JPH07127376A - Branch shield driving method - Google Patents

Branch shield driving method

Info

Publication number
JPH07127376A
JPH07127376A JP30094193A JP30094193A JPH07127376A JP H07127376 A JPH07127376 A JP H07127376A JP 30094193 A JP30094193 A JP 30094193A JP 30094193 A JP30094193 A JP 30094193A JP H07127376 A JPH07127376 A JP H07127376A
Authority
JP
Japan
Prior art keywords
window hole
segment ring
shield machine
branch
inner segment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP30094193A
Other languages
Japanese (ja)
Other versions
JP3031596B2 (en
Inventor
Toshimi Nakajima
利美 中島
Toru Watanabe
徹 渡辺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nishimatsu Construction Co Ltd
Original Assignee
Nishimatsu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nishimatsu Construction Co Ltd filed Critical Nishimatsu Construction Co Ltd
Priority to JP5300941A priority Critical patent/JP3031596B2/en
Publication of JPH07127376A publication Critical patent/JPH07127376A/en
Application granted granted Critical
Publication of JP3031596B2 publication Critical patent/JP3031596B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

PURPOSE:To enhance safety and reduce a construction period by bringing a branch shield machine into an inner segment ring and closing a second window hole from inside by turning and jacking up the shield machine in alignment with the first and second window holes. CONSTITUTION:An outer segment ring 10 and an inner segment ring 20 which is housed in such a fashion that it may turn about its axis, are build-up in double structure. In this case, a first window hole 11 and a second window hole 21 are installed to the inner segment 10 and the outer ring segment 20 respectively. The first window hole 11 is closed by turning the inner ring segment 10. A branch shield machine 30 is launched by opening the first window hole 11, thereby excavating a branch tunnel. When opening the first window hole 11, the inner segment ring 10 is turned with the second window hole 21 closed with a branch shield machine 30. This construction makes it possible to prevent the collapse of fallen around by allowing the machine 30 close to the fallen ground to receive the earth and earth pressure outside the first window hole 11 and keep the underground not exposed in the pit.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、途中で分岐されるトン
ネルを、本線トンネル及び分岐トンネルともにシールド
掘進機により構築する分岐シールド工法に関するもので
ある。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a branch shield construction method for constructing a tunnel to be branched on the way, both a main line tunnel and a branch tunnel, by a shield machine.

【0002】[0002]

【従来の技術】従来、分岐トンネルをシールド掘進機で
構築する場合、予め分岐予定場所に立坑を構築してお
き、本線トンネルと分岐トンネルとはこの立坑で連結す
る(分岐トンネルは立坑より掘削し、本線トンネルは立
坑を通るようになす。)ようになした立坑連結工法と、
本線トンネル掘削終了後に、該本線トンネルの分岐予定
場所のセグメントリングの一部を除去して、本線トンネ
ルの坑内に搬入した分岐シールド掘進機をこの分岐予定
場所より発進させて分岐トンネルを掘進する本線内分岐
トンネル後発掘進工法とが知られている。
2. Description of the Related Art Conventionally, when constructing a branch tunnel with a shield machine, a vertical shaft is constructed in advance at a planned branching point, and the main line tunnel and the branch tunnel are connected by this vertical shaft (the branch tunnel is excavated from the vertical shaft. , The main line tunnel is made to pass through the vertical shaft.)
After excavating the main line tunnel, a part of the segment ring at the planned branch point of the main line tunnel is removed, and the branch shield excavator carried into the mine of the main line tunnel is started from this planned branch point to drive the branch tunnel. It is known that the method of excavating after the inner branch tunnel.

【0003】[0003]

【発明が解決しようとする課題】しかし、上記の立坑連
結工法は、立坑の構築が必要で、この立坑を構築するの
に以下のごとき課題を有している。 1.周辺環境、交通への影響等が起こりやすく社会的制
約を受け、立坑構築場所が確保できない場合がある。 2.立坑構築場所が確保できても、立坑の構築には相応
な工期と工費が必要である。 3.さらに、立坑構築のためには、その近くに作業基地
を確保する必要性を有するのが通常で、そのための用地
確保も難しい場合がある。 4.深度が深いと立坑の構築が自体困難となる場合があ
る。
However, the shaft connection method described above requires the construction of a shaft, and has the following problems in constructing this shaft. 1. In some cases, it is not possible to secure the shaft construction site due to social restrictions, which are likely to affect the surrounding environment and traffic. 2. Even if the vertical shaft construction site can be secured, the construction of the vertical shaft requires a suitable construction period and cost. 3. Further, it is usually necessary to secure a work base near the shaft for constructing the shaft, and it may be difficult to secure a site for that purpose. 4. If the depth is deep, it may be difficult to construct the shaft.

【0004】また、上記本線内分岐トンネル後発掘進工
法は、本線トンネルのセグメントリングの一部を除去す
るに際して、地下地盤が大気圧の坑内に一時的に露出す
るので、地盤崩壊などの危険性を有し、これを防止する
には分岐予定場所付近の大掛かりな地盤改良(薬液注入
・凍結)が必要とされ、工期、工費、安全性になお課題
を有するものである。
Further, in the method for excavating after branch tunnel in the main line, when removing a part of the segment ring of the main line tunnel, the underground ground is temporarily exposed in the mine at atmospheric pressure, and therefore there is a risk of ground collapse. In order to prevent this, large-scale ground improvement (chemical solution injection / freezing) near the planned branching point is required, and there are still problems in construction period, construction cost, and safety.

