JPH0754391Y2 JP1991028878U JP2887891U JPH0754391Y2 JP H0754391 Y2 JPH0754391 Y2 JP H0754391Y2 JP 1991028878 U JP1991028878 U JP 1991028878U JP 2887891 U JP2887891 U JP 2887891U JP H0754391 Y2 JPH0754391 Y2 JP H0754391Y2
Authority
JP
Japan
Prior art keywords
casing tube
chuck
frame
cylinder
sub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1991028878U
Other languages
Japanese (ja)
Other versions
JPH04122792U (en
Inventor
明 岩倉
繁男 柘植
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Sharyo Ltd
Original Assignee
Nippon Sharyo Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Sharyo Ltd filed Critical Nippon Sharyo Ltd
Priority to JP1991028878U priority Critical patent/JPH0754391Y2/en
Publication of JPH04122792U publication Critical patent/JPH04122792U/en
Application granted granted Critical
Publication of JPH0754391Y2 publication Critical patent/JPH0754391Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Earth Drilling (AREA)

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】本考案は、土木基礎工事等のオー
ルケーシング工法において、大口径杭を造成するための
ケーシングチューブの押込みと引抜きを行うチュービン
グ装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a tubing device which pushes in and pulls out a casing tube for constructing a large-diameter pile in an all-casing construction method such as civil engineering foundation work.

【0002】[0002]

【従来の技術】チュービング装置(例えば、特公昭63
−251520号公報参照)を用いたオールケーシング
工法では、メインチャック装置により把持したケーシン
グチューブを回転させながら、昇降シリンダにて昇降
フレームを降下させて地中に押込みつつケーシングチュ
ーブ内の土砂の掘削を行い、所定の深さに到達するまで
複数本のケーシングチューブを連結してケーシングチュ
ーブの押込みとチューブ内の掘削を繰り返して、鉄筋の
挿入等所定の手当を行った後にチューブ内にコンクリー
トを打設しながら、メインチャック装置で把持したケー
シングチューブを、昇降シリンダにて徐々に引抜いて
場所打杭を造成する。
2. Description of the Related Art A tubing device (for example, Japanese Patent Publication Sho 63
In all casing method using a reference JP -251520), while rotating the casing tube gripped by the main chuck device, the excavation of sediment of lowering the lift frame at the lift cylinder pushing while the casing tube into the ground row have, by repeating the drilling pushing and the tube casing tube by connecting a <br/> plurality of casings tube until it reaches a predetermined depth, the tube after the insertion or the like predetermined allowance rebar the while Da設concrete, the casing tube held by the main chuck device, to construct a location hitting pile gradually withdrawn at lifting cylinders.

【0003】この際に、昇降用シリンダの1ストローク
分ケーシングチューブを引抜くと、一旦メインチャック
装置の把持を開放し、昇降フレームを下げ、ケーシング
チューブの下部をメインチャック装置で把持し直してか
ら、再び昇降シリンダにて昇降フレームを上昇させ、
これを繰り返して順次引抜きを行うが、メインチャック
装置の把持を開放したときにケーシングチューブが自重
で沈下しないように、クレーンにてその上端を吊り上げ
ていた。
At this time, if the casing tube for one stroke of the lifting cylinder is pulled out, the main chuck is temporarily removed.
Opening the gripping devices, lowering the lifting frame, the re-grip the lower portion of the casing tube main chuck device, raises the lifting frame again by lifting cylinders,
While sequentially performed a pull-out by repeating this, the main chuck
The upper end of the device was lifted by a crane so that the casing tube would not sink under its own weight when the device was released.

【0004】このような工法を行う場合に用いられるク
レーンは、通常、チュービング装置本体の移動や、チュ
ーブ内の掘削作業に見合った能力のものが選定される。
The crane used for carrying out such a construction method is usually selected to have a capacity suitable for the movement of the main body of the tubing device and the excavation work in the tube.

【0005】[0005]

【考案が解決しようとする課題】ところが、近年大口径
大深度杭が増大する傾向にあり、このような大形の杭を
施行する場合は、継ぎ足したケーシングチューブの重量
は相当重くなり、特に、従来用いられていたクレーンで
は、ケーシングチューブの吊持能力が不足することか
ら、より大形のクレーンを必要としていた。また、地質
によってはケーシングチューブの押込み中にもメインチ
ャック装置の把持を開放すると、ケーシングチューブが
自重で沈下する場合がある。
However, in recent years, large-diameter and deep-deep piles have tended to increase, and when implementing such large-sized piles, the weight of the added casing tube becomes considerably heavy. With the conventional crane
Needed a larger crane due to the lack of suspension capacity of the casing tube . Also, depending on the geology, the main chi
When the grip of the backpack device is released, the casing tube may sink due to its own weight.

【0006】そこで本考案は、クレーンを用いることな
くケーシングチューブの自重による沈下を確実に防止す
ることのできるチュービング装置を提供することを目的
としている。
Therefore, an object of the present invention is to provide a tubing device capable of reliably preventing the casing tube from sinking due to its own weight without using a crane.

【0007】[0007]

【課題を解決するための手段】上記目的を達成するため
本考案は、ケーシングチューブを把持するメインチャッ
ク装置を設けた回転体と、該回転体を回転可能に支持す
る昇降フレームと、該昇降フレームに設けられて、前記
回転体を回転させる回転駆動装置と、前記昇降フレーム
の昇降用シリンダを立設したベースフレームとを備え、
メインチャック装置で回転体に把持したケーシングチュ
ーブを、回転駆動装置で回転させながら、昇降用シリン
ダで昇降フレームを昇降させてケーシングチューブの回
転押込みと引抜きを行うチュービング装置において、前
記ベースフレームと前記昇降フレームとの間に、前記メ
インチャック装置のケーシングチューブ把持開放時に、
前記ケーシングチューブを把持するサブチャック装置を
配設したことを特徴としている。
SUMMARY OF THE INVENTION To achieve the above object, the present invention is directed to a main chuck for holding a casing tube.
A rotating body provided with a locking device, and rotatably supporting the rotating body.
And a lifting frame provided on the lifting frame.
Rotation drive device for rotating a rotating body, and the lifting frame
With a base frame that stands up and down the cylinder for
The casing tug held on the rotating body by the main chuck device.
While rotating the cylinder with the rotary drive,
In a tubing device that raises and lowers the elevating frame with a dam to rotate and push the casing tube in and out , between the base frame and the elevating frame,
When releasing the casing tube of the inchuck device,
A sub-chuck device for holding the casing tube
It is characterized by being arranged .

【0008】[0008]

【作 用】このように構成することにより、メインチャ
ック装置のケーシングチューブ把持開放時に、サブチャ
ック装置にてケーシングチューブを把持して、ケーシン
グチューブの自重による沈下を確実に防止する。
[ Operation ] By configuring in this way, the maincha
When the casing tube of the locking device is released, the casing tube is grasped by the sub-chuck device, and the sinking of the casing tube due to its own weight is reliably prevented.

【0009】[0009]

【実施例】以下、本考案の一実施例を図面に基づいて説
明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings.

【0010】チュービング装置1は、ベースフレーム2
の上部に昇降フレーム3を配設し、該昇降フレーム3を
ベースフレーム2に立設した昇降用シリンダであるスラ
ストシリンダ4にてベースフレーム2に昇降可能に支持
し、前記昇降フレーム3にリング状の回転体5をベアリ
ング6を介して回転可能に設けるとともに、昇降フレー
ム3に、回転体5を回転駆動する回転駆動装置7を設け
ている。
The tubing apparatus 1 includes a base frame 2
The elevating frame 3 is arranged on the upper part of the
The slash, which is a lifting cylinder erected on the base frame 2,
Stroke cylinder 4 supports the base frame 2 so that it can move up and down.
Then, the ring-shaped rotating body 5 is barely attached to the elevating frame 3.
It is rotatably installed through the ring 6, and the lifting frame
A rotary drive device 7 for rotating the rotary body 5 is provided on the frame 3.
ing.

【0011】該回転駆動装置7は、油圧モータ7aと、
油圧モータ7aの出力を回転体5に伝達する減速歯車機
構7bとで構成されている。
The rotary drive device 7 includes a hydraulic motor 7a,
Reduction gear that transmits the output of the hydraulic motor 7a to the rotating body 5
Structure 7b.

【0012】前記回転体5には、メインチャック装置8
が設けられている。このメインチャック装置8は、リン
グ状の上部フレーム9と、上部フレーム9に吊持された
楔状のチャック部材10と、上部フレーム9を回転可能
に支持する支持フレーム11と、昇降フレーム3に立設
されて支持フレーム11を昇降可能に支持するメインチ
ャックシリンダ12とで構成され、メインチャックシリ
ンダ12を縮めて支持フレーム11を下降させると、チ
ャック部材10が回転体5の傾斜内面に沿って下方へ移
動して縮径し、チャック部材10の内側に挿通されたケ
ーシングチューブ13を把持する。
A main chuck device 8 is attached to the rotating body 5.
Is provided. This main chuck device 8 is
It was hung on the upper frame 9 and the upper frame 9
Wedge-shaped chuck member 10 and upper frame 9 can be rotated
Standing on the support frame 11 that supports the
The mainch that supports the support frame 11 so that it can be raised and lowered.
It consists of a back cylinder 12 and a main chuck
When the holder 12 is contracted and the support frame 11 is lowered,
The backpack member 10 moves downward along the inclined inner surface of the rotating body 5 to reduce its diameter, and holds the casing tube 13 inserted inside the chuck member 10.

【0013】このように構成されたチュービング装置1
は、ケーシングチューブ13の押込み時には、メインチ
ャックシリンダ12を縮めてチャック部材10でケーシ
ングチューブ13を把持し、油圧モータ7aにて回転体
5を回転させながらスラストシリンダ4を縮めて昇降フ
レーム3を下降し、スラストシリンダ4の1ストローク
分ケーシングチューブ13を地中に押込む。
The tubing apparatus 1 configured as described above
When the casing tube 13 is pushed in, the main chuck cylinder 12 is contracted so that the chuck member 10 grips the casing tube 13, and the hydraulic motor 7a rotates the rotating body.
While rotating 5, the thrust cylinder 4 is contracted to lower the elevating frame 3, and the casing tube 13 for one stroke of the thrust cylinder 4 is pushed into the ground.

【0014】1ストローク分ケーシングチューブ13が
押込まれたら、メインチャックシリンダ12を伸ばして
チャック部材10を引上げてケーシングチューブ13
把持を開放し、スラストシリンダ4を伸ばして昇降フレ
ーム3を上昇させ、再びメインチャックシリンダ12を
縮めてチャック部材10でケーシングチューブ13を把
持し、上記と同様にしてケーシングチューブ13を押し
込み、これを繰返してケーシングチューブ13を複数本
連結して所定の深さにまで押込む。
When the casing tube 13 is pushed in for one stroke, the main chuck cylinder 12 is extended and the chuck member 10 is pulled up to remove the casing tube 13 from the casing tube 13 .
Gripping opening and raises the lift frame 3 by extending the thrust cylinder 4, to grip the casing tube 13 by the chuck member 10 by shortening the main chuck cylinder 12 again, pushing the casing tube 13 in the same manner as described above, it Repeatedly, a plurality of casing tubes 13 are connected and pushed to a predetermined depth.

【0015】また、前記チュービング装置1には、ベー
スフレーム2と昇降フレーム3との間に、メインチャッ
ク装置8のケーシングチューブ把持開放時に、ケーシン
グチューブ13を把持するサブチャック装置14が設け
られている。
[0015] In addition, in the tubing device 1, base
Between the frame 2 and the lifting frame 3 , the main chassis
When the casing tube of the control device 8 is released,
A sub-chuck device 14 that holds the tube 13 is provided.

【0016】このサブチャック装置14は、3枚の弓形
の平板15a,15b,15cを連結したチャック部材
15と、平板15a,15cの端部に連結したシザース
リンク16と、シザースリンク16を開閉作動するサブ
チャックシリンダ17とで構成され、サブチャックシリ
ンダ17の伸張によりチャック部材15を縮径させて
チャック部材15内に挿通されたケーシングチューブ1
3の把持を行う。
This sub-chuck device 14 has three bow-shaped parts.
Chuck member in which flat plates 15a, 15b, 15c of
15 and scissors connected to the ends of the flat plates 15a and 15c
Link 16 and a sub that opens and closes the scissors link 16
And the chuck cylinder 17, and the chuck member 15 is reduced in diameter by the extension of the sub chuck cylinder 17.
Casing tube 1 inserted into chuck member 15
3 is gripped.

【0017】前記サブチャックシリンダ17は、昇降フ
レーム3よりも外側の位置に配設されているので、弓形
の平板15a,15b,15cからなるチャック部材1
5と相俟って、サブチャック装置14を、ベースフレー
ム2と昇降フレーム3との間の狭い間隙に配設すること
ができる。
Since the sub chuck cylinder 17 is arranged at a position outside the lifting frame 3, the sub chuck cylinder 17 has an arcuate shape.
Chuck member 1 comprising flat plates 15a, 15b, 15c
I 5 coupled with the sub-chuck device 14, the base frame
It can be arranged in a narrow gap between the frame 2 and the lifting frame 3 .

【0018】メインチャックシリンダ12とサブチャッ
クシリンダ17とを作動する油圧回路18は、図3に示
されるように、方向制御弁19のAポートからメインチ
ャックシリンダ12の縮み側への回路20に、サブチャ
ックシリンダ17の縮み側への回路21を接続し、該回
路21にシーケンスアンドチェックバルブ22を設けて
いる。
The hydraulic circuit 18 for operating the main chuck cylinder 12 and the sub chuck cylinder 17 is, as shown in FIG. 3, provided in the circuit 20 from the port A of the directional control valve 19 to the contracted side of the main chuck cylinder 12. A circuit 21 is connected to the contraction side of the sub chuck cylinder 17, and a sequence and check valve 22 is provided in the circuit 21.

【0019】また、方向制御弁19のBポートからの回
路23を分岐して、一方の回路24をシーケンスアンド
チェックバルブ25を介してメインチャックシリンダ1
2の伸び側へ接続し、他方の回路26をストップバルブ
27を介してサブチャックシリンダ17の伸び側へ接続
している。
Further, the circuit 23 from the port B of the direction control valve 19 is branched, and one circuit 24 is connected to the main chuck cylinder 1 via the sequence and check valve 25.
2 is connected to the extension side, and the other circuit 26 is connected to the extension side of the sub chuck cylinder 17 via a stop valve 27.

【0020】このように構成することにより、ケーシン
グチューブ13を引抜く場合に、油圧ポンプ28からの
圧油を、方向制御弁19のAポートから回路20を介し
てメインチャックシリンダ12の縮み側へ送ると、メイ
ンチャックシリンダ12が縮みメインチャック装置8の
チャック部材10によりケーシングチューブ13を把持
する。
With this structure, when the casing tube 13 is pulled out, the pressure oil from the hydraulic pump 28 is passed from the port A of the directional control valve 19 to the compression side of the main chuck cylinder 12 via the circuit 20. When sent, the main chuck cylinder 12 contracts and the main chuck device 8
The casing tube 13 is gripped by the chuck member 10 .

【0021】メインチャック装置8によりケーシングチ
ューブ13が把持されて回路20内の圧力が所定以上に
なると、シーケンスアンドチェックバルブ22が開い
て、圧油が回路21を介してサブチャックシリンダ17
の縮み側へ送られ、サブチャックシリンダ17が縮んで
サブチャック装置14のチャック部材15が拡開して、
サブチャック装置14によるケーシングチューブ13の
把持を開放する。
When the casing tube 13 is gripped by the main chuck device 8 and the pressure in the circuit 20 exceeds a predetermined value, the sequence and check valve 22 opens, and the pressure oil passes through the circuit 21 and the sub chuck cylinder 17 is pressed.
Of the sub-chuck cylinder 17 is contracted, the chuck member 15 of the sub-chuck device 14 is expanded,
Of the casing tube 13 by the sub-chuck device 14.
Release the grip.

【0022】この状態で、スラストシリンダ4を伸ばし
て昇降フレーム3を上昇し、スラストシリンダ4の1ス
トローク分ケーシングチューブ13を引抜く。
In this state, the thrust cylinder 4 is extended to raise the elevating frame 3 and the casing tube 13 is pulled out for one stroke of the thrust cylinder 4.

【0023】次に、方向制御弁19をBポートに切換え
ると、圧油が回路26を介してサブチャックシリンダ1
7の伸び側へ送られ、サブチャックシリンダ17が伸び
てサブチャック装置14のチャック部材15が縮径して
ケーシングチューブ13を把持する。
Next, when the directional control valve 19 is switched to the B port, the pressure oil passes through the circuit 26 and the sub-chuck cylinder 1
7, the sub-chuck cylinder 17 extends and the chuck member 15 of the sub-chuck device 14 contracts to grip the casing tube 13.

【0024】サブチャック装置14によりケーシングチ
ューブ13が把持されて回路26内の圧力が所定以上に
なると、シーケンスアンドチェックバルブ25が開い
て、圧油が回路24を介してメインチャックシリンダ1
2の伸び側へ送られ、メインチャックシリンダ12が伸
びてメインチャック装置8のチャック部材10によるケ
ーシングチューブ13の把持を開放する。
When the casing tube 13 is gripped by the sub-chuck device 14 and the pressure in the circuit 26 exceeds a predetermined value, the sequence and check valve 25 is opened, and the pressure oil is passed through the circuit 24 to the main chuck cylinder 1
2 is sent to the extension side of the main chuck cylinder 12, and the main chuck cylinder 12 is extended so that the chuck member 10 of the main chuck device 8 can
The grasping of the housing tube 13 is released.

【0025】この状態で、スラストシリンダ4を縮めて
昇降フレーム3を下降し、再び方向制御弁19を切換え
てAポートから圧油をメインチャックシリンダ12の縮
み側へ送り、メインチャック装置8のチャック部材10
でケーシングチューブ13を把持するとともに、サブチ
ャック装置14のチャック部材15を拡開して、前記と
同様に、スラストシリンダ4の1ストローク分ケーシン
グチューブ13を引抜く。
In this state, the thrust cylinder 4 is contracted to lower the elevating frame 3, the directional control valve 19 is switched again, and pressure oil is sent from the A port to the contracted side of the main chuck cylinder 12 to chuck the main chuck device 8. Member 10
While gripping the casing tube 13 with, the chuck member 15 of the sub chuck device 14 is expanded, and the casing tube 13 is pulled out for one stroke of the thrust cylinder 4 in the same manner as described above.

【0026】そして、ケーシングチューブ13が1本分
引抜かれると、下部のケーシングチューブ13との連結
を解除して、上部のケーシングチューブ13をクレーン
で吊上げ、前記工程を繰り返して次のケーシングチュー
ブ13を引抜く。
When one casing tube 13 is pulled out, the connection with the lower casing tube 13 is released, the upper casing tube 13 is lifted by a crane, and the above steps are repeated to remove the next casing tube 13. Pull out.

【0027】以上のように、ケーシングチューブ13の
引抜き作業時には、メインチャック装置8のチャック部
材10とサブチャック装置14のチャック部材15のい
ずれかが常にケーシングチューブ13を把持しているの
で、ケーシングチューブ13の自重による沈下を確実に
防止できる。
As described above, when the casing tube 13 is pulled out , the chuck portion of the main chuck device 8 is
Since either the material 10 or the chuck member 15 of the sub chuck device 14 always holds the casing tube 13, it is possible to reliably prevent the casing tube 13 from sinking due to its own weight.

【0028】したがって、ケーシングチューブ13を吊
上げるクレーンも、1本分のケーシングチューブ13を
吊上げる能力のもので良い。
Therefore, the crane for hoisting the casing tube 13 may have the ability to hoist one casing tube 13.

【0029】なお、ケーシングチューブ13を押込む際
に、ケーシングチューブ13の重量が地盤の支持力によ
って受止められている場合には、サブチャック装置14
を開放した状態で、回路26のストップバルブ27を閉
めることによりメインチャック装置8だけの作動とする
ことができ、ケーシングチューブ13の自重で沈下する
ような場合には、ストップバルブ27を開けて、前記し
た引抜きの場合と同様に、メインチャック装置8とサブ
チャック装置14のいずれかで常にケーシングチューブ
13を把持して、ケーシングチューブ13の沈下を防止
することができる。
When the casing tube 13 is pushed in and the weight of the casing tube 13 is received by the supporting force of the ground, the sub chuck device 14
The main chuck device 8 can be operated only by closing the stop valve 27 of the circuit 26 in the state where the stop valve 27 is opened, and when the casing tube 13 sinks due to its own weight, the stop valve 27 is opened. As in the case of the above-described drawing, either the main chuck device 8 or the sub chuck device 14 can always hold the casing tube 13 to prevent the casing tube 13 from sinking .

【0030】[0030]

【考案の効果】本考案は以上のように、チュービング装
置の昇降フレームとベースフレームとの間にサブチャッ
ク装置を設け、メインチャック装置によるケーシングチ
ューブの把持開放時に、サブチャック装置にてケーシン
グチューブを把持できるようにしたので、ケーシングチ
ューブの自重による沈下を確実に防止できる。
As described above, according to the present invention, the sub chuck device is provided between the elevating frame and the base frame of the tubing device, and the casing chuck by the main chuck device is provided.
Since the casing tube can be held by the sub-chuck device when the tube is released, it is possible to reliably prevent the casing tube from sinking due to its own weight.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本考案の一実施例を示すチュービング装置の
一部断面正面図
FIG. 1 is a partial sectional front view of a tubing apparatus showing an embodiment of the present invention.

【図2】 図1のII−II矢視図2 is a view taken along the line II-II of FIG.

【図3】 メインチャックシリンダとサブチャックシリ
ンダの油圧回路図
[Fig. 3] Main chuck cylinder and sub chuck cylinder
A hydraulic circuit diagram of Sunda

【符号の説明】[Explanation of symbols]

1…チュービング装置、2…ベースフレーム、3…昇降
フレーム、4…スラストシリンダ、5…回転体、7…回
転駆動装置、8…メインチャック装置、9…上部フレー
ム、10…メインチャック装置のチャック部材、11…
支持フレーム、12…メインチャックシリンダ、13…
ケーシングチューブ、14…サブチャック装置、15…
サブチャック装置14のチャック部材、16…シザース
リンク、17…サブチャックシリンダ、18…メインチ
ャックシリンダ12とサブチャックシリンダ17の油圧
回路図
1 ... Tubing device, 2 ... Base frame, 3 ... Lifting frame, 4 ... Thrust cylinder, 5 ... Rotating body, 7 ... Rotation
Rolling drive device, 8 ... Main chuck device, 9 ... Upper frame
Mu, 10 ... Chuck member of main chuck device, 11 ...
Support frame, 12 ... Main chuck cylinder, 13 ...
Casing tube, 14 ... Sub chuck device, 15 ...
Chuck member of the sub-chuck device 14, 16 ... Scissors
Link, 17 ... Sub chuck cylinder, 18 ... Mainch
Hydraulic circuit diagram of back cylinder 12 and sub-chuck cylinder 17

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 ケーシングチューブを把持するメインチ
ャック装置を設けた回転体と、該回転体を回転可能に支
持する昇降フレームと、該昇降フレームに設けられて、
前記回転体を回転させる回転駆動装置と、前記昇降フレ
ームの昇降用シリンダを立設したベースフレームとを備
え、メインチャック装置で回転体に把持したケーシング
チューブを、回転駆動装置で回転させながら、昇降用シ
リンダで昇降フレームを昇降させてケーシングチューブ
の回転押込みと引抜きを行うチュービング装置におい
て、前記ベースフレームと前記昇降フレームとの間に、
前記メインチャック装置のケーシングチューブ把持開放
時に、前記ケーシングチューブを把持するサブチャック
装置を配設したことを特徴とするチュービング装置。
1. A main grip for holding a casing tube.
A rotating body provided with a backing device and the rotating body are rotatably supported.
A lifting frame to be held, and provided on the lifting frame,
A rotation drive device that rotates the rotating body, and the lifting frame.
With a base frame that stands upright for raising and lowering the boom.
The casing held by the main chuck device on the rotating body
While rotating the tube with the rotary drive, move the tube up and down.
In a tubing device that lifts and lowers an elevating frame with a binder to rotationally push and pull a casing tube , between the base frame and the elevating frame,
Releasing the casing tube of the main chuck device
Sometimes, tubing apparatus being characterized in that disposed a sub-chuck device for gripping the casing tube.
JP1991028878U 1991-04-24 1991-04-24 Tubing equipment Expired - Lifetime JPH0754391Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1991028878U JPH0754391Y2 (en) 1991-04-24 1991-04-24 Tubing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1991028878U JPH0754391Y2 (en) 1991-04-24 1991-04-24 Tubing equipment

Publications (2)

Publication Number Publication Date
JPH04122792U JPH04122792U (en) 1992-11-05
JPH0754391Y2 true JPH0754391Y2 (en) 1995-12-18

Family

ID=31912884

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1991028878U Expired - Lifetime JPH0754391Y2 (en) 1991-04-24 1991-04-24 Tubing equipment

Country Status (1)

Country Link
JP (1) JPH0754391Y2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014173383A (en) * 2013-03-12 2014-09-22 Nippon Sharyo Seizo Kaisha Ltd Tubing device
JP2014173384A (en) * 2013-03-12 2014-09-22 Nippon Sharyo Seizo Kaisha Ltd Tubing device

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07238776A (en) * 1994-03-01 1995-09-12 Nippon Sharyo Seizo Kaisha Ltd Shaft reverse excavating method and tubing device
JP3074457B2 (en) * 1995-09-08 2000-08-07 日本車輌製造株式会社 Tubing equipment
JP3392324B2 (en) * 1997-07-18 2003-03-31 日立建機株式会社 Sub-band device and laying plate for casing driver
JP6177088B2 (en) * 2013-10-23 2017-08-09 日本車輌製造株式会社 Tubing device
JP6233054B2 (en) * 2014-01-28 2017-11-22 株式会社大林組 Steel pipe column joining method
JP6719823B2 (en) * 2016-09-21 2020-07-08 日本車輌製造株式会社 Tubing equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5152805U (en) * 1974-10-18 1976-04-22
JPS5512493A (en) * 1978-07-05 1980-01-29 Stanley Tools Ltd Length measuring device
JPS58143017A (en) * 1982-02-17 1983-08-25 Takechi Koumushiyo:Kk Pressing and drawing device for steel pipe
JPS63251520A (en) * 1987-04-07 1988-10-19 Nippon Sharyo Seizo Kaisha Ltd Full-rotary tubing device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2549184Y2 (en) * 1991-03-20 1997-09-30 三和機材株式会社 Casing positioning device in rotary tubing device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5152805U (en) * 1974-10-18 1976-04-22
JPS5512493A (en) * 1978-07-05 1980-01-29 Stanley Tools Ltd Length measuring device
JPS58143017A (en) * 1982-02-17 1983-08-25 Takechi Koumushiyo:Kk Pressing and drawing device for steel pipe
JPS63251520A (en) * 1987-04-07 1988-10-19 Nippon Sharyo Seizo Kaisha Ltd Full-rotary tubing device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014173383A (en) * 2013-03-12 2014-09-22 Nippon Sharyo Seizo Kaisha Ltd Tubing device
JP2014173384A (en) * 2013-03-12 2014-09-22 Nippon Sharyo Seizo Kaisha Ltd Tubing device

Also Published As

Publication number Publication date
JPH04122792U (en) 1992-11-05

Similar Documents

Publication Publication Date Title
US6540443B2 (en) Apparatus for and a method of boring the ground
BRPI1014431B1 (en) METHOD OF ADDING A TUBE JOINT TO A SEGMENTED RING AND CONDUCTOR RING COLUMN
JPH0754391Y2 (en) Tubing equipment
JPS6054479B2 (en) Well casing jacking mechanism
JP4308410B2 (en) All casing drilling rig
JP4693586B2 (en) Circular shaft excavation method
JP3239951B2 (en) Pile injection system and pile injection method
JP2704118B2 (en) Drilling equipment for press-fit steel pipes
JP3719920B2 (en) Tubing device
JP4555788B2 (en) Pile holding device
JP4399436B2 (en) Excavation and excavation bucket and excavation and excavation equipment using the bucket
JP3129981B2 (en) Rotary reaction force removal device for tubing device
JP3074457B2 (en) Tubing equipment
JP6810181B2 (en) Drilling equipment and drilling method
JPH0619631Y2 (en) Auxiliary weight
JP2003301683A (en) Excavating device
JP4076485B2 (en) Casing driver
JPH07127060A (en) Pile pressing-in machine and pile pressing-in and drawing-out construction method
JP2895564B2 (en) Shaft drilling rig
JPS6120147Y2 (en)
JP3239950B2 (en) Pile press-in system and pile press-in method using the same
JP2974979B2 (en) Drilling machine and drilling method for deep foundation
JPH0629226Y2 (en) Steel pipe pile placing device
JP3014417U (en) Simple turret for geological survey drilling machine
JPH0791830B2 (en) Pile construction machine by all casing method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term