JPH07208065A - Tunnel construction method - Google Patents

Tunnel construction method

Info

Publication number
JPH07208065A
JPH07208065A JP2317894A JP2317894A JPH07208065A JP H07208065 A JPH07208065 A JP H07208065A JP 2317894 A JP2317894 A JP 2317894A JP 2317894 A JP2317894 A JP 2317894A JP H07208065 A JPH07208065 A JP H07208065A
Authority
JP
Japan
Prior art keywords
ground
tunnel
space
support
arrow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2317894A
Other languages
Japanese (ja)
Inventor
Kiyoshi Matsushita
清 松下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Construction Co Ltd
Original Assignee
Mitsui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Construction Co Ltd filed Critical Mitsui Construction Co Ltd
Priority to JP2317894A priority Critical patent/JPH07208065A/en
Publication of JPH07208065A publication Critical patent/JPH07208065A/en
Pending legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

PURPOSE:To accurately construct a vertically long and a large sectional tunnel. CONSTITUTION:By use of a pair of right and left side drift tunnels 7A, 7B excavated in advance in the ground 2, earth retaining walls 9, 9 are constructed in the ground 2 at the underside thereof and the lower support ground 2A is formed in advance between the earth retaining walls 9, 9. Concrete side walls 10, 10 are erected at the side walls of side drift tunnels 7A, 7B and a pipe roof 16 is inserted in the ground 2 between the side drift tunnels to form the upper support ground 2B between the side drift tunnels under the pipe roof 16. While supporting the ground by the pipe roof 16 and the right and left side walls 10, 10, the upper support ground 2B is excavated to form an upper space 5 and construct a covering member 21 in the upper space 5. And while supporting the ground 2 by the earth retaining walls 9, 9 and the covering member 21, the lower support ground 2A under the upper space 5 is dug down to form a tunnel space 3 and a concrete body 25 is constructed in the space.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、上下線並列道路用のト
ンネルを構築する際に適用するのに好適なトンネル構築
方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a tunnel construction method suitable for use in constructing a tunnel for a parallel road.

【0002】[0002]

【従来の技術】従来、高速道路等の上り線と下り線が並
列走行するような道路に設けられるトンネルにおいて
は、該上下の線を一緒に通す形で大断面のトンネルを構
築したり、或いは、上り線と下り線の各々専用のトンネ
ルを別個に構築したり、さらには、トンネルの断面形状
をメガネ状にしたり、等の各種の方法が、道路の用途や
車線数、或いはトンネル構築箇所の現場条件等に応じて
任意採択されていた。しかし、これらの方法ではいずれ
にしても、トンネルが地盤中において左右方向に有る程
度の領域を占有する形になるため、既存の道路の下側
等、左右の幅が限定された領域では、こうしたトンネル
を構築することが出来ないという不都合がある。そこ
で、前記上り線と下り線が上下方向に並ぶような縦長大
断面のトンネルを構築したいという要求があった。
2. Description of the Related Art Conventionally, in a tunnel provided on a road such as an expressway in which an up line and a down line run in parallel, a tunnel having a large cross section is constructed by passing the upper and lower lines together, or Various methods such as constructing a dedicated tunnel for each of the up and down lines separately, and making the cross-sectional shape of the tunnel eyeglasses, etc. can be used depending on the road use, the number of lanes, or the tunnel construction location. It was voluntarily adopted according to site conditions. However, in any of these methods, the tunnel occupies an area in the left-right direction in the ground. There is the inconvenience that you cannot build a tunnel. Therefore, there has been a demand for constructing a tunnel having a vertically long large cross section in which the up line and the down line are vertically aligned.

【0003】[0003]

【発明が解決しようとする課題】ところが、地盤は、深
さに応じて異なる性状を有するものであるため、上述し
たように縦長断面のトンネルを構築しようとすると、該
トンネルを、互いに異なる性状をなす地盤の各領域に跨
るように構築しなければならない。特に、地盤中におい
て地下水位より上側の領域と下側の領域とでは、地盤性
状やこれに適した掘削及び支保方法が明らかに異なるた
めに、該地下水位より上側の領域と下側の領域の両方に
適した掘削及び支保方法でトンネルを構築するのは、非
常に難しい。それに加えて、土被りの浅い土砂地山にト
ンネルを構築するとなると更に一層難しくなる。そこ
で、深さに応じて異なる性状をなす地盤中に縦長大断面
のトンネルを的確に構築することが出来るような方法の
開発が望まれていた。そこで、本発明は、上記事情に鑑
み、縦長大断面のトンネルを的確に構築することが出来
るようにした、トンネル構築方法を提供するものであ
る。
However, since the ground has different properties depending on the depth, when attempting to construct a tunnel having a vertically long section as described above, the tunnels have different properties. It must be constructed so as to straddle each area of the ground. Particularly, in the ground, the area above the groundwater level and the area below the groundwater level are clearly different from each other in the ground property and the excavation and support method suitable for this, so that the area above the groundwater level and the area below It is very difficult to construct a tunnel with excavation and support methods suitable for both. In addition to that, it will be even more difficult to construct a tunnel in a shallow sandy earth cover. Therefore, it has been desired to develop a method capable of accurately constructing a tunnel having a vertically long and large cross section in the ground that has different properties depending on the depth. Therefore, in view of the above circumstances, the present invention provides a tunnel construction method capable of accurately constructing a tunnel having a vertically long large cross section.

【0004】[0004]

【課題を解決するための手段】即ち本発明のうち第一の
発明は、左右方向に所定の間隔(L1)をなす一対のサ
イロット坑(7A、7B)を地盤(2)中に先進させ、
前記一対のサイロット坑(7A、7B)を利用して、該
各々のサイロット坑(7A、7B)の下側の地盤(2)
中に土留壁(9)を構築して、該左右の土留壁(9)間
に下部支保地盤(2A)を形成しておき、前記各々のサ
イロット坑(7A、7B)の側壁部(7c)に側壁支保
部材(10)を設置すると共に、前記一対のサイロット
坑(7A、7B)間の地盤(2)に、これらサイロット
坑(7A、7B)間を連絡する形の先行支保手段(1
6)を挿入して、該先行支保手段(16)の下部で前記
一対のサイロット坑(7A、7B)間に上部支保地盤
(2B)を形成しておき、前記先行支保手段(16)
と、前記一対のサイロット坑(7A、7B)に設置され
た左右の側壁支保部材(10)によって地盤(2)を支
持しながら、前記上部支保地盤(2B)を掘削してトン
ネル上部空間(5)を形成し、該形成されたトンネル上
部空間(5)にトンネル上部覆工(21)を構築し、前
記左右の土留壁(9)と前記トンネル上部覆工(21)
によって地盤(2)を支持しながら、前記トンネル上部
空間(5)より下側の前記下部支保地盤(2A)を掘り
下げていく形で掘削することによってトンネル空間
(3)を形成し、前記トンネル空間(3)にトンネル躯
体(25)を構築するようにして構成される。また、本
発明のうち第二の発明は、第一の発明において、前記先
行支保手段がパイプルーフ(16)からなる。また、本
発明のうち第三の発明は、第一の発明において、前記ト
ンネル躯体(25)を、上下方向に並ぶ形のトンネル供
用空間(26、27)を形成するように構築した。ま
た、本発明のうち第四の発明は、第一の発明において、
前記サイロット坑(7A、7B)及び、前記上部支保地
盤(2B)を地下水位(P1)より上のレベルに形成し
ておき、前記上部支保地盤(2B)を掘削した後、掘削
形成されたトンネル上部空間(5)を利用して地下水位
(P1)より下のレベルの地盤(2)を地盤改良し、そ
の後、前記下部支保地盤(2A)を掘削するようにして
構成される。
That is, the first invention of the present invention is to advance a pair of silot shafts (7A, 7B) forming a predetermined space (L1) in the left-right direction into the ground (2),
The ground (2) below the respective sillot pits (7A, 7B) is utilized by utilizing the pair of sillot pits (7A, 7B).
The earth retaining wall (9) is built inside, the lower supporting ground (2A) is formed between the left and right earth retaining walls (9), and the side wall portion (7c) of each of the silt pits (7A, 7B). A side wall support member (10) is installed on the ground, and the ground support (2) between the pair of silott pits (7A, 7B) is connected to the silt pits (7A, 7B) so as to support the preceding support means (1).
6) is inserted to form an upper support ground (2B) between the pair of silot shafts (7A, 7B) below the preceding support means (16), and the preceding support means (16) is provided.
And the upper support ground (2B) is excavated while the ground (2) is supported by the left and right side wall support members (10) installed in the pair of Shiroto pits (7A, 7B). ) Is formed, a tunnel upper lining (21) is constructed in the formed tunnel upper space (5), and the left and right earth retaining walls (9) and the tunnel upper lining (21) are formed.
The tunnel space (3) is formed by excavating the lower supporting ground (2A) below the tunnel upper space (5) while supporting the ground (2) with the tunnel space (3). (3) is constructed by constructing a tunnel frame (25). A second invention of the present invention is the first invention according to the first invention, wherein the preceding support means comprises a pipe roof (16). A third aspect of the present invention is the first aspect of the present invention, wherein the tunnel skeleton (25) is constructed so as to form tunnel service spaces (26, 27) that are vertically aligned. The fourth invention of the present invention is, in the first invention,
A tunnel formed by excavating the silt mine (7A, 7B) and the upper support ground (2B) at a level above the groundwater level (P1) and excavating the upper support ground (2B). The upper space (5) is used to improve the ground (2) at a level below the groundwater level (P1), and then the lower support ground (2A) is excavated.

【0005】なお、( )内の番号等は、図面における
対応する要素を示す、便宜的なものであり、従って、本
記述は図面上の記載に限定拘束されるものではない。以
下の作用の欄についても同様である。
The numbers in parentheses () indicate the corresponding elements in the drawings for the sake of convenience, and the present description is not limited to the description in the drawings. The same applies to the following action columns.

【0006】[0006]

【作用】上記した構成により、本発明のうち第一の発明
では、トンネル空間(3)は、この掘削に先立って別個
に形成された上部支保地盤(2B)及び、下部支保地盤
(2A)を掘削する形で形成される。また、本発明のう
ち第二の発明では、パイプルーフ(16)がパイプルー
フ(16)より上方の地盤(2)を支持する。また、本
発明のうち第三の発明では、1本の道路幅のトンネル
(1)に上下に複数本の道路が納められる。また、本発
明のうち第四の発明は、左右の土留壁(9)と不透水性
の改良地盤(2a)によって、地下水位より下の下部支
保地盤(2A)のうちトンネル空間(3)に相当する部
位が周囲の地盤(2)に対して水封される。
With the above structure, in the first aspect of the present invention, the tunnel space (3) has the upper support ground (2B) and the lower support ground (2A) formed separately prior to this excavation. It is formed by excavating. In the second aspect of the present invention, the pipe roof (16) supports the ground (2) above the pipe roof (16). In addition, in the third aspect of the present invention, a plurality of roads are vertically housed in the tunnel (1) having one road width. In addition, a fourth invention of the present invention is that, in the tunnel space (3) of the lower support ground (2A) below the groundwater level, the left and right soil retaining walls (9) and the improved impermeable ground (2a) are used. The corresponding part is water-sealed to the surrounding ground (2).

【0007】[0007]

【実施例】図1は、本発明を適用して構築されているト
ンネルの一例のうち、上部切羽付近を示した模式断面
図、図2は、図1に示すトンネルのうち、下部切羽付近
を示した模式断面図、図3は、図1のX1−Y1線断面
図、図4は、図2のX2−Y2線断面図である。
DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 is a schematic cross-sectional view showing the vicinity of an upper face of a tunnel constructed by applying the present invention, and FIG. 2 shows the vicinity of a lower face of the tunnel shown in FIG. The schematic sectional view shown in FIG. 3, FIG. 3 is a sectional view taken along line X1-Y1 of FIG. 1, and FIG. 4 is a sectional view taken along line X2-Y2 of FIG.

【0008】構築中のトンネル1は、図1乃至図4に示
すように(但し、図1の紙面右端部位と図2の紙面左端
部位とは互いに連続している)、地山2中に図の紙面左
右方向である矢印A、B方向(水平方向)に伸延した形
で掘削形成された断面が略半円形の上部空間5を有して
おり、該上部空間5の下側には、これに隣接した形で断
面が略長方形の下部空間6が掘削形成されている。上部
空間5の上部切羽5aは下部空間6の下部切羽6aより
も矢印A側に先行しており、上部空間5と下部空間6と
が上下に隣接した箇所(図2の紙面右端部付近)では、
上部空間5と下部空間6とが上下に隣接連通して縦長大
断面のトンネル空間3が形成されている。なお、上部空
間5周囲の地山2は、土被りの浅い土砂地山となってい
る。上部空間5の上部切羽5aからは、図1及び図3に
示すように、上部空間5の一部が矢印A側に先行掘削さ
れた形で、矢印A、B方向に伸延した小断面の2つのサ
イロット坑7A、7Bが掘削形成されており、サイロッ
ト坑7A、7Bの上部切羽5aに形成された開口部7a
A、7aBはそれぞれ、図3の紙面左右方向に間隔L1
で、上部切羽5aの半円形形状の紙面左下、右下の両隅
に整合した形で形成されている。即ち、サイロット坑7
A、7Bの底面7b、7bと上部空間5の底面5bとは
矢印A、B方向に水平連続しており、サイロット坑7A
の図3紙面左側の側壁部7cと上部空間5の図3紙面左
側の側壁部5c(二点鎖線で図示)とは矢印A、B方向
に連続しており、サイロット坑7Bの図3紙面右側の側
壁部7cと上部空間5の図3紙面右側の側壁部5c(二
点鎖線で図示)とは矢印A、B方向に連続している。各
サイロット坑7A、7Bの矢印A側端部にはサイロット
切羽7d、7dがそれぞれ形成されている。
The tunnel 1 being constructed is shown in FIGS. 1 to 4 (however, the right end portion of the paper surface of FIG. 1 and the left end portion of the paper surface of FIG. 2 are continuous to each other), and the tunnel 2 is shown in FIG. Has an upper space 5 having a substantially semicircular cross section, which is formed by extending in the direction of arrows A and B (horizontal direction) which is the left-right direction of the sheet of the drawing. A lower space 6 having a substantially rectangular cross section is formed by excavation so as to be adjacent to. The upper cutting face 5a of the upper space 5 precedes the lower cutting face 6a of the lower space 6 on the arrow A side, and at a position where the upper space 5 and the lower space 6 are vertically adjacent to each other (near the right end of the paper surface of FIG. 2). ,
The upper space 5 and the lower space 6 are vertically adjacent to each other and communicate with each other to form a tunnel space 3 having a vertically large cross section. The ground 2 around the upper space 5 is a shallow earth and sand cover. As shown in FIGS. 1 and 3, from the upper face 5a of the upper space 5, a part of the upper space 5 is excavated in advance on the arrow A side, and a small cross section 2 extending in the directions of the arrows A and B is formed. The two silot pits 7A and 7B are formed by excavation, and the opening 7a formed in the upper face 5a of the silot pits 7A and 7B is formed.
A and 7aB are spaced apart from each other by a distance L1 in the horizontal direction of the paper surface of FIG.
The upper face 5a is formed in a semicircular shape aligned with the lower left and lower right corners of the drawing. That is, Shirotoken 7
The bottom surfaces 7b and 7b of A and 7B and the bottom surface 5b of the upper space 5 are horizontally continuous in the directions of arrows A and B.
The side wall 7c on the left side of FIG. 3 of the drawing and the side wall 5c of the upper space 5 on the left side of FIG. 3 (shown by the alternate long and two short dashes line) are continuous in the directions of arrows A and B, and the right side of FIG. 3 and the side wall 5c (shown by a chain double-dashed line) on the right side of the upper space 5 in FIG. 3 are continuous in the directions of arrows A and B. Silot faces 7d and 7d are formed at the end portions of the respective sillot mines 7A and 7B on the arrow A side.

【0009】サイロット坑7A、7Bのうち各サイロッ
ト切羽7d、7d付近からサイロット坑7A、7Bの開
口部7aA、7aBまでは、掘削された地山2の表面
に、コンクリートの吹き付けによって形成された吹き付
けコンクリート支保工(図示せず)が設けられている。
サイロット坑7A、7Bは、上述したように、小断面で
形成されているため、吹き付けコンクリート支保工(図
示せず)によってこれらサイロット坑7A、7B周囲の
地山2は安定している。また、サイロット坑7A、7B
のうち各サイロット切羽7d、7dから所定距離矢印B
側の位置より矢印B側部位(但し、図示しない前記吹き
付けコンクリート支保工が設けられている部位)におい
ては、各底面7b、7b側の地山2に、複数の鉛直な柱
状の壁部材片9aが矢印A、B方向の一重並列の形で互
いに隙間無く連続してそれぞれ打設されており、連続し
て打設された複数の壁部材片9aはそれぞれ土留壁9、
9となっている。なお、各壁部材片9aは内部にH型鋼
が埋め込まれたコンクリートによって構成されており、
各土留壁9、9は、サイロット坑7Aでは図3の紙面左
側の側壁部7c、サイロット坑7Bでは図3の紙面右側
の側壁部7cにそれぞれ沿った形で構築されている。従
って、地山2のうち土留壁9、9に挾まれた部分は水平
方向(図3の紙面左右方向)からの土圧から支保された
下部支保地盤2Aとなっている。また、サイロット坑7
A、7Bのうち前記土留壁9、9が構築されている部位
には、サイロット坑7Aでは図3の紙面左側の側壁部7
c、サイロット坑7Bでは図3の紙面左側の側壁部7c
に沿った形で側壁コンクリート10、10がそれぞれ設
けられている。従って、側壁コンクリート10、10は
対応する各土留壁9、9の上端部に載置接合された形で
設けられている。
From the vicinity of each silott face 7d, 7d of the sillot pits 7A, 7B to the openings 7aA, 7aB of the sillot pits 7A, 7B, a spray formed by spraying concrete on the surface of the excavated ground 2 Concrete support (not shown) is provided.
As described above, since the silot pits 7A and 7B are formed to have a small cross section, the ground 2 around the silot pits 7A and 7B is stable due to the sprayed concrete support (not shown). In addition, Shiroto mine 7A, 7B
A predetermined distance from each silott face 7d, 7d
In the portion on the arrow B side from the position on the side (however, the portion on which the sprayed concrete support work (not shown) is provided), a plurality of vertical columnar wall member pieces 9a are formed on the ground 2 on the bottom surfaces 7b, 7b. Are continuously laid in the form of single parallel in the directions of arrows A and B without gaps, and the plurality of wall member pieces 9a that are continuously laid are the retaining wall 9, respectively.
It is 9. In addition, each wall member piece 9a is made of concrete in which H-shaped steel is embedded,
The earth retaining walls 9, 9 are constructed along the side wall portion 7c on the left side of the paper surface of FIG. 3 in the silot pit 7A and the side wall portion 7c on the right side of the paper surface of the FIG. 3 in the silott pit 7B. Therefore, the portion sandwiched between the retaining walls 9 and 9 of the natural ground 2 is the lower supporting ground 2A that is supported by the earth pressure from the horizontal direction (left and right direction of the paper surface of FIG. 3). In addition, Shirotoken 7
A portion of A and 7B where the retaining walls 9 and 9 are constructed has a side wall portion 7 on the left side of FIG.
c, the side wall 7c on the left side of the plane of FIG.
Sidewall concretes 10 and 10 are respectively provided along the line. Therefore, the side wall concretes 10 and 10 are provided in the form of being mounted and joined to the upper end portions of the corresponding soil retaining walls 9 and 9.

【0010】サイロット坑7A、7Bの矢印B側に連続
する前記上部空間5においては、該上部空間5の上部切
羽5aに近接する形でプレサポート掘削機11が配置さ
れており、プレサポート掘削機11は、図1に示すよう
に、上部空間5の半円形断面に沿ってアーチ状をなす胴
型に形成された殻体12を有している。殻体12は、上
部空間5に整合した形で位置しているため、プレサポー
ト掘削機11の配置箇所では、上部空間5周辺の地山2
は殻体12によって支保され安定している。なお、サイ
ロット坑7A、7Bの下方の地山2に打設されている土
留壁9、9及び、サイロット坑7A、7Bに設けられて
いる側壁コンクリート10、10は、サイロット坑7
A、7Bの矢印B側に連続する上部空間5の下方の地山
2及び、上部空間5内にも連続して、従って、矢印B方
向に延長された形で設けられている。従って、プレサポ
ート掘削機11の殻体12は、その配置箇所に存在する
側壁コンクリート10、10と干渉しない形態に形成さ
れている(但し、後述するようにプレサポート掘削機1
1が矢印A方向に移動する際、側壁コンクリート10、
10によって殻体12が移動方向にガイドされ得るよう
に、側壁コンクリート10、10と殻体12とを干渉さ
せてもよい。)。殻体12の内側には公知のパイプルー
フ施工を行い得るパイプルーフ支保工ユニット13が設
けられており、パイプルーフ支保工ユニット13は所定
の送り出し装置15と、該送り出し装置15に装着支持
された、矢印A、B方向に伸延した鋼管等からなる複数
のパイプ16aを有している。複数のパイプ16aは図
3に示すように、前記上部空間5の上部輪郭(即ち、半
円形)に整合した形で一重に並列して装着支持されてお
り、これらパイプ16aはパイプルーフ16を構成して
いる。つまり、パイプルーフ16は、送り出し装置15
の駆動によって、殻体12に対して矢印A、B方向に突
出後退し得るようになっている。なお、各パイプ16a
の内部には、該パイプ16aの矢印A側端部に掘削部先
端をもつ図示しないオーガ掘削機が設けられており、従
って、各パイプ16aがその矢印A側より矢印A方向に
地山2に挿入される際には、図示しない前記オーガ掘削
機が駆動されて、各パイプ16aの挿入が容易に行える
ようになっている。また、パイプルーフ16は、図1に
示すように、その矢印A側部分が前記上部切羽5aから
矢印A方向に地山2に挿入されているため、上部切羽5
a周辺の地山2はパイプルーフ16によって支保され、
該上部切羽5aは安定している。従って、パイプルーフ
16の下部の地山2で、しかも前記側壁コンクリート1
0、10に挾まれた部分はその周囲の地山2の土圧から
支保された上部支保地盤2Bとなっている。
In the upper space 5 continuous to the arrow B side of the silot pits 7A and 7B, a pre-support excavator 11 is arranged in the vicinity of the upper face 5a of the upper space 5, and the pre-support excavator is provided. As shown in FIG. 1, the reference numeral 11 has a shell body 12 formed in the shape of an arch along the semicircular cross section of the upper space 5. Since the shell body 12 is positioned so as to be aligned with the upper space 5, at the place where the pre-support excavator 11 is arranged, the ground 2 around the upper space 5 is located.
Is supported by the shell 12 and is stable. The earth retaining walls 9 and 9 placed in the ground 2 below the silt pits 7A and 7B and the side wall concretes 10 and 10 provided in the silot pits 7A and 7B are
It is provided continuously in the natural ground 2 below the upper space 5 which is continuous to the arrow B side of A and 7B, and in the upper space 5 as well, and thus is extended in the direction of the arrow B. Therefore, the shell body 12 of the pre-support excavator 11 is formed in a form that does not interfere with the side wall concrete 10 or 10 existing at the location (however, as will be described later, the pre-support excavator 1).
When 1 moves in the direction of arrow A, side wall concrete 10,
The side wall concretes 10, 10 and the shell 12 may be interfered with each other so that the shell 12 can be guided by the shell 10 in the moving direction. ). A pipe roof supporting and supporting unit 13 capable of performing a known pipe roof construction is provided inside the shell body 12. The pipe roof supporting and supporting unit 13 is attached to and supported by a predetermined feeding device 15 and the feeding device 15. , A plurality of pipes 16a made of a steel pipe or the like extending in the directions of arrows A and B. As shown in FIG. 3, the plurality of pipes 16 a are mounted and supported in parallel in a single line so as to be aligned with the upper contour (that is, a semicircle) of the upper space 5, and the pipes 16 a form the pipe roof 16. is doing. That is, the pipe roof 16 has the delivery device 15
Is driven, the shell 12 can be projected and retracted in the directions of arrows A and B. In addition, each pipe 16a
An auger excavator (not shown) having an excavation tip at the end of the pipe 16a on the arrow A side is provided inside the pipe 16a. Therefore, each pipe 16a extends from the arrow A side to the natural ground 2 in the arrow A direction. At the time of insertion, the auger excavator (not shown) is driven so that the pipes 16a can be easily inserted. Further, as shown in FIG. 1, the pipe roof 16 has the portion on the arrow A side inserted from the upper face 5a into the natural ground 2 in the direction of the arrow A.
The ground 2 around a is supported by the pipe roof 16,
The upper face 5a is stable. Therefore, at the ground level 2 below the pipe roof 16, and also at the side wall concrete 1
The part sandwiched between 0 and 10 is the upper supporting ground 2B supported by the earth pressure of the ground 2 around it.

【0011】殻体12の内側には、図1に示すように、
地山2を掘削し得るロードヘッダ等の削岩機17が、そ
のビット部分を前記上部切羽5aに向けた形で配設され
ており、殻体12の内側の後部には、プレサポート掘削
機11を矢印A方向に向けて推進させるための推進ジャ
ッキ19が設けられている。上部空間5のうちプレサポ
ート掘削機11の矢印B側端部付近より矢印B側には、
アーチ形状の複数のセグメントリング20aが、上部空
間5の半円形断面に整合した形で、矢印A、B方向に並
んだ形で設けられており、しかも各セグメントリング2
0aの下端部20b、20bが対応した位置に存在する
前記側壁コンクリート10、10の上端部10a、10
aにそれぞれ搭載支持された形で設けられている。な
お、各セグメントリング20aは、複数のセグメントピ
ース20cを、矢印C、D方向に示すトンネル周方向に
沿ってアーチ形状をなすように締結接続して構成されて
おり、複数のセグメントリング20aは、各セグメント
リング20a相互間をボルト等によって締結接続された
形で設けられている。また、互いに締結接続された複数
のセグメントリング20aはセグメント構造物20とな
っている。また、セグメント構造物20の矢印A側端部
付近は、前記殻体12の内側に配置されており、セグメ
ント構造物20の矢印A側端部には前記推進ジャッキ1
9のラム側が当接し得るようになっている。つまり、推
進ジャッキ19によってセグメント構造物20を矢印B
方向に押圧することにより、前記プレサポート掘削機1
1は、この押圧の反力を受けて矢印A方向に推進できる
ようになっている。なお、セグメント構造物20の内側
には図示しない防水シートが敷設されており、セグメン
ト構造物20のうち殻体12よりも矢印B側に所定の間
隔をあけた位置から矢印B側の部分においては、セグメ
ント構造物20と地山2との間にはモルタル等による裏
込めが施されている。以上のように、プレサポート掘削
機11より矢印B側における上部空間5では、側壁コン
クリート10、10に支持された形で設けられたセグメ
ント構造物20によって、該上部空間5周囲の地山2が
支保され安定している。
Inside the shell 12, as shown in FIG.
A rock drilling machine 17 such as a road header capable of excavating the natural ground 2 is arranged with its bit portion facing the upper face 5a, and a pre-support drilling machine is provided in the rear portion of the shell body 12. A propulsion jack 19 for propelling 11 in the direction of arrow A is provided. In the upper space 5, on the arrow B side from the vicinity of the end portion of the pre-support excavator 11 on the arrow B side,
A plurality of arch-shaped segment rings 20a are provided so as to be aligned with the semicircular cross section of the upper space 5 and lined up in the directions of arrows A and B.
0a lower end portions 20b, 20b exist at corresponding positions, the side wall concrete 10, 10 upper end portions 10a, 10
It is provided so as to be mounted and supported on a. Each segment ring 20a is configured by fastening and connecting a plurality of segment pieces 20c so as to form an arch shape along the tunnel circumferential direction indicated by the arrows C and D, and the plurality of segment rings 20a are The segment rings 20a are provided so as to be fastened and connected to each other by bolts or the like. Further, the plurality of segment rings 20a fastened and connected to each other form a segment structure 20. The vicinity of the arrow A side end of the segment structure 20 is disposed inside the shell body 12, and the propulsion jack 1 is provided at the arrow A side end of the segment structure 20.
The ram side of 9 can contact. That is, the propelling jack 19 moves the segment structure 20 to the arrow B.
By pressing in the direction, the pre-support excavator 1
1 can be propelled in the arrow A direction by receiving the reaction force of this pressing. In addition, a waterproof sheet (not shown) is laid inside the segment structure 20, and in a portion of the segment structure 20 on the arrow B side from a position spaced a predetermined distance from the shell 12 on the arrow B side. Between the segment structure 20 and the natural ground 2 is backfilling with mortar or the like. As described above, in the upper space 5 on the arrow B side of the pre-support excavator 11, the segment structure 20 provided so as to be supported by the sidewall concretes 10 and 10 causes the natural ground 2 around the upper space 5 to move. It is supported and stable.

【0012】プレサポート掘削機11より所定距離だけ
矢印B側には、図2又は図3に示すように、セグメント
構造物20の内周に沿って前述した防水シートを介して
現場打設されたコンクリートからなる二次巻アーチ部2
2が形成されており、二次巻アーチ部22の下端部22
b、22bは前記側壁コンクリート10、10の上端部
10a、10aに搭載支持されている(即ち、側壁コン
クリート10の上端部10aには、上述したセグメント
構造物20の下端部20bと共に、二次巻アーチ部22
の下端部22bをも搭載支持させ得る。)。二次巻アー
チ部22が形成されていることにより、該二次巻アーチ
部22の形成箇所には、側壁コンクリート10、10及
び、セグメント構造物20及び、該セグメント構造物2
0の内側に敷設された図示しない防水シート及び、二次
巻アーチ部22及び、セグメント構造物20の背面側の
裏込め等によって構成された覆工体21が構築完了され
ている。
A predetermined distance from the pre-support excavator 11 on the arrow B side, as shown in FIG. 2 or 3, was cast on site along the inner circumference of the segment structure 20 through the above-mentioned waterproof sheet. Secondary winding arch part 2 made of concrete
2 is formed, and the lower end portion 22 of the secondary winding arch portion 22 is formed.
b and 22b are mounted and supported on the upper ends 10a and 10a of the side wall concrete 10 and 10 (that is, on the upper end 10a of the side wall concrete 10 together with the lower end 20b of the segment structure 20 described above, the secondary winding is used. Arch part 22
The lower end portion 22b of the can also be mounted and supported. ). Since the secondary winding arch portion 22 is formed, the side wall concrete 10, 10 and the segment structure 20 and the segment structure 2 are formed at the location where the secondary winding arch portion 22 is formed.
A waterproof sheet (not shown) laid inside 0, the secondary winding arch portion 22, and the backing 21 on the back side of the segment structure 20 and the like have been completely constructed.

【0013】覆工体21の矢印A側端部より所定距離だ
け矢印B側より矢印B側では、上部空間5の底面5b側
の地山2が掘削されて、上述した下部空間6が形成され
ている。下部空間6は、上部空間5の側壁コンクリート
10、10の下方に打設されている土留壁9、9の間で
ある下部支保地盤2Aを掘削する形で形成されており、
従って、上部空間5の底面5b側の地山2が掘削除去さ
れても、覆工体21は、側壁コンクリート10、10に
おいて土留壁9、9を介して地山2に支持されているこ
とから、上部空間5の上方の地山2は安定して支保され
ている。なお、下部切羽6aは、多段ベンチ式に形成さ
れているため、下部空間6は大断面に形成されている
が、この下部切羽6aでは地山2の安定が確保されてい
る。また、掘削形成された下部空間6においては、対面
した土留壁9、9間に複数の切梁23が適宜架設されて
いるので、下部空間6の水平側方の地山2はより確実に
支保されている。また、下部空間6の底面6cを形成し
ている地山2には所定の地盤改良薬液が注入されてお
り、不透水性の改良地盤2aになっている。下部空間6
の下部切羽6aより所定距離だけ矢印B側の位置より矢
印B側では、コンクリート躯体25が構築されており、
コンクリート躯体25は、互いに一体的に設けられた下
部スラブ25a、側壁躯体25b、25b、上部スラブ
25cから構成されている。即ち、下部スラブ25aは
下部空間6の底面6cに沿った形で水平に敷設構築され
ており、側壁躯体25b、25bは、下部スラブ25a
に立設された形で、しかも土留壁9、9に沿った形で鉛
直に構築されており、上部スラブ25cは、側壁躯体2
5b、25bに支持された形で、しかも上部空間5と下
部空間6との境界をなす形で水平に構築されている。な
お、上部スラブ25cは、該上部スラブ25cの上面側
と覆工体21の下端側とが互いに一体接合されるように
構築される。従って、上部空間5には、上部スラブ25
cと覆工体21によって包囲された上通行空間26が形
成され、下部空間6にはコンクリート躯体25内部に下
通行空間27が形成されている。なお、このトンネル1
近辺の地山2中には図示しない帯水層が形成されてお
り、その水位は、トンネル1の上部空間5と下部空間6
との境界付近である図の水位P1に形成されている。し
かし、下部空間6は上述したように、その両側を土留壁
9、9によって挾まれ、土留壁9、9間であり、下部空
間6の下方である位置には不透水性の改良地盤2aが形
成されているので、下部空間6内は地山2側との間で遮
水されている。
On the arrow B side from the arrow B side by a predetermined distance from the end portion of the lining body 21 on the arrow A side, the ground 2 on the bottom surface 5b side of the upper space 5 is excavated to form the lower space 6 described above. ing. The lower space 6 is formed by excavating the lower supporting ground 2A, which is between the earth retaining walls 9 and 9 placed below the side wall concrete 10 and 10 of the upper space 5,
Therefore, even if the rock mass 2 on the bottom surface 5b side of the upper space 5 is excavated and removed, the lining body 21 is supported by the rock mass 2 on the sidewall concretes 10 and 10 via the earth retaining walls 9 and 9. The ground 2 above the upper space 5 is stably supported. Since the lower face 6a is formed in a multi-stage bench type, the lower space 6 has a large cross section, but the lower face 6a ensures the stability of the ground 2. Further, in the lower space 6 formed by excavation, a plurality of beams 23 are appropriately installed between the facing retaining walls 9, 9, so that the ground 2 on the horizontal side of the lower space 6 is more reliably supported. Has been done. In addition, a predetermined ground improvement chemical solution is injected into the ground 2 forming the bottom surface 6c of the lower space 6 to form the impermeable improved ground 2a. Lower space 6
The concrete skeleton 25 is constructed on the arrow B side from the position on the arrow B side by a predetermined distance from the lower face 6a of
The concrete skeleton 25 is composed of a lower slab 25a, side wall skeletons 25b and 25b, and an upper slab 25c that are integrally provided. That is, the lower slab 25a is laid and constructed horizontally along the bottom surface 6c of the lower space 6, and the side wall frames 25b and 25b are the lower slab 25a.
The slab 25c is vertically installed so that it is vertically installed along the earth retaining walls 9 and 9.
It is horizontally constructed so as to be supported by 5b and 25b and form a boundary between the upper space 5 and the lower space 6. The upper slab 25c is constructed such that the upper surface side of the upper slab 25c and the lower end side of the lining body 21 are integrally joined to each other. Therefore, in the upper space 5, the upper slab 25
An upper passage space 26 surrounded by c and the lining body 21 is formed, and a lower passage space 27 is formed inside the concrete frame 25 in the lower space 6. In addition, this tunnel 1
An aquifer (not shown) is formed in the nearby ground 2, and the water level is the upper space 5 and the lower space 6 of the tunnel 1.
It is formed at the water level P1 in the figure, which is near the boundary with. However, as described above, the lower space 6 is sandwiched between the soil retaining walls 9 and 9 on both sides of the lower space 6 and is located between the soil retaining walls 9 and 9, and at a position below the lower space 6, the improved impermeable ground 2a is provided. Since it is formed, the interior of the lower space 6 is blocked from the ground 2 side.

【0014】構築中のトンネル1及びプレサポート掘削
機11等は以上のような構成を有しているので、該トン
ネル1を構築するには、まず2本のサイロット坑7A、
7Bを、図1及び図3に示すように、トンネル空間3を
掘削形成すべき地山2中に、掘削形成されるべき上部空
間5における両側下隅にそれぞれ配置させる形で、従っ
て、既設のサイロット坑7A、7Bのサイロット切羽7
d、7dより更に矢印A方向に前進掘削させる形で、図
の矢印A方向に先進掘削する。サイロット坑7A、7B
の先進掘削と共に、従って、該先進掘削によるサイロッ
ト切羽7d、7dの矢印A方向への移動形成に追随する
形で、先進掘削直後のサイロット坑7A、7Bの掘削面
にコンクリートの吹き付けを行い吹き付けコンクリート
支保工(図示せず)を構築して行く。なお、サイロット
坑7A、7Bは、上述したように、小断面で掘削形成さ
れるため、吹き付けコンクリート支保工(図示せず)に
よってこれらサイロット坑7A、7B周囲の地山2は安
定する。サイロット坑7A、7Bにおける吹き付けコン
クリート支保工(図示せず)の構築箇所が矢印A方向に
伸長されると共に、サイロット坑7A、7Bの底面7
b、7bより地山2に、複数の壁部材片9aを、既設の
土留壁9、9の矢印A側に隙間無く連続する形で打設し
て土留壁9、9を矢印A方向に延長構築して行く。つま
り、土留壁9、9の延長構築によって、地山2のうちこ
れら土留壁9、9間の下部支保地盤2Aを矢印A方向に
延長形成して行く。なお、壁部材片9aの打設は、まず
サイロット坑7A、7Bの空間を利用して、図示しない
H型鋼を底面7b、7bより地山2に挿入打設する。こ
の挿入打設はサイロット坑7A、7B内で挿入打設可能
な長さの複数のH型鋼を順次溶接接続しながら挿入打設
することで可能となる。H型鋼を所定の長さ挿入打設し
た後、該H型鋼の周囲にコンクリートを注入して壁部材
片9aが形成される。土留壁9、9の延長構築と共に、
サイロット坑7A、7Bでは図3の紙面左、右側の側壁
部7c、7cに沿った形で側壁コンクリート10、10
を、既設の側壁コンクリート10、10の矢印A側に連
続する形で打設構築して、側壁コンクリート10、10
を矢印A方向に延長構築して行く。
Since the tunnel 1 and the pre-support excavator 11 and the like being constructed have the above-mentioned structure, first, in order to construct the tunnel 1, first, two silot pits 7A,
As shown in FIG. 1 and FIG. 3, 7B are respectively arranged in the ground 2 where the tunnel space 3 is to be excavated and formed at the lower corners on both sides of the upper space 5 to be excavated and formed. Silot face 7 of mine 7A, 7B
Advanced excavation is carried out in the direction of arrow A in the figure in such a manner that the excavation is further advanced in the direction of arrow A from d and 7d. Silot mine 7A, 7B
With the advanced excavation, therefore, concrete is sprayed on the excavated surface of the silot pits 7A, 7B immediately after the advanced excavation in a manner to follow the movement formation of the silott face 7d, 7d in the direction of the arrow A by the advanced excavation. Build a shoring (not shown). As described above, since the silot pits 7A and 7B are formed by excavation with a small cross section, the ground 2 around the silot pits 7A and 7B is stabilized by the shot concrete support (not shown). The construction site of the blown concrete support (not shown) in the silot pits 7A, 7B is extended in the direction of arrow A, and the bottom surface 7 of the silott pits 7A, 7B is also formed.
Extending the earth retaining walls 9, 9 in the direction of the arrow A by placing a plurality of wall member pieces 9a on the ground 2 from b, 7b so as to be continuous on the arrow A side of the existing earth retaining walls 9, 9 without a gap. Build and go. That is, by extending and constructing the retaining walls 9 and 9, the lower supporting ground 2A between the retaining walls 9 and 9 of the natural ground 2 is extended and formed in the arrow A direction. In order to drive the wall member piece 9a, first, the H-shaped steel (not shown) is inserted into the ground 2 from the bottom surfaces 7b and 7b by utilizing the space of the silot pits 7A and 7B. This insertion driving can be performed by sequentially welding and connecting a plurality of H-shaped steels having a length capable of being inserted and driven in the silot pits 7A and 7B. After the H-shaped steel is inserted and cast for a predetermined length, concrete is poured around the H-shaped steel to form the wall member piece 9a. With the extension construction of the retaining wall 9, 9,
In the Shirot pits 7A and 7B, the side wall concrete 10 and 10 along the left and right side wall portions 7c and 7c of FIG.
Of the existing side wall concrete 10 and 10 is continuously formed on the arrow A side of the existing side wall concrete 10.
To be extended in the direction of arrow A.

【0015】側壁コンクリート10、10の延長構築に
従って、上部空間5の上部切羽5aに近接する形で配置
されているプレサポート掘削機11のパイプルーフ支保
工ユニット13によって公知のパイプルーフ施工を進行
させる。即ち、送り出し装置15の駆動によってパイプ
ルーフ16を、殻体12に対して矢印A方向に突出させ
る。突出により、パイプルーフ16は、図1に示すよう
に、その矢印A側部分が前記上部切羽5aから矢印A方
向に地山2に挿入される(或いは、地山2への挿入が更
に矢印A方向に深められる。)。パイプルーフ16の挿
入により、地山2のうちパイプルーフ16の下部で、し
かも既に構築されている側壁コンクリート10、10の
間の部分が上部支保地盤2Bとなる。また、パイプルー
フ施工の進行に伴って、プレサポート掘削機11の削岩
機17により、上部切羽5aを矢印A方向に掘削する。
上部空間5は半円形断面で扁平な大断面空間であるの
で、その掘削と同時に、該上部空間5の上部或いは、左
右の側壁部5c、5cの下部に土圧が集中し易い。しか
し、掘削する箇所は前記上部支保地盤2Bであり、該上
部支保地盤2Bの上部にはパイプルーフ16が施されて
おり、左右の側壁部5c、5cには予め側壁コンクリー
ト10、10による支保が施されているので、掘削直後
の上部空間5周囲の地山2は安定している。更に、パイ
プルーフ16を地山2に挿入した際、パイプ16aと地
山2との間に隙間が殆ど形成されないので、パイプルー
フ16上部の地山2の沈下が防止されている。つまり、
トンネル構築作業による地表(図示せず)への影響が極
力防止されている。なお、パイプルーフ施工及び、削岩
機17による掘削は、プレサポート掘削機11の推進ジ
ャッキ19のラム側を既設のセグメント構造物20の矢
印A側端部に当接させる形で矢印A方向の反力を適宜得
る形で行う。上部切羽5aが所定量掘削されて、該上部
切羽5aが矢印A方向に所定距離移動形成される毎に、
推進ジャッキ19のラム側を矢印B方向に突出させて、
既設のセグメント構造物20の矢印A側端部を押圧す
る。この押圧の反力によりプレサポート掘削機11を矢
印A方向に摺動推進させる。所定距離推進させた後毎
に、推進ジャッキ19のラム側を矢印A方向に後退させ
て、図示しないエレクタ等によって、複数のセグメント
ピース20cを、矢印C、D方向に示すトンネル周方向
に沿って半円形のアーチ形状をなすように上部空間5の
地山2表面に沿って敷設し、これらセグメントピース2
0c間を締結接続して地山2表面に沿って敷設された形
でセグメントリング20aを構築し、また、敷設すべき
セグメントリング20aは、最も矢印A側にある既設の
セグメントリング20aと互いに締結接続する形で敷設
構築する。従って、上部切羽5aが所定量掘削される毎
に、プレサポート掘削機11が矢印A方向に所定距離推
進され、セグメント構造物20が矢印A方向に延長構築
される。つまり、上部切羽5aが掘削されて矢印A方向
に移動するに従って、殻体12が矢印A方向に移動し、
セグメント構造物20が矢印A方向に延長構築されるの
で、上部空間5周囲の地山2は継続して確実に支保され
ている。なお、セグメント構造物20の延長構築に伴っ
て、セグメント構造物20に対する防水シート(図示せ
ず)の敷設や裏込め等が進行施工される。
In accordance with the extension construction of the side wall concretes 10 and 10, a known pipe roof construction is advanced by the pipe roof support unit 13 of the pre-support excavator 11 which is arranged in the vicinity of the upper face 5a of the upper space 5. . That is, the pipe roof 16 is caused to project in the arrow A direction with respect to the shell body 12 by driving the delivery device 15. As a result of the projection, as shown in FIG. 1, the portion of the pipe roof 16 on the arrow A side is inserted from the upper face 5a into the ground 2 in the direction of the arrow A (or the insertion into the ground 2 is further indicated by the arrow A). It is deepened in the direction.). When the pipe roof 16 is inserted, the portion of the ground 2 below the pipe roof 16 and between the side wall concretes 10 and 10 already constructed serves as the upper supporting ground 2B. Further, as the pipe roof construction progresses, the rock drill 17 of the pre-support excavator 11 excavates the upper face 5a in the direction of arrow A.
Since the upper space 5 is a flat large cross-sectional space having a semicircular cross section, simultaneously with excavation, earth pressure is likely to concentrate on the upper portion of the upper space 5 or the lower portions of the left and right side wall portions 5c, 5c. However, the place to be excavated is the upper support ground 2B, the pipe roof 16 is provided on the upper part of the upper support ground 2B, and the left and right side walls 5c, 5c are previously supported by the side wall concrete 10, 10. Since it is provided, the ground 2 around the upper space 5 immediately after excavation is stable. Furthermore, when the pipe roof 16 is inserted into the natural ground 2, a clearance is hardly formed between the pipe 16a and the natural ground 2, so that the natural ground 2 above the pipe roof 16 is prevented from sinking. That is,
The influence on the ground surface (not shown) by the tunnel construction work is prevented as much as possible. In addition, the pipe roof construction and the excavation by the rock drill 17 are performed in the direction of the arrow A by abutting the ram side of the propulsion jack 19 of the pre-support excavator 11 on the arrow A side end of the existing segment structure 20. The reaction force is appropriately obtained. Every time the upper face 5a is excavated by a predetermined amount and the upper face 5a is moved and formed in the direction of arrow A by a predetermined distance,
Make the ram side of the propulsion jack 19 project in the direction of arrow B,
The arrow A side end of the existing segment structure 20 is pressed. The reaction force of this pressing causes the pre-support excavator 11 to slide and propel in the direction of arrow A. Each time after propelling for a predetermined distance, the ram side of the propulsion jack 19 is retracted in the direction of arrow A, and a plurality of segment pieces 20c are moved along the tunnel circumferential direction shown in the directions of arrows C and D by an unillustrated erector or the like. These segment pieces 2 are laid along the surface of the ground 2 of the upper space 5 so as to form a semicircular arch shape.
The segment rings 20a are constructed by laying along the surface of the natural ground 2 by fastening and connecting 0c, and the segment ring 20a to be laid is fastened to the existing segment ring 20a closest to the arrow A side. Laying and building in the form of connecting. Therefore, each time the upper face 5a is excavated by a predetermined amount, the pre-support excavator 11 is propelled by a predetermined distance in the arrow A direction, and the segment structure 20 is extended and constructed in the arrow A direction. That is, as the upper face 5a is excavated and moves in the direction of arrow A, the shell 12 moves in the direction of arrow A,
Since the segment structure 20 is extended and constructed in the direction of arrow A, the ground 2 around the upper space 5 is continuously and reliably supported. Note that as the segment structure 20 is extended and constructed, a waterproof sheet (not shown) is laid, backfilled, and the like with respect to the segment structure 20.

【0016】セグメント構造物20の延長構築と共に、
セグメント構造物20の矢印A側端部よりも所定距離矢
印B側の位置より、図2及び図4に示すように、セグメ
ント構造物20の内周に沿ってコンクリートを現場打設
して形成される二次巻アーチ部22を、既設の二次巻ア
ーチ部22の矢印A側に連続させる形で構築して、側壁
コンクリート10、10及び、セグメント構造物20及
び、該セグメント構造物20の内側に敷設された図示し
ない防水シート及び、二次巻アーチ部22、及びセグメ
ント構造物20の背面側の裏込め等からなる覆工体21
を、既設の覆工体21の矢印A側に連続させる形で延長
構築する。
With the extension construction of the segment structure 20,
As shown in FIGS. 2 and 4, from the position on the arrow B side at a predetermined distance from the end of the segment structure 20 on the arrow A side, concrete is formed on site along the inner circumference of the segment structure 20. The secondary winding arch portion 22 is constructed so as to be continuous on the arrow A side of the existing secondary winding arch portion 22, and the side wall concrete 10, 10 and the segment structure 20 and the inside of the segment structure 20 are constructed. A waterproof sheet (not shown) laid on the back, a secondary winding arch portion 22, and a backing 21 on the back side of the segment structure 20.
Is extended and constructed so as to be continuous with the arrow A side of the existing lining body 21.

【0017】覆工体21の延長構築に従って、上部空間
5より、その底面5b側の地山2に適宜ボーリング等を
行うことによって所定の地盤改良薬液を注入し、既設の
土留壁9、9間の下部支保地盤2Aの一部(或いは全
て)を不透水性の改良地盤2aとする。なお、改良地盤
2aは土留壁9、9間に亙って隙間無く形成されると共
に、改良地盤2aは形成されるべき下部空間6の底面6
cとなるレベルよりも下方のレベルに底端をもつ形で形
成される。また、改良地盤2aは既設の改良地盤2aの
矢印A側に隙間無く連続する形で形成される。改良地盤
2aの延長形成に従って、下部空間6の下部切羽6aを
矢印A方向に掘削前進させる。下部切羽6aでの掘削
は、土留壁9、9間の範囲で、改良地盤2aの底端より
も上の範囲で行われるので、土留壁9、9と改良地盤2
aによって囲まれた下部空間6には、水位がレベルP1
であるにも拘らず地下水の進入が殆どない(なお、上部
空間5は、地下水のレベルP1以上に位置するので、そ
の掘削作業はドライ状態で円滑に行なわれる。)。つま
り、下部空間6での諸作業がドライ状態で行えるため、
作業が容易になる。なお、下部空間6の掘削は、土留壁
9、9の間である下部支保地盤2Aを掘削する形で行わ
れるので、下部空間6の掘削形成によって形成されるト
ンネル空間3は、その上半部は土留壁9、9を介して下
部の地山2に支持されている覆工体21によって支保さ
れており、下半部は、切梁23等を介した土留壁9、9
によって支持されているため、トンネル空間3周辺の地
山2は安定して支保されている。下部切羽6aでの掘削
と共に、下部空間6にコンクリート躯体25を、既設の
コンクリート躯体25の矢印A側に連続した形で構築す
る。なお、コンクリート躯体25は必要に応じてトンネ
ル空間3の図4における全断面について構築してもよい
ことは勿論である。コンクリート躯体25の延長構築に
より、上部空間5では、上部スラブ25cと覆工体21
によって包囲された上通行空間26が延長形成され、下
部空間6ではコンクリート躯体25内部に下通行空間2
7が延長形成される。即ち、トンネル1のうち構築完了
された部分が矢印A方向に延長された。
In accordance with the extension construction of the lining body 21, a predetermined ground improvement chemical is injected into the ground 2 on the bottom surface 5b side of the upper space 5 by appropriately boring the space, and the existing soil retaining walls 9 and 9 are separated from each other. A part (or all) of the lower supporting ground 2A of (1) is used as the impermeable improved ground 2a. The improved ground 2a is formed without gaps between the soil retaining walls 9 and 9, and the improved ground 2a is formed on the bottom surface 6 of the lower space 6 to be formed.
It is formed with a bottom end at a level lower than the level of c. Further, the improved ground 2a is formed continuously on the arrow A side of the existing improved ground 2a without any gap. In accordance with the extension formation of the improved ground 2a, the lower face 6a of the lower space 6 is excavated and advanced in the arrow A direction. Since the excavation by the lower face 6a is performed in the range between the soil retaining walls 9 and 9 and above the bottom end of the improved soil 2a, the soil retaining walls 9 and 9 and the improved soil 2 are excavated.
In the lower space 6 surrounded by a, the water level is level P1.
However, there is almost no intrusion of groundwater (note that the upper space 5 is located at the groundwater level P1 or higher, so that the excavation work is smoothly performed in a dry state). In other words, since various operations in the lower space 6 can be performed in a dry state,
Work becomes easy. Since the excavation of the lower space 6 is performed by excavating the lower support ground 2A that is between the retaining walls 9, 9, the tunnel space 3 formed by excavation of the lower space 6 has an upper half portion thereof. Is supported by the lining body 21 supported by the ground 2 at the bottom through the retaining walls 9, 9, and the lower half part is supported by the retaining beams 9, 9 through the cutting beams 23 and the like.
Being supported by, the ground 2 around the tunnel space 3 is stably supported. Along with excavation by the lower face 6a, the concrete skeleton 25 is constructed in the lower space 6 in a continuous form on the arrow A side of the existing concrete skeleton 25. Of course, the concrete skeleton 25 may be constructed for the entire cross section of the tunnel space 3 in FIG. 4 if necessary. Due to the extension construction of the concrete skeleton 25, in the upper space 5, the upper slab 25c and the lining 21
An upper traffic space 26 surrounded by the extension is formed, and in the lower space 6, the lower traffic space 2 is provided inside the concrete frame 25.
7 is extended. That is, the part of the tunnel 1 that has been completely constructed is extended in the direction of arrow A.

【0018】[0018]

【発明の効果】以上説明したように、本発明のうち第一
の発明は、左右方向に間隔L1等の所定の間隔をなす一
対のサイロット坑7A、7B等のサイロット坑を地山2
等の地盤中に先進させ、前記一対のサイロット坑を利用
して、該各々のサイロット坑の下側の地盤中に土留壁9
等の土留壁を構築して、該左右の土留壁間に下部支保地
盤2A等の下部支保地盤を形成しておき、前記各々のサ
イロット坑の側壁部7c等の側壁部に側壁コンクリート
10等の側壁支保部材を設置すると共に、前記一対のサ
イロット坑間の地盤に、これらサイロット坑間を連絡す
る形のパイプルーフ等の先行支保手段を挿入して、該先
行支保手段の下部で前記一対のサイロット坑間に上部支
保地盤2B等の上部支保地盤を形成しておき、前記先行
支保手段と、前記一対のサイロット坑に設置された左右
の側壁支保部材によって地盤を支持しながら、前記上部
支保地盤を掘削して上部空間5等のトンネル上部空間を
形成し、該形成されたトンネル上部空間に覆工体21等
のトンネル上部覆工を構築し、前記左右の土留壁と前記
トンネル上部覆工によって地盤を支持しながら、前記ト
ンネル上部空間より下側の前記下部支保地盤を掘り下げ
ていく形で掘削することによってトンネル空間3等のト
ンネル空間を形成し、前記トンネル空間にコンクリート
躯体25等のトンネル躯体を構築するようにして構成さ
れるので、トンネル空間3は、この掘削に先立って形成
された上部支保地盤及び、下部支保地盤を掘削する形で
形成されるので、トンネル空間3の掘削形成は周囲の地
盤の安定を図りながら安全且つ的確に行える。また、上
部支保地盤及び、下部支保地盤はそれぞれ別個に形成さ
れるので、上部支保地盤及び、下部支保地盤を形成する
際の支保の強度や態様は、それぞれの地盤の性状に応じ
て互いに異ならせることも可能である。つまり、トンネ
ル空間の上下で地盤の性状が異なる場合にも、上部支保
地盤及び、下部支保地盤はそれぞれ的確に形成される。
つまり、本発明を適用すると縦長大断面のトンネルを的
確に構築することが出来る。
As described above, according to the first aspect of the present invention, a pair of silot pits 7A, 7B, etc., which form a predetermined interval such as the interval L1 in the left-right direction, are used as the ground 2
Etc., and the soil retaining wall 9 is provided in the ground below each of the silott pits by utilizing the pair of silott pits.
Etc., and the lower supporting ground such as the lower supporting ground 2A is formed between the left and right soil retaining walls, and the side wall concrete 10 or the like is provided on the side wall portion 7c or the like of each of the silot pits. A side wall support member is installed, and a preceding support means such as a pipe roof that connects the silot pits is inserted into the ground between the pair of silott pits, and the pair of silots is located below the preceding support means. The upper supporting ground such as the upper supporting ground 2B is formed between the pits, and the upper supporting ground is supported while supporting the ground by the preceding supporting means and the left and right side wall supporting members installed in the pair of silot pits. Excavation is performed to form a tunnel upper space such as the upper space 5, and a tunnel upper lining such as a lining body 21 is constructed in the formed tunnel upper space, and the left and right earth retaining walls and the tunnel upper lining are constructed. Therefore, while supporting the ground, a tunnel space such as the tunnel space 3 is formed by excavating the lower supporting ground below the tunnel upper space so as to form a tunnel space such as the concrete frame 25 in the tunnel space. Since the tunnel space 3 is formed by constructing the frame, the tunnel space 3 is formed by excavating the upper support ground and the lower support ground formed prior to this excavation, so that the tunnel space 3 is not formed by excavation. You can do it safely and accurately while stabilizing the surrounding ground. In addition, since the upper support ground and the lower support ground are formed separately, the strength and mode of the support when forming the upper support ground and the lower support ground are different from each other according to the properties of each ground. It is also possible. That is, even when the properties of the ground are different above and below the tunnel space, the upper supporting ground and the lower supporting ground are formed properly.
That is, when the present invention is applied, a tunnel having a vertically long cross section can be constructed accurately.

【0019】また、本発明のうち第二の発明は、第一の
発明において、前記先行支保手段がパイプルーフ16等
のパイプルーフからなるので、第一の発明の効果に加え
て、パイプルーフを地盤に挿入することにより、該パイ
プルーフによりパイプルーフより上方の地盤が支持さ
れ、パイプルーフ上部の地盤の沈下が防止される。つま
り、軟弱な地盤や土被りの浅い土砂地盤等の施工条件の
厳しいところにおいても、縦長大断面のトンネルを安定
的に構築することが可能となる。
In addition, in the second invention of the present invention, in the first invention, the preceding support means is a pipe roof such as the pipe roof 16, so that in addition to the effects of the first invention, When the pipe roof is inserted into the ground, the ground above the pipe roof is supported by the pipe roof, and the ground above the pipe roof is prevented from sinking. In other words, it is possible to stably construct a tunnel having a vertically long large section even in places where construction conditions are severe, such as soft ground or shallow earth and sand.

【0020】また、本発明のうち第三の発明は、第一の
発明において、前記トンネル躯体を、上下方向に並ぶ形
の上通行空間26、下通行空間27等のトンネル供用空
間を形成するように構築したので、第一の発明の効果に
加えて、トンネル供用空間は自動車道路等の1本の道路
幅のトンネルに上下に複数本の道路を納めることができ
るので、既存の道路の下側等、左右の幅が限定された領
域に複数本の道路を納めることができるので都合が良
い。
A third aspect of the present invention is the same as the first aspect of the present invention, in which the tunnel skeletons are used to form a tunnel service space such as an upper traffic space 26 and a lower traffic space 27 arranged in a vertical direction. In addition to the effect of the first invention, since the tunnel service space can accommodate multiple roads up and down in a tunnel of one road width such as an automobile road, For example, a plurality of roads can be accommodated in an area having a limited width on the left and right, which is convenient.

【0021】また、本発明のうち第四の発明は、第一の
発明において、前記サイロット坑及び、前記上部支保地
盤を水位P1等の地下水位より上のレベルに形成してお
き、前記上部支保地盤を掘削した後、掘削形成されたト
ンネル上部空間を利用して地下水位より下のレベルの地
盤を地盤改良し、その後、前記下部支保地盤を掘削する
ようにして構成されるので、第一の発明の効果に加え
て、左右の土留壁と不透水性の改良地盤2aによって下
部支保地盤のうちトンネル空間に相当する部位は周囲の
地盤に対して水封される。つまり、トンネル空間の掘削
形成或いは、トンネル空間内での諸作業はトンネル空間
の全断面にわたりドライ状態で行うことができるのでト
ンネル構築作業は容易かつ円滑に行われる。
A fourth aspect of the present invention is the same as the first aspect, wherein the silt pit and the upper support ground are formed at a level higher than a groundwater level such as a water level P1. After excavating the ground, the ground at the level below the groundwater level is improved by utilizing the upper space of the excavated tunnel, and then the lower supporting ground is excavated. In addition to the effect of the present invention, the portion corresponding to the tunnel space of the lower support ground is water-sealed to the surrounding ground by the left and right soil retaining walls and the improved impermeable ground 2a. That is, since the excavation and formation of the tunnel space or various operations in the tunnel space can be performed in a dry state over the entire cross section of the tunnel space, the tunnel construction work can be easily and smoothly performed.

【図面の簡単な説明】[Brief description of drawings]

【図1】図1は、本発明を適用して構築されているトン
ネルの一例のうち、上部切羽付近を示した模式断面図で
ある。
FIG. 1 is a schematic cross-sectional view showing the vicinity of an upper face of an example of a tunnel constructed by applying the present invention.

【図2】図2は、図1に示すトンネルのうち、下部切羽
付近を示した模式断面図である。
FIG. 2 is a schematic cross-sectional view showing the vicinity of a lower face of the tunnel shown in FIG.

【図3】図3は、図1のX1−Y1線断面図である。FIG. 3 is a sectional view taken along line X1-Y1 of FIG.

【図4】図4は、図2のX2−Y2線断面図である。4 is a cross-sectional view taken along line X2-Y2 of FIG.

【符号の説明】[Explanation of symbols]

2……地盤(地山) 2A……下部支保地盤 2B……上部支保地盤 3……トンネル空間 5……トンネル上部空間(上部空間) 7c……側壁部 7A……サイロット坑 7B……サイロット坑 9……土留壁 10……側壁支保部材(側壁コンクリート) 16……先行支保手段(パイプルーフ) 21……トンネル上部覆工(覆工体) 25……トンネル躯体(コンクリート躯体) 26……トンネル供用空間(上通行空間) 27……トンネル供用空間(下通行空間) L1……間隔 P1……地下水位(水位) 2 …… Ground (ground) 2A …… Lower supporting ground 2B …… Upper supporting ground 3 …… Tunnel space 5 …… Tunnel upper space (upper space) 7c …… Sidewall 7A …… Silot pit 7B …… Silot pit 9 …… Soil retaining wall 10 …… Sidewall support member (sidewall concrete) 16 …… Preceding support means (pipe roof) 21 …… Tunnel top lining (lining body) 25 …… Tunnel frame (concrete frame) 26 …… Tunnel Service space (upper traffic space) 27 …… Tunnel service space (lower traffic space) L1 …… Interval P1 …… Groundwater level (water level)

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】左右方向に所定の間隔をなす一対のサイロ
ット坑を地盤中に先進させ、 前記一対のサイロット坑を利用して、該各々のサイロッ
ト坑の下側の地盤中に土留壁を構築して、該左右の土留
壁間に下部支保地盤を形成しておき、 前記各々のサイロット坑の側壁部に側壁支保部材を設置
すると共に、前記一対のサイロット坑間の地盤に、これ
らサイロット坑間を連絡する形の先行支保手段を挿入し
て、該先行支保手段の下部で前記一対のサイロット坑間
に上部支保地盤を形成しておき、 前記先行支保手段と、前記一対のサイロット坑に設置さ
れた左右の側壁支保部材によって地盤を支持しながら、
前記上部支保地盤を掘削してトンネル上部空間を形成
し、該形成されたトンネル上部空間にトンネル上部覆工
を構築し、 前記左右の土留壁と前記トンネル上部覆工によって地盤
を支持しながら、前記トンネル上部空間より下側の前記
下部支保地盤を掘り下げていく形で掘削することによっ
てトンネル空間を形成し、 前記トンネル空間にトンネル躯体を構築するようにして
構成したトンネル構築方法。
1. A soil retaining wall is constructed in the ground below each of the silott pits by utilizing a pair of the silott pits by advancing a pair of silott pits having a predetermined interval in the left-right direction into the ground. Then, a lower support ground is formed between the left and right earth retaining walls, and a side wall support member is installed on the side wall portion of each of the silott mines, and the ground between the pair of silot mines is provided with a space between these silot mines. The leading support means of the form for connecting is inserted, and the upper support ground is formed between the pair of silott mines at the lower part of the leading support means, and the leading support means and the pair of sillot mines are installed. While supporting the ground by the left and right side wall support members,
Excavating the upper supporting ground to form a tunnel upper space, constructing a tunnel upper lining in the formed tunnel upper space, while supporting the ground by the left and right earth retaining walls and the tunnel upper lining, A tunnel construction method configured to form a tunnel space by excavating the lower supporting ground below the tunnel upper space in a form of being dug down, and constructing a tunnel frame in the tunnel space.
【請求項2】前記先行支保手段がパイプルーフからなる
請求項1記載のトンネル構築方法。
2. The tunnel construction method according to claim 1, wherein the preceding support means comprises a pipe roof.
【請求項3】前記トンネル躯体を、上下方向に並ぶ形の
トンネル供用空間を形成するように構築した請求項1記
載のトンネル構築方法。
3. The tunnel construction method according to claim 1, wherein the tunnel skeleton body is constructed so as to form a tunnel service space having a shape lined up and down.
【請求項4】前記サイロット坑及び、前記上部支保地盤
を地下水位より上のレベルに形成しておき、 前記上部支保地盤を掘削した後、掘削形成されたトンネ
ル上部空間を利用して地下水位より下のレベルの地盤を
地盤改良し、 その後、前記下部支保地盤を掘削するようにして構成し
た請求項1記載のトンネル構築方法。
4. The silt pit and the upper support ground are formed at a level above the groundwater level, and after the upper support ground is excavated, the tunnel upper space formed by excavation is used to remove the water from the groundwater level. The tunnel construction method according to claim 1, wherein the ground at a lower level is improved, and then the lower support ground is excavated.
JP2317894A 1994-01-25 1994-01-25 Tunnel construction method Pending JPH07208065A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2317894A JPH07208065A (en) 1994-01-25 1994-01-25 Tunnel construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2317894A JPH07208065A (en) 1994-01-25 1994-01-25 Tunnel construction method

Publications (1)

Publication Number Publication Date
JPH07208065A true JPH07208065A (en) 1995-08-08

Family

ID=12103394

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2317894A Pending JPH07208065A (en) 1994-01-25 1994-01-25 Tunnel construction method

Country Status (1)

Country Link
JP (1) JPH07208065A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010077605A (en) * 2008-09-24 2010-04-08 Shimizu Corp Construction method for widening tunnel
CN106761774A (en) * 2016-12-13 2017-05-31 中铁隧道勘测设计院有限公司 A kind of push bench process Tunnel Engineering tube coupling stopping device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010077605A (en) * 2008-09-24 2010-04-08 Shimizu Corp Construction method for widening tunnel
CN106761774A (en) * 2016-12-13 2017-05-31 中铁隧道勘测设计院有限公司 A kind of push bench process Tunnel Engineering tube coupling stopping device

Similar Documents

Publication Publication Date Title
JP4309219B2 (en) Tunnel construction method
JP4022687B2 (en) Construction method for underground structures
JP2001520340A (en) Arch support structure
KR100986312B1 (en) Apparatus for guiding the driving force of steel pipe loop structure
JPH07208065A (en) Tunnel construction method
JP4303512B2 (en) Construction method of large section tunnel
JP4583236B2 (en) Shield excavator
JPS622116B2 (en)
JPS6117696A (en) Construction of underground head
JP4705467B2 (en) Construction method of underground structure
JP2006336228A (en) Construction method of underground space
JP2015196990A (en) Ground digging method
JPH0654016B2 (en) Underground space construction method
JP3646698B2 (en) Construction method for underground structures
JP2004316125A (en) Work execution method for large sectional tunnel and deformed section shield machine
JPS6145036B2 (en)
JP3710106B2 (en) How to build a shield start base
JPH07208066A (en) Tunnel construction method
JPH0726877A (en) Construction method of underground structure
JPS6317999B2 (en)
JP5167578B2 (en) Construction method for underground structures
JP2006265827A (en) Construction method for underground penetration body, and steel-shell element therefor
JPH07197771A (en) Tunnel construction method
JP2005200875A (en) Divided box body and construction method for underground three dimensional intersection
JP4191537B2 (en) Shield machine