JPH0698462A - Power supply control apparatus - Google Patents

Power supply control apparatus

Info

Publication number
JPH0698462A
JPH0698462A JP4369792A JP4369792A JPH0698462A JP H0698462 A JPH0698462 A JP H0698462A JP 4369792 A JP4369792 A JP 4369792A JP 4369792 A JP4369792 A JP 4369792A JP H0698462 A JPH0698462 A JP H0698462A
Authority
JP
Japan
Prior art keywords
time
load
load group
power supply
energization control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP4369792A
Other languages
Japanese (ja)
Inventor
Hideji Kubota
秀治 窪田
Masayoshi Okabe
正義 岡部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP4369792A priority Critical patent/JPH0698462A/en
Publication of JPH0698462A publication Critical patent/JPH0698462A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Selective Calling Equipment (AREA)

Abstract

PURPOSE:To obtain a power supply control apparatus wherein electric charges can be reduced by effectively utilizing midnight electric power. CONSTITUTION:A plurality of loads 8 are classified into a first load group which cannot be postponed and a second load group which can be postponed. The time to feed electric power to the respective loads 8 is set and input by an input part 10, and the time set by the input part 10 is stored by a memory 12. When the time informed from a clock circuit 11 by a power supply control part 13 and the time set for the loads 8 in the first load group become the same, a remote-controlled relay 7 is closed by immediately feeding electric power to the loads 8 in the first load group. When the time informed from the clock circuit 11 and the time set for the loads 8 in the second load group become the same, the remote-controlled relay 7 is controlled by information from a special-rate time setting part 21 so as to regulate the feed of the electric power to the loads 8 in the second load group until the night time when a special rate is applied.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、時間帯別電灯電力料
金制度の適用の元に、割安な電力料金となる特別料金時
間帯での運転比率が高まるように通電を自動的に制御す
る通電制御装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is an energizing system that automatically controls energization to increase the operating ratio in a special rate time zone where the electricity rate is cheaper under the application of the hourly electric power rate system. Regarding the control device.

【0002】[0002]

【従来の技術】従来、一般家庭を対象とした電力活用の
ための電力料金制度としては、単相200ボルトを使用
する蓄熱型の電気給湯器を主な負荷として深夜電力料金
制度があり、この制度を効率良く利用し、電力設備の高
効率運転に寄与できる装置が多数提案されている。
2. Description of the Related Art Conventionally, there has been a midnight power charge system as a power load system for general households to utilize electric power, mainly using a heat storage type electric water heater that uses a single-phase 200 volt. Many devices have been proposed that can efficiently utilize the system and contribute to highly efficient operation of electric power equipment.

【0003】但し、この深夜電力料金制度は蓄熱型の電
気給湯器等を接続するために設けられた単相200ボル
トの専用配線が対象となっており、一般家庭の家庭電化
製品の電源となっている単相100ボルト配線は割安な
深夜電力制度の対象となっていなかった。
However, this late-night power rate system is intended for single-phase 200-volt dedicated wiring provided to connect a heat storage type electric water heater, etc., and serves as a power source for household electric appliances in general households. The single-phase 100-volt wiring is not subject to the cheap late-night power system.

【0004】しかしながら、各電力会社により平成2年
11月から従来の深夜電力料金制度と並立して、時間帯
別電灯料金制度が導入された。この制度は、電灯料金の
対象範囲を一般電化製品の電源となる電灯回路の単相1
00ボルトまで広げると共に、電力使用量の計上時間帯
を7時〜23時の昼間時間と、23時〜翌朝7時の夜間
時間の2つに区分し、従来の電力料金と比較して夜間時
間は大幅に安く、昼間時間は若干割り高としている。
[0004] However, from November 1990, each electric power company introduced the hourly electric light charge system in parallel with the conventional late-night electric power charge system. Under this system, the applicable range of the electric charge is the single-phase 1
In addition to expanding it to 00 volts, the power consumption amount accounting time zone is divided into two, daytime hours from 7:00 to 23:00 and night hours from 23:00 to 7:00 the next morning. Is considerably cheaper, and daytime hours are slightly higher.

【0005】図5は、従来の通電制御装置の構成を示す
ブロック図である。
FIG. 5 is a block diagram showing the configuration of a conventional energization control device.

【0006】通電制御装置は、電気給湯器8のヒータ1
5への電力供給を開閉する開閉部14を有しており、開
閉部14には開閉を指示する制御部16が接続されてい
る。そして、制御部16には、電気給湯器8が貯湯する
お湯の温度を検出するセンサー17、及び制御部16へ
の電源をON/OFFする電源スイッチ18が接続され
ている。
The energization control device is the heater 1 of the electric water heater 8.
5 has an opening / closing unit 14 for opening / closing the power supply to the vehicle 5, and a control unit 16 for instructing opening / closing is connected to the opening / closing unit 14. A sensor 17 for detecting the temperature of hot water stored by the electric water heater 8 and a power switch 18 for turning on / off the power to the control unit 16 are connected to the control unit 16.

【0007】なお、商用電力はタイムスイッチ20によ
り23時〜翌朝7時の深夜時間内のみ通電するようにな
っている。
The commercial power is turned on by the time switch 20 only during the midnight time from 23:00 to 7:00 the next morning.

【0008】次に動作について説明する。Next, the operation will be described.

【0009】23時〜翌朝7時の深夜時間内かつ電源ス
イッチ18がONされている状態において、制御部16
はセンサー17により電気給湯器8が貯湯するお湯の温
度を常時検出しており、お湯の温度が所定値より低くな
った場合、開閉部14を閉じ、ヒータ15へ通電してお
湯の焚き上げをする。
In the midnight time from 23:00 to 7:00 the next morning and the power switch 18 is turned on, the control unit 16
Constantly detects the temperature of the hot water stored in the electric water heater 8 by the sensor 17. When the temperature of the hot water becomes lower than a predetermined value, the opening / closing part 14 is closed and the heater 15 is energized to heat the hot water. To do.

【0010】そして、お湯の温度が所定値より高くなっ
た場合、開閉部14を開放し、ヒータ15への通電を遮
断して焚き上げを停止する。
When the temperature of the hot water becomes higher than a predetermined value, the opening / closing section 14 is opened, the electric power to the heater 15 is cut off, and the heating is stopped.

【0011】[0011]

【発明が解決しようとする課題】従来の通電制御装置
は、以上のように構成されていたので、電気給湯器8の
み特別料金時間帯での運転制御ができるが、他の一般の
家庭電化製品は個別にタイムスイッチを設けなければ特
別料金時間帯での運転制御をすることができず、有効的
に深夜電力を利用することができないという課題があっ
た。
Since the conventional energization control device is configured as described above, only the electric water heater 8 can be operated and controlled in the special charge time zone, but other general household appliances. Had a problem that it was not possible to control the operation in the special charge time zone without providing a separate time switch, and it was not possible to effectively use the midnight power.

【0012】この発明は、上記のような課題を解消する
ためになされたもので、有効的に深夜電力を利用して電
気料金を低減できる通電制御装置を得ることを目的とす
るものである。
The present invention has been made to solve the above problems, and an object of the present invention is to obtain an energization control device that can effectively use the late-night power to reduce the electricity charge.

【0013】[0013]

【課題を解決するための手段】この発明の請求項1に係
わる通電制御装置は、個々の負荷への電力供給を開閉す
る複数のスイッチ回路と、個々の負荷への電力供給時刻
を設定入力する入力部と、入力部により設定された時刻
を記憶するメモリと、商用電力を負荷へ供給するように
スイッチ回路を閉じ制御する通電制御部と、特別料金と
なる夜間時間を設定する特別料金時間設定部と、現在の
時刻を通電制御部へ報知する時計回路と、を備え、前記
入力部は、前記複数の負荷を後回しできない第1負荷群
と後回し可能な第2負荷群とに分け電力供給時刻を設定
することを特徴とするものである。
An energization control device according to claim 1 of the present invention sets and inputs a plurality of switch circuits for opening and closing power supply to individual loads, and power supply time to each load. Input section, memory that stores the time set by the input section, energization control section that closes and controls the switch circuit so as to supply commercial power to the load, and special charge time setting that sets special nighttime hours And a clock circuit that notifies the current time to the energization control unit, and the input unit divides the plurality of loads into a first load group that cannot be postponed and a second load group that can be postponed, and the power supply time Is set.

【0014】この発明の請求項2に係わる通電制御装置
は、個々の負荷への電力供給を開閉する複数のスイッチ
回路と、個々の負荷への電力供給時刻を設定入力する入
力部と、入力部により設定された時刻を記憶するメモリ
と、商用電力を負荷へ供給するようにスイッチ回路を閉
じ制御する通電制御部と、特別料金となる夜間時間を設
定する特別料金時間設定部と、現在の時刻を通電制御部
へ報知する時計回路と、を備え、また複数の負荷を後回
しできない第1負荷群と後回し可能な第2負荷群とに分
類している。前記通電制御部は、時計回路から報知され
る時刻と第1負荷群の負荷の設定時刻とが同じになった
場合、直ちに第1負荷群の負荷へ電力を供給するように
スイッチ回路を閉じ制御し、時計回路から報知される時
刻と第2負荷群の負荷の設定時刻とが同じになった場
合、特別料金時間設定部からの情報と第1負荷群への電
力供給情報が所定の条件を満足している場合、第2負荷
群への電力供給を特別料金となる時間まで規制するよう
にスイッチ回路を制御することを特徴とするものであ
る。
According to a second aspect of the present invention, an energization control device has a plurality of switch circuits for opening and closing power supply to individual loads, an input section for setting and inputting power supply time to each load, and an input section. The memory that stores the time set by, the energization control unit that closes and controls the switch circuit so that commercial power is supplied to the load, the special charge time setting unit that sets the night time that is a special charge, and the current time Is provided to the energization control unit, and the plurality of loads are classified into a first load group that cannot be postponed and a second load group that can be postponed. The energization control unit controls to close the switch circuit so as to immediately supply power to the load of the first load group when the time notified by the clock circuit and the set time of the load of the first load group become the same. However, when the time notified from the clock circuit and the set time of the load of the second load group are the same, the information from the special charge time setting unit and the power supply information to the first load group meet a predetermined condition. When satisfied, the switch circuit is controlled so that the power supply to the second load group is regulated until the time when it becomes the special charge.

【0015】この発明の請求項3に係わる通電制御装置
は、個々の負荷への電力供給を開閉するスイッチ回路
と、個々の負荷への電力供給時刻を設定入力する入力部
と、入力部により設定された時刻を記憶するメモリと、
商用電力を負荷へ供給するようにスイッチ回路を閉じ制
御する通電制御部と、特別料金となる夜間時間を設定す
る特別料金時間設定部と、外部から電力線を介して供給
される時刻信号を受信する受信部と、を備え、また複数
の負荷を後回しできない第1負荷群と後回し可能な第2
負荷群とに分類している。前記通電制御部は、受信部に
より受信する時刻と第1負荷群の負荷の設定時刻とが同
じになった場合、直ちに第1負荷群の負荷へ電力を供給
するようにスイッチ回路を閉じ制御し、受信部により受
信する時刻と第2負荷群の負荷の設定時刻とが同じにな
った場合、特別料金時間設定部からの情報により特別料
金となる時間まで電力供給を規制するようにスイッチ回
路を制御することを特徴とするものである。
According to a third aspect of the present invention, an energization control device has a switch circuit for opening and closing power supply to each load, an input section for setting and inputting power supply time to each load, and setting by the input section. Memory that stores the time
An energization control unit that closes and controls a switch circuit so as to supply commercial power to a load, a special charge time setting unit that sets a special night time, and a time signal supplied from outside via a power line. A first load group that can not postpone a plurality of loads and a second postpile that can postpone it.
It is classified into a load group. The energization control unit closes and controls the switch circuit so as to immediately supply power to the load of the first load group when the time received by the receiving unit and the set time of the load of the first load group become the same. If the time received by the receiving unit and the set time of the load of the second load group are the same, the switch circuit is configured to regulate the power supply until the time when the special charge is set according to the information from the special charge time setting unit. It is characterized by controlling.

【0016】[0016]

【作用】この発明の請求項1における通電制御装置は、
複数の負荷を後回しできない第1負荷群と後回し可能な
第2負荷群とに分類し、それぞれの負荷への電力供給時
刻を入力部により設定入力し、入力部により設定された
時刻をメモリにより記憶する。
The energization control device according to claim 1 of the present invention is
A plurality of loads are classified into a first load group that can not be postponed and a second load group that can be postponed, the power supply time to each load is set and input by the input unit, and the time set by the input unit is stored in the memory To do.

【0017】この発明の請求項2における通電制御装置
は、複数の負荷を後回しできない第1負荷群と後回し可
能な第2負荷群とに分類し、それぞれの負荷への電力供
給時刻を入力部により設定入力し、入力部により設定さ
れた時刻をメモリにより記憶し、通電制御部により時計
回路から報知される時刻と第1負荷群の負荷の設定時刻
とが同じになった場合、直ちに第1負荷群の負荷へ電力
を供給するようにスイッチ回路を閉じ制御し、時計回路
から報知される時刻と第2負荷群の負荷の設定時刻とが
同じになった場合、特別料金時間設定部からの情報と第
1負荷群への電力供給情報が所定の条件を満たしている
場合、第2負荷群への電力供給を特別料金となる夜間時
間まで規制するようにスイッチ回路を制御する。
According to a second aspect of the present invention, the energization control device classifies a plurality of loads into a first load group that cannot be postponed and a second load group that can be postponed, and the power supply time to each load is input by an input unit. If the time set by the input unit and stored by the input unit is stored in the memory and the time notified by the energization control unit from the clock circuit and the set time of the load of the first load group become the same, the first load is immediately When the switch circuit is controlled to be closed so as to supply power to the load of the group and the time notified by the clock circuit and the set time of the load of the second load group are the same, the information from the special charge time setting unit When the power supply information to the first load group satisfies a predetermined condition, the switch circuit is controlled so that the power supply to the second load group is regulated until the nighttime when the special charge is applied.

【0018】この発明の請求項3における通電制御装置
は、複数の負荷を後回しできない第1負荷群と後回し可
能な第2負荷群とに分類し、それぞれの負荷への電力供
給時刻を入力部により設定入力し、入力部により設定さ
れた時刻をメモリにより記憶し、外部から電力線を介し
て供給される時刻信号を受信部により受信し、通電制御
部により受信部により受信した時刻と第1負荷群の負荷
の設定時刻とが同じになった場合、直ちに第1負荷群の
負荷へ電力を供給するようにスイッチ回路を閉じ制御
し、受信部により受信した時刻と第2負荷群の負荷の設
定時刻とが同じになった場合、特別料金時間設定部から
の情報により特別料金となる夜間時間まで電力供給を規
制するようにスイッチ回路を制御する。
According to a third aspect of the present invention, the energization control device classifies a plurality of loads into a first load group that cannot be postponed and a second load group that can be postponed, and the power supply time to each load is input by an input unit. The time input by setting, the time set by the input unit is stored in the memory, the time signal supplied from the outside through the power line is received by the receiving unit, and the time received by the receiving unit by the energization control unit and the first load group When the set time of the load of the second load group is the same as the set time of the load of the first load group, the switch circuit is closed and controlled so that the power is immediately supplied to the load of the first load group. If the same applies, the switch circuit is controlled so as to regulate the power supply until the nighttime when the special charge is set, based on the information from the special charge time setting unit.

【0019】[0019]

【実施例】以下、この発明の一実施例を図を用いて説明
する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings.

【0020】(1)請求項1及び請求項2記載の発明の
実施例 図1は、請求項1及び請求項2記載の発明に係る通電制
御装置の構成を示すブロック図である。
(1) Embodiments of the Inventions of Claims 1 and 2 FIG. 1 is a block diagram showing the configuration of an energization control device according to the inventions of claims 1 and 2.

【0021】通電制御装置は、商用電源1から電力計2
を介して供給される商用電力を分電する分電盤3を有し
ており、分電盤3には、許容値以上の電流が流れるのを
阻止する主ブレーカ4が設けられている。そして、主ブ
レーカ4には、商用電力を分電する複数の分電ブレーカ
a1〜Ban,Bb1〜Bbn5が接続されており、分電ブレ
ーカBa1〜Ban5にはコンセント6が接続されている。
The energization control device includes a commercial power source 1 to a power meter 2
The distribution board 3 has a distribution board 3 for distributing commercial power supplied through the distribution board 3, and the distribution board 3 is provided with a main breaker 4 for preventing a current exceeding a permissible value from flowing. Then, the main breaker 4, the plurality of power distribution breaker B a1 ~B an, B b1 ~B bn 5 is connected, power distribution breaker B a1 ~B an 5 to power distribution commercial power outlet 6 Are connected.

【0022】更に、分電ブレーカBb1〜Bbn5にはそれ
ぞれスイッチ部としてのリモコンリレーR1 〜Rn 7が
接続されており、リモコンリレーR1 〜Rn 7には、そ
れぞれ負荷L1 〜Ln 8が接続されると共にリモコンリ
レーR1 〜Rn 7をON/OFF制御する制御部9が接
続されており、制御部9には、分電ブレーカから電気給
湯器への電力供給時間を設定入力する入力部10が接続
されている。
Furthermore, power distribution breaker B b1 .about.B bn 5 are respectively connected remote relay R 1 to R n 7 as a switch portion is in, the remote relay R 1 to R n 7 are each load L 1 To L n 8 are connected, and a control unit 9 for controlling ON / OFF of the remote control relays R 1 to R n 7 is connected to the control unit 9. The control unit 9 has a power supply time from the distribution breaker to the electric water heater. An input unit 10 for setting and inputting is connected.

【0023】なお、複数の負荷L1 〜Ln 8は、例えば
電気ストーブ(L1 )、電気給湯器(L2 )等の後回し
できない第1負荷群と、食器乾燥器(L3 )、衣類乾燥
器(L4 )、ジャー炊飯器(L5 )等の後回し可能な第
2負荷群とからなっている。
The plurality of loads L 1 to L n 8 are, for example, a first load group such as an electric stove (L 1 ), an electric water heater (L 2 ), which cannot be postponed, a tableware dryer (L 3 ), clothes. It is composed of a drier (L 4 ), a jar rice cooker (L 5 ), and other second load groups that can be postponed.

【0024】また、制御部9は、図2に示すように、現
在の時刻を報知する時計回路11、及び入力部10によ
り設定された時刻を記憶するメモリ12を有しており、
時計回路11及びメモリ12はリモコンリレーR1 〜R
n 7をON/OFF制御する通電制御部13に接続され
ており、更に通電制御部13には、特別料金となる夜間
時間を設定する特別料金時間設定部21が接続されてい
る。
As shown in FIG. 2, the control section 9 has a clock circuit 11 for informing the present time and a memory 12 for storing the time set by the input section 10.
The clock circuit 11 and the memory 12 are remote control relays R 1 to R
The energization control unit 13 that controls ON / OFF of n7 is connected to the energization control unit 13. Further, the energization control unit 13 is connected to a special charge time setting unit 21 that sets a nighttime time as a special charge.

【0025】一方、前記負荷8は、電力供給を開閉する
開閉部14を有しており、開閉部14には、負荷部15
及び開閉部14へ開閉を指示する制御部16が接続され
ている。また、負荷8は、温度等を検出するセンサー1
7を有しており、センサー17には受信部19が接続さ
れている。
On the other hand, the load 8 has an opening / closing part 14 for opening / closing the power supply, and the opening / closing part 14 has a load part 15 therein.
Also, a control unit 16 for instructing the opening / closing unit 14 to open / close is connected. The load 8 is a sensor 1 that detects temperature and the like.
7, and the receiving unit 19 is connected to the sensor 17.

【0026】そして、受信部19には、受信信号を温度
に換算する換算部22が接続されており、換算部22に
は、温度設定部23により設定された温度とセンサーが
検出した温度とを比較する比較部24が接続されてい
る。
A conversion unit 22 for converting the received signal into temperature is connected to the reception unit 19, and the conversion unit 22 stores the temperature set by the temperature setting unit 23 and the temperature detected by the sensor. The comparison unit 24 for comparison is connected.

【0027】更に、比較部24には制御部16が接続さ
れており、制御部16には、制御部16への電源をON
/OFFする電源スイッチ18が接続されている。
Furthermore, the control unit 16 is connected to the comparison unit 24, and the control unit 16 is powered on.
A power switch 18 for turning on / off is connected.

【0028】ついで、本実施例の作用について説明す
る。
Next, the operation of this embodiment will be described.

【0029】使用者は、予め入力部10により負荷L1
〜Ln 8への電力供給時間を設定する。
The user uses the input unit 10 to load L 1 in advance.
It sets the power supply time to ~L n 8.

【0030】例えば、電気ストーブ(L1 )、電気給湯
器(L2 )等の第1負荷群及び食器乾燥器(L3 )、衣
類乾燥器(L4 )、ジャー炊飯器(L5 )等の第2負荷
群の運転時間(電力供給時間)を入力部10により設定
し、入力部10により設定された時間はメモリ12に記
憶される。それから、通電制御部13は、時計回路11
から報知される時刻と第1負荷群の負荷(電気ストーブ
(L1 )、電気給湯器(L2 )等)の設定時刻とが同じ
になった場合、直ちに第1負荷群の負荷(L1、L2
へ電力を供給するようにリモコンリレー7を閉じ制御
し、第1負荷群の負荷(L1 、L2 )を運転する。
For example, a first load group such as an electric stove (L 1 ), an electric water heater (L 2 ), a tableware dryer (L 3 ), a clothes dryer (L 4 ), a jar rice cooker (L 5 ), etc. The operating time (power supply time) of the second load group is set by the input unit 10, and the time set by the input unit 10 is stored in the memory 12. Then, the energization control unit 13 causes the clock circuit 11 to
When the time notified from the time and the set time of the load of the first load group (electric stove (L 1 ), electric water heater (L 2 ), etc.) become the same, the load of the first load group (L 1 , L 2 )
The remote control relay 7 is controlled to be closed so as to supply electric power to the loads (L 1 and L 2 ) of the first load group.

【0031】この際、第1負荷群の負荷(L1 、L2
の制御部16は、センサー17により常時温度等を検知
しており、温度等が所定値以下になっている場合、開閉
部14をONして負荷部15へ通電し、運転を行う。
At this time, the loads of the first load group (L 1 , L 2 )
The controller 16 constantly detects the temperature and the like with the sensor 17, and when the temperature and the like are below a predetermined value, the opening / closing part 14 is turned on to energize the load part 15 to perform the operation.

【0032】また、温度等が所定値以上になると、制御
部16は、開閉部14をOFFして負荷部15への通電
を停止し、運転を停止する。
When the temperature or the like exceeds a predetermined value, the control unit 16 turns off the opening / closing unit 14 to stop energizing the load unit 15 and stops the operation.

【0033】一方、時計回路から報知される時刻と第2
負荷群の負荷(L3 、L4 、L5 )の設定時刻とが同じ
になった場合、特別料金時間設定部(21)からの情報
により特別料金となる夜間時間(23時)まで電力供給
を規制し、深夜電力料金となる23時になると第2負荷
群の負荷(L3 、L4 、L5 )へ電力を供給する。
On the other hand, the time notified by the clock circuit and the second
When the set times of the loads (L 3 , L 4 , L 5 ) of the load group are the same, power is supplied until the night time (23:00), which is a special charge according to the information from the special charge time setting unit (21). Is regulated, and power is supplied to the loads (L 3 , L 4 , L 5 ) of the second load group at 23:00, which is the midnight power rate.

【0034】この際、第1負荷群の負荷(L1 、L2
制御部16は、センサー17により常時温度等を検知し
ており、温度等が所定値以下になっている場合、開閉部
14をONして負荷部15へ通電し、運転を行う。
At this time, the loads (L 1 , L 2 ) of the first load group
The control unit 16 constantly detects the temperature and the like with the sensor 17, and when the temperature and the like are below a predetermined value, the switching unit 14 is turned on to energize the load unit 15 to perform the operation.

【0035】また、温度等が所定値以上になると、制御
部16は、開閉部14をOFFして負荷部15への通電
を停止し、運転を停止する。
When the temperature or the like exceeds a predetermined value, the control section 16 turns off the opening / closing section 14 to stop energizing the load section 15 and stop the operation.

【0036】(2)請求項3記載の発明の実施例 図3は、請求項3記載の発明に係る通電制御装置の構成
を示すブロック図である。
(2) Embodiment of Invention of Claim 3 FIG. 3 is a block diagram showing the configuration of an energization control device according to the invention of claim 3.

【0037】通電制御装置は、商用電源1から電力計2
を介して供給される商用電力を分電する分電盤3を有し
ており、分電盤3には、許容値以上の電流が流れるのを
阻止する主ブレーカ4が設けられている。
The energization control device includes a commercial power source 1 to a power meter 2
The distribution board 3 has a distribution board 3 for distributing commercial power supplied through the distribution board 3, and the distribution board 3 is provided with a main breaker 4 for preventing a current exceeding a permissible value from flowing.

【0038】そして、主ブレーカ4には、商用電力を分
電する複数の分電ブレーカBa1〜Ban,Bb1〜Bbn5が
接続されており、分電ブレーカBa1〜Ban5にはコンセ
ント6が接続されている。
[0038] Then, the main breaker 4, a plurality of power distribution breaker B a1 .about.B an, for power distribution to commercial power, B b1 .about.B bn 5 is connected, to the power distribution circuit breaker B a1 ~B an 5 Is connected to the outlet 6.

【0039】更に、分電ブレーカBb1〜Bbn5には
それぞれスイッチ部としてのリモコンリレーR1 〜Rn
7が接続されており、リモコンリレーR1 〜Rn 7に
は、それぞれ負荷L1 〜Ln 8が接続されると共にリモ
コンリレーR1 〜Rn 7をON/OFF制御する制御部
9が接続されており、制御部9には、分電ブレーカから
電気給湯器への電力供給時間を設定入力する入力部10
が接続されている。
Further, the distribution breakers Bb1 to Bbn5 are respectively equipped with remote control relays R 1 to R n as switch sections.
7 are connected to the remote control relays R 1 to R n 7, loads L 1 to L n 8 are connected to the remote control relays R 1 to R n 7, and a control unit 9 for ON / OFF controlling the remote control relays R 1 to R n 7 is connected. The control unit 9 has an input unit 10 for setting and inputting a power supply time from the distribution breaker to the electric water heater.
Are connected.

【0040】なお、複数の負荷L1 〜Ln 8は、例えば
電気ストーブ(L1 )、電気給湯器(L2 )等の後回し
できない第1負荷群と、食器乾燥器(L3 )、衣類乾燥
器(L4 )、ジャー炊飯器(L5 )等の後回し可能な第
2負荷群とからなっている。
The plurality of loads L 1 to L n 8 are, for example, a first load group such as an electric stove (L 1 ), an electric water heater (L 2 ), which cannot be postponed, a tableware dryer (L 3 ), clothes. It is composed of a drier (L 4 ), a jar rice cooker (L 5 ), and other second load groups that can be postponed.

【0041】そして、商用電源1を送電する電力線25
には、時間信号を電力線25へ出力する発振部26が接
続されており、発振部26は例えば電力会社等に設けら
れている。更に、主ブレーカ4と分電ブレーカBa1〜B
an,Bb1〜Bbn5との間には並列に発振部26より発振
された時刻信号を受信する受信部27が接続されてい
る。
The power line 25 for transmitting the commercial power source 1
An oscillator 26 for outputting a time signal to the power line 25 is connected to the oscillator, and the oscillator 26 is provided in, for example, a power company. Furthermore, the main breaker 4 and the distribution breakers B a1 to B
A receiving unit 27 that receives the time signal oscillated by the oscillating unit 26 is connected in parallel between an and B b1 to B bn 5.

【0042】また、制御部9は、図4に示すように、入
力部10により設定された時刻を記憶するメモリ12を
有しており、メモリ12はリモコンリレーR1 〜Rn
をON/OFF制御する通電制御部13に接続されてお
り、更に通電制御部13には、特別料金となる夜間時間
を設定する特別料金時間設定部21が接続されている。
一方、前記負荷8は、電力供給を開閉する開閉部14
を有しており、開閉部14には、負荷部15及び開閉部
14へ開閉を指示する制御部16が接続されている。
Further, as shown in FIG. 4, the control unit 9 has a memory 12 for storing the time set by the input unit 10, and the memory 12 has remote control relays R 1 to R n 7.
Is connected to an energization control unit 13 for ON / OFF control, and the energization control unit 13 is further connected to a special charge time setting unit 21 for setting a night time which is a special charge.
On the other hand, the load 8 includes an opening / closing unit 14 for opening / closing the power supply.
The open / close unit 14 is connected to the load unit 15 and the control unit 16 for instructing the open / close unit 14 to open / close.

【0043】また、負荷8は、温度等を検出するセンサ
ー17を有しており、センサー17には受信部19が接
続されている。そして、受信部19には、受信信号を温
度に換算する換算部22が接続されており、換算部22
には、温度設定部23により設定された温度とセンサー
が検出した温度とを比較する比較部24が接続されてい
る。更に、比較部24には制御部16が接続されてお
り、制御部16には、制御部16への電源をON/OF
Fする電源スイッチ18が接続されている。
Further, the load 8 has a sensor 17 for detecting the temperature and the like, and the sensor 17 is connected to a receiver 19. A conversion unit 22 that converts the received signal into temperature is connected to the reception unit 19.
A comparison unit 24 that compares the temperature set by the temperature setting unit 23 with the temperature detected by the sensor is connected to the. Further, the control unit 16 is connected to the comparison unit 24, and the control unit 16 is powered on / off.
The power switch 18 for F is connected.

【0044】ついで、本実施例の作用について説明す
る。
Next, the operation of this embodiment will be described.

【0045】使用者は、予め入力部10により負荷L1
〜Ln 8への電力供給時間を設定する。
The user uses the input unit 10 to load L 1 in advance.
It sets the power supply time to ~L n 8.

【0046】例えば、電気ストーブ(L1 )、電気給湯
器(L2 )等の第1負荷群及び食器乾燥器(L3 )、衣
類乾燥器(L4 )、ジャー炊飯器(L5 )等の第2負荷
群の運転時間(電力供給時間)を入力部10により設定
し、入力部10により設定された時間はメモリ12に記
憶される。
For example, a first load group such as an electric stove (L 1 ), an electric water heater (L 2 ), a tableware dryer (L 3 ), a clothes dryer (L 4 ), a jar rice cooker (L 5 ), etc. The operating time (power supply time) of the second load group is set by the input unit 10, and the time set by the input unit 10 is stored in the memory 12.

【0047】また、発振部26は電力線25へ時刻信号
を送信し、電力線25へ送出された時刻信号は受信部2
7により受信される。
The oscillator 26 transmits a time signal to the power line 25, and the time signal sent to the power line 25 is received by the receiver 2.
7 received.

【0048】それから、通電制御部13は、受信部27
により受信した時刻と第1負荷群の負荷(電気ストーブ
(L1 )、電気給湯器(L2 )等)の設定時刻とが同じ
になった場合、直ちに第1負荷群の負荷(L1 、L2
へ電力を供給するようにリモコンリレー7を閉じ制御
し、第1負荷群の負荷(L1 、L2 )を運転する。
Then, the energization controller 13 receives the signal from the receiver 27.
If the time received by the and the set time of the load of the first load group (electric stove (L 1 ), electric water heater (L 2 ), etc.) become the same, the load of the first load group (L 1 , L 2 )
The remote control relay 7 is controlled to be closed so as to supply electric power to the loads (L 1 and L 2 ) of the first load group.

【0049】この際、第1負荷群の負荷(L1 、L2
の制御部16は、センサー17により常時温度等を検知
しており、温度等が所定値以下になっている場合、開閉
部14をONして負荷部15へ通電し、運転を行う。
At this time, the loads of the first load group (L 1 , L 2 )
The controller 16 constantly detects the temperature and the like with the sensor 17, and when the temperature and the like are below a predetermined value, the opening / closing part 14 is turned on to energize the load part 15 to perform the operation.

【0050】また、温度等が所定値以上になると、制御
部16は、開閉部14をOFFして負荷部15への通電
を停止し、運転を停止する。
When the temperature or the like exceeds a predetermined value, the control unit 16 turns off the opening / closing unit 14 to stop energizing the load unit 15 and stop the operation.

【0051】一方、受信部27により受信した時刻と第
2負荷群の負荷(L3 、L4 、L5)の設定時刻とが同
じになった場合、特別料金時間設定部21からの情報に
より特別料金となる夜間時間(23時)まで電力供給を
規制し、深夜電力料金となる23時になると第2負荷群
の負荷(L3 、L4 、L5 )へ電力を供給する。
On the other hand, when the time received by the receiving unit 27 and the set time of the loads (L 3 , L 4 , L 5 ) of the second load group become the same, the information from the special charge time setting unit 21 The power supply is regulated until night time (23:00), which is a special charge, and power is supplied to the loads (L 3 , L 4 , L 5 ) of the second load group at 23:00, which is the midnight power charge.

【0052】この際、第1負荷群の負荷(L1 、L2
の制御部16は、センサー17により常時温度等を検知
しており、温度等が所定値以下になっている場合、開閉
部14をONして負荷部15へ通電し、運転を行う。
At this time, the loads (L 1 , L 2 ) of the first load group
The controller 16 constantly detects the temperature and the like with the sensor 17, and when the temperature and the like are below a predetermined value, the opening / closing part 14 is turned on to energize the load part 15 to perform the operation.

【0053】また、温度等が所定値以上になると、制御
部16は、開閉部14をOFFして負荷部15への通電
を停止し、運転を停止する。
When the temperature or the like exceeds a predetermined value, the control section 16 turns off the opening / closing section 14 to stop energizing the load section 15 and stop the operation.

【0054】なお、上述実施例においては、23時から
深夜電力を第2負荷群の負荷(L3、L4 、L5 )へ供
給するように設定したが、これに限らず、23時から翌
朝7時までの間に作業が終了するならばいずれの時間で
もよい。
In the above embodiment, the midnight power is set to be supplied to the loads (L 3 , L 4 and L 5 ) of the second load group from 23:00, but the present invention is not limited to this, and it is possible to start from 23:00. Any time will do as long as the work is completed by 7 am the next morning.

【0055】[0055]

【発明の効果】以上説明したように、本発明によれば、
複数の負荷を後回しできない第1負荷群と後回し可能な
第2負荷群に分類し、それぞれの負荷群への電力供給時
刻を入力部により設定入力し、入力部により設定された
時刻をメモリにより記憶するように構成したので、負荷
群ごとに深夜電力を有効利用して電気料金の低減を図る
ことができる。
As described above, according to the present invention,
Multiple loads are classified into a first load group that can not be postponed and a second load group that can be postponed, the power supply time to each load group is set and input by the input unit, and the time set by the input unit is stored in the memory Since it is configured to do so, it is possible to effectively use the late-night power for each load group and reduce the electricity charge.

【0056】また、本発明によれば、複数の負荷を後回
しできない第1負荷群と後回し可能な第2負荷群に分類
し、それぞれの負荷群への電力供給時刻を入力部により
設定入力し、入力部により設定された時刻をメモリによ
り記憶し、通電制御部により時計回路から報知される時
刻と第1負荷群の負荷の設定時刻とが同じになった場
合、直ちに第1負荷群の負荷へ電力を供給するようにス
イッチ回路を閉じ制御し、時計回路から報知される時刻
と第2負荷群の負荷の設定時刻とが同じになった場合、
特別料金時間設定部からの情報と第1負荷群への電力供
給情報が所定の条件を満たしている場合、第2負荷群へ
の電力供給を特別料金となる夜間時間まで電力供給を規
制するようにスイッチ回路を制御するように構成したの
で、電気給湯器のみならず他の一般の家庭電化製品も特
別料金時間帯で運転制御を行うことができ、深夜電力を
有効的に利用して、電気料金の低減を図ることができ
る。
Further, according to the present invention, a plurality of loads are classified into a first load group that cannot be postponed and a second load group that can be postponed, and the power supply time to each load group is set and input by the input unit, When the time set by the input unit is stored in the memory and the time notified from the clock circuit by the energization control unit and the set time of the load of the first load group are the same, the load of the first load group is immediately output. When the switch circuit is closed and controlled to supply electric power, and the time notified by the clock circuit and the set time of the load of the second load group are the same,
When the information from the special charge time setting unit and the information on the power supply to the first load group satisfy a predetermined condition, the power supply to the second load group is regulated until the night time when the special charge is applied. Since it is configured to control the switch circuit, the operation control can be performed not only for the electric water heater but also for other general household appliances in the special charge time zone, and the midnight power can be effectively used to It is possible to reduce charges.

【0057】更に、本発明によれば、複数の負荷を後回
しできない第1負荷群と後回し可能な第2負荷群とに分
類し、それぞれの負荷への電力供給時刻を入力部により
設定入力し、入力部により設定された時刻をメモリによ
り記憶し、外部から電力線を介して供給される時刻信号
を受信部により受信し、通電制御部により受信部により
受信した時刻と第1負荷群の負荷の設定時刻とが同じに
なった場合、直ちに第1負荷群の負荷へ電力を供給する
ようにスイッチ回路を閉じ制御し、受信部により受信し
た時刻と第2負荷群の負荷の設定時刻とが同じになった
場合、特別料金時間設定部からの情報により特別料金と
なる夜間時間まで電力供給を規制するようにスイッチ回
路を制御するように構成したので、電気給湯器のみなら
ず他の一般の家庭電化製品も特別料金時間帯で運転制御
を行うことができ、深夜電力を有効的に利用して、電気
料金の低減を図ることができる。
Further, according to the present invention, a plurality of loads are classified into a first load group that cannot be postponed and a second load group that can be postponed, and the power supply time to each load is set and input by the input unit, The time set by the input unit is stored in the memory, the time signal supplied from the outside through the power line is received by the receiving unit, and the time received by the receiving unit by the energization control unit and the load of the first load group are set. When the time becomes the same, the switch circuit is closed and controlled so that the power is immediately supplied to the load of the first load group, and the time received by the receiving unit and the set time of the load of the second load group become the same. In this case, the switch circuit is configured to control the power supply until the night time when the special charge is applied according to the information from the special charge time setting unit. Of the product can also be carried out operation control at a special rate time zone, it is possible to use effectively the midnight power, reduced electricity rates.

【図面の簡単な説明】[Brief description of drawings]

【図1】請求項1及び2記載の発明に係わる通電制御装
置の構成を示すブロック図である。
FIG. 1 is a block diagram showing the configuration of an energization control device according to the first and second aspects of the present invention.

【図2】請求項1及び2記載の発明に係わる制御部の構
成を示すブロック図である。
FIG. 2 is a block diagram showing a configuration of a control unit according to the invention described in claims 1 and 2.

【図3】請求項3記載の発明に係わる通電制御装置の構
成を示すブロック図である。
FIG. 3 is a block diagram showing a configuration of an energization control device according to a third aspect of the invention.

【図4】請求項3記載の発明に係わる制御部の構成を示
すブロック図である。
FIG. 4 is a block diagram showing a configuration of a control unit according to the invention of claim 3;

【図5】従来の通電制御装置の構成を示すブロック図で
ある。
FIG. 5 is a block diagram showing a configuration of a conventional energization control device.

【符号の説明】[Explanation of symbols]

7 リモコンリレー 8 負荷 9 制御部 11 時計回路 12 メモリ 13 通電制御部 21 特別料金時間設定部 25 電力線 26 発振部 27 受信部 7 Remote Control Relay 8 Load 9 Control Section 11 Clock Circuit 12 Memory 13 Energization Control Section 21 Special Charge Time Setting Section 25 Power Line 26 Oscillating Section 27 Receiving Section

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 複数の負荷のON/OFF制御をする通
電制御装置において、 個々の負荷への電力供給を開閉する複数のスイッチ回路
と、 個々の負荷への電力供給時刻を設定入力する入力部と、 入力部により設定された時刻を記憶するメモリと、 商用電力を負荷へ供給するようにスイッチ回路を閉じ制
御する通電制御部と、 特別料金となる夜間時間を設定する特別料金時間設定部
と、 現在の時刻を通電制御部へ報知する時計回路と、を備
え、 前記入力部は、前記複数の負荷を後回しできない第1負
荷群と後回し可能な第2負荷群とに分け電力供給時刻を
設定することを特徴とする通電制御装置。
1. An energization control device for controlling ON / OFF of a plurality of loads, a plurality of switch circuits for opening and closing power supply to each load, and an input unit for setting and inputting a power supply time to each load. A memory that stores the time set by the input unit, an energization control unit that closes and controls the switch circuit so as to supply commercial power to the load, and a special charge time setting unit that sets a special charge night time. And a clock circuit for notifying the current time to the energization control unit, wherein the input unit sets the power supply time by dividing the plurality of loads into a first load group that cannot be postponed and a second load group that can be postponed. An energization control device characterized by:
【請求項2】 複数の負荷のON/OFF制御をする通
電制御装置において、 個々の負荷への電力供給を開閉する複数のスイッチ回路
と、 個々の負荷への電力供給時刻を設定入力する入力部と、 入力部により設定された時刻を記憶するメモリと、 商用電力を負荷へ供給するようにスイッチ回路を閉じ制
御する通電制御部と、 特別料金となる夜間時間を設定する特別料金時間設定部
と、 現在の時刻を通電制御部へ報知する時計回路と、を備
え、 前記複数の負荷を後回しできない第1負荷群と後回し可
能な第2負荷群とに分類し、 前記通電制御部は、時計回路から報知される時刻と第1
負荷群の負荷の設定時刻とが同じになった場合、直ちに
第1負荷群の負荷へ電力を供給するようにスイッチ回路
を閉じ制御し、時計回路から報知される時刻と第2負荷
群の負荷の設定時刻とが同じになった場合、特別料金時
間設定部からの情報と第1負荷群への電力供給情報が所
定の条件を満足している場合、第2負荷群への電力供給
を特別料金となる時間まで規制するようにスイッチ回路
を制御することを特徴とする通電制御装置。
2. An energization control device for controlling ON / OFF of a plurality of loads, a plurality of switch circuits for opening and closing power supply to each load, and an input unit for setting and inputting a power supply time to each load. A memory that stores the time set by the input unit, an energization control unit that closes and controls the switch circuit so as to supply commercial power to the load, and a special charge time setting unit that sets a special charge night time. A clock circuit for notifying the current time to the energization control unit, the plurality of loads are classified into a first load group that cannot be postponed and a second load group that can be postponed, and the energization control unit is a clock circuit. First time and time notified from
When the set time of the load of the load group becomes the same, the switch circuit is closed and controlled so that power is immediately supplied to the load of the first load group, and the time notified by the clock circuit and the load of the second load group If the information from the special charge time setting unit and the information on the power supply to the first load group satisfy the predetermined conditions when the set time of the above is the same, the power supply to the second load group is specially performed. An energization control device characterized by controlling a switch circuit so as to regulate until a time when a charge is reached.
【請求項3】 複数の負荷のON/OFF制御をする通
電制御装置において、 個々の負荷への電力供給を開閉するスイッチ回路と、 個々の負荷への電力供給時刻を設定入力する入力部と、 入力部により設定された時刻を記憶するメモリと、 商用電力を負荷へ供給するようにスイッチ回路を閉じ制
御する通電制御部と、 特別料金となる夜間時間を設定する特別料金時間設定部
と、 外部から電力線を介して供給される時刻信号を受信する
受信部と、を備え、 前記複数の負荷を後回しできない第1負荷群と後回し可
能な第2負荷群とに分類し、 前記通電制御部は、受信部により受信する時刻と第1負
荷群の負荷の設定時刻とが同じになった場合、直ちに第
1負荷群の負荷へ電力を供給するようにスイッチ回路を
閉じ制御し、受信部により受信する時刻と第2負荷群の
負荷の設定時刻とが同じになった場合、特別料金時間設
定部からの情報により特別料金となる夜間時間まで電力
供給を規制するようにスイッチ回路を制御することを特
徴とする通電制御装置。
3. An energization control device for controlling ON / OFF of a plurality of loads, a switch circuit for opening and closing power supply to each load, and an input unit for setting and inputting a power supply time to each load. A memory that stores the time set by the input unit, an energization control unit that closes and controls the switch circuit so as to supply commercial power to the load, a special charge time setting unit that sets a special night time, and an external charge And a receiving unit that receives a time signal supplied via a power line from the first load group that can not postpone the plurality of loads and a second load group that can be postplied, and the energization control unit, When the time received by the receiving unit and the set time of the load of the first load group become the same, the switch circuit is closed and controlled so that the power is immediately supplied to the load of the first load group, and the receiving unit receives the load. When the time and the set time of the load of the second load group are the same, the switch circuit is controlled so that the power supply is regulated until the nighttime when the special charge is set by the information from the special charge time setting unit. Energization control device.
JP4369792A 1991-06-06 1992-02-28 Power supply control apparatus Pending JPH0698462A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4369792A JPH0698462A (en) 1991-06-06 1992-02-28 Power supply control apparatus

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
JP13469691 1991-06-06
JP3-134696 1991-06-21
JP3-149991 1991-06-21
JP14999191 1991-06-21
JP4369792A JPH0698462A (en) 1991-06-06 1992-02-28 Power supply control apparatus

Publications (1)

Publication Number Publication Date
JPH0698462A true JPH0698462A (en) 1994-04-08

Family

ID=27291639

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4369792A Pending JPH0698462A (en) 1991-06-06 1992-02-28 Power supply control apparatus

Country Status (1)

Country Link
JP (1) JPH0698462A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4875079A (en) * 1987-03-19 1989-10-17 Ricoh Company, Ltd. Toner density control for multicolor electrophotographic copier
JPH0884387A (en) * 1994-04-22 1996-03-26 Sgs Thomson Microelectron Sa System with machine that informs fare change

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4875079A (en) * 1987-03-19 1989-10-17 Ricoh Company, Ltd. Toner density control for multicolor electrophotographic copier
JPH0884387A (en) * 1994-04-22 1996-03-26 Sgs Thomson Microelectron Sa System with machine that informs fare change

Similar Documents

Publication Publication Date Title
US5625236A (en) Electrical load controller to regulate power consumption
EP2041853B1 (en) A load management controller for a household electrical installation
US20010030468A1 (en) Method and apparatus utilized for priority sequencing
US4245319A (en) Energy management method and apparatus utilizing duty cycle reduction synchronized with the zero points of the applied voltage
AU711866B2 (en) Electrical load optimization device
US8617316B2 (en) Energy management of dishwasher appliance
US20020074865A1 (en) Two line switch and power sharing for programmable means
US5543666A (en) Method of reducing the peak load of energy supply network systems and apparatus for limiting the power consumption of a consumer unit fed from an energy supply connection
GB1579764A (en) Power demand limiting system
GB1590290A (en) Electric motor control system
AU2007219699C1 (en) A controllable water heater
US5140255A (en) Average power level controller
JPH0698462A (en) Power supply control apparatus
JPH11346437A (en) Demand control system for household
JPH11136866A (en) Power storage system for household
US4421992A (en) Smart switch
JPH0698464A (en) Power supply control apparatus
EP0717487B1 (en) An electrical system with control of the power demand
JPH0698463A (en) Power supply control apparatus
JPH0698465A (en) Loading apparatus
JPH0568340A (en) Conduction controlling device
JPH0698466A (en) Power supply control apparatus
GB2188799A (en) Control system for electric power distribution
US4197468A (en) Electrical demand controller
JP3921121B2 (en) Energization control device and electric water heater operation control system