JPH07246498A - Heading machine - Google Patents

Heading machine

Info

Publication number
JPH07246498A
JPH07246498A JP6466994A JP6466994A JPH07246498A JP H07246498 A JPH07246498 A JP H07246498A JP 6466994 A JP6466994 A JP 6466994A JP 6466994 A JP6466994 A JP 6466994A JP H07246498 A JPH07246498 A JP H07246498A
Authority
JP
Japan
Prior art keywords
die
forging
work
hole
pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP6466994A
Other languages
Japanese (ja)
Other versions
JP3560635B2 (en
Inventor
Masahiko Matsuo
正彦 松尾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asahi Sunac Corp
Original Assignee
Asahi Sunac Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asahi Sunac Corp filed Critical Asahi Sunac Corp
Priority to JP06466994A priority Critical patent/JP3560635B2/en
Publication of JPH07246498A publication Critical patent/JPH07246498A/en
Application granted granted Critical
Publication of JP3560635B2 publication Critical patent/JP3560635B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Forging (AREA)
  • Press Drives And Press Lines (AREA)
  • Punching Or Piercing (AREA)

Abstract

PURPOSE:To form with a heading machine of its process number being one rank lower in a case of forming a heading product to require plural processes. CONSTITUTION:An inserting through hole 23 is formed on the side of a heading die of a 3rd process of a die block 3 in a heading machine of three dies and three blow system, and a projecting pin 26 is inserted through its inside. A slender tube shaped auxiliary die having a diameter reduced forming hole 38 on its top end surface is installed on the front side. When a bottomed tubular shape work d formed in the 3rd process is conveyed to the front side of the projecting pin 26 with a transferring member, the pin 26 advances and the work d is pressed in so as to fit outside the top end part of the auxiliary die 37. When the inner bottom surface of work d makes in contact with the top end surface of the auxiliary die 37, and the projecting pin 27 advances further, the forming part 54 breaks the bottom surface of the work d, enters inside the forming hole 38 while opening the hole, and a final product of blind tubular shape with hole is formed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、ワークを搬送しつつ複
数工程にわたって順次に圧造成形を施して製品を得るよ
うにした圧造機に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a forging machine capable of obtaining a product by sequentially performing forging over a plurality of steps while conveying a work.

【0002】[0002]

【従来の技術】この種の圧造機を使用して、例えば、有
底筒形でその底に中心孔を開口した形状の圧造製品を成
形する場合は、図5に示すように、一定寸法に切断され
た丸線aを、第1工程で背の低いたる形bに成形し、第
2工程で一面に凹部を設けた背の低い円柱形cに成形
し、第3工程で有底筒形dに形成し、第4工程で底に孔
を開けて孔付き有底筒形の最終製品eを得るようにして
いる。
2. Description of the Related Art For example, when a forging product having a cylindrical shape with a bottom and a central hole opened at the bottom is molded by using this type of forging machine, as shown in FIG. The cut round wire a is formed in the first step into a short barrel shape b, in the second step is formed into a short columnar shape c having a recess on one surface, and in the third step, a bottomed cylindrical shape. In the fourth step, a hole is made in the bottom to obtain a bottomed cylindrical end product e having holes.

【0003】その場合、従来は、上記の各工程に対応し
て4個ずつの圧造ダイスとパンチとを備えた、いわゆる
4ダイス4ブロー式の圧造機が使用されていた。
In this case, conventionally, a so-called four-die, four-blow type forging machine having four forging dies and punches corresponding to each of the above steps has been used.

【0004】[0004]

【発明が解決しようとする課題】ところで、上記の第4
工程は主に薄い底に孔を開けるだけであるから本来は低
荷重で成形可能であるが、上記のように4ダイス4ブロ
ー式となれば、第4工程も前の3工程の同様に高荷重に
対応した仕様の金型を設けることになる。そのため、圧
造機が必要以上に高価となっていた。
The above-mentioned fourth problem
Since the process mainly consists of making holes in the thin bottom, it is possible to form with a low load originally, but if the 4 dice 4 blow type is used as described above, the 4th process is also as high as the previous 3 processes. A mold with specifications corresponding to the load will be installed. Therefore, the press machine was more expensive than necessary.

【0005】[0005]

【課題を解決するための手段】本発明の圧造機は、この
ような事情を背景として完成されたものであって、本体
の最終工程の圧造ダイスの側方に、その最終工程の圧造
ダイスとパンチにより成形されてトランスファ部材で搬
送されて来たワークを前方に突き出す突き出しピンを設
けるとともに、その突き出しピンの前方に、進出した突
き出しピンと係合してワークに低荷重の圧造成形を施す
補助ダイスを設けた構成とした。
The forging machine of the present invention has been completed in view of the above circumstances, and a forging die for the final step is formed on the side of the forging die for the final step of the main body. Auxiliary dies that provide a protruding pin that protrudes the work that has been formed by the punch and conveyed by the transfer member to the front, and engages the protruding pin that has advanced in the front of the protrusion pin to perform low-load forging forming on the work. Is provided.

【0006】[0006]

【作用】本発明の作用は以下のとおりである。ワークに
対してダイスブロックに設けた圧造ダイスの数に対応し
た工程の圧造成形が施されると、その最終工程の成形を
終えたワークが、トランスファ部材によってその最終工
程の圧造ダイスの側方に設けられた突き出しピンの前面
に搬送される。そうすると、突き出しピンが進出してワ
ークを前方に突き出し、その前方に設けられた補助ダイ
スと係合することによって、ワークに低荷重の圧造成形
が付加的に施される。
The operation of the present invention is as follows. When the press forming of the process corresponding to the number of press dies provided in the die block is performed on the work, the work finished in the final process is transferred to the side of the press die of the final process by the transfer member. It is conveyed to the front of the protruding pin provided. Then, the ejection pin advances to eject the work forward, and engages with an auxiliary die provided in front of the work, whereby the work is additionally subjected to low-load forging.

【0007】したがって、例えば、4工程の圧造成形を
必要とする製品の場合、従来4ダイス4ブロー式の圧造
機を使用していたところを、工程数が1ランク下の3ダ
イス3ブロー式の圧造機を使用すれば足りることにな
る。
Therefore, for example, in the case of a product requiring four-step press forming, the place where the conventional four-die, four-blowing forging machine was used is replaced by the three-die, three-blowing type, which is one rank lower in the number of steps. It is enough to use a press machine.

【0008】[0008]

【実施例】以下、本発明の一実施例を図1〜図5に基づ
いて説明する。本実施例は、前記した4工程の圧造成形
により孔付き有底筒形の製品を製造する場合を例示す
る。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to FIGS. This example illustrates a case where a bottomed cylindrical product with holes is manufactured by the above-described four-step press forming.

【0009】本実施例の圧造機はいわゆる3ダイス3ブ
ロー式であって、図1において、ヘッダー本体1に形成
された凹所2にはダイスブロック3が装置されており、
その一端側の前面に形成された後退面3aに2個の装置
孔5、6が並んで形成され、一方の装置孔5に、圧造製
品の素材となる丸線の供給パイプ7に接続された剪断ダ
イス8が嵌着され、他方の装置孔6に、突き出しダイス
9が進退自由に嵌装されている。また、丸駒カッタ12
を嵌着したカッタレバー11が、両装置孔5、6の前面
の間での揺動自由に設けられている。
The forging machine of this embodiment is a so-called 3 die 3 blow type, and in FIG. 1, the die block 3 is installed in the recess 2 formed in the header body 1.
Two device holes 5 and 6 are formed side by side on a receding surface 3a formed on the front surface on one end side, and one device hole 5 is connected to a round wire supply pipe 7 which is a raw material of a pressed product. A shearing die 8 is fitted, and a protruding die 9 is fitted in the other device hole 6 so as to freely move back and forth. Also, round piece cutter 12
A cutter lever 11 fitted with is attached so as to be freely swingable between the front surfaces of both device holes 5 and 6.

【0010】ダイスブロック3の突出面3bには3個の
装置孔14が一定の間隔を開けて水平方向に並んで形成
されて、それぞれにダイスホルダ15a〜15cが嵌装
されており、各ダイスホルダ15a〜15cの前面の中
心には、同図の上側から順次に第1〜第3の圧造ダイス
16a〜16cが嵌着されている。各圧造ダイス16a
〜16cの成形孔内には、図示しないカムにより進退駆
動される突き出しピン17a〜17cの先端が挿通され
ている。
On the protruding surface 3b of the die block 3, three device holes 14 are formed side by side in the horizontal direction at regular intervals, and the die holders 15a to 15c are fitted in the respective device holes 15a to 15d. First to third forging dies 16a to 16c are fitted in order from the upper side of FIG. Each forging die 16a
The tips of the ejection pins 17a to 17c, which are driven forward and backward by a cam (not shown), are inserted into the molding holes 16c to 16c.

【0011】そのダイスブロック3の突出面3bの前方
には、ラム19がダイスブロック3に接離する方向の往
復運動可能に装置されており、そのラム19の前面に3
個のパンチホルダ20が突設されて、各パンチホルダ2
0の先端面に上記した各圧造ダイス17a〜17cと対
をなす第1〜第3のパンチ21a〜21cが嵌着されて
いる。
A ram 19 is provided in front of the projecting surface 3b of the die block 3 so that the ram 19 can reciprocate in the direction toward and away from the die block 3.
Individual punch holders 20 are provided so as to project from each punch holder 2
The first to third punches 21a to 21c which are paired with the above-described forging dies 17a to 17c are fitted to the front end surface of 0.

【0012】ダイスブロック3の突出面3bの、上記の
第3圧造ダイス17cを設けた位置から各圧造ダイス1
7a〜17c間と同じ間隔をおいた側方の位置には、前
端側を縮径した段付きの挿通孔23が穿設されている。
From the position where the above-mentioned third forging die 17c is provided on the protruding surface 3b of the die block 3, each forging die 1
A stepped insertion hole 23 having a reduced diameter on the front end side is formed at a lateral position with the same spacing as between 7a to 17c.

【0013】この挿通孔23内には、図2に詳細に示す
ように、突き出しピン26を先端に突設した駆動杆25
が摺動自由に嵌装され、その後端が図示しないカムと係
合されているとともに、挿通孔23の段付面と駆動杆2
5の前面との間に圧縮ばね27が装着されており、常に
はその弾拡力で駆動杆25が後退付勢されて突き出しピ
ン26の先端が挿通孔23内に退避し、カムで駆動杆2
5が圧縮ばね27の弾力に抗して前進することにより突
き出しピン26が挿通孔23から突出するようになって
いる。
In the insertion hole 23, as shown in detail in FIG. 2, a drive rod 25 having a protruding pin 26 at the tip thereof is provided.
Is slidably fitted, the rear end of which is engaged with a cam (not shown), and the stepped surface of the insertion hole 23 and the drive rod 2
5, a compression spring 27 is mounted between the front surface of the drive rod 5 and the front surface of the drive rod 5, and the driving rod 25 is always biased by the elastic force of the compression spring 27 so that the tip of the protruding pin 26 retracts into the insertion hole 23. Two
The push-out pin 26 protrudes from the insertion hole 23 when the compression spring 27 moves forward against the elastic force of the compression spring 27.

【0014】ダイスブロック3の前面には図示しないト
ランスファ部材が装置されており、詳しくは後記するよ
うに剪断されたワークが第1〜第3の圧造ダイス17a
〜17cから最終の突き出しピン26の前面にわたって
順次に搬送されるようになっている。
A transfer member (not shown) is provided on the front surface of the die block 3, and more specifically, the work that has been sheared is cut into the first to third forging dies 17a as described later.
It is configured to be sequentially conveyed from the first to 17c to the front surface of the final ejection pin 26.

【0015】上記は従来と同じ構造であって、従来は、
最終の突き出しピン26の前方に取出パイプが設けられ
て、第3圧造ダイス17cで成形されたワークが挿通孔
23の前面に一旦搬送されたのち、突き出しピン26の
進出により前方に突き出されて、取出パイプを通って順
次に取り出されるようになっていた。
The above is the same structure as the conventional one.
An ejection pipe is provided in front of the final ejection pin 26, and the work formed by the third forging die 17c is once conveyed to the front surface of the insertion hole 23, and then ejected forward by the ejection pin 26 advancing, It was supposed to be taken out sequentially through the take-out pipe.

【0016】本実施例では、その取出パイプに代わっ
て、低荷重用の補助ダイス装置29が設けられている。
In this embodiment, a low load auxiliary die device 29 is provided in place of the extraction pipe.

