JPH0748819A - Construction method for underwater structure - Google Patents

Construction method for underwater structure

Info

Publication number
JPH0748819A
JPH0748819A JP21696493A JP21696493A JPH0748819A JP H0748819 A JPH0748819 A JP H0748819A JP 21696493 A JP21696493 A JP 21696493A JP 21696493 A JP21696493 A JP 21696493A JP H0748819 A JPH0748819 A JP H0748819A
Authority
JP
Japan
Prior art keywords
positioning
jacket body
tube
guide
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP21696493A
Other languages
Japanese (ja)
Other versions
JP3297158B2 (en
Inventor
Atsuhiro Kitazawa
厚宏 北澤
Morio Oura
盛夫 大浦
Shohachiro Daimaru
正八郎 大丸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Construction Co Ltd
Original Assignee
Mitsui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Construction Co Ltd filed Critical Mitsui Construction Co Ltd
Priority to JP21696493A priority Critical patent/JP3297158B2/en
Publication of JPH0748819A publication Critical patent/JPH0748819A/en
Application granted granted Critical
Publication of JP3297158B2 publication Critical patent/JP3297158B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Revetment (AREA)

Abstract

PURPOSE:To construct an underwater structure with high accuracy without requiring the complex and difficult work. CONSTITUTION:A plurality of positioning pipes 5 each formed with a pile driving space 5 are driven into the ground, and the depths H2 between a plurality of positioning pipes 5 and the reference level K are measured respectively. A plurality of pillar members 7 each formed with a guide space 7d are provided at positions corresponding to the installation positions of the positioning pipes 5 to construct a jacket body 6, and flanges 7a are set at positions corresponding to the measured depths H2 between the pillar members 7 and the corresponding positioning pipes 5 respectively. The jacket body 6 is installed so that the pillar members 7 are supported by the positioning pipes 5 via the flanges 7a and the guide spaces 7d of the pillar members 7 and the pile driving spaces 5b of the positioning pipes 5 corresponding to the pillar members 7 are communicated and connected to each other. Support piles 10 are driven and constructed into the ground 3 through the guide spaces 7d and the pile driving spaces 5b, and the support piles 10 and the jacket body 6 are connected so that the jacket body 6 is supported by the support piles 10.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、桟橋やドルフィン等の
水中構造物を構築する際に適用される水中構造物の構築
方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing an underwater structure applied when constructing an underwater structure such as a jetty or a dolphin.

【0002】[0002]

【従来の技術】図5は、従来提案されている構築方法に
より、水中構造物を構築している作業の一工程を示した
図である。従来、水中構造物(例えば、桟橋やドルフィ
ン等)を構築するには、海底の地盤中の支持層に到達す
る形の、水中構造物の一部である複数の支持杭を最初に
打設構築し、これら支持杭を基準にしながら水中構造物
全体を構築していた。また最近、構築現場の海底の地盤
表面を、図5に示すように、まず掘削等するなどして整
地して平坦な整地面41に成型し、複数の鋼管が柱梁構
造をなす形で陸上で予め構築されたジャケット体43
を、該ジャケット体43を構成する複数の柱部材42が
整地面41に載置立設される形で設置し、次いで、これ
ら柱部材42の下端側を埋没させる形で整地面41の上
に栗石層45を敷設し、これら栗石層45を水中コンク
リートで固めてジャケット体43の根固めを行い、支持
杭46を、各柱部材42の管内部42aを通して、従っ
て、各柱部材42をガイドにして、場所打ちにより、し
かも各柱部材42と各支持杭46とが互いに接合される
形で構築して水中構造物40を構築する構築方法が提案
されている。
2. Description of the Related Art FIG. 5 is a diagram showing one step of work for constructing an underwater structure by a conventionally proposed construction method. Conventionally, in order to construct an underwater structure (for example, a pier or a dolphin), a plurality of support piles that are part of the underwater structure and reach the support layer in the ground on the seabed are first placed and constructed. However, the entire underwater structure was constructed with reference to these support piles. Further, recently, as shown in FIG. 5, the ground surface on the sea floor of the construction site is first ground by excavating or the like to form a flat ground 41, and a plurality of steel pipes form a pillar-beam structure on land. Body 43 pre-built with
Is installed in such a manner that a plurality of pillar members 42 constituting the jacket body 43 are placed upright on the leveled ground 41, and then the lower ends of the pillar members 42 are buried on the leveled ground 41. The cobblestone layer 45 is laid, the cobblestone layer 45 is solidified with underwater concrete to solidify the jacket body 43, and the support pile 46 is passed through the pipe inside 42a of each column member 42, and thus each column member 42 is used as a guide. Then, there is proposed a construction method of constructing the underwater structure 40 by casting in place and by constructing each pillar member 42 and each support pile 46 to be joined to each other.

【0003】[0003]

【発明が解決しようとする課題】しかし、従来実施され
ている上述した前者の構築方法では、支持杭を高精度で
打設することが困難であるため、構築される水中構造物
の精度を向上させることが困難であった。また、提案さ
れている上述した後者の方法では、図5に示すように、
設置されたジャケット体43を基準にして支持杭46が
構築されるため、陸上で予め高精度で構築されたジャケ
ット体43を、平坦な整地面41に高精度で設置するこ
とができ、水中構造物40の精度を向上させることが容
易である。しかしその反面、ジャケット体43の設置の
精度を向上させるためには海底の地盤表面を整地する作
業、及び、整地面41の上に敷設した栗石層45を水中
コンクリートで固める作業等の煩雑で困難な作業が必要
となる。そこで、本発明は、上記事情に鑑み、水中構造
物の精度を容易に向上させることができると共に、海底
の地盤表面を整地する作業、及び、整地面の上に敷設し
た栗石層を水中コンクリートで固める作業等の煩雑で困
難な作業を必要としない水中構築物の構築方法を提供す
ることを目的とする。
However, since it is difficult to drive the support piles with high accuracy in the former construction method which has been conventionally performed, it is possible to improve the accuracy of the underwater structure to be constructed. It was difficult to do. Further, in the latter method proposed above, as shown in FIG.
Since the support pile 46 is constructed on the basis of the installed jacket body 43, the jacket body 43 preliminarily constructed with high precision on land can be installed with high precision on the flat ground leveling ground 41. It is easy to improve the accuracy of the object 40. However, on the other hand, in order to improve the accuracy of the installation of the jacket body 43, it is complicated and difficult to perform the work of leveling the ground surface of the seabed and the work of hardening the cobblestone layer 45 laid on the leveled ground 41 with underwater concrete. Work is required. Therefore, the present invention, in view of the above circumstances, can easily improve the accuracy of the underwater structure, work to level the ground surface of the seabed, and the stone stone layer laid on the leveled ground in underwater concrete. An object of the present invention is to provide a method for constructing an underwater structure that does not require complicated and difficult work such as solidifying work.

【0004】[0004]

【課題を解決するための手段】即ち、本発明は、上下方
向に貫通した杭打ち孔(5b)を有する複数の位置決め
管(5)を、水底地盤(3)に打設し、前記複数の位置
決め管(5)と基準位置(K)との間の上下距離(H
2)をそれぞれ測定し、上下方向に貫通したガイド孔
(7d)を有するガイド管(7)を、前記位置決め管
(5)の打設位置に対応させた形で複数本設けてジャケ
ット体(6)を構築し、前記ガイド管(7)と該ガイド
管(7)に対応した前記位置決め管(5)の間の該ガイ
ド管(7)に対応する位置決め管(5)の測定された前
記上下距離(H2)に対応した位置に係止手段(7a、
7e、7f)をそれぞれ設定し、前記ジャケット体
(6)を、前記ガイド管(7)が前記係止手段(5a、
5c、5d、7a、7e、7f)を介して前記位置決め
管(5)にそれぞれ支持され、かつ該ガイド管(7)の
ガイド孔(7d)と、該ガイド管(7)に対応した前記
位置決め管(5)の各杭打ち孔(5b)とが互いに上下
方向に連通接続される形で設置し、上下方向に連通した
ガイド孔(7d)と杭打ち孔(5b)とを通して、前記
水底地盤(3)に支持杭(10)を打設構築し、前記支
持杭(10)と前記ジャケット体(6)とを、該ジャケ
ット体(6)が該支持杭(10)に支持される形で接続
して構成される。なお、( )内の番号等は、図面にお
ける対応する要素を示す、便宜的なものであり、従っ
て、本記述は図面上の記載に限定拘束されるものではな
い。以下の作用の欄についても同様である。
That is, according to the present invention, a plurality of positioning pipes (5) each having a pile driving hole (5b) penetrating in the up-down direction are driven on a submarine ground (3), and the plurality of positioning pipes (5) are installed. Vertical distance (H) between positioning tube (5) and reference position (K)
2) are respectively measured, and a plurality of guide tubes (7) having guide holes (7d) penetrating in the vertical direction are provided in a form corresponding to the driving position of the positioning tube (5), and a jacket body (6) is provided. ), And the measured up and down of the positioning pipe (5) corresponding to the guide pipe (7) between the guide pipe (7) and the positioning pipe (5) corresponding to the guide pipe (7). At the position corresponding to the distance (H2), the locking means (7a,
7e, 7f), respectively, and the guide tube (7) holds the jacket body (6) by the locking means (5a, 7a).
5c, 5d, 7a, 7e, 7f) are respectively supported by the positioning tube (5), and the guide hole (7d) of the guide tube (7) and the positioning corresponding to the guide tube (7) The pipe (5) is installed such that the pile driving holes (5b) are vertically communicated with each other, and the guide hole (7d) and the pile driving holes (5b) that are vertically communicated with each other are used to form the subseabed ground. (3) A support pile (10) is driven and constructed, and the support pile (10) and the jacket body (6) are supported by the support pile (10). Connected and configured. The numbers in parentheses () indicate the corresponding elements in the drawings for convenience, and therefore the present description is not limited to the description in the drawings. The same applies to the following action columns.

【0005】[0005]

【作用】上記した構成により本発明では、複数の位置決
め管(5)の打設が、水底地盤(3)を整地したり、そ
の整地面の上に栗石層を敷設して水中コンクリートで固
めるなどの作業を必要とせずに行われ、その他の作業即
ち、上下距離(H2)の測定及び、ジャケット体(6)
の構築及び、該ジャケット体(6)の位置決め管(5)
への設置及び、支持杭(10)の打設構築が殆ど非水中
作業で行われる。
According to the present invention having the above-described structure, the positioning pipes (5) are laid to level the water bottom ground (3), or to lay a crushed stone layer on the leveled ground and harden it with underwater concrete. Other work, that is, measurement of vertical distance (H2) and jacket body (6)
And positioning tube (5) for the jacket body (6)
Installation and construction of support piles (10) are carried out almost in non-underwater operation.

【0006】[0006]

【実施例】以下、本発明の実施例を図面に基づき説明す
る。図1は、本発明による水中構造物の構築方法により
構築されたドルフィンの一例を示した断面図、図2は、
図1で示すドルフィンを上方から見た平面図、図3は、
図1で示すドルフィンの構築における一工程を示した
図、図4(a)は、柱部材の外周面側のツバとして設け
られた、柱部材と位置決め管との係止手段の一例を示し
た図、図4(b)は、柱部材の開口下端として設けられ
た、柱部材と位置決め管との係止手段の一例を示した
図、図4(c)は、柱部材の開口下端として設けられ
た、柱部材と位置決め管との係止手段の他の一例を示し
た図である。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a sectional view showing an example of a dolphin constructed by the method for constructing an underwater structure according to the present invention, and FIG.
A plan view of the dolphin shown in FIG. 1 seen from above, and FIG.
FIG. 4A is a view showing one step in the construction of the dolphin shown in FIG. 1, and FIG. 4A shows an example of locking means for the pillar member and the positioning tube, which is provided as a collar on the outer peripheral surface side of the pillar member. FIG. 4 (b) is a view showing an example of locking means for the pillar member and the positioning tube provided as the opening lower end of the pillar member, and FIG. 4 (c) is provided as the opening lower end of the pillar member. It is the figure which showed another example of the locking means of the pillar member and the positioning tube which were made.

【0007】構築現場2には、図1及び図2に示すよう
に、ドルフィン1が構築されており、ドルフィン1は円
筒状の鋼管からなり、その内部が杭打ち空間5bとなっ
ている複数の位置決め管5を有している。各位置決め管
5は、海底の地盤3に鉛直方向に打ち込まれており、こ
れら位置決め管5の各開口上端5aは、地盤3の地盤表
面3aの上方に突出している。複数の位置決め管5には
ジャケット体6が支持され設けられている。ジャケット
体6は、円筒鋼管からなり、その内部がガイド空間7d
となっている複数の柱部材7と、鋼管からなる複数の梁
部材9とが互いに柱梁構造をなす形で接続されて構成さ
れており、ジャケット体6は、各柱部材7がその下側よ
り、各位置決め管5によって支持される形で設けられて
いる。即ち、各柱部材7の内周面側には各柱部材7の軸
心方向に突出したツバ7aが形成されており、各柱部材
7は、各柱部材7の開口下端側からその内部であるガイ
ド空間7dに柱部材7より小径の位置決め管5をそれぞ
れ挿入させると共に、そのツバ7aを各位置決め管5の
開口上端5aにおいて当接させる形で各位置決め管5に
よって支持されている。また、ドルフィン1は、各位置
決め管5の杭打ち空間5bを上下方向に充足する形の、
鉄筋コンクリートからなる複数の支持杭10を有してい
る。各支持杭10の下端側は、杭打ち空間5bから地盤
3を下方に挿入されて地盤3中の支持層3bに到達して
おり、各支持杭10の上端側は、杭打ち空間5bから柱
部材7のガイド空間7dに達している。なお、各柱部材
7の内周面側にはツバ7aよりも上方の位置において、
複数の図示しない係合リブが形成されており、この係合
リブに支持杭10のコンクリートが係合することによっ
て該支持杭10と柱部材7との間では充分な付着力が発
生し、ジャケット体6の重量(及び、ジャケット体6に
加わる負荷重量)が支持杭10に充分に伝達され得るよ
うになっている。このように、ジャケット体6は複数の
位置決め管5によって支持されているだけでなく、複数
の支持杭10によっても支持されている。なお、支持杭
10は、上述したように、地盤3中の支持層3bに到達
しているため、複数の支持杭10によって支持されたジ
ャケット体6は、複数の支持杭10を介して支持層3b
によって支持されていることになり、ジャケット体6
(或いは、負荷重量を得たジャケット体6)は安定した
状態で支持され設けられている。なお、ジャケット体6
のうち最上位置の梁部材9の上端9a及び、柱部材7の
開口上端7cはともに常に海面上に位置している計画さ
れた水平な基準レベルKに存在しており、これら最上位
置の梁部材9には、或いは、これら柱部材7には、これ
ら梁部材9の上端側に架設される形で、或いは、これら
柱部材7の開口上端7cに載置される形で、鋼板からな
る水平なデッキプレート11aが設けられている。ま
た、デッキプレート11aの上には鉄筋コンクリートか
らなる水平なスラブ11が設けられている(なお、図2
では、便宜上、デッキプレート11a及びスラブ11の
輪郭のみを二点鎖線をもって示している。)。
As shown in FIGS. 1 and 2, a dolphin 1 is constructed at the construction site 2, and the dolphin 1 is made of a cylindrical steel pipe, and a plurality of piled spaces 5b are formed inside the dolphin 1. It has a positioning tube 5. Each positioning pipe 5 is vertically driven into the ground 3 on the seabed, and each opening upper end 5a of each positioning pipe 5 projects above the ground surface 3a of the ground 3. A jacket body 6 is supported by the plurality of positioning tubes 5. The jacket body 6 is made of a cylindrical steel pipe, and the inside thereof is a guide space 7d.
And a plurality of beam members 9 made of steel pipe are connected to each other in a column-beam structure, and the jacket body 6 has each column member 7 on the lower side thereof. Therefore, it is provided so as to be supported by each positioning tube 5. That is, a brim 7 a protruding in the axial direction of each pillar member 7 is formed on the inner peripheral surface side of each pillar member 7, and each pillar member 7 is formed from the lower end side of the opening of each pillar member 7 to the inside thereof. The positioning pipes 5 each having a diameter smaller than that of the pillar member 7 are inserted into a certain guide space 7d, and the flanges 7a are supported by the positioning pipes 5 in such a manner that they come into contact with the opening upper ends 5a of the positioning pipes 5. Further, the dolphin 1 has a shape that vertically fills the pile driving space 5b of each positioning pipe 5,
It has a plurality of support piles 10 made of reinforced concrete. The lower end side of each support pile 10 reaches the support layer 3b in the ground 3 by inserting the ground 3 downward from the pile driving space 5b, and the upper end side of each support pile 10 is a pillar from the pile driving space 5b. It reaches the guide space 7d of the member 7. In addition, at the position above the brim 7a on the inner peripheral surface side of each pillar member 7,
A plurality of engagement ribs (not shown) are formed, and when the concrete of the support pile 10 engages with the engagement ribs, a sufficient adhesive force is generated between the support pile 10 and the pillar member 7, and the jacket The weight of the body 6 (and the load weight applied to the jacket body 6) can be sufficiently transmitted to the support pile 10. In this way, the jacket body 6 is supported not only by the plurality of positioning tubes 5 but also by the plurality of support piles 10. In addition, since the support pile 10 reaches the support layer 3b in the ground 3 as described above, the jacket body 6 supported by the plurality of support piles 10 has a support layer through the plurality of support piles 10. 3b
Will be supported by the jacket body 6
(Alternatively, the jacket body 6 having the loaded weight) is supported and provided in a stable state. In addition, jacket body 6
Of these, the upper end 9a of the uppermost beam member 9 and the opening upper end 7c of the pillar member 7 both exist at the planned horizontal reference level K which is always located on the sea surface. 9 or these pillar members 7 are installed horizontally on the upper end sides of these beam members 9 or mounted on the opening upper ends 7c of these pillar members 7 and are made of horizontal steel plates. A deck plate 11a is provided. A horizontal slab 11 made of reinforced concrete is provided on the deck plate 11a (see FIG. 2).
Then, for convenience, only the contours of the deck plate 11a and the slab 11 are shown by a chain double-dashed line. ).

【0008】ドルフィン1及び、その構築現場2は以上
のように構成されているので、ドルフィン1が未だ構築
されていない構築現場2に、本発明による水中構造物の
構築方法を適用して該ドルフィン1を構築するには次の
ように行う。なお、海上には、公知のベノト工法により
場所打ち杭を構築するのに使用されるベノト掘削装置ユ
ニット12が待機しており、ベノト掘削装置ユニット1
2は、図示しないクレーン付作業台船に搭載されている
ケーシングチューブ13及び揺動装置15と、ブーム付
台船16のブーム16aの先端よりワイヤを介して釣支
されたハンマグラブ17からなっている。構築作業はま
ず、未だドルフィン1が構築されていない構築現場2の
海底において、地盤3に、図示しない公知の水中ハンマ
ー等を介して複数の位置決め管5をそれぞれ所定の位置
(即ち、前記ジャケット体6の複数の柱部材7の位置に
それぞれ対応した位置)に鉛直方向に打ち込む。次い
で、海上より、前記基準レベルKから各位置決め管5の
開口上端5aまでの鉛直方向の深さH2をそれぞれ測量
する(なお、深さH2は、各位置決め管5によってそれ
ぞれ異なることが普通である。)。一方、陸上において
は、複数の柱部材7と複数の梁部材9とを柱梁構造をな
す形で接合する形でジャケット体6が構築されており、
上述した測量の結果値である深さH2に基づいて、各柱
部材7の内周面側に各柱部材7の軸心方向に突出したツ
バ7aが溶接接合によりそれぞれ設けられる。即ち、各
ツバ7aは、各柱部材7の開口上端7cから各ツバ7a
の下面位置までの距離が、これら柱部材7に対応した位
置の位置決め管5の各深さH2の大きさの距離に等しく
なる位置においてそれぞれ設けられる。なお、ジャケッ
ト体6には、デッキプレート11aは設けられている
が、スラブ11は未だ設けられていない状態にある。ま
た、ジャケット体6は陸上の安定した作業環境において
構築されるため、その構築は容易かつ高精度で行われ
る。次いで、ツバ7aが設けらたジャケット体6を図示
しない作業台船に積込み、該台船を介して構築現場2ま
で曳航する。そして、ジャケット体6を、図示しない作
業台船に設けられた図示しないクレーンによって揚重
し、各柱部材7の位置がそれぞれ対応した位置決め管5
の上方に整合対応する形でジャケット体6を降下させ
る。降下により、ジャケット体6はその下側より海中2
aに進入し、進入をつづけることによって、各柱部材7
の各開口下端の位置がそれぞれ対応した位置決め管5の
開口上端5aに略同心状に整合対応する形で到達する。
更なる降下により、各柱部材7の各開口下端側より、そ
れぞれ対応した位置決め管5の開口上端5a側が各柱部
材7の各ガイド空間7dに進入し、各柱部材7のツバ7
aが位置決め管5の開口上端5aに到達当接する。到達
当接の後、図示しないクレーンによるジャケット体6の
揚重を解除させる。解除により、ジャケット体6は、ツ
バ7aにおいて当接していた位置決め管5により係止さ
れ支持される。なお、柱部材7の内径と位置決め管5の
外径とは、所定の大きさの径差を有しているため、位置
決め管5の打設が高精度で行われず、従って、各位置決
め管5の打設位置と、これらと対応した各柱部材7の位
置との間に水平距離における誤差が生じている場合に
も、各位置決め管5とそれぞれ対応した柱部材7との間
では、前記径差を利用して各位置決め管5がそれぞれ対
応した柱部材7に極力挿入され得るようになっている。
また、位置決め管5は、地盤3の支持層3bには到達し
ない形で打設されているが、ジャケット体6には未だ鉄
筋コンクリートによる大重量のスラブ11が形成されて
おらず、従って、柱部材7から位置決め管5に伝達され
る加重は極力軽減された状態になっているため、ジャケ
ット体6はこれら位置決め管5によって充分に支持され
得る。
Since the dolphin 1 and the construction site 2 thereof are configured as described above, the construction method 2 of the present invention is applied to the construction site 2 where the dolphin 1 has not been constructed yet. To build 1, do the following: In addition, on the sea, a Benot excavator unit 12 used for constructing a cast-in-place pile by a known Benot method is on standby, and the Benot excavator unit 1
Reference numeral 2 includes a casing tube 13 and a rocking device 15 mounted on a work table with a crane (not shown), and a hammer mug 17 supported by a wire from the tip of a boom 16a of a ship 16 with a boom. . In the construction work, first, on the seabed of the construction site 2 where the dolphins 1 have not been constructed yet, a plurality of positioning pipes 5 are respectively provided at predetermined positions (that is, the jacket body) on the ground 3 through a known underwater hammer or the like (not shown). 6 are vertically driven into positions corresponding to the positions of the plurality of pillar members 7). Then, the depth H2 in the vertical direction from the reference level K to the upper end 5a of the opening of each positioning pipe 5 is measured from the sea (the depth H2 is usually different for each positioning pipe 5). .). On the other hand, on land, the jacket body 6 is constructed by joining a plurality of pillar members 7 and a plurality of beam members 9 in a form of a pillar-beam structure,
Based on the depth H2 which is the result value of the above-described survey, the brim 7a protruding in the axial direction of each pillar member 7 is provided on the inner peripheral surface side of each pillar member 7 by welding. That is, each brim 7a extends from each opening upper end 7c of each pillar member 7 to each brim 7a.
Is provided at a position where the distance to the lower surface position is equal to the distance of the depth H2 of the positioning tube 5 at the position corresponding to these column members 7. Although the deck plate 11a is provided on the jacket body 6, the slab 11 is not provided yet. Further, since the jacket body 6 is constructed in a stable work environment on land, the construction is performed easily and with high accuracy. Next, the jacket body 6 provided with the brim 7a is loaded on a work table (not shown) and towed to the construction site 2 via the table. Then, the jacket body 6 is lifted by a crane (not shown) provided on a work berth (not shown), and the positioning pipes 5 corresponding to the positions of the respective pillar members 7 are provided.
The jacket body 6 is lowered so as to be aligned and corresponding to the above. Due to the descent, the jacket body 6 is underwater 2 from below.
Each pillar member 7 is entered by continuing to enter a.
The positions of the lower ends of the openings reach the upper ends 5a of the corresponding positioning tubes 5 in a substantially concentric manner.
By further lowering, from the lower end side of each opening of each pillar member 7, the upper opening 5a side of the corresponding positioning tube 5 enters each guide space 7d of each pillar member 7, and the brim 7 of each pillar member 7 is inserted.
The a reaches the upper end 5a of the opening of the positioning tube 5 and comes into contact therewith. After the arrival contact, the lifting of the jacket body 6 by the crane (not shown) is released. When released, the jacket body 6 is locked and supported by the positioning tube 5 that is in contact with the collar 7a. Since the inner diameter of the pillar member 7 and the outer diameter of the positioning tube 5 have a predetermined difference in diameter, the positioning tube 5 cannot be driven with high accuracy, and therefore each positioning tube 5 is Even if there is an error in the horizontal distance between the driving position of each of the column members 7 and the position of each of the column members 7 corresponding thereto, the diameter between the respective positioning pipes 5 and the column members 7 corresponding thereto is By utilizing the difference, each positioning tube 5 can be inserted into the corresponding column member 7 as much as possible.
Further, the positioning pipe 5 is cast in such a manner that it does not reach the support layer 3b of the ground 3, but the jacket body 6 does not yet have the heavy slab 11 made of reinforced concrete, and therefore the pillar member is not formed. Since the weight transmitted from 7 to the positioning tubes 5 is reduced as much as possible, the jacket body 6 can be sufficiently supported by these positioning tubes 5.

【0009】ところで、前記基準レベルKから各位置決
め管5の開口上端5aまでの鉛直方向の深さは深さH2
であり、柱部材7の開口上端7cからツバ7aまでの距
離は各深さH2に等しい大きさの距離になっているの
で、各柱部材7の開口上端7cは、全て前記基準レベル
Kに存在している。つまり、ジャケット体6は水平に高
精度で設置された。次いで、ジャケット体6の上側の前
記デッキプレート11aを足場として公知のベノト工法
により支持杭10の構築を行う。なお、支持杭10の構
築は、1本の柱部材7毎に行う形で全ての柱部材7に対
して行われる。即ち、各柱部材7に対する支持杭10の
構築は、まず図3に示すように、各柱部材7の開口上端
7cより、図示しない作業台船の図示しないクレーンに
よって吊下げたケーシングチューブ13を各柱部材7の
ガイド空間7dに挿入し降下させ、更に、該ガイド空間
7dより位置決め管5の杭打ち空間5bに挿入し降下さ
せ、ケーシングチューブ13の刃13bが形成された先
端を位置決め管5の杭打ち空間5bに存在している地盤
表面3aに到達させる。到達させた後、図示しない前記
作業台船から積み下し、ジャケット体6上のデッキプレ
ート11aに設置された揺動装置15を介してケーシン
グチューブ13を水平方向に揺動させると共に、下方に
押込むことにより、図3に示すように、刃13bが形成
されたケーシングチューブ13の先端付近を地盤3の中
に挿入させる。次いで、図示しない排水ポンプを介し
て、ケーシングチューブ13の内部13aの海水を排水
した後、該ケーシングチューブ13の内部13a或い
は、該内部13aの上方位置に、ブーム付台船16のブ
ーム16aの先端に釣支されたハンマグラブ17を設置
させる。次いで、該ハンマグラブ17をケーシングチュ
ーブ13の内部13aで落下させ、ケーシングチューブ
13の先端付近の地盤3を掘削して掘削孔19を形成
し、該ハンマグラブ17により掘削した土を掴んで上昇
し、掴んだ土を外部に排出する形の一連の動作と共に、
揺動装置15を介してケーシングチューブ13を水平方
向に揺動させ、かつ該チューブ13を更に下方に押込む
一連の動作を繰り返しながら、地盤3の掘削及び、ケー
シングチューブ13の地盤3への挿入を進める。更に、
掘削及び、挿入を進めて、ケーシングチューブ13が地
盤3の中の支持層3bに到達し、従って、掘削孔19が
支持層3bに到達することにより、これら掘削及び、挿
入を停止する。
By the way, the vertical depth from the reference level K to the upper end 5a of the opening of each positioning tube 5 is the depth H2.
Since the distance from the opening upper end 7c of the pillar member 7 to the brim 7a is equal to each depth H2, the opening upper end 7c of each pillar member 7 is all present at the reference level K. is doing. That is, the jacket body 6 was installed horizontally with high precision. Next, the support pile 10 is constructed by the well-known Benot method using the deck plate 11a on the upper side of the jacket body 6 as a scaffold. The support piles 10 are constructed for all the pillar members 7 in the form of being carried out for each one of the pillar members 7. That is, in order to build the support pile 10 for each pillar member 7, first, as shown in FIG. 3, each casing tube 13 hung from the opening upper end 7c of each pillar member 7 by a crane (not shown) of a work pontoon (not shown) is provided. It is inserted into the guide space 7d of the pillar member 7 and lowered, and further inserted from the guide space 7d into the pile driving space 5b of the positioning pipe 5 and lowered, so that the tip of the casing tube 13 on which the blade 13b is formed is moved. The ground surface 3a existing in the stakeout space 5b is reached. After reaching it, the container tube is unloaded from the work berth not shown, and the casing tube 13 is horizontally swung through the swing device 15 installed on the deck plate 11a on the jacket body 6 and is pushed downward. By inserting, as shown in FIG. 3, the vicinity of the tip of the casing tube 13 in which the blade 13b is formed is inserted into the ground 3. Then, after draining the seawater in the inside 13a of the casing tube 13 via a drainage pump (not shown), the tip of the boom 16a of the boom-equipped pier 16 is located at the inside 13a of the casing tube 13 or at a position above the inside 13a. Install the Hammaglab 17 that is supported by. Next, the hammer mug 17 is dropped inside the casing tube 13 to excavate the ground 3 near the tip of the casing tube 13 to form an excavation hole 19, and the soil excavated by the hammer mug 17 is grasped and lifted. With a series of operations that discharge the soil to the outside,
Excavation of the ground 3 and insertion of the casing tube 13 into the ground 3 are repeated while repeating a series of operations in which the casing tube 13 is horizontally rocked through the rocking device 15 and the tube 13 is pushed further downward. Proceed. Furthermore,
By excavating and inserting, the casing tube 13 reaches the supporting layer 3b in the ground 3, and therefore the excavation hole 19 reaches the supporting layer 3b to stop the excavating and inserting.

【0010】その後、ケーシングチューブ13の内部1
3aに図示しないポンプを介して清水注入、泥水排出に
よるスライム除去を行った後、図示しないクレーンを介
して、ケーシングチューブ13の内部13a即ち、掘削
孔19に鉄筋カゴを挿入設置し、図示しないコンクリー
トポンプ及び、図示しないコンクリート圧送管を介し
て、ケーシングチューブ13の内部13a即ち、掘削孔
19にコンクリートを打設する。なお、コンクリートの
打設にともなってケーシングチューブ13は図示しない
クレーンを介して揚重抜取りする。打設及び、抜取りに
より、コンクリートを所定の位置即ち、柱部材7のツバ
7aの上方の図示しない前記係合リブを埋没させる位置
まで打ち上げて、該柱部材7から、ケーシングチューブ
13、図示しないコンクリート圧送管を撤去して、打設
されたコンクリートを固結させることにより、支持杭1
0を構築が完了する。なお、支持杭10は、支持層3b
に到達している掘削孔19の下端位置から、柱部材7の
ガイド空間7dの所定の打ち上げ位置までの上下範囲に
亙って、掘削孔19、位置決め管5の杭打ち空間5b、
柱部材7のガイド空間7dをコンクリートで充填した形
で構築される。以下、その他の柱部材7に対しても1本
づつ上述した支持杭10の構築作業と同様の作業を行
う。即ち、ケーシングチューブ13を、該チューブ13
の先端を地盤表面3aに到達させる形で、柱部材7の内
部7b及び位置決め管5の内部に挿入させ、揺動装置1
5を介してケーシングチューブ13を水平方向に揺動さ
せると共に下方に押込むことにより、チューブ13の先
端付近を地盤3の中に挿入させ、ケーシングチューブ1
3の内部13aの海水を排水した後、該ケーシングチュ
ーブ13の内部13aでハンマグラブ17を落下させ、
ケーシングチューブ13の先端付近の地盤3を掘削して
掘削孔19を形成し、掘削した土を掴んで上昇し、掴ん
だ土を外部に排出する形の一連の動作と共に、揺動装置
15を介してケーシングチューブ13を水平方向に揺動
させ、かつ該チューブ13を更に下方に押込む一連の動
作を繰り返えす。また、更に、地盤3の掘削及び、ケー
シングチューブ13の地盤3への挿入を進めて、ケーシ
ングチューブ13を支持層3bに到達させ、従って、掘
削孔19を支持層3bに到達させることにより、これら
掘削及び、挿入を停止し、チューブ13の内部13aの
スライム除去を行った後、該内部13a即ち、掘削孔1
9に鉄筋カゴを挿入設置し、ケーシングチューブ13を
揚重抜取りしながら該掘削孔19にコンクリートを所定
の位置まで打設し、打設したコンクリートを固結させ
る。こうした支持杭10の構築作業を、全ての柱部材7
に対して1本づつ行う。
Then, the inside 1 of the casing tube 13
After injecting fresh water into 3a through a pump (not shown) and removing slime by discharging muddy water, a reinforcing bar basket is inserted and installed in the inside 13a of the casing tube 13, that is, the excavation hole 19 via a crane (not shown). Concrete is poured into the inside 13a of the casing tube 13, that is, the excavation hole 19 through a pump and a concrete pressure-feeding pipe (not shown). The casing tube 13 is lifted and removed by a crane (not shown) when the concrete is poured. By pouring and pulling out, concrete is driven up to a predetermined position, that is, a position above the brim 7a of the pillar member 7 where the engaging rib (not shown) is embedded, and the pillar member 7 is pushed to the casing tube 13 and concrete (not shown). By removing the pressure pipe and solidifying the cast concrete, the support pile 1
Construction of 0 is completed. In addition, the support pile 10 is the support layer 3b.
From the lower end position of the excavation hole 19 to the predetermined launch position of the guide space 7d of the pillar member 7, the excavation hole 19, the pile driving space 5b of the positioning pipe 5,
The guide space 7d of the pillar member 7 is constructed by being filled with concrete. Hereinafter, the same work as the above-described work for constructing the support piles 10 is performed on the other pillar members 7 one by one. That is, the casing tube 13 is replaced with the tube 13
The tip of the rocking member is inserted into the inside 7b of the pillar member 7 and the inside of the positioning pipe 5 so that the tip of the rocking surface reaches the ground surface 3a.
The casing tube 13 is horizontally swung via 5 and pushed downward to insert the vicinity of the tip end of the tube 13 into the ground 3, and thus the casing tube 1
After draining the seawater in the inside 13a of No. 3, the Hammaglab 17 is dropped in the inside 13a of the casing tube 13,
The ground 3 near the tip of the casing tube 13 is excavated to form the excavation hole 19, the excavated soil is gripped and lifted, and the gripped soil is discharged to the outside. The casing tube 13 is horizontally swung and the tube 13 is pushed further downward to repeat a series of operations. Further, by further excavating the ground 3 and inserting the casing tube 13 into the ground 3 so that the casing tube 13 reaches the support layer 3b and thus the drill hole 19 reaches the support layer 3b, After excavation and insertion are stopped and slime is removed from the inside 13a of the tube 13, the inside 13a, that is, the drilled hole 1 is removed.
A reinforcing steel basket is inserted and installed in 9, and the casing tube 13 is lifted and removed, and concrete is poured into the excavation hole 19 to a predetermined position, and the cast concrete is solidified. The construction work of such a support pile 10 is performed for all the pillar members 7
For each one.

【0011】次いで、ジャケット体6のデッキプレート
11aの上側に鉄筋等を配筋し、コンクリートを打設し
て固結させ、スラブ11を構築する。なお、上述したよ
うに、大重量のスラブ11が構築されたジャケット体6
は、複数の支持杭10を介して支持層3bによって確実
に支持されている。以上で、ドルフィン1の構築が全て
完了する。
Next, reinforcing bars and the like are arranged on the upper side of the deck plate 11a of the jacket body 6 and concrete is poured and solidified to construct the slab 11. In addition, as described above, the jacket body 6 in which the heavy slab 11 is constructed
Are reliably supported by the support layer 3b via the plurality of support piles 10. With the above, the construction of the dolphin 1 is completed.

【0012】以上のように、本発明による水中構造物の
構築方法によってドルフィン1を構築すると、従来提案
されている水中構造物の構築方法のように海底の地盤3
を整地したり、その整地面の上に栗石層を敷設して水中
コンクリートで固めるなどの作業を必要とせずに、複数
の位置決め管5の打設が容易に行われ、その他の作業即
ち、海上からの基準レベルKと位置決め管5との間の深
さH2の測定及び、陸上でのジャケット体6の構築及
び、該ジャケット体6の位置決め管5への設置及び、柱
部材7の上端7cからの支持杭10の打設構築は殆ど容
易で安全な非水中作業で行われるため、煩雑で困難な作
業が必要ない。また、ジャケット体6は、前記深さH2
に対応した位置に設定された、ジャケット体6と位置決
め管5との間のツバ7aを介して位置決め管5に支持さ
れる形で設置されるので、海面2bに対する該ジャケッ
ト体6の上下方向の設置位置が正確となり、該ジャケッ
ト体6の設置精度が向上され、ドルフィン1の構築精度
が向上される。
As described above, when the dolphin 1 is constructed by the method for constructing an underwater structure according to the present invention, the ground 3 on the seabed is constructed like the conventionally proposed method for constructing an underwater structure.
The positioning pipes 5 can be easily placed without leveling the ground or laying a cobblestone layer on the ground and hardening it with underwater concrete. Of the depth H2 between the reference level K and the positioning tube 5 from above, construction of the jacket body 6 on land, installation of the jacket body 6 on the positioning tube 5, and from the upper end 7c of the pillar member 7 Since the construction and construction of the support pile 10 is performed by non-underwater work which is almost easy and safe, complicated and difficult work is not required. Further, the jacket body 6 has the depth H2.
Since it is installed in such a manner that it is supported by the positioning tube 5 via the brim 7a between the jacket body 6 and the positioning tube 5 which is set at a position corresponding to, The installation position becomes accurate, the installation accuracy of the jacket body 6 is improved, and the construction accuracy of the dolphin 1 is improved.

【0013】なお、上述した実施例では支持杭10はベ
ノト工法による場所打ち杭として打設構築したが、支持
杭10は、上下方向に連通接続された柱部材7のガイド
空間7dと、該柱部材7に対応した位置決め管5の各杭
打ち空間5bを通して打設構築でき、しかも該支持杭1
0とジャケット体6とを、該ジャケット体6が該支持杭
10に支持される形で接続し得るならば、例えば、鋼管
杭等のように、どのような杭として打設構築されてもよ
い。
In the above-mentioned embodiment, the support pile 10 was constructed by casting as a cast-in-place pile by the Benoto method, but the support pile 10 is formed with the guide space 7d of the pillar member 7 which is vertically connected and communicated with the pillar. It can be constructed by driving through the pile driving spaces 5b of the positioning pipe 5 corresponding to the member 7, and the supporting pile 1
If 0 and the jacket body 6 can be connected in such a manner that the jacket body 6 is supported by the support pile 10, any pile such as a steel pipe pile may be formed and constructed. .

【0014】また、上述した実施例ではジャケット体6
の構築は陸上で高精度に行われているが、ジャケット体
6の構築場所は、安定した作業環境で構築が高精度に行
われ得るならば、陸上でなくともよく、例えば、ドライ
ドック或いは、作業台船上或いは、既に構築された水中
構造物の上でもよい。
Further, in the above-mentioned embodiment, the jacket body 6 is used.
Is constructed on land with high precision, but the construction location of the jacket body 6 need not be on land as long as construction can be conducted with high accuracy in a stable working environment. For example, dry dock or It may be on a work table or on an already constructed underwater structure.

【0015】また、上述した実施例では柱部材7の内周
面側にツバ7aを設けて、このツバ7aと位置決め管5
の開口上端5aを柱部材7と位置決め管5との係止手段
とした。しかし、柱部材7の内周面側にツバ7aを設け
る代わりに、図4(a)に示すように、柱部材7の外周
面側にツバ7eを設けて、該ツバ7eと位置決め管5の
開口上端5aを柱部材7と位置決め管5との係止手段と
してもよい。ツバ7eを設けた場合、柱部材7の外径は
位置決め管5の内径より小さく形成され、柱部材7は位
置決め管5によって、柱部材7の開口下端側が位置決め
管5の開口上端5a側より、位置決め管5の内部に挿入
する形で、かつツバ7eと位置決め管5の開口上端5a
とが当接する形で支持される。
Further, in the above-described embodiment, the collar 7a is provided on the inner peripheral surface side of the column member 7, and the collar 7a and the positioning pipe 5 are provided.
The upper end 5a of the opening is used as a locking means for the pillar member 7 and the positioning tube 5. However, instead of providing the brim 7a on the inner peripheral surface side of the pillar member 7, as shown in FIG. 4 (a), the brim 7e is provided on the outer peripheral surface side of the pillar member 7, and the brim 7e and the positioning tube 5 are The upper end 5a of the opening may be a locking means for the pillar member 7 and the positioning tube 5. When the brim 7e is provided, the outer diameter of the pillar member 7 is formed smaller than the inner diameter of the positioning tube 5, and the pillar member 7 is positioned by the positioning tube 5 so that the opening lower end side of the pillar member 7 is closer to the opening upper end 5a side of the positioning tube 5. Inserted into the positioning tube 5, the flange 7e and the opening upper end 5a of the positioning tube 5
And are supported so that they abut.

【0016】また、柱部材7の内外周面側いずれにもツ
バ7a或いは、ツバ7eを設けず、図4(b)或いは、
図4(c)に示すように、位置決め管5の内周面側或い
は、外周面側にツバ5c或いは、ツバ5dを設けてもよ
い。位置決め管5にツバ5c或いは、ツバ5dを設ける
場合、柱部材7は位置決め管5によって、柱部材7の開
口下端7f側が位置決め管5の開口上端5a側より位置
決め管5の内部に挿入する形で、或いは、位置決め管5
の開口上端5aが柱部材7の開口下端7f側より柱部材
7の内部に挿入する形で、かつツバ5c或いは、ツバ5
dと柱部材7の開口下端7fとが当接する形で支持され
る。なお、位置決め管5にツバ5c或いは、ツバ5dを
設ける場合、柱部材7と位置決め管5との係止手段はツ
バ5cと柱部材7の開口下端7f或いは、ツバ5dと柱
部材7の開口下端7fとなる。また、測定されるべき複
数の位置決め管5と基準レベルKとの間の深さH2は、
位置決め管5のツバ5c或いは、ツバ5dと海面2bと
の間の距離となり(ツバ5c、5dは位置決め管5の図
4上端より一定の位置に予め設けられている)、予め長
手方向の長さを長めにして形成された柱部材7を、該柱
部材7に対応する位置決め管5の測定された深さH2に
対応した位置において切断し、その切断端部を開口下端
7fと設定する。
Further, neither the collar 7a nor the collar 7e is provided on either the inner or outer peripheral surface side of the column member 7, and the column member 7 is shown in FIG.
As shown in FIG. 4C, the collar 5c or the collar 5d may be provided on the inner peripheral surface side or the outer peripheral surface side of the positioning tube 5. When the collar 5c or the collar 5d is provided on the positioning tube 5, the pillar member 7 is inserted by the positioning tube 5 so that the opening lower end 7f side of the pillar member 7 is inserted into the positioning tube 5 from the opening upper end 5a side of the positioning tube 5. Or positioning tube 5
The upper end 5a of the opening is inserted into the pillar member 7 from the lower end 7f side of the opening of the pillar member 7, and the brim 5c or the brim 5
d and the lower end 7f of the opening of the column member 7 are supported in abutment with each other. In the case where the positioning tube 5 is provided with the brim 5c or the brim 5d, the locking means between the pillar member 7 and the positioning tube 5 is the opening lower end 7f of the brim 5c and the pillar member 7 or the opening lower end of the brim 5d and the pillar member 7. 7f. The depth H2 between the plurality of positioning tubes 5 to be measured and the reference level K is
The distance between the collar 5c of the positioning tube 5 or the collar 5d and the sea surface 2b (the collars 5c and 5d are provided in advance at a fixed position from the upper end of the positioning tube 5 in FIG. 4), and the length in the longitudinal direction is preset. Is cut at a position corresponding to the measured depth H2 of the positioning tube 5 corresponding to the pillar member 7, and the cut end is set as the opening lower end 7f.

【発明の効果】以上説明したように、本発明による水中
構造物の構築方法は、上下方向に貫通した杭打ち空間5
b等の杭打ち孔を有する複数の位置決め管5等の位置決
め管を、地盤3等の水底地盤に打設し、前記複数の位置
決め管と基準レベルK等の基準位置との間の深さH2等
の上下距離をそれぞれ測定し、上下方向に貫通したガイ
ド空間7d等のガイド孔を有する柱部材7等のガイド管
を、前記位置決め管の打設位置に対応させた形で複数本
設けてジャケット体6等のジャケット体を構築し、前記
ガイド管と該ガイド管に対応した前記位置決め管の間の
該ガイド管に対応する位置決め管の測定された前記上下
距離に対応した位置にツバ7a、7eと開口上端5a、
開口下端7fとツバ5c、5d等の係止手段をそれぞれ
設定し、前記ジャケット体を、前記ガイド管が前記係止
手段を介して前記位置決め管にそれぞれ支持され、かつ
該ガイド管のガイド孔と、該ガイド管に対応した前記位
置決め管の各杭打ち孔とが互いに上下方向に連通接続さ
れる形で設置し、上下方向に連通したガイド孔と杭打ち
孔とを通して、前記水底地盤に支持杭10等の支持杭を
打設構築し、前記支持杭と前記ジャケット体とを、該ジ
ャケット体が該支持杭に支持される形で接続して構成さ
れる。従って、本発明による水中構造物の構築方法で
は、複数の位置決め管の打設が、水底地盤を整地した
り、その整地面の上に栗石層を敷設して水中コンクリー
トで固めるなどの作業を必要とせずに容易に行われ、そ
の他の作業即ち、前記上下距離の測定及び、ジャケット
体の構築及び、該ジャケット体の位置決め管への設置及
び、支持杭の打設構築は殆ど容易で安全な非水中作業で
行われるため、煩雑で困難な作業が必要ないばかりでな
く、ジャケット体は、前記上下距離に対応した位置に設
定された、ジャケット体と位置決め管との間の係止手段
を介して位置決め管に支持される形で設置されるので、
水面に対する該ジャケット体の上下方向の設置位置が正
確となり、該ジャケット体の設置精度が向上され、水中
構造物の構築精度が向上される。
As described above, in the method of constructing an underwater structure according to the present invention, the pile driving space 5 that penetrates vertically is provided.
Positioning pipes such as a plurality of positioning pipes 5 having a pile driving hole such as b are driven in the water bottom ground such as the ground 3, and a depth H2 between the plurality of positioning pipes and a reference position such as a reference level K is set. And the like, and a plurality of guide tubes such as column members 7 having guide holes such as guide spaces 7d penetrating in the vertical direction are provided in a form corresponding to the driving position of the positioning tube. A jacket body such as the body 6 is constructed, and the brim 7a, 7e is provided between the guide tube and the positioning tube corresponding to the guide tube at a position corresponding to the measured vertical distance of the positioning tube corresponding to the guide tube. And the opening upper end 5a,
The lower end 7f of the opening and the locking means such as the collars 5c and 5d are set respectively, and the jacket body is supported by the positioning tube via the locking means and the guide hole of the guide tube is formed. , The pile pipes of the positioning pipe corresponding to the guide pipes are installed so that they are vertically connected to each other, and the support piles are mounted on the subseabed through the guide holes and the pile pipes that are vertically communicated with each other. It is constructed by driving and constructing 10 or the like support piles, and connecting the support piles and the jacket body in such a manner that the jacket body is supported by the support piles. Therefore, in the method of constructing an underwater structure according to the present invention, placing a plurality of positioning pipes requires work such as leveling a water bottom ground and laying a stone stone layer on the leveled ground and solidifying with underwater concrete. Other operations, that is, the measurement of the vertical distance, the construction of the jacket body, the installation of the jacket body on the positioning pipe, and the construction of the support piles are almost easy and safe. Since the work is performed underwater, not only is complicated and difficult work not only necessary, but the jacket body is set at a position corresponding to the vertical distance through a locking means between the jacket body and the positioning tube. Since it is installed so that it is supported by the positioning tube,
The vertical installation position of the jacket body with respect to the water surface becomes accurate, the installation accuracy of the jacket body is improved, and the construction accuracy of the underwater structure is improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】図1は、本発明による水中構造物の構築方法に
より構築されたドルフィンの一例を示した断面図であ
る。
FIG. 1 is a cross-sectional view showing an example of a dolphin constructed by a method for constructing an underwater structure according to the present invention.

【図2】図2は、図1で示すドルフィンを上方から見た
平面図である。
FIG. 2 is a plan view of the dolphin shown in FIG. 1 seen from above.

【図3】図3は、図1で示すドルフィンの構築における
一工程を示した図である。
FIG. 3 is a diagram showing one step in the construction of the dolphin shown in FIG. 1.

【図4】図4(a)は、柱部材の外周面側のツバとして
設けられた、柱部材と位置決め管との係止手段の一例を
示した図である。図4(b)は、柱部材の開口下端とし
て設けられた、柱部材と位置決め管との係止手段の一例
を示した図である。図4(c)は、柱部材の開口下端と
して設けられた、柱部材と位置決め管との係止手段の他
の一例を示した図である。
FIG. 4 (a) is a view showing an example of locking means for a pillar member and a positioning tube, which is provided as a collar on the outer peripheral surface side of the pillar member. FIG. 4B is a diagram showing an example of locking means for the pillar member and the positioning tube, which is provided as the lower end of the opening of the pillar member. FIG. 4C is a view showing another example of a locking means for locking the pillar member and the positioning tube, which is provided as the lower end of the opening of the pillar member.

【図5】図5は、従来提案されている構築方法により、
水中構造物を構築している作業の一工程を示した図であ
る。
FIG. 5 is a diagram showing a construction method conventionally proposed,
It is the figure which showed 1 process of the work which is constructing the underwater structure.

【符号の説明】[Explanation of symbols]

1……水中構造物(ドルフィン) 3……水底地盤(地盤) 5……位置決め管 5a……係止手段(開口上端) 5b……杭打ち孔(杭打ち空間) 5c……係止手段(ツバ) 5d……係止手段(ツバ) 6……ジャケット体 7……ガイド管(柱部材) 7a……係止手段(ツバ) 7d……ガイド孔(ガイド空間) 7e……係止手段(ツバ) 7f……係止手段(開口下端) 10……支持杭 H2……上下距離(深さ) K……基準位置(基準レベル) 1 ... Underwater structure (Dolphin) 3 ... Underwater ground (ground) 5 ... Positioning pipe 5a ... Locking means (opening upper end) 5b ... Pile driving hole (pile driving space) 5c ... Locking means ( Collar 5d ...... Locking means (collar) 6 ...... Jacket body 7 ...... Guide tube (column member) 7a …… Locking means (collar) 7d …… Guide hole (guide space) 7e …… Locking means ( Collar 7f …… Locking means (lower end of opening) 10 …… Support pile H2 …… Vertical distance (depth) K …… Reference position (reference level)

フロントページの続き (72)発明者 大丸 正八郎 福岡県福岡市博多区店屋町1番35号 博多 三井ビルディング2号館 三井建設株式会 社九州支店内Front Page Continuation (72) Inventor Shohachiro Daimaru 1-35 Sayaya, Hakata-ku, Fukuoka-shi, Fukuoka Hakata Mitsui Building No. 2 Building Mitsui Construction Co., Ltd. Kyushu Branch

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】上下方向に貫通した杭打ち孔を有する複数
の位置決め管を、水底地盤に打設し、 前記複数の位置決め管と基準位置との間の上下距離をそ
れぞれ測定し、 上下方向に貫通したガイド孔を有するガイド管を、前記
位置決め管の打設位置に対応させた形で複数本設けてジ
ャケット体を構築し、 前記ガイド管と該ガイド管に対応した前記位置決め管の
間の該ガイド管に対応する位置決め管の測定された前記
上下距離に対応した位置に係止手段をそれぞれ設定し、 前記ジャケット体を、前記ガイド管が前記係止手段を介
して前記位置決め管にそれぞれ支持され、かつ該ガイド
管のガイド孔と、該ガイド管に対応した前記位置決め管
の各杭打ち孔とが互いに上下方向に連通接続される形で
設置し、 上下方向に連通したガイド孔と杭打ち孔とを通して、前
記水底地盤に支持杭を打設構築し、 前記支持杭と前記ジャケット体とを、該ジャケット体が
該支持杭に支持される形で接続して構成した水中構造物
の構築方法。
1. A plurality of positioning pipes having pile-piercing holes penetrating in the vertical direction are placed in a subseabed ground, and vertical distances between the plurality of positioning pipes and a reference position are measured, respectively. A plurality of guide tubes having penetrating guide holes are provided in a form corresponding to the driving position of the positioning tube to construct a jacket body, and the jacket between the guide tube and the positioning tube corresponding to the guide tube is constructed. Locking means are respectively set at positions corresponding to the measured vertical distances of the positioning tubes corresponding to the guide tubes, and the jacket body is supported by the positioning tubes via the locking means. The guide hole of the guide pipe and the pile driving holes of the positioning pipe corresponding to the guide pipe are installed so that they are vertically connected to each other. Through the sea bed soil to the supporting piles constructed pouring, said the support piles and the jacket body, method for constructing a underwater structure constituted by connecting in the form of the jacket body is supported by the supporting piles.
JP21696493A 1993-08-09 1993-08-09 How to build underwater structures Expired - Fee Related JP3297158B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21696493A JP3297158B2 (en) 1993-08-09 1993-08-09 How to build underwater structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21696493A JP3297158B2 (en) 1993-08-09 1993-08-09 How to build underwater structures

Publications (2)

Publication Number Publication Date
JPH0748819A true JPH0748819A (en) 1995-02-21
JP3297158B2 JP3297158B2 (en) 2002-07-02

Family

ID=16696682

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21696493A Expired - Fee Related JP3297158B2 (en) 1993-08-09 1993-08-09 How to build underwater structures

Country Status (1)

Country Link
JP (1) JP3297158B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010248780A (en) * 2009-04-15 2010-11-04 Nippon Steel Corp Water area structure using sea bed ground driving member
CN109356021A (en) * 2018-11-27 2019-02-19 中铁六局集团有限公司 Temporary rest pier waterborne and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010248780A (en) * 2009-04-15 2010-11-04 Nippon Steel Corp Water area structure using sea bed ground driving member
CN109356021A (en) * 2018-11-27 2019-02-19 中铁六局集团有限公司 Temporary rest pier waterborne and its construction method

Also Published As

Publication number Publication date
JP3297158B2 (en) 2002-07-02

Similar Documents

Publication Publication Date Title
US9567720B2 (en) Offshore platform for a marine environment
WO2015135471A1 (en) Hollow cylindrical pier for fixing offshore platform structure to bed and method of installing and constructing same
CN110258582B (en) Inclined support foundation pit supporting structure based on steel pipe pile and Lassen steel plate and construction method
KR20120012504A (en) Cast in place concrete pile With precast type Caisson
JP3979466B2 (en) Temporary closing method
KR101256274B1 (en) Reverse Drill Method With precast type Caisson and Jacket
CN109707002B (en) Device and method for accurately positioning, sinking and installing large water intake head
JP6674868B2 (en) Construction method of underground structure
CN101392521A (en) Rock-socketed steel dock structure and construction method thereof
JP2002146811A (en) Construction method for underwater structure foundation
US3091937A (en) Underwater foundation structure and method therefor
CN111364413A (en) Construction process of outfitting wharf
JPH06146305A (en) Underwater foundation and installation method thereof
JPH0748819A (en) Construction method for underwater structure
JP2016148224A (en) Immersed structure construction method and immersed structure
KR101680794B1 (en) Basic structure for constructing a caisson foundation and the construction method using the same
JPH0748818A (en) Construction method for structure
JP4260448B2 (en) Connection method and structure of submerged shaft and horizontal shaft
KR20200123977A (en) Lathe type quay structure reinforced sheet pile and method for reinforcement quay structure using sheet pile
CN109469080A (en) A kind of embedding rock steel sheet pile cofferdam structure and its construction method under water
JP2002121753A (en) Floating construction method for pier
JPS598835A (en) Footing type steel plate cell caisson work
JP2002047665A (en) Installation method for jacket structure
JPH0340169B2 (en)
JP3579104B2 (en) How to bury structures

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080412

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 9

Free format text: PAYMENT UNTIL: 20110412

LAPS Cancellation because of no payment of annual fees