JPH0771042A - Method of installing packer plate for equipment installation - Google Patents

Method of installing packer plate for equipment installation

Info

Publication number
JPH0771042A
JPH0771042A JP24397093A JP24397093A JPH0771042A JP H0771042 A JPH0771042 A JP H0771042A JP 24397093 A JP24397093 A JP 24397093A JP 24397093 A JP24397093 A JP 24397093A JP H0771042 A JPH0771042 A JP H0771042A
Authority
JP
Japan
Prior art keywords
template
concrete
anchor bolt
packer plate
packer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP24397093A
Other languages
Japanese (ja)
Other versions
JP3368360B2 (en
Inventor
Yasunori Asano
泰紀 浅野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Engineering and Construction Co Ltd
Original Assignee
Toshiba Engineering and Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Engineering and Construction Co Ltd filed Critical Toshiba Engineering and Construction Co Ltd
Priority to JP24397093A priority Critical patent/JP3368360B2/en
Publication of JPH0771042A publication Critical patent/JPH0771042A/en
Application granted granted Critical
Publication of JP3368360B2 publication Critical patent/JP3368360B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PURPOSE:To complete a concrete placing at one time, to reduce manhours and, at the same time, to greatly shorten a construction period in a method of installing packer plates for installation of a large-sized equipment such as a generator or a turbine, etc. CONSTITUTION:A method of installing packer plates for installation of an equipment is the method to install the packer plate together with an anchor bolt on the foundation, first of all, a template 7 is mounted on bearing legs 6 elected on a buried bearing section 2, and the anchor bolt 8 is borne thereon in a detachable manner. In addition, the packer plates 13 with concrete blocks 12 produced in advance are borne on the template 7 through connection members 15 in a detachable manner. Then, after concrete 16 is place up to a specific height, the connection member 15 and template 7 are removed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は機器据付用パッカープレ
ートをアンカーボルトと共に基礎に設置する方法に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of installing a packer plate for equipment installation on a foundation together with anchor bolts.

【0002】[0002]

【従来の技術】発電機やタービン等の大型で重量の大き
な機器を基礎に据え付けるには、十分な据付安定性と共
に据付姿勢の精密性を要求される。そのため従来からア
ンカーボルトの周囲にパッカープレートを埋め込み設置
し、そのパッカープレートで機器の下部ベースを正確に
支持する方法が採用されている。アンカーボルトと共に
パッカープレートを設置する従来の方法は、先ず、埋設
される支持部に立設された支脚にテンプレートを取り付
け、それにアンカーボルトを着脱自在に支持させてか
ら、コンクリートを打設する。次いでテンプレートを除
去した後、アンカーボルトの周囲のコンクリートを部分
的に凹状にハツリ、そのハツリ部にグラウト材を介して
パッカープレートを埋め込み固定していた。
2. Description of the Related Art In order to install a large and heavy equipment such as a generator or a turbine on a foundation, sufficient installation stability and precision of installation attitude are required. Therefore, conventionally, a method has been adopted in which a packer plate is embedded around the anchor bolt and the lower base of the device is accurately supported by the packer plate. In the conventional method of installing the packer plate together with the anchor bolt, first, a template is attached to a supporting leg that is erected on a support portion to be embedded, the anchor bolt is detachably supported by the template, and then concrete is poured. Then, after removing the template, the concrete around the anchor bolt was partially chipped into a concave shape, and a packer plate was embedded and fixed in the chipped portion via a grout material.

【0003】[0003]

【発明が解決しようとする課題】しかしながら上記方法
は、アンカーボルト埋め込みのためのコンクリート打設
工程、コンクリートのハツリ工程、パッカープレート埋
め込みのためのグラウト材の打設工程の少なくとも三つ
の工程と、中間にグラウト材の固化のための待ち時間と
を必要とする。そのため工数が多く煩雑な上に、工期が
長くなるという問題があった。また、アンカーボルト周
囲の正確な位置に複数のパッカープレートを水平に精度
よく設置することが困難であった。そこで本発明は、こ
のような従来の方法における問題点を解決することを課
題とするものである。
However, the above-mentioned method has at least three steps, namely, a concrete placing step for embedding an anchor bolt, a chipping step for concrete, and a grout material placing step for embedding a packer plate, and an intermediate step. It requires a waiting time for the grout material to solidify. Therefore, there is a problem that the number of man-hours is large and complicated, and the construction period becomes long. Further, it has been difficult to horizontally and accurately install a plurality of packer plates at accurate positions around the anchor bolts. Then, this invention makes it a subject to solve the problem in such a conventional method.

