JPH07305328A - Equipment and materials carrying device - Google Patents

Equipment and materials carrying device

Info

Publication number
JPH07305328A
JPH07305328A JP29184494A JP29184494A JPH07305328A JP H07305328 A JPH07305328 A JP H07305328A JP 29184494 A JP29184494 A JP 29184494A JP 29184494 A JP29184494 A JP 29184494A JP H07305328 A JPH07305328 A JP H07305328A
Authority
JP
Japan
Prior art keywords
rail
dam
concrete
rail mount
carrier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP29184494A
Other languages
Japanese (ja)
Inventor
Shigemi Sato
成美 佐藤
Hiroshi Shimada
洋 嶋田
Yoichi Fukumoto
洋一 福元
Takuro Odawara
卓郎 小田原
Hideo Imai
英雄 今井
Hidefumi Take
秀文 岳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Miike Machinery Co Ltd
Shimizu Construction Co Ltd
Mitsui Miike Engineering Corp
Shimizu Corp
Original Assignee
Mitsui Miike Machinery Co Ltd
Shimizu Construction Co Ltd
Mitsui Miike Engineering Corp
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Miike Machinery Co Ltd, Shimizu Construction Co Ltd, Mitsui Miike Engineering Corp, Shimizu Corp filed Critical Mitsui Miike Machinery Co Ltd
Priority to JP29184494A priority Critical patent/JPH07305328A/en
Publication of JPH07305328A publication Critical patent/JPH07305328A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To carry equipment and materials from a river bed onto an embankment by providing a frame loading a first rail and a lower side second rail on the side wall of a dam embankment, elevating the frame following to progress of concrete placing, and followingly providing the second rail. CONSTITUTION:A bucket 11 is elevated along guide rails 10, 46 by means of a winding device 54, carried concrete is loaded on a dump car 22 through a temporary receiving hopper 49, and placed on the upper face of an embankment 1. Next, according to progress of concrete placing, a divided body 5a is continuously provided to the upper part of a climbing rail 5 through anchor bolts 9 and the like, so as to extend upward. Next a rail frame 27 is elevated along the extending direction of the rail 5 by the use of an elevating mechanism 29, and fixed to it through a detachable engaging part. The divided body of the rail 10 is continuously provided between the rail 46 of the frame 27 and the rail 10. Hereby, a concrete kneading facility can be provided on a river bed part, safely executed, and the construction period can be remarkably shortened.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、コンクリート等の資材
やコンクリート打設用機材等の資機材を搬送する資機材
搬送装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a material / material carrying device for carrying materials such as concrete and materials for concrete pouring.

【0002】[0002]

【従来の技術】従来から、ダム建設には、面状に広くコ
ンクリートを打設していくRCD(Roller Compacted D
am-concrete)工法や拡張レヤー打設工法等が採用され
ており、該工法は、すでにコンクリート打設で形成され
たダム堤体上に一層ずつコンクリート打設層を積み重ね
てダム堤体を上方に構築していくものである。そして、
上記の場合、すでに形成されたダム堤体上に、新たな打
設を行うための、コンクリート等の資材やコンクリート
打設用機材等の資機材を搬送する必要があり、従来は、
コンクリート混練設備等をダム堤頂部近傍であって該堤
頂部よりやや高い位置に設け、これよりさらに高い位置
にケーブルクレーンを設置し該ケーブルクレーンを用い
て資機材を搬送したり、ダムの掘削面にインクライン設
備を設け該インクライン設備を用いてダム堤体上に資機
材を降ろしたり、さらにはベルトコンベアで河床部から
搬送する方法等が採用されている。
2. Description of the Related Art RCD (Roller Compacted D) has conventionally been used to construct concrete in a wide area for dam construction.
am-concrete) construction method and extended layer casting construction method are adopted. In this construction method, concrete placing layers are stacked one by one on the dam embankment already formed by concrete placing, and the dam embankment is placed above. It is something to build. And
In the above case, it is necessary to transport materials such as concrete and equipment for concrete pouring for new pouring on the already formed dam levee.
Concrete kneading equipment is installed near the dam ridge top and at a position slightly higher than the ridge top, and a cable crane is installed at a higher position than this to transport materials and equipment, and to excavate the dam surface. There is adopted a method in which an incline facility is provided to unload the equipment and materials on the dam bank using the incline facility, and further, a belt conveyor conveys the equipment from the riverbed.

【0003】[0003]

【発明が解決しようとする課題】上記したケーブルクレ
ーンを用いる場合には、主に以下の問題があった。 (1)コンクリート混練設備及びケーブルクレーンを設
置するための広い用地がダム堤頂部付近に必要となるた
め、該ダム堤頂部付近の山を大きく削り取って用地を確
保する必要があり、自然環境保全や景観上の観点から好
ましくない。 (2)ケーブルクレーンのバケット等が作業者の上方を
移動するため作業者の安全確保に一層の注意を払わなけ
ればならない。
When the above cable crane is used, there are mainly the following problems. (1) A wide site for installing concrete kneading equipment and cable cranes is required near the dam ridge top, so it is necessary to largely scrape off the mountains near the dam ridge top to secure the site, and to preserve the natural environment. Not preferable from the viewpoint of landscape. (2) Since the bucket of the cable crane moves above the worker, more attention must be paid to ensuring the safety of the worker.

【0004】上記したインクライン設備を用いる場合に
は、主に以下の問題があった。 (1)ケーブルクレーンの場合と同様、コンクリート混
練設備を設置するための広い用地がダム堤頂部付近に必
要となるため、該ダム堤頂部付近の山を大きく削り取っ
て用地を確保する必要があり、自然環境保全や景観上の
観点から好ましくない。 (2)台車を走行させるレール設備を、ダムの掘削面の
ダム頂部から河床に至る間に設置しなければならないた
め、ダムの打設開始に先立ってレール設備下面全体の岩
盤について岩盤検査を受ける必要があり、またレールを
前もって上から下まで全部を敷設しなければ稼働できな
い構造であり、よって、ダムコンクリートの打設開始に
対する工程上の制約がある。加えてコンクリート打設の
進捗と共に、基礎コンクリートの撤去などの作業を行わ
なければダムコンクリートの打設作業を進行できない。
したがって、必然的に工期が長くなってしまう。
When the above-mentioned incline equipment is used, there are mainly the following problems. (1) As in the case of the cable crane, a wide site for installing concrete kneading equipment is required near the dam ridge top, so it is necessary to largely scrape off the mountain near the dam ridge top to secure the site, Not preferable from the viewpoint of conservation of natural environment and landscape. (2) Since the rail equipment for running the bogie must be installed between the top of the dam on the excavated surface of the dam and the riverbed, a bedrock inspection of the entire bedrock of the bottom surface of the rail equipment is performed before the start of the dam setting. This is a structure that cannot be operated unless all the rails are laid in advance from the top to the bottom. Therefore, there are restrictions in the process for starting the placing of dam concrete. In addition, as concrete pouring progresses, dam concrete pouring work cannot proceed unless the basic concrete is removed.
Therefore, the construction period inevitably becomes long.

【0005】上記したベルトコンベアで河床部から搬送
する場合には、以下の問題があった。 (1)コンクリート打設面の上昇に伴うベルトコンベア
ラインの盛替が大変であり、また、ベルトコンベアの敷
設に伴う地山の切取りが発生するため、必然的に工期が
長くなってしまう。
When the above belt conveyor conveys from the riverbed, there are the following problems. (1) It is difficult to replace the belt conveyor line with the rise of the concrete placing surface, and the ground is cut off due to the laying of the belt conveyor, which inevitably prolongs the construction period.

【0006】本発明は、従来の技術の有するこのような
問題点に鑑みてなされたものであり、その目的とすると
ころは、自然環境保全や景観上の観点から好ましく、ま
た安全性が高く、さらに工期を大幅に短縮できるダム建
設の施工に用いて好適な資機材搬送装置を提供するもの
である。
The present invention has been made in view of the above problems of the prior art, and the object thereof is preferable from the viewpoint of conservation of natural environment and landscape, and high safety. Further, the present invention provides a material / material transport device suitable for use in construction of a dam that can significantly reduce the construction period.

【0007】[0007]

【課題を解決するための手段】上記目的を達成するため
に、本発明の請求項1記載の資機材搬送装置は、資機材
を搭載可能な搬送器と、すでにコンクリート打設により
形成されたダム堤体の側壁面に上下方向に沿って延在設
置される案内部材と、該案内部材に反力をとりつつ前記
ダム堤体の側壁面に沿って上昇可能であるとともに、前
記搬送器の移動を案内する第一レールが上昇方向に沿っ
て設けられたレール架台と、該レール架台の第一レール
の下側に連続するよう前記ダム堤体の側壁面に設けられ
る第二レールと、を具備することを特徴としている。
In order to achieve the above object, a material / material conveying device according to claim 1 of the present invention comprises a carrier on which the material / material can be mounted and a dam already formed by concrete pouring. A guide member extending along the vertical direction on the side wall surface of the dam body, capable of ascending along the side wall surface of the dam dam body while applying a reaction force to the guide member, and movement of the carrier. A rail mount in which a first rail for guiding the rail is provided along an ascending direction, and a second rail provided on the side wall surface of the dam bank so as to be continuous with the lower side of the first rail of the rail mount. It is characterized by doing.

【0008】本発明の請求項2記載の資機材搬送装置
は、請求項1記載のものに加えて、前記レール架台に、
前記搬送器に連結された線状体を巻上げ及び繰出すこと
により該搬送器を昇降させる巻上装置が設けられている
ことを特徴としている。
According to a second aspect of the present invention, there is provided a material and material conveying device, wherein, in addition to the equipment according to the first aspect,
It is characterized in that a hoisting device for raising and lowering the carrier by hoisting and unwinding the linear body connected to the carrier is provided.

【0009】本発明の請求項3記載の資機材搬送装置
は、請求項1記載のものに加えて、前記レール架台以外
の位置に、前記搬送器に連結された線状体を巻上げ及び
繰出すことにより該搬送器を昇降させる巻上装置が設け
られ、前記レール架台には、前記線状体がかけられるプ
ーリが設けられていることを特徴としている。
According to a third aspect of the present invention, in addition to the first aspect of the present invention, in addition to the apparatus of the first aspect, the linear body connected to the carrier is wound up and unwound at a position other than the rail mount. Thus, a hoisting device for raising and lowering the carrier is provided, and the rail mount is provided with a pulley to which the linear body is applied.

【0010】本発明の請求項4記載の資機材搬送装置
は、請求項2又は3に記載のものに加えて、前記搬送器
を二つ有しており、前記巻上装置は、それぞれの搬送器
に連結された線状体をそれぞれ個別の回転体に逆向きに
巻いてなることを特徴としている。
In addition to the apparatus of claim 2 or 3, the apparatus for transporting materials and equipment according to claim 4 of the present invention has two of the transporters, and the hoisting device has respective transporting means. It is characterized in that the linear body connected to the container is wound in the opposite direction on each individual rotating body.

【0011】本発明の請求項5記載の資機材搬送装置
は、請求項1乃至4のいずれか一項に記載のものに加え
て、前記レール架台に、前記搬送器により運搬された資
材を仮受けする仮受ホッパーが設けられていることを特
徴としている。
According to a fifth aspect of the present invention, in addition to the apparatus of any one of the first to fourth aspects, in addition to the equipment of any one of the first to fourth aspects, the material carried by the carrier is temporarily placed on the rail mount. It is characterized in that a temporary receiving hopper for receiving is provided.

【0012】本発明の請求項6記載の資機材搬送装置
は、請求項1乃至5のいずれか一項に記載のものに加え
て、前記案内部材は、複数の分割体からなるとともに、
前記レール架台と係合状態にある分割体のみで、該レー
ル架台をダム堤体の側壁面に支持可能であることを特徴
としている。
According to a sixth aspect of the present invention, there is provided the material and material conveying device according to any one of the first to fifth aspects, wherein the guide member is composed of a plurality of divided bodies.
It is characterized in that the rail mount can be supported on the side wall surface of the dam levee body only by the divided body in the engaged state with the rail mount.

【0013】本発明の請求項7記載の資機材搬送装置
は、請求項1乃至6のいずれか一項に記載のものに加え
て、前記案内部材は、延在方向に複数配設された係合穴
を有しており、前記レール架台は、該レール架台に固定
されるとともに前記係合穴に係脱可能な固定係合部と、
伸縮機構を介して前記レール架台に連結され該レール架
台に対し前記案内部材の延在方向に沿って移動可能とさ
れるとともに前記係合穴に係脱可能な移動係合部とを有
することを特徴としている。
According to a seventh aspect of the present invention, in addition to the one according to any one of the first to sixth aspects, a plurality of the guide members are arranged in the extending direction. And a fixed engaging portion that is fixed to the rail pedestal and that is engageable with and disengageable from the engaging hole.
And a movable engaging portion that is connected to the rail mount via an expansion / contraction mechanism and is movable with respect to the rail mount along the extending direction of the guide member and that is disengageable from the engaging hole. It has a feature.

【0014】[0014]

【作用】本発明の請求項1記載の資機材搬送装置によれ
ば、すでにコンクリート打設により形成されたダム堤体
の側壁面に案内部材を設置して該案内部材にレール架台
を設け、該レール架台の第一レールとその下側に連続す
るようダム堤体の側壁面に設けられた第二レールとで搬
送器の移動を案内して、河床部側から搬入されたコンク
リート等の資機材をすでにコンクリート打設により形成
されたダム堤体上に運搬する。そして、コンクリート打
設の進捗とともに、レール架台を案内部材に反力をとり
つつ上昇させることにより、レール架台に設けられた第
一レールをコンクリート打設の進捗にともなって上昇さ
せる。そして、上昇したレール架台の第一レールと連続
するよう第二レールを設ける。上記のように、搬送器の
移動を案内する第一レールおよび第二レールをコンクリ
ート打設の進捗にともなって延長させることができるこ
とから、すでに打設されたダム堤体を利用して河床部側
から資機材をダム堤体上に運搬できることになるため、
コンクリートを混練製造するコンクリート混練設備等を
河床部に設置することができ、またケーブルクレーンの
数も少なくできることになり、よって、該コンクリート
混練設備及びケーブルクレーンを設置するための用地確
保のためにダム堤頂部付近の山を大きく削り取る必要が
なくなるとともに、ケーブルクレーンのバケット等が作
業者の上方を移動する機会も少なくなる。また、掘削面
に設けられるのではなくすでに形成されたダム堤体の側
壁面に沿って設けられるものであるため、掘削面の岩盤
検査及び基礎構築が必要なくなり、またコンクリート打
設の進捗とともに延長できることから前もって上から下
まで全部布設する必要もなくなり、さらにはダムコンク
リート打設の進捗と共に下から基礎を順次撤去する必要
もなくなる。加えて、盛替も容易であり地山の切取りも
不要となる。
According to the equipment transporting apparatus of the present invention, the guide member is installed on the side wall surface of the dam levee body already formed by concrete casting, and the rail mount is provided on the guide member. The first rail of the rail mount and the second rail provided on the side wall surface of the dam bank so as to be continuous to the lower side of the rail guide the movement of the transporter, and the materials and equipment such as concrete loaded from the riverbed side. Are transported on the dam body already formed by concrete pouring. Then, as the concrete pouring progresses, the rail pedestal is raised while taking a reaction force to the guide member, so that the first rail provided on the rail pedestal is raised along with the progress of the concrete pouring. Then, the second rail is provided so as to be continuous with the first rail of the elevated rail mount. As mentioned above, the first and second rails that guide the movement of the transporter can be extended as the concrete pouring progresses. Since it will be possible to transport materials and equipment from above to the dam body,
Concrete kneading equipment for kneading and manufacturing concrete can be installed on the riverbed, and the number of cable cranes can be reduced. Therefore, a dam for securing a site for installing the concrete kneading equipment and cable cranes is required. It is not necessary to largely scrape off the mountains near the top of the bank, and the opportunity for the cable crane bucket to move above the operator is reduced. Since it is not provided on the excavation surface but along the side wall surface of the dam dam body already formed, it is not necessary to inspect the rock surface of the excavation surface and foundation construction, and it is extended as the concrete pouring progresses. Since it is possible, it is not necessary to lay all of it from top to bottom in advance, and further, it is not necessary to remove the foundation from the bottom as the dam concrete is placed. In addition, exchanging is easy and there is no need to cut the ground.

【0015】本発明の請求項2記載の資機材搬送装置に
よれば、レール架台に、搬送器を昇降させる巻上装置が
設けられているため、コンクリート打設の進捗にともな
ってレール架台を上昇させることで該レール架台に設け
られた巻上装置を上昇させることができる。
According to the material and material carrier of claim 2 of the present invention, since the rail mount is provided with the hoisting device for raising and lowering the carrier, the rail mount is lifted as the concrete pouring progresses. By doing so, the hoisting device provided on the rail mount can be raised.

【0016】本発明の請求項3記載の資機材搬送装置に
よれば、レール架台に、巻上装置が巻上げ及び繰出す線
状体がかけられるプーリが設けられているため、コンク
リート打設の進捗にともなってレール架台を上昇させる
ことで該レール架台に設けられたプーリを上昇させるこ
とができる。また、プーリをレール架台に設け、巻上装
置をレール架台以外の位置に設けるため、搭載物を含む
レール架台の重量を増大させてしまうことがない。
According to the third aspect of the present invention, there is provided the equipment for transporting the equipment, since the rail mount is provided with the pulley on which the linear member for hoisting and unwinding the hoisting device is attached. Accordingly, by raising the rail mount, the pulley provided on the rail mount can be raised. Further, since the pulley is provided on the rail mount and the hoisting device is provided at a position other than the rail mount, the weight of the rail mount including the mounted object is not increased.

【0017】本発明の請求項4記載の資機材搬送装置に
よれば、巻上装置は、それぞれの搬送器に連結された線
状体をそれぞれ個別の回転体に逆向きに巻いてなるた
め、回転体を一体回転させることにより、一方の搬送器
を上昇させると他方の搬送器が下降することになる。こ
れにより、下降する搬送器が上昇する搬送器のカウンタ
ウエイト代りとなる。
According to the material / material carrier of claim 4 of the present invention, in the hoisting device, the linear members connected to the respective carrier are wound in the opposite directions on the respective rotating members. By rotating the rotating body integrally, when one carrier is raised, the other carrier is lowered. As a result, the descending carrier replaces the counterweight of the ascending carrier.

【0018】本発明の請求項5記載の資機材搬送装置に
よれば、レール架台に、仮受ホッパーが設けられている
ため、コンクリート打設の進捗にともなってレール架台
を上昇させることで仮受ホッパーを上昇させることがで
きる。
According to the material and material conveying device of the fifth aspect of the present invention, since the rail mount is provided with the temporary support hopper, the temporary support is performed by raising the rail mount as the concrete pouring progresses. The hopper can be raised.

【0019】本発明の請求項6記載の資機材搬送装置に
よれば、案内部材が、レール架台と係合状態にある分割
体のみで該レール架台をダム堤体の側壁面に支持可能で
あるため、レール架台に係合する分割体以外の下側にあ
る分割体を延長用の分割体に転用できる。
According to the sixth aspect of the present invention, the guide member is capable of supporting the rail mount on the side wall surface of the dam dam body only by the divided body which is engaged with the rail mount. Therefore, it is possible to use the lower divided body other than the divided body that engages with the rail mount as the extended divided body.

【0020】本発明の請求項7記載の資機材搬送装置に
よれば、レール架台に固定された固定係合部を案内部材
に設けられた係合穴に係合させた状態から、移動係合部
を案内部材の他の係合穴に係合させ、そして、固定係合
部の係合穴との係合を解除し、伸縮機構を移動係合部が
レール架台に対し案内部材の延在方向に沿って移動する
方向に駆動させると、係合穴との係合により移動係合部
は案内部材に対し移動せず、よってレール架台が案内部
材の延在方向に沿って移動する。
According to the seventh aspect of the present invention, there is provided the material and material conveying apparatus, wherein the fixed engaging portion fixed to the rail mount is engaged with the engaging hole provided in the guide member, and the movable engaging portion is moved. Part is engaged with another engaging hole of the guide member, and then disengaged from the engaging hole of the fixed engaging part, and the expansion mechanism is moved. The engaging part extends the guide member with respect to the rail mount. When driven in the direction of movement along the direction, the moving engagement portion does not move with respect to the guide member due to engagement with the engagement hole, and thus the rail mount moves along the extending direction of the guide member.

【0021】[0021]

【実施例】本発明の第1実施例を図1〜図5を参照して
説明する。なお、第1実施例において、ダム堤体の形成
は、面状に広くコンクリートを打設していくRCD工法
や拡張レヤー打設工法等が採用される。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A first embodiment of the present invention will be described with reference to FIGS. In addition, in the first embodiment, the dam levee body is formed by the RCD construction method in which concrete is widely laid in a plane or the extended layer construction construction method.

【0022】図中符号1は既にコンクリート打設により
形成されたダム堤体、符号2は該ダム堤体1の下流又は
上流の側壁面3に設置された第1実施例の資機材搬送装
置をそれぞれ示している。資機材搬送装置2は、ダム堤
体1の傾斜した側壁面3に該側壁面3の傾斜に沿って上
下に延在設置される二本の案内部材であるクライミング
レール5を有しており、各クライミングレール5は、同
形状の分割体5aが長さ方向に複数連設されて構成され
ている。
In the figure, reference numeral 1 is a dam levee body already formed by concrete pouring, and reference numeral 2 is the equipment transporting device of the first embodiment installed on the side wall surface 3 downstream or upstream of the dam levee body 1. Shown respectively. The material / material conveying device 2 has a climbing rail 5 which is two guide members installed vertically on the inclined side wall surface 3 of the dam body 1 along the inclination of the side wall surface 3, Each climbing rail 5 is composed of a plurality of divided bodies 5a having the same shape, which are continuously arranged in the length direction.

【0023】クライミングレール5の分割体5aは、長
方形状の底板部6と、該底板部6の幅方向の中間位置に
該底板部6に垂直をなして同長さ設けられた支持板部7
とを有する形状をなしており、底板部6は、ダム堤体1
に一部埋設されたアンカーボルト9等でダム堤体1に締
結固定されるようになっている。また、支持板部7に
は、複数の係合穴8が長さ方向に等ピッチで配列された
状態で、板厚方向に貫通形成されている。ここで、これ
らクライミングレール5は、その上部を、すでに形成さ
れたダム堤体1の上部近傍まで延在させている。
The split body 5a of the climbing rail 5 has a rectangular bottom plate portion 6 and a support plate portion 7 which is provided at an intermediate position in the width direction of the bottom plate portion 6 so as to be perpendicular to the bottom plate portion 6 and have the same length.
The bottom plate portion 6 has a shape having
Anchor bolts 9 and the like partially buried in the dam are fastened and fixed to the dam bank body 1. In addition, the support plate portion 7 is formed with a plurality of engagement holes 8 penetrating in the plate thickness direction in a state in which the engagement holes 8 are arranged at equal pitches in the length direction. Here, the climbing rails 5 have their upper portions extended to the vicinity of the upper portions of the dam body 1 already formed.

【0024】両クライミングレール5の間には、これら
クライミングレール5と平行をなして四本のバケット用
ガイドレール(第二レール)10がダム堤体1に図示せ
ぬアンカーボルト等で固定されており、これらガイドレ
ール10の一側の二本には、これらガイドレール10に
より移動が案内される搬送器である一方のバケット11
が、他側の二本のガイドレール10にも、これらガイド
レール10により移動が案内される他方のバケット11
が、ともに二本のクライミングレール5の間に位置して
設けられている(図1においては、バケット11のうち
一つは後述するレール架台27のガイドレール(第一レ
ール)46上にある)。なお、これらガイドレール10
も図示は略すが複数の分割体が連設されて構成されてお
り、該分割体を既存のものの上側に連設することで上方
への延長が可能となっている。また、ガイドレール10
の下部は河床部12に設けられた穴部13の底部まで延
在されている。
Between the two climbing rails 5, four bucket guide rails (second rails) 10 parallel to the climbing rails 5 are fixed to the dam bank 1 by anchor bolts or the like (not shown). The two guide rails 10 on one side are provided with one bucket 11 which is a transporter whose movement is guided by the guide rails 10.
However, the other two guide rails 10 also have the other bucket 11 whose movement is guided by these guide rails 10.
Both are provided so as to be located between the two climbing rails 5 (in FIG. 1, one of the buckets 11 is on a guide rail (first rail) 46 of a rail mount 27 described later). . In addition, these guide rails 10
Although not shown in the figure, a plurality of divided bodies are connected in series, and the divided body can be extended upward by connecting the divided bodies to the upper side of the existing one. In addition, the guide rail 10
The lower part of the is extended to the bottom of the hole 13 provided in the river bed 12.

【0025】二つのバケット11は、図2に示すよう
に、ガイドレール10上を転動するローラ15を上下左
右に四つ有するとともに、これらローラ15をガイドレ
ール10に接触させた状態で上方に開口する上部開口部
16を有している。なお、バケット11の上部には、図
2に二点鎖線で示すように上部蓋体17が必要に応じて
取付可能となっている。さらに、バケット11の下部の
ダム堤体1側には、ローラ15の間の中間所定範囲に下
部開口部19が設けられており、該下部開口部19は、
油圧駆動の開閉シリンダ20で摺動される下部蓋体21
により開閉可能となっている。
As shown in FIG. 2, each of the two buckets 11 has four rollers 15 rolling on the guide rail 10 in the vertical and horizontal directions. The two buckets 11 move upward while the rollers 15 are in contact with the guide rail 10. It has an upper opening 16 that opens. An upper lid 17 can be attached to the upper portion of the bucket 11 as needed, as indicated by the chain double-dashed line in FIG. Further, on the dam bank 1 side below the bucket 11, a lower opening 19 is provided in an intermediate predetermined range between the rollers 15, and the lower opening 19 is
Lower lid 21 slid by hydraulically driven opening / closing cylinder 20
Can be opened and closed.

【0026】このような構成のバケット11は、コンク
リート等の資材を搬送する場合は、上部蓋体17が外さ
れた状態で用いられ、下部開口部19を下部蓋体21で
閉塞状態として上部開口部16からコンクリートを受取
って搬送を行い、一方、開閉シリンダ20で下部蓋体2
1を移動させ下部開口部19を開放することにより、下
方にコンクリートを排出するようになっている。一方、
コンクリートを搬送しない場合等には、上部蓋体17を
取り付け、該上部蓋体17上にコンクリート荷重相当分
のダンプカー22等の機材を載置してこれを搬送するこ
とができるようになっている。
When carrying a material such as concrete, the bucket 11 having such a structure is used with the upper lid 17 removed, and the lower opening 19 is closed with the lower lid 21 to open the upper opening. The concrete is received from the part 16 and conveyed, while the opening / closing cylinder 20 is used to convey the concrete.
By moving 1 and opening the lower opening 19, concrete is discharged downward. on the other hand,
When the concrete is not transported, the upper lid 17 is attached, and equipment such as a dump truck 22 corresponding to the concrete load can be placed on the upper lid 17 and transported. .

【0027】ガイドレール10の下部は、上述したよう
に、河床部12に設けられた穴部13まで延在してお
り、該穴部13には、上部開口部23からコンクリート
を受取って、ある程度のコンクリートを一時貯留すると
ともに、下方に位置するバケット11に、各バケット毎
に開閉可能とされた下部開口部24からコンクリートを
供給する下部ホッパー25が設けられている。ここで、
ダム下流の河床部12には、諸材料を所定の配合比率で
混練してコンクリートを製造する図示せぬコンクリート
混練設備が設けられており、このコンクリート混練設備
から、ダンプカー22等で下部ホッパー25にコンクリ
ートが運搬されることになるため、ダンプカー22から
のコンクリートの受取りを容易とするよう、下部ホッパ
ー25は穴部13内に、その上面を河床部12の表面に
略合せた状態で設けられている。
As described above, the lower part of the guide rail 10 extends to the hole 13 provided in the river bed 12, and the hole 13 receives concrete from the upper opening 23 to some extent. In addition to temporarily storing the concrete, the lower hopper 25 that supplies the concrete from the lower opening 24 that can be opened and closed for each bucket is provided in the bucket 11 located below. here,
The river bed 12 downstream of the dam is provided with a concrete kneading equipment (not shown) for kneading various materials at a predetermined mixing ratio to produce concrete. From the concrete kneading equipment, a dump truck 22 or the like is provided to the lower hopper 25. Since the concrete will be transported, the lower hopper 25 is provided in the hole 13 with its upper surface substantially aligned with the surface of the riverbed 12 so that the concrete can be easily received from the dump truck 22. There is.

【0028】図1に示すように、両クライミングレール
5間の、側壁面3上部側には、レール架台27が設けら
れている。このレール架台27の両側部には上昇機構2
9がそれぞれ設けられている。これらの上昇機構29
は、図1及び図3に示すように、レール架台27の側面
に内側が固定されるとともに外側がクライミングレール
5の支持板部7に略接触する上側台部(固定係合部)3
0と、該上側台部30の、レール架台27の長手方向下
側に設けられレール架台27の側面に内側が固定される
とともに、外側がクライミングレール5の支持板部7に
略接触する下側台部31とを有しており、これら両側の
上側台部30及び下側台部31の接触により、レール架
台27はその移動がクライミングレール5により案内さ
れることになる。
As shown in FIG. 1, a rail mount 27 is provided on the upper side of the side wall surface 3 between the climbing rails 5. The lifting mechanism 2 is provided on both sides of the rail mount 27.
9 are provided respectively. These lifting mechanisms 29
As shown in FIGS. 1 and 3, the upper base portion (fixed engagement portion) 3 is fixed to the side surface of the rail mount 27 on the inner side and substantially contacts the outer side with the support plate portion 7 of the climbing rail 5.
0, a lower side of the upper base 30 which is provided on the lower side in the longitudinal direction of the rail base 27 and whose inner side is fixed to the side surface of the rail base 27 and whose outer side substantially contacts the support plate portion 7 of the climbing rail 5. The rail base 27 is guided by the climbing rail 5 by the contact of the upper base portion 30 and the lower base portion 31 on both sides thereof.

【0029】そして、上側台部30と下側台部31との
間には移動台部(移動係合部)32が設けられており、
該移動台部32は、上側台部30に、油圧駆動の移動用
シリンダ(伸縮機構)34を介して連結されている。す
なわち、移動用シリンダ34は、シリンダ本体35が移
動台部32に固定されるとともにピストンロッド36が
上側台部30に固定されており、よって、ピストンロッ
ド36をシリンダ本体35から最も突出させることによ
り、下側台部31に干渉しない範囲で移動台部32を上
側台部30から離間させ、ピストンロッド36をシリン
ダ本体35側に最も引込ませることにより移動台部32
を上側台部30に近接させるようになっている。
A movable base portion (movable engagement portion) 32 is provided between the upper base portion 30 and the lower base portion 31,
The moving table portion 32 is connected to the upper table portion 30 via a hydraulically driven moving cylinder (expanding mechanism) 34. That is, in the moving cylinder 34, the cylinder body 35 is fixed to the moving base portion 32 and the piston rod 36 is fixed to the upper base portion 30. Therefore, by making the piston rod 36 protrude most from the cylinder body 35, , The moving base portion 32 is separated from the upper base portion 30 within a range where it does not interfere with the lower base portion 31, and the piston rod 36 is retracted to the cylinder body 35 side to the maximum.
Is arranged close to the upper base portion 30.

【0030】上側台部30には、油圧駆動の上部係合シ
リンダ38が、そのシリンダ本体39を移動用シリンダ
34の固定位置の上側に固定させた状態でそれぞれ設け
られている。この上部係合シリンダ38は、クライミン
グレール5側に配置されたピストンロッド40をシリン
ダ本体39から最も突出させることにより、これを、位
置の合った係合穴8に挿通させて上側台部30すなわち
レール架台27をクライミングレール5に係合固定し、
一方、ピストンロッド40をシリンダ本体39側に最も
引込ませることにより、係合穴8への挿通を解除して上
側台部30すなわちレール架台27とクライミングレー
ル5との係合固定を解除するようになっている。なお、
この上部係合シリンダ38のクライミングレール5への
係合によりレール架台27はクライミングレール5を介
してダム堤体1に固定されることになる。ここで、この
ときのレール架台27の荷重を、該レール架台27が係
合する両側の分割体5aのみで支持可能となるよう、分
割体5aをダム堤体1に固定させるアンカーボルト9の
数及び強度等が設定されている。
The upper base 30 is provided with a hydraulically driven upper engagement cylinder 38 with its cylinder body 39 fixed above the fixed position of the moving cylinder 34. In this upper engagement cylinder 38, the piston rod 40 arranged on the climbing rail 5 side is protruded most from the cylinder body 39, so that the piston rod 40 is inserted into the aligned engagement hole 8 and thus the upper base portion 30, that is, the upper base portion 30. The rail mount 27 is fixedly engaged with the climbing rail 5,
On the other hand, by pulling the piston rod 40 most toward the cylinder body 39 side, the insertion into the engagement hole 8 is released, and the engagement fixing between the upper base portion 30, that is, the rail mount 27 and the climbing rail 5 is released. Has become. In addition,
By the engagement of the upper engagement cylinder 38 with the climbing rail 5, the rail mount 27 is fixed to the dam bank 1 via the climbing rail 5. Here, the number of anchor bolts 9 for fixing the divided body 5a to the dam bank 1 so that the load of the rail platform 27 at this time can be supported only by the divided bodies 5a on both sides with which the rail platform 27 engages. And strength etc. are set.

【0031】移動台部32には、油圧駆動の下部係合シ
リンダ42が、そのシリンダ本体43を移動用シリンダ
34の固定位置の下側に固定させた状態でそれぞれ設け
られている。この下部係合シリンダ42は、クライミン
グレール5側に配置されたピストンロッド44をシリン
ダ本体43から最も突出させることにより、これを、位
置の合った係合穴8に挿通させて移動台部32をクライ
ミングレール5に係合固定し、一方、ピストンロッド4
4をシリンダ本体43側に最も引込ませることにより、
係合穴8への挿通を解除して移動台部32とクライミン
グレール5との係合固定を解除するようになっている。
A hydraulically driven lower engagement cylinder 42 is provided on the movable table portion 32, with its cylinder body 43 fixed below the fixing position of the moving cylinder 34. In this lower engagement cylinder 42, the piston rod 44 arranged on the climbing rail 5 side is caused to protrude most from the cylinder body 43 so that the piston rod 44 is inserted into the aligned engagement hole 8 and the movable base portion 32 is fixed. Fixed to climbing rail 5 while piston rod 4
By pulling 4 into the cylinder body 43 side most,
The insertion into the engaging hole 8 is released to release the fixed engagement between the moving base portion 32 and the climbing rail 5.

【0032】また、レール架台27には、その下端から
上端位置まで、上記ダム堤体1に敷設されたガイドレー
ル10と連続する位置に四本のガイドレール46が固定
されており、バケット11は、これらガイドレール46
と、これに連設してダム堤体1に敷設されたガイドレー
ル10とに案内されて昇降する。なお、図中符号47で
示すものは、支柱48に中央が支持されるとともに両端
がレール架台27の両端に取り付けられたワイヤで、該
ワイヤ47の張力でレール架台27の強度を向上させて
いる。そして、レール架台27は、傾斜する側壁面3に
沿いつつすでに形成されたダム堤体1より上方にその上
部を延出させており、この延出した部分のダム堤体1側
には、上部ホッパー(仮受ホッパー)49が支持されて
いる。この上部ホッパー49は、バケット11で搬送さ
れたコンクリートを、上部開口部50で受取り、ある程
度一時貯留するべく仮受けして、必要に応じて開閉可能
な下部開口部51から下方に位置するダンプカー22等
に供給するものである。
Further, on the rail mount 27, four guide rails 46 are fixed from the lower end to the upper end position at a position continuous with the guide rail 10 laid on the dam body 1, and the bucket 11 is , These guide rails 46
And the guide rail 10 laid on the dam bank 1 so as to be connected to this and guided up and down. Reference numeral 47 in the drawing denotes a wire whose center is supported by the support column 48 and whose both ends are attached to both ends of the rail mount 27, and the tension of the wire 47 improves the strength of the rail mount 27. . The rail mount 27 has its upper part extended above the dam dam body 1 already formed along the sloping side wall surface 3, and the upper part is extended to the dam dam body 1 side of this extended part. A hopper (temporary receiving hopper) 49 is supported. The upper hopper 49 receives the concrete conveyed in the bucket 11 at the upper opening 50, temporarily receives the concrete for temporary storage to a certain extent, and the dump truck 22 positioned below the lower opening 51 that can be opened and closed as needed. Etc.

【0033】さらに、レール架台27上には、その下部
側所定位置に、バケット11の走行に干渉しないようガ
イドレール46からの高さが設定された機台52が、側
壁面3にレール架台27が沿った状態で水平をなすよう
固定されている。該機台52上には、同軸上に配列され
た二つの同形状の巻胴(回転体)53を有する巻上装置
54が載置されており、各巻胴53は、減速機及び電動
機からなる駆動源55に、接離切換手段であるクラッチ
56を介して連結されている。このクラッチ56は、両
巻胴53を連結して駆動源55からの駆動力でこれらを
一体に回転させたり、両巻胴53の連結を解除して駆動
源55からの駆動力を各巻胴53にそれぞれ独立して伝
達させたりすることができるものである。
Further, on the rail mount 27, a machine base 52, whose height from the guide rail 46 is set so as not to interfere with the traveling of the bucket 11, is provided at a predetermined position on the lower side of the rail mount 27 on the side wall surface 3. It is fixed so that it is horizontal when it is along. On the machine base 52, a hoisting device 54 having two coaxially arranged winding drums (rotating bodies) 53 is placed, and each winding drum 53 includes a speed reducer and an electric motor. It is connected to the drive source 55 via a clutch 56 which is a contact / separation switching means. This clutch 56 connects both winding cylinders 53 to integrally rotate them by the driving force from the drive source 55, or releases the connection of both winding cylinders 53 to transfer the driving force from the drive source 55 to each winding cylinder 53. Can be transmitted to each independently.

【0034】ここで、巻上装置54は、各巻胴53にそ
れぞれワイヤ(線状体)58が二本ずつ相互に干渉せぬ
よう分離されて巻かれており、これらワイヤ58の繰出
側は、レール架台27の上端に設けられたプーリ59に
かけられた後、その先端が下方の対応するバケット11
にそれぞれ連結されている。そして、クラッチは、一方
の巻胴53のワイヤ58と他方の巻胴53のワイヤ58
とが相互に逆向きに巻かれかつ一方のバケット11が下
部ホッパー25の下側位置にあるとき他方のバケット1
1が上部ホッパー49の上側位置となるよう位相を調整
して両巻胴53を一体に連結している。これにより、一
方のバケット11を上昇させる際には他方のバケット1
1が下降することになる。
Here, in the hoisting device 54, two wires (linear bodies) 58 are separately wound around each of the winding drums 53 so as not to interfere with each other. After being hooked on a pulley 59 provided at the upper end of the rail mount 27, the tip end of the bucket 59 corresponds to the lower bucket 11.
Are connected to each. The clutch includes a wire 58 of one winding cylinder 53 and a wire 58 of the other winding cylinder 53.
Are wound in mutually opposite directions and when one bucket 11 is in the lower position of the lower hopper 25, the other bucket 1
The winding cylinders 53 are integrally connected by adjusting the phase so that 1 is located above the upper hopper 49. Thus, when raising one bucket 11, the other bucket 1
1 will fall.

【0035】次に、このような構成の資機材搬送装置2
を用いたダム構築について以下に説明する。河床部12
に設けられた図示せぬコンクリート混練設備からダムコ
ンクリートを、ダンプカー等で下部ホッパー25に運搬
し一時貯蔵する。すでにコンクリート打設により形成さ
れたダム堤体1には、上記した資機材搬送装置2が設け
られており、この資機材搬送装置2では、下部ホッパー
25の下側に一方のバケット11を位置させ(このとき
他方のバケット11は上部ホッパー49の上側に位置し
ている)、下部ホッパー25の対応する側の下部開口部
24を所定時間開かせてバケット11内にコンクリート
を積み込む。
Next, the material / material conveying device 2 having such a configuration
The dam construction using is explained below. Riverbed 12
Dam concrete is transported from the concrete kneading equipment (not shown) provided in the above to a lower hopper 25 by a dump truck or the like and temporarily stored. The dam levee body 1 already formed by concrete pouring is provided with the above-described equipment / material conveying device 2. In this equipment / material conveying device 2, one bucket 11 is positioned below the lower hopper 25. (At this time, the other bucket 11 is located above the upper hopper 49), the lower opening 24 on the corresponding side of the lower hopper 25 is opened for a predetermined time, and concrete is loaded into the bucket 11.

【0036】次に、巻上装置54の駆動源55で両巻胴
53を一方向に一体回転させることにより、コンクリー
トを積み込んだバケット11をガイドレール10及びガ
イドレール46の上を走行させて上昇させ(この上昇時
に他方の空のバケット11は下降する)、上部ホッパー
49の上側に位置させる(このとき他方のバケット11
は下部ホッパー25の下側に位置する)。そして、この
状態でバケット11の下部蓋体21を開閉シリンダ20
で移動させ開作動させることにより、積み込まれたコン
クリートを上部ホッパー49の上部開口部50に落し込
む。
Next, the drive source 55 of the hoisting device 54 integrally rotates the two hoisting drums 53 in one direction, so that the bucket 11 loaded with concrete is caused to run on the guide rails 10 and 46 and rise. (The other empty bucket 11 descends when this rises) and is positioned above the upper hopper 49 (the other bucket 11 at this time).
Is located below the lower hopper 25). Then, in this state, the lower lid 21 of the bucket 11 is opened and closed by the open / close cylinder 20.
Then, the loaded concrete is dropped into the upper opening portion 50 of the upper hopper 49 by moving it and opening it.

【0037】落し込みが終了したら、バケット11の下
部蓋体21を閉作動させ(このとき下部ホッパー25の
下側にある他方のバケット11には上記と同様にしてコ
ンクリートが積み込まれている)、巻上装置54の巻胴
53を逆方向に一体回転させることによって、空となっ
た一方のバケット11を下降させ(この下降時にコンク
リートが積み込まれた他方のバケット11は上昇す
る)、下部ホッパー25の下側に一方のバケット11を
位置させる。このような工程を適宜繰り返すことによ
り、河床部12のコンクリート混練設備からダンプカー
等で運搬されたコンクリートをすでに形成されたダム堤
体1上に、両バケット11で交互に搬送する。
When the dropping is completed, the lower lid 21 of the bucket 11 is closed (at this time, the other bucket 11 below the lower hopper 25 is loaded with concrete in the same manner as above), By integrally rotating the winding cylinder 53 of the hoisting device 54 in the opposite direction, the emptied one bucket 11 is lowered (the other bucket 11 loaded with concrete is raised during this lowering), and the lower hopper 25. The one bucket 11 is located on the lower side. By repeating these steps as appropriate, the concrete transported by the dump truck or the like from the concrete kneading equipment of the riverbed 12 is alternately transported by the both buckets 11 onto the dam dam body 1 which has already been formed.

【0038】一方、上部ホッパー49で仮受けされたコ
ンクリートは、該上部ホッパー49からダム堤体1上に
あるダンプカー22等に積み込まれる。そして、該ダン
プカー22を自走によりすでに形成されたダム堤体1の
上面のコンクリート打設位置まで運行させてコンクリー
トを打設する。このとき、ダム堤体1上においてコンク
リート打設は、ダム用資機材搬送装置2より遠い位置か
ら順次行い、最終的に、バケット11に上部蓋体17を
取り付けこの上部蓋体17上にダンプカー22等の機材
を逃した状態でダム用資機材搬送装置回りの施工を行う
ことになる。また必要に応じて、バケット11に上部蓋
体17を取り付けこの上部蓋体17上にダンプカー22
等の機材を搭載してバケット11の昇降で該機材を運搬
する。
On the other hand, the concrete temporarily received by the upper hopper 49 is loaded from the upper hopper 49 into the dump truck 22 or the like on the dam bank 1. Then, the dump truck 22 is moved to the concrete pouring position on the upper surface of the dam body 1 already formed by self-propelling to pour concrete. At this time, concrete is placed on the dam body 1 sequentially from a position farther from the dam material and material conveying device 2. Finally, the upper lid 17 is attached to the bucket 11 and the dump truck 22 is mounted on the upper lid 17. The construction around the dam material and material transfer device will be carried out with the other equipment missing. If necessary, the upper lid 17 is attached to the bucket 11 and the dump truck 22 is mounted on the upper lid 17.
Equipment such as the like is mounted and the equipment is transported by raising and lowering the bucket 11.

【0039】なお、バケット11に設けられた上部蓋体
17と河床部12との間でダンプカー等の機材の受け渡
しを行う場合には、バケット11を穴部13内に潜り込
ませて上部蓋体17の高さを河床部12に合せるととも
に、下部ホッパー25上と、下部ホッパー25及びバケ
ット11の隙間等とに機材通過のための踏板を載置させ
ることになる。また、バケット11に設けられた上部蓋
体17とダム堤体1との間でダンプカー22等の機材の
受け渡しを行う場合にも、バケット11の上部蓋体17
の高さをダム堤体1の上面に合せるとともに、バケット
11とダム堤体1の隙間に踏板を載置させた状態で、ダ
ンプカー22等の機材をガイドレール46間を通過させ
ることになる。
When transferring equipment such as a dump truck between the upper lid 17 provided on the bucket 11 and the riverbed 12, the bucket 11 is slid into the hole 13 to allow the upper lid 17 to move. The height of the floor is adjusted to the riverbed portion 12, and a tread for equipment passage is placed on the lower hopper 25 and the gap between the lower hopper 25 and the bucket 11. Also, when the equipment such as the dump truck 22 is transferred between the upper lid 17 provided on the bucket 11 and the dam bank 1, the upper lid 17 of the bucket 11 is also delivered.
The height of the dump truck 22 is adjusted to the upper surface of the dam bank 1, and equipment such as the dump truck 22 is passed between the guide rails 46 with the tread plate placed in the gap between the bucket 11 and the dam bank 1.

【0040】そして、上記コンクリート打設を面状に行
い、例えば、ダンプカー22等による上部ホッパー49
からのコンクリート受取りが困難となるであろう位置ま
で打設が進捗した場合には、必要に応じて、分割体5a
を既存のクライミングレール5の上部に、ダム堤体1に
一部埋設されたアンカーボルト9等で連設させ、該クラ
イミングレール5を上方に延長する。ここで、上述した
ように、クライミングレール5は、レール架台27と係
合する両側の分割体5aのみで該レール架台27を支持
することができるため、下側の、後にレール架台27と
係合しない使用済の分割体5aをダム堤体1から外し
て、これを延長用として上部に連設させる。
Then, the concrete pouring is performed in a plane shape, and, for example, the upper hopper 49 by the dump truck 22 or the like.
If the casting progresses to a position where it will be difficult to receive concrete from the split body 5a, if necessary.
Are continuously connected to the upper part of the existing climbing rail 5 by anchor bolts 9 and the like partially embedded in the dam body 1, and the climbing rail 5 is extended upward. Here, as described above, the climbing rail 5 can support the rail pedestal 27 only by the split bodies 5a on both sides which engage with the rail pedestal 27. The used division body 5a which is not used is removed from the dam bank body 1 and is connected to the upper part for extension.

【0041】そして、レール架台27を上昇機構29を
用いて以下のように必要高さ上昇させる。なお、分割体
5aの連結は、他の作業と独立して行えるため、必要が
生じる以前にあらかじめ延長しておくことも勿論可能で
ある。また、レール架台27の上昇に必要な分クライミ
ングレール5がある場合には、分割体5aの連結を行わ
ずにレール架台27のみ上昇させてもよい。図3に示す
ように、レール架台27に固定された上側台部30の上
部係合シリンダ38のピストンロッド40をクライミン
グレール5の係合穴8aに挿入し係合させた状態(通常
レール架台27はこの状態でクライミングレール5に支
持固定されている)から、縮長状態にある移動用シリン
ダ34を介して連結された移動台部32の下部係合シリ
ンダ42のピストンロッド44を上記係合穴8aより二
つ下方の係合穴8bに挿入し係合させる。
Then, the rail mount 27 is raised by the raising mechanism 29 to a required height as follows. Since the divided bodies 5a can be connected independently of other work, it is of course possible to extend them in advance before the need arises. Further, when there are climbing rails 5 required to raise the rail mount 27, only the rail mount 27 may be raised without connecting the divided bodies 5a. As shown in FIG. 3, the piston rod 40 of the upper engagement cylinder 38 of the upper pedestal portion 30 fixed to the rail pedestal 27 is inserted into the engagement hole 8a of the climbing rail 5 and engaged (normal rail pedestal 27). Is supported and fixed to the climbing rail 5 in this state), and the piston rod 44 of the lower engaging cylinder 42 of the moving base portion 32 connected via the moving cylinder 34 in the contracted state is inserted into the engaging hole. 8a is inserted into the engaging holes 8b two below and engaged.

【0042】そして、図4に示すように、下部係合シリ
ンダ42の係合穴8bへの係合を確認した上で、上部係
合シリンダ38のピストンロッド40を挿通されている
係合穴8aから引き抜き、上側台部30のクライミング
レール5との係合を解除した状態で、移動用シリンダ3
4を伸長させ移動台部32を上側台部30に対し離間す
るようクライミングレール5の延在方向に沿って移動さ
せると、下部係合シリンダ42の係合穴8bとの係合に
より移動台部32はクライミングレール5に対し移動せ
ず、よって、上側台部30すなわちレール架台27がク
ライミングレール5の延在方向に沿って、その上部係合
シリンダ38を上記係合穴8aより一つ上の係合穴8c
に合せる位置まで上方に移動する。
Then, as shown in FIG. 4, after confirming the engagement of the lower engaging cylinder 42 with the engaging hole 8b, the engaging hole 8a through which the piston rod 40 of the upper engaging cylinder 38 is inserted. The moving cylinder 3 in a state where the upper base 30 is disengaged from the climbing rail 5.
4 is moved to move the moving base 32 along the extending direction of the climbing rail 5 so as to be separated from the upper base 30, the moving base 32 is engaged with the engaging hole 8b of the lower engaging cylinder 42. 32 does not move with respect to the climbing rail 5, and therefore, the upper base portion 30, that is, the rail mount 27, has its upper engagement cylinder 38 located above the engagement hole 8a along the extending direction of the climbing rail 5. Engagement hole 8c
Move upward to the position to match.

【0043】このように1スパン移動すると、図5に示
すように、上昇された上側台部30の上部係合シリンダ
38のピストンロッド40を係合穴8cに係合させ、そ
して、この係合を確認した状態で、移動台部32の下部
係合シリンダ42のピストンロッド44を係合穴8bか
ら引き抜き、移動用シリンダ34を縮長させて、移動台
部32を、その下部係合シリンダ42が一つ上の係合穴
8dに合う位置まで上昇させる。そして、図3の状態と
同様に、移動台部32の下部係合シリンダ42のピスト
ンロッド44を係合穴8dに係合させる。このような作
動を適宜繰り返し行うことによって、レール架台27と
ともに、これに設けられた上部ホッパー49および巻上
装置54が上昇する。
When this one span movement is made, as shown in FIG. 5, the piston rod 40 of the lifted upper engaging cylinder 38 of the upper base 30 is engaged with the engaging hole 8c, and this engaging is performed. , The piston rod 44 of the lower engaging cylinder 42 of the moving base 32 is pulled out from the engaging hole 8b, and the moving cylinder 34 is contracted to move the moving base 32 to the lower engaging cylinder 42 thereof. Is raised to a position that fits in the engagement hole 8d one above. Then, similarly to the state of FIG. 3, the piston rod 44 of the lower engagement cylinder 42 of the moving base portion 32 is engaged with the engagement hole 8d. By repeating such operations as appropriate, the rail pedestal 27 and the upper hopper 49 and the hoisting device 54 provided on the rail pedestal 27 ascend.

【0044】ここで、レール架台27が必要高さまで上
昇されると、このときの上部係合シリンダ38のクライ
ミングレール5との係合でレール架台27はダム堤体1
の側壁面3に支持されることになる。そして、このよう
にレール架台27の位置が決められると、該レール架台
27のガイドレール46と上昇前のガイドレール10と
の間に、ガイドレール10の分割体を、ダム堤体1に一
部埋設されたアンカーボルト等で固定し連設させる。ま
た、レール架台27を必要高さ上昇させると、巻上装置
54は、一方のバケット11が下部ホッパー25の下側
位置にあるとき他方のバケット11が上部ホッパー49
の上側位置となるよう、ワイヤ58の延長とクラッチ5
6による両巻胴53の位相の再調整とを行う。そして、
上記のように、コンクリート打設の進捗(面状打設層の
積み重ね)とともにクライミングレール5の延長及びレ
ール架台27の上昇を適宜繰り返して、ダム堤体1のコ
ンクリート打設を完結する。
When the rail pedestal 27 is raised to the required height, the rail pedestal 27 is engaged with the climbing rail 5 by the upper engagement cylinder 38 at this time so that the rail pedestal 27 is dam dam body 1.
Will be supported by the side wall surface 3. When the position of the rail pedestal 27 is determined in this way, a divided body of the guide rail 10 is partly provided in the dam bank 1 between the guide rail 46 of the rail pedestal 27 and the guide rail 10 before rising. Fix with embedded anchor bolts, etc. to make them continuous. Further, when the rail mount 27 is raised to the required height, the hoisting device 54 causes the other bucket 11 to move to the upper hopper 49 while the other bucket 11 moves to the lower position of the lower hopper 25.
The wire 58 and the clutch 5 so that
Readjustment of the phases of both winding cylinders 53 by 6 is performed. And
As described above, along with the progress of concrete pouring (stacking of plane-casting layers), the climbing rail 5 is extended and the rail mount 27 is raised as appropriate, and the concrete pouring of the dam body 1 is completed.

【0045】上記第1実施例は、以下に述べる効果を奏
する。 (1)クライミングレール5をコンクリート打設の進捗
とともに分割体5aの連結で延長し、レール架台27を
クライミングレール5に反力をとりつつ上昇させ、加え
てガイドレール10の分割体を追加することで、バケッ
ト11の移動を案内するガイドレール46およびガイド
レール10をコンクリート打設の進捗にともなって延長
させることができる。しかも、比較的簡易な構成でレー
ル架台27を上昇させることができる。 (2)レール架台27に巻上装置54が設けられている
ため、コンクリート打設の進捗にともなうレール架台2
7の上昇で巻上装置54をも上昇させることができ、バ
ケット11の上昇位置を高くすることができる。したが
って、巻上装置54のコンクリート打設の進捗にともな
う上昇が容易となり、工期の短縮が図れる。 (3)クライミングレール5は、レール架台27と係合
状態にある分割体5aのみで該レール架台27をダム堤
体1の側壁面3に支持できるため、レール架台27に係
合する分割体5a以外の下側にある分割体5aを延長用
の分割体5aに転用できる。したがって、分割体5aの
数を最小限にすることができる。
The first embodiment described above has the following effects. (1) The climbing rail 5 is extended by the connection of the divided bodies 5a as the concrete pouring progresses, the rail mount 27 is raised while taking a reaction force to the climbing rail 5, and the divided body of the guide rail 10 is added. Thus, the guide rail 46 and the guide rail 10 that guide the movement of the bucket 11 can be extended as the concrete pouring progresses. Moreover, the rail mount 27 can be raised with a relatively simple structure. (2) Since the hoisting device 54 is provided on the rail mount 27, the rail mount 2 can be used as the concrete pouring progresses.
7, the hoisting device 54 can also be raised, and the raised position of the bucket 11 can be raised. Therefore, the hoisting device 54 can be easily raised with the progress of pouring concrete, and the construction period can be shortened. (3) Since the climbing rail 5 can support the rail pedestal 27 on the side wall surface 3 of the dam body 1 only by the divisional body 5a engaged with the rail pedestal 27, the divisional body 5a engaged with the rail pedestal 27. The division body 5a on the lower side of the other than can be diverted to the extension division body 5a. Therefore, the number of the divided bodies 5a can be minimized.

【0046】(4)上記のようにガイドレール46およ
びガイドレール10をコンクリート打設の進捗にともな
って上昇させることができることから、すでに打設され
たダム堤体1を利用して河床部12側から資機材をダム
堤体1上に運搬できることになるため、コンクリートを
混練製造するコンクリート混練設備等を河床部12に設
置することができ、またケーブルクレーンの数も少なく
できることになり、よって、該コンクリート混練設備及
びケーブルクレーンを設置するための用地確保のために
ダム堤頂部付近の山を大きく削り取る必要がなくなる。
したがって、自然環境保全や景観上の観点から好まし
い。 (5)コンクリートの大量搬送が、大きな設置面積を必
要とせず比較的簡易な構造で実現できる。しかもコンク
リート打設場所の邪魔になることがないため、打設作業
の安全性及び効率を向上させることができる。
(4) Since the guide rail 46 and the guide rail 10 can be raised as the concrete pouring progresses as described above, the river bed 12 side can be used by using the dam dam body 1 already cast. Since the equipment and materials can be transported on the dam bank 1, concrete kneading equipment for kneading and manufacturing concrete can be installed in the riverbed 12, and the number of cable cranes can be reduced. It is not necessary to largely scrape off the mountain near the top of the dam to secure a site for installing concrete kneading equipment and cable cranes.
Therefore, it is preferable from the viewpoint of natural environment conservation and landscape. (5) A large amount of concrete can be transported with a relatively simple structure without requiring a large installation area. Moreover, since it does not interfere with the concrete pouring place, the safety and efficiency of the pouring work can be improved.

【0047】(6)河床部12側から資機材をダム堤体
1上に運搬でき、ケーブルクレーンの数が少なくできる
ため、ケーブルクレーンのバケット等が作業者の上方を
移動する機会も少なくなって、さらに、安全上好まし
い。 (7)資機材搬送装置2は、掘削面に設けられるのでは
なくすでに形成されたダム堤体1の側壁面3にアンカー
ボルト等で支持されるため、掘削面の岩盤検査及び基礎
構築は必要なくなり、またコンクリート打設の進捗とと
もに延長できるため前もって上から下まで全部布設する
必要もなくなる。すなわち、設置及び延長はコンクリー
ト打設と並行して後から追いかける形となるので全体工
程に影響を及ぼさない。したがって、ダムコンクリート
の打設開始を迅速に行うことができる。
(6) Since equipment and materials can be transported from the riverbed 12 side onto the dam bank 1 and the number of cable cranes can be reduced, the chances that the cable crane bucket or the like moves above the operator are reduced. Furthermore, it is preferable for safety. (7) Since the equipment / material transportation device 2 is not provided on the excavation surface but is supported by the anchor bolts or the like on the side wall surface 3 of the dam dam body 1 already formed, it is necessary to inspect the excavation surface and establish a foundation. Since it can be extended with the progress of concrete pouring, it is not necessary to lay it from the top to the bottom in advance. In other words, installation and extension do not affect the overall process because they will be followed up after the concrete is placed. Therefore, the pouring of dam concrete can be started quickly.

【0048】(8)資機材搬送装置2は、すでに形成さ
れたダム堤体1の側壁面3に沿って設けられるため、ダ
ムコンクリート打設の進捗と共に下から基礎を順次撤去
する必要がなくなる。したがって、上記ダムコンクリー
トの打設開始の迅速化の実現と合せ、工期を大幅に短縮
できる。 (9)ベルトコンベアラインで搬送する場合に比して、
盛替が容易であり、敷設のための地山の切取りも不要と
なって、さらには豪雪地域での冬期養生が不要となり、
コンクリート配合の切替えに手間どることもなくなる。 (10)レール架台27を上昇させることにより、巻上
装置54の他に上部ホッパー49をコンクリート打設の
進捗にともなって上昇させることができるため、さら
に、工期の短縮が図れる。
(8) Since the equipment / material transporting device 2 is provided along the side wall surface 3 of the dam dam body 1 already formed, it is not necessary to sequentially remove the foundation from the bottom as the dam concrete is placed. Therefore, the construction period can be greatly shortened in addition to the realization of the quick start of the pouring of the dam concrete. (9) Compared with the case of carrying on a belt conveyor line,
It is easy to relocate, there is no need to cut out the ground for laying, and winter curing in heavy snow areas is unnecessary,
No more hassle with switching concrete mix. (10) By raising the rail mount 27, the upper hopper 49 as well as the hoisting device 54 can be raised as the concrete pouring progresses, so that the construction period can be further shortened.

【0049】(11)昇降可能なバケット11に上部蓋
体17を取り付ければ、その上側に、コンリート打設時
にダンプカー22等の機材を逃すことができ、また機材
を搭載し昇降させることができる。したがって、補助用
ケーブルクレーンを少なくかつ小型のものですませるこ
とができる。 (12)クラッチ56により駆動源55からの駆動力を
各巻胴53に独立して伝達可能となっているため、何等
かの理由により片側のラインが動かせない場合にも、非
可動ライン側のクラッチ接続を切ることで、可動側のラ
インを単独に稼働させることができる。 (13)各巻胴53が、そのワイヤ58がそれぞれ巻方
向を逆にし、かつ一方のバケット11の上昇行程と他方
のバケット11の下降行程とを一致させるように位相を
調整してクラッチ56により一体に接続されているた
め、両巻胴53の一体回転で同時に一方のバケット11
の上昇と他方のバケット11の下降を行うことができ、
しかも、コンクリート入りのバケット11を巻上げる際
に、下降する空のバケット11がカウンターウェイト代
りとなっていわゆるつるべ式となるため、バケット11
の重量分が相殺され、駆動源の駆動力が小さくてすみ、
省エネ化が図れるとともにサイクルタイムを短縮でき
る。
(11) If the upper lid 17 is attached to the bucket 11 that can be raised and lowered, equipment such as the dump truck 22 can be escaped on the upper side of the upper lid 17 when the concrete is laid, and the equipment can be mounted and raised. Therefore, the number of auxiliary cable cranes can be reduced and the number can be reduced. (12) Since the clutch 56 allows the driving force from the driving source 55 to be independently transmitted to each winding cylinder 53, even if the line on one side cannot be moved for some reason, the clutch on the non-movable line side By disconnecting the connection, the movable line can be operated independently. (13) The winding cylinders 53 are integrated by the clutch 56 by adjusting the phases of the wires 58 so that the winding directions are reversed and the ascending stroke of the one bucket 11 and the descending stroke of the other bucket 11 are matched. Is connected to one of the buckets 11 at the same time by the integral rotation of both winding cylinders 53.
Can be raised and the other bucket 11 can be lowered,
Moreover, when the concrete-filled bucket 11 is rolled up, the empty bucket 11 that descends serves as a counterweight instead of a so-called slippery type.
The weight of is offset and the driving force of the driving source is small,
Energy saving can be achieved and cycle time can be shortened.

【0050】次に、本発明の第2実施例を図6を参照し
て、上記第1実施例との相違部分を中心に以下に説明す
る。第2実施例において、レール架台27には、各ワイ
ヤ58をそれぞれかけるプーリ59が設けられており、
このワイヤ58を巻上げ及び繰出す巻上装置54は、河
床部12に形成された穴部13に設けられている。すな
わち、レール架台27には、その上端部に、並列して四
つのプーリ59が回転自在に支持されており、また、河
床部12側の穴部13内にも、並列する四つのプーリ7
1がダム堤体1側に回転自在に支持されている。そし
て、各バケット11に連結された各ワイヤ58は、プー
リ59にかけられた後にレール架台27等に沿って穴部
13内まで下方に延在し、穴部13内に設けられたプー
リ71でダム堤体1に対し離間方向に延在されて、穴部
13に設置された巻上装置54に巻かれている。
Next, a second embodiment of the present invention will be described below with reference to FIG. 6 focusing on the difference from the first embodiment. In the second embodiment, the rail mount 27 is provided with pulleys 59 on which the wires 58 are respectively attached.
The hoisting device 54 for hoisting and unwinding the wire 58 is provided in the hole 13 formed in the riverbed 12. That is, four pulleys 59 are rotatably supported in parallel at the upper end of the rail base 27, and four pulleys 7 are arranged in parallel in the hole 13 on the riverbed 12 side.
1 is rotatably supported on the dam bank 1 side. Then, each wire 58 connected to each bucket 11 is extended to the inside of the hole 13 along the rail mount 27, etc. after being hung on the pulley 59, and the pulley 71 provided in the hole 13 dams the wire 58. The winding device 54 extends in the direction away from the bank 1 and is wound around a hoisting device 54 installed in the hole 13.

【0051】このような構成の第2実施例の資機材搬送
装置2においても、レール架台27すなわちプーリ59
を上昇させることにより、コンクリート打設の進捗にと
もなってバケット11の上昇位置を高くすることができ
る。よって、第1実施例と同様の効果を発揮することが
できる。加えて、第2実施例においては、プーリ59を
レール架台27に設け、巻上装置54をレール架台27
以外の部分である河床部12側に設けるため、搭載物を
含むレール架台27の重量を大幅に低減できる。
Also in the material / material carrier 2 of the second embodiment having such a configuration, the rail mount 27, that is, the pulley 59.
By moving up, the rising position of the bucket 11 can be raised as the concrete pouring progresses. Therefore, the same effect as the first embodiment can be exhibited. In addition, in the second embodiment, the pulley 59 is provided on the rail mount 27 and the hoisting device 54 is installed on the rail mount 27.
Since it is provided on the riverbed 12 side, which is a portion other than the above, the weight of the rail mount 27 including the mounted object can be significantly reduced.

【0052】なお、第2実施例においては、河床部12
側に巻上装置54を設けるものを例にとり説明したが、
これに限定されることなく、ダム堤体1上、近接する岩
盤等のいずれの位置にも設けることができる。また、第
1実施例および第2実施例においては、レール架台27
に巻上装置54またはプーリ59を設け、さらに上部ホ
ッパー49を設けるものを例にとり説明したが、勿論、
上部ホッパー49を除くことも可能である。逆に、バケ
ット11が自走でガイドレール46およびガイドレール
10を昇降するもの(例えば、ガイドレール46および
ガイドレール10にラックギアを設け、バケット11に
このラックギアに噛み合うピニオンギアおよびこれを駆
動する駆動源を設けて、このピニオンギアの回転により
バケット11が昇降するもの等)であれば、レール架台
27に上部ホッパー49のみを設けることも可能であ
る。加えて、以上の第1及び第2実施例においては、ク
ライミングレール5を、ダム堤体1の傾斜する側壁面3
に設けたものを例にとり説明したが、勿論、鉛直に沿う
鉛直面部に設けることも可能である。
In the second embodiment, the riverbed 12
Although the example in which the hoisting device 54 is provided on the side has been described,
The present invention is not limited to this, and the dam can be provided at any position on the dam body 1, on the adjacent rock, or the like. Further, in the first and second embodiments, the rail mount 27
An example in which the hoisting device 54 or the pulley 59 is provided and the upper hopper 49 is further provided has been described as an example.
It is also possible to omit the upper hopper 49. On the contrary, the bucket 11 that moves up and down the guide rail 46 and the guide rail 10 by itself (for example, a rack gear is provided on the guide rail 46 and the guide rail 10, and the bucket 11 is a pinion gear that meshes with the rack gear and a drive for driving the pinion gear). It is also possible to provide only the upper hopper 49 on the rail mount 27 if the bucket 11 is raised and lowered by the rotation of the pinion gear by providing a power source). In addition, in the above-described first and second embodiments, the climbing rail 5 is connected to the inclined side wall surface 3 of the dam body 1.
However, it is of course also possible to provide it on the vertical surface portion along the vertical direction.

【0053】[0053]

【発明の効果】本発明の請求項1記載の資機材搬送装置
によれば、搬送器の移動を案内する第一レールおよび第
二レールをコンクリート打設の進捗にともなって延長さ
せることができることから、すでに打設されたダム堤体
を利用して河床部側から資機材をダム堤体上に運搬でき
ることになるため、コンクリートを混練製造するコンク
リート混練設備等を河床部に設置することができ、また
ケーブルクレーンの数も少なくできることになり、よっ
て、該コンクリート混練設備及びケーブルクレーンを設
置するための用地確保のためにダム堤頂部付近の山を大
きく削り取る必要がなくなるため、自然環境保全や景観
上の観点から好ましい。それとともに、ケーブルクレー
ンのバケット等が作業者の上方を移動する機会も少なく
なるため、安全性も高まる。また、掘削面に設けられる
のではなくすでに形成されたダム堤体の側壁面に沿って
設けられるものであるため、掘削面の岩盤検査及び基礎
構築が必要なくなり、またコンクリート打設の進捗とと
もに延長できることから前もって上から下まで全部布設
する必要もなくなる。したがって、ダムコンクリートの
打設開始を迅速に行うことができる。加えて、資機材搬
送装置はすでに形成されたダム堤体の側壁面に沿って設
けられるため、ダムコンクリート打設の進捗と共に基礎
を下から順次撤去する必要もなくなり、さらには、盛替
が容易であり地山の切取りも不要となる。したがって、
上記ダムコンクリートの打設開始の迅速化の実現と合
せ、工期を大幅に短縮できる。
As described above, according to the material / material carrier of the present invention, the first rail and the second rail for guiding the movement of the carrier can be extended as the concrete pouring progresses. , Since the equipment can be transported from the riverbed side to the dam levee using the already placed dam levee, concrete kneading equipment for kneading and manufacturing concrete can be installed in the riverbed. Also, the number of cable cranes can be reduced, so that it is not necessary to largely scrape off the mountains near the top of the dam embankment in order to secure a site for installing the concrete kneading equipment and cable crane, which helps to preserve the natural environment and improve the scenery. From the viewpoint of. At the same time, the chances that the bucket or the like of the cable crane moves above the worker is reduced, so that the safety is improved. Since it is not provided on the excavation surface but along the side wall surface of the dam dam body already formed, it is not necessary to inspect the rock surface of the excavation surface and foundation construction, and it is extended as the concrete pouring progresses. Since it is possible, it is not necessary to lay it from top to bottom in advance. Therefore, the pouring of dam concrete can be started quickly. In addition, since the equipment transporter is installed along the side wall surface of the dam dam body that has already been formed, it is not necessary to remove the foundation one by one from the bottom as the dam concrete is placed, and it is easy to relocate. Therefore, it is not necessary to cut the ground. Therefore,
Along with the realization of the quick start of the pouring of the dam concrete, the construction period can be greatly shortened.

【0054】本発明の請求項2記載の資機材搬送装置に
よれば、コンクリート打設の進捗にともなってレール架
台を上昇させることで該レール架台に設けられた巻上装
置を上昇させることができる。よって、コンクリート打
設の進捗にともなって搬送器の上昇位置を高くすること
ができる。
According to the material and material transporting device of the second aspect of the present invention, the hoisting device provided on the rail mount can be lifted by raising the rail mount as the concrete pouring progresses. . Therefore, the ascending position of the carrier can be increased as the concrete pouring progresses.

【0055】本発明の請求項3記載の資機材搬送装置に
よれば、レール架台に、巻上装置が巻上げ及び繰出す線
状体がかけられるプーリが設けられているため、コンク
リート打設の進捗にともなってレール架台を上昇させる
ことで該レール架台に設けられたプーリを上昇させるこ
とができる。よって、コンクリート打設の進捗にともな
って搬送器の上昇位置を高くすることができる。また、
プーリをレール架台に設け、巻上装置をレール架台以外
の位置に設けるため、搭載物を含むレール架台の重量を
増大させてしまうことがない。
According to the material / material carrier of claim 3 of the present invention, since the rail mount is provided with the pulley on which the linear body for hoisting and unwinding by the hoisting device is provided, the progress of the concrete placing is progressed. Accordingly, by raising the rail mount, the pulley provided on the rail mount can be raised. Therefore, the ascending position of the carrier can be increased as the concrete pouring progresses. Also,
Since the pulley is provided on the rail mount and the hoisting device is provided at a position other than the rail mount, the weight of the rail mount including the load is not increased.

【0056】本発明の請求項4記載の資機材搬送装置に
よれば、下降する搬送器が上昇する搬送器のカウンタウ
エイト代りとなるため、搬送器の重量分が相殺され、駆
動源の駆動力が小さく省エネ化が図れる。
According to the material / material carrier of claim 4 of the present invention, since the descending carrier serves as a counterweight for the ascending carrier, the weight of the carrier is offset and the driving force of the driving source is offset. Is small and energy can be saved.

【0057】本発明の請求項5記載の資機材搬送装置に
よれば、レール架台に、仮受ホッパーが設けられている
ため、コンクリート打設の進捗にともなってレール架台
を上昇させることで該レール架台に設けられた仮受ホッ
パーを上昇させることができる。よって、コンクリート
打設の進捗にともなって仮受ホッパーによる仮受位置を
高くすることができる。
According to the material / material carrier of claim 5 of the present invention, since the rail mount is provided with the temporary receiving hopper, the rail mount is raised by the progress of the concrete pouring. The temporary receiving hopper provided on the frame can be raised. Therefore, the temporary receiving position of the temporary receiving hopper can be increased as the concrete pouring progresses.

【0058】本発明の請求項6記載の資機材搬送装置に
よれば、案内部材が、レール架台と係合状態にある分割
体のみで該レール架台をダム堤体の側壁面に支持可能で
あるため、レール架台に係合する分割体以外の下側にあ
る分割体を延長用の分割体に転用できる。したがって、
分割体の数を最小限にすることができる。
According to the equipment transporting apparatus of the sixth aspect of the present invention, the guide member can support the rail mount on the side wall surface of the dam dam body only by the divided body engaged with the rail mount. Therefore, it is possible to use the lower divided body other than the divided body that engages with the rail mount as the extended divided body. Therefore,
The number of divisions can be minimized.

【0059】本発明の請求項7記載の資機材搬送装置に
よれば、レール架台に固定された固定係合部を案内部材
に設けられた係合穴に係合させた状態から、移動係合部
を案内部材の他の係合穴に係合させ、そして、固定係合
部の係合穴との係合を解除し、伸縮機構を移動係合部が
レール架台に対し案内部材の延在方向に沿って移動する
方向に駆動させると、係合穴との係合により移動係合部
は案内部材に対し移動せず、よってレール架台が案内部
材の延在方向に沿って移動する。したがって、比較的簡
易な構成でレール架台を上昇させることができる。
According to the seventh aspect of the present invention, in the material / material conveying device, the fixed engagement portion fixed to the rail mount is engaged with the engagement hole provided in the guide member to move the engagement. Part is engaged with another engaging hole of the guide member, and then disengaged from the engaging hole of the fixed engaging part, and the expansion mechanism is moved. The engaging part extends the guide member with respect to the rail mount. When driven in the direction of movement along the direction, the moving engagement portion does not move with respect to the guide member due to engagement with the engagement hole, and thus the rail mount moves along the extending direction of the guide member. Therefore, the rail mount can be raised with a relatively simple structure.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の第1実施例による資機材搬送装置の全
体構成を概略的に示す斜視図である。
FIG. 1 is a perspective view schematically showing an overall configuration of a material / material carrier according to a first embodiment of the present invention.

【図2】本発明の第1実施例による資機材搬送装置の下
部ホッパー及びバケット等を示す側面図である。
FIG. 2 is a side view showing a lower hopper, a bucket and the like of the material / materials transporting apparatus according to the first embodiment of the present invention.

【図3】本発明の第1実施例による資機材搬送装置の上
昇機構の作動の一状態を示す図である。
FIG. 3 is a diagram showing one state of operation of the lifting mechanism of the material and material transporting device according to the first embodiment of the present invention.

【図4】本発明の第1実施例による資機材搬送装置の上
昇機構の作動の次の状態を示す図である。
FIG. 4 is a diagram showing the next state of the operation of the lifting mechanism of the material and material transporting device according to the first embodiment of the present invention.

【図5】本発明の第1実施例による資機材搬送装置の上
昇機構の作動のさらに次の状態を示す図である。
FIG. 5 is a diagram showing a further next state of the operation of the lifting mechanism of the material and material transporting device according to the first embodiment of the present invention.

【図6】本発明の第2実施例による資機材搬送装置の全
体構成を概略的に示す斜視図である。
FIG. 6 is a perspective view schematically showing an overall configuration of a material / material carrier according to a second embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 ダム堤体 2 資機材搬送装置 3 側壁面 5 クライミングレール(案内部材) 5a 分割体 8 係合穴 10 ガイドレール(第二レール) 11 バケット(搬送器) 27 レール架台 30 上側台部(固定係合部) 32 移動台部(移動係合部) 34 移動用シリンダ(伸縮機構) 46 ガイドレール(第一レール) 49 上部ホッパー(仮受ホッパー) 53 巻胴(回転体) 54 巻上装置 58 ワイヤ(線状体) DESCRIPTION OF SYMBOLS 1 Dam bank 2 Material / material transport device 3 Side wall surface 5 Climbing rail (guide member) 5a Divided body 8 Engagement hole 10 Guide rail (second rail) 11 Bucket (transporter) 27 Rail mount 30 Upper platform (fixing member) Joint part 32 Moving base part (moving engaging part) 34 Cylinder for movement (expansion / contraction mechanism) 46 Guide rail (first rail) 49 Upper hopper (temporary receiving hopper) 53 Winding drum (rotating body) 54 Hoisting device 58 Wire (Linear body)

フロントページの続き (72)発明者 福元 洋一 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 (72)発明者 小田原 卓郎 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 (72)発明者 今井 英雄 東京都中央区日本橋室町二丁目1番1号 株式会社三井三池製作所内 (72)発明者 岳 秀文 福岡県大牟田市旭町二丁目28番地 株式会 社三井三池製作所三池事業所内Front page continuation (72) Inventor Yoichi Fukumoto 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Takuro Odawara 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Hideo Imai 1-1-1, Nihombashi Muromachi, Chuo-ku, Tokyo Mitsui Miike Manufacturing Co., Ltd. (72) Hidefumi Gaku, 2-28 Asahimachi, Omuta City, Fukuoka Mitsui Miike Plant Miike Business In-house

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 資機材を搭載可能な搬送器と、 すでにコンクリート打設により形成されたダム堤体の側
壁面に上下方向に沿って延在設置される案内部材と、 該案内部材に反力をとりつつ前記ダム堤体の側壁面に沿
って上昇可能であるとともに、前記搬送器の移動を案内
する第一レールが上昇方向に沿って設けられたレール架
台と、 該レール架台の第一レールの下側に連続するよう前記ダ
ム堤体の側壁面に設けられる第二レールと、を具備する
ことを特徴とする資機材搬送装置。
1. A transporter on which materials and equipment can be mounted, a guide member extending vertically along a side wall of a dam dam body already formed by concrete casting, and a reaction force to the guide member. And a rail mount on which a first rail for guiding the movement of the carrier is provided along the rising direction while being able to rise along the side wall surface of the dam bank, and a first rail of the rail mount. A second rail provided on the side wall surface of the dam bank so as to be continuous to the lower side of the dam material carrier.
【請求項2】 前記レール架台に、前記搬送器に連結さ
れた線状体を巻上げ及び繰出すことにより該搬送器を昇
降させる巻上装置が設けられていることを特徴とする請
求項1記載の資機材搬送装置。
2. The hoisting device for raising and lowering the carrier by hoisting and unwinding a linear body connected to the carrier is provided on the rail mount. Equipment transportation equipment.
【請求項3】 前記レール架台以外の位置に、前記搬送
器に連結された線状体を巻上げ及び繰出すことにより該
搬送器を昇降させる巻上装置が設けられ、 前記レール架台には、前記線状体がかけられるプーリが
設けられていることを特徴とする請求項1記載の資機材
搬送装置。
3. A hoisting device for hoisting and unwinding a linear body connected to the carrier to raise and lower the carrier is provided at a position other than the rail cradle, and the rail gantry has the above-mentioned hoisting device. 2. The material and material conveying device according to claim 1, further comprising a pulley on which the linear member is hung.
【請求項4】 前記搬送器を二つ有しており、前記巻上
装置は、それぞれの搬送器に連結された線状体をそれぞ
れ個別の回転体に逆向きに巻いてなることを特徴とする
請求項2又は3記載の資機材搬送装置。
4. The hoisting device has two of the transporters, and the hoisting device is configured such that the linear bodies connected to the respective transporters are respectively wound on respective individual rotating bodies in opposite directions. The material / material transportation device according to claim 2 or 3.
【請求項5】 前記レール架台に、前記搬送器により運
搬された資材を仮受けする仮受ホッパーが設けられてい
ることを特徴とする請求項1乃至4のいずれか一項に記
載の資機材搬送装置。
5. The equipment according to any one of claims 1 to 4, wherein the rail mount is provided with a temporary receiving hopper for temporarily receiving the material transported by the carrier. Transport device.
【請求項6】 前記案内部材は、複数の分割体からなる
とともに、前記レール架台と係合状態にある分割体のみ
で、該レール架台をダム堤体の側壁面に支持可能である
ことを特徴とする請求項1乃至5のいずれか一項に記載
の資機材搬送装置。
6. The guide member is composed of a plurality of divided bodies, and the rail foundation can be supported on the side wall surface of the dam body by only the divided bodies engaged with the rail mount. The material and material transport device according to any one of claims 1 to 5.
【請求項7】 前記案内部材は、延在方向に複数配設さ
れた係合穴を有しており、前記レール架台は、該レール
架台に固定されるとともに前記係合穴に係脱可能な固定
係合部と、伸縮機構を介して前記レール架台に連結され
該レール架台に対し前記案内部材の延在方向に沿って移
動可能とされるとともに前記係合穴に係脱可能な移動係
合部とを有することを特徴とする請求項1乃至6のいず
れか一項に記載の資機材搬送装置。
7. The guide member has a plurality of engagement holes arranged in the extending direction, and the rail mount is fixed to the rail mount and detachable from the engagement holes. A fixed engagement portion and a movable engagement that is connected to the rail mount via an expansion / contraction mechanism, is movable in the extension direction of the guide member with respect to the rail mount, and is engageable with and disengageable from the engagement hole. The material and material conveying device according to any one of claims 1 to 6, further comprising:
JP29184494A 1994-03-15 1994-11-25 Equipment and materials carrying device Pending JPH07305328A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP29184494A JPH07305328A (en) 1994-03-15 1994-11-25 Equipment and materials carrying device

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP6-44438 1994-03-15
JP4443894 1994-03-15
JP29184494A JPH07305328A (en) 1994-03-15 1994-11-25 Equipment and materials carrying device

Publications (1)

Publication Number Publication Date
JPH07305328A true JPH07305328A (en) 1995-11-21

Family

ID=26384354

Family Applications (1)

Application Number Title Priority Date Filing Date
JP29184494A Pending JPH07305328A (en) 1994-03-15 1994-11-25 Equipment and materials carrying device

Country Status (1)

Country Link
JP (1) JPH07305328A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014118707A (en) * 2012-12-14 2014-06-30 Taisei Corp Moving carriage of concrete slope transport facility

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014118707A (en) * 2012-12-14 2014-06-30 Taisei Corp Moving carriage of concrete slope transport facility

Similar Documents

Publication Publication Date Title
CN110952561A (en) Working method of riprap leveling ship
CN112573113A (en) Riprap leveling ship
US1956967A (en) Revetment and method and apparatus for forming the same
JPH07305328A (en) Equipment and materials carrying device
JP5292019B2 (en) Pile construction device and cast-in-place concrete pile construction method
JP3163433B2 (en) Equipment transfer equipment
JP3381043B2 (en) Dam concrete placement equipment
JP3381044B2 (en) Dam construction method
CN212711257U (en) Riprap leveling ship
JP3563130B2 (en) Equipment transfer equipment
KR101217354B1 (en) Loading cargo of dump truck dividing compartment and method loading gradually paving materials on the weak soil layers
JP3637513B2 (en) Concrete conveying device and dam dam construction method
JP3851693B2 (en) Concrete conveyor
CN221053698U (en) Underground lifting type slag bucket storage device
JPH07300841A (en) Construction method of dam
CN221253839U (en) Panel construction material conveyer suitable for rock-fill dam
CN216588612U (en) Scheduling platform for slag tapping construction of large-gradient tunnel winch
JP3373318B2 (en) Transfer device
CN211494398U (en) Stone sliding pipe device of riprap leveling ship
JP2512735Y2 (en) Dam concrete transport plant
JPH083966A (en) Execution method for dam
JPH0853827A (en) Construction method of dam
JPH08218348A (en) Method for dismantling conveyor for dam
JPH07300840A (en) Transfer device for dam construction
JPH10140537A (en) Concrete conveyor

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20040420