JPH07189242A - Method of construction of underground wall - Google Patents

Method of construction of underground wall

Info

Publication number
JPH07189242A
JPH07189242A JP33518193A JP33518193A JPH07189242A JP H07189242 A JPH07189242 A JP H07189242A JP 33518193 A JP33518193 A JP 33518193A JP 33518193 A JP33518193 A JP 33518193A JP H07189242 A JPH07189242 A JP H07189242A
Authority
JP
Japan
Prior art keywords
circular
excavation
hole
holes
underground wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP33518193A
Other languages
Japanese (ja)
Other versions
JP2622230B2 (en
Inventor
Akira Nishio
公 西尾
Shuichi Fukuda
修一 福田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CONCRETE KOORING KK
Original Assignee
CONCRETE KOORING KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CONCRETE KOORING KK filed Critical CONCRETE KOORING KK
Priority to JP5335181A priority Critical patent/JP2622230B2/en
Priority to US08/501,101 priority patent/US5586840A/en
Priority to KR1019950703104A priority patent/KR960700384A/en
Priority to CN94191062A priority patent/CN1117304A/en
Priority to PCT/JP1994/002006 priority patent/WO1995015419A1/en
Priority to EP95902271A priority patent/EP0686730A4/en
Publication of JPH07189242A publication Critical patent/JPH07189242A/en
Application granted granted Critical
Publication of JP2622230B2 publication Critical patent/JP2622230B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

PURPOSE:To form an underground wall having thin thickness efficiently. CONSTITUTION:A plurality of circular excavated holes an are formed precedently, and groove-shaped excavated holes bn are formed among the circular excavated holes an by reciprocating and moving a bit while applying impact force under a continuous state, and the excavated holes bn are formed repeatedly in succession while using the circular excavated holes at the rear end sections of the excavated holes bn as guides. Joint members are inserted into the specified circular excavated holes, sheets 64 with bag sections are annexed, the bag sections are filled with cement paste S, and bentonite muddy water filled into the excavating holes an, bn is replaced with solidified muddy water B.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、地中壁の構築工法に
関し、特に、礫などが混在する地盤中に薄い厚みの地中
壁を連続した状態で構築することができる地中壁の構築
工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing an underground wall, and more particularly to the construction of an underground wall capable of continuously constructing a thin underground wall in the ground where gravel and the like are mixed. It is related to the construction method.

【0002】[0002]

【従来の技術】地下構造物を構築する際の土留め壁や、
ダムや廃棄物処理場などの周囲に設けられる止水壁を構
築する工法として、地中連続壁工法が知られている。こ
の種の地中連続壁工法では、地盤表面から所定の深度ま
で矩形状の掘削溝を掘削し、掘削溝内にコンクリートな
どの固化物を充填して、パネル状の単位壁体を形成す
る。
2. Description of the Related Art Soil retaining walls for constructing underground structures,
The underground continuous wall construction method is known as a construction method for constructing a water blocking wall provided around a dam or a waste treatment plant. In this type of underground continuous wall construction method, a rectangular excavation groove is excavated from the ground surface to a predetermined depth, and a solidified material such as concrete is filled in the excavation groove to form a panel-shaped unit wall body.

【0003】そして、このような工程を順次繰り返すこ
とにより、単位壁体を順に横方向に連結形成することに
より連続した地中壁が地盤中に構築される。ところで、
このような工法では、地盤中に矩形状の掘削溝を掘削す
る必要があるが、このような掘削溝の形成に用いられる
地盤掘削装置としては、例えば、グラブ形式の掘削装置
や、ロータリカッタを用いる掘削装置が通常採用されて
いた。
Then, by repeating these steps in sequence, the unit wall bodies are sequentially connected laterally to form a continuous underground wall in the ground. by the way,
In such a construction method, it is necessary to excavate a rectangular excavation groove in the ground, and as a ground excavation device used for forming such an excavation groove, for example, a grab-type excavation device or a rotary cutter is used. The drilling rig used was usually adopted.

【0004】しかしながら、このような掘削装置を使用
した地中壁の構築工法には、以下に説明する技術的課題
があった。
However, the construction method of the underground wall using such an excavating device has the following technical problems.

【0005】[0005]

【発明が解決しようとする課題】すなわち、前述したよ
うな地中連続壁工法で構築される地中壁は、これを本体
の一部として利用する場合を除いて、仮設用の場合に
は、要求される壁体強度が有ればよいが、従来のグラブ
形式の掘削装置や、ロータリカッタを用いる掘削装置で
は、比較的薄い厚みの掘削溝を掘削することが難しく、
これらの掘削装置の小型化によりある程度薄い掘削溝が
掘削できるようにしても、例えば、礫が混在している地
盤に薄い厚みの掘削溝を掘削することが非常に難しく、
殆ど不可能であった。
That is, the underground wall constructed by the underground continuous wall construction method as described above, except when it is used as a part of the main body, is It is only necessary to have the required wall strength, but it is difficult to excavate a comparatively thin excavation groove with a conventional grab-type excavator or an excavator that uses a rotary cutter,
Even if it is possible to excavate a thin excavation groove to some extent by miniaturizing these excavation devices, for example, it is very difficult to excavate a thin excavation groove in the ground where gravel is mixed,
It was almost impossible.

【0006】また、柱列杭状の地中壁を形成する際に、
複数の円筒状の掘削ビットを直線状に配列した地盤掘削
装置も提供されているが、このような形式の地盤掘削装
置では、掘削ビットの径を小径にし、衝撃力印加装置を
用いると、礫が混在している地盤中に比較的薄い厚みの
掘削溝を形成することもできるが、小径の円筒状掘削ビ
ットを一列状に多数配置すると構成が複雑になり、配置
数が制限され、1回の掘削で形成される溝長さが短くな
って、掘削効率が低下するという問題もあった。
[0006] Further, when forming an underground wall in the form of a column pile,
A ground excavating device in which a plurality of cylindrical excavating bits are arranged in a straight line is also provided.However, in such a type of ground excavating device, if the diameter of the excavating bit is made small and an impact force applying device is used, gravel Although it is possible to form excavation trenches with a relatively thin thickness in the ground where there are mixed, but if a large number of small-diameter cylindrical excavation bits are arranged in a row, the configuration becomes complicated and the number of arrangements is limited. There is also a problem that the length of the groove formed by excavation is shortened and the excavation efficiency is reduced.

【0007】本発明は、このような従来の問題点に鑑み
てなされたものであって、その目的とするところは、効
率よく薄い厚みの地中壁が形成できる地中壁の構築工法
を提供することにある。
The present invention has been made in view of such conventional problems, and an object thereof is to provide a method for constructing an underground wall capable of efficiently forming a thin underground wall. To do.

【0008】[0008]

【課題を解決するための手段】上記目的を達成するた
め、本発明は、地盤にベントナイト泥水を充満して掘削
孔を形成する第1工程と、前記掘削溝内に固化性泥状物
を充填して固化させる第2工程とからなる地中壁の構築
工法において、前記第1工程で、地盤中に所定の間隔を
おいて複数の円形掘削孔を形成し、これらの円形掘削孔
の間に当該円形掘削孔の径よりも薄い厚みの溝状掘削孔
を所定深度まで連通形成し、前記溝状掘削孔を形成する
際に、板状掘削ビットに衝撃力を加えながら往復移動さ
せることを特徴とする。
In order to achieve the above object, the present invention provides a first step of forming a drill hole by filling the ground with bentonite mud, and filling the excavation trench with a solidified mud. In the method of constructing an underground wall, which comprises a second step of solidifying and solidifying, a plurality of circular drill holes are formed in the ground at predetermined intervals in the first step, and between the circular drill holes. It is characterized in that a grooved drilling hole having a thickness smaller than the diameter of the circular drilled hole is formed continuously to a predetermined depth, and when the grooved drilling hole is formed, the plate-shaped drilling bit is moved back and forth while applying an impact force. And

【0009】前記第2工程の前に、前記円形掘削孔内に
複数のジョイント部材を挿入し、このジョイント部材間
に上端が開口した袋状シートを付設し、このシート内に
固化性泥状物を充填して、前記シートを拡開させて、前
記円形掘削孔と溝状掘削孔との間を閉塞した後に、前記
掘削孔内に前記固化性泥状物を充填することができる。
Before the second step, a plurality of joint members are inserted into the circular excavation hole, a bag-shaped sheet having an open upper end is attached between the joint members, and the solidified mud-like material is placed in the sheet. And the sheet is expanded to close the space between the circular drill hole and the groove-shaped drill hole, and then the solidified mud is filled in the drill hole.

【0010】前記シートには、前記固化性泥状物を充填
する袋部を、両端と底部側とに略凹状に形成することが
できる。
In the sheet, a bag portion for filling the solidifying mud can be formed in a substantially concave shape at both ends and the bottom side.

【0011】[0011]

【作用】上記構成の地中壁の構築工法によれば、地盤に
ベントナイト泥水を充満して掘削孔を形成するときに、
地盤中に所定の間隔をおいて複数の円形掘削孔を形成
し、これらの円形掘削孔の間に当該円形掘削孔の径より
も薄い厚みの溝状掘削孔を所定深度まで連通形成する際
に、板状掘削ビットに衝撃力を加えながら往復移動させ
るので、礫が混在する地盤でも、この衝撃力により礫を
破砕することができ、薄い厚みの地中壁を能率よく構築
することができる。
According to the construction method of the underground wall having the above structure, when the ground is filled with bentonite muddy water to form an excavation hole,
When forming a plurality of circular drill holes at a predetermined interval in the ground, and when forming a grooved drill hole having a thickness smaller than the diameter of the circular drill holes to a predetermined depth between these circular drill holes Since the plate-shaped excavating bit is reciprocally moved while applying an impact force, even in the ground where gravel is mixed, the impact force can crush the gravel, and a thin underground wall can be efficiently constructed.

【0012】また、請求項2の構成によれば、円形掘削
孔内に複数のジョイント部材を挿入し、このジョイント
部材に上端が開口した袋状シートを付設し、このシート
内に固化性泥状物を充填して、シートを拡開させて円形
掘削孔と溝状掘削孔との間を閉塞した後に、掘削孔内に
前記固化性泥状物を充填するので、地中壁を打ち継ぎ形
成する際などに、打ち継ぎ部分の止水性が確保される。
According to the second aspect of the present invention, a plurality of joint members are inserted into the circular excavation hole, and a bag-like sheet having an open upper end is attached to the joint members. After filling the material and expanding the sheet to close the gap between the circular drilling hole and the trench drilling hole, the solidifying mud is filled in the drilling hole, so that the underground wall is spliced and formed. Water resistance of the splicing part is ensured when doing so.

【0013】さらに、請求項3の構成によれば、シート
に固化性泥状物を充填する袋部を、両端と底部側とに略
凹状に形成しているので、地中壁の最底部側に固化性泥
状物が固化した部分が形成され、スライムなどにより弱
体化する恐れのある地中壁の最底部側が効果的に補強さ
れる。
Further, according to the third aspect of the present invention, since the bag portion for filling the sheet with the solidifying mud is formed in a substantially concave shape at both ends and the bottom side, the bottom side of the underground wall. A solidified mud is formed on the bottom, and the bottom side of the underground wall, which may be weakened by slime or the like, is effectively reinforced.

【0014】[0014]

【実施例】以下本発明の好適な実施例について添附図面
を参照して詳細に説明する。図1〜図13は、本発明に
かかる地中壁の構築工法の一実施例を示しており、同図
には、略長方形状の土留め壁を構築する場合が示されて
いる。図14〜図17には、本発明にかかる地中壁の構
築工法に用いる地盤掘削装置の一例が示されている。こ
れらの図に示す地盤掘削装置は、キャタピラー式の作業
車10に装着されるものであり、作業車10は、シリン
ダで駆動される揺動アーム12と起倒シリンダ14とが
設けられ、揺動アーム12と起倒シリンダ14との間に
保持プレート16が装着支持されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT A preferred embodiment of the present invention will be described in detail below with reference to the accompanying drawings. 1 to 13 show an embodiment of a method for constructing an underground wall according to the present invention, in which the case of constructing a substantially rectangular earth retaining wall is shown. 14 to 17 show an example of a ground excavation device used in the method for constructing an underground wall according to the present invention. The ground excavating device shown in these figures is mounted on a caterpillar type work vehicle 10. The work vehicle 10 is provided with a rocking arm 12 driven by a cylinder and a tilting cylinder 14, and rocks. A holding plate 16 is mounted and supported between the arm 12 and the tilting cylinder 14.

【0015】保持プレート16の前面側には、所定の間
隔を置いて3本の支柱18が、垂直方向を指向して固設
されている。支柱18の下端側には、支柱18間を連結
する連結材20が設けられ、この連結材20には、地盤
面への着底位置を調節するためのアウトリガー22が設
けられている。各支柱18の下端近傍には、ロッドブレ
ーカ24およびロッドホルダー26がそれぞれ配置され
ている。
On the front side of the holding plate 16, three columns 18 are fixedly installed at predetermined intervals in a vertical direction. A connecting member 20 that connects the columns 18 is provided on the lower end side of the columns 18, and the connecting member 20 is provided with an outrigger 22 for adjusting the bottoming position on the ground surface. A rod breaker 24 and a rod holder 26 are arranged near the lower ends of the columns 18, respectively.

【0016】また、各支柱18の上端側には、パーカッ
ションヘッド(衝撃印加装置)28と、回転駆動装置3
0とがそれぞれ配置されている。また、各支柱18の上
端には、地盤掘削装置を引き抜くための給進装置32が
それぞれ配置されている。パーカッションヘッド28
は、内部に油圧で駆動されるピストンを内蔵していて、
このピストンを上下させることにより衝撃力が得られ
る。
Further, a percussion head (impact applying device) 28 and a rotation driving device 3 are provided on the upper end side of each of the columns 18.
0 and 0 are arranged respectively. Further, a feeding device 32 for pulling out the ground excavation device is arranged at the upper end of each of the columns 18. Percussion head 28
Has a hydraulically driven piston inside,
An impact force can be obtained by moving the piston up and down.

【0017】また、回転駆動装置30は、例えば、油圧
で駆動する形式のモータが用いられる。本実施例の地盤
掘削装置の主要部材である掘削ビット部34は、パーカ
ッションヘッド28の下端側に配置されるものであっ
て、その詳細を図16,17に示している。同図に示す
掘削ビット部34は、左右および中心掘削ビット36,
38,40からなる円筒状のものと、これらの掘削ビッ
ト36,38,40間に渡設された一対の左右板状掘削
ビット42,44とから概略構成されている。
Further, as the rotary drive device 30, for example, a motor of a hydraulic drive type is used. The excavation bit part 34, which is a main member of the ground excavation device of this embodiment, is arranged on the lower end side of the percussion head 28, and its details are shown in FIGS. The excavation bit portion 34 shown in the figure includes left and right and center excavation bits 36,
It is roughly configured by a cylindrical one composed of 38 and 40, and a pair of left and right plate-shaped excavating bits 42 and 44 provided between the excavating bits 36, 38 and 40.

【0018】円筒状の左右および中心掘削ビット36,
38,40は、支柱18の前面側に配置され、上端をパ
ーカッションヘッド28の下端側に装着し、下端側がロ
ッドホルダー26によって支持されるものであって、各
掘削ビット36,38,40には、その上端側からパー
カッションヘッド(衝撃印加装置)26により衝撃力が
加えられるとともに、回転駆動装置28により回転が与
えられ、掘削ビット36,38,40間の間隔は、支柱
18の配置間隔と同一になっている。
Cylindrical left and right and center drilling bits 36,
38 and 40 are arranged on the front side of the column 18, the upper end of which is attached to the lower end of the percussion head 28, and the lower end of which is supported by the rod holder 26. , An impact force is applied from the upper end side by a percussion head (impact application device) 26, and rotation is given by a rotation drive device 28, and the interval between the excavating bits 36, 38, 40 is the same as the arrangement interval of the columns 18. It has become.

【0019】左右および中心掘削ビット36,38,4
0は、相互に螺着ないしは固着される先端,中間および
上端筒体361,381,401,362,382,4
02,363,383,403から構成され、その内部
に軸方向に貫通する孔部364,384,404が設け
られていて、この孔部364,384,404には、地
盤を掘削する際に、掘削された孔壁の安定を確保するた
めのベントナイト泥水Aが供給される。
Left and right and center drill bits 36, 38, 4
0 is the tip, middle and upper end cylinders 361, 381, 401, 362, 382, 4 screwed or fixed to each other.
02, 363, 383, 403, and inside thereof, hole portions 364, 384, 404 penetrating in the axial direction are provided, and in the hole portions 364, 384, 404, when excavating the ground, Bentonite muddy water A for ensuring the stability of the excavated hole wall is supplied.

【0020】各先端筒体361,381,401のそれ
ぞれの先端外周には、ビット刃365,385,405
が固着されているとともに、各先端筒体361,38
1,401の上端側には、ビット刃365,385,4
05の直径よりも若干小径の第1拡径部366,38
6,406がそれぞれ形成されている。また、この実施
例では、左右掘削ビット36,38の中間筒体362,
382は、中心掘削ビット40の中間筒体402よりも
全長が短くなっているとともに、各上端筒体363,3
83,403の下端には、前記第1拡径部366,38
6,406と同一直径を有する円錐台状の第2拡径部3
67,387,407がそれぞれ形成されている。
Bit blades 365, 385, 405 are provided on the outer circumferences of the tips of the respective tip cylinders 361, 381, 401.
Is fixed, and each tip cylinder 361, 38
On the upper end side of 1,401, bit blades 365, 385, 4
The first expanded portion 366, 38 having a diameter slightly smaller than the diameter of 05.
6, 406 are formed respectively. Further, in this embodiment, the intermediate cylindrical body 362 of the left and right excavating bits 36, 38 is
382 has a shorter overall length than the intermediate tubular body 402 of the center drilling bit 40, and each upper end tubular body 363, 3
At the lower ends of 83 and 403, the first expanded diameter portions 366 and 38 are provided.
Second expanded portion 3 having a truncated cone shape having the same diameter as 6, 406
67, 387 and 407 are formed respectively.

【0021】さらに、中心掘削ビット40の中間筒体4
02の上下端側には、同一半径方向に突出する略楕円形
状の一対のカム408が一体に形成されている。一方、
左右板状掘削ビット42,44は、略三角形状に形成さ
れた基板421,441と、基板421,441の外側
端に固設された中空筒状の一対の左右スリーブ422,
442と、基板421,441の内側端に跨がるように
して固設された中空筒状の中心スリーブ423と、各基
板421,441の下端に固設された複数のビット片4
24,444とから構成されている。
Further, the intermediate cylindrical body 4 of the center drilling bit 40.
A pair of substantially elliptical cams 408 projecting in the same radial direction are integrally formed on the upper and lower ends of 02. on the other hand,
The left and right plate-shaped excavating bits 42 and 44 include substrates 421 and 441 formed in a substantially triangular shape, and a pair of hollow cylinder-shaped left and right sleeves 422 fixed to the outer ends of the substrates 421 and 441.
442, a hollow cylindrical central sleeve 423 fixedly provided so as to straddle the inner ends of the substrates 421, 441, and a plurality of bit pieces 4 fixedly provided at the lower ends of the substrates 421, 441.
24 and 444.

【0022】左右スリーブ422,442は、それぞれ
左右掘削ビット36,38の中間筒体362,382の
外周に嵌着され、その上下端に先端および上端筒体36
1,381,363,383の第1および第2拡径部3
66,386,367,387が挟み込むように当接さ
れ、この当接部が、左右掘削ビット36,38から左右
板状掘削ビット42,44にパーカッションヘッド28
からの衝撃力を伝達する衝撃力伝達部Aを構成してい
る。
The left and right sleeves 422 and 442 are fitted around the outer circumferences of the intermediate cylinders 362 and 382 of the left and right excavation bits 36 and 38, respectively, and the tip and the top cylinder 36 are attached to the upper and lower ends thereof.
1,381,363,383 first and second expanded diameter portions 3
66, 386, 367, 387 are abutted so as to be sandwiched, and this abutting portion extends from the left and right excavation bits 36, 38 to the left and right plate-shaped excavation bits 42, 44.
An impact force transmitting portion A that transmits the impact force from

【0023】そして、左右スリーブ422,442に
は、その中心軸上に、基板421,441の面方向に長
軸が位置する長孔425,445が貫通形成されてい
る。また、中心スリーブ423は、中心掘削ビット40
の中間筒体402の外周に嵌着され、その上下端に先端
および上端筒体401,403の第1および第2拡径部
406,407が鋏込むように当接され、この当接部
が、中心掘削ビット40から左右板状掘削ビット42,
44にパーカッションヘッド28からの衝撃力を伝達す
る衝撃力伝達部Aを構成している。
The left and right sleeves 422 and 442 are formed with long holes 425 and 445, respectively, on the central axes of which the long axes are located in the plane direction of the substrates 421 and 441. Further, the central sleeve 423 is provided with the central drill bit 40.
Of the intermediate cylindrical body 402, and the first and second expanded diameter portions 406 and 407 of the tip and upper end cylindrical bodies 401 and 403 are abutted to the upper and lower ends of the intermediate cylindrical body 402 so as to scissor. , Center drill bit 40 to left and right plate-shaped drill bit 42,
An impact force transmission portion A that transmits the impact force from the percussion head 28 is formed at 44.

【0024】また、中心スリーブ423には、その中心
軸上に、ビット片424,444の厚み方向に長軸側が
位置し、短軸側がビット片424,444の長手方向に
位置する略楕円状のカム面426が貫通形成されてい
る。カム面426は、図4にその断面を示すように、長
軸側の長さがカム408の長さよりも若干大きく、短軸
側の長さがカム408と略同一長さに設定されている。
このカム面426は、カム408と係合して、中心掘削
ビット40に回転駆動装置30から加えられる回転力
を、往復移動に変換して左右板状掘削ビット42,44
に伝達する移動方向変換部Bを構成している。
The central sleeve 423 has a substantially elliptical shape in which the major axis side is located on the central axis in the thickness direction of the bit pieces 424 and 444 and the minor axis side is located in the longitudinal direction of the bit pieces 424 and 444. The cam surface 426 is formed so as to penetrate therethrough. As shown in the cross section of FIG. 4, the cam surface 426 is set such that the length on the major axis side is slightly larger than the length of the cam 408 and the length on the minor axis side is substantially the same as the length of the cam 408. .
The cam surface 426 engages with the cam 408 to convert the rotational force applied to the central excavation bit 40 from the rotary drive device 30 into a reciprocating movement to produce the left and right plate-shaped excavation bits 42, 44.
And a moving direction conversion unit B that transmits the

【0025】なお、カム面426は、中心スリーブ42
3の全長に亘って設ける必要はなく、例えば、カム40
8と係合できる範囲のみに形成することも可能である。
また、本実施例では、左右板状掘削ビット42,44の
基板421,441およびビット片424,444を含
む厚みは、円筒状に形成された掘削ビット36,38,
40の直径よりも小さく設定されている。
The cam surface 426 is formed by the central sleeve 42.
3 does not need to be provided over the entire length, and, for example, the cam 40
It is also possible to form only in the range that can be engaged with 8.
Further, in the present embodiment, the thickness of the left and right plate-shaped excavating bits 42, 44 including the substrates 421, 441 and the bit pieces 424, 444 has a cylindrical shape.
It is set smaller than the diameter of 40.

【0026】さらに、複数のビット片424,444
は、円筒状掘削ビット36,38,40の先端よりも上
方に位置していて、それぞれの長さが板状掘削ビット4
2,44の後述する往復移動ストロークlと略同一の長
さを有し、長手方向に沿って隣接する部分で、ビット片
424,444の山部が相互に直交するように配置され
ている。なお、この場合、ビット片424,444の山
部は、必ずしも直交するように配置する必要はなく、例
えば、所定の角度で交差するようにしてもよい。
Further, a plurality of bit pieces 424, 444
Are located above the tips of the cylindrical drill bits 36, 38, 40, and each has a length of the plate drill bit 4
2 and 44 have substantially the same length as a reciprocating stroke 1 to be described later, and the mountain portions of the bit pieces 424 and 444 are arranged so as to be orthogonal to each other at the adjacent portions along the longitudinal direction. In this case, the peak portions of the bit pieces 424 and 444 do not necessarily need to be arranged orthogonally, and may intersect at a predetermined angle, for example.

【0027】また、図16において符号46で示した部
材は、中心掘削ビット40の先端筒体40aの外周に取
り付けられたスタビライザであって、掘削の進行に伴っ
て、ビット刃405で掘削された孔壁に当接して、中心
掘削ビット40の安定性を保もつ機能を有する。さら
に、符号48で示した部材は、左右および中心掘削ビッ
ト36,38,40を上端側で回転可能に連結する連結
部材であって、左右掘削ビット36,38の上端筒体3
63,383の外周に嵌着される中空状の左右筒体48
1,482と、中心掘削ビット40の上端筒体403の
外周に嵌着される中心筒体483と、これらの筒体48
1〜483間を連結する一対の連結板484とから構成
されている。
A member indicated by reference numeral 46 in FIG. 16 is a stabilizer attached to the outer periphery of the tip end cylinder 40a of the center excavating bit 40, and is excavated by the bit blade 405 as the excavation progresses. It has a function of contacting the hole wall and maintaining the stability of the central drill bit 40. Further, the member indicated by the reference numeral 48 is a connecting member that rotatably connects the left and right and the center excavating bits 36, 38, 40 on the upper end side, and the upper end cylinder 3 of the left and right excavating bits 36, 38.
Hollow left and right cylindrical bodies 48 fitted around the outer circumferences of 63 and 383
1, 482, a central tubular body 483 fitted to the outer periphery of the upper end tubular body 403 of the central drilling bit 40, and these tubular bodies 48.
It is composed of a pair of connecting plates 484 connecting between 1 to 483.

【0028】連結部材48は、掘削の進行に伴って、掘
削された溝内に侵入するので、筒体481〜483の径
は、掘削ビット36,38,40の径よりも小さく、ま
た、連結板484の厚みは、ビット片422,442の
厚みよりも小さくなっている。さて、以上にように構成
された地盤掘削装置では、支柱18の前面側に掘削ビッ
ト部34を配置し、各円筒状掘削ビット36,38,4
0が掘削地盤面にほぼ垂直状態になるように立設して、
パーカッションヘッド28および回転駆動装置30が始
動される。パーカッションヘッド28および回転駆動装
置30が始動されると、円筒状掘削ビット36,38,
40には、その上端側から衝撃力と回転力とが同時に加
えられ、これによりビット刃365,385,405に
より地盤が掘削され、まず、図1(A)に示すように、
各ビット36,38,40の形状に対応した円形掘削孔
1 〜a3 が先行形成される。
Since the connecting member 48 penetrates into the excavated groove as the excavation proceeds, the diameters of the cylinders 481 to 483 are smaller than the diameters of the excavating bits 36, 38 and 40, and the connecting members 48 are also connected. The thickness of the plate 484 is smaller than the thickness of the bit pieces 422 and 442. By the way, in the ground excavating device configured as described above, the excavating bit portion 34 is arranged on the front side of the support column 18, and the cylindrical excavating bits 36, 38, 4 are arranged.
Erected so that 0 is almost vertical to the excavated ground surface,
The percussion head 28 and the rotary drive 30 are started. When the percussion head 28 and rotary drive 30 are started, the cylindrical drill bits 36, 38,
An impact force and a rotational force are simultaneously applied to 40 from its upper end side, whereby the ground is excavated by the bit blades 365, 385, 405, and first, as shown in FIG.
Circular drill holes a 1 to a 3 corresponding to the shapes of the bits 36, 38, 40 are formed in advance.

【0029】そして、このような円形掘削孔a1 〜a3
形成が進行して、左右板状掘削ビット42,44が地盤
面に到達すると、この左右板状掘削ビット42,44に
は、衝撃力伝達部Aを介して、パーカッションヘッド2
8の衝撃力が伝達されるとともに、移動方向変換部Bを
介して、往復移動力が伝達されるので、左右板状掘削ビ
ット42,44は、往復移動しながら衝撃力を地盤に加
えることになる。
Then, such circular drill holes a 1 to a 3 are formed.
When the formation progresses and the left and right plate-shaped excavation bits 42, 44 reach the ground surface, the percussion head 2 is attached to the left and right plate-shaped excavation bits 42, 44 via the impact force transmission portion A.
In addition to transmitting the impact force of No. 8, the reciprocating movement force is transmitted via the movement direction conversion unit B, so that the left and right plate-shaped excavating bits 42, 44 apply the impact force to the ground while reciprocating. Become.

【0030】図18は、中心掘削ビット40に回転駆動
装置30を介して加えられる回転力を往復移動に変換す
る移動方向変換部Bの作動の詳細を示している。いま、
例えば、図18(A)に示すような初期状態において、
カム408がカム面426の短軸方向と一致していたと
し、中心掘削ビット40が時計方向に回転するとすれ
ば、カム408が(A)に示す位置から略90°回転し
て、カム408がカム面426の長軸方向と一致した状
態になると、カム面426の長軸がカム408の全長よ
りも若干長いので、スリーブ40bは、板状掘削ビット
42,44の板厚み方向には殆ど移動しない。
FIG. 18 shows the details of the operation of the moving direction converting portion B for converting the rotational force applied to the central excavating bit 40 via the rotary drive device 30 into the reciprocating movement. Now
For example, in the initial state as shown in FIG.
If the cam 408 coincides with the minor axis direction of the cam surface 426 and the center excavating bit 40 rotates clockwise, the cam 408 rotates approximately 90 ° from the position shown in (A), and the cam 408 rotates. When the state coincides with the long axis direction of the cam surface 426, since the long axis of the cam surface 426 is slightly longer than the entire length of the cam 408, the sleeve 40b almost moves in the plate thickness direction of the plate-like excavation bits 42, 44. do not do.

【0031】そして、中心掘削ビット40がさらに時計
方向に回転し、図18(A)から同図(B)に示すよう
に、カム408がカム面426の短軸方向と一致するよ
うに略180°回転すると、この過程でカム408がカ
ム面426を右方向に移動させることになり、この移動
により中心スリーブ423が同方向に移動するが、中心
スリーブ423は、左右スリーブ422,442と基板
421,441を介して連結されているので、この結
果、左右板状掘削ビット42,44が同一方向に同じ量
だけ移動する。
Then, the central excavating bit 40 further rotates clockwise, and as shown in FIGS. 18 (A) to 18 (B), the cam 408 is approximately 180 degrees so as to coincide with the minor axis direction of the cam surface 426. When rotated by a degree, the cam 408 moves the cam surface 426 to the right in this process, and this movement causes the central sleeve 423 to move in the same direction, but the central sleeve 423 includes the left and right sleeves 422 and 442 and the substrate 421. , 441, the left and right plate-shaped excavating bits 42, 44 move in the same direction by the same amount.

【0032】次いで、さらに中心掘削ビット40が時計
方向に回転し、図18(B)から同図(A)に示すよう
に、カム408がカム面426の短軸方向と一致するよ
うに略180°回転すると、この過程でカム408がカ
ム面426を左方向に移動させることになり、上記と同
様に、左右板状掘削ビット42,44が、左方向に同じ
量だけ移動し、以後は、中心掘削ビット40の一回転毎
に1往復ずつ移動し、この移動ストロークlは、カム4
08の突出した部分に相当する長さになる。
Next, the center excavating bit 40 further rotates clockwise, and as shown in FIGS. 18B to 18A, the cam 408 is approximately 180 degrees so as to coincide with the minor axis direction of the cam surface 426. When rotated by °, the cam 408 moves the cam surface 426 to the left in this process, and the left and right plate-shaped excavating bits 42 and 44 move to the left by the same amount in the same manner as described above. The center excavating bit 40 moves one reciprocation every one rotation, and the moving stroke l
The length corresponds to the protruding portion of 08.

【0033】この場合、カム408の回転過程におい
て、左右掘削ビット36,38,40は、連結部材48
によって回転は可能であるが、それ以外の方向への移動
が規制されているので、左右板状掘削ビット42,44
は、掘削ビット36,38,40の中心を結ぶ直線方向
にのみ移動し、ビット片424,444の厚み方向には
殆ど移動しない。このような往復移動が行われると、左
右板状掘削ビット42,44のビット片424,444
で円形掘削孔a1 〜a3 間の地盤が掘削され、このとき
に衝撃力も同時に加えられるので、例えば、礫が混在す
る地盤でも厚みの薄い溝状掘削溝b1,2 を形成するこ
とができる(図1(B)参照)。
In this case, during the rotation process of the cam 408, the left and right excavating bits 36, 38, 40 are connected to the connecting member 48.
Although it is possible to rotate by the, the movement in the other directions is restricted, so the left and right plate-shaped excavating bits 42, 44 are
Moves only in the direction of the straight line connecting the centers of the drill bits 36, 38, 40, and hardly moves in the thickness direction of the bit pieces 424, 444. When such reciprocating movement is performed, the bit pieces 424 and 444 of the left and right plate-shaped excavating bits 42 and 44 are formed.
Since the ground between the circular excavation holes a 1 to a 3 is excavated at this time, and the impact force is also applied at the same time at this time, for example, it is necessary to form the groove-shaped excavation grooves b 1 and b 2 which are thin even in the ground where gravel is mixed. (See FIG. 1B).

【0034】特に、上記構成の掘削装置では、ビット片
424,444の長さが往復移動ストロークlと略同一
になっていて、しかも山が直交するように配置されてい
るので、地盤をより効果的に掘削することができる。そ
して、掘削が進行して、掘削ビット36,38,40の
上端が掘削地盤面に近接すると、掘削を一端停止し、パ
ーカッションヘッド28と掘削ビット36,38,40
との結合をロッドブレーカ24で切り離し、掘削ビット
36,38,40をロードホルダー26のみで支持し、
その上端に新たなロッドを継ぎ足して、上記と同様な操
作を行い、再び掘削が行われ、このような操作を適宜繰
り返すことにより、所望の深度まで掘削溝を形成するこ
とになる。
In particular, in the excavator having the above-mentioned structure, the length of the bit pieces 424 and 444 is substantially the same as the reciprocating stroke l, and the mountains are arranged orthogonally to each other, so that the ground is more effective. Can be excavated. Then, when the excavation proceeds and the upper ends of the excavation bits 36, 38, 40 approach the excavation ground surface, the excavation is temporarily stopped, and the percussion head 28 and the excavation bits 36, 38, 40 are stopped.
The connection with and is disconnected by the rod breaker 24, and the drill bits 36, 38, 40 are supported only by the load holder 26,
A new rod is added to the upper end, the same operation as described above is performed, the excavation is performed again, and the excavation groove is formed to a desired depth by appropriately repeating such an operation.

【0035】以上のようにして第1エレメント分の円形
掘削孔a1 〜a3 と溝状掘削溝b1,2 とが所定深度ま
で形成されると、掘削ビット36,38,40に継ぎ足
したロッドを取り外しながら給進装置32により引き上
げた後に、端部に位置する円形掘削孔a3 をガイドとし
て、上述した工程を順に行い、第2エレメントの円形掘
削孔a4 〜a5 と溝状掘削孔b3,4 が形成され(図1
(C)参照)、以下同様な手順で第3〜第nエレメント
の掘削孔an,n が形成され、この工程が本発明の地盤
中に掘削孔an,n を形成する第1工程である。
When the circular excavation holes a 1 to a 3 and the groove excavation grooves b 1 and b 2 for the first element are formed to a predetermined depth as described above, they are added to the excavation bits 36, 38 and 40. and after pulling by KyuSusumu device 32 while detaching the rod, as a guide a circular borehole a 3 located at the end, it performed sequentially the steps described above, the circular borehole a 4 ~a 5 and the groove-shaped second element Drill holes b 3 and b 4 are formed (Fig. 1
See (C)), drilled holes a n of the third to n elements in a similar procedure, b n is formed below, the first to form a borehole a n, b n this process is in the ground of the present invention It is a process.

【0036】このような方法で行われる第1工程では、
複数の円形掘削孔a1 〜a3 間に、この円形掘削a1
3 の径よりも小さい厚みの溝状掘削孔b1,2 が形成
され、このとき、円形およびび溝状掘削孔a1 〜a3 ,
1,2 を形成する際に、衝撃力が加えられるので、礫
が混在する地盤でも、この衝撃力により礫を破砕するこ
とができる。
In the first step carried out by such a method,
Between the plurality of circular borehole a 1 ~a 3, the circular drilling a 1 ~
Groove-shaped drill holes b 1 and b 2 having a thickness smaller than the diameter of a 3 are formed. At this time, circular and groove-shaped drill holes a 1 to a 3,
Since an impact force is applied when forming b 1 and b 2 , even in the ground where gravel is mixed, the gravel can be crushed by this impact force.

【0037】また、本実施例の第1工程によれば、円形
掘削孔a1 〜a3 を先行形成した後に、これらの円形掘
削孔a1 〜a3 間に、板状掘削ビット42,44の往復
移動により、端部がそれぞれ円形掘削孔a1 〜a3 に連
続し、かつ、円形掘削孔a1〜a3 の直径よりも薄い厚
みの溝状掘削孔b1,2 が形成されるので、掘削孔a n,
n の形成能率も向上する。
According to the first step of this embodiment, the circular shape
Drilling hole a1~ A3These circular digs after preforming
Drilling a1~ A3Between the plate-shaped drilling bits 42, 44
Due to the movement, the ends are circular drill holes a.1~ A3In a row
And the circular drilling hole a1~ A3Thinner than the diameter of
Minono groove-shaped drilling hole b1,b2Is formed, the drill hole a n,
bnThe formation efficiency of is also improved.

【0038】なお、上記実施例では、同一方向に往復移
動する板状掘削ビット42,44により円形掘削孔a1
〜a3 間に溝状掘削孔b1,2 を形成する場合を例示し
たが、例えば、移動方向変換部Bのカムを複数設け、左
右板状掘削ビット42,44が相互に異なった方向に往
復移動するようにして溝状掘削孔b1,2 を形成しても
よい。また、上記実施例では、円形掘削孔を3個先行形
成する工法を例示したが、この円形掘削孔は、2以上の
複数個を採用することができる。
In the above embodiment, the circular excavation hole a 1 is formed by the plate-shaped excavation bits 42 and 44 that reciprocate in the same direction.
Although the case where the grooved excavation holes b 1 and b 2 are formed between the a to a 3 has been illustrated, for example, a plurality of cams of the movement direction conversion portion B are provided, and the left and right plate-shaped excavation bits 42 and 44 have different directions. The grooved excavation holes b 1 and b 2 may be formed by reciprocating. Further, in the above embodiment, the construction method in which three circular drilling holes are formed in advance has been exemplified, but a plurality of circular drilling holes can be adopted.

【0039】以上のようにして掘削孔an,n が形成さ
れると、全エレメントが形成された段階で、図2に示す
ように、例えば、第1および第3エレメントの端部側に
位置する一対の円形掘削孔a1,7 にそれぞれジョイン
ト部材50が挿入される。本実施例で用いられるジョイ
ント部材50は、土留め用の地中壁が略長方形状に形成
されるので、長方形の辺上に位置する円形掘削孔a1,
7,13内に挿入されるジョイント部材50と、コーナ部
に位置する円形掘削孔a17内に挿入されるジョイント部
材50aとが異なった形状に形成されている。
When the drill holes a n, b n are formed as described above, at the stage when all the elements are formed, as shown in FIG. 2, for example, on the end side of the first and third elements. The joint member 50 is inserted into each of the pair of circular drill holes a 1 and a 7 . In the joint member 50 used in the present embodiment, since the underground wall for retaining soil is formed in a substantially rectangular shape, the circular excavation holes a 1, a located on the sides of the rectangle are formed.
The joint member 50 inserted into 7, a 13 and the joint member 50a inserted into the circular excavation hole a 17 located at the corner are formed in different shapes.

【0040】円形掘削孔a1,7,13内に挿入されるジ
ョイント部材50は、図3にその断面形状を示すよう
に、一対のコ字形鋼材を背中合わせに接合した本体部5
01と、本体部501のコ字形部の内面の中心部に固設
された略C字断面の一対のガイド部材502とから構成
されている。円形掘削孔a17内に挿入されるジョイント
部材50aは、コ字形鋼材と略L字形鋼材とから構成さ
れた本体部501aと、一対の略C字断面の一対のガイ
ド部材502aとから構成されている。
The joint member 50 inserted into the circular drill holes a 1, a 7, a 13 has a body portion 5 in which a pair of U-shaped steel members are joined back to back as shown in FIG.
01 and a pair of guide members 502 having a substantially C-shaped cross section, which are fixed to the central portion of the inner surface of the U-shaped portion of the main body 501. The joint member 50a inserted into the circular excavation hole a 17 is composed of a main body portion 501a composed of a U-shaped steel material and a substantially L-shaped steel material, and a pair of guide members 502a having a substantially C-shaped cross section. There is.

【0041】本体部501aは、コ字形鋼材の一端角部
にL字形鋼材の端部が固設された形状に形成され、コ字
形鋼材の内面の中心部に一方のガイド部材502aが固
設され、鋼材間の結合部に他方のガイド部材502aが
固設されている。各ジョイント部材50,50aは、円
形掘削孔a1 〜an と同じ長さを有し、接続部分には、
図5に示すように、ゴムパッキン60を介装して、添接
板62が固設されている。
The main body 501a is formed in a shape in which an end of an L-shaped steel material is fixed to one end of a U-shaped steel material, and one guide member 502a is fixed to the center of the inner surface of the U-shaped steel material. The other guide member 502a is fixed to the joint between the steel members. Each of the joint members 50, 50a has the same length as the circular drill holes a 1 to a n, and the connecting portion has
As shown in FIG. 5, a splice plate 62 is fixedly mounted with a rubber packing 60 interposed.

【0042】所定箇所へのジョイント部材50,50a
の挿入が終了すると、ジョイント部材50,50aへの
シート64の付設が行われる。このシート64は、例え
ば、セメントペーストなどの固化性泥状物の構成粒子が
透過しない程度の透水性を有する不織布や織布、あるい
は、非透水性のプラスチックシートなどが用いられ、隣
接する掘削孔間に挿入されているジョイント部材50,
50a間に対応した幅と、掘削孔a1 〜an とほぼ同じ
長さを有している。
Joint members 50, 50a to predetermined locations
When the insertion of the sheet is completed, the seat 64 is attached to the joint members 50 and 50a. As the sheet 64, for example, a non-woven fabric or a woven fabric having water permeability to the extent that the constituent particles of the solidifying mud such as cement paste do not permeate, or a water impermeable plastic sheet is used. A joint member 50 inserted between
A width corresponding to between 50a, have approximately the same length as the borehole a 1 ~a n.

【0043】また、シート64の幅方向の両端側と底部
側には、上端が開口し、周縁部において略凹状に形成さ
れた袋部64aが設けられている。シート64の付設に
当たっては、図6および図7に示す付設装置65が用い
られる。これらの図に示す付設装置65は、ジョイント
部材50間の中心に設置されるセンター架台66と、シ
ート64を捲回して、センター架台66に回転可能に支
持されたローラ67と、手動ウインチ68とを有してい
る。
Further, a bag portion 64a having an opening at the upper end and a substantially concave shape at the peripheral edge portion is provided at both ends and the bottom portion side in the width direction of the sheet 64. To attach the seat 64, the attachment device 65 shown in FIGS. 6 and 7 is used. The attachment device 65 shown in these figures includes a center mount 66 installed at the center between the joint members 50, a roller 67 that winds the sheet 64 and is rotatably supported by the center mount 66, and a manual winch 68. have.

【0044】手動ウインチ68は、シート64の底部側
に一端が係止された引き込みワイヤ69を巻き上げるこ
とにより、シート64を引き出すものであって、ワイヤ
69は、各ジョイント部材50,50aの先端に設けら
れた滑車70に予め巻き付けて、ジョイント部材50,
50aとともに円形掘削孔a1 〜an 内に挿入される。
The manual winch 68 pulls out the seat 64 by winding up the pull-in wire 69 whose one end is locked to the bottom side of the seat 64, and the wire 69 is attached to the tip of each joint member 50, 50a. The joint member 50, which is wound around the provided pulley 70 in advance,
It is inserted into the circular drill holes a 1 to a n together with 50 a.

【0045】この場合、シート64の両端側に位置する
袋部64aの外側面には、板状の滑り易いプラスチック
などで形成されたガイド片64bが固着されていて、こ
のガイド片64bがジョイント部材50,50aのC形
断面のガイド部材502,502a内に挿入するように
セットされる。手動ウインチ68の操作により、シート
64が所定の位置に設置されると、シート64の袋部6
4a内に、例えば、セメントペーストSが注入される。
In this case, a guide piece 64b formed of a plate-like slippery plastic is fixed to the outer surface of the bag portion 64a located at both ends of the seat 64, and the guide piece 64b is a joint member. It is set so as to be inserted into the guide members 502 and 502a having a C-shaped cross section of 50 and 50a. When the seat 64 is installed at a predetermined position by operating the manual winch 68, the bag portion 6 of the seat 64 is
Cement paste S is injected into 4a, for example.

【0046】なお、シート64の袋部64a内に注入す
る固化性泥状物は、セメントペーストに限られることは
なく、例えば、掘削孔an,n 内に充満されているベン
トナイト泥水Aと置換する固化泥水であってもよいが、
望ましくは、固化したときに、掘削孔an,n 内に充填
する固化性泥状物よりも引っ張りないしは一軸圧縮強度
が大きく、かつ、透水係数も小さいものがよい。
The solidified mud that is injected into the bag portion 64a of the sheet 64 is not limited to cement paste, and, for example, bentonite mud A filled in the drill holes a n and b n It may be solidified mud to replace,
Desirably, when solidified, the tensile or uniaxial compressive strength is higher than that of the solidified mud material filled in the drill holes a n, b n , and the hydraulic conductivity is also small.

【0047】セメントペーストSをシート64の袋部6
4aに注入すると、袋部64aは、図8,9,10に示
すように拡開し、特に、ジョイント部材50,50aの
近傍では、各ジョイント部材50,50aの本体部50
1,501aの内周面沿って広がり、溝状掘削孔bn
円形掘削孔an との間が閉塞される。このため、セメン
トペーストSが固化すると、特に、地中壁の打ち継ぎ部
分で大きな止水性が得られる。
The cement paste S is added to the bag portion 6 of the sheet 64.
4a, the bag portion 64a expands as shown in FIGS. 8, 9 and 10, and particularly in the vicinity of the joint members 50, 50a, the main body portion 50 of each joint member 50, 50a.
1, 501a spreads along the inner peripheral surface, and a gap between the groove-shaped excavation hole b n and the circular excavation hole a n is closed. For this reason, when the cement paste S is solidified, a large waterproofness can be obtained especially in the splicing portion of the underground wall.

【0048】セメントペーストSの注入が終了すると、
図11に示すように、その固化後ないしは固化中に掘削
孔an,n 内のベントナイト泥水Aと固化泥水Bとの置
換が行われる(第2工程)。この置換に当たっては、作
泥プラント71で掘削孔an,n 内から採取したベント
ナイト泥水Aに所定量のセメントを添加して固化泥水B
を作成し、この固化泥水Bをポンプ72で送り込むこと
により行われ、固化泥水Bが固化すると、図12に示す
ような地中壁が構築され、地中壁の上端側にコンクリー
ト壁73を形成する上部処理を行って工事が完了する
(図13参照)。
When the injection of the cement paste S is completed,
As shown in FIG. 11, the bentonite mud A in the drill holes a n and b n is replaced with the solidified mud B after the solidification or during the solidification (second step). In this replacement, a predetermined amount of cement is added to the bentonite mud A collected from the drill holes a n, b n in the mud plant 71 to solidify the mud B.
And the solidified mud B is sent by the pump 72. When the solidified mud B is solidified, the underground wall as shown in FIG. 12 is constructed, and the concrete wall 73 is formed on the upper end side of the underground wall. The work is completed and the construction is completed (see FIG. 13).

【0049】さて、以上のような工程で行われる地中壁
の構築工法によれば、地盤にベントナイト泥水Aを充満
して掘削孔を形成するときに、地盤中に所定の間隔をお
いて複数の円形掘削孔an 形成し、これらの円形掘削孔
n の間に当該円形掘削孔a n の径よりも薄い厚みの溝
状掘削孔bn を所定深度まで連通形成する際に、板状掘
削ビット42,44に衝撃力を加えながら往復移動させ
るので、礫が混在する地盤でも、この衝撃力により礫を
破砕することができ、薄い厚みの地中壁を能率よく構築
することができる。
Now, the underground wall which is formed by the above steps
According to the construction method, the ground is filled with bentonite mud A
When forming a drill hole, make sure to keep a predetermined interval in the ground.
A plurality of circular drill holes anForming these circular drill holes
anBetween the circular drill holes a nGrooves thinner than the diameter of
Hole bnPlate-shaped digging when forming
Move the cutting bits 42, 44 back and forth while applying impact force.
Therefore, even on the ground where gravel is mixed, this impact force will remove gravel.
Can be crushed and efficiently constructs a thin underground wall
can do.

【0050】また、本実施例の構成によれば、円形掘削
孔an 内にジョイント部材50,50aを挿入し、この
ジョイント部材50,50aに上端が開口した袋状シー
ト64を付設し、このシート64内にセメントペースト
Sを充填して、シート64を拡開させて円形掘削孔an
と溝状掘削孔bn との間を閉塞した後に、掘削孔an,
n 内に固化泥水Bを充填するので、打ち継ぎ部分の止水
性が確保される。
Further, according to the structure of this embodiment, the joint members 50, 50a are inserted into the circular excavation holes a n , and the bag-like sheet 64 having an open upper end is attached to the joint members 50, 50a. The sheet 64 is filled with the cement paste S, and the sheet 64 is expanded to form a circular drill hole a n.
And the trench-shaped drill hole b n are closed, the drill holes a n, b
Since the solidified mud B is filled in n , the water stopping property of the splicing portion is secured.

【0051】さらに、セメントペーストSを充填した部
分の間にもシート64が介在しているので、この部分の
止水性も向上する。さらにまた、本実施例の構成によれ
ば、シート64に凹状の袋部64aが設けられているの
で、地中壁の最底部側にセメントペーストSが固化した
部分が形成され、スライムなどにより弱体化する恐れの
ある地中壁の最底部側が効果的に補強される。
Further, since the sheet 64 is also interposed between the portions filled with the cement paste S, the water stopping property of this portion is also improved. Furthermore, according to the configuration of the present embodiment, since the sheet 64 is provided with the concave bag portion 64a, a portion where the cement paste S is solidified is formed on the bottommost side of the underground wall, and it is weakened by slime or the like. The bottommost side of the underground wall, which is likely to become solid, is effectively reinforced.

【0052】なお、上記実施例では、掘削孔an,n
に充填する固化性泥状物として、固化泥水Bを用いる工
法を例示したが、本発明の実施はこれに限定されること
はなく、固化泥水Bに代えてコンクリートを使用するこ
とも可能である。また、掘削孔an,n 内に充填する固
化性泥状物は、掘削孔an,n を全て形成したのちに、
一度に充填することもできるが、例えば、シート64の
袋部64aで分割された部分を単位として、所定長さの
単位毎に分けて充填することも勿論可能である。
In the above embodiment, the method of using the solidified mud B as the solidifying mud to be filled in the excavation holes a n, b n is illustrated, but the practice of the present invention is not limited to this. Instead, it is possible to use concrete instead of the solidified mud B. Further, borehole a n, solidifying the mud-like material to fill in the b n is, after forming all the borehole a n, b n,
Although it is possible to fill them all at once, it is of course possible to fill them in units of a predetermined length, for example, with the portion divided by the bag portion 64a of the sheet 64 as a unit.

【0053】[0053]

【発明の効果】以上、実施例で詳細に説明したように、
本発明にかかる地中壁の構築工法によれば、効率よく薄
い厚みの地中壁を形成することができる。
As described above in detail in the embodiments,
According to the underground wall construction method of the present invention, it is possible to efficiently form an underground wall having a thin thickness.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明にかかる地中壁の構築工法における掘削
孔を形成する第1工程を示す平面説明図である。
FIG. 1 is an explanatory plan view showing a first step of forming an excavation hole in a method of constructing an underground wall according to the present invention.

【図2】図1の工程で形成された掘削孔にジョイント部
材を挿入する工程の説明図である。
FIG. 2 is an explanatory view of a step of inserting a joint member into the excavation hole formed in the step of FIG.

【図3】図2のA−A線断面図である。3 is a cross-sectional view taken along the line AA of FIG.

【図4】図2のB−B線断面図である。FIG. 4 is a sectional view taken along line BB in FIG.

【図5】本発明の構築工法で用いるジョイント部材の側
面図である。
FIG. 5 is a side view of a joint member used in the construction method of the present invention.

【図6】図2に示したジョイント部材間にシートを付設
する際の説明図である。
FIG. 6 is an explanatory diagram when a sheet is attached between the joint members shown in FIG.

【図7】図6の側面図である。FIG. 7 is a side view of FIG.

【図8】図6のC−C線断面図である。8 is a cross-sectional view taken along line CC of FIG.

【図9】図6のD−D線断面図である。9 is a cross-sectional view taken along line DD of FIG.

【図10】図6のE−E断面図である。10 is a cross-sectional view taken along line EE of FIG.

【図11】本発明の掘削孔内に固化性泥状物を充填する
第2工程を示す説明図である。
FIG. 11 is an explanatory view showing a second step of filling the solidified mud in the excavation hole of the present invention.

【図12】図11の要部上面図である。FIG. 12 is a top view of a main part of FIG.

【図13】本発明にかる構築工法で形成された地中壁の
要部断面図である。
FIG. 13 is a sectional view of an essential part of an underground wall formed by a construction method according to the present invention.

【図14】本発明にかかる地中壁の構築工法で用いる掘
削装置を作業車に装着した状態の側面図である。
FIG. 14 is a side view showing a state where the excavator used in the underground wall construction method according to the present invention is mounted on a work vehicle.

【図15】図1の正面図である。FIG. 15 is a front view of FIG. 1.

【図16】図1の作業車に装着される掘削ビット部の正
面図である。
16 is a front view of an excavating bit unit mounted on the work vehicle of FIG. 1. FIG.

【図17】図16のA−A断面図である。17 is a cross-sectional view taken along the line AA of FIG.

【図18】図1に示した工程で溝状掘削孔を形成する際
の説明図である。
FIG. 18 is an explanatory diagram when forming a trench excavation hole in the step shown in FIG. 1.

【符号の説明】[Explanation of symbols]

1 〜an 円形掘削孔 b1 〜bn 溝状掘削孔 A ベントナイト泥水 B 固化泥水 S セメントペースト 28 パーカッションユニット(衝撃印加装
置) 30 回転駆動装置 34 掘削ビット部 36 左掘削ビット 38 右掘削ビット 385 ビット刃 40 中心掘削ビット 405 ビット刃 408 カム 42 左板状掘削ビット 426 カム面 44 右板状掘削ビット 50,50a ジョイント部材 64 シート 64a 袋部
a 1 to a n circular drill hole b 1 to b n groove drill hole A bentonite mud B solidified mud S cement paste 28 percussion unit (impact application device) 30 rotary drive device 34 drill bit part 36 left drill bit 38 right drill bit 385 bit blade 40 center drill bit 405 bit blade 408 cam 42 left plate drill bit 426 cam surface 44 right plate drill bit 50, 50a joint member 64 seat 64a bag part

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 地盤にベントナイト泥水を充満して掘削
孔を形成する第1工程と、前記掘削溝内に固化性泥状物
を充填して固化させる第2工程とからなる地中壁の構築
工法において、 前記第1工程で、地盤中に所定の間隔をおいて複数の円
形掘削孔を形成し、これらの円形掘削孔の間に当該円形
掘削孔の径よりも薄い厚みの溝状掘削孔を所定深度まで
連通形成し、 前記溝状掘削孔を形成する際に、板状掘削ビットに衝撃
力を加えながら往復移動させることを特徴とする地中壁
の構築工法。
1. Construction of an underground wall comprising a first step of filling the ground with bentonite muddy water to form an excavation hole, and a second step of filling the excavation trench with a solidifying mud and solidifying it. In the construction method, in the first step, a plurality of circular drill holes are formed in the ground at predetermined intervals, and a groove-like drill hole having a thickness smaller than the diameter of the circular drill holes is formed between the circular drill holes. Is communicated to a predetermined depth, and when the groove-shaped drilling hole is formed, the plate-shaped drilling bit is reciprocally moved while applying an impact force.
【請求項2】 前記第2工程の前に、前記円形掘削孔内
に複数のジョイント部材を挿入し、このジョイント部材
間に上端が開口した袋状シートを付設し、このシート内
に固化性泥状物を充填して、前記シートを拡開させて、
前記円形掘削孔と溝状掘削孔との間を閉塞した後に、前
記掘削孔内に前記固化性泥状物を充填することを特徴と
する請求項1記載の地中壁の構築工法。
2. Before the second step, a plurality of joint members are inserted into the circular excavation hole, a bag-shaped sheet having an open upper end is attached between the joint members, and the solidifying mud is contained in the sheet. Fill the sheet, expand the sheet,
The method for constructing an underground wall according to claim 1, wherein the solidified mud is filled in the drill hole after closing the gap between the circular drill hole and the trench drill hole.
【請求項3】 前記シートは、前記固化性泥状物を充填
する袋部が、両端と底部側とに略凹状に形成されている
ことを特徴とする請求項2記載の地中壁の構築工法。
3. The construction of the underground wall according to claim 2, wherein the sheet has a bag portion for filling the solidifying mud in a substantially concave shape at both ends and the bottom side. Construction method.
JP5335181A 1993-11-30 1993-12-28 Underground wall construction method Expired - Lifetime JP2622230B2 (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
JP5335181A JP2622230B2 (en) 1993-12-28 1993-12-28 Underground wall construction method
US08/501,101 US5586840A (en) 1993-11-30 1994-11-30 Apparatus for digging soil foundation and method for constructing underground wall by using the apparatus
KR1019950703104A KR960700384A (en) 1993-11-30 1994-11-30 Ground Excavation Equipment and Underground Wall Construction Method Using the Equipment (APPARATUS FOR DIGGING SOIL FOUNDATION AND METHOD FOR CONSTRUCTING UNDERGROUND WALL BY USING THE APPARATUS)
CN94191062A CN1117304A (en) 1993-11-30 1994-11-30 Ground boring device and method for constructing an underground wall using the same
PCT/JP1994/002006 WO1995015419A1 (en) 1993-11-30 1994-11-30 Ground boring device and method for constructing an underground wall using the same
EP95902271A EP0686730A4 (en) 1993-11-30 1994-11-30 Ground boring device and method for constructing an underground wall using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5335181A JP2622230B2 (en) 1993-12-28 1993-12-28 Underground wall construction method

Publications (2)

Publication Number Publication Date
JPH07189242A true JPH07189242A (en) 1995-07-28
JP2622230B2 JP2622230B2 (en) 1997-06-18

Family

ID=18285668

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5335181A Expired - Lifetime JP2622230B2 (en) 1993-11-30 1993-12-28 Underground wall construction method

Country Status (1)

Country Link
JP (1) JP2622230B2 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03107014A (en) * 1989-09-21 1991-05-07 Matsuzawa Kiko:Kk Execution method for landslide protection wall

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03107014A (en) * 1989-09-21 1991-05-07 Matsuzawa Kiko:Kk Execution method for landslide protection wall

Also Published As

Publication number Publication date
JP2622230B2 (en) 1997-06-18

Similar Documents

Publication Publication Date Title
JPH07113214B2 (en) Excavation device for underground wall and construction method using the device
JP6774132B1 (en) Construction method of steel pipe pile
KR100870988B1 (en) A boring machine and method for reinforcing earth using thereof
KR101851114B1 (en) Auger crane for sheet file and perforated guide for using the same
KR100949606B1 (en) Hole-boring and hammering-vibration working method and device for integrated construction with sheet-pile fixed to outside of hole-boring auger casing
KR100375020B1 (en) a pole for mud wall and constrution method of fence for mud
KR20090078054A (en) Earth-supported structure using pile with screw
KR101388101B1 (en) Constructing method of underwater anchor using diamond wiring
WO1995015419A1 (en) Ground boring device and method for constructing an underground wall using the same
JPH07189242A (en) Method of construction of underground wall
JPH11350473A (en) Execution method for steel pipe pile
JPH07292652A (en) Soil improvement method
KR101756933B1 (en) The pile foundation construction method that can build bulb of various type
JP2006009468A (en) Driving method of inner excavation type steel pipe sheet pile and the steel pipe sheet pile used therefor
JP2717058B2 (en) Ground excavation method
JP2003184499A (en) Large diameter lock bolt anchor for natural ground reinforcement
CN105442546A (en) V-shaped buckling equipment for L-shaped piles and rectangular piles
JPH09302654A (en) Construction method and device for driving steel pipe pile
KR101756937B1 (en) The pile foundation construction method that can build bulb of various type
JP2583006B2 (en) Ground drilling rig
JP3801672B2 (en) Tunnel excavation method
JPH1150447A (en) Formation method of steel pipe column continuous wall and device therefor
KR100383452B1 (en) Wall composition structure of working hole in underground turnel
CN105442548A (en) V-shaped inserting-connection equipment for L-shaped piles and rectangular piles
CN105568984A (en) V-shaped inserting and buckling device for T-shaped piles and rectangular piles