【0004】[0004]

【課題を解決するための手段】すなわち本発明は機器据
付用パッカープレートを基礎のアンカーボルト近傍に設
置する方法において、先ず、埋設される支持部2に支脚
6を立設し、その支脚6にテンプレート7を取付け、そ
のテンプレート7にアンカーボルト8の上端部を着脱自
在に支持させると共に、そのテンプレート7に垂下され
た連結部材15を介してコンクリートブロック12付きパッ
カープレート13を着脱自在に支持させる工程をとる。次
に前記アンカーボルト8の中間部以下及び前記コンクリ
ートブロック12の少なくとも中間部以下が埋設されるよ
うにコンクリート16を打設する工程をとる。次いで前記
連結部材15およびテンプレート7を除去する工程をとる
ことを特徴とするものである。
That is, according to the present invention, in a method for installing a packer plate for equipment installation in the vicinity of an anchor bolt of a foundation, first, a supporting leg 6 is erected on the embedded support portion 2, and the supporting leg 6 is attached to the supporting leg 6. A step of attaching the template 7 and detachably supporting the upper end portion of the anchor bolt 8 on the template 7, and detachably supporting the packer plate 13 with the concrete block 12 through the connecting member 15 depending on the template 7. Take Next, a step of placing concrete 16 so that the portion below the intermediate portion of the anchor bolt 8 and the portion below the intermediate portion of the concrete block 12 are buried is taken. Then, the step of removing the connecting member 15 and the template 7 is performed.

【0005】[0005]

【作用】本発明の機器据付用パッカープレートの設置方
法によれば、コンクリート打設工程が一回であるので工
数が減少すると共に、従来のような中間のグラウト材固
化のための待ち時間を必要としないので工期も著しく短
縮される。また複数のパッカープレートをアンカーボル
ト周囲の所定位置に且つ水平に精度よく設置することが
できる。さらに二回のコンクリート打設をしないので、
脆弱部分またはひび割れを生じる原因となるコンクリー
トの境界部分が発生することもない。
According to the method for installing the packer plate for equipment installation of the present invention, since the concrete placing step is performed once, the man-hour is reduced and a waiting time for solidifying the intermediate grout material as in the conventional case is required. Since it does not, the construction period will be significantly shortened. In addition, a plurality of packer plates can be accurately installed horizontally at predetermined positions around the anchor bolt. Since we do not pour concrete twice more,
There are no fragile parts or concrete boundaries that cause cracks.

【0006】[0006]

【実施例】次に図面により本発明の実施例を説明する。
図1は本発明の方法によりアンカーボルトと共にパッカ
ープレートを基礎に設置する途中工程を示す部分断面図
であり、図2は図1に使用したコンクリートブロック付
きパッカープレートの斜視図である。図1において、基
礎スラブ1上に埋設支持部2が鋼材等により架構状に組
立られている。(なお、基礎スラブの代わりに天井面形
成用のコンクリート型枠となることもある。)さらに基
礎スラブ1上には細長い矩形の受けブロック3が適宜の
間隔で配置され、その上に井桁状の下場筋4が基礎スラ
ブ1から所定スペースだけ上方に水平に配置されてい
る。
Embodiments of the present invention will now be described with reference to the drawings.
FIG. 1 is a partial cross-sectional view showing an intermediate step of installing a packer plate on a foundation together with anchor bolts by the method of the present invention, and FIG. 2 is a perspective view of the packer plate with a concrete block used in FIG. In FIG. 1, an embedded support portion 2 is assembled on a base slab 1 from a steel material or the like in a frame structure. (Note that instead of the foundation slab, it may be a concrete formwork for forming the ceiling surface.) Further, on the foundation slab 1, elongated rectangular receiving blocks 3 are arranged at appropriate intervals, and on the foundation slab, there are double-column-shaped support blocks. The lower stir bar 4 is horizontally arranged above the basic slab 1 by a predetermined space.

【0007】埋設支持部2上には井桁状の上場筋5が水
平に配置されている。またこの埋設支持部2にはその上
方に立設した複数の支脚6を有している。そして夫々の
支脚6の頂部間にテンプレート7が水平に支持されてい
るが、このテンプレート7は例えば点溶接等の手段によ
り支脚6に固定されている。テンプレート7にはアンカ
ーボルト8およびその周囲に設置されるパッカープレー
ト13支持用の複数の挿通孔が所定位置に穿設されてい
る。そしてこの挿通孔に挿通されたアンカーボルト8は
ナット9によりテンプレート7に支持されている。なお
必要によりアンカーボルト8は、テンプレート7に点溶
接等で仮固定することもできる。
On the buried support portion 2, a cross-shaped field stirrup 5 is horizontally arranged. Further, the embedded support portion 2 has a plurality of support legs 6 standing upright above the embedded support portion 2. The template 7 is horizontally supported between the tops of the respective supporting legs 6, and the template 7 is fixed to the supporting legs 6 by means such as spot welding. The template 7 is provided with a plurality of insertion holes for supporting the anchor bolt 8 and the packer plate 13 installed around the anchor bolt 8 at predetermined positions. The anchor bolt 8 inserted through the insertion hole is supported by the template 7 by the nut 9. If necessary, the anchor bolt 8 can be temporarily fixed to the template 7 by spot welding or the like.

【0008】さらにテンプレート7にはコンクリートブ
ロック12付きのパッカープレート13が連結部材15を介し
て支持されている。このコンクリートブロック12付きの
パッカープレート13は、図2のように下方が拡大された
台形状のコンクリートブロック12と、その頂部に埋め込
まれて固定された金属製のパッカープレート13を有し、
該パッカープレート13には例えばネジ孔のような取付部
14が複数(図示の例では2つ)設けられている。そして
テンプレート7の挿通孔に挿通したボルト等の連結部材
15をこの取付部14に結合することにより、コンクリート
ブロック12付きパッカープレート13がテンプレート7に
支持される。また必要により連結部材15をテンプレート
7に点溶接等で仮固定することもできる。なお16はコン
クリートブロック12の中間部まで打設されたコンクリー
トである。
Further, a packer plate 13 with a concrete block 12 is supported on the template 7 via a connecting member 15. The packer plate 13 with the concrete block 12 has a trapezoidal concrete block 12 whose lower part is enlarged as shown in FIG. 2 and a metal packer plate 13 embedded and fixed on the top thereof.
The packer plate 13 has a mounting portion such as a screw hole.
A plurality of (14 in the illustrated example) 14 are provided. A connecting member such as a bolt inserted through the insertion hole of the template 7
By coupling 15 to the mounting portion 14, the packer plate 13 with the concrete block 12 is supported by the template 7. If necessary, the connecting member 15 can be temporarily fixed to the template 7 by spot welding or the like. In addition, 16 is concrete cast up to the middle part of the concrete block 12.

【0009】そこで、次にアンカーボルト8と共にパッ
カープレート13を基礎に設置する工程を説明すると、先
ずアングル型鋼等よりなる架構状に組立られた埋設支持
部2を、基礎スラブ1上に配置すると共に、受けブロッ
ク3を適宜の間隔で配置する。次に、井桁状に形成され
る鉄筋よりなる下場筋4を受けブロック3の上に配置
し、さらに埋設支持部2の上側に井桁状の鉄筋よりなる
上場筋5を配置する。次に、埋設支持部2の上側の複数
の支脚6の頂部間にテンプレート7を点溶接等により水
平に支持した後、テンプレート7の挿通孔にアンカーボ
ルト8を挿通してナット9により支持する。さらに、テ
ンプレート7の挿通孔に連結部材15を挿通し、それに予
め作成されたコンクリートブロック12付パッカープレー
ト13を連結して吊下げる。
Then, the process of installing the packer plate 13 together with the anchor bolt 8 on the foundation will be described. First, the embedded support portion 2 assembled in a frame structure made of angle steel or the like is arranged on the foundation slab 1. The receiving blocks 3 are arranged at appropriate intervals. Next, the lower field reinforcements 4 made of rebar-shaped rebars are placed on the receiving blocks 3, and the upper rebars 5 made of double rebars are arranged above the embedded support 2. Next, after the template 7 is horizontally supported by spot welding or the like between the tops of the plurality of support legs 6 on the upper side of the embedded support portion 2, the anchor bolt 8 is inserted into the insertion hole of the template 7 and is supported by the nut 9. Further, the connecting member 15 is inserted into the insertion hole of the template 7, and the packer plate 13 with the concrete block 12 which is created in advance is connected to and suspended.

【0010】次に、コンクリート16を図1の如くコンク
リートブロック12の上端が少し露出するまで打設し、そ
れが固化した後、ナット9および連結部材15を取り除
き、ついでテンプレート7を除去する。なお、コンクリ
ート16の表面から上方に突出して残された支脚6は必要
により切断して取り除く。上記説明は1個のアンカーボ
ルト8の周囲に2個のコンクリートブロック12付きパッ
カープレート13を設置した例であるが、コンクリートブ
ロック12付パッカープレート13は、通常機器設置部の外
周に多数並列される。また、機器を設置するためには通
常多数のアンカーボルト8も必要とするが、上記のよう
な方法によりそれらを順次または同時に設置施工するこ
とができる。なおそのための埋設支持部2やテンプレー
ト7は、共通型または分割型のいずれであってもよい。
Next, concrete 16 is cast as shown in FIG. 1 until the upper end of the concrete block 12 is slightly exposed, and after it is solidified, the nut 9 and the connecting member 15 are removed, and then the template 7 is removed. Incidentally, the supporting leg 6 left protruding upward from the surface of the concrete 16 is cut and removed if necessary. Although the above description is an example in which two packer plates 13 with concrete blocks 12 are installed around one anchor bolt 8, a large number of packer plates 13 with concrete blocks 12 are usually arranged in parallel on the outer periphery of the equipment installation part. . In addition, a large number of anchor bolts 8 are usually required to install the equipment, but they can be installed sequentially or simultaneously by the method as described above. The embedded support portion 2 and the template 7 for that purpose may be of a common type or a divided type.

【0011】[0011]

【発明の効果】本発明は以上のような構成としたので、
コンクリート打設工程が一回で済み、工数が減少すると
共に、従来のような中間のコンクリート固化( グラウト
材の固化) のための待ち時間を必要とせず工期も著しく
短縮される。また複数のパッカープレートを、アンカー
ボルト周囲の所定位置に且つ水平に精度よく設置するこ
とができる。
Since the present invention has the above-mentioned structure,
The concrete pouring process only needs to be done once, and the man-hours are reduced. In addition, the waiting time for intermediate solidification of concrete (solidification of grout material) is not required, and the construction period is significantly shortened. In addition, a plurality of packer plates can be accurately installed horizontally at predetermined positions around the anchor bolt.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の方法によりアンカーボルトと共にパッ
カープレートを基礎に設置する工程の途中の段階を示す
部分断面図。
FIG. 1 is a partial cross-sectional view showing a stage in the middle of a process of installing a packer plate on a foundation together with anchor bolts by the method of the present invention.

【図2】図1に使用したコンクリートブロック12付パッ
カープレート13の斜視図。
FIG. 2 is a perspective view of a packer plate 13 with a concrete block 12 used in FIG.

【符号の説明】[Explanation of symbols]

1 基礎スラブ 2 埋設支持部 3 受けブロック 4 下場筋 5 上場筋 6 支脚 7 テンプレート 8 アンカーボルト 9 ナット 12 コンクリートブロック 13 パッカープレート 14 取付部 15 連結部材 16 コンクリート 1 Foundation slab 2 Buried support part 3 Receiving block 4 Bottom line 5 Listed line 6 Support leg 7 Template 8 Anchor bolt 9 Nut 12 Concrete block 13 Packer plate 14 Mounting part 15 Connecting member 16 Concrete

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 機器据付用パッカープレートを基礎のア
ンカーボルト近傍に設置する方法において、 埋設される支持部2に支脚6を立設し、その支脚6にテ
ンプレート7を取付け、そのテンプレート7にアンカー
ボルト8の上端部を着脱自在に支持させると共に、その
テンプレート7に垂下された連結部材15を介してコンク
リートブロック12付きパッカープレート13を着脱自在に
支持させる工程と、 次に前記アンカーボルト8の中間部以下及び前記コンク
リートブロック12の少なくとも中間部以下が埋設される
ようにコンクリート16を打設する工程と、 次いで前記連結部材15およびテンプレート7を除去する
工程と、を具備することを特徴とする機器据付用パッカ
ープレートの設置方法。
1. A method of installing a packer plate for equipment installation in the vicinity of an anchor bolt of a foundation, in which a support leg 6 is erected on the embedded support portion 2, a template 7 is attached to the support leg 6, and the template 7 is anchored. The step of detachably supporting the upper end of the bolt 8 and the detachable support of the packer plate 13 with the concrete block 12 through the connecting member 15 suspended from the template 7, and then the middle of the anchor bolt 8 Parts, and a step of placing concrete 16 so that at least an intermediate part of the concrete block 12 is buried, and then a step of removing the connecting member 15 and the template 7 are provided. How to install the installation packer plate.
JP24397093A 1993-09-03 1993-09-03 How to install a packer plate for equipment installation Expired - Fee Related JP3368360B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24397093A JP3368360B2 (en) 1993-09-03 1993-09-03 How to install a packer plate for equipment installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24397093A JP3368360B2 (en) 1993-09-03 1993-09-03 How to install a packer plate for equipment installation

Publications (2)

Publication Number Publication Date
JPH0771042A true JPH0771042A (en) 1995-03-14
JP3368360B2 JP3368360B2 (en) 2003-01-20

Family

ID=17111763

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24397093A Expired - Fee Related JP3368360B2 (en) 1993-09-03 1993-09-03 How to install a packer plate for equipment installation

Country Status (1)

Country Link
JP (1) JP3368360B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276747A (en) * 2013-06-26 2013-09-04 陕西建工集团第十一建筑工程有限公司 One-time high-accuracy pre-burying construction method for large equipment base guide rails

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276747A (en) * 2013-06-26 2013-09-04 陕西建工集团第十一建筑工程有限公司 One-time high-accuracy pre-burying construction method for large equipment base guide rails

Also Published As

Publication number Publication date
JP3368360B2 (en) 2003-01-20

Similar Documents

Publication Publication Date Title
JP3368360B2 (en) How to install a packer plate for equipment installation
JP3044459B2 (en) Tower structure construction method
JPH0657956A (en) Construction of concrete structure
JPH1181343A (en) Embedded footing
JP3453895B2 (en) How to install anchor bolts on large steel frames
JP2000129953A (en) Fitting method of base isolation device to foundation
JP2649205B2 (en) Anchor bolt burying method
JP2003193491A (en) Method for mounting air conditioning equipment and the like in underground space
JP2009150067A (en) Method of and structure for renewing existing bearing apparatus
JP2002097818A (en) Method of installing base isolating foundation frame for building
JPH10292668A (en) Construction method for fitting base isolation device
JPH09125415A (en) Foundation base for equipment devices
JPH0649982A (en) Formwork unit and its construction
JP2000160687A (en) Construction method for composite structure and precast concrete column
JPH0641918A (en) Support structure of form device for molding bridge and bridge construction method using support structure
JP2023118297A (en) Construction method
JP2002212957A (en) Precast foundation constructing method and constructing jig
JP2001241047A (en) Method of installing anchor bolt for fixing large-sized equipment
JP2724891B2 (en) Construction method of pillar half PCa formwork
JP2003213953A (en) Plant building constructing method
JP2002242202A (en) Column base part construction method for foundation
JPH026901B2 (en)
JPH11140883A (en) Positioning support device for anchor bolt for construction of foundation
JP2722121B2 (en) Construction method of reinforced concrete building
JPH06146579A (en) Frame unit and construction of stepwise slab by use thereof

Legal Events

Date Code Title Description
S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 5

Free format text: PAYMENT UNTIL: 20071115

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081115

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees