JPH07237883A - Lift raising method for cranes such as container crane, etc., and its raising device - Google Patents

Lift raising method for cranes such as container crane, etc., and its raising device

Info

Publication number
JPH07237883A
JPH07237883A JP4769494A JP4769494A JPH07237883A JP H07237883 A JPH07237883 A JP H07237883A JP 4769494 A JP4769494 A JP 4769494A JP 4769494 A JP4769494 A JP 4769494A JP H07237883 A JPH07237883 A JP H07237883A
Authority
JP
Japan
Prior art keywords
lifting
crane
pedestal
raising
container crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP4769494A
Other languages
Japanese (ja)
Other versions
JP3032933B2 (en
Inventor
Glennon Thomas
トーマス・グレノン
Mcleod Denny
デニー・マックロード
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
RIGGING INTERNATL
RIGINGU INTERNATL
Original Assignee
RIGGING INTERNATL
RIGINGU INTERNATL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by RIGGING INTERNATL, RIGINGU INTERNATL filed Critical RIGGING INTERNATL
Priority to JP6047694A priority Critical patent/JP3032933B2/en
Publication of JPH07237883A publication Critical patent/JPH07237883A/en
Application granted granted Critical
Publication of JP3032933B2 publication Critical patent/JP3032933B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Leg Units, Guards, And Driving Tracks Of Cranes (AREA)

Abstract

PURPOSE: To carry out extension and repair work at a site without disassembly work requiring much time, eliminate the necessity of a large scale lifting device and perform precise aligning work in relation to proper lift raising by applying a device to raise the lift of a crane to a container crane in particular. CONSTITUTION: A raising device with lifting beam which can at least move upward keeping itself horizontal inward of the pier stud 110 of a crane K is arranged, and the lifting beam and the pier stud 110 are engaged with each other, and the pier stud 110 is separated at a position below this engagement portion, and then, with the lifting beam moved up, the body section of the crane K is raised, and a raising pier stud 110A is made to intervene at the raising portion of the pier stud 110 of the crane K.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】A. 発明の目的 (1) 産業上の利用分野 この発明は、クレーン類の揚程嵩上げ方法並びにその嵩
上げ装置に関し、特には、コンテナークレーンに適用し
て好適な揚程嵩上げ方法並びにその嵩上げ装置に関す
る。
A. Purpose of the invention (1) Industrial field of use The present invention relates to a lifting height raising method for cranes and a lifting heightening apparatus therefor, and more particularly to a lifting height raising height method suitable for a container crane and a lifting heightening apparatus therefor. Regarding

【0002】(2) 従来の技術 コンテナークレーンはコンテナー船からの荷役作業に使
用されるが、コンテナー船の大型化に伴い、その揚程を
更に増大する補修作業がなされる場合がある。このた
め、コンテナークレーンの躯体部の脚部を継ぎ足すこと
がなされる。しかして、従来においては、その一方法と
して、当該コンテナークレーンを解体し、工場において
継足し作業をなすことを通常とする。このため、手間を
要し、補修期間が長期化するばかりでなく、解体された
部材の運搬に対する運搬費用が掛かり、費用の掛かるも
のとなっている。また、現場において補修をなす一作業
方法として、他のクレーンをもって対象クレーンを吊り
上げつつ、脚柱の切り離しを行い、しかる後上部のクレ
ーンの躯体部を移動し、継ぎ足された脚柱に再度躯体部
を取り付けるという方法も採られる。しかしながら、こ
の方法によれば、大型のクレーンを要し、また、クレー
ン躯体部上部の吊り上げにより継ぎ足される脚柱との位
相が大きくずれ、正確な芯合わせ作業が困難となり、加
えて、このようなクレーンの吊り上げ作業は危険を伴う
ものである。
(2) Conventional Technology A container crane is used for loading and unloading work from a container ship. However, as the size of the container ship increases, repair work may be performed to further increase the lift. Therefore, the legs of the body part of the container crane are replenished. Therefore, conventionally, as one of the methods, it is usual to dismantle the container crane and add the work at the factory. For this reason, not only is it time-consuming and prolongs the repair period, but also the transportation cost for transporting the disassembled members is high and costly. In addition, as one work method for repairing at the site, while lifting the target crane with another crane, the pedestal is separated, then the skeleton part of the upper crane is moved, and the skeleton part is added to the pedestal again. The method of attaching is also adopted. However, according to this method, a large-sized crane is required, and the phase of the pedestal to be added by the suspension of the upper part of the crane body is significantly deviated, which makes accurate centering work difficult. Lifting a crane is dangerous.

【0003】(3) 発明が解決しようとする問題点 本発明は上記実情に鑑み、手間の懸かる解体作業のない
現場における継ぎ足し補修作業を実施する方法を採り、
大掛かりな扛上装置を必要とせず、かつ、正確な芯合わ
せ作業の可能なクレーン類の揚程嵩上げ方法並びにその
嵩上げ装置を提供することを目的とする。
(3) Problems to be Solved by the Invention In view of the above situation, the present invention adopts a method of performing repair work by adding a piece of material on a site without troublesome disassembling work,
An object of the present invention is to provide a hoisting height raising method for cranes and a hoisting device for the crane, which does not require a large-scale lifting device and can perform accurate centering work.

【0004】B.発明の構成 (1) 問題点を解決するための手段 本発明は上記目的を達成するため、以下の構成を採る。
第1番目の発明はクレーン類の揚程嵩上げ方法に係り、
躯体部の隅部に実質的に鉛直をなす脚柱を有するクレー
ン類において、前記脚柱の内方に、水平を保持して少な
くとも上昇可能な持上げ梁を有する嵩上げ装置を設置
し、前記持上げ梁と前記脚柱とを係合し、当該係合部位
の下方で前記脚柱を切り離し、しかる後、前記持上げ梁
を扛上させてクレーンの躯体部を持ち上げ、クレーンの
脚柱の持上げ部位に嵩上げ用の脚柱を介装させることを
特徴とする。第2番目の発明は上記クレーン類の揚程嵩
上げ方法に使用される装置であって、躯体部の隅部に実
質的に鉛直をなす脚柱を有するクレーン類の嵩上げ方法
に使用される装置であって、前記躯体部の脚柱部の内方
に配され、その端部が前記脚柱部に係合するとともに水
平に配される持上げ梁を有し、前記持上げ梁は嵩上げさ
れる部位の下方に反力を取って扛上装置により扛上され
ることを特徴とする。
B. Structure of the Invention (1) Means for Solving Problems The present invention has the following structures in order to achieve the above object.
The first invention relates to a lifting height raising method for cranes,
In a crane having a substantially vertical pedestal at a corner of a skeleton, a lifting device having a lifting beam capable of holding horizontally and at least rising is installed inside the pedestal. And the pedestal are engaged with each other, the pedestal is separated below the engaging portion, and then the lifting beam is lifted to lift the skeleton of the crane, and the crane is lifted to the lifting portion of the stanchion. It is characterized by interposing a pedestal. A second aspect of the present invention is an apparatus used in the method of raising the height of a crane for lifting cranes, wherein the apparatus is used in a method of raising cranes having pedestals that are substantially vertical in the corners of the body. And a lifting beam that is disposed inside the pedestal portion of the skeleton portion and has an end portion that engages with the pedestal portion and that is horizontally disposed, and the lifting beam is below a portion to be raised. It is characterized by being lifted by a lifting device by taking a reaction force to.

【0005】(2) 作用 嵩上げ装置はクレーン類の切り離される部位の下方部す
なわち残存する部位もしくは基盤に設置される。本実施
例では残存する部位への態様を示す。クレーン類の脚柱
の切り離された部位は残存する部位に対して鉛直方向並
びに水平方向に位相のずれを生じることがなく、扛上さ
れる。扛上動作は連続的あるいは間欠的になされる。実
施例では間欠的に扛上する動作態様が示される。
(2) Action The raising device is installed in the lower part of the part where the cranes are cut off, that is, the remaining part or the base. In the present embodiment, the mode for the remaining portion is shown. The separated parts of the pedestals of cranes are lifted without any phase shift in the vertical and horizontal directions with respect to the remaining parts. The raising motion is performed continuously or intermittently. In the embodiment, an operation mode of intermittently lifting is shown.

【0006】(3) 実施例 本発明のクレーン類の揚程嵩上げ方法並びにその嵩上げ
装置の実施例を図面に基づいて説明する。図1〜図10
・図12はその一実施例としてコンテナークレーンへの
適用例を示す。すなわち、図1及び図2はその全体構成
を示し、図3〜図10及び図12はその各部分構成を示
す。
(3) Embodiments Embodiments of the crane hoist lifting method and the hoisting apparatus of the present invention will be described with reference to the drawings. 1 to 10
-Fig. 12 shows an example of application to a container crane as an example. That is, FIGS. 1 and 2 show the overall configuration, and FIGS. 3 to 10 and 12 show the respective partial configurations.

【0007】(コンテナークレーンK)先ず、本実施例
の対象とするコンテナークレーンについて説明する。図
1・図2において、Kはコンテナークレーンであって、
いわゆる槌形クレーンの態様を採り、港湾の岸壁に臨ん
で設置される。該コンテナークレーンKは鉄骨組をもっ
て四角状の塔体に形成された躯体部100の上部にトロ
ーリー102が水平状に横架され、また、核躯体部10
0の下部には走行台車104が配される。トローリー1
02は海側に向けて延設され、コンテナー船(図示せ
ず)とのコンテナー荷物の受渡しに供される。
(Container Crane K) First, the container crane which is the object of this embodiment will be described. 1 and 2, K is a container crane,
It takes the form of a so-called mallet-shaped crane and is installed facing the quay of a port. In the container crane K, a trolley 102 is horizontally mounted on an upper part of a skeleton portion 100 formed in a square tower body with a steel frame, and a nuclear skeleton portion 10 is provided.
A traveling carriage 104 is arranged below 0. Trolley 1
02 is extended toward the sea side and is used for delivery of container cargo with a container ship (not shown).

【0008】もっと詳しくは、クレーン躯体部100
は、四隅の脚柱110と、これを側面において繋ぐ横桁
材、すなわち、走行方向に沿う両側面に配される横桁材
112及び走行方向に直角な両側面に配される横桁材1
14と、からなる。直角面にはまた、斜材116が配さ
れる。なお、横桁材112は下部及び上部の横桁材11
2A,112Bとからなる。横桁材114は中間位置に
配される。クレーン躯体部100は、更に上方へ延設さ
れ、屋根形状の躯体上部118を構成する。この構造は
本実施例に特有のものであって、他のコンテナークレー
ンにおいては別の態様を採りうるものであり、更には、
他の大型クレーンにおいてはこの態様に限定されない。
トローリー102は、そのI型部102Aをクレーン躯
体部100の上部横桁材112Bに固定され、該I型部
102Aにピン120を介して結合されたトラス部10
2Bはワイヤー部材122によって上方へ引き上げ可能
とされる。
More specifically, the crane body 100
Is a four-cornered pedestal 110 and a cross girder member connecting the pedestals 110 on its side surfaces, that is, a cross girder member 112 arranged on both side faces along the traveling direction and a cross girder member 1 arranged on both side faces perpendicular to the traveling direction.
14 and. A diagonal member 116 is also arranged on the right-angled surface. The cross beam members 112 are the lower and upper cross beam members 11.
2A and 112B. The cross beam member 114 is arranged at an intermediate position. The crane body 100 is extended further upward to form a roof-shaped body upper portion 118. This structure is peculiar to this embodiment, and can adopt another mode in other container cranes.
Other large cranes are not limited to this mode.
The trolley 102 has its I-shaped portion 102A fixed to the upper cross beam 112B of the crane body 100, and the truss portion 10 coupled to the I-shaped portion 102A via a pin 120.
2B can be pulled up by the wire member 122.

【0009】走行台車104は、図4に示すように、主
台車130、中間台車132、及び走行車輪134を有
する下部走行台車136、からなる。すなわち、主台車
130はクレーン躯体部100の各脚柱110の下端に
配され、該主台車130の両端に中間台車132が、ま
た、各中間台車132の両端に下部走行台車136が、
それぞれ配される。台車130,132,136が重畳
的に配されることにより、走行レールの曲率に従い走行
車輪134の円滑な回転を保障する。しかして、港湾の
荷役現場において、走行ルールRが敷設され、本実施例
のコンテナークレーンKはこの走行ルールR上を自走も
しくは他走をもって走行する。
As shown in FIG. 4, the traveling vehicle 104 comprises a main vehicle 130, an intermediate vehicle 132, and a lower traveling vehicle 136 having traveling wheels 134. That is, the main carriage 130 is arranged at the lower end of each pedestal 110 of the crane body 100, the intermediate carriages 132 are provided at both ends of the main carriage 130, and the lower traveling carriages 136 are provided at both ends of each intermediate carriage 132.
Each is arranged. Since the carriages 130, 132, 136 are arranged in a superposed manner, smooth rotation of the traveling wheels 134 is guaranteed according to the curvature of the traveling rail. Then, the traveling rule R is laid at the loading and unloading site of the harbor, and the container crane K of the present embodiment travels on the traveling rule R either by itself or by another traveling.

【0010】(嵩上げ装置S)本実施例の嵩上げ装置S
は、このコンテナークレーンKに組み付けられて使用さ
れる。すなわち、本嵩上げ装置Sはコンテナークレーン
Kの躯体部100の脚柱110の内方に、かつ、その下
部横桁材112A上に設置される。この嵩上げ装置S
は、コンテナークレーンKの各脚柱110の内側でかつ
横桁材112A上に立設され、扛上機構Jが組み込まれ
た4つの案内支柱1と、これらの案内支柱1の相互間を
剛的に繋ぐ横面トラス2及び縦面トラス3と、更には横
面における案内支柱1の相互間に架け渡されるととも
に、該案内支柱1の扛上機構Jに連動する持上げ梁4
と、を含む。一方、コンテナークレーンKには、脚柱1
10の内側面にこの嵩上げ装置Sに連動する支え部材6
が取り付けられる。
(Pawler S) The paddle S of this embodiment
Is assembled and used in this container crane K. That is, the raising device S is installed inside the pedestal 110 of the body part 100 of the container crane K and on the lower cross girder member 112A thereof. This raising device S
Are four guide columns 1 installed inside each pedestal 110 of the container crane K and on the cross beam 112A, and in which the lifting mechanism J is incorporated, and between these guide columns 1 are rigidly connected. And a horizontal truss 2 and a vertical truss 3 which are connected to each other, and a lifting beam 4 which is bridged between the guide columns 1 on the horizontal plane and which is interlocked with the lifting mechanism J of the guide columns 1.
And, including. On the other hand, the pedestal 1 is attached to the container crane K.
A support member 6 interlocking with this raising device S is provided on the inner surface of 10.
Is attached.

【0011】以下、本嵩上げ装置Sの各部の細部構成を
説明する。案内支柱1 本実施例では4つの案内支柱1は各々、コンテナークレ
ーンKの各脚柱110の内側に所定間隔を存して、か
つ、下部横桁材112A上に固定して立設される。すな
わち、案内支柱1は4本の素柱10をその下端を下部横
面横桁材112Aの側面に溶接・取付けボルトその他適
宜手段をもって一体的もしくは取外し可能に強固に固設
され、一対の対向側面にブレース材(補剛材)11、上
面に天井組12をそれぞれ配し、所定の剛性をもってや
ぐら状に組み立てられる。なお、素柱10並びに天井組
12はH形鋼を主体とし、ブレース材11はL形鋼を主
体として組み立てられるが、他の適宜部材を採用するこ
とは自由である。案内支柱1は門形をなし、その内部空
間に持上げ梁4の扛上・扛下の移動域を提供する。天井
組12はこの持上げ梁4の最扛上状態で可及的に障害と
ならないように移動域を確保する。また、天井組に12
の横側面には横面トラス2との取付けに供される取付け
リブ12aが配される。
The detailed configuration of each part of the raising device S will be described below. Guide Struts 1 In this embodiment, each of the four guide struts 1 is installed inside each pedestal 110 of the container crane K with a predetermined interval and fixedly erected on the lower cross beam 112A. That is, the guide column 1 has four element columns 10 whose lower ends are integrally or detachably firmly fixed to the side surfaces of the lower horizontal cross beam 112A by welding / attaching bolts or other appropriate means, and which are provided as a pair of opposite side surfaces. A brace material (stiffening material) 11 and a ceiling assembly 12 are arranged on the upper surface, and they are assembled in a tower shape with a predetermined rigidity. The element columns 10 and the ceiling set 12 are mainly made of H-shaped steel, and the brace member 11 is mainly made of L-shaped steel, but other appropriate members can be freely adopted. The guide pillar 1 has a gate shape, and provides an up and down moving area of the lifting beam 4 in its inner space. The ceiling set 12 secures a moving area so as not to obstruct as much as possible when the lifting beam 4 is in the highest position. Also, 12 for the ceiling set
Mounting ribs 12a provided for mounting the horizontal truss 2 are arranged on the lateral side surface of the.

【0012】この案内支柱1に本実施例に特有の扛上機
構Jが組み込まれる。図5〜図9を参照してこの扛上機
構Jを説明する。扛上機構Jは、案内支柱1の上部に配
される支持架台15と、この支持架台15上に設置され
る油圧ジャッキ16と、該油圧ジャッキ16上に架設さ
れる扛上桁17と、該扛上桁17より相平行して垂設さ
れる2つの吊り板18と、該吊り板18の下端に固設さ
れる受け桁19と、からなる。更には、支持架台15上
に立設され扛上桁17の上下動の案内をなす案内構2
0、及び吊り板18に装着され支持架台15及び扛上桁
17の上面に反力を取る盛替えピン21,22を含む。
なお、盛替えピン21,22は同時的装着されることは
ない。
A lifting mechanism J peculiar to this embodiment is incorporated in the guide column 1. The lifting mechanism J will be described with reference to FIGS. The lifting mechanism J includes a support base 15 arranged on the upper part of the guide column 1, a hydraulic jack 16 installed on the support base 15, a lifting girder 17 installed on the hydraulic jack 16, and The suspension girder 17 includes two suspension plates 18 that are vertically suspended from each other in parallel with each other, and a receiving girder 19 that is fixed to the lower end of the suspension plate 18. Further, a guide structure 2 which is erected on the support base 15 and which guides the up-and-down movement of the lifting girder 17.
0, and refill pins 21 and 22 attached to the hanging plate 18 and adapted to take a reaction force on the upper surfaces of the support frame 15 and the lifting girder 17.
Note that the refill pins 21, 22 are not mounted at the same time.

【0013】もっと詳しくは、支持架台15はいわゆる
反力台の機能を果たし、案内支柱1の上面すなわち天井
組12上に固定的に設置される。該支持架台15の上面
の水平面部の中央には吊り板18を受け入れる溝25が
上下に貫通して形成される。26は該支持架台15の上
面に固設された盛替えピン21の受け板である。油圧ジ
ャッキ16はこの支持架台15の両端部に形成された凹
部上に固定的に設置される。該油圧ジャッキ16は本実
施例では各端部に1個配されるが、2個もしくはそれ以
上の態様であってもよいし、また、支持架台15の中央
部に配されてもよい。扛上桁17は、油圧ジャッキ16
上に載置され、油圧ジャッキ16の扛上作用を受けて扛
上される。その下面は最下降状態で支持架台15の上面
との間に盛替えピン21の挿脱のための所定のすき間を
保持する。該扛上桁17には支持架台15に溝25と位
相が一致する溝27が形成され、また、盛替えピン22
用の受け板28が配される。案内構20は、支持架台1
5上に立設される4本の鉛直柱20aをもって扛上桁1
7の上下動の案内をなし、鉛直柱20aの頂部には水平
梁20bが固設され、ラーメン構造を採り全体の剛性を
保つ。以上の支持架台15、扛上桁17及び案内構20
は、剛性の高い鋼材をもって作成され、実際的にはH形
鋼の組立てをもって構成される。
More specifically, the support base 15 functions as a so-called reaction base and is fixedly installed on the upper surface of the guide column 1, that is, on the ceiling set 12. A groove 25 for receiving the hanging plate 18 is vertically formed at the center of the horizontal surface portion of the upper surface of the support frame 15. Reference numeral 26 is a receiving plate of the refill pin 21 fixedly provided on the upper surface of the support frame 15. The hydraulic jacks 16 are fixedly installed on the recesses formed at both ends of the support base 15. In this embodiment, one hydraulic jack 16 is provided at each end, but two or more hydraulic jacks may be provided, or the hydraulic jack 16 may be provided at the center of the support frame 15. The lifting girder 17 is a hydraulic jack 16
It is placed on top of the hydraulic jack 16 and is lifted by the lifting action of the hydraulic jack 16. A lower surface of the lower surface holds a predetermined gap between the upper surface and the upper surface of the support frame 15 for inserting and removing the refill pin 21. A groove 27 having the same phase as the groove 25 is formed on the supporting frame 15 of the uplift girder 17.
The receiving plate 28 for is arranged. The guide structure 20 is the support base 1
A vertical girder with four vertical pillars 20a standing upright on 5
A vertical beam 20b is fixed to the top of the vertical column 20a, and a rigid frame structure is adopted to maintain the overall rigidity. The above-mentioned support stand 15, uplift girder 17, and guide structure 20
Is made of steel having high rigidity, and is actually constructed by assembling H-section steel.

【0014】吊り板18は、長尺の平板体をなし、長手
方向に一定間隔をもって盛替えピン21,22の挿脱さ
れるピン孔30が開設される。しかして、該吊り板18
は支持架台15及び扛上桁17の溝25,27内に挿通
され、そのピン孔30には盛替えピン21,22が挿し
込まれる。受け桁19は、相並ぶ吊り板18の下端に横
断的に固設される。しかして、吊り板18間の上面をも
って持上げ梁4を支持する。なお、該受け桁19の下面
には適宜、突起19a(図6、破線表示9が突設され、
該受け桁19が最下降状態のとき横桁材112Aの上面
に当接し、吊り板18の下端の衝突を避ける機能、もし
くは持上げ梁4を介して当接される支え部材6の位置決
めの機能を果たす。
The hanging plate 18 is a long flat plate and has pin holes 30 for inserting and removing the rearrangement pins 21 and 22 at regular intervals in the longitudinal direction. Then, the hanging plate 18
Is inserted into the grooves 25 and 27 of the support base 15 and the upholstery girder 17, and the refill pins 21 and 22 are inserted into the pin holes 30 thereof. The receiving girders 19 are transversely fixed to the lower ends of the hanging plates 18 aligned with each other. Then, the upper surface between the hanging plates 18 supports the lifting beam 4. In addition, a projection 19a (FIG. 6, a broken line display 9 is appropriately provided on the lower surface of the receiving girder 19,
When the receiving girder 19 is in the lowest position, it has a function of contacting the upper surface of the cross girder member 112A and avoiding the collision of the lower end of the hanging plate 18, or a function of positioning the support member 6 contacted via the lifting beam 4. Fulfill

【0015】図11は扛上機構Jの別な態様を示す。す
なわち、ここでは概念的な構成が示される。図示される
ように、支持架台15及び扛上桁17は単純な平板体よ
りなり、支持架台15を素柱10に直接的に固定できる
ときには天井組12は省略されうる。
FIG. 11 shows another mode of the lifting mechanism J. That is, a conceptual configuration is shown here. As shown in the figure, the support pedestal 15 and the uplift girder 17 are simple flat plates, and the ceiling assembly 12 can be omitted when the support pedestal 15 can be directly fixed to the bare column 10.

【0016】横面トラス2、縦面トラス3 横面トラス2は(図3参照)、横材35、斜材36より
なり、コンテナークレーンKの横桁材112A上に立設
された2つの案内支柱1の相互間の倒れを防止し、案内
支柱1相互を剛的に繋ぐ。縦面トラス3は(図4参
照)、それ自体で剛性を保持し、相対向する案内支柱1
の相互間の倒れを防止し、案内支柱1相互を剛的に繋
ぐ。横面トラス2及び縦面トラス3はそれぞれその長さ
を個々のコンテナークレーンKの諸元に合わせて製作さ
れる。このため、長さが可変となるブロック形式が好適
である。嵩上げ装置Sは、案内支柱1及びこれらの横面
トラス2、縦面トラス3により剛的な枠体が構成され、
安定的な位置関係を保つ。
The horizontal truss 2 and the vertical truss 3 The horizontal truss 2 (see FIG. 3) comprises a horizontal member 35 and a diagonal member 36, and two guides are provided upright on the horizontal girder member 112A of the container crane K. The pillars 1 are prevented from collapsing with each other, and the guide pillars 1 are rigidly connected to each other. The vertical truss 3 (see FIG. 4) maintains rigidity by itself and is opposed to the guide columns 1
The guide columns 1 are rigidly connected to each other. The horizontal truss 2 and the vertical truss 3 are manufactured by adjusting their lengths to the specifications of the individual container crane K. Therefore, the block format whose length is variable is preferable. In the raising device S, a rigid frame body is configured by the guide columns 1, the lateral trusses 2 and the vertical trusses 3,
Maintain a stable positional relationship.

【0017】持上げ梁4 持上げ梁4は、大きな剛性を有する水平の梁材より形成
される。そして、コンテナークレーンKの横桁材112
A上に立設された2つの案内支柱1の受け桁19に固定
的に横架され、その両端部は案内支柱1より突出し、受
け棚40に形成される。
Lifting Beam 4 The lifting beam 4 is formed of a horizontal beam material having great rigidity. And the cross girder material 112 of the container crane K
The two guide columns 1 erected on A are fixedly crossed over the receiving girders 19 of the guide columns 1, and both ends thereof project from the guide column 1 and are formed on the receiving rack 40.

【0018】支え部材6 支え部材6は、コンテナークレーンKの脚柱110の内
側面に案内支柱1側に向けて突出して固設され、その下
面45は平坦面をなし、持上げ梁4の受け棚40に当接
する。該支え部材6は大きな剛性を有するとともに、強
固に脚柱110に取り付けられる。該支え部材6の脚柱
110への取付け位置は、コンテナークレーンKの横桁
材112Aの上面より適宜の高さを保ものとされる。
Support member 6 The support member 6 is fixedly installed on the inner surface of the pedestal 110 of the container crane K so as to project toward the guide column 1 side, and the lower surface 45 thereof is a flat surface, and the receiving shelf of the lifting beam 4 is provided. Abut 40. The support member 6 has great rigidity and is firmly attached to the pedestal 110. The mounting position of the supporting member 6 on the pedestal 110 is maintained at an appropriate height from the upper surface of the cross beam 112A of the container crane K.

【0019】(揚程嵩上げ方法)本実施例のコンテナー
クレーンの揚程嵩上げ方法は叙上の嵩上げ装置Sを用い
て次のようになされる。以下、作業手順に基づいて説明
する。なお、図1〜図4は扛上前の状態、図10は扛上
途中の状態、図12は扛上後の状態を示す。
(Height raising method) The height raising method of the container crane according to this embodiment is performed as follows by using the hoisting device S. Hereinafter, description will be given based on the work procedure. 1 to 4 show a state before the ascent, FIG. 10 shows a state during the ascending, and FIG. 12 shows a state after the ascent.

【0020】(1) 準備作業として、嵩上げ補修の施工さ
れるコンテナークレーンKは所定位置にレールR上を移
動され、そのトローリー102をワイヤー部材122を
もって上方へ引き上げられ、その全体の重心位置をクレ
ーン躯体部100の内部に導く。
(1) As a preparatory work, the container crane K, which is to be repaired by raising, is moved to a predetermined position on the rail R, the trolley 102 is pulled up by the wire member 122, and the entire center of gravity of the container crane K is moved to the crane. It is guided inside the body 100.

【0021】(2) しかる後、コンテナークレーンKの横
桁材112A上に、各案内支柱1を脚柱110より所定
間隔を存して設置する。すなわち、各素柱10の基部を
横桁材112Aに固設し、側面にブレース材11、上部
に天井組12を組み付ける。 (2-a) この後、この案内支柱1に扛上機構Jを組み付け
てゆく。すなわち、支持架台15、油圧シリンダー1
6、扛上桁17を順次組み付け、そして、支持架台15
及び扛上桁17の溝25,27に吊り板18を挿入し、
かつ、盛替えピン21,22を装着する。しかる後、吊
り板18の下端に受け桁19を取り付ける。これらは組
立て・分解が自在であり、コンテナークレーンKの躯体
部100の諸元に合わせて長さを融通する。勿論、ユニ
ット毎に予め製作されていてもよい。 (2-b) コンテナークレーンKの横桁材112A上の2つ
の案内支柱1の受け桁19間に持上げ梁4を架け渡す。
(2) Thereafter, the guide columns 1 are installed on the cross beam 112A of the container crane K at a predetermined distance from the column 110. That is, the base of each pillar 10 is fixed to the cross beam 112A, the brace 11 is attached to the side surface, and the ceiling assembly 12 is attached to the upper part. (2-a) After that, the lifting mechanism J is assembled to the guide column 1. That is, the support base 15 and the hydraulic cylinder 1
6, ascending girder 17 is assembled in sequence, and then the support stand 15
And, the hanging plate 18 is inserted into the grooves 25 and 27 of the lift girder 17,
Also, the refill pins 21, 22 are attached. Then, the receiving girder 19 is attached to the lower end of the hanging plate 18. These can be assembled and disassembled freely, and the length can be changed according to the specifications of the body part 100 of the container crane K. Of course, each unit may be manufactured in advance. (2-b) The lifting beam 4 is bridged between the receiving girders 19 of the two guide columns 1 on the cross girder material 112A of the container crane K.

【0022】(3) 一方、コンテナークレーンKの脚柱1
10に支え部材6が固設される。以上によって、本嵩上
げ装置Sの設置並びに支え部材6の設置が完了する。
(3) On the other hand, the pedestal 1 of the container crane K
The support member 6 is fixedly mounted on 10. With the above, the installation of the raising device S and the installation of the support member 6 are completed.

【0023】(4) 案内支柱1の扛上機構Jの油圧ジャッ
キ16を作動して、持上げ梁4を扛上し、その両端の受
け棚40をコンテナークレーンKの脚柱110の支え部
材6の下面45に所定の押上げ力をもって当接させる。
この工程に替え、受け桁19の下面を横桁材112Aの
上面に当接させ、かつ、持上げ梁4を載置し、この状態
で支え部材6をその下面45を持上げ梁4に当接させて
取り付ける態様を採りうる。この状態によれば、油圧ジ
ャッキ16に負荷がかからず、便利である。この場合、
突起19a付の受け桁19の使用が効果的である。
(4) The hydraulic jack 16 of the lifting mechanism J of the guide strut 1 is operated to lift the lifting beam 4, and the receiving shelves 40 at both ends of the lifting beam 4 are supported by the support member 6 of the pedestal 110 of the container crane K. The lower surface 45 is brought into contact with a predetermined pushing force.
Instead of this step, the lower surface of the receiving girder 19 is brought into contact with the upper surface of the transverse girder member 112A, and the lifting beam 4 is placed. In this state, the support member 6 is brought into contact with the lifting beam 4 with the lower surface 45 thereof. It is possible to adopt a mode of attachment. According to this state, no load is applied to the hydraulic jack 16, which is convenient. in this case,
It is effective to use the receiving girder 19 with the protrusion 19a.

【0024】(5) コンテナークレーンKの各脚柱110
の所定箇所を切断もしくは切り離す。
(5) Each column 110 of the container crane K
Cut or cut off the specified part of.

【0025】(6) 各案内支柱1における扛上機構Jの油
圧ジャッキ16を同期的に作動し、扛上桁17の盛替え
ピン22を介して吊り板18を引き上げ、これにより受
け桁19及び持上げ梁4を扛上し、該持上げ梁4に当接
する支え部材6を介してコンテナークレーンKを持ち上
げる。油圧ジャッキ16の扛上工程の1ストロークにお
いて、吊り板18の孔30と支持架台15の上面との位
相が一致したとき、盛替えピン21を挿入する。しかる
後、油圧ジャッキ16を少しく下降し、、盛替えピン2
1を介して荷重を受ける。
(6) The hydraulic jacks 16 of the lifting mechanism J of the guide columns 1 are operated synchronously, and the suspension plate 18 is pulled up via the refilling pins 22 of the lifting girder 17, whereby the receiving girders 19 and The lifting beam 4 is lifted, and the container crane K is lifted via the support member 6 that abuts on the lifting beam 4. In one stroke of the lifting process of the hydraulic jack 16, when the phase of the hole 30 of the suspension plate 18 and the upper surface of the support base 15 match, the refill pin 21 is inserted. After that, lower the hydraulic jack 16 a little, and change the pin 2
It receives a load through 1.

【0026】(7) 盛替えピン22を引き抜いた状態で、
扛上機構Jの油圧ジャッキ16を下降させ、無負荷の扛
上桁17を扛下し、該扛上桁17の上面と吊り板18の
孔30との位相の一致する位置で作動を停止し、しかる
後、この孔30に盛替えピン22を挿入する。
(7) With the refill pin 22 pulled out,
The hydraulic jack 16 of the lifting mechanism J is lowered to lower the unloaded lifting girder 17, and the operation is stopped at the position where the upper surface of the lifting girder 17 and the hole 30 of the hanging plate 18 are in phase. After that, the refill pin 22 is inserted into the hole 30.

【0027】(8) 上記の工程6及び工程7を繰り返し、
コンテナークレーンKの躯体部100を所定の高さすな
わち継ぎ足される揚程まで持ち上げる。
(8) The above steps 6 and 7 are repeated,
The skeleton 100 of the container crane K is lifted to a predetermined height, that is, a lifting height to be added.

【0028】(9) コンテナークレーンKの脚柱110部
において、用意された継ぎ足される補修用脚柱110A
を接続固定する(図12参照)。
(9) Repair pedestal 110A to be added to the pedestal 110 of the container crane K
Are connected and fixed (see FIG. 12).

【0029】(10)補修用脚柱110Aの固設が完了すれ
ば、本嵩上げ装置Sの取外し・解体がなされる。この手
順は組立ての逆の手順で行われる。
(10) When the fixing of the repair pedestal 110A is completed, the lifting device S is removed and disassembled. This procedure is the reverse of assembly.

【0030】(実施例の作用・効果)以上の本実施例の
コンテナークレーンの揚程嵩上げ方法並びにその嵩上げ
装置によれば、コンテナークレーンKの揚程嵩上げにお
いて、脚柱110の継ぎ足される部位のみの切り離し作
業で済み、クレーンK全体の解体作業がないので作業手
間の大幅な減少を図ることができ、効率的な作業を実施
できる。また、切り離されるクレーンの本体の上下部位
の水平投影並びに鉛直投影の位相関係にずれが生ぜず、
その位置関係が確定し、嵩上げ用の脚柱の配設作業が容
易になされる。更に、扛上機構Jにおける扛上動作は吊
り板18の孔30のピッチにより確実に行われ、安全な
扛上作業が保障される。また、案内支柱1並びに扛上機
構Jを構成する部材は、平板、H形等の一般的な型鋼材
の使用で済み、構造が簡単であり、経済的に製作され
る。叙上の実施例ではコンテナークレーンKの揚程嵩上
げ方法を述べたが、これを本実施例装置Sを用いて揚程
を減少させることは容易な応用例である。すなわち、持
上げ梁4を最上位もしくは所定の高さにまで引き上げ、
この状態で脚柱110と係合し、脚柱110の所定箇所
を切り離し、次いで持上げ梁4を間欠的に下降させ、残
存する脚柱110相互を接合する。
(Operation / Effects of Embodiment) According to the lifting height raising method of the container crane and the lifting equipment thereof according to the present embodiment described above, when raising the lifting height of the container crane K, the work of separating only the portion to which the pedestal 110 is added is detached. Since there is no dismantling work for the entire crane K, it is possible to significantly reduce the labor and work efficiency. In addition, there is no deviation in the phase relationship between the horizontal and vertical projections of the upper and lower parts of the main body of the crane to be separated,
The positional relationship is fixed, and the work of arranging the pedestal for raising the body is facilitated. Further, the lifting operation in the lifting mechanism J is surely performed by the pitch of the holes 30 of the hanging plate 18, and the safe lifting operation is guaranteed. Further, as the members constituting the guide column 1 and the lifting mechanism J, it is sufficient to use a general shaped steel material such as a flat plate or an H shape, the structure is simple, and the manufacturing is economical. Although the lifting height raising method of the container crane K is described in the above embodiment, it is an easy application example to reduce the lifting height using the apparatus S of this embodiment. That is, the lifting beam 4 is raised to the top or a predetermined height,
In this state, the pillars 110 are engaged with each other, the predetermined portions of the pillars 110 are separated, and then the lifting beams 4 are intermittently lowered to join the remaining pillars 110 to each other.

【0031】本発明は上記実施例に限定されるものでは
なく、本発明の基本的技術思想の範囲内で種々設計変更
が可能である。すなわち、以下の態様は本発明の技術的
範囲に包含される。 案内支柱1に組み込まれる扛上機構は本実施例で示
された扛上機構Jの態様に限定されず、他の尺取り式扛
上機構を採用することができる。例えば、吊り板18を
丸鋼棒(吊り棒)に代えた場合、この丸鋼棒を抱持する
ホール式油圧ジャッキによる扛上機構とする。また、尺
取り式扛上機構に限らず、連続的な扛上機構の採用も可
能である。 持上げ梁4と脚柱110との係合関係は、本実施例
の支圧態様に限らず、吊下げ態様も除外するものではな
い。
The present invention is not limited to the above embodiments, and various design changes can be made within the scope of the basic technical idea of the present invention. That is, the following aspects are included in the technical scope of the present invention. The lifting mechanism incorporated in the guide column 1 is not limited to the mode of the lifting mechanism J shown in the present embodiment, and another measuring type lifting mechanism can be adopted. For example, when the hanging plate 18 is replaced with a round steel rod (hanging rod), the lifting mechanism is a hall type hydraulic jack that holds the round steel rod. Further, it is possible to adopt a continuous lifting mechanism as well as the length-adjusting lifting mechanism. The engagement relationship between the lifting beam 4 and the pedestal 110 is not limited to the bearing mode of this embodiment, and the hanging mode is not excluded.

【0032】C. 発明の効果 本発明によれば、クレーン類の揚程嵩上げにおいて、脚
柱の継ぎ足される部位のみの切り離し作業で済み、解体
作業がないので作業手間の大幅な減少を図ることがで
き、効率的な作業を実施できる。また、切り離されるク
レーンの上下部位の水平投影並びに鉛直投影の位相関係
にずれが生ぜず、その位置関係が確定し、嵩上げ用の脚
柱の配設作業が容易になされる。
C. Effect of the Invention According to the present invention, in raising the lifting height of cranes, only the part to which the pedestal is replenished can be cut off, and there is no dismantling work, so the work time can be greatly reduced. Can perform efficient work. Further, there is no deviation in the phase relationship between the horizontal and vertical projections of the upper and lower parts of the crane to be separated, the positional relationship is fixed, and the work for arranging the pedestal for raising the bank is facilitated.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明のクレーン類の揚程嵩上げ方法並びにそ
の嵩上げ装置の一実施例であるコンテナークレーンへの
適用例の全体を示す側面図(第2図のI 方向矢視図)
FIG. 1 is a side view showing an entire application example to a container crane, which is an embodiment of the lifting height raising method for cranes and its raising device of the present invention (view in the direction of arrow I in FIG. 2).

【図2】図1のII方向矢視図。FIG. 2 is a view on arrow II in FIG.

【図3】図2のIII 部分拡大図。FIG. 3 is an enlarged view of a part III in FIG.

【図4】図3のIV-IV 線断面図。FIG. 4 is a sectional view taken along line IV-IV of FIG.

【図5】案内支柱の拡大側面図(図6のV方向矢視
図)。
FIG. 5 is an enlarged side view of a guide column (a view in the direction V in FIG. 6).

【図6】図5のVI方向矢視図。6 is a view on arrow VI in FIG.

【図7】案内支柱の上部側面図(図9のVII 方向矢視
図)。
FIG. 7 is a side view of the upper part of the guide column (view in the direction of arrow VII in FIG. 9).

【図8】図7のIIX 方向矢視図(図9のIIX 方向矢視
図)。
8 is a view in the direction of the arrow IIX in FIG. 7 (a view in the direction of the arrow IIX in FIG. 9).

【図9】図8のIX-IX 線断面図。9 is a sectional view taken along line IX-IX in FIG.

【図10】持上げ梁の端部の状態図。FIG. 10 is a state diagram of an end portion of a lifting beam.

【図11】扛上機構の他の態様を示す構成図。FIG. 11 is a configuration diagram showing another aspect of the lifting mechanism.

【図12】扛上状態における脚柱部の側面図。FIG. 12 is a side view of the pedestal portion in a lifted state.

【符号の説明】[Explanation of symbols]

K…クレーン、S…揚程嵩上げ装置、J…扛上機構、1
…案内支柱、2…横面トラス、3…縦面トラス、4…持
上げ梁、100…躯体部、110…脚柱
K ... Crane, S ... Lifting device, J ... Raising mechanism, 1
… Guide columns, 2… Horizontal trusses, 3… Vertical trusses, 4… Lifting beams, 100… Body parts, 110… Pillars

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】躯体部の隅部に実質的に鉛直をなす脚柱を
有するクレーン類において、 前記脚柱の内方に、水平を保持して少なくとも上昇可能
な持上げ梁を有する嵩上げ装置を設置し、 前記持上げ梁と前記脚柱とを係合し、 当該係合部位の下方で前記脚柱を切り離し、 しかる後、前記持上げ梁を扛上させてクレーンの躯体部
を持ち上げ、クレーンの脚柱の持上げ部位に嵩上げ用の
脚柱を介装させる、ことを特徴とするクレーン類の揚程
嵩上げ方法。
1. A crane having a substantially vertical pedestal at a corner of a skeleton, wherein a hoisting device having a lifting beam capable of holding horizontally and at least rising is installed inside the pedestal. Then, the lifting beam and the pedestal are engaged with each other, the pedestal is separated below the engaging portion, and then the lifting beam is lifted to lift the skeleton of the crane, and the pedestal of the crane is lifted. A lifting height raising method for cranes, characterized in that a lifting pedestal is provided at the lifting portion of the crane.
【請求項2】躯体部の隅部に実質的に鉛直をなす脚柱を
有するクレーン類の嵩上げ方法に使用される装置であっ
て、 前記躯体部の脚柱部の内方に配され、その端部が前記脚
柱部に係合するとともに水平に配される持上げ梁を有
し、前記持上げ梁は嵩上げされる部位の下方に反力を取
って扛上装置により扛上される、ことを特徴とするクレ
ーン類の揚程嵩上げ装置。
2. A device used in a method of raising a crane, which has a substantially vertical pedestal at a corner of a skeleton, which is arranged inside a pedestal of the skeleton, An end portion having a lifting beam that engages with the pedestal portion and is horizontally arranged, and the lifting beam is lifted by a lifting device by taking a reaction force below a portion to be raised. A lifting device for lifting cranes.
JP6047694A 1994-02-21 1994-02-21 Lifting method and lifting device for cranes such as container cranes Expired - Fee Related JP3032933B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6047694A JP3032933B2 (en) 1994-02-21 1994-02-21 Lifting method and lifting device for cranes such as container cranes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6047694A JP3032933B2 (en) 1994-02-21 1994-02-21 Lifting method and lifting device for cranes such as container cranes

Publications (2)

Publication Number Publication Date
JPH07237883A true JPH07237883A (en) 1995-09-12
JP3032933B2 JP3032933B2 (en) 2000-04-17

Family

ID=12782396

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6047694A Expired - Fee Related JP3032933B2 (en) 1994-02-21 1994-02-21 Lifting method and lifting device for cranes such as container cranes

Country Status (1)

Country Link
JP (1) JP3032933B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100352759C (en) * 2004-12-08 2007-12-05 上海振华港口机械(集团)股份有限公司 Rise and fall crossbeam type crane for container

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100352759C (en) * 2004-12-08 2007-12-05 上海振华港口机械(集团)股份有限公司 Rise and fall crossbeam type crane for container

Also Published As

Publication number Publication date
JP3032933B2 (en) 2000-04-17

Similar Documents

Publication Publication Date Title
US11634877B2 (en) Method for removal of temporary support system for road bridge pre-fabricated small box girder-type concealed bent cap, and equipment therefor
JP4748420B2 (en) Construction method of corrugated steel web bridge using girder for erection work
JP2021070978A (en) Heavy object movement device and heavy object movement method using the heavy object movement device
CN109573851B (en) Arc-shaped roof internode steel truss hanging and installing integrated device and butt-joint hanging method
CN111794119A (en) Temporary support system and hoisting method for basket type steel box tied arch
JP2008214940A (en) Movable suspension timbering
CN111335182A (en) Portable single-rail bridge girder erection machine and steel column and steel girder installation method in bridge erecting process
CN114059758A (en) Assembled double-layer integral elevator shaft platform
CN110424749B (en) Rail type overhead connection device for pier body reinforcement height connection construction and height connection method thereof
JPH07237883A (en) Lift raising method for cranes such as container crane, etc., and its raising device
CN210002826U (en) detachable welding platform for steel column construction
JP4523185B2 (en) Crane superstructure lifting device
CN220960636U (en) Test bed for bridge crane
CN220725767U (en) Movable high and large formwork support
CN114045861B (en) Tower crane foundation connecting structure transferring force to existing column and construction method thereof
CN216638685U (en) Hoisting equipment for construction of prefabricated box girder
CN209923781U (en) A interim strutting arrangement that is used for modularization adjustable gesture of prefabricated bent cap installation
CN218434625U (en) Rotary telescopic type hoisting device for low-altitude assembling and segmented lifting assembly of large tank body
CN215618848U (en) Walking integral hydraulic prefabricated small box girder template structure
CN217997830U (en) Rail mounted translation frame roof beam device
CN110194241B (en) Installation device and method of segmented component
CN107575034B (en) Construction method for corner structure of bottom steel girder of steel platform formwork system
JPH09287112A (en) Arrangement method of reinforcements in main girder of pc bridge and device thereof
SU897709A1 (en) Walking hoist
JP2513376B2 (en) How to build a building