【0017】この補助ダイス装置29は、ヘッダー本体
1のダイスブロック3の装置面と直角をなす側面上に、
取付ブロック30がボルト31によって取り付けられて
おり、その取付ブロック30のダイスブロック3と対応
する前面の、突き出しピン26の軸線上に対応する位置
に、内周に雌ねじを切った装置孔33が形成されてい
る。
This auxiliary die device 29 is provided on a side surface of the die body 3 of the header body 1 which is perpendicular to the device surface.
The mounting block 30 is mounted by bolts 31, and a device hole 33 with an internal thread is formed on the inner periphery at a position corresponding to the die block 3 of the mounting block 30 on the axis of the protruding pin 26. Has been done.

【0018】その装置孔33には、前端側に縮径した摺
動孔35を形成した筒形ホルダ34が、後端の外周に形
成した雄ねじ部分をねじ込んで、前端側を取付ブロック
30の前面から突出させて固定されている。
A cylindrical holder 34 having a sliding hole 35 having a reduced diameter on the front end side is screwed into the device hole 33, and a male screw portion formed on the outer periphery of the rear end is screwed in, so that the front end side is attached to the front surface of the mounting block 30. It is fixed by protruding from.

【0019】その筒形ホルダ34内の軸線上には、前端
側に縮径した成形孔38を設けた細長い管形の補助ダイ
ス37が、取付ブロック30の後面に上記の装置孔33
と連通して開口された取付孔40側から挿通されて、そ
の後端に形成された係止鍔41が取付孔40の段付き部
に突き当てられ、係止鍔41の後側に押え環42を嵌め
たのち、取付ブロック30の後面に押えブロック44を
ボルト45で取り付けることによって、前端側を筒形ホ
ルダ34の前面からさらに突出させて固定されている。
Along the axis of the cylindrical holder 34, an elongated tubular auxiliary die 37 having a molding hole 38 having a reduced diameter on the front end side is provided on the rear surface of the mounting block 30 with the device hole 33.
The engaging collar 41 formed at the rear end of the retaining ring 40 is inserted through the side of the mounting hole 40 that communicates with the retaining hole 40 and is abutted against the stepped portion of the mounting hole 40. After fitting, the pressing block 44 is attached to the rear surface of the mounting block 30 with the bolt 45, so that the front end side is further protruded from the front surface of the cylindrical holder 34 and fixed.

【0020】その補助ダイス37と筒形ホルダ34の間
には、長さ方向の略中央部の外周にストッパ鍔48を形
成した移動管47が軸線方向の摺動自由に嵌装されてお
り、ストッパ鍔48の後面と装置孔33の後壁との間に
装着された圧縮ばね49の弾拡力で筒形ホルダ34の前
方に突出する方向の移動力が付勢されて、ストッパ鍔4
8の前面が摺動孔35の口縁に当たることによりその移
動が規制され、そのとき移動管47の先端面が補助ダイ
ス37の先端面と略面一となるまで突出するようになっ
ている。
Between the auxiliary die 37 and the cylindrical holder 34, a moving tube 47 having a stopper flange 48 formed on the outer periphery of the substantially central portion in the lengthwise direction is fitted so as to be slidable in the axial direction. The elastic force of the compression spring 49 mounted between the rear surface of the stopper collar 48 and the rear wall of the device hole 33 urges the moving force in the forward projecting direction of the cylindrical holder 34, and the stopper collar 4
The movement of the front surface of the moving tube 47 is restricted by hitting the front edge of the sliding hole 35 with the front surface of the moving hole 47, and at this time, the tip end surface of the moving tube 47 projects until it is substantially flush with the tip end surface of the auxiliary die 37.

【0021】なお、補助ダイス37の後端の開口は、押
え環42の中空、押えブロック44に透設された通孔5
1を介して、ヘッダー本体1に形成された吸引機能付き
の排出通路52に接続されている。
The opening at the rear end of the auxiliary die 37 is a hollow of the presser ring 42, and the through hole 5 is transparently provided in the presser block 44.
1 is connected to a discharge passage 52 having a suction function formed in the header body 1.

【0022】また、前記した最終の突き出しピン26の
先端部は、補助ダイス37の成形孔38内に嵌入可能に
縮径されて成形部54が形成されている。
Further, the tip end portion of the final ejecting pin 26 described above is reduced in diameter so that it can be fitted into the forming hole 38 of the auxiliary die 37 to form a forming portion 54.

【0023】本実施例は上記のような構造であって、続
いてその作動を説明する。図1において、供給パイプ7
を通って供給される連続した丸線の先端が剪断ダイス8
を通して丸駒カッタ12内に一定寸法突出すると、カッ
タレバー11が側方に揺動することにより、図5のaに
示す一定寸法に切断された丸線からなるワークが形成さ
れ、突き出しダイス9の進出によりそのワークaがカッ
タレバー11の前面に突き出され、そののちトランスフ
ァ部材により第1圧造ダイス16aの前面に搬送され
る。
The present embodiment has the above-mentioned structure, and its operation will be described below. In FIG. 1, the supply pipe 7
The tip of the continuous round wire supplied through the shearing die 8
When the cutter lever 11 swings to a certain size through the circular piece cutter 12 through the through hole, a work made of round wires cut into a certain size shown in FIG. By advancing, the work a is projected to the front surface of the cutter lever 11, and then transferred to the front surface of the first forging die 16a by the transfer member.

【0024】引き続いてラム19が前進することにより
その第1圧造ダイス17aと第1パンチ21aとの間で
第1工程の圧造成形が行われて、図5のbに示す背の低
いたる形のワークに成形され、ラム19が後退するとと
もに突き出しピン17aが進出して、そのワークbが第
1圧造ダイス16aの前面に突き出され、トランスファ
部材により第2圧造ダイス16bの前面に搬送される。
Subsequently, the ram 19 is moved forward to perform the forging forming in the first step between the first forging die 17a and the first punch 21a, thereby forming a short barrel shape shown in FIG. 5b. The work is formed into a work, the ram 19 retracts, and the ejection pin 17a advances, the work b is ejected to the front surface of the first forging die 16a, and is transferred to the front surface of the second forging die 16b by the transfer member.

【0025】その後、同様にして、第2圧造ダイス16
bと第2パンチ21bとの間で第2工程の圧造成形が行
われて、図5のcに示す一面に凹部を設けた背の低い円
柱形のワークに成形され、さらに、その隣りの第3圧造
ダイス16cと第3パンチ21cとの間で第3工程の圧
造成形が行われて、図5のdに示す有底筒形のワークに
成形される。
Thereafter, in the same manner, the second forging die 16
2b and the second punch 21b are subjected to the forging forming in the second step to form a short cylindrical work having a concave portion on one surface shown in FIG. The forging forming of the third step is performed between the three forging die 16c and the third punch 21c to form a bottomed cylindrical work shown in d of FIG.

【0026】第3工程で成形されたワークdは、同様に
突き出しピン17cにより第3圧造ダイス16cの前面
に突き出されて、ダイスブロック3の突出面3bに沿っ
てその側方に搬送され、図2に示すように、最終の突き
出しピン26の挿通孔23の前面と、補助ダイス装置2
9の突出した移動管47の前端との間に入り込む。
The work d formed in the third step is similarly ejected to the front surface of the third forging die 16c by the ejecting pin 17c, and is conveyed laterally along the protruding surface 3b of the die block 3 as shown in FIG. 2, the final front surface of the insertion hole 23 of the protruding pin 26 and the auxiliary die device 2
9 and the front end of the moving tube 47 protruding.

【0027】そうすると、駆動杆25が圧縮ばね27を
弾縮しつつ前進して、突き出しピン26の先端が挿通孔
23から突出し、それにより、図3に示すように、ワー
クdがその外底面を突き出しピン26で押されて、移動
管47を圧縮ばね49を弾縮させて後退させつつ補助ダ
イス37の先端部に外嵌するようにして押し込まれる。
Then, the drive rod 25 moves forward while elastically compressing the compression spring 27, and the tip of the ejecting pin 26 projects from the insertion hole 23. As a result, as shown in FIG. The movable pipe 47 is pushed by the protrusion pin 26, and is pushed in such that the moving pipe 47 is retracted by elastically compressing the compression spring 49 and externally fitted on the tip end portion of the auxiliary die 37.

【0028】ワークdの内底面が補助ダイス37の先端
面に当たってさらに突き出しピン26が突き出される
と、図4に示すように、先端の成形部54がワークの底
面を破って孔を開けつつ補助ダイス37の成形孔38内
に嵌入し、それにより、図5のeに示すように、孔付き
有底筒形の最終製品が成形される。
When the inner bottom surface of the work d hits the tip surface of the auxiliary die 37 and the ejection pin 26 is further ejected, as shown in FIG. 4, the molding portion 54 at the tip breaks the bottom surface of the work to open a hole and assist the work. It is fitted into the forming hole 38 of the die 37, and as a result, as shown in FIG. 5e, a bottomed tubular product having a bottom is formed.

【0029】その孔開けに伴って生じた切り屑は、補助
ダイス37の中空から、押え環42の中空及び通孔51
を通って排出通路52側に吸引されて排出される。
The chips produced by the opening of the hole are removed from the hollow of the auxiliary die 37 to the hollow of the holding ring 42 and the through hole 51.
And is sucked toward the discharge passage 52 side and discharged.

【0030】最終製品eが成形されたら、駆動杆25が
圧縮ばね27の復元弾力で後退して、成形部54が製品
eの孔から抜けつつ突き出しピン26が挿通孔23内に
後退し、それとともに、移動管47が圧縮ばね49の復
元弾力で前方に移動して、製品eが補助ダイス37の外
周から抜けつつ補助ダイス37の先端とダイスブロック
3の突出面3bの間に押し出され、自然落下により取り
出される。
When the final product e is molded, the drive rod 25 is retracted by the restoring elastic force of the compression spring 27, the molding portion 54 is pulled out from the hole of the product e, and the ejection pin 26 is retracted into the insertion hole 23. At the same time, the moving tube 47 moves forward by the restoring elasticity of the compression spring 49, and the product e is pushed out between the tip of the auxiliary die 37 and the projecting surface 3b of the die block 3 while coming out from the outer periphery of the auxiliary die 37. It is taken out by falling.

【0031】このように本実施例によれば、4つの圧造
工程を必要とする圧造製品の成形が3ダイス3ブロー式
の圧造機で製造できる。
As described above, according to the present embodiment, the forging product requiring the four forging steps can be manufactured by the three-die, three-blowing forging machine.

【0032】特に、本実施例のように、第3工程で成形
されたワークをその側方の位置に設けた突き出しピンで
突き出して取出パイプにより取り出すようにしたものに
おいては、その突き出しピンをそのまま利用し、また、
取出パイプに代わって補助ダイス装置を設けるだけで、
余分なスペースを取ることなく簡単に改造することが可
能である。
Particularly, as in the present embodiment, in the case where the work formed in the third step is ejected by the ejector pin provided at the side position and taken out by the ejector pipe, the ejector pin is used as it is. Use it again
Only by providing an auxiliary die device instead of the take-out pipe,
It can be easily modified without taking up extra space.

【0033】なお、本発明は、上記実施例に示した孔付
き有底筒形の製品に限らず、他の形状の圧造製品の製造
に適用することも可能である。
The present invention is not limited to the bottomed cylindrical product with a hole shown in the above embodiment, but can be applied to the manufacture of a forged product having another shape.

【0034】また、4工程を必要とする場合に限らず、
複数の圧造工程が必要で最終の工程が低荷重であるもの
全般について、広く適用することができる。
Further, not only when four steps are required,
The present invention can be widely applied to all those in which a plurality of forging steps are required and the final step has a low load.

【0035】[0035]

【発明の効果】このように本発明によれば、複数の工程
による圧造製品を成形する場合に、工程数の1ランク下
のもので最終製品まで得ることができ、すなわち低価格
の圧造機による成形が可能となって、設備費の削減、ひ
いては、製造コストの低減に寄与することができる効果
がある。
As described above, according to the present invention, in the case of forming a forged product by a plurality of steps, it is possible to obtain the final product with one rank lower than the number of steps, that is, by a low-cost forging machine. Molding is possible, and there is an effect that it is possible to contribute to reduction of equipment cost and eventually manufacturing cost.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例の全体構造を示す一部切欠平
面図である。
FIG. 1 is a partially cutaway plan view showing the overall structure of an embodiment of the present invention.

【図2】低荷重圧造成形部分の拡大断面図である。FIG. 2 is an enlarged cross-sectional view of a low-load forging forming portion.

【図3】その成形途中を示す断面図である。FIG. 3 is a cross-sectional view showing the molding process.

【図4】その成形完了時を示す断面図である。FIG. 4 is a cross-sectional view showing the completion of molding.

【図5】圧造製品の各工程の形状の説明図である。FIG. 5 is an explanatory diagram of a shape of each process of the pressed product.

【符号の説明】[Explanation of symbols]

1:ヘッダー本体 3:ダイスブロック 16a〜16
c:圧造ダイス 19:ラム 21a〜21c:パンチ
26:突き出しピン 37:補助ダイス 38:成形
孔 54:(突き出しピン26の)成形部
1: Header body 3: Dice block 16a-16
c: Forging die 19: Ram 21a to 21c: Punch 26: Ejecting pin 37: Auxiliary die 38: Forming hole 54: Forming part (of ejecting pin 26)

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 本体のダイスブロックに複数の圧造ダイ
スを並設するとともに、前記ダイスブロックに対向して
前後に往復運動するラムに、前記各圧造ダイスと対をな
す同数のパンチを装着し、ワークをトランスファ部材に
より前記各圧造ダイスの前面に順次に搬送しつつ対応す
る前記パンチとの間で打圧することにより複数工程にわ
たって圧造成形を施すようにした圧造機において、 前記本体の最終工程の前記圧造ダイスの側方に、その最
終工程の前記圧造ダイスと前記パンチにより成形されて
前記トランスファ部材で搬送されて来たワークを前方に
突き出す突き出しピンを設けるとともに、該突き出しピ
ンの前方に、進出した前記突き出しピンと係合してワー
クに低荷重の圧造成形を施す補助ダイスを設けたことを
特徴とする圧造機。
1. A plurality of forging dies are arranged in parallel in a die block of a main body, and the same number of punches forming a pair with each forging die are attached to a ram that reciprocates back and forth facing the die block, In a forging machine configured to perform forging forming over a plurality of steps by pressing the work with a corresponding punch while sequentially transferring the work to the front surface of each forging die by a transfer member, the final step of the main body On the side of the forging die, there is provided an ejecting pin for ejecting the work formed by the forging die and the punch in the final step and conveyed by the transfer member to the front, and to the front of the ejecting pin. A forging machine provided with an auxiliary die that engages with the protruding pin and performs a low-load forging process on a work.
JP06466994A 1994-03-07 1994-03-07 Forging machine Expired - Fee Related JP3560635B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP06466994A JP3560635B2 (en) 1994-03-07 1994-03-07 Forging machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP06466994A JP3560635B2 (en) 1994-03-07 1994-03-07 Forging machine

Publications (2)

Publication Number Publication Date
JPH07246498A true JPH07246498A (en) 1995-09-26
JP3560635B2 JP3560635B2 (en) 2004-09-02

Family

ID=13264833

Family Applications (1)

Application Number Title Priority Date Filing Date
JP06466994A Expired - Fee Related JP3560635B2 (en) 1994-03-07 1994-03-07 Forging machine

Country Status (1)

Country Link
JP (1) JP3560635B2 (en)

Also Published As

Publication number Publication date
JP3560635B2 (en) 2004-09-02

Similar Documents

Publication Publication Date Title
US20020054806A1 (en) Grooved nut and manufacturing method thereof
CN110666075A (en) Screw cold heading forming device
CN216461488U (en) Ring-grinding cogging forging hydraulic press
US2287214A (en) Means for making articles having a polygonal cross section or the like
US2689359A (en) Forging apparatus for making pipe plugs
US3540255A (en) Method and apparatus for making hollow metal articles
US2393850A (en) Method and means for making nut blanks
JPH07246498A (en) Heading machine
GB617905A (en) Improvements in or relating to screw blanks
JPH0337452B2 (en)
KR0177003B1 (en) Multi-stage forging apparatus
JP2015047636A (en) Method for manufacturing headed axis-shaped component
US2568438A (en) Shear mechanism for headers
KR100454882B1 (en) Manufacturing method of ball seat
JP3919119B2 (en) Fastener material trimming apparatus and method for trimming head from fastener material
US5170655A (en) Method for forming hollow articles
US3048063A (en) Double blow header
JPS59225846A (en) Method and device for forming article with stepped diameter from slender blank
US3253287A (en) Method of cold heading blanks
JP2007307581A (en) Multi-stage former
JPH0683876B2 (en) Header
US2432844A (en) Method of and means for making nut blanks
JPH0646586Y2 (en) Punching device in multi-stage press forming machine
US2023042A (en) Open die header
CN108405778B (en) Waste discharging mechanism and method of cold forging processing die

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Effective date: 20040518

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040526

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees