JPH07111237B2 - Water stopping method for existing porous power lines - Google Patents

Water stopping method for existing porous power lines

Info

Publication number
JPH07111237B2
JPH07111237B2 JP21085391A JP21085391A JPH07111237B2 JP H07111237 B2 JPH07111237 B2 JP H07111237B2 JP 21085391 A JP21085391 A JP 21085391A JP 21085391 A JP21085391 A JP 21085391A JP H07111237 B2 JPH07111237 B2 JP H07111237B2
Authority
JP
Japan
Prior art keywords
packer
limited space
grout material
water
parts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP21085391A
Other languages
Japanese (ja)
Other versions
JPH0552291A (en
Inventor
康雄 宮崎
敏明 佐藤
明 神出
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OOSAKA BOSUI KENSETSUSHA KK
Original Assignee
OOSAKA BOSUI KENSETSUSHA KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OOSAKA BOSUI KENSETSUSHA KK filed Critical OOSAKA BOSUI KENSETSUSHA KK
Priority to JP21085391A priority Critical patent/JPH07111237B2/en
Publication of JPH0552291A publication Critical patent/JPH0552291A/en
Publication of JPH07111237B2 publication Critical patent/JPH07111237B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Pipe Accessories (AREA)
  • Electric Cable Installation (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は既設多孔電力管路の止水
工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a water stopping method for an existing porous power line.

【0002】[0002]

【従来技術とその問題点】既設の多孔電力管路は、第5
〜6図に示されるように、コンクリート製本体部(1)
と、該本体部(1)内を長さ方向に貫通する多数本、例
えば3列3段配列の貫通孔(2)とから構成され、貫通
孔(2)は通常石綿管(3)によって形成されている。
電力管路の埋設深度は通常4m程度で多くの場合地下水
位以下となり、古い管路に於ては本体部(1)及び石綿
管(3)の亀裂部(4)より貫通孔(2)内に地下水が
浸入し水漏れが生じている。このような水漏れは貫通孔
(2)内へのケーブルの入線及び使用の障害となり、そ
の対策が望まれていた。
2. Description of the Related Art The existing porous power line is the fifth one.
~ As shown in FIG. 6, the concrete main body (1)
And a plurality of through-holes (2) arranged in the main body (1) in the lengthwise direction, for example, three-row, three-stage arrangement, the through-holes (2) are usually formed by asbestos pipes (3). Has been done.
The burial depth of the power line is usually about 4 m, which is below the groundwater level in most cases. In the old line, the main body (1) and the asbestos pipe (3) are cracked (4) into the through hole (2). Groundwater infiltrates into the area, causing water leakage. Such water leakage hinders the entry and use of the cable into the through hole (2), and measures against it have been desired.

【0003】水漏れ防水の一つの対策として第7図に示
すように例えば貫通孔(2)内の全長に亘りグラウト材
(5)を注入充填し、この注入充填圧で貫通孔(2)内
に開口している亀裂部(4)にグラウト材(5)を強制
的に圧入充填することが考えられる。この方法は亀裂部
などの地下水浸入部分の全てにグラウト材を万遍なく圧
入充填できるという有利性はあるが、圧入充填までに相
当の時間がかかるので、グラウト材として可使時間の長
い、所謂緩結性のものを使用せざるを得なくなり、緩結
性グラウト材では地下水中への流出ひいては水質に悪影
響を与える虞れがあり、あまり好ましくない。
As one measure against water leakage and waterproofing, as shown in FIG. 7, for example, the grout material (5) is injected and filled over the entire length of the through hole (2), and the injection filling pressure is applied to the inside of the through hole (2). It is conceivable that the grout material (5) is forcibly press-filled into the cracked portion (4) which is open in the. This method has the advantage that the grout material can be uniformly press-filled into all the groundwater infiltration parts such as cracks, but since it takes a considerable time to press-fit the material, the so-called long-life pot of grout material, so-called Since it is unavoidable to use a loose-cure material, a loose-cure grout material may adversely affect the outflow into groundwater and eventually the water quality, which is not preferable.

【0004】本発明は、このような問題点を一掃するこ
とを目的としてなされたものである。
The present invention has been made for the purpose of eliminating such problems.

【0005】[0005]

【問題点を解決するための手段】本発明は、コンクリー
ト製本体部と、該本体部の長さ方向に貫通する多数本の
貫通孔とを具備する既設多孔電力管路を止水処理するに
あたり、前後両端部に遠隔操作下に拡、縮されるパッカ
ー部を、また之等両パッカー部間の中間軸部にグラウト
材の注入口を、それぞれ具備するパッカーを用い、該パ
ッカーを貫通孔内に遠隔操作下に孔内移動可能に設置し
た状態で移動と停止を繰返し行ない、各停止位置に於
て、 a 前後の両パッカー部を拡張し、之等両パッカー部間
に限定空間を形成する操作、 b 限定空間形成状態のまましばらくの間放置した後
に、限定空間内よりの流出水量確認で、浸水部有無を判
断するために、少なくとも一方のパッカー部を収縮し、
限定空間を開放する操作及び、 c 浸水部“有”と判断した場合は、再び両パッカー部
を拡張状態に戻した後に、中間軸部の注入口より上記限
定空間を通じ浸水部内にグラウト材を注入充填する操
作、 とを順次行なうことを特徴とする既設多孔電力管路の止
水工法に係る。
DISCLOSURE OF THE INVENTION In the present invention, a concrete main body portion and a large number of through holes penetrating in the lengthwise direction of the main body portion are provided for water-stopping an existing porous electric power line. , A packer part which is expanded and contracted by remote control at both front and rear ends, and a grout material injection port at an intermediate shaft part between the both packer parts is used. Repeatedly move and stop while being installed so that it can be moved inside the hole under remote control, and at each stop position, expand both front and rear packer parts to form a limited space between both packer parts. Operation, b) After leaving it for a while in the limited space forming state, at least one packer part is contracted in order to judge the presence or absence of the flooded part by checking the amount of water flowing out from the limited space,
Operation to open the limited space and c If it is judged that the flooded part is "exist", after returning both packer parts to the expanded state again, inject the grout material into the flooded part through the limited space from the inlet of the intermediate shaft part. The present invention relates to a water stopping method for an existing porous power pipeline, which is characterized in that the filling operation and the step are sequentially performed.

【0006】[0006]

【実施例】以下に本発明工法の一実施状況を添附図面に
もとづき説明すると、次の通りである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The following will describe one embodiment of the method of the present invention with reference to the accompanying drawings.

【0007】本発明工法に於ては、第1図に示すように
補修対象の貫通孔(2)内に、パッカー(6)が遠隔操
作、例えばロープ(7)の牽引操作によって孔内移動可
能に設置される。
In the method of the present invention, as shown in FIG. 1, the packer (6) can be moved into the through hole (2) to be repaired by remote control, for example, by pulling the rope (7). Is installed in.

【0008】パッカー(6)は、貫通孔(2)内で浸水
個所の探査と、探査発見の浸水個所へグラウト材を注入
充填するためのものであり、前後両端部に、遠隔操作例
えばエアーの給、排操作で膨脹、収縮する前、後パッカ
ー部(8a)、(8b)と、両パッカー部(8a)、
(8b)間の中間軸部(9)に開口するグラウト材の注
入口(10)とを具備し、このような構成のパッカー
(6)は、管路の継手部の補修に既に使用されており公
知である。
The packer (6) is for exploring a flooded portion in the through hole (2) and for injecting and filling the grout material into the flooded portion for exploration and discovery. The front and rear packer parts (8a) and (8b), which expand and contract by supply and discharge operations, and both packer parts (8a),
The packer (6) having a grout material injection port (10) opening in the intermediate shaft part (9) between (8b) and having such a structure is already used for repairing the joint part of the pipeline. It is well known.

【0009】パッカー(6)は貫通孔(2)内で例えば
その長さに相当する間隔で移動と停止が繰返され、その
一つの停止位置に於て、第2図に示すように両パッカー
部(8a)(8b)が膨脹され、之等の間に限定空間
(11)が形成される。両パッカー部(8a)(8b)
間の貫通孔部分(2a)に亀裂部が生じている場合は、
亀裂部より浸入した地下水が限定空間(11)内に溜ま
るので、第2図に示す状態でしばらくの間放置後、第3
図に示すように、後側のパッカー部(8b)を収縮し限
定空間(11)の後端側を開放させ、流出する水量を確
認することで、亀裂部ひいては、浸水個所の有無を判別
できる。流出水量が相当量あり、浸水個所“有”と判断
した場合は、再び第2図に示す状態に戻し、中間軸部
(9)に開口している注入口(10)より、限定空間
(11)を通じ浸水個所にグラウト材を注入充填し、そ
の後、両パッカー部(8a)(8b)を収縮して、第1
図に示す状態に戻す。一方流出水量が殆んどなく、浸水
個所“無”と判断した場合は、後端側に加え前端側のパ
ッカー部(8a)を収縮し、グラウト材の注入充填操作
なしに第1図に示す状態に戻す。
The packer (6) is repeatedly moved and stopped in the through hole (2) at an interval corresponding to its length, for example, and at one stop position, both packer parts are provided, as shown in FIG. (8a) and (8b) are expanded to form a limited space (11) between them. Both packer parts (8a) (8b)
If there is a crack in the through hole (2a) between
Since the groundwater that has infiltrated through the cracks accumulates in the limited space (11), after leaving it for a while in the state shown in FIG.
As shown in the figure, the rear packer part (8b) is contracted to open the rear end side of the limited space (11) and the amount of water flowing out is confirmed, so that it is possible to determine the presence of the cracked part and the presence of the flooded part. . When it is determined that there is a considerable amount of outflow water and the inundation point is “present”, the state shown in FIG. 2 is restored again, and the limited space (11) is opened from the inlet (10) opened in the intermediate shaft (9). ) Is used to inject and fill the water with the grout material, and then both packer parts (8a) and (8b) are contracted to
Return to the state shown in the figure. On the other hand, when there is almost no outflow and it is judged that there is no flooded part, the packer part (8a) on the front end side is contracted in addition to the rear end side, and the filling and filling operation of grout material is not performed, as shown in FIG. Return to the state.

【0010】第1図に示す状態に戻した後は、パッカー
(6)を第1図に矢符(12)で示す方向に一ピッチ前
進し、この前進位置で再び先と同じ操作を行なう。
After returning to the state shown in FIG. 1, the packer (6) is advanced by one pitch in the direction indicated by the arrow (12) in FIG. 1, and the same operation as before is performed again at this advanced position.

【0011】このような操作の繰返しにより、貫通孔
(2)の全長に亘り止水処理を施すことができる。
By repeating such an operation, it is possible to perform the water blocking treatment over the entire length of the through hole (2).

【0012】本発明工法に於ては、探査で浸水部が発見
されるごとに、探査に使用したパッカー(6)を利用し
て浸水部にグラウト材を注入充填するので、グラウト材
の注入充填に要する作業時間を短縮でき、グラウト材と
して可使時間の短かい、例えば数十秒乃至数分程度のも
のを使用することが可能となり、可使時間の長いグラウ
ト材を用いる場合にみられる問題点を一掃できる。
In the method of the present invention, the grout material is injected and filled in the flooded portion by using the packer (6) used for the exploration every time when the flooded portion is discovered by the exploration. It is possible to reduce the work time required for the grout material, and it is possible to use a grout material with a short pot life, for example, several tens of seconds to several minutes, which is a problem seen when using a grout material with a long pot life. You can wipe out the points.

【0013】本発明に於て用いるグラウト材は可使時間
が数十秒乃至数分と短かく、所謂瞬結性であるので、主
剤と硬化剤とは、限定空間(11)内までは個別に給送
され、限定空間(11)内で混合される。このような瞬
結性グラウト材は、固結強度の小さい、ホモゲルタイプ
のものが、孔内残渣の排除などを考慮し適当である。
The grout material used in the present invention has a short pot life of several tens of seconds to several minutes and has a so-called instantaneous binding property. Therefore, the main agent and the curing agent are individually separated into the limited space (11). And is mixed in the confined space (11). As such an instant setting grout material, a homogel type material having a small consolidation strength is suitable in consideration of elimination of residues in the pores.

【0014】本発明工法に於ては、作業能率の向上を目
的として、浸水の有無を最初に10m程度を一単位とし
て行ない、浸水“有”の場合は、先の仕様で浸水個所を
特定し、グラウト材注入を行ない、浸水“無”の場合
は、10m先に進むようにしてもよい。この浸水有無の
判断は、例えば、10m先でパッカー(6)の膨脹によ
り孔内を閉じ、この間の流出水量を観察することで行な
い得る。
In the method of the present invention, for the purpose of improving work efficiency, the presence or absence of water infiltration is first performed in units of about 10 m, and in the case of "inundation", the inundation location is specified by the above specifications. Alternatively, the grout material may be injected, and in the case of no flooding, the grout material may be advanced 10 m ahead. The presence / absence of water infiltration can be determined, for example, by closing the inside of the hole by the expansion of the packer (6) 10 m ahead and observing the amount of outflow water during this period.

【0015】本発明工法に於ては、浸水個所へのグラウ
ト材の注入充填に際し、これに隣接する貫通孔(2)内
に亀裂部(4)を通じグラウト材(5)が流出すること
を防止するために、第4図に概略的に示すように、保護
パッカー(13)を使用してもよい。
In the method of the present invention, it is possible to prevent the grout material (5) from flowing out through the cracked portion (4) into the through hole (2) adjacent to it when pouring and filling the grout material into the flooded portion. To do this, a protective packer (13) may be used, as shown schematically in FIG.

【0016】[0016]

【効果】本発明工法に於ては、貫通孔内の浸水部に対す
るグラウト材の注入充填に要する時間を短縮でき、グラ
ウト材として可使時間の短かい所謂瞬結性のものを使用
することが可能となり、グラウト材の地下水中への流出
ひいては汚染をなくし得る特徴を有する。
[Effect] In the method of the present invention, the time required for injecting and filling the grout material into the submerged portion in the through hole can be shortened, and it is possible to use a so-called instantaneous binding material having a short pot life as the grout material. It is possible, and it has the feature that it can eliminate the outflow of grout material into the groundwater and thus the pollution.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明工法の作業手順を示す説明図である。FIG. 1 is an explanatory view showing a work procedure of a method of the present invention.

【図2】本発明工法の作業手順を示す説明図である。FIG. 2 is an explanatory diagram showing a work procedure of the method of the present invention.

【図3】本発明工法の作業手順を示す説明図である。FIG. 3 is an explanatory diagram showing a work procedure of the method of the present invention.

【図4】本発明工法の変更例を示す説明図である。FIG. 4 is an explanatory diagram showing a modified example of the method of the present invention.

【図5】既設多孔管路の構造説明図である。FIG. 5 is a structural explanatory view of an existing perforated pipeline.

【図6】既設多孔管路の構造説明図である。FIG. 6 is a structural explanatory view of an existing perforated pipeline.

【図7】本発明工法との比較工法の説明図である。FIG. 7 is an explanatory diagram of a method of comparison with the method of the present invention.

【符号の説明】[Explanation of symbols]

6 パッカー 7 ロープ 8a パッカー部 8b パッカー部 9 中間軸部 10 注入口 11 限定空間 6 Packer 7 Rope 8a Packer part 8b Packer part 9 Intermediate shaft part 10 Injection port 11 Limited space

───────────────────────────────────────────────────── フロントページの続き (51)Int.Cl.6 識別記号 庁内整理番号 FI 技術表示箇所 F16L 1/038 H02G 1/08 Z ─────────────────────────────────────────────────── ─── Continuation of the front page (51) Int.Cl. 6 Identification code Internal reference number FI technical display location F16L 1/038 H02G 1/08 Z

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 コンクリート製本体部と、該本体部の長
さ方向に貫通する多数本の貫通孔とを具備する既設多孔
電力管路を止水処理するにあたり、前後両端部に遠隔操
作下に拡、縮されるパッカー部を、また之等両パッカー
部間の中間軸部にグラウト材の注入口を、それぞれ具備
するパッカーを用い、該パッカーを貫通孔内に遠隔操作
下に孔内移動可能に設置した状態で移動と停止を繰返し
行ない、各停止位置に於て、 a 前後の両パッカー部を拡張し、之等両パッカー部間
に限定空間を形成する操作、 b 限定空間形成状態のまましばらくの間放置した後
に、限定空間内よりの流出水量確認で、浸水部有無を判
断するために、少なくとも一方のパッカー部を収縮し、
限定空間を開放する操作及び、 c 浸水部“有”と判断した場合は、再び両パッカー部
を拡張状態に戻した後に、中間軸部の注入口より上記限
定空間を通じ浸水部内にグラウト材を注入充填する操
作、 とを順次行なうことを特徴とする既設多孔電力管路の止
水工法。
1. When water-stopping an existing porous power line having a concrete main body and a large number of through-holes penetrating in the lengthwise direction of the main body, the front and rear ends are remotely controlled. A packer that expands and contracts, and a grout material injection port on the intermediate shaft between both packer parts is used, and the packer can be moved inside the through hole by remote control. Repeatedly moving and stopping in the state of being installed in each of the above positions, at each stop position, a) expanding both front and rear packer parts to form a limited space between both packer parts, b) remaining limited space formation state After leaving it for a while, at least one packer part is contracted in order to judge the presence or absence of the flooded part by checking the amount of water flowing out from the limited space,
Operation to open the limited space and c If it is judged that the flooded part is "exist", after returning both packer parts to the expanded state again, inject the grout material into the flooded part through the limited space from the inlet of the intermediate shaft part. A method of stopping water in an existing porous power line, which is characterized in that the filling operation and the step are sequentially performed.
JP21085391A 1991-08-22 1991-08-22 Water stopping method for existing porous power lines Expired - Lifetime JPH07111237B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21085391A JPH07111237B2 (en) 1991-08-22 1991-08-22 Water stopping method for existing porous power lines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21085391A JPH07111237B2 (en) 1991-08-22 1991-08-22 Water stopping method for existing porous power lines

Publications (2)

Publication Number Publication Date
JPH0552291A JPH0552291A (en) 1993-03-02
JPH07111237B2 true JPH07111237B2 (en) 1995-11-29

Family

ID=16596191

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21085391A Expired - Lifetime JPH07111237B2 (en) 1991-08-22 1991-08-22 Water stopping method for existing porous power lines

Country Status (1)

Country Link
JP (1) JPH07111237B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4867485B2 (en) * 2006-06-12 2012-02-01 日立金属株式会社 Channel blockage tool
CN110966481B (en) * 2019-11-21 2021-06-15 中电建生态环境集团有限公司 Pressure pipeline repairing construction method

Also Published As

Publication number Publication date
JPH0552291A (en) 1993-03-02

Similar Documents

Publication Publication Date Title
CN109098687A (en) Single stop grouting plug retrusive sublevel grouting device and method suitable for crack rock
CN101666234B (en) Fracture rock no-slurry-blocking wall compound grouting construction method
WO2021189932A1 (en) Plugging method
CN109629845A (en) Concrete structure seam areas leakage treatment device and its construction method
CN109024706A (en) A kind of foundation pit waterproof curtain breakthrough inside method for blocking
CN112900512A (en) Basement bottom plate crack punching, reinforcing and repairing construction method
CZ296015B6 (en) Method for re-insulating underground steam pipes in situ within a conduit
JP3418069B2 (en) Injection method and injection equipment
CN112482415B (en) Consolidation grouting method for underground cavern under high external water pressure and flowing water condition
CN110106884A (en) A kind of grouting construction method
JPH07111237B2 (en) Water stopping method for existing porous power lines
CN113153396A (en) Hole sealing, grouting and water plugging reinforcing method for anchor cable holes in roadway water spraying area
CN106321125B (en) A kind of weakness homogenous rock stratum tunnel active support method
CN109707416A (en) A kind of method that tunnel waterproofing layer reconstruction is repaired
KR100791889B1 (en) Trenchless method using resin forming grouting
CN109779287A (en) Microdilatancy water-proof emulsion construction technology
KR20210105091A (en) How to repair the leaky part of the roof floor
CN114645691A (en) Ground straight-through type through-lane drilling and well cementation downhole device and well cementation construction method
KR102037163B1 (en) Water Leakage Repair Method and Construction Equipment of Concrete Structures
Hognestad et al. Pre‐excavation grouting in rock tunneling–Dealing with high groundwater pressures
CN112377223A (en) Rock mass anti-seepage treatment structure for submarine tunnel
Vigl et al. Grouting in pressure tunnel construction
JP2000028034A (en) Blocking method of column pipe for high hydraulic pressure
CN219472133U (en) Grouting pipe or hollow grouting anchor cable and anchor rod tail end plugging device
CN112627894B (en) Underground airtight wall construction method and airtight wall