【0005】そこで、本発明は上記課題に鑑みなされて
もので、立坑が不要で、分岐予定場所の地盤改良も不要
で、安全性が高く、工期が短縮でき、且つ、経済的な分
岐シールド工法を提供することを目的とするものであ
る。
Therefore, the present invention has been made in view of the above problems. Therefore, a vertical shaft is not required, ground improvement at a planned branching point is not necessary, and the safety is high, the construction period can be shortened, and the branching shield construction method is economical. It is intended to provide.

【0006】[0006]

【課題を解決するための手段】上記の目的に沿い、先述
特許請求の範囲を要旨とする本発明の構成は前述課題を
解決するために、本線シールド掘進機1により常法で分
岐予定場所まで本線トンネルT1を掘進し、本線トンネ
ルT1の分岐予定場所では、周面に分岐シールド掘進機
30が構内より発進できる大きさの第一窓孔11を有し
た外側セグメントリング10と、同じく周面に上記分岐
シールド掘進機30が構内より発進できる大きさの第二
窓孔21を有すると共に上記外側セグメントリング10
内にその軸方向に向かう中心軸を回転中心軸として回動
可能に収納した内側セグメントリング20とを二重構造
状に構築し、上記内側セグメントリング20は、分岐シ
ールド掘進機30の搬入前は、上記第一窓孔11と第二
窓孔21との位置が完全にずれるように設置して、第一
窓孔11を内側セグメントリング20の周面で第二窓孔
21を外側セグメントリング10の周面で夫々塞いでお
き、本線シールド掘進機1が分岐予定場所を通過した後
に、内側セグメントリング20内に分岐シールド掘進機
30を搬入して、第二窓孔21をこの分岐シールド掘進
機30で内側より塞ぐようになして設置し、次いで、内
側セグメントリング20を設置した該分岐シールド掘進
機30と共に回動させて、上記第一窓孔11と第二窓孔
21との両者の位置を合致させ、この第一窓孔11と第
二窓孔21内より上記分岐シールド掘進機30を発進さ
せて分岐トンネルT2を掘進するようになした技術的手
段を講じたものである。
In order to solve the above-mentioned problems, in order to solve the above-mentioned problems, the structure of the present invention, which is based on the above-mentioned claims and has the above-mentioned object, is carried out by a main line shield machine 1 to a planned branching position in a conventional manner. The main line tunnel T1 is excavated, and at the planned branching point of the main line tunnel T1, the outer segment ring 10 having the first window hole 11 of a size that allows the branch shield machine 30 to start from the premises on the peripheral surface, and also on the peripheral surface. The branch shield machine 30 has a second window hole 21 having a size that allows the branch shield machine 30 to start from the premises and the outer segment ring 10
An inner segment ring 20 that is rotatably housed inside with a central axis extending in the axial direction as a central axis of rotation is constructed in a double structure, and the inner segment ring 20 is provided before the branch shield machine 30 is carried in. The first window hole 11 and the second window hole 21 are installed so that their positions are completely deviated from each other, and the first window hole 11 is formed on the peripheral surface of the inner segment ring 20 and the second window hole 21 is formed on the outer segment ring 10. After the main line shield machine 1 has passed through the planned branching position, the branch shield machine 30 is carried into the inner segment ring 20, and the second window hole 21 is formed in the branch shield machine. It is installed so as to be blocked from the inside by 30 and then rotated together with the branch shield machine 30 with the inside segment ring 20 installed to position both the first window hole 11 and the second window hole 21. It was met, in which took technical means without to excavating the branch tunnel T2 by starting the branch shield machine 30 from this first window opening 11 within the second window hole 21.

【0007】[0007]

【作用】それ故本発明分岐シールド工法は、外側セグメ
ントリング10と、この外側セグメントリング10内に
その軸方向を回転中心軸として回動可能に収納した内側
セグメントリングと20を二重構造状に構築し、該外側
セグメントリング10には第一窓孔11を、内側セグメ
ントリング20には第二窓孔21を設けてあるので、内
側セグメントリング10を回動することで該第一窓孔1
1を開閉する作用を呈する。
Therefore, according to the branch shield construction method of the present invention, the outer segment ring 10 and the inner segment ring 20 rotatably housed in the outer segment ring 10 so as to be rotatable about the axial direction thereof have a double structure. Since the outer segment ring 10 is provided with the first window hole 11 and the inner segment ring 20 is provided with the second window hole 21, by rotating the inner segment ring 10, the first window hole 1 is constructed.
It exhibits the action of opening and closing 1.

【0008】そして、第一窓孔11を開けたらこの第一
窓孔11より分岐シールド掘進機30を発進させること
で分岐トンネルT2が掘進できるが、第一窓孔11を開
くに際して、本発明は工法は、予め第二窓孔21を分岐
シールド掘進機30で塞いだ状態で上記内側セグメント
リング10を回動させるため、この第一窓孔11の外側
の地下地盤に近接して位置する分岐シールド掘進機30
で土・水圧を受けて、この地下地盤は坑内に露出するこ
とがないので地下地盤の崩壊が防がれる作用を呈するも
のである。
When the first window hole 11 is opened, the branch tunnel excavator 30 is started from the first window hole 11 to start the branch tunnel T2. When the first window hole 11 is opened, the present invention is In the construction method, since the inner segment ring 10 is rotated in a state where the second window hole 21 is closed by the branch shield machine 30 in advance, the branch shield located near the underground ground outside the first window hole 11 is rotated. Excavator 30
Under the influence of soil and water pressure, this underground ground will not be exposed in the mine, so it will prevent collapse of the underground ground.

【0009】[0009]

【実施例】次に、本発明の実施例を添付図面に基づいて
詳細に説明する。図中、1が本線シールド掘進機、T1
がこの本線シールド掘進機1で掘削した本線トンネルで
ある。
Embodiments of the present invention will now be described in detail with reference to the accompanying drawings. In the figure, 1 is a main line shield machine, T1
Is a main line tunnel excavated by this main line shield machine 1.

【0010】上記本線シールド掘進機1は泥水シール
ド、土・水圧シールド、その他の従来公知なものが使用
でき、スキンプレート2の先端側カッターディスク(図
示せず)等で掘削した掘削土を後方装置(同じく図示せ
ず)で地上まで搬出し、該スキンプレート2の後方部内
にはセグメントSをセグメントリング(図示の場合外側
セグメントリング10、または内側セグメントリング2
0)に組み立て、組み立てられた該外側セグメントリン
グ10または内側セグメントリング20を反力受けとし
て推進ジャッキ3によりこの本線シールド掘進機1は推
進力を得て切羽部を掘削しつつ推進されるのも従来と同
じで、本発明はこの本線シールド掘進機1により常法で
分岐予定場所まで本線トンネルT1を掘進する。
The main line shield machine 1 may be a muddy water shield, a soil / water pressure shield, or any other conventionally known one, and the excavated soil excavated by the tip side cutter disk (not shown) of the skin plate 2 may be used as a rear device. (Similarly not shown) It is carried to the ground, and the segment S is placed in the rear part of the skin plate 2 (the outer segment ring 10 or the inner segment ring 2 in the figure).
0), the main line shield machine 1 is propelled by the propelling jack 3 using the assembled outer segment ring 10 or inner segment ring 20 as a reaction force to obtain propulsive force while excavating the face. As in the conventional case, the present invention excavates the main line tunnel T1 by the main line shield excavator 1 in a conventional manner to the planned branching point.

【0011】そして、本線トンネルT1の分岐予定場所
では、周面に分岐シールド掘進機1が坑内より発進でき
る大きさの第一窓孔11を有した外側セグメントリング
10と、同じく周面に上記分岐シールド掘進機1が坑内
より発進できる大きさの第二窓孔21を有すると共に上
記外側セグメントリング10内にその軸方向に向かう中
心軸を回転中心軸として回動可能に収納した内側セグメ
ントリング20とを二重構造状に構築する。
At the planned branching point of the main line tunnel T1, an outer segment ring 10 having a first window hole 11 of a size that allows the branching shield machine 1 to start from the mine on the peripheral surface, and the branching on the peripheral surface as well. An inner segment ring 20 that has a second window hole 21 of a size that allows the shield machine 1 to start from inside the mine and that is rotatably housed in the outer segment ring 10 with the central axis extending in the axial direction as the central axis of rotation. Is constructed in a double structure.

【0012】上記外側セグメントリング10と内側セグ
メントリング20とはその材質を、従来公知なコンクリ
ート製、スチール製などのいずれを使用してもよい(一
つのセグメントリングにコンクリート製セグメントとス
チール製セグメントとを混用してもよい。)が、図示実
施例では外側セグメントリング10はプレキャストコン
クリート製を、内側セグメントリング20にはスチール
製を使用している。なを、上記外側セグメントリング1
0と内側セグメントリング20とは夫々が土・水圧を受
けるのに充分な強度を有するように設定することが望ま
しいが、外側セグメントリング10に加わる土・水圧の
一部が内側セグメントリング20にも加わり両者で土・
水圧に抗するようになしてもよい。
The outer segment ring 10 and the inner segment ring 20 may be made of any conventionally known material such as concrete or steel (one segment ring includes a concrete segment and a steel segment). However, in the illustrated embodiment, the outer segment ring 10 is made of precast concrete and the inner segment ring 20 is made of steel. The outer segment ring 1
0 and the inner segment ring 20 are preferably set so as to have sufficient strength to receive soil and water pressure respectively, but part of the soil and water pressure applied to the outer segment ring 10 is also applied to the inner segment ring 20. Sat by both parties
It may be designed to resist water pressure.

【0013】なお、上記第一窓孔11と第二窓孔21と
の径が外側セグメントリング10と内側セグメントリン
グ20の各1リングの幅より大きい場合は、複数の外側
セグメントリング10または複数の内側セグメントリン
グ20で該第一窓孔11と第二窓孔21とを夫々形成す
るようになせばよいのは無論で、図示実施例では二重第
二リングR2乃至二重第四リングR4の3リング部に該
第一窓孔11と第二窓孔21とを夫々設けてある。
When the diameters of the first window hole 11 and the second window hole 21 are larger than the width of each one of the outer segment ring 10 and the inner segment ring 20, a plurality of outer segment rings 10 or a plurality of outer segment rings 10 are formed. Of course, it is sufficient to form the first window hole 11 and the second window hole 21 in the inner segment ring 20, respectively. In the illustrated embodiment, the double second ring R2 to the double fourth ring R4 are formed. The first window hole 11 and the second window hole 21 are provided in the three ring portions, respectively.

【0014】上記外側セグメントリング10と内側セグ
メントリング20とは単に同心二重構造となして、内側
セグメントリング20の外周面が外側セグメントリング
10の内周面に当接して、該内側セグメントリング20
は外側セグメントリング10の内周面に案内されて回動
可能となしてもよいが、この場合は土・水圧等で両セグ
メントリング10,20の断面真円が変形しないことを
前提としており、断面真円が浮力等で変形する(セグメ
ントリングは土・水圧で浮力を受けて断面楕円形状にや
や変形する傾向を有する。)と内側セグメントリング2
0は回動できなくなることがあるので、本実施例では外
側セグメントリング10のある垂直断面部位に、図示例
では二重第一セグメントリングR1と二重第五セグメン
トリングR5部位に、端面に案内凹溝12を有した肉厚
部13を内側に突設し、内側セグメントリング20の両
端は上記案内凹溝12内に案内される突条部22を設け
て、この案内凹溝12と突条部22との嵌合部位に多少
の間隙を設けて、両セグメントリング10,20とが多
少変形しても内側セグメントリング20の回動を阻害し
ないようになしてある。
The outer segment ring 10 and the inner segment ring 20 simply have a concentric double structure, and the outer peripheral surface of the inner segment ring 20 abuts on the inner peripheral surface of the outer segment ring 10 so that the inner segment ring 20 is in contact with the inner segment ring 20.
May be guided by the inner peripheral surface of the outer segment ring 10 to be rotatable, but in this case, it is premised that the true circles in cross section of both segment rings 10 and 20 are not deformed by soil, water pressure, or the like. Inner segment ring 2 when the true circle of the section is deformed by buoyancy (the segment ring has a tendency to be slightly deformed into an elliptical section due to the buoyancy of soil and water pressure)
Since 0 may not be able to rotate, in the present embodiment, it is guided to the vertical cross-section portion where the outer segment ring 10 is located, to the double first segment ring R1 and the double fifth segment ring R5 portion in the illustrated example, to the end surface. A thick portion 13 having a concave groove 12 is provided so as to project inward, and both ends of the inner segment ring 20 are provided with protruding portions 22 that are guided into the guide concave groove 12. A slight gap is provided in the fitting portion with the portion 22 so that the inner segment ring 20 is not hindered from rotating even if the segment rings 10 and 20 are slightly deformed.

【0015】なお、図示実施例では、外側セグメントリ
ング10の外周面と内周面とのいずれか一方は偏心させ
て、周面の一方側が肉薄となるようになし、この肉薄部
位に前記第一窓孔11を設けてある。この周面偏心によ
る外側セグメントリング10の偏肉部の形成は、第一窓
孔11を設けることで生ずる空隙部の深さを最小にとど
めるようになすためで、空隙の深さを小さくすることで
周辺地盤への影響を最小となしてある。
In the illustrated embodiment, one of the outer peripheral surface and the inner peripheral surface of the outer segment ring 10 is eccentric so that one side of the peripheral surface is thin, and the first portion is formed in the thin portion. A window hole 11 is provided. The formation of the uneven thickness portion of the outer segment ring 10 due to the eccentricity of the peripheral surface is performed so as to minimize the depth of the void portion generated by providing the first window hole 11, and thus the depth of the void should be reduced. Therefore, the influence on the surrounding ground is minimized.

【0016】なお、第一窓孔11を設けると、この第一
窓孔11内はスキンプレート2内周面との間隔がその分
広くなるので、テールパッキイン4の止水が不能となる
場合がある。このような場合は「図8」に示すように内
側セグメントリング20の内側より第一窓孔11内に設
けたエアーバック5等(膨縮可能であれば、水、油等を
注入するバックでもよい。)を配設しておいて、このエ
アーバック5を膨らませてテールパッキイン4の止水機
能を確保すればよい。なお、このエアーバック5は内側
セグメントリング20の必要とする各セグメントSごと
に一個宛て設けておき、シールテール4が通過したもの
はエアーなどを抜いてしぼませるようになし、さらに
は、必要に応じてはエアーバック5自体を内側セグメン
トリング20の内側に引く抜き、代わりに通常の裏込材
とおき代えてもよいものである。
When the first window hole 11 is provided, the distance between the inside of the first window hole 11 and the inner peripheral surface of the skin plate 2 is widened by that much, so that the tail packing 4 cannot be stopped. There is. In such a case, as shown in FIG. 8, an air bag 5 or the like provided in the first window hole 11 from the inside of the inner segment ring 20 (or a bag for injecting water, oil or the like if expandable and contractible) The air bag 5 may be inflated to secure the water blocking function of the tail packing 4. It should be noted that one air bag 5 is provided for each segment S required by the inner segment ring 20, and the air that has passed through the seal tail 4 is deflated and further deflated. Accordingly, the air bag 5 itself may be pulled out to the inner side of the inner segment ring 20 and replaced with a normal backing material instead.

【0017】そして、上記内側セグメントリング20
は、分岐シールド掘進機30の搬入前は、上記第一窓孔
11と第二窓孔21との位置が完全にずれるように設置
して、第一窓孔11を内側セグメントリング20の周面
で第二窓孔21を外側セグメントリング10の周面で夫
々塞いでおく。すなわち、第一窓孔11は外側セグメン
トリング10の一方側(分岐トンネルT2の掘進方向)
に向け、第二窓孔21は内側セグメントリング20の反
対側に位置させておき、第一窓孔11は内側セグメント
リング20の周面により内側で塞がれ、第二窓孔21は
外側セグメントリング10の周面により外側で塞がれる
ようになしてある。
Then, the inner segment ring 20
Before the branch shield machine 30 is loaded, the branch shield machine 30 is installed such that the positions of the first window hole 11 and the second window hole 21 are completely deviated from each other, and the first window hole 11 is placed on the peripheral surface of the inner segment ring 20. Then, the second window holes 21 are closed by the peripheral surface of the outer segment ring 10, respectively. That is, the first window hole 11 is located on one side of the outer segment ring 10 (the direction of excavation of the branch tunnel T2).
The second window hole 21 is located on the opposite side of the inner segment ring 20, the first window hole 11 is closed on the inner side by the peripheral surface of the inner segment ring 20, and the second window hole 21 is the outer segment. The outer surface of the ring 10 is closed.

【0018】しかし、第一窓孔11は内側セグメントリ
ング20の周面により内側で塞がれ、第二窓孔21は外
側セグメントリング10の周面により外側で塞がれると
しても、この第一窓孔11と第二窓孔21とはそのまま
では確実に密閉できるものではない。そこで、本実施例
では第一シールパッキン50と第二シールパッキン5
1,51で確実な密閉性を保つようになしてある。
However, even though the first window hole 11 is closed inside by the peripheral surface of the inner segment ring 20, and the second window hole 21 is closed outside by the peripheral surface of the outer segment ring 10, The window hole 11 and the second window hole 21 cannot be reliably sealed as they are. Therefore, in this embodiment, the first seal packing 50 and the second seal packing 5 are provided.
1,51 is designed to maintain a reliable hermeticity.

【0019】上記第一シールパッキン50は外側セグメ
ントリング10の内周面と内側セグメントリング20の
外周面との間で、第一窓孔11の外周部に設けられ、ま
た第二パッキン51,51は外側セグメントリング10
の内周面と内側セグメントリング20の外周面との間
で、該内側セグメントリング20の両端部位に設けられ
ている。
The first seal packing 50 is provided on the outer peripheral portion of the first window hole 11 between the inner peripheral surface of the outer segment ring 10 and the outer peripheral surface of the inner segment ring 20, and the second packings 51, 51. Is the outer segment ring 10
It is provided at both end portions of the inner segment ring 20 between the inner peripheral surface of the inner segment ring 20 and the outer peripheral surface of the inner segment ring 20.

【0020】なお、上記第一パッキン50と第二パッキ
ン51,51とのいずれか一方は省略しても密閉性が保
たれるが、図示実施例では外側セグメント10の内周面
と内側セグメントリング20の外周面との間に潤滑剤
(油脂類等)を充填して内側セグメントリング20の回
動を容易にしようとしているため、この潤滑剤の密閉の
ために第一パッキン50と第二パッキン51,51との
双方を使用している。また、上記第二パッキン51,5
1は通常のリング状のものが使用できるが、第一パッキ
ン50は、図では明示していないが、本実施例ではセグ
メントの組み立て作業の必要上、分割型のものが使用さ
れている。
Although the first packing 50 and the second packings 51, 51 can be omitted even if they are omitted, in the illustrated embodiment, the inner peripheral surface of the outer segment 10 and the inner segment ring. Since the inner segment ring 20 is intended to be easily rotated by filling a lubricant (oil or the like) with the outer peripheral surface of the first packing 20, the first packing 50 and the second packing are sealed to seal the lubricant. Both 51 and 51 are used. In addition, the second packing 51, 5
Although 1 can be a normal ring-shaped one, the first packing 50 is a split type in the present embodiment because of the necessity of segment assembly work, although not shown in the drawing.

【0021】さらに、図では省略したが、外側セグメン
トリング10の内周面と内側セグメントリング20の外
周面との間には、上記潤滑剤と共に、内側セグメントリ
ング20の回動を円滑にするためのコロを複数本収納し
ておくとよい。なお、このコロは外側セグメントリング
10に加わる土・水圧を内側セグメントリング20に伝
えるためにも使用され、このようになすことで土・水圧
を外側セグメントリング10と内側セグメントリング2
0との双方で受けるようになすことができる。
Further, although not shown in the drawing, in order to facilitate the rotation of the inner segment ring 20 between the inner peripheral surface of the outer segment ring 10 and the outer peripheral surface of the inner segment ring 20, together with the above lubricant. It is recommended to store multiple rollers. This roller is also used to transmit the soil / water pressure applied to the outer segment ring 10 to the inner segment ring 20, and by doing so, the soil / water pressure is transferred to the outer segment ring 10 and the inner segment ring 2.
It can be set so that both 0 and 0 are received.

【0022】そして、本発明は、本線シールド掘進機1
が分岐予定場所を通過した後に内側セグメントリング2
0内に上記分岐シールド掘進機30を搬入して、第二窓
孔21を該分岐シールド掘進機30で内側より塞ぐよう
になして設置し、次いで、内側セグメントリング20を
設置した分岐シールド掘進機30と共に回動させて、上
記第一窓孔11と第二窓孔21との両者の位置を合致さ
せ、この第一窓孔11と第二窓孔21内より上記分岐シ
ールド掘進機30を発進させて分岐トンネルT2を掘進
する。
The present invention also provides a main line shield machine 1
Inner segment ring 2 after passing through the planned branch location
The above-mentioned branch shield machine 30 is carried into 0, the second window hole 21 is installed so as to be blocked from the inside by the branch shield machine 30, and then the branch shield machine having the inner segment ring 20 is installed. It is rotated together with 30 to match the positions of both the first window hole 11 and the second window hole 21, and the branch shield machine 30 is started from the inside of the first window hole 11 and the second window hole 21. Then, the branch tunnel T2 is dug.

【0023】上記分岐シールド掘進機30は地上より本
線トンネルT1内を通って搬入されるのは無論で、この
搬入の便宜上必要ならは分割したものを搬入後に組み立
てるようになせばよい。また、該分岐シールド掘進機3
0のスキンプレートの全長が内側セグメントリング内に
収納できない場合は、該分岐シールド掘進機30を第一
窓孔11及び第二窓孔21より仮発進し、後胴部分を継
ぎ足すようになせばよい。
It is a matter of course that the branch shield machine 30 is carried in from the ground through the main line tunnel T1. For convenience of carrying in, if necessary, the divided shield machine 30 may be assembled after being carried in. In addition, the branch shield machine 3
If the total length of the 0 skin plate cannot be accommodated in the inner segment ring, the branch shield machine 30 is provisionally started from the first window hole 11 and the second window hole 21 and the rear trunk portion is replenished. Good.

【0024】この分岐シールド掘進機30も従来公知な
ものを使用すればよいが、切羽の土・水圧をチャンバー
の後方坑道内に解放しない、土圧シールドまたは泥水シ
ールドのいずれかをを使用する。
The branch shield machine 30 may be a conventionally known one, but either an earth pressure shield or a muddy water shield which does not release the soil / water pressure of the face into the rear tunnel of the chamber is used.

【0025】そして、上記分岐シールド掘進機30を内
側セグメントリング内に搬入して、第二窓孔21を該分
岐シールド掘進機30で内側より塞ぐようになして設置
するには、第二窓孔21の周縁にエントランスパッキン
31を取り付け、分岐シールド掘進機30の先端部は上
記エントランスパッキン31内に嵌入されるように位置
させる。
To carry the branch shield machine 30 into the inner segment ring and install the second window hole 21 so as to be blocked from the inside by the branch shield machine 30, the second window hole is installed. An entrance packing 31 is attached to a peripheral edge of the branch 21, and the tip end of the branch shield machine 30 is positioned so as to be fitted into the entrance packing 31.

【0026】そして、内側セグメントリング20内の所
定位置に該分岐シールド掘進機30が位置したら、これ
を内側セグメントリング20に支保工32等で変移不能
に仮固定する。
When the branch shield machine 30 is located at a predetermined position in the inner segment ring 20, it is temporarily fixed to the inner segment ring 20 by a support 32 or the like so that it cannot be displaced.

【0027】そして、内側セグメントリング20を回動
すれば、その第二窓孔21及び分岐シールド掘進機30
は共に回動し、やがて第二窓孔21は第一窓孔11の位
置に適合すると、この第一窓孔11は開いて分岐シール
ド掘進機30が発進可能となる。なお、この内側セグメ
ントリング20回動は、図では省略したが、内側セグメ
ントリング20の内周面に内歯歯車を固定し、この内歯
歯車に噛み合うピニオンを有したモータを外側セグメン
トリング10側に固定して、このモータの駆動で行なう
等なせばよいものである。
When the inner segment ring 20 is rotated, the second window hole 21 and the branch shield machine 30 are rotated.
Rotate together, and when the second window hole 21 eventually matches the position of the first window hole 11, the first window hole 11 opens and the branch shield machine 30 can start. Although the rotation of the inner segment ring 20 is omitted in the figure, an internal gear is fixed to the inner peripheral surface of the inner segment ring 20, and a motor having a pinion meshing with the internal gear is attached to the outer segment ring 10 side. It may be fixed to the motor and driven by this motor.

【0028】なお、第一窓孔11が開くと、土・水圧が
分岐シールド掘進機30に直接加えられるため、該分岐
シールド掘進機30の前面側、及びチャンバ−内に予め
モルタル・泥水等の充填材を注入しておいて地盤崩壊を
防止することが望ましい。
When the first window hole 11 is opened, soil and water pressure are directly applied to the branch shield machine 30, so that mortar, muddy water, etc. are stored in advance on the front side of the branch shield machine 30 and in the chamber. It is desirable to inject a filler to prevent ground collapse.

【0029】そして、第一窓孔11が開いたら、分岐シ
ールド掘進機30によって分岐トンネルT2を掘進すれ
ばよく、この掘進は従来法がそのまま使用できるもので
ある。
When the first window hole 11 is opened, the branch tunnel excavator 30 may be used to excavate the branch tunnel T2. This conventional excavation can be used as it is.

【0030】[0030]

【発明の効果】本発明は上記のごときであるので掘削し
た本線トンネルT1内より分岐トンネルを掘進できの
で、立坑が不要であるのでその分、経済的で、立坑が設
けられない部位を分岐点となすことができる分岐シール
ド工法を提供できるものである。
Since the present invention is as described above, a branch tunnel can be dug out from the excavated main line tunnel T1. Therefore, a vertical shaft is not required, and therefore, it is economical and the portion where the vertical shaft is not provided is a branch point. It is possible to provide a branch shield construction method capable of

【0031】また、本発明は予め設けた第一窓孔11を
開くようになしたため、この作業が自動で行なえ危険性
が少なく、また第一窓孔11を開いても第二窓孔21は
分岐シールド掘進機30で塞がれているので、地下地盤
が大気圧部位に露出することはないので、地盤崩壊の心
配は無く、分岐点周辺の地盤改良が不要な分岐シールド
工法を提供できるものである。
Further, according to the present invention, since the first window hole 11 provided in advance is opened, this work can be performed automatically and there is little danger. Even if the first window hole 11 is opened, the second window hole 21 is not opened. Since it is blocked by the branch shield machine 30, the underground ground is not exposed to the atmospheric pressure area, so there is no concern about ground collapse and it is possible to provide a branch shield construction method that does not require ground improvement around the branch point. Is.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明により掘進中のトンネルの縦断面図であ
る。
FIG. 1 is a vertical cross-sectional view of a tunnel being dug according to the present invention.

【図2】「図1」のA−A線断面図である。FIG. 2 is a sectional view taken along line AA of “FIG. 1”.

【図3】本発明法の分岐シールド掘進機を設置した状態
での縦断面図である。
FIG. 3 is a vertical sectional view showing a state in which a branch shield machine of the method of the present invention is installed.

【図4】「図3」のB−B線断面図である。FIG. 4 is a cross-sectional view taken along the line BB of “FIG. 3”.

【図5】第一窓孔を開いた状態の縦断面図である。FIG. 5 is a vertical sectional view showing a state in which a first window hole is opened.

【図6】「図5」のC−C線断面図である。6 is a cross-sectional view taken along the line CC of FIG.

【図7】「図1」の正面図である。FIG. 7 is a front view of “FIG. 1”.

【図8】本発明法により掘削途中のトンネルの縦断面図
である。
FIG. 8 is a vertical cross-sectional view of a tunnel during excavation by the method of the present invention.

【符号の説明】[Explanation of symbols]

T1 本線トンネル T2 分岐トンネル 1 本線シールド掘進機 10 外側セグメントリング 11 第一窓孔 20 内側セグメントリング 21 第二窓孔 30 分岐シールド掘進機 T1 Main line tunnel T2 Branch tunnel 1 Main line shield machine 10 Outer segment ring 11 First window hole 20 Inner segment ring 21 Second window hole 30 Branch shield machine

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 本線シールド掘進機(1)により常法で
分岐予定場所まで本線トンネル(T1)を掘進し、 本線トンネル(T1)の分岐予定場所では、周面に分岐
シールド掘進機(30)が構内より発進できる大きさの
第一窓孔(11)を有した外側セグメントリング(1
0)と、同じく周面に上記分岐シールド掘進機(30)
が構内より発進できる大きさの第二窓孔(21)を有す
ると共に上記外側セグメントリング(10)内にその軸
方向に向かう中心軸を回転中心軸として回動可能に収納
した内側セグメントリング(20)とを二重構造状に構
築し、 上記内側セグメントリング(20)は、分岐シールド掘
進機(30)の搬入前は、上記第一窓孔(11)と第二
窓孔(21)との位置が完全にずれるように設置して、
第一窓孔(11)を内側セグメントリング(20)の周
面で第二窓孔(21)を外側セグメントリング(10)
の周面で夫々塞いでおき、 本線シールド掘進機(1)が分岐予定場所を通過した後
に、内側セグメントリング(20)内に分岐シールド掘
進機(30)を搬入して、第二窓孔(21)をこの分岐
シールド掘進機(30)で内側より塞ぐようになして設
置し、次いで、内側セグメントリング(20)を設置し
た該分岐シールド掘進機(30)と共に回動させて、上
記第一窓孔(11)と第二窓孔(21)との両者の位置
を合致させ、この第一窓孔(11)と第二窓孔(21)
内より上記分岐シールド掘進機(30)を発進させて分
岐トンネル(T2)を掘進するようになした分岐シール
ド工法。
1. A main line shield excavator (1) is used to excavate a main line tunnel (T1) to a planned branching position by a conventional method, and at the planned branching position of the main line tunnel (T1), a branch shield excavator (30) is provided on the circumferential surface. An outer segment ring (1) having a first window hole (11) large enough to be launched from the premises
0) and the above-mentioned branch shield machine (30) on the peripheral surface as well.
Has a second window hole (21) of such a size that it can be started from the premises, and the inner segment ring (20) is rotatably housed in the outer segment ring (10) with the central axis extending in the axial direction as the central axis of rotation. ) And a double structure, the inner segment ring (20) has the first window hole (11) and the second window hole (21) before the branch shield machine (30) is carried in. Install so that the position is completely displaced,
The first window hole (11) is provided on the peripheral surface of the inner segment ring (20) and the second window hole (21) is provided on the outer segment ring (10).
After the main line shield machine (1) has passed the planned branching position, the branch shield machine (30) is carried into the inner segment ring (20) and the second window hole ( 21) is installed so as to be blocked from the inside by this branch shield machine (30), and then rotated together with the branch shield machine (30) having the inner segment ring (20) installed, so that the first The positions of both the window hole (11) and the second window hole (21) are matched, and the first window hole (11) and the second window hole (21) are aligned.
A branch shield construction method in which the branch shield excavator (30) is started from inside to excavate a branch tunnel (T2).
JP5300941A 1993-11-05 1993-11-05 Branch shield method Expired - Fee Related JP3031596B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5300941A JP3031596B2 (en) 1993-11-05 1993-11-05 Branch shield method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5300941A JP3031596B2 (en) 1993-11-05 1993-11-05 Branch shield method

Publications (2)

Publication Number Publication Date
JPH07127376A true JPH07127376A (en) 1995-05-16
JP3031596B2 JP3031596B2 (en) 2000-04-10

Family

ID=17890947

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5300941A Expired - Fee Related JP3031596B2 (en) 1993-11-05 1993-11-05 Branch shield method

Country Status (1)

Country Link
JP (1) JP3031596B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006307455A (en) * 2005-04-26 2006-11-09 Jfe Metal Products & Engineering Inc Shutter device for entrance and start or arrival method for shield machine
CN103244134A (en) * 2013-04-26 2013-08-14 上海交通大学 Anti-floating ballasting method for shield tunnel under negative earthing condition
CN105604577A (en) * 2015-12-29 2016-05-25 上海隧道工程有限公司 Floating-up control device suitable for quasi-rectangular shield tunnel
CN106437731A (en) * 2016-10-09 2017-02-22 中国电建集团成都勘测设计研究院有限公司 Pre-warning dual-shield TBM

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006307455A (en) * 2005-04-26 2006-11-09 Jfe Metal Products & Engineering Inc Shutter device for entrance and start or arrival method for shield machine
JP4707445B2 (en) * 2005-04-26 2011-06-22 Jfe建材株式会社 Shutter device for entrance and start or reach method of shield excavator
CN103244134A (en) * 2013-04-26 2013-08-14 上海交通大学 Anti-floating ballasting method for shield tunnel under negative earthing condition
CN105604577A (en) * 2015-12-29 2016-05-25 上海隧道工程有限公司 Floating-up control device suitable for quasi-rectangular shield tunnel
CN106437731A (en) * 2016-10-09 2017-02-22 中国电建集团成都勘测设计研究院有限公司 Pre-warning dual-shield TBM

Also Published As

Publication number Publication date
JP3031596B2 (en) 2000-04-10

Similar Documents

Publication Publication Date Title
JPH07127376A (en) Branch shield driving method
JP3268342B2 (en) Drilling rig
JP4092265B2 (en) Tunnel construction method and tunnel excavator
JP3245528B2 (en) Starting method of shield excavator from branch tunnel entrance
JP3172432B2 (en) Starting a shield machine from a shaft
JP2921825B2 (en) Branch shield machine
JP2780777B2 (en) Shield construction method and shield excavator
JP3122362B2 (en) Wellhead packing mounting structure
JPH0468188A (en) Execution method of tunnel widening section
JP2612771B2 (en) Underground joining method of different diameter shield tunnel
JP2965923B2 (en) Shield machine and shield method
JP3529242B2 (en) Excavation method and apparatus in shield machine
JP3427360B2 (en) Shield machine
JP2835388B2 (en) Branch shield method
JP2835387B2 (en) Branch shield method
JP2673003B2 (en) Shield excavator for excavation of different diameter section
JPS58213996A (en) Shield excavator, excavating section thereof can freely be changed
JPH08218788A (en) Cutter-provided segment and horizontal tunnel-excavation method using the segment
JP2699150B2 (en) Starting method of shield and caisson shaft having the starting device
JPH0641716B2 (en) A method for reaching a shield excavator into a vertical shaft, and a sealing device and an airtight tank used for the method.
JPH0476188A (en) Tunneling shaft wall structure and tunneling method
JPH08254096A (en) Tail seal replacing method for shield machine
JP2003003783A (en) Shield boring machine capable of branching and branch shield boring method
JPH03262895A (en) Underground joining method at shield work process and shield excavator
JPH08109789A (en) Shield machine for underground docking

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080210

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 9

Free format text: PAYMENT UNTIL: 20090210

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100210

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 10

Free format text: PAYMENT UNTIL: 20100210

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20110210

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20110210

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120210

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 12

Free format text: PAYMENT UNTIL: 20120210

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130210

Year of fee payment: 13

LAPS Cancellation because of no payment of annual fees