JPH0716267B2 - Central management system - Google Patents

Central management system

Info

Publication number
JPH0716267B2
JPH0716267B2 JP59043584A JP4358484A JPH0716267B2 JP H0716267 B2 JPH0716267 B2 JP H0716267B2 JP 59043584 A JP59043584 A JP 59043584A JP 4358484 A JP4358484 A JP 4358484A JP H0716267 B2 JPH0716267 B2 JP H0716267B2
Authority
JP
Japan
Prior art keywords
load
control
loads
control box
channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP59043584A
Other languages
Japanese (ja)
Other versions
JPS60187198A (en
Inventor
正幸 飯田
光男 藤本
憲敬 森
一則 松本
克正 皆川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanyo Electric Co Ltd
Original Assignee
Sanyo Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanyo Electric Co Ltd filed Critical Sanyo Electric Co Ltd
Priority to JP59043584A priority Critical patent/JPH0716267B2/en
Publication of JPS60187198A publication Critical patent/JPS60187198A/en
Publication of JPH0716267B2 publication Critical patent/JPH0716267B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q9/00Arrangements in telecontrol or telemetry systems for selectively calling a substation from a main station, in which substation desired apparatus is selected for applying a control signal thereto or for obtaining measured values therefrom

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Control By Computers (AREA)
  • Selective Calling Equipment (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Description

【発明の詳細な説明】 (イ)産業上の利用分野 本発明は、オンオフ制御及びその他制御の機能を有する
第1負荷と、オンオフ制御機能を有する第2負荷とを夫
々1個以上備え、これらの負荷を中央制御ボックスによ
り集中管理するシステムに関する。
DETAILED DESCRIPTION OF THE INVENTION (a) Field of Industrial Application The present invention includes at least one first load having an on / off control function and other control functions and at least one second load having an on / off control function. System that centrally manages the load of a computer with a central control box.

(ロ)従来技術 従来、オンオフ制御及びその他制御の機能を有する負荷
としての空気調和機を遠隔制御するものとして、特開昭
56−155326号公報の提案がある。これは1台の空気調和
機を単に遠隔制御するものに過ぎない。
(B) Prior Art Conventionally, as a remote control of an air conditioner as a load having an on / off control function and other control functions, Japanese Patent Application Laid-Open No.
There is a proposal of Japanese Patent Publication No. 56-155326. This is just a remote control of one air conditioner.

快適環境を得るため及び生活の合理化のため等に種々の
電気機器が使用されている。これらの電気機器は電力源
からみれば、負荷となり、この負荷にも、オンオフ制御
及びその他制御の機能を有する第1負荷と、オンオフ制
御機能を有する第2負荷とがある。第1負荷としては空
気調和装置、複数の照明灯を部分的に点灯可能な照明装
置等があり、第2負荷としては、個々の照明器具、個々
の換気装置、個別のオーディオ又はビデオ機器等があ
る。
Various electric devices are used to obtain a comfortable environment and to rationalize life. These electric devices serve as loads when viewed from the power source, and the loads also include a first load having an on / off control function and other control functions and a second load having an on / off control function. The first load is an air conditioner, a lighting device capable of partially lighting a plurality of lightings, and the second load is an individual lighting device, an individual ventilation device, an individual audio or video device, or the like. is there.

このように負荷にも2種類あり、これらの負荷を全て中
央で集中管理することが望まれる。この場合に、一部屋
に設けられる壁掛け空気調和機、フロアースタンド及び
加湿器等の3個の負荷を、その部屋の中央に設けた中央
制御装置から放射される赤外線で制御するものが提案さ
れている。これは中央制御装置がその位置における温
度、湿度、照度等を検知し、その検知結果に基いて空気
調和機等に制御信号を放出するものであり、特定の部屋
に設けた3個の負荷を制御するものであるが、その部屋
外から遠隔制御できない。
As described above, there are two types of loads, and it is desirable to centrally manage all of these loads. In this case, it has been proposed to control three loads such as a wall-mounted air conditioner, a floor stand and a humidifier provided in one room by infrared rays emitted from a central control device provided in the center of the room. There is. In this system, the central control unit detects the temperature, humidity, illuminance, etc. at that position and outputs a control signal to an air conditioner or the like based on the detection result. It is controlled, but it cannot be controlled remotely from the outside.

(ハ)発明の目的 本発明は、かかる背景のもとに発明されたものにして、
前記第1負荷及び第2負荷を、これらの負荷を取付ける
部屋の外から集中的に制御管理できるとともに、制御ボ
ックスに第1負荷および第2負荷の作動状態が表示さ
れ、これらの制御状態または運転状況のモニターをする
ことができ、制御ボックスと前記中継器あるいは前記コ
ンセントボックスとの間の通信機能をチェックするチェ
ック機能とを有するとともに、更に、前記チェック機能
によりエラーが検出された前記中継器あるいは前記コン
セントボックスに接続された前記複数の第1負荷あるい
は第2負荷に対しては、前記制御状態または運転状況の
モニターは行わずに、前記複数の第1負荷および第2負
荷を夫々複数の組に分割し、前記制御状態または運転状
況のモニターにおける一定時間間隔よりも長い時間間隔
で組毎に順次エラーモニターを行って、前記制御状態ま
たは運転状況のモニター動作を円滑に行いつつ、前記複
数の負荷のエラーモニター動作時間を短縮して動作効率
の良いシステムを提供することを目的とする。
(C) Purpose of the Invention The present invention has been invented under such a background,
The first load and the second load can be centrally controlled and managed from the outside of the room where these loads are installed, and the operating states of the first load and the second load are displayed on the control box, and the control state or operation of these loads can be displayed. It is possible to monitor the situation, has a check function for checking the communication function between the control box and the repeater or the outlet box, and further, the repeater or the relay in which an error is detected by the check function. With respect to the plurality of first loads or the second loads connected to the outlet box, the plurality of first loads and the plurality of second loads are not monitored, but the plurality of sets of the plurality of first loads and the plurality of second loads are set. Error in each group at a time interval longer than a fixed time interval in the control status or operating status monitor. Performing Nita, while smoothly perform monitoring operation of the control state or operating conditions, and an object thereof is to provide an operation efficient system by reducing the error monitoring operation time of the plurality of loads.

(ニ)発明の構成 かかる目的を達成するため、本発明によるシステムは、
集中管理機能を有する制御ボックスと、オンオフ制御及
びその他制御の機能を有する複数の第1負荷と、オンオ
フ制御機能を有する複数の第2負荷と、前記制御ボック
スと各第1負荷との間に介挿され、前記制御ボックスの
指令に基いて前記第1負荷を制御する中継器と、前記制
御ボックスと各第2負荷との間に介挿され、前記制御ボ
ックスの指令に基いて前記第2負荷をオンオフ制御する
コンセントボックスと、からなるものである。
(D) Configuration of the Invention In order to achieve the above object, the system according to the present invention comprises:
A control box having a centralized management function, a plurality of first loads having an on / off control function and other control functions, a plurality of second loads having an on / off control function, and an intermediary between the control box and each first load. A relay that is inserted between the control box and each second load and controls the first load based on a command from the control box, and the second load based on a command from the control box. And an outlet box that controls on and off.

また、より具体的には、前記制御ボックスは、前記第1
負荷及び第2負荷を制御する操作部と、この操作の表示
及び前記各負荷の作動状態の表示を行う表示部とを備え
てなることが望ましい。さらに前記制御ボックスは、こ
の制御ボックスと中継器あるいはコンセントボックスと
の間の通信機能をチェックするチェック機能と、前記複
数の第1負荷及び前記第2負荷のオン、オフ制御状態を
一定時間間隔で順次モニターするとともに、前記チェッ
ク機能によりエラーを検出した前記中継器或いは前記コ
ンセントボックスに接続された前記複数の第1負荷或い
は前記第2負荷に対しては、前記モニターは行わずに、
前記複数の第1負荷及び前記第2負荷を夫々複数の組に
分割し、前記一定時間間隔よりも長い時間間隔で組毎に
順次エラーモニターするモニター機能とを有するもので
ある。
Further, more specifically, the control box is the first box.
It is desirable to include an operation unit that controls the load and the second load, and a display unit that displays this operation and the operating state of each load. Further, the control box has a check function for checking a communication function between the control box and the repeater or the outlet box, and an ON / OFF control state of the plurality of first loads and the second loads at regular time intervals. While sequentially monitoring, the monitoring is not performed for the plurality of first loads or the second loads connected to the repeater or the outlet box where an error is detected by the check function,
The plurality of first loads and the plurality of second loads are each divided into a plurality of groups, and a monitor function is provided for sequentially error-monitoring each group at a time interval longer than the fixed time interval.

(ホ)実施例 本発明の一実施例を図面に基いて説明する。第1図は集
中管理システムの概略図である。この図面において、
(100)は中央制御ボックスであり、集中管理機能を有
するものである。(200)(2001)〜(200n)はオンオフ制
御及びその他制御の機能を有する第1負荷であり、実施
例では夫々空気調和装置である。(300)(3001)〜(30
0m)はオンオフ制御機能を有する第2負荷である。この
第2負荷としては、前述の如く、個々の照明器具、個々
の換気装置、個別のオーディオ又はビデオ機器等であ
り、また単にオンオフ制御機能のみを有する負荷に限ら
ず、たとえば周囲の明るさに応じて輝度を制御する照明
器具の如く、自動制御機能を内蔵した物も含まれる。
(400)(4001)〜(400n)は夫々中継器にして、制御ボッ
クス(100)と各第1負荷(200)との間に介挿され、制
御ボックス(100)の指令に基いて対応する第1負荷(2
00)を制御するものである。(500)(5001)〜(500m)は
コンセントボックスにして、制御ボックス(100)と各
第2負荷(300)との間に介挿され、制御ボックス(10
0)の指令に基いて第2負荷をオンオフ制御するもので
ある。制御ボックス(100)と各中継器(400)及び各コ
ンセントボックス(500)の間は通信路(600)にて連結
されている。この通信路として専用線を用いてもよく、
また屋内配線(電力線)を用いてもよい。
(E) Embodiment An embodiment of the present invention will be described with reference to the drawings. FIG. 1 is a schematic diagram of a centralized management system. In this drawing,
(100) is a central control box, which has a centralized management function. (200) (200 1 ) to (200 n ) are first loads having on / off control and other control functions, and are air conditioners in the embodiments. (300) (300 1 ) ~ (30
0 m ) is a second load having an on / off control function. The second load is, as described above, an individual lighting device, an individual ventilation device, an individual audio or video device, etc., and is not limited to a load having only an on / off control function, but may be, for example, the ambient brightness. It also includes an object having an automatic control function, such as a lighting device that controls the brightness accordingly.
Each of (400) (400 1 ) to (400 n ) is a repeater, and is inserted between the control box (100) and each first load (200), and based on the command of the control box (100). Corresponding first load (2
00) is controlled. (500) (500 1 ) to (500 m ) are outlet boxes, which are inserted between the control box (100) and each second load (300), and the control box (10
The second load is on / off controlled based on the command (0). A communication path (600) connects the control box (100) to the relays (400) and the outlet boxes (500). A dedicated line may be used as this communication path,
Alternatively, indoor wiring (power line) may be used.

次に制御ボックス(100)は第2図に示すブロック図か
ら明らかな如く、制御部(120)と、その入力操作部で
あるキーマトリクス(121)と、プログラマブル・タイ
マー(122)と、記憶部(123)と、そのバッテリーバッ
クアップ回路(124)と、制御部(120)の入出力を司さ
どる遠隔制御用IC(125)と、インターフェース回路(1
26)と、キーマトリクス(121)の操作指令内容及び各
負荷の運転状況を表示する表示部(127)とからなる。
Next, as is apparent from the block diagram shown in FIG. 2, the control box (100) has a control section (120), a key matrix (121) which is an input operation section thereof, a programmable timer (122), and a storage section. (123), its battery backup circuit (124), remote control IC (125) that controls the input / output of the control unit (120), and interface circuit (1
26) and a display section (127) for displaying the operation command contents of the key matrix (121) and the operating status of each load.

また制御ボックス(100)のパネル(128)の正面図を第
3図に示す。この図面において、(129)は第1負荷ブ
ロック(130)と第2負荷ブロック(131)のブロックを
切換える切換スイッチである。第1負荷ブロック(13
0)は具体的には3個の第1負荷(2001)〜(2003)を制御
するであり、第2負荷ブロック(131)は16個の第2負
荷(3001)〜(30016)を制御するものである。第1負荷ブ
ロック(130)には、夫々チャンネルランプ(132)を有
するチャンネルキー(133)と、「運転中」の表示ラン
プ(134)と、空気調和装置のフィルターの汚れ状況を
表示する「フィルターサイン」の表示ランプ(135)と
がある。第2負荷ブロック(131)には、チャンネルラ
ンプ(136)を有するチャンネルキー(137)と、「運転
中」の表示ランプ(138)を、第2負荷(3001)〜(30016)
の器具名を書く「接続器具」の書き込み欄(139)とが
ある。(140)はオールチャンネルキーにして、一方の
ブロックの全てのチャンネルキー(133)又は(137)を
押す代りに押されるものである。(141)は表示内容変
更キー欄で、上から順に、自動運転設定用の自動キー
(142)、運転切換キー(143)、タイマー切換キー(14
4)、設定温度の上るキー(145)と下るキー(146)、
タイマー設定キー(147)、風速切換キー(148)が設け
られている。(149)は表示欄にして、各キーに対応し
た表示が図示の如くできるようになっている。尚室温表
示(150)は第1負荷(200)が取付けられている部屋の
室温の表示である。(151)は表示内容変更キー欄(14
1)のいずれかのキーが押されると、高速点滅する「設
定中」の表示ランプで、設定完了キー(152)の押圧を
促す。またパネル(128)には、運転キー(153)、停止
キー(154)及びクリアーキー(155)が設けられてい
る。
A front view of the panel (128) of the control box (100) is shown in FIG. In this figure, reference numeral (129) is a changeover switch for switching the first load block (130) and the second load block (131). 1st load block (13
0) specifically controls the three first loads (200 1 ) to (200 3 ), and the second load block (131) includes 16 second loads (300 1 ) to (300 16 ). ) Is controlled. The first load block (130) has a channel key (133) each having a channel lamp (132), an "in operation" display lamp (134), and a "filter" for displaying the dirt condition of the filter of the air conditioner. There is a sign display lamp (135). The second load block (131) is provided with a channel key (137) having a channel lamp (136) and an "in operation" display lamp (138), and a second load (300 1 ) to (300 16 ).
There is a writing field (139) for "connecting device" for writing the device name. (140) is an all channel key which is pressed instead of pressing all channel keys (133) or (137) of one block. (141) is a display content change key column, and in order from the top, the automatic key (142) for automatic operation setting, the operation switching key (143), and the timer switching key (14
4), Set temperature up key (145) and down key (146),
A timer setting key (147) and a wind speed switching key (148) are provided. (149) is a display field, and a display corresponding to each key can be performed as shown in the figure. The room temperature indication (150) is an indication of the room temperature of the room where the first load (200) is attached. (151) is the display content change key column (14
When any one of the keys 1) is pressed, a "setting in progress" indicator lamp that flashes at high speed prompts the setting completion key (152) to be pressed. The panel (128) is also provided with an operation key (153), a stop key (154) and a clear key (155).

上記各キー及び切換スイッチ(129)は操作部(156)を
構成し、表示欄(149)及び各ランプは表示部(127)を
構成する。
The respective keys and the changeover switch (129) form an operation unit (156), and the display column (149) and each lamp form a display unit (127).

次に第4図に中継器のブロック図を示す。中継器(40
0)はインターフェース回路(401)、遠隔制御用IC(40
2)、チャンネル設定回路(403)及び制御部(404)か
らなり、第1負荷(200)の入力部(201)及び表示部
(202)を介して負荷本体(203)と信号を送受する。
(405)は設置テスト部である。
Next, FIG. 4 shows a block diagram of the repeater. Repeater (40
0) is the interface circuit (401) and remote control IC (40
2) consists of a channel setting circuit (403) and a control unit (404), and sends and receives signals to and from the load body (203) via the input unit (201) and display unit (202) of the first load (200).
(405) is an installation test unit.

第5図はコンセントボックスのブロック図であり、コン
セントボックス(500)は、インターフェース回路(50
1)、遠隔制御用IC(502)、電流検出回路(503)、チ
ャンネル設定回路(504)、電力線の壁コンセントに挿
入される差込プラグ(505)、このプラグに電源線(50
6)を介して接続されるソケット(507)及び電源線(50
6)に設けられ、遠隔制御用IC(502)により開閉制御さ
れるスイッチ回路(508)からなる。
FIG. 5 is a block diagram of the outlet box, where the outlet box (500) is an interface circuit (50).
1), remote control IC (502), current detection circuit (503), channel setting circuit (504), plug plug (505) inserted into the wall outlet of the power line, power line (50
6) Socket (507) and power line (50) connected via
The switch circuit (508) is provided in (6) and is controlled to open / close by the remote control IC (502).

尚中継器(400)及びコンセントボックス(500)の各チ
ャンネル設定回路(403)(504)は各負荷に対応したチ
ャンネル信号を設定するものであり、夫々インターフェ
ース回路(401)(501)から入ってくる制御ボックス
(100)からのチャンネル信号が特定の負荷用のチャン
ネル信号と一致するか否かを遠隔制御用IC(402)(50
2)内で判定し、一致するとき、制御ボックス(100)か
らの指令により、制御又は運転状況のモニターをする。
Each channel setting circuit (403) (504) of the repeater (400) and the outlet box (500) sets a channel signal corresponding to each load, and is input from the interface circuits (401) (501) respectively. The remote control IC (402) (50) determines whether the channel signal from the incoming control box (100) matches the channel signal for a specific load.
If it is judged in 2) and they match, the control or operation status is monitored by a command from the control box (100).

以上の構成における作動を説明する。The operation of the above configuration will be described.

第2図の制御ボックス(100)において、制御部(120)
は常時キーマトリクス(121)をスキャンしており、キ
ーが押されると、入力キーに対応して、入力内容が表示
部(127)に表示される。特定の負荷(200)または(30
0)との通信が必要なときは、遠隔制御用IC(125)に、
その負荷に対応したチャンネル指定部とコマンドからな
る送信データを送り、スタート信号(157)を出す。遠
隔制御用IC(125)はスタート信号(157)を受けて、送
信データをインターフェース回路(126)を介して、通
信路(600)上に送出する。遠隔制御用IC(125)が通信
路(126)からなんらかの信号を受信すると、受信信号
(158)を出し、制御部(120)はその受信信号を受け
て、受信データを解析し、正しいデータであれば表示部
(127)にそのデータを表示する。
In the control box (100) of FIG. 2, the control unit (120)
Always scans the key matrix (121), and when a key is pressed, the input content is displayed on the display unit (127) in correspondence with the input key. Specific load (200) or (30
When communication with 0) is required, the remote control IC (125)
Transmission data including a channel designation section and a command corresponding to the load is sent, and a start signal (157) is issued. The remote control IC (125) receives the start signal (157) and sends the transmission data to the communication path (600) via the interface circuit (126). When the remote control IC (125) receives any signal from the communication path (126), it outputs a reception signal (158), and the control unit (120) receives the reception signal and analyzes the reception data to obtain correct data. If there is, the data is displayed on the display unit (127).

より具体的に詳述すると、切換スイッチ(129)により
制御対象を第1負荷ブロック(130)と第2負荷ブロッ
ク(131)との間で切換える。それまで第1負荷(200)
のいずれかの運転内容を表示欄(149)に表示していて
も、切換スイッチ(129)の切換えにより、その表示を
消し、初期状態即ちチャンネルキー入力待ち状態とな
る。切換スイッチ(129)が第1負荷ブロック(130)側
に切換えられたとする。この状態で、たとえばチャンネ
ル番号1のチャンネルキー(133)が押されたとする
と、そのキーのチャンネルランプ(132)が低速点滅
し、対応する中継器(400)を介して第1負荷(2001)と
通信を行い、この負荷の運転状況及び各種設定内容を表
示欄(149)に表示する。即ち負荷の内容モニター状態
となる。この状態で、チャンネル番号2のチャンネルキ
ー(133)が押されると、チャンネル番号1のチャンネ
ルランプ(132)は低速点滅から点灯状態に変り、チャ
ンネル番号2の第1負荷(2002)の内容モニター状態が表
示欄(149)に表示される。またこのチャンネル2のチ
ャンネルランプ(132)が低速点滅してモニター状態で
あることを表示する。また第1負荷ブロック(130)側
に切換スイッチ(129)が切換えられた状態において、
オールチャンネルキー(140)が押されるときには、チ
ャンネル番号1の内容モニターを行い、チャンネル番号
1のチャンネルランプ(132)のみが低速点滅状態にな
り、チャンネル番号2と3のチャンネルランプは点灯状
態になる。
More specifically, the changeover switch (129) switches the controlled object between the first load block (130) and the second load block (131). Until then, the first load (200)
Even if any one of the operation contents is displayed in the display column (149), the display is erased by switching the changeover switch (129), and the initial state, that is, the channel key input waiting state is entered. It is assumed that the changeover switch (129) is changed over to the first load block (130) side. If, for example, the channel key (133) of channel number 1 is pressed in this state, the channel lamp (132) of that key blinks at a low speed, and the first load (200 1 ) passes through the corresponding repeater (400). The load status and various setting contents are displayed in the display field (149). That is, the load content is monitored. In this state, if the channel key (133) of channel number 2 is pressed, the channel lamp (132) of channel number 1 will change from slow flashing to lit state, and the contents monitor of the first load (200 2 ) of channel number 2 will be displayed. The status is displayed in the display field (149). Further, the channel lamp (132) of this channel 2 blinks at a low speed to indicate that it is in the monitor state. Further, in the state where the changeover switch (129) is changed over to the first load block (130) side,
When the all channel key (140) is pressed, the contents of channel number 1 are monitored, only the channel lamp (132) of channel number 1 is flashing slowly, and the channel lamps of channel numbers 2 and 3 are lit. .

第1負荷ブロック(130)のチャンネル番号1の内容モ
ニター状態において、表示内容変更キー欄(141)のい
ずれかのキーが押されると、対応する表示内容を変更す
ると共に設定中ランプ(151)を高速点滅させ、使用者
に設定完了キー(152)を押すように促す。この設定完
了キーが押されると、その設定内容を送信信号により第
1負荷(2001)に伝えられ、この第1負荷(2001)を制御
し、その後はこの第1負荷の内容モニター状態となる。
When any key of the display content change key column (141) is pressed in the content monitor state of the channel number 1 of the first load block (130), the corresponding display content is changed and the setting lamp (151) is turned on. Flashes at high speed and prompts the user to press the setting completion key (152). When this setting completion key is pressed, the setting contents are transmitted to the first load (200 1 ) by a transmission signal, the first load (200 1 ) is controlled, and thereafter, the contents monitoring state of the first load is displayed. Become.

これに対し、切換スイッチ(129)が第1負荷ブロック
(130)側に切換っており、オールチャンネルキー(14
0)が押されているときには、前述の如くチャンネル番
号1の内容モニター状態にあり、ここで表示内容変更キ
ー欄(141)のいずれかのキーが押され、その後設定完
了キー(152)が押されると、第1負荷(2001)と通信を
行なって、設定内容を第1負荷(2001)に送信してその第
1負荷(2001)を制御し、その後再度第1負荷(2001)の内
容モニタを行ない使用者に設定内容の確認ができるよう
にする。その後数秒後に、チャンネル番号1のチャンネ
ルランプ(132)及び表示欄の表示内容を消し、チャン
ネル番号1の設定内容が、そのまま次のチャンネル番号
に対応する第1負荷(2002)にも送信されて、この負荷を
制御する。同様にチャンネル番号3の第1負荷(2003)を
も制御する。この場合に、チャンネル番号1のチャンネ
ルランプ(132)は指令後消灯し、次にチャンネル番号
2のチャンネルランプ(132)が低速点滅から指令後に
消灯する。最後のチャンネル番号即ち3のチャンネルラ
ンプ(132)は、指令後であっても、消灯せず、低速点
滅状態のままでありこのチャンネルの第1負荷(2003)の
内容モニター状態になる。内容モニター中で表示内容変
更キー欄(141)のいずれのキーも押されていないとき
に、運転キー(153)もしくは停止キー(154)が押され
ると、設定完了キー(152)の押圧時と同様に、順次各
負荷への指令と各負荷の内容モニターを繰返す。
On the other hand, the changeover switch (129) is changed over to the first load block (130) side, and the all channel key (14
When (0) is pressed, the contents are being monitored for channel number 1 as described above, and any key in the display contents change key column (141) is pressed here, and then the setting completion key (152) is pressed. are the, by performing communication with the first load (200 1), and controls the first load (200 1) was sent to it a first load (200 1) setting, first load thereafter again (200 1 ) Monitor the contents so that the user can check the settings. A few seconds later, the channel lamp (132) of channel number 1 and the display contents of the display column are turned off, and the setting content of channel number 1 is sent to the first load (200 2 ) corresponding to the next channel number as it is. , Control this load. Similarly, the first load (200 3 ) of channel number 3 is also controlled. In this case, the channel lamp (132) of the channel number 1 is turned off after the command, and then the channel lamp (132) of the channel number 2 is turned off after the command after the low speed blinking. The channel lamp (132) of the last channel number, that is, 3 does not turn off even after the command is issued and remains in the low speed blinking state, and the state of monitoring the contents of the first load (200 3 ) of this channel is set. If none of the display content change key fields (141) in the content monitor are pressed, and the operation key (153) or stop key (154) is pressed, the setting completion key (152) will be pressed. Similarly, the command to each load and the content monitor of each load are repeated in sequence.

通信路(600)上にのる雑音等の影響で、制御ボックス
(100)と各第1負荷(200)または各第2負荷(300)
との間の通信ができないことがあり得るので、内容モニ
ター及び設定変更等の通信時に、制御ボックス(100)
から何らかの信号、たとえば運転キー(153)の押圧に
よる運転信号を送信するときには、必ずその信号に応答
する信号即ちアンサーバックを受信することを原則と
し、送信後一定時間内にアンサーバックを受信しないと
き、又は受信データが誤っている時は、再度送信し、受
信待ちとなる。数度たとえば3回送信しても正しいアン
サーバックを受信できないときは、通信エラーとして該
当するチャンネルランプ(132)又は(136)を高速点滅
し、以後クリアーキー(155)が押される迄の間、運転
キー(153)、停止キー(154)あるいは設定完了キー
(152)が押されても、当該チャンネルとの通信を行な
わない。
Control box (100) and each first load (200) or each second load (300) under the influence of noise on the communication path (600)
It may not be possible to communicate with the control box (100) at the time of communication such as content monitoring and setting changes.
In principle, when sending any signal from, for example, a driving signal by pressing the driving key (153), always receive a signal that responds to that signal, that is, an answerback, when an answerback is not received within a certain time after the transmission. Or, if the received data is incorrect, it is retransmitted and waits for reception. If the correct answerback cannot be received even if it is transmitted several times, for example, three times, the channel lamp (132) or (136) is flashed at high speed as a communication error, and thereafter, until the clear key (155) is pressed, Even if the operation key (153), stop key (154) or setting completion key (152) is pressed, communication with the channel is not performed.

以上説明した動作の流れを図示すると、第6図に示すも
のとなる。これまで主として第1負荷(200)に対する
内容モニター及び指令についてその動作を説明したが、
この図から明らかな如く第2負荷(300)に対しても、
同様に内容モニターに代るオンオフモニターと運転ある
いは停止の指令を行なうことができる。ただ第2負荷
(300)に対しては、第6図において、表示「表示内容
変更キー」から「設定完了キー」に至る流れが存在しな
い点で、第1負荷(200)に対するものと異なる。
The flow of the operation described above is shown in FIG. Up to now, the operation has been explained mainly regarding the content monitor and the command for the first load (200),
As is clear from this figure, even for the second load (300),
Similarly, an on / off monitor instead of the content monitor and a command to start or stop can be issued. However, the second load (300) differs from the first load (200) in that there is no flow from the display "display content change key" to the "setting completion key" in FIG.

而して、キー入力のないとき、プログラマブルタイマー
(122)からの割込みにより、定期的たとえば1分毎
に、自動的にモニターを行なう。即ちブロック切換スイ
ッチ(129)の切換えに関係なく、全ての中継器(400)
及びコンセントボックス(500)と順次通信を行ない、
第1負荷(200)及び第2負荷(300)のオンオフ状態を
調べ、運転中ランプ(134)又は(138)の表示をする。
この場合に第1負荷(200)のどれか(2001)〜(2003)の
運転状態、たとえば室温、タイマー時間等に変化があれ
ば、内容モニターによりパネル(128)の表示内容を最
新のものに変える。
Thus, when there is no key input, an interrupt from the programmable timer (122) automatically monitors periodically, for example, every minute. That is, regardless of the changeover of the block changeover switch (129), all the repeaters (400)
And communicate with the outlet box (500) in sequence,
The on / off state of the first load (200) and the second load (300) is checked, and the operating lamp (134) or (138) is displayed.
In this case, if there is a change in the operating condition of any of the first loads (200) (200 1 ) to (200 3 ), such as room temperature and timer time, the contents displayed on the panel (128) will be updated to the latest contents. Change into something.

このオンオフモニター中に通信エラーとなる場合に、該
当するチャンネルの負荷が存在しないことが考えられる
ので、このチャンネルに対しては以後一定時間、たとえ
ばプログラマブルタイマー(122)から1時間毎に割込
みをかけるようにし、この割込みがかかる迄の期間内
は、該当するチャンネルに対してオンオフモニターを行
なわない。第1負荷(200)及び第2負荷(300)の接続
可能台数を多くした場合には、一定時間後にオンオフモ
ニターを再開するとき、通信エラーとなった全てのチャ
ネルに対して再開するのではなく、そのチャンネルをい
くつかの組に分け、組毎に再開していく。即ち組毎に再
開する時点をずらす。
When a communication error occurs during this on / off monitoring, it is considered that the load of the corresponding channel does not exist. Therefore, an interrupt is applied to this channel for a fixed time thereafter, for example, from the programmable timer (122) every hour. In this way, on / off monitoring is not performed for the corresponding channel until the interruption occurs. When the connectable number of the first load (200) and the second load (300) is increased, when restarting the on / off monitor after a certain time, it is not restarted for all channels in which a communication error occurs. , The channel is divided into several groups and each group restarts. That is, the time to restart each group is shifted.

以上のように、前記エラーモニター動作は、通信エラー
となったチャネルをいくつかの組に分け、組毎に、前記
オンオフモニター動作のサイクルとは別のサイクルでし
かもオンオフモニター動作のサイクルタイム(一定時間
間隔)より長いサイクルタイム(一定時間間隔)で、モ
ニターを行うので、前記オンオフモニター動作に影響を
与える(前記オンオフモニター動作を阻害する)ことな
く、エラーモニターに要する時間が短縮され、システム
の処理効率が向上する。
As described above, in the error monitor operation, the channel in which the communication error occurs is divided into some groups, and the cycle time of the on / off monitor operation (constant) is different from the cycle of the on / off monitor operation for each group. Since the monitoring is performed with a cycle time (constant time interval) longer than the time interval), the time required for error monitoring can be shortened without affecting the on / off monitor operation (impeding the on / off monitor operation). The processing efficiency is improved.

オンオフモニター中にキー入力があると、オンオフモニ
ターを中断し、この中断したチャンネル番号を記憶部
(123)に書き込み、キー入力に対する処理を行なった
後、記憶部(123)から中断したチャンネル番号を読み
出し、オンオフモニターを継続する。
If there is a key input during on / off monitoring, the on / off monitoring is interrupted, the interrupted channel number is written to the memory (123), the key input is processed, and then the interrupted channel number is recorded from the memory (123). Continue reading and on / off monitoring.

第7図にオンオフモニターの動作の流れ図を示す。この
図の最下段の「リターン」は、第6図のいずれかの表示
「キー入力待ち」に動作が戻ることを示す。
FIG. 7 shows a flow chart of the operation of the on / off monitor. "Return" at the bottom of the figure indicates that the operation returns to any of the displays "waiting for key input" in FIG.

第1負荷(200)又は第2負荷(300)の負荷によって
は、負荷本体にタイマー機能を有しない物があり、これ
に対応するため、制御ボックス(100)に設けた時計機
能により、タイマー機能を有しない負荷のオン時刻及び
オフ時刻を設定できるようにすることもできる。この場
合に、キー入力により、それぞれのチャンネルのオン時
刻及びオフ時刻が設定されると、その設定時刻を記憶部
(123)に記憶しておく。プログラマブルタイマー(12
2)から1分毎に割込みを受けると、制御部(120)は表
示部(127)に設けられる時計表示をインクリメント
し、記憶部(123)から読み出したオン時刻及びオフ時
刻と比較してオンオフの状態を変化させるべきチャンネ
ルがあれば、該当する中継器(400)又はコンセントボ
ックス(500)と通信を行ない、負荷のオン又はオフの
制御を行なう。
Depending on the load of the first load (200) or the second load (300), some load bodies do not have a timer function. To cope with this, a timer function is provided by the clock function provided in the control box (100). It is also possible to set the on-time and off-time of a load that does not have the. In this case, when the on time and off time of each channel are set by key input, the set time is stored in the storage unit (123). Programmable timer (12
When the interrupt is received every 1 minute from 2), the control unit (120) increments the clock display provided on the display unit (127) and compares it with the on time and off time read from the storage unit (123) to turn on and off. If there is a channel whose state is to be changed, communication is performed with the corresponding repeater (400) or outlet box (500) to control the load on or off.

いずれかの負荷に異常事態が発生したとき、たとえば負
荷の保護装置が作動したとき、内容モニター及びオンオ
フモニターに対するアンサーバックとして、異常発生の
信号を受信し、該当するチャンネルの運転中ランプ(13
2)又は(136)を高速点滅することにより、使用者に異
常発生を知らせる。
When an abnormal condition occurs in any of the loads, for example, when the load protection device is activated, an abnormal occurrence signal is received as an answerback to the content monitor and the on / off monitor, and the running lamp (13
2) or (136) blinks at high speed to notify the user of the occurrence of an abnormality.

而して、第4図に戻って、中継器(400)の作動を説明
する。通信路(600)からインターフェース回路(401)
を介して制御ボックス(100)からの送信信号を受信す
ると、遠隔制御用IC(402)は受信データのチャンネル
指定部とチャンネル設定回路(403)のデータを比較
し、一致すると、受信信号(406)を制御部(404)に送
る。制御部(404)は受信信号(406)により、受信デー
タのコマンド部を解読する。コマンド内容が、内容モニ
ターあるいはオンオフモニター命令であれば、対応する
1つの第1負荷(200)の表示部(202)から表示データ
(407)を取り込み、必要なデータを送信データに変換
して、遠隔制御用IC(402)へ送り、スタート信号(40
8)を出す。コマンド内容が内容モニター及びオンオフ
モニター以外の命令であれば、その命令に従って第1負
荷(200)の入力部(201)へ設定信号(409)を出し、
その後この負荷の表示部(202)から取り込んだデータ
を送信データに変換し、遠隔制御用IC(402)へスター
ト信号(408)を出す。このICはスタート信号(408)に
より送信データをアンサーバックとしてインターフェー
ス回路(401)から通信路(600)を介して制御ボックス
(100)に送出する。
Then, returning to FIG. 4, the operation of the repeater (400) will be described. Communication circuit (600) to interface circuit (401)
When the transmission signal from the control box (100) is received via the remote control IC (402), the remote control IC (402) compares the channel designation section of the reception data with the data of the channel setting circuit (403). ) Is sent to the control unit (404). The control section (404) decodes the command section of the reception data by the reception signal (406). If the command content is a content monitor or an on / off monitor command, the display data (407) is fetched from the corresponding display unit (202) of the first load (200), and the necessary data is converted into transmission data, Send to remote control IC (402), start signal (40
8) Issue. If the command content is an instruction other than content monitor and on / off monitor, a setting signal (409) is issued to the input section (201) of the first load (200) according to the instruction,
After that, the data taken in from the display section (202) of this load is converted into transmission data, and a start signal (408) is sent to the remote control IC (402). This IC sends the transmission data as an answer back from the interface circuit (401) to the control box (100) via the communication path (600) by the start signal (408).

第5図のコンセントボックス(500)の作動を、同様に
説明すると、通信路(600)からインターフェース回路
(501)を通して信号を受信すると、遠隔制御用IC(50
2)は受信データのチャンネル指定部とチャンネル設定
回路(504)のデータとを比較し、一致すれば、コマン
ド内容に従ってスイッチ回路(508)の制御を行ない、
電流検出回路(503)からの出力に基き判定した1つの
対応する第2負荷(300)のオンオフ状態をインターフ
ェース回路(501)を通して通信路(600)へ送出する。
The operation of the outlet box (500) of FIG. 5 will be described in the same manner. When a signal is received from the communication path (600) through the interface circuit (501), the remote control IC (50
2) compares the channel designation section of the received data with the data of the channel setting circuit (504), and if they match, controls the switch circuit (508) according to the command contents,
The on / off state of one corresponding second load (300) determined based on the output from the current detection circuit (503) is sent to the communication path (600) through the interface circuit (501).

而して、制御ボックス(100)及び各中継器(400)は自
己診断機能を有している。即ち、制御ボックス(100)
は各種のキー及び表示ランプなどの機能が正常に動作す
るか否か、又各中継器(400)又は各コンセントボック
ス(500)と通信できるか否かのチェック機能を有し、
各中継器(400)は設置テスト部(405)の操作により、
対応する負荷(200)の設定内容を変更できるか否か、
又この負荷(200)の表示データを受取ることができる
か否かのチェック機能を有する。
Thus, the control box (100) and each repeater (400) have a self-diagnosis function. That is, the control box (100)
Has a function to check whether the functions of various keys and indicators work normally, and whether it can communicate with each repeater (400) or each outlet box (500).
Each repeater (400) is operated by the installation test unit (405).
Whether the setting contents of the corresponding load (200) can be changed,
It also has a function of checking whether the display data of this load (200) can be received.

(ヘ)発明の効果 従って、上述の構成により、第1負荷及び第2負荷を外
部から集中的に制御管理することができると共に前記第
2負荷については、全く負荷側を変更することなく、オ
ンオフ制御を行うことを可能とすることがができ、制御
ボックスに第1負荷および第2負荷の作動状態が表示さ
れ、これらの制御状態または運転状況のモニターをする
ことができ、制御ボックスと前記中継器あるいは前記コ
ンセントボックスとの間の通信機能をチェックするチェ
ック機能とを有するので、通信路上にのる雑音等の影響
で制御ボックスと各第1負荷または第2負荷との間の通
信に障害があっても、これら負荷の制御および前記モニ
ターの動作を誤りなく確実に行うことができ、システム
全体の信頼性を向上することができるとともに、更に、
前記チェック機能によりエラーが検出された前記中継器
あるいは前記コンセントボックスに接続された前記複数
の第1負荷あるいは第2負荷に対しては、前記制御状態
または運転状況のモニターは行わずに、前記複数の第1
負荷および第2負荷を夫々複数の組に分割し、前記制御
状態または運転状況のモニターにおける一定時間間隔よ
りも長い時間間隔で組毎に順次エラーモニターを行うの
で、前記制御状態または運転状況のモニター動作を円滑
に行いつつ、前記複数の負荷のエラーモニター動作時間
を(1つづつ順次モニターするのと比べて)短縮し、シ
ステムの動作効率を向上することができる。
(F) Effects of the Invention Therefore, with the above-described configuration, the first load and the second load can be centrally controlled and controlled from the outside, and the second load is turned on and off without changing the load side at all. It is possible to perform control, the operating state of the first load and the second load is displayed on the control box, and the control state or operating status of these can be monitored, and the control box and the relay Since it has a check function for checking the communication function between the control box and the outlet box, the communication between the control box and each of the first load or the second load may be disturbed by the influence of noise on the communication path. Even if there is, the control of these loads and the operation of the monitor can be reliably performed without error, and the reliability of the entire system can be improved.
For the plurality of first loads or second loads connected to the repeater or the outlet box in which an error is detected by the check function, the plurality of first loads or the second loads are not monitored but the control state or the operation state is not monitored. First of
The load and the second load are each divided into a plurality of groups, and error monitoring is sequentially performed for each group at a time interval longer than a fixed time interval in the control status or operating status monitoring. Therefore, the control status or operating status monitoring is performed. While performing the operation smoothly, it is possible to shorten the error monitoring operation time of the plurality of loads (compared to sequentially monitoring one by one) and improve the operation efficiency of the system.

【図面の簡単な説明】[Brief description of drawings]

図面は本発明による集中管理システムの一実施例を示
し、第1図はシステムの概略図、第2図は制御ボックス
のブロック図、第3図は制御ボックスのパネルの正面
図、第4図は中継器のブロック図、第5図はコンセント
ボックスのブロック図、第6図は制御ボックスの動作流
れ図、第7図はオンオフモニターの動作流れ図である。 (100)…制御ボックス、(200)(2001)〜(200n)…第1
負荷、(300)(3001)〜(300m)…第2負荷、(400)(400
1)〜(400n)…中継器、(500)(5001)〜(500m)…コンセ
ントボックス、(156)…操作部、(127)…表示部。
The drawings show an embodiment of a centralized management system according to the present invention. FIG. 1 is a schematic view of the system, FIG. 2 is a block diagram of a control box, FIG. 3 is a front view of a panel of the control box, and FIG. FIG. 5 is a block diagram of the repeater, FIG. 5 is a block diagram of the outlet box, FIG. 6 is an operation flowchart of the control box, and FIG. 7 is an operation flowchart of the on / off monitor. (100) ... Control box, (200) (200 1 ) to (200 n ) ... 1st
Load, (300) (300 1 ) ~ (300 m ) ... 2nd load, (400) (400
1 ) to (400 n ) ... Repeater, (500) (500 1 ) to (500 m ) ... Outlet box, (156)… Operation part, (127)… Display part.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 森 憲敬 大阪府守口市京阪本通2丁目18番地 三洋 電機株式会社内 (72)発明者 松本 一則 群馬県邑楽郡大泉町大字坂田180番地 東 京三洋電機株式会社内 (72)発明者 皆川 克正 群馬県邑楽郡大泉町大字坂田180番地 東 京三洋電機株式会社内 (56)参考文献 特開 昭56−139036(JP,A) 特開 昭53−113980(JP,A) 特開 昭59−95750(JP,A) 特開 昭57−39(JP,A) 実開 昭56−163378(JP,U) ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Noritaka Mori 2-18 Keihan Hondori, Moriguchi City, Osaka Prefecture Sanyo Electric Co., Ltd. (72) Inventor Kazunori Matsumoto 180 Sakata, Oizumi Town, Gunma Prefecture Tokyo Sanyo Denki Co., Ltd. (72) Inventor Katsumasa Minagawa 180 Sakata, Oizumi-cho, Gunma Prefecture Oozumi-cho, Tokyo Kyoyo Sanyo Denki Co., Ltd. (56) Reference JP 56-139036 (JP, A) JP 53 -113980 (JP, A) JP-A-59-95750 (JP, A) JP-A-57-39 (JP, A) Actually developed JP-A-56-163378 (JP, U)

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】集中管理機能を有する制御ボックスと、オ
ンオフ制御及びその他制御の機能を有する複数の第1負
荷と、オンオフ制御機能を有する複数の第2負荷と、前
記制御ボックスと各第1負荷との間に介挿され、前記制
御ボックスの指令に基いて前記第1負荷を制御する中継
器と、前記制御ボックスと各第2負荷との間に介挿さ
れ、前記制御ボックスの指令に基いて前記第2負荷をオ
ンオフ制御するコンセントボックスとからなる集中管理
システムにおいて、前記制御ボックスは、前記第1負荷
及び前記第2負荷を制御する操作部と、この操作の表示
及び前記第1負荷及び前記第2負荷の作動状態の表示を
行なう表示部と、前記制御ボックスと前記中継器或いは
前記コンセントボックスとの間の通信機能をチェックす
るチェック機能と、前記複数の第1負荷及び前記第2負
荷のオン、オフ制御状態を一定時間間隔で順次モニター
するとともに、前記チェック機能によりエラーを検出し
た前記中継器或いは前記コンセントボックスに接続され
た前記複数の第1負荷或いは前記第2負荷に対しては、
前記モニターは行わずに、前記複数の第1負荷及び前記
第2負荷を夫々複数の組に分割し、前記一定時間間隔よ
りも長い時間間隔で組毎に順次エラーモニターするモニ
ター機能とを有することを特徴とする集中管理システ
ム。
1. A control box having a centralized management function, a plurality of first loads having an on / off control function and other control functions, a plurality of second loads having an on / off control function, the control box and each first load. And a relay for controlling the first load based on a command from the control box, and a relay that is interposed between the control box and each second load, and based on a command from the control box. In a centralized management system including an outlet box that controls on / off of the second load, the control box includes an operation unit that controls the first load and the second load, a display of the operation, and the first load and A display unit for displaying the operating state of the second load, and a check function for checking the communication function between the control box and the repeater or the outlet box, The ON / OFF control states of the plurality of first loads and the second load are sequentially monitored at regular time intervals, and the plurality of first loads connected to the repeater or the outlet box in which an error is detected by the check function. For one load or the second load,
A monitor function for dividing the plurality of first loads and the plurality of second loads into a plurality of groups without performing the monitoring and sequentially performing error monitoring for each group at a time interval longer than the constant time interval. Centralized management system characterized by.
JP59043584A 1984-03-06 1984-03-06 Central management system Expired - Lifetime JPH0716267B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP59043584A JPH0716267B2 (en) 1984-03-06 1984-03-06 Central management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP59043584A JPH0716267B2 (en) 1984-03-06 1984-03-06 Central management system

Publications (2)

Publication Number Publication Date
JPS60187198A JPS60187198A (en) 1985-09-24
JPH0716267B2 true JPH0716267B2 (en) 1995-02-22

Family

ID=12667825

Family Applications (1)

Application Number Title Priority Date Filing Date
JP59043584A Expired - Lifetime JPH0716267B2 (en) 1984-03-06 1984-03-06 Central management system

Country Status (1)

Country Link
JP (1) JPH0716267B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60251404A (en) * 1984-05-28 1985-12-12 Sanyo Electric Co Ltd Centralized control device
JP2786349B2 (en) * 1991-08-09 1998-08-13 シャープ株式会社 Home bus system
KR100629345B1 (en) * 2005-02-24 2006-09-29 엘지전자 주식회사 Multi-Air Conditioner central control system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56139036A (en) * 1980-03-31 1981-10-30 Matsushita Electric Works Ltd Indoor load control device

Also Published As

Publication number Publication date
JPS60187198A (en) 1985-09-24

Similar Documents

Publication Publication Date Title
JP2799809B2 (en) Air conditioning management system
JPS62269596A (en) Remote operation panel
WO2021060233A1 (en) Home electrical appliance system, control method, and control program
KR20010017425A (en) Apparatus and method for controlling home appliances
JPH0716267B2 (en) Central management system
JPH0550900B2 (en)
JPH04101598A (en) Centralized control system
JPH0565775B2 (en)
JPH0211075B2 (en)
JP2666993B2 (en) Inspection method for serial line of air conditioner
JP3717126B2 (en) Lighting control system
JP3121482B2 (en) Air conditioner with self-diagnosis display
JPH0137658B2 (en)
JP2783098B2 (en) Remote control system
JPH0740915Y2 (en) Air conditioner
JPS62102051A (en) Centralized control device for air-conditioning machine
JP3236909B2 (en) Display control device
JPH04263736A (en) Air conditioning system
JP3430675B2 (en) Fire receiver with automatic registration of disaster prevention terminals
JPH1183131A (en) Air conditioner system
JPH02146448A (en) Inspection method for air conditioner
JP2000105881A (en) Emergency receiver of automatic fire alarm system
JPH0142198B2 (en)
JPH0228778B2 (en)
JPH05322286A (en) Air conditioner

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term