、また荷重が他のはりに分散され
ることで、柱が変形や座屈するのを防止することができ
る。また、はりに荷重がかかった場合でも、はりと部材
とを溶接しなくても開かず、構造耐力を強化することが
できる。更に、はりを支持する支持点がブラケットの先
端部分となって、はりの両側における支持点の間隔が短
くなって、大きな荷重が加わってもはりのたわみ量を非
常に少なくすることができる。従って、はりのたわみを
少なくすることができるので、加わる荷重に対する許容
範囲内ではりの大きさを小さくして重量を軽くしたり、
はりの鋼板の厚みを薄くすることができ、そのため、コ
ストダウンを図ることができる。したがって、はりの大
きさを小さくして重量を軽くした場合には、はりの輸送
コスト、はりのメッキ処理におけるコストを下げること
ができ、立体駐車場全体では、大幅にコストを削減する
ことができる。また、はりの先端が自由端とした場合に
は、はりの支持点がブラケットの先端部分となるため
に、はりのたわみを少なくすることができる。
Further, according to the beam support structure of the fourth aspect, it is possible to prevent the beam from dropping by merely placing the beam between the brackets, and to secure the beam to the bracket with only one bolt. It is possible to prevent lateral displacement of the grip. Therefore, it is possible to remove the wire from the crane that suspends the beam by simply stopping one bolt, and the crane can move to the next beam construction work to improve the assembly workability. In addition, the pillars, brackets, and beams are integrated into a substantially cruciform support structure by the iron plate, fixing members, attachment plates, and fixing plates, and the structural yield strength increases even if the load applied to the beams is large. Also, the load is distributed to the other beams, so that the column can be prevented from being deformed or buckled. Further, even when a load is applied to the beam, it does not open even if the beam and the member are not welded, and the structural yield strength can be enhanced. Further, the supporting point for supporting the beam serves as the tip portion of the bracket, and the distance between the supporting points on both sides of the beam becomes short, so that the deflection amount of the beam can be extremely reduced even when a large load is applied. Therefore, since the deflection of the beam can be reduced, the size of the beam can be reduced to reduce the weight within the allowable range for the applied load,
It is possible to reduce the thickness of the steel plate of the beam, which leads to cost reduction. Therefore, when the size of the beam is reduced and the weight is reduced, the cost of transporting the beam and the cost of plating the beam can be reduced, and the cost can be significantly reduced in the entire multistory parking lot. . Further, when the tip of the beam is a free end, the supporting point of the beam is the tip portion of the bracket, so that the deflection of the beam can be reduced.

【0116】請求項5記載のはりの支持構造によれば、
はりをブラケット間に載置するだけではりが落下するの
を防止できて、はりをブラケットに1本のボルトで止め
るだけではりの横方向のずれを防止できる。従って、1
本のボルトを止めるだけではりを吊っているクレーンか
らのワイヤーを外すことができて、クレーンは次のはり
の施工作業に移れて組立作業性を向上させることができ
る。また、柱、ブラケット、はりが、鉄板、固定用の部
材、添板、固定板により支持構造が略十字形に一体化さ
れることになり、はりに加わる荷重が大きくても構造耐
力が大きくなり、また荷重が他のはりに分散されること
で、柱が変形や座屈するのを防止することができる。ま
た、はりに荷重がかかった場合でも、はりと部材とを溶
接しなくても開かず、構造耐力を強化することができ
る。更に、はりを支持する支持点がブラケットの先端部
分となって、はりの両側における支持点の間隔が短くな
って、大きな荷重が加わってもはりのたわみ量を非常に
少なくすることができる。そのため、建物の構造を3階
建てとした場合にも、2階部分のはりの支持部分の構造
耐力を大きくすることができ、3階建てにも十分に対応
することができる。また、はりのたわみを少なくするこ
とができるので、加わる荷重に対する許容範囲内ではり
の大きさを小さくして重量を軽くしたり、はりの鋼板の
厚みを薄くすることができ、そのため、コストダウンを
図ることができる。したがって、はりの大きさを小さく
して重量を軽くした場合には、はりの輸送コスト、はり
のメッキ処理におけるコストを下げることができ、立体
駐車場全体では、大幅にコストを削減することができ
る。また、はりの先端が自由端とした場合には、はりの
支持点がブラケットの先端部分となるために、はりのた
わみを少なくすることができる。
According to the beam support structure of claim 5,
The beam can be prevented from dropping only by placing the beam between the brackets, and the lateral displacement of the beam can be prevented only by fixing the beam to the bracket with one bolt. Therefore, 1
The wire from the crane that suspends the beam can be removed simply by stopping the bolt of the book, and the crane can move to the next beam construction work to improve the assembly workability. In addition, the pillars, brackets, and beams are integrated into a substantially cruciform support structure by the iron plate, fixing members, attachment plates, and fixing plates, and the structural yield strength increases even if the load applied to the beams is large. Also, the load is distributed to the other beams, so that the column can be prevented from being deformed or buckled. Further, even when a load is applied to the beam, it does not open even if the beam and the member are not welded, and the structural yield strength can be enhanced. Further, the supporting point for supporting the beam serves as the tip portion of the bracket, and the distance between the supporting points on both sides of the beam becomes short, so that the deflection amount of the beam can be extremely reduced even when a large load is applied. Therefore, even when the structure of the building is a three-story structure, the structural strength of the supporting portion of the beam on the second-floor part can be increased, and it is possible to sufficiently deal with a three-story structure. Also, since the deflection of the beam can be reduced, it is possible to reduce the size of the beam and reduce the weight within the allowable range for the applied load, and to reduce the thickness of the steel plate of the beam, thus reducing the cost. Can be achieved. Therefore, when the size of the beam is reduced and the weight is reduced, the cost of transporting the beam and the cost of plating the beam can be reduced, and the cost can be significantly reduced in the entire multistory parking lot. . Further, when the tip of the beam is a free end, the supporting point of the beam is the tip portion of the bracket, so that the deflection of the beam can be reduced.

【0117】請求項6記載のはりの支持構造によれば、
2階部分のはりの支持部分の構造耐力を大きくすること
ができ、3階建てにも十分に対応することができる。
According to the beam support structure of claim 6,
The structural strength of the beam supporting portion on the second floor can be increased, and it is possible to sufficiently deal with the third floor.

【0118】請求項7記載のはりの支持構造によれば、
下方と比べて上方の階にかかる荷重が少ないので、許容
範囲内で柱の厚みを薄くすることでコストダウンを図る
ことができるものである。
According to the beam support structure of claim 7,
Since the load on the upper floor is smaller than that on the lower floor, the cost can be reduced by reducing the thickness of the pillar within the allowable range.

【0119】請求項8記載のはりの支持部の施工方法に
よれば、予め工場において柱の上部にブラケットと部材
とを固着しておくので、このブラケット及び部材を固着
した略T字型の柱を施工現場で立設し、クレーンではり
を吊ってそのまま載置してブラケットや部材等に連結固
定することで、迅速に施工を行うことができる。また、
予め工場等において柱の上部にブラケットや部材を取着
して略T字型としているので、ブラケットを十字状に配
設した場合と比べて、この柱をそのT字型とした形でメ
ッキ工場、塗装工場等への搬入、搬出等の輸送時、ま
た、施工現場への輸送時においては、柱を並設してトラ
ックに積載することができる。従って、柱が嵩張らない
のでトラックへの積載量を法定限度内まででき、多くの
柱を積載して輸送することができ、輸送コストを大幅に
削減できる。そのため、結果として建築物、あるいは立
体駐車場等の全体のコストを大幅に低下させることがで
きる。また、柱の保管時において単に柱を並設して保管
できるので、ブラケットを十字状にした場合と比べて保
管場所が大幅に少なくて済み、保管場所に伴う経費を削
減できてコストダウン化を図ることができる。更には、
メッキ工場において柱をメッキ槽に入れてメッキする場
合にも、柱をT字型としているため、同時に多くの柱を
メッキ槽に入れることができ、メッキ処理量が多くで
き、コストダウン化を図ることができる。
According to the method of constructing the beam supporting portion of the eighth aspect, since the bracket and the member are fixed to the upper part of the pillar in advance in the factory, the substantially T-shaped pillar to which the bracket and the member are fixed is fixed. By standing upright at the construction site, suspending the beam with a crane, placing it as it is, and connecting and fixing it to a bracket or member, it is possible to perform the construction quickly. Also,
Since a bracket or member is attached to the top of a pillar in a factory in advance to form a T shape, compared to the case where brackets are arranged in a cross shape, the plating factory uses this T shape as a pillar. During transportation such as loading and unloading to a painting factory, and at the time of transportation to a construction site, columns can be installed in parallel and loaded on a truck. Therefore, since the pillars are not bulky, the load capacity on the truck can be kept within the legal limit, and many pillars can be loaded and transported, and the transportation cost can be significantly reduced. Therefore, as a result, the overall cost of the building or the multistory parking lot can be significantly reduced. In addition, since the columns can be stored simply side by side when storing the columns, the storage location can be significantly reduced compared to the case where the brackets are cross-shaped, and the costs associated with the storage locations can be reduced, leading to cost reduction. Can be planned. Furthermore,
Even when the pillars are placed in the plating tank and plated at the plating factory, since the pillars are T-shaped, many pillars can be put in the plating tank at the same time, the plating processing amount can be increased, and the cost can be reduced. be able to.

【0120】請求項9記載のはりの支持部の施工方法に
よれば、予め工場において柱の上部や中間部にブラケッ
トと部材とを固着しておくので、このブラケット及び部
材を固着した略T字型の柱を施工現場で立設し、クレー
ンではりを吊ってそのまま載置してブラケットや部材等
に連結固定することで、3階建ての立体駐車場を迅速に
施工できる。また、予め工場等において柱の上部にブラ
ケットや部材を取着して略T字型としているので、ブラ
ケットを十字状に配設した場合と比べて、この柱をその
T字型とした形でメッキ工場、塗装工場等への搬入、搬
出等の輸送時、また、施工現場への輸送時においては、
柱を並設してトラックに積載することができる。従っ
て、柱が嵩張らないのでトラックへの積載量を法定限度
内まででき、多くの柱を積載して輸送することができ、
輸送コストを大幅に削減できる。そのため、結果として
建築物、あるいは立体駐車場等の全体のコストを大幅に
低下させることができる。また、柱の保管時において単
に柱を並設して保管できるので、ブラケットを十字状に
した場合と比べて保管場所が大幅に少なくて済み、保管
場所に伴う経費を削減できてコストダウン化を図ること
ができる。更には、メッキ工場において柱をメッキ槽に
入れてメッキする場合にも、柱をT字型としているた
め、同時に多くの柱をメッキ槽に入れることができ、メ
ッキ処理量が多くでき、コストダウン化を図ることがで
きる。
According to the method of constructing the beam supporting portion of the ninth aspect, since the bracket and the member are fixed to the upper part or the middle part of the pillar in advance in the factory, the substantially T-shape in which the bracket and the member are fixed to each other. A three-story multi-storey parking lot can be quickly constructed by erecting a model pillar at the construction site, suspending a beam with a crane and placing it as it is, and connecting and fixing it to a bracket or member. In addition, since a bracket or member is attached to the upper part of the pillar in a factory in advance to form a substantially T-shape, this pillar has a T-shape in comparison with the case where the bracket is arranged in a cross shape. At the time of transportation such as loading and unloading to a plating factory, a painting factory, etc., and at the time of transportation to a construction site,
Pillars can be installed side by side and loaded on a truck. Therefore, since the pillars are not bulky, the loading capacity on the truck can be within the legal limit, and many pillars can be loaded and transported,
The transportation cost can be significantly reduced. Therefore, as a result, the overall cost of the building or the multistory parking lot can be significantly reduced. In addition, since the columns can be stored simply side by side when storing the columns, the storage location can be significantly reduced compared to the case where the brackets are cross-shaped, and the costs associated with the storage locations can be reduced, leading to cost reduction. Can be planned. Furthermore, even when the pillars are placed in the plating tank and plated at the plating factory, since the pillars are T-shaped, many pillars can be put in the plating tank at the same time, the plating processing amount can be increased, and the cost can be reduced. Can be realized.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施例の3階建てにおけるはりの支持
構造を示す図である。
FIG. 1 is a diagram showing a beam support structure in a three-story building according to an embodiment of the present invention.

【図2】本発明の実施例のブラケットの接合を示す分解
斜視図である。
FIG. 2 is an exploded perspective view showing joining of the brackets according to the embodiment of the present invention.

【図3】本発明の実施例の施工工程を示す図である。FIG. 3 is a diagram showing a construction process according to an embodiment of the present invention.

【図4】本発明の実施例の施工工程を示す図である。FIG. 4 is a diagram showing a construction process according to an embodiment of the present invention.

【図5】本発明の実施例の施工工程を示す図である。FIG. 5 is a diagram showing a construction process according to an embodiment of the present invention.

【図6】本発明の実施例の施工工程を示す図である。FIG. 6 is a diagram showing a construction process according to an embodiment of the present invention.

【図7】本発明の実施例の3階建ての施工工程を示す図
である。
FIG. 7 is a diagram showing a three-story construction process according to the embodiment of the present invention.

【図8】本発明の実施例の3階建ての施工工程を示す図
である。
FIG. 8 is a diagram showing a three-story construction process according to the embodiment of the present invention.

【図9】本発明の実施例の3階建ての施工工程を示す図
である。
FIG. 9 is a diagram showing a three-story construction process according to the embodiment of the present invention.

【図10】本発明の実施例の3階建ての施工工程を示す
図である。
FIG. 10 is a diagram showing a three-story construction process according to the embodiment of the present invention.

【図11】本発明の排水システムの実施例の立体駐車場
の要部破断斜視図である。
FIG. 11 is a fragmentary perspective view showing the main part of the multi-storey car park of the embodiment of the drainage system of the present invention.

【図12】本発明の実施例の床パネル本体の斜視図であ
る。
FIG. 12 is a perspective view of the floor panel body of the embodiment of the present invention.

【図13】本発明の実施例の床パネル本体の破断斜視図
である。
FIG. 13 is a cutaway perspective view of the floor panel body of the embodiment of the present invention.

【図14】本発明の実施例の床パネル本体の要部拡大斜
視図である。
FIG. 14 is an enlarged perspective view of a main part of the floor panel body of the embodiment of the present invention.

【図15】本発明の実施例の床パネル本体の断面図であ
る。
FIG. 15 is a cross-sectional view of the floor panel body of the embodiment of the present invention.

【図16】本発明の実施例のH型鋼と床パネル本体とを
連結固定した場合の要部断面図である。
FIG. 16 is a cross-sectional view of essential parts when the H-section steel and the floor panel body of the embodiment of the present invention are connected and fixed.

【図17】本発明の実施例の床パネル本体同士を連結固
定した場合の要部断面図である。
FIG. 17 is a cross-sectional view of essential parts when the floor panel main bodies according to the embodiment of the present invention are connected and fixed to each other.

【図18】本発明の実施例のH型鋼の下面に樋体を固定
した場合の断面図である。
FIG. 18 is a cross-sectional view when a gutter is fixed to the lower surface of an H-shaped steel according to an example of the present invention.

【図19】本発明の実施例の連結金具をH型鋼に固着し
た状態の断面図である。
FIG. 19 is a cross-sectional view showing a state in which the connecting fitting of the embodiment of the present invention is fixed to H-section steel.

【図20】本発明の実施例の第3,第4の樋体を取り付
けた状態を示す図である。
FIG. 20 is a view showing a state in which the third and fourth gutter bodies of the embodiment of the present invention are attached.

【図21】本発明の実施例の第3の樋体の斜視図であ
る。
FIG. 21 is a perspective view of a third gutter according to the embodiment of the present invention.

【図22】本発明の実施例の柱に第4の樋体を取り付け
る状態を示す図である。
FIG. 22 is a view showing a state in which a fourth gutter body is attached to a pillar according to the embodiment of the present invention.

【図23】本発明の実施例の柱に第4の樋体を取り付け
た状態を示す図である。
FIG. 23 is a view showing a state in which a fourth gutter body is attached to the pillar according to the embodiment of the present invention.

【図24】本発明の実施例2の柱とブラケットとの要部
分解斜視図である。
FIG. 24 is an exploded perspective view of a main part of a pillar and a bracket according to a second embodiment of the present invention.

【図25】本発明の実施例2の柱とブラケットとの接合
部分を示す平面図である。
FIG. 25 is a plan view showing a joint portion between the pillar and the bracket according to the second embodiment of the present invention.

【図26】本発明の実施例2の柱と一方のブラケットと
の接合部分を示す要部拡大断面図である。
FIG. 26 is an enlarged cross-sectional view of a main portion showing a joint portion between a pillar and one bracket according to the second embodiment of the present invention.

【図27】本発明の実施例2の柱と他方のブラケットと
の接合部分を示す要部拡大断面図である。
FIG. 27 is an enlarged cross-sectional view of a main portion showing a joint portion between a pillar and the other bracket according to the second embodiment of the present invention.

【図28】本発明の実施例3の柱とブラケットとの要部
分解斜視図である。
FIG. 28 is an exploded perspective view of a main part of a pillar and a bracket according to a third embodiment of the present invention.

【図29】本発明の実施例3の柱とブラケットとの接合
部分を示す平面図である。
FIG. 29 is a plan view showing a joint portion between a pillar and a bracket according to the third embodiment of the present invention.

【図30】本発明の実施例4の柱とブラケットとの要部
分解斜視図である。
FIG. 30 is an exploded perspective view of a main part of a pillar and a bracket according to a fourth embodiment of the present invention.

【図31】本発明の実施例4の柱とブラケットとの接合
部分を示す平面図である。
FIG. 31 is a plan view showing a joint portion between a pillar and a bracket according to the fourth embodiment of the present invention.

【図32】本発明の実施例の施工状態を示す図である。FIG. 32 is a diagram showing a construction state of an example of the present invention.

【図33】本発明の実施例の施工状態を示す図である。FIG. 33 is a view showing a working state of the example of the present invention.

【図34】本発明の実施例の施工状態を示す図である。FIG. 34 is a view showing a working state of the example of the present invention.

【図35】本発明の実施例の施工状態を示す図である。FIG. 35 is a diagram showing a construction state of the embodiment of the present invention.

【図36】本発明の実施例の施工状態を示す図である。FIG. 36 is a diagram showing a construction state of the example of the present invention.

【図37】本発明の実施例の施工状態を示す図である。FIG. 37 is a diagram showing a construction state of the embodiment of the present invention.

【図38】本発明の実施例の施工状態を示す図である。FIG. 38 is a diagram showing a construction state of the embodiment of the present invention.

【図39】従来例のはりの支持構造を示す図である。FIG. 39 is a view showing a conventional beam support structure.

【図40】他の従来例のはりの支持構造を示す図であ
る。
FIG. 40 is a diagram showing another conventional beam supporting structure.

【符号の説明】[Explanation of symbols]

22 H型鋼(はり) 32 柱 50 ブラケット 501 ブラケット 502 第2のブラケット 71 鉄板 72 部材 73 固定板 75 添板 76 部材 77 部材22 H-shaped steel (beam) 32 Column 50 Bracket 50 1 Bracket 50 2 Second bracket 71 Iron plate 72 Member 73 Fixing plate 75 Addition plate 76 Member 77 Member

Claims (9)

【特許請求の範囲】[Claims] 【請求項1】 立設した柱(32)の側面にブラケット
(50)を取着し、このブラケット(50)の基部の上
面に固定用の部材(76)を取着し、上記部材(76)
の端面にはり(22)の端面を当接させて該はり(2
2)を上記ブラケット(50)の上面に固定し、上記は
り(22)と部材(76)の両側の側面にそれぞれ跨が
せた添板(75)により該はり(22)と部材(76)
とを連結固定し、はり(22)と部材(76)の上面に
跨がせた固定板(73)により該はり(22)と部材
(76)とを連結固定したことを特徴とするはりの支持
構造。
1. A bracket (50) is attached to a side surface of an upright pillar (32), and a fixing member (76) is attached to an upper surface of a base portion of the bracket (50). )
The end surface of the beam (22) is brought into contact with the end surface of the
2) is fixed to the upper surface of the bracket (50), and the beam (22) and the member (76) are attached by the attachment plates (75) which are laid across the side surfaces on both sides of the beam (22) and the member (76).
The beam and the member (76) are connected and fixed, and the beam (22) and the member (76) are connected and fixed by a fixing plate (73) extending over the upper surfaces of the beam (22) and the member (76). Support structure.
【請求項2】 立設した柱(32)間に縦方向、横方向
にそれぞれはり(22)を架橋するようにしたはりの支
持構造において、四角円筒状の柱(32)の各側面にブ
ラケット(50)をそれぞれ取着し、このブラケット
(50)が交差する中心部分に固定用の第1の部材(7
6)と第2の部材(77)とを略十字状に固定し、上記
各部材(76)(77)の端面に縦方向、横方向の各は
り(22)の端面を当接させて該はり(22)を上記ブ
ラケット(50)の上面にそれぞれ固定し、上記はり
(22)と部材(76)(77)の両側の側面にそれぞ
れ跨がせた添板(75)により該はり(22)と部材
(76)(77)とをそれぞれ連結固定し、はり(2
2)と部材(76)(77)の上面に跨がせた固定板
(73)により該はり(22)と部材(76)(77)
とをそれぞれ連結固定したことを特徴とするはりの支持
構造。
2. In a beam support structure in which beams (22) are bridged vertically and horizontally between standing columns (32), a bracket is provided on each side surface of a square cylindrical column (32). The first member (7) for fixing is attached to the central portion where the brackets (50) intersect each other.
6) and the second member (77) are fixed in a substantially cross shape, and the end faces of the beams (22) in the vertical and horizontal directions are brought into contact with the end faces of the members (76) (77). The beam (22) is fixed to the upper surface of the bracket (50), and the beam (22) is attached to the beam (22) and the members (76) and (77) by the attachment plates (75) that are laid across the side surfaces. ) And the members (76) and (77) are connected and fixed, respectively, and the beam (2
2) and the members (76) and (77) by means of a fixing plate (73) extending over the upper surfaces of the beams (22) and the members (76) and (77).
A beam support structure characterized in that and are connected and fixed.
【請求項3】 立設した柱(32)間に縦方向、横方向
にそれぞれはり(22)を架橋するようにしたはりの支
持構造において、四角円筒状の柱(32)の各側面にブ
ラケット(50)をそれぞれ取着し、このブラケット
(50)が交差する部分の上面に鉄板(71)を載置し
て該鉄板(71)と各ブラケット(50)とをそれぞれ
連結固定し、この鉄板(71)の中心部分に固定用の第
1の部材(76)と第2の部材(77)とを略十字状に
固定し、上記各部材(76)(77)の端面に縦方向、
横方向の各はり(22)の端面を当接させて該はり(2
2)を上記ブラケット(50)の上面にそれぞれ固定
し、上記はり(22)と部材(76)(77)の両側の
側面にそれぞれ跨がせた添板(75)により該はり(2
2)と部材(76)(77)とをそれぞれ連結固定し、
はり(22)と部材(76)(77)の上面に跨がせた
固定板(73)により該はり(22)と部材(76)
(77)とをそれぞれ連結固定したことを特徴とするは
りの支持構造。
3. In a beam support structure in which beams (22) are bridged vertically and laterally between standing columns (32), a bracket is provided on each side surface of the square cylindrical column (32). (50) are attached to each other, an iron plate (71) is placed on the upper surface of the intersection of the brackets (50), and the iron plate (71) and each bracket (50) are connected and fixed. The first fixing member (76) and the second fixing member (77) are fixed to the central portion of (71) in a substantially cross shape, and are vertically formed on the end faces of the respective members (76) (77).
Abutting the end faces of the lateral beams (22), the beams (2
2) is fixed to the upper surface of the bracket (50) and is attached to the beams (2) and the members (76) and (77) by the attachment plates (75) that are laid across the side surfaces on both sides of the beams (2).
2) and the members (76) (77) are connected and fixed,
The beam (22) and the member (76) are fixed to each other by the fixing plate (73) extending over the upper surfaces of the beam (22) and the members (76) and (77).
(77) is a beam support structure characterized by connecting and fixing respectively.
【請求項4】 立設した柱(32)間に縦方向、横方向
にそれぞれはり(22)を架橋するようにしたはりの支
持構造において、四角円筒状の柱(32)の各側面にブ
ラケット(50)をそれぞれ取着し、このブラケット
(50)が交差する部分の上面に鉄板(71)を載置し
て該鉄板(71)と各ブラケット(50)とをそれぞれ
連結固定し、この鉄板(71)の中心部分に柱(32)
を配設し、柱(32)の各側面に固定用の部材(72)
を当接させて該部材を鉄板(71)の上面にそれぞれ載
置すると共に、各部材(72)を柱(32)の側面と鉄
板(71)の上面にそれぞれ固着し、上記各部材(7
2)の端面に縦方向、横方向の各はり(22)の端面を
当接させて該はり(22)を上記ブラケット(50)の
上面にそれぞれ固定し、上記はり(22)と部材(7
2)の両側の側面にそれぞれ跨がせた添板(75)によ
り該はり(22)と部材(72)とをそれぞれ連結固定
し、はり(22)と部材(72)の上面に跨がせた固定
板(73)により該はり(22)と部材(72)とをそ
れぞれ連結固定したことを特徴とするはりの支持構造。
4. In a beam support structure in which beams (22) are bridged vertically and horizontally between standing columns (32), a bracket is provided on each side surface of a square cylindrical column (32). (50) are attached to each other, an iron plate (71) is placed on the upper surface of the intersection of the brackets (50), and the iron plate (71) and each bracket (50) are connected and fixed. Pillar (32) at the center of (71)
And fixing members (72) on each side of the pillar (32)
And the members are placed on the upper surface of the iron plate (71), and the members (72) are fixed to the side surfaces of the columns (32) and the upper surface of the iron plate (71).
The end faces of the vertical and horizontal beams (22) are brought into contact with the end faces of (2) to fix the beams (22) to the upper surface of the bracket (50), respectively.
2) The beam (22) and the member (72) are connected and fixed to each other by the attachment plates (75) which are provided on both side surfaces of the beam (22) and the upper surface of the beam (22) and the member (72). A support structure for a beam, characterized in that the beam (22) and the member (72) are connected and fixed by a fixing plate (73).
【請求項5】 立設した柱(32)間に縦方向、横方向
にそれぞれはり(22)を架橋するようにしたはりの支
持構造において、四角円筒状の柱(32)の高さ方向の
略中央の各側面にブラケット(50)をそれぞれ取着
し、柱(32)の周囲のブラケット(50)の上面に鉄
板(71)を固定し、柱(32)の各側面に固定用の部
材(72)を当接させて該部材を鉄板(71)の上面に
それぞれ載置すると共に、各部材(72)を柱(32)
の側面と鉄板(71)の上面にそれぞれ固着し、上記各
部材(72)の端面に縦方向、横方向の各はり(22)
の端面を当接させて該はり(22)を上記ブラケット
(50)の上面にそれぞれ固定し、上記はり(22)と
部材(72)の両側の側面にそれぞれ跨がせた添板(7
5)により該はり(22)と部材(72)とをそれぞれ
連結固定し、はり(22)と部材(72)の上面に跨が
せた固定板(73)により該はり(22)と部材(7
2)とをそれぞれ連結固定したことを特徴とするはりの
支持構造。
5. In a beam support structure in which beams (22) are bridged vertically and laterally between standing columns (32), in the height direction of square cylindrical columns (32). A bracket (50) is attached to each side surface at substantially the center, an iron plate (71) is fixed to the upper surface of the bracket (50) around the pillar (32), and a fixing member is fixed to each side surface of the pillar (32). The members (72) are brought into contact with each other to place the members on the upper surface of the iron plate (71), and the members (72) are attached to the columns (32).
And the upper surface of the iron plate (71), respectively, and the beams (22) in the vertical and horizontal directions on the end faces of the members (72).
The beam (22) is fixed to the upper surface of the bracket (50) by abutting the end faces of the plate (7) and the beam (22) and the member (72) on both side surfaces.
5) The beam (22) and the member (72) are connected and fixed to each other, and the beam (22) and the member (72) are fixed by a fixing plate (73) extending over the upper surfaces of the beam (22) and the member (72). 7
2) A support structure for a beam, characterized in that and are connected and fixed.
【請求項6】 請求項4又は請求項5記載のはりの支持
構造の柱(32)の上部に、請求項1又は請求項2又は
請求項3記載のはりの支持構造を組み合わせたことを特
徴とする請求項1〜5記載のはりの支持構造。
6. A beam supporting structure according to claim 1, 2 or 3 is combined with an upper portion of a column (32) of the beam supporting structure according to claim 4 or 5. The beam support structure according to claim 1.
【請求項7】 架橋しているはりの位置より上方の柱
(32)の厚みを、下方の柱(32)の厚みより薄くし
たことを特徴とする請求項4〜6記載のはりの支持構
造。
7. The support structure for a beam according to claim 4, wherein the pillar (32) above the position of the cross-linked beam is made thinner than the thickness of the lower pillar (32). .
【請求項8】 四角円筒状の柱(32)の上部に予め工
場においてブラケット(501 )を固着して柱(32)
を略T字型に形成すると共に、上記ブラケット(50
1 )の上面に固定用の部材(76)(77)を略十字状
に固着し、施工現場において上記略T字型の柱(32)
を立設し、その後第2のブラケット(502 )を柱(3
2)の両側の側面にそれぞれ固定して該柱(32)の上
部を略十字状に形成し、上記各部材(76)(77)の
端面に縦方向、横方向の各はり(22)の端面を当接さ
せて該はり(22)を上記ブラケット(50)の上面に
それぞれ固定し、上記はり(22)と部材(76)(7
7)の両側の側面にそれぞれ跨がせた添板(75)によ
り該はり(22)と部材(76)(77)とをそれぞれ
連結固定し、はり(22)と部材(76)(77)の上
面に跨がせた固定板(73)により該はり(22)と部
材(76)(77)とをそれぞれ連結固定するようにし
たことを特徴とするはりの支持部の施工方法。
8. A pillar (32) having a bracket (50 1 ) fixed in advance on a square cylindrical pillar (32) in a factory.
Is formed in a substantially T shape, and the bracket (50
The fixing members (76) (77) are fixed to the upper surface of 1 ) in a substantially cross shape, and at the construction site, the above-mentioned substantially T-shaped pillar (32).
Stand, and then attach the second bracket (50 2 ) to the pillar (3
2) is fixed to both side surfaces, and the upper portion of the pillar (32) is formed in a substantially cross shape, and the vertical (horizontal) and lateral (22) beams (22) are formed on the end faces of the members (76) (77). The beam (22) is fixed to the upper surface of the bracket (50) by bringing the end faces into contact with each other, and the beam (22) and the members (76) (7) are fixed.
The beams (22) and the members (76) and (77) are connected and fixed to each other by the attachment plates (75) which are provided on both side surfaces of the beam (7). A method of constructing a support portion of a beam, characterized in that the beam (22) and the members (76) (77) are connected and fixed by a fixing plate (73) extending over the upper surface of the beam.
【請求項9】 四角円筒状の柱(32)の上部に予め工
場においてブラケット(501 )を固着して柱(32)
を略T字型に形成すると共に、上記ブラケット(50
1 )の上面に固定用の部材(76)(77)を略十字状
に固着し、上記柱(32)の中間部に内ダイヤを形成す
る際にブラケット(501 )及び平板状の鉄板(71)
を一体に固着すると共に、上記鉄板(71)の上面に固
着した固定用の第3の部材(72)の端面を柱(32)
の各側面に固着し、施工現場において上記略T字型の柱
(32)を立設し、その後第2のブラケット(502
を柱(32)の上部及び中間部における両側の側面にそ
れぞれ固定して該柱(32)の上部及び中間部を略十字
状に形成し、上記各部材(76)(77)(72)の端
面に縦方向、横方向の各はり(22)の端面を当接させ
て該はり(22)を上記ブラケット(50)の上面にそ
れぞれ固定し、上記はり(22)と部材(76)(7
7)(72)の両側の側面にそれぞれ跨がせた添板(7
5)により該はり(22)と部材(76)(77)(7
2)とをそれぞれ連結固定し、はり(22)と部材(7
6)(77)(72)の上面に跨がせた固定板(73)
により該はり(22)と部材(76)(77)(72)
とをそれぞれ連結固定するようにしたことを特徴とする
はりの支持部の施工方法。
9. A pillar (32) having a bracket (50 1 ) fixed in advance on a square cylindrical pillar (32) in a factory.
Is formed in a substantially T shape, and the bracket (50
Members for fixing to the upper surface of 1) (76) (77) secured to a substantially cross shape, bracket when forming the inner diamond in the middle portion of the pillar (32) (50 1) and the flat plate-like iron plate ( 71)
And the end face of the third fixing member (72) fixed to the upper surface of the iron plate (71) as a pillar (32).
The pillars (32) of the above-mentioned T-shape are erected at the construction site and fixed to each side surface of the second bracket (50 2 ).
Are fixed to the side surfaces on both sides of the upper and middle portions of the pillar (32) to form the upper and middle portions of the pillar (32) in a substantially cross shape, and the members (76) (77) (72) The beam (22) is fixed to the upper surface of the bracket (50) by abutting the end faces of the beam (22) in the vertical and horizontal directions on the end face, and the beam (22) and the members (76) (7).
7) An attachment plate (7) which is laid on both side surfaces of (72).
5) the beam (22) and the members (76) (77) (7)
2) are connected and fixed respectively, and the beam (22) and the member (7)
6) Fixing plate (73) straddling the upper surfaces of (77) and (72)
The beam (22) and the members (76) (77) (72)
A method of constructing a support portion of a beam, characterized in that and are connected and fixed respectively.
JP25785093A 1993-09-20 1993-09-20 Beam support structure and construction method Expired - Fee Related JP3198283B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25785093A JP3198283B2 (en) 1993-09-20 1993-09-20 Beam support structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25785093A JP3198283B2 (en) 1993-09-20 1993-09-20 Beam support structure and construction method

Publications (2)

Publication Number Publication Date
JPH0791099A true JPH0791099A (en) 1995-04-04
JP3198283B2 JP3198283B2 (en) 2001-08-13

Family

ID=17312029

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25785093A Expired - Fee Related JP3198283B2 (en) 1993-09-20 1993-09-20 Beam support structure and construction method

Country Status (1)

Country Link
JP (1) JP3198283B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284671A (en) * 2016-08-30 2017-01-04 荣阳铝业(中国)有限公司 A kind of Full-automatic telescopic cantilever glass sunlight house
CN107119707A (en) * 2017-07-04 2017-09-01 四川路带生态科技有限公司 A kind of steel bushing stake steel bracket multipurpose combination column foot

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284671A (en) * 2016-08-30 2017-01-04 荣阳铝业(中国)有限公司 A kind of Full-automatic telescopic cantilever glass sunlight house
CN106284671B (en) * 2016-08-30 2019-01-25 澳普利发(南阳)门窗***有限公司 A kind of Full-automatic telescopic cantilever glass sunlight house
CN107119707A (en) * 2017-07-04 2017-09-01 四川路带生态科技有限公司 A kind of steel bushing stake steel bracket multipurpose combination column foot

Also Published As

Publication number Publication date
JP3198283B2 (en) 2001-08-13

Similar Documents

Publication Publication Date Title
US8234827B1 (en) Express framing building construction system
US5050358A (en) Structural members and building frames
US5638917A (en) Scaffold bracket for roof structure installation
CA2017669C (en) Curtain wall for a building
JP5572100B2 (en) Paneling system and method
JPH0791099A (en) Beam supporting structure and its execution method
JP3764020B2 (en) Steel frame structure
JP2012167462A (en) Joint member, joint structure using the same, and steel-frame building
JPH07293019A (en) Structure for supporting beam and method for assembling supporting part of beam
JP5603805B2 (en) Lifting jig, lifting jig mounting structure, and balcony unit lifting method
US3958824A (en) Lifting frame and methods of lifting prefabricated building modules
JPH0791098A (en) Beam supporting structure and its execution method
JPH02147595A (en) Bottom plate structure of escalator and assembly thereof
JPH06136981A (en) Panel type roof floor board for multistoried parking area
JP3198282B2 (en) Roof deck for multi-story parking lot and drainage system
JPH06136980A (en) Roof floor panel for multistoried parking area
JPS5834882Y2 (en) Assembly structure of verandas, balconies, etc.
EP1820917B1 (en) Floor element
JP2006052564A (en) Panel carrier and panel constructing method using the same
JP3847029B2 (en) Box-type building
JPH04368525A (en) Structure for building outer corridor
JP3328398B2 (en) Fall prevention device for roof construction
JPH02272136A (en) Intermediate flooring structure for multistoried installation of bookrack
JPH0849439A (en) Supported structure of beam and method for assembling supported part of beam
JP2942741B2 (en) Floor

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees