JPH0689551B2 - Work machine control method and apparatus in power shovel - Google Patents

Work machine control method and apparatus in power shovel

Info

Publication number
JPH0689551B2
JPH0689551B2 JP3487386A JP3487386A JPH0689551B2 JP H0689551 B2 JPH0689551 B2 JP H0689551B2 JP 3487386 A JP3487386 A JP 3487386A JP 3487386 A JP3487386 A JP 3487386A JP H0689551 B2 JPH0689551 B2 JP H0689551B2
Authority
JP
Japan
Prior art keywords
angle
bucket
boom
arm
automatic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP3487386A
Other languages
Japanese (ja)
Other versions
JPS62194332A (en
Inventor
忠幸 花本
信爾 高杉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Komatsu Ltd
Original Assignee
Komatsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd filed Critical Komatsu Ltd
Priority to JP3487386A priority Critical patent/JPH0689551B2/en
Publication of JPS62194332A publication Critical patent/JPS62194332A/en
Publication of JPH0689551B2 publication Critical patent/JPH0689551B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Operation Control Of Excavators (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明はパワーショベルにおける作業機制御方法および
装置に関する。
The present invention relates to a work machine control method and apparatus for a power shovel.

〔従来の技術〕[Conventional technology]

周知のように、パワーショベルは第8図に示すようにバ
ケット1、アーム2、ブーム3およびこれらを各別に円
弧運動させるバケットシリンダ4、アームシリンダ5、
ブームシリンダ6を有している。このバケット1は上記
各シリンダの伸縮による円弧運動の組み合せによって移
動する。このため、バケット1を所望の軌跡と姿勢で移
動させるには各シリンダの伸縮を同時制御することが不
可欠である。
As is well known, a power shovel has a bucket 1, an arm 2, a boom 3, and a bucket cylinder 4, an arm cylinder 5, and an arm cylinder 5 for individually moving them in an arc as shown in FIG.
It has a boom cylinder 6. The bucket 1 is moved by a combination of circular movements caused by expansion and contraction of the cylinders. Therefore, in order to move the bucket 1 in a desired trajectory and posture, it is essential to simultaneously control the expansion and contraction of each cylinder.

したがって、バケット1を所望の軌跡と姿勢で移動させ
るには、オペレータがバケット、アーム、ブームのそれ
ぞれに対応する操作レバーを同時あるいは交互に操作し
なければならず、操作に熟練を要していた。
Therefore, in order to move the bucket 1 in a desired locus and posture, the operator must operate the operation levers corresponding to the bucket, the arm, and the boom simultaneously or alternately, which requires skill. .

また、未熟練者は掘削時に、第9図(a)に示すように
バケット刃先を進行方向に向けなかったり、第9図
(b)に示すようにバケット底板を削ったあとの掘削面
に干渉させたりして、無用な掘削抵抗増を引き起こして
いた。
In addition, an unskilled person does not direct the bucket blade tip in the traveling direction as shown in FIG. 9 (a) or interferes with the excavated surface after cutting the bucket bottom plate as shown in FIG. 9 (b) during excavation. It caused unnecessary increase in drilling resistance.

一方、予めバケット刃先の移動軌跡(例えば、直線、円
弧等)およびこれらの軌跡に対するバケット姿勢を設定
しておき、この軌跡に沿ってバケット刃先が移動するよ
うにバケット、アーム、ブームを自動制御するようにし
たパワーショベルの制御装置は種々考案されている。し
かしながら、この装置は予め移動軌跡等を入力しなけれ
ばならないため自由度が少なく、仕上げ作業には有効で
あるが、他の掘削作業には適さない。
On the other hand, movement trajectories of the bucket blade tip (for example, straight lines, arcs, etc.) and bucket postures with respect to these trajectories are set in advance, and the bucket, arm, and boom are automatically controlled so that the bucket blade tip moves along this trajectory. Various power shovel control devices have been devised. However, this device has a small degree of freedom because the movement trajectory and the like must be input in advance, and is effective for finishing work, but is not suitable for other excavation work.

〔発明が解決しようとする問題点〕[Problems to be solved by the invention]

本発明は、特に掘削積込時の操作レバーの操作を簡単に
し、アームの操作のみで他の作業機も掘削積込に最適な
動作をするように自動制御し、掘削積込作業の効率を向
上させることができるパワーショベルにおける作業機制
御方法および装置を提供することを目的とする。
INDUSTRIAL APPLICABILITY The present invention particularly simplifies the operation of the operation lever at the time of excavating and loading, and automatically controls other work machines so as to perform the optimum operation for excavating and loading by only operating the arm, thereby improving the efficiency of excavating and loading work. An object of the present invention is to provide a work machine control method and apparatus for a power shovel that can be improved.

〔問題点を解決するための手段〕[Means for solving problems]

本発明によれば、パワーショベルの作業機操作レバーに
よる操作に関連して発生する各作業機回動指令に基づい
てバケット、アーム、ブームを回動制御するパワーショ
ベルにおいて、掘削開始位置からの掘削深さに応じて該
掘削深さに適したバケット刃先の移動軌跡上のn個の地
点の位置を掘削開始位置を基準にして記憶するととも
に、これらの各地点にバケット刃先が位置するときのバ
ケット姿勢を記憶しておき、作業機操作レバーによって
バケット刃先を掘削開始位置に移動させ、かつ掘削深さ
を設定し、その後半自動モードを選択すると、この選択
時点におけるバケット角、アーム角およびブーム角をそ
れぞれ初期のバケット角、アーム角およびブーム角とし
て記憶するとともに、前記設定された掘削深さに基づい
て読み出される前記n個の地点のブーム回動点に対する
位置を前記掘削開始位置より算出し、この算出した位置
にバケット刃先点を移動させ、かつバケット姿勢を当該
地点毎に記憶したバケット姿勢としたときのバケット
角、アーム角およびブーム角をそれぞれ各位置毎に第1
のバケット角、アーム角およびブーム角、…、第nのバ
ケット角、アーム角およびブーム角として算出記憶し、
前記半自動モードを選択し、かつアーム操作レバーを掘
削側に操作してアーム角が初期のアーム角から第1のア
ーム角に変化すると、その変化に応じてバケット角およ
びブーム角をそれぞれ初期のバケット角およびブーム角
から第1のバケット角およびブーム角に徐々に変化さ
せ、…、アーム角が第n−1のアーム角から第nのアー
ム角に変化すると、その変化に応じてバケット角および
ブーム角を徐々に変化させる自動バケット回動指令およ
び自動ブーム回動指令を算出し、前記半自動モードを選
択した場合には上記算出した自動バケット回動指令およ
び自動ブーム回動指令をそれぞれ手動操作による各回動
指令に代えて若しくは各回動指令に加算して出力するこ
とを特徴としている。
ADVANTAGE OF THE INVENTION According to this invention, in the power shovel which controls rotation of a bucket, an arm, and a boom based on each work machine rotation instruction | command which generate | occur | produces in connection with operation with the work machine operation lever of a power shovel, excavation from the excavation start position. The positions of n points on the moving path of the bucket blade edge suitable for the excavation depth according to the depth are stored based on the excavation start position, and the buckets when the bucket blade edge is located at each of these points are stored. If you store the posture, move the bucket blade tip to the excavation start position with the work implement operating lever, set the excavation depth, and select the latter half automatic mode, the bucket angle, arm angle, and boom angle at this selection point are set. The initial bucket angle, the arm angle, and the boom angle are stored, respectively, and are read based on the set excavation depth. The position of each point with respect to the boom rotation point is calculated from the excavation start position, the bucket blade point is moved to the calculated position, and the bucket angle when the bucket attitude is the bucket attitude stored for each point, The arm angle and the boom angle are first for each position.
, The nth bucket angle, the arm angle and the boom angle are calculated and stored,
When the semi-automatic mode is selected and the arm operation lever is operated to the excavation side to change the arm angle from the initial arm angle to the first arm angle, the bucket angle and the boom angle are changed according to the change. Angle and boom angle are gradually changed from the first bucket angle and the boom angle, and the arm angle is changed from the (n-1) th arm angle to the nth arm angle, the bucket angle and the boom angle are changed according to the change. The automatic bucket rotation command and the automatic boom rotation command for gradually changing the angle are calculated, and when the semi-automatic mode is selected, the calculated automatic bucket rotation command and the automatic boom rotation command are manually operated each time. It is characterized in that it outputs instead of the motion command or in addition to each rotation command.

〔作用〕[Action]

まず、バケット刃先位置を掘削開始位置に移動させたの
ち、前記モード選択手段によって半自動モードを選択す
ると、その後アーム操作レバーによるアーム動作に応じ
て、バケットおよびブームが自動制御される。すなわ
ち、アーム操作によりアームが前記掘削開始位置におけ
る初期のアーム角から前記第1のアーム角に変化する
と、この変化に応じてバケット角およびブーム角をそれ
ぞれ初期のバケット角およびブーム角から第1のバケッ
ト角およびブーム角に徐々に自動的に変化させ、同様
に、アーム角が第2、…第nのアーム角に順次変化する
と、この変化に応じてバケット角およびブーム角もそれ
ぞれ第2、…、第nのバケット角およびブーム角に徐々
に自動的に変化させる。このようにして、掘削作業をア
ーム操作レバーのみの操作によって行なうようにしてい
る。
First, the bucket blade position is moved to the excavation start position, and then the semi-automatic mode is selected by the mode selection means. After that, the bucket and the boom are automatically controlled according to the arm operation by the arm operation lever. That is, when the arm is changed by the arm operation from the initial arm angle at the excavation start position to the first arm angle, the bucket angle and the boom angle are changed from the initial bucket angle and the boom angle to the first arm angle in accordance with the change. When the bucket angle and the boom angle are gradually and automatically changed, and similarly, when the arm angle is sequentially changed to the second, ..., Nth arm angle, the bucket angle and the boom angle are respectively changed to the second ,. , Nth bucket angle and boom angle are gradually and automatically changed. In this way, excavation work is performed by operating only the arm operation lever.

〔実施例〕〔Example〕

以下、本発明を添付図面を参照して詳細に説明する。 Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

まず、掘削作業を行なうときには、次の条件を満足する
ようにする。
First, when performing excavation work, the following conditions should be satisfied.

掘削抵抗を小さくする。Reduce excavation resistance.

(イ)掘削開始時に掘削角(掘削方向とバケット底板と
のなす角)が小さくなるようにする。
(B) At the start of excavation, the excavation angle (angle formed by the excavation direction and the bucket bottom plate) is made small.

(ロ)掘削中にバケット背部がなるべく土と干渉しない
範囲で掘削角が小さくなるようにする。
(B) During excavation, the excavation angle should be reduced within the range where the back of the bucket does not interfere with soil as much as possible.

掘削作業中の操作を簡単にする。Simplify operation during excavation work.

(イ)掘削開始時にバケットの姿勢をボタンを押すなど
して自動的に設定する。
(B) At the start of excavation, the posture of the bucket is automatically set by pressing a button.

(ロ)アーム操作レバーでアームの回動を指示すると、
アームの回動速度に比例したバケット回動速度およびブ
ーム回動速度になるようにバケットおよびブームを自動
的に制御する。このとき、比例係数を適当に選んでの
(ロ)の条件を満たすようにする。
(B) When the arm operation lever is used to instruct rotation of the arm,
The bucket and boom are automatically controlled so that the bucket rotation speed and the boom rotation speed are proportional to the rotation speed of the arm. At this time, the proportional coefficient is appropriately selected so that the condition (b) is satisfied.

次に、積込作業を行なうときには、次の条件を満足する
ようにする。
Next, when carrying out the loading work, the following conditions should be satisfied.

積荷をこぼさないようにする。Do not spill your shipment.

バケットの上面を常に水平に保持するようにする。Always keep the top of the bucket horizontal.

積込作業中の操作を簡単にする。Simplify operations during loading work.

アーム操作レバーを操作してすくい上げたバケットを前
方に送り出すときは、バケットの傾きを保ち土砂をこぼ
さないようにバケットを自動制御する。
When sending out a bucket that has been scooped up by operating the arm operation lever, the bucket is automatically controlled so that the inclination of the bucket is kept and spillage of soil is not spilled.

すなわち、本発明は、アーム操作レバーのみの操作で掘
削積込作業を可能にし、かつ他の作業機を掘削積込作業
に適合するよう自動制御するものである。
That is, the present invention enables excavation and loading work by operating only the arm operation lever, and automatically controls other work machines so as to be suitable for excavation and loading work.

次に、上記条件を満足するようにアーム以外の作業機を
自動制御する際の具体的な内容について説明する。
Next, the specific contents when automatically controlling the working machine other than the arm so as to satisfy the above conditions will be described.

まず、作業機各部の長さ、角度等を第2図に示すように
定義する。すなわち、 l1:点A,B間の長さ l2:点B,C間の長さ l3:点C,D間の長さ α:線分ABとBCとのなす角(バケット角) β:線分BCとCDとのなす角(ブーム角) γ:線分CDと水平線とのなす角(バケット角) δ:線分ABとバケット底板とのなす角(バケット刃先
角) とする。なお、点Aはバケット刃先点、点Bはバケット
回動点、点Cはアーム回動点、点Dはブーム回動点であ
る。
First, the length, angle, etc. of each part of the working machine are defined as shown in FIG. That is, l 1 : length between points A and B l 2 : length between points B and C l 3 : length between points C and D α: angle between line segments AB and BC (bucket angle) β: angle between line segment BC and CD (boom angle) γ: angle between line segment CD and horizontal line (bucket angle) δ: angle between line segment AB and bucket bottom plate (bucket blade angle) Note that point A is the bucket blade tip point, point B is the bucket pivot point, point C is the arm pivot point, and point D is the boom pivot point.

ここで、土地掘削作業における−(イ)の条件を満足
する初期のバケット角αs(第3図)を求める。すなわ
ち、線分ACとバケット底板とが直交(掘削角θ=0)す
るバケット角αsを求めておく。このバケット角αsは、
アーム角βおよびブーム角γによらず一定である。そし
て、バケット刃先点Aを掘削開始点に移動させたのち、
バケット姿勢を初期設定するためのボタンを押した場合
には、バケット角がαが初期のバケット角αsになるよ
うに制御する。なお、このときのアーム角βおよびブー
ム角γを初期のアーム角βsおよびブーム角γsとする。
また、掘削角θ=0に限らず、0〜10°程度の範囲とな
るαsを設定してもよい。
Here, the initial bucket angle α s (Fig. 3) that satisfies the condition (-) in the land excavation work is obtained. That is, the bucket angle α s at which the line segment AC and the bucket bottom plate are orthogonal (excavation angle θ = 0) is obtained. This bucket angle α s is
It is constant regardless of the arm angle β and the boom angle γ. Then, after moving the bucket blade tip point A to the excavation start point,
When the button for initializing the bucket attitude is pressed, the bucket angle is controlled so that α becomes the initial bucket angle α s . The arm angle β and the boom angle γ at this time are the initial arm angle β s and the boom angle γ s .
Further, the excavation angle θ is not limited to 0, and α s in the range of 0 to 10 ° may be set.

また、予め掘削深さに応じて掘削開始時におけるバケッ
ト姿勢を記憶しておき、バケット姿勢を初期設定するた
めのボタンを押した場合には、実機のバケット姿勢が掘
削深さに応じて読み出されるバケット姿勢と一致するよ
うにバケット角を制御するようにしてもよい。
Further, if the bucket attitude at the start of excavation is stored in advance according to the excavation depth and the button for initializing the bucket attitude is pressed, the bucket attitude of the actual machine is read according to the excavation depth. The bucket angle may be controlled so as to match the bucket attitude.

ここで、バケット姿勢をバケット底板と水平面とのなす
角φ定義すると(第2図)、この角φは、次式、 φ=α+β+γ−δ−π ……(1) で表わすことができる。したがって、バケット姿勢を掘
削開始時における所定のバケット姿勢(φs)と一致さ
せるためには、実機のバケット角α、アーム角βおよび
ブーム角γを検出して上記第(1)式よりφを求め、こ
のφが掘削開始時におけるφs(第4図参照)になるよ
うにバケット角を制御すればよい。
Here, if the bucket posture is defined as an angle φ formed by the bucket bottom plate and the horizontal plane (FIG. 2), this angle φ can be expressed by the following equation: φ = α + β + γ−δ−π (1) Therefore, in order to match the bucket attitude with the predetermined bucket attitude (φ s ) at the start of excavation, the bucket angle α, the arm angle β, and the boom angle γ of the actual machine are detected, and φ is calculated from the above equation (1). Then, the bucket angle may be controlled so that this φ becomes φ s at the start of excavation (see FIG. 4).

次に、掘削作業における−(ロ)の条件を満足すべ
く、以下に示す方法を採る。
Next, the following method is adopted in order to satisfy the condition (-) in the excavation work.

まず、第4図に示すように、掘削深さdに応じて、その
掘削深さdに最適なバケット刃先の移動軌跡上の複数の
地点、この実施例では地点P1,P2,P3の位置を掘削開始位
置Psを基準にして記憶するとともに、各地点P1,P2,P3
バケット刃先位置するときのバケット姿勢、すなわちφ
1,φ2,φ3を記憶しておく。なお、φ1,φ2はバケッ
ト底板が掘削した軌跡に干渉しないように、かつバケッ
ト底板と軌跡とのなす角が小さくなるように決定し、ま
たφ3はバケット上面がほぼ水平になるように決定す
る。
First, as shown in FIG. 4, according to the excavation depth d, a plurality of points on the movement path of the bucket blade edge that is optimum for the excavation depth d, in this embodiment, points P 1 , P 2 , P 3 Is stored with reference to the excavation start position P s, and the bucket attitude when the bucket blade position is located at each of the points P 1 , P 2 , P 3 , that is, φ
Memorize 1 , φ 2 , and φ 3 . In addition, φ 1 and φ 2 are determined so that the bucket bottom plate does not interfere with the excavated track and the angle between the bucket bottom plate and the track is small, and φ 3 is set so that the bucket top surface is almost horizontal. decide.

いま、地点P1の位置を(x1,y1)、掘削開始位置Psのブ
ーム回動点Dを基準とする位置を(Xs,Ys)とすると、
地点P1のブーム回動点Dに対する位置(X1,Y1)は、 となる。なお、Xs,Ysは掘削開始位置における初期のバ
ケット角αs、アーム角βsおよびバケット角γsから、
次式、 によって求めることができる。
Now, assuming that the position of the point P 1 is (x 1 , y 1 ), and the position of the excavation start position P s based on the boom rotation point D is (X s , Y s ),
The position (X 1 , Y 1 ) of the point P 1 with respect to the boom rotation point D is Becomes Note that X s and Y s are calculated from the initial bucket angle α s , arm angle β s, and bucket angle γ s at the excavation start position,
The following equation, Can be sought by.

同様にして、P2,P3のブーム回動点Dに対する位置(X2,Y
2),(X3,Y3)求めることができる。また、これらの各地点
P1,P2,P3にバケット刃先が位置するときのバケット姿勢
が定まっているので、各地点P1,P2,P3ごとに、それぞれ
これらの条件を満足するためのバケット角、アーム角お
よびブーム角を一義的に決定することができる。
Similarly, the position with respect to the boom times moving point D of P 2, P 3 (X 2 , Y
2 ), (X 3 , Y 3 ) can be obtained. Also, each of these points
P 1, since the bucket edge to P 2, P 3 are definite bucket attitude when located, for each point P 1, P 2, P 3, the bucket angle for satisfying these conditions, respectively, the arms The angle and boom angle can be uniquely determined.

そして、このようにして各地点P1,P2,P3に関して決定さ
れるバケット角、アーム角およびブーム角を、第4図に
示すように(α1,β1,γ1),(α2,β2,γ2),
(α3,β3,γ3)とすると、アーム角が初期のアーム
角βsから順次β1,β2,β3と変化する場合に、この変
化に応じてバケット角およびブーム角も自動的に初期の
バケット角αs、ブーム角γsから順次(α1,γ1),
(α2,γ2),(α3,γ3)と変化するようにする。
The bucket angle, arm angle, and boom angle thus determined for each of the points P 1 , P 2 , P 3 are (α 1 , β 1 , γ 1 ), (α 1 2 , β 2 , γ 2 ),
If (α 3 , β 3 , γ 3 ), when the arm angle sequentially changes from the initial arm angle β s to β 1 , β 2 , and β 3 , the bucket angle and boom angle are automatically adjusted according to this change. From the initial bucket angle α s to the boom angle γ s1 , γ 1 ),
It is changed to (α 2 , γ 2 ) and (α 3 , γ 3 ).

すなわち、アーム角がβsからβ1に変化する場合には、
バケット角αおよびブーム角γを、次式、 に示すようにαsからα1およびγsからγ1に徐々に変化
させる。
That is, when the arm angle changes from β s to β 1 ,
Bucket angle α and boom angle γ are As shown in ( 1) , α s is changed to α 1 and γ s is gradually changed to γ 1 .

同様にして、アーム角がβ1からβ2およびβ3に変化す
る場合には、バケット角αおよびブーム角γは、それぞ
れ、次式、 (β1≧β≧β2) および、 に示すようにα1からα2,α2からα3およびγ1から
γ2,γ2からγ3に徐々に変化させる。
Similarly, when the arm angle changes from β 1 to β 2 and β 3 , the bucket angle α and the boom angle γ are calculated by the following equations, 1 ≧ β ≧ β 2 ) and, As shown in Fig. 3 , the values are gradually changed from α 1 to α 2 , α 2 to α 3, γ 1 to γ 2 , and γ 2 to γ 3 .

一方、積込作業における−(ロ)の条件を満足するバ
ケット角αは、次式、 α=π−β−γ ……(7) によって求めることができる。したがって、上記第
(7)式を満たすようにアーム回動変化に応じてバケッ
ト角αを自動制御すれば、土砂がこぼれないようにバケ
ットを前方に押し出すことができる。なお、第5図で
は、ブームも同時に手動操作した場合に関して示してい
る。
On the other hand, the bucket angle α satisfying the condition of − (b) in the loading work can be obtained by the following equation, α = π−β−γ (7). Therefore, if the bucket angle α is automatically controlled in accordance with the change in the arm rotation so as to satisfy the above expression (7), the bucket can be pushed forward so that the earth and sand will not spill. Note that FIG. 5 shows a case where the boom is also manually operated at the same time.

第1図は、本発明の一実施例を示すブロック図で、上記
各制御を実現するものである。この装置は、半自動モー
ド選択スイッチ14により通常の手動モードと本発明に係
る半自動モードに切り換えられる。
FIG. 1 is a block diagram showing an embodiment of the present invention, which realizes each of the above controls. The device can be switched between a normal manual mode and a semi-automatic mode according to the present invention by a semi-automatic mode selection switch 14.

まず、半自動モード選択スイッチ14によって半自動モー
ドを選択しない場合(手動モード)について説明する。
この場合、演算処理装置17は、切換スイッチ18および19
の各可動接片18cおよび19cをそれぞれ接点18aおよび19b
に接続させる。
First, a case where the semi-automatic mode is not selected by the semi-automatic mode selection switch 14 (manual mode) will be described.
In this case, the arithmetic processing unit 17 includes the changeover switches 18 and 19
The movable contacts 18c and 19c of the contacts 18a and 19b, respectively.
Connect to.

バケット操作レバー10は、通常中立位置にあり、レバー
操作されるとその操作方向および操作量に対応するバケ
ット回動速度指令rを示す信号がレバー位置検出器20
より出力される。このバケット回動速度指令rを示す
信号は、スイッチ18を介してバケット回動速度の目標値
としてバケット制御系30を加えられる。
The bucket operation lever 10 is normally in the neutral position, and when the lever is operated, a signal indicating the bucket rotation speed command r corresponding to the operation direction and the operation amount is output to the lever position detector 20.
Will be output. A signal indicating the bucket rotation speed command r is applied to the bucket control system 30 as a target value of the bucket rotation speed via the switch 18.

バケット制御系30は、バケット角αを検出する角度セン
サ31、このバケット角αを微分して実際のバケット回動
速度を検出する微分器32、目標値と実際のバケット回
動速度を示す信号との偏差をとる加算点33および加算
点33からの偏差信号を0にすべくその偏差信号に応じた
流量の圧油をバケットシリンダ4に供給する流量制御弁
34から構成されている。したがって、バケットはバケッ
ト操作レバー10で指令された速度で回動する。
The bucket control system 30 includes an angle sensor 31 that detects the bucket angle α, a differentiator 32 that differentiates the bucket angle α to detect the actual bucket rotation speed, and a signal indicating the target value and the actual bucket rotation speed. And a flow rate control valve that supplies pressure oil of a flow rate according to the deviation signal to the bucket cylinder 4 so that the deviation signal from the addition point 33
It consists of 34. Therefore, the bucket rotates at the speed commanded by the bucket operating lever 10.

同様に、レバー位置検出器21はアーム操作レバー11のレ
バー操作に対応するアーム回動速度指令rを示す信号
をアーム制御系40に出力し、レバー位置検出器22はブー
ム操作レバー12のレバー操作に対応するブーム回動速度
指令rを示す信号を切換スイッチ19を介してブーム制
御系50に出力する。なお、アーム制御系40およびブーム
制御系50は、バケット制御系30と同様にそれぞれ角度セ
ンサ41,51、微分器42,52、加算点43,53および流量制御
弁44,54を有し、目標速度に一致するようにアームおよ
びブームを回動制御する。
Similarly, the lever position detector 21 outputs a signal indicating the arm rotation speed command r corresponding to the lever operation of the arm operation lever 11 to the arm control system 40, and the lever position detector 22 operates the lever operation of the boom operation lever 12. A signal indicating the boom rotation speed command r corresponding to is output to the boom control system 50 via the changeover switch 19. The arm control system 40 and the boom control system 50 have angle sensors 41 and 51, differentiators 42 and 52, addition points 43 and 53, and flow rate control valves 44 and 54, respectively, as in the bucket control system 30. Control the rotation of the arm and boom to match the speed.

次に、本発明に係る制御を第6図に示すフローチャート
を参照しながら説明する。
Next, the control according to the present invention will be described with reference to the flowchart shown in FIG.

まず、半自動モード選択スイッチ14によって半自動モー
ドを選択する前に、掘削深さ設定器13により、掘削開始
からの掘削深さdを設定する。メモリ25は、予め掘削深
さdに応じてその掘削深さに最適なバケット刃先の移動
軌跡上の3個の地点P1,P2,P3の位置を掘削開始位置を基
準にして記憶するとともに、これらの地点P1,P2,P3およ
び掘削開始位置にバケット刃先が位置するときのバケッ
ト姿勢φ1,φ2,φ3およびφsを示すデータを記憶して
いる。そして、掘削深さ設定器13によって掘削深さdが
設定されると、メモリ25はこの掘削深さdに応じて上記
地点P1,P2,P3およびバケット姿勢φ1,φ2,φ3,φs
示すデータを演算処理装置17に出力する。
First, before the semi-automatic mode is selected by the semi-automatic mode selection switch 14, the excavation depth setter 13 sets the excavation depth d from the start of excavation. The memory 25 stores in advance the positions of the three points P 1 , P 2 , P 3 on the moving path of the bucket blade edge that are optimum for the excavation depth d, based on the excavation start position, in accordance with the excavation depth d. In addition, data indicating the bucket attitudes φ 1 , φ 2 , φ 3 and φ s when the bucket blade edge is located at these points P 1 , P 2 , P 3 and the excavation start position is stored. Then, when the excavation depth d is set by the excavation depth setter 13, the memory 25 determines the points P 1 , P 2 , P 3 and the bucket postures φ 1 , φ 2 , φ according to the excavation depth d. The data indicating 3 and φ s are output to the arithmetic processing unit 17.

演算処理装置17は、メモリ25から掘削深さdに応じた上
記地点P1,P2,P3およびバケット姿勢φ1,φ2,φ3を示
すデータを入力するとともに、レバー位置検出器21から
のアーム回動速度rを示す信号および角度センサ31,4
1,51から実機のバケット角α,アーム角β,ブーム角γ
を示す信号を入力する(ステップ100)。
The arithmetic processing unit 17 inputs data indicating the points P 1 , P 2 , P 3 and bucket attitudes φ 1 , φ 2 , φ 3 corresponding to the excavation depth d from the memory 25, and the lever position detector 21. Signal indicating the arm rotation speed r and angle sensor 31,4
1,51 to actual bucket angle α, arm angle β, boom angle γ
Is input (step 100).

次に、半自動モード選択スイッチ14によって半自動モー
ドが選択されたか否かを判別し(ステップ101)、半自
動モードが選択されていない場合には、初期値設定ボタ
ン15によって初期値設定モードが選択されたか否かを判
別する(ステップ102)。
Next, it is determined whether or not the semi-automatic mode is selected by the semi-automatic mode selection switch 14 (step 101), and if the semi-automatic mode is not selected, the initial value setting mode is selected by the initial value setting button 15. It is determined whether or not (step 102).

ここで、半自動モードとはアーム操作レバー11のみの操
作による作業機制御方式をいい、初期値設定モードとは
バケット姿勢を初期掘削抵抗の少ない所定のバケット姿
勢に設定する方式をいう。
Here, the semi-automatic mode refers to a work machine control method by operating only the arm operation lever 11, and the initial value setting mode refers to a method in which the bucket attitude is set to a predetermined bucket attitude with less initial excavation resistance.

いま、手動操作によりバケット刃先点を掘削開始位置ま
で移動させ、ここで初期値設定ボタン15を押して初期値
設定モードを選択した場合について説明する。この場
合、演算処理装置17は切換スイッチ18の可動接片18cを
接点18bに切り換え、バケット姿勢を示す角度φを第
(1)式に基づいて算出し(ステップ103)、この算出
した角度φが掘削開始時におけるバケット姿勢を示す角
度φsと一致するか否かを判別し(ステップ104)、不一
致の場合には一致するまで適宜の自動バケット回動速度
指令r′を示す信号を切換スイッチ18を介してバケッ
ト制御系30に出力し、これによりバケット姿勢を初期値
に設定する(ステップ105)。
Now, a case will be described in which the bucket blade tip point is moved to the excavation start position by manual operation, and the initial value setting button 15 is pressed here to select the initial value setting mode. In this case, the arithmetic processing unit 17 switches the movable contact piece 18c of the changeover switch 18 to the contact 18b, calculates the angle φ indicating the bucket attitude based on the equation (1) (step 103), and the calculated angle φ is It is determined whether or not it matches the angle φ s indicating the bucket attitude at the start of excavation (step 104), and if they do not match, a signal indicating an appropriate automatic bucket rotation speed command r ′ is output until it matches. To the bucket control system 30, and the bucket attitude is set to the initial value (step 105).

次に、バケットの初期値設定が終了後、半自動モード選
択スイッチ14を投入して半自動モードを選択した場合に
ついて説明する。
Next, a case where the semi-automatic mode selection switch 14 is turned on to select the semi-automatic mode after the initial value setting of the bucket is completed will be described.

この場合、演算処理装置17は、まず切換スイッチ18およ
び19の可動接片18cおよび19cをそれぞれ接点18bおよび1
9bに切換えたのち、掘削開始時か否かを判別する(ステ
ップ106)。
In this case, the processing unit 17 first connects the movable contact pieces 18c and 19c of the changeover switches 18 and 19 to the contacts 18b and 1 respectively.
After switching to 9b, it is determined whether or not it is the start of excavation (step 106).

掘削開始時には、現在のバケット角α、アーム角βおよ
びブーム角γをそれぞれ(αs,βs,γs)として入力
し、また、これらの角度αs,βs,γsからバケット刃
先位置(掘削開始位置)を算出する(第3式)(ステッ
プ107)。続いて、この算出した掘削開始位置と、各地
点P1,P2,P3およびバケット姿勢φ1,φ2,φ3とから各
地点毎に各作業機のとるバケット角、アーム角、ブーム
角を演算し(ステップ108)、掘削開始位置および各地
点毎のバケット角、アーム角、ブーム角をそれぞれ(α
s,βs,γs)、(α1,β1,γ1)、(α2,β2
γ2)および(α3,β3,γ3)として記憶する(ステッ
プ109)。
At the start of excavation, the current bucket angle α, arm angle β, and boom angle γ are input as (α s , β s , γ s ) respectively, and the bucket blade tip position is calculated from these angles α s , β s , γ s. (Excavation start position) is calculated (formula 3) (step 107). Then, based on the calculated excavation start position, the points P 1 , P 2 , P 3 and the bucket attitudes φ 1 , φ 2 , φ 3 , the bucket angle, the arm angle, and the boom of each working machine at each point. The angle is calculated (step 108), and the excavation start position and the bucket angle, arm angle, and boom angle at each point are calculated as (α
s , β s , γ s ), (α 1 , β 1 , γ 1 ), (α 2 , β 2 ,
γ 2 ) and (α 3 , β 3 , γ 3 ) are stored (step 109).

次に、アーム操作レバー11が掘削側に操作されているか
否かをアーム回動速度指令rを示す信号から判別し
(ステップ110)、掘削側に操作されている場合にはス
テップ111に進む。
Next, it is determined whether or not the arm operation lever 11 is operated to the excavation side from the signal indicating the arm rotation speed command r (step 110), and if it is operated to the excavation side, the process proceeds to step 111.

ステップ111では、アーム角の範囲に応じて次式に示す
自動バケット回動速度指令r′および自動ブーム回動
速度指令r′を演算する。
In step 111, it computes the auto bucket pivoting speed command r 'and automatic boom pivot speed command r' in the following equation in accordance with the range of the arm angle.

なお、第(8)式,第(9)式および第(10)式はそれ
ぞれ前述した第(4)式,第(5)式および第(6)式
を時間微分したものである。また、第(8)式,第
(9)式および第(10)式における比例定数はステップ
109で記憶した値から求めたものである。また、rはア
ーム回動速度指令であるが、微分器42で求めた実機のア
ーム回動速度でもよい。
The expressions (8), (9), and (10) are time-differentiated expressions (4), (5), and (6) described above, respectively. Also, the proportional constants in the equations (8), (9) and (10) are
It is obtained from the value stored in 109. Further, r is the arm rotation speed command, but may be the arm rotation speed of the actual machine obtained by the differentiator 42.

上記のようにして求めた自動バケット回動速度指令
r′を示す信号は切換スイッチ18を介してバケット制
御系30に出力され、自動ブーム回動速度指令r′を示
す信号は切換スイッチ19を介してブーム制御系50に出力
され、これによりアームの動作に追従してバケットおよ
びブームが自動制御される(ステップ112)。
Automatic bucket rotation speed command calculated as above
A signal indicating r ′ is output to the bucket control system 30 via the changeover switch 18, and a signal indicating the automatic boom rotation speed command r ′ is output to the boom control system 50 via the changeover switch 19, whereby The bucket and boom are automatically controlled following the operation (step 112).

一方、アーム操作レバー11が積込例に操作されている場
合には、ステップ113に進む。このステップ113では、バ
ケット自動回動速度指令r′を、次式、r ′=−rr ……(11) によって算出する。なお、第(11)式は前述した第
(7)式を時間微分したものである。また、rr
示す信号はレバー位置検出器21,22の出力信号である
が、微分器42,52の信号を用いてもよい。
On the other hand, when the arm operation lever 11 is operated in the loading example, the process proceeds to step 113. In this step 113, the bucket automatic rotation speed command r'is calculated by the following equation, r '= -r - r (11). The equation (11) is a time derivative of the above equation (7). Further, the signals indicating r 1 and r 2 are output signals of the lever position detectors 21 and 22, but the signals of the differentiators 42 and 52 may be used.

この自動バケット回動速度指令r′を示す信号は切換
スイッチ18を介してバケット制御系30に出力され、これ
によりアームの動作に追従してバケットが自動制御され
る。
The signal indicating the automatic bucket rotation speed command r'is output to the bucket control system 30 via the changeover switch 18, and the bucket is automatically controlled by following the operation of the arm.

なお、上記アーム操作レバー11のみによる掘削積込作業
中において、バケット操作レバー10およびブーム操作レ
バー12を適宜操作してもよい。この場合、バケット操作
レバー10の操作によって発生するバケット回動速度指令
rを示す信号は、加算点23において自動バケット回動
速度指令r′を示す信号と加算され、またブーム操作
レバー12の操作によって発生するブーム回動速度指令
rを示す信号は、加算点24において自動ブーム回動速度
指令r′を示す信号と加算される。
The bucket operating lever 10 and the boom operating lever 12 may be appropriately operated during the excavation and loading operation using only the arm operating lever 11. In this case, the bucket rotation speed command generated by operating the bucket operating lever 10
The signal indicating r is added to the signal indicating the automatic bucket rotation speed command r ′ at the addition point 23, and the boom rotation speed command generated by operating the boom operation lever 12 is added.
The signal indicating r is added to the signal indicating the automatic boom rotation speed command r ′ at the addition point 24.

また、第1図の実施例では各作業機の指令値として速度
指令を与えるようにしたが、位置(角度)指令を与える
ように構成してもよい。また、操作レバーはそれぞれ作
業機ごとに独立したものに限らず、第7図に示すように
レバー25の操作方向によってアームと旋回の回動指令を
与え、レバー26の操作方向によってバケットとブームの
回動指令を与えるものでもよい。
Further, in the embodiment shown in FIG. 1, the speed command is given as the command value of each working machine, but the position (angle) command may be given. Further, the operating lever is not limited to an independent one for each work machine, but as shown in FIG. 7, the arm and the turning command are given by the operating direction of the lever 25, and the bucket and the boom are operated by the operating direction of the lever 26. It may be one that gives a rotation command.

更に、本実施例では、掘削深さに適したバケット刃先の
移動軌跡上の地点の数を3個としたが、これに限定され
ない。
Furthermore, in the present embodiment, the number of points on the moving path of the bucket blade edge suitable for the excavation depth is set to three, but the number is not limited to this.

〔発明の効果〕〔The invention's effect〕

以上説明したように、本発明によれば、半自動モードを
選択することにより通常の手動による各作業機の制御か
ら、アーム操作レバーのみの操作による掘削制御が可能
となり、操作が簡単になる。また、この掘削時には掘削
抵抗が少なく、かつ荷こぼれがないように他の作業機の
制御が行なわれるので、作業効率の向上を図ることがで
きる。
As described above, according to the present invention, by selecting the semi-automatic mode, it becomes possible to perform excavation control by operating only the arm operating lever, instead of controlling each working machine by normal manual operation, and simplifying the operation. Further, during this excavation, since the excavation resistance is small and the other work machines are controlled so that the load is not spilled, it is possible to improve the work efficiency.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明の一実施例を示すブロック図、第2図は
作業機の長さ、角度等を定義するために用いた図、第3
図乃至第5図はそれぞれ本発明の原理を説明するために
用いた図、第6図は第1図の演算処理装置の動作を説明
するために用いたフローチャート、第7図は作業機レバ
ーを示す図、第8図はパワーショベルの外観図、第9図
(a)および(b)はそれぞれ従来のパワーショベルの
掘削時における不具合を説明するために用いた図であ
る。 10……バケット操作レバー、11……アーム操作レバー、
12……ブーム操作レバー、13……掘削深さ設定器、14…
…半自動モード選択スイッチ、15……初期値設定ボタ
ン、17……演算処理装置、18,19……切換スイッチ、20,
21,22……レバー位置検出器、25……メモリ、30……バ
ケット制御系、40……アーム制御系、50……ブーム制御
系。
FIG. 1 is a block diagram showing an embodiment of the present invention, FIG. 2 is a diagram used to define the length, angle, etc. of a working machine, and FIG.
5 to 5 are diagrams used to explain the principle of the present invention, FIG. 6 is a flowchart used to explain the operation of the arithmetic processing unit of FIG. 1, and FIG. 7 is a working machine lever. FIG. 8 and FIG. 8 are external views of the power shovel, and FIGS. 9A and 9B are views used to explain problems during excavation of the conventional power shovel. 10 …… Bucket operating lever, 11 …… Arm operating lever,
12 …… Boom control lever, 13 …… Excavation depth setting device, 14…
… Semi-automatic mode selection switch, 15 …… Initial value setting button, 17 …… Computation processing device, 18,19 …… Changeover switch, 20,
21,22 …… Lever position detector, 25 …… Memory, 30 …… Bucket control system, 40 …… Arm control system, 50 …… Boom control system.

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】パワーショベルの作業機操作レバーによる
操作に関連して発生する各作業機回動指令に基づいてバ
ケット、アーム、ブームを回動制御するパワーショベル
において、 掘削開始位置からの掘削深さに応じて該掘削深さに適し
たバケット刃先の移動軌跡上のn個の地点の位置を掘削
開始位置を基準にして記憶するとともに、これらの各地
点にバケット刃先が位置するときのバケット姿勢を記憶
しておき、 作業機操作レバーによってバケット刃先を掘削開始位置
に移動させ、かつ掘削深さを設定し、 その後半自動モードを選択すると、この選択時点におけ
るバケット角、アーム角およびブーム角をそれぞれ初期
のバケット角、アーム角およびブーム角として記憶する
とともに、前記設定された掘削深さに基づいて読み出さ
れる前記n個の地点のブーム回動点に対する位置を前記
掘削開始位置より算出し、この算出した位置にバケット
刃先点を移動させ、かつバケット姿勢を当該地点毎に記
憶したバケット姿勢としたときのバケット角、アーム角
およびブーム角をそれぞれ各位置毎に第1のバケット
角、アーム角およびブーム角、…、第nのバケット角、
アーム角およびブーム角として算出記憶し、 前記半自動モードを選択し、かつアーム操作レバーを掘
削側に操作してアーム角が初期のアーム角から第1のア
ーム角に変化すると、その変化に応じてバケット角およ
びブーム角をそれぞれ初期のバケット角およびブーム角
から第1のバケット角およびブーム角に徐々に変化さ
せ、…、アーム角が第n−1のアーム角から第nのアー
ム角に変化すると、その変化に応じてバケット角および
ブーム角を徐々に変化させる自動バケット回動指令およ
び自動ブーム回動指令を算出し、 前記半自動モードを選択した場合には上記算出した自動
バケット回動指令および自動ブーム回動指令をそれぞれ
手動操作による各回動指令に代えて若しくは各回動指令
に加算して出力することを特徴とするパワーショベルに
おける作業機制御方法。
1. A power shovel for rotating and controlling a bucket, an arm, and a boom on the basis of a work machine rotation command generated in association with an operation of a work machine operation lever of a power shovel. The positions of n points on the moving locus of the bucket blade edge suitable for the excavation depth are stored on the basis of the excavation start position, and the bucket attitude when the bucket blade edge is located at each of these points is stored. When the semi-automatic mode is selected after moving the bucket blade tip to the excavation start position by the work implement operation lever and then selecting the semi-automatic mode, the bucket angle, arm angle and boom angle at this selection point are respectively set. The n is stored as the initial bucket angle, arm angle, and boom angle, and is read based on the set excavation depth. The position of the point with respect to the boom rotation point is calculated from the excavation start position, the bucket blade tip point is moved to the calculated position, and the bucket angle and the arm when the bucket attitude is the bucket attitude stored for each point The first bucket angle, the arm angle and the boom angle, ..., The nth bucket angle,
When the arm angle and the boom angle are calculated and stored, the semi-automatic mode is selected, and the arm operation lever is operated to the excavation side to change the arm angle from the initial arm angle to the first arm angle, according to the change. When the bucket angle and the boom angle are gradually changed from the initial bucket angle and the boom angle to the first bucket angle and the boom angle, respectively, and the arm angle is changed from the (n-1) th arm angle to the nth arm angle. , An automatic bucket rotation command and an automatic boom rotation command for gradually changing the bucket angle and the boom angle according to the change are calculated, and when the semi-automatic mode is selected, the calculated automatic bucket rotation command and the automatic bucket rotation command are automatically calculated. A power shovel which outputs a boom rotation command in place of or in addition to each manual rotation command. Work machine control method in.
【請求項2】パワーショベルの作業機操作レバーによる
操作に関連して発生する各作業機回動指令に基づいてバ
ケット、アーム、ブームを回動制御するパワーショベル
において、 半自動モードを選択するモード選択手段と、 掘削開始位置からの掘削深さを設定する掘削深さ設定手
段と、 掘削深さに応じて該掘削深さに適したバケット刃先の移
動軌跡上のn個の地点の位置を掘削開始位置を基準にし
て記憶するとともに、これらの各地点にバケット刃先が
位置するときのバケット姿勢を記憶する第1の記憶手段
と、 パワーショベルのバケット角、アーム角およびブーム角
をそれぞれ検出する角度検出手段と、 前記モード選択手段による半自動モードの選択時点に前
記角度検出手段により検出したバケット角、アーム角お
よびブーム角をそれぞれ初期のバケット角、アーム角お
よびブーム角として入力する入力手段と、 前記掘削深さ設定手段によって設定された掘削深さに関
連して前記記憶手段から読み出されるn個の地点の位置
および前記初期のバケット角、アーム角およびブーム角
に基づいて求めたバケット刃先位置より前記n個の地点
のブーム回動点に対する位置を算出する第1の演算手段
と、 前記第1の演算手段によって算出した各位置にバケット
刃先点を移動させ、かつバケット姿勢を前記第1の記憶
手段から各位置毎に読み出されるバケット姿勢としたと
きのバケット角、アーム角およびブーム角をそれぞれ各
位置毎に第1のバケット角、アーム角およびブーム角、
…、第nのバケット角、アーム角およびブーム角として
算出する第2の演算手段と、 アーム操作レバーの操作によってアーム角が前記初期の
アーム角から第1のアーム角に変化する場合には、その
変化に応じてバケット角およびブーム角をそれぞれ初期
のバケット角およびブーム角から第1のバケット角およ
びブーム角に徐々に変化させ、…、アーム角が第n−1
のアーム角から第nのアーム角に変化する場合には、そ
の変化に応じてバケット角およびブーム角をそれぞれ第
n−1のバケット角およびブーム角から第nのバケット
角およびブーム角に徐々に変化させる自動バケット回動
指令および自動ブーム回動指令を算出する第3の演算手
段と、 前記モード選択手段によって半自動モードが選択され、
かつアーム操作レバーが掘削側に操作されると、前記自
動バケット回動指令および自動ブーム回動指令をそれぞ
れ手動操作による各回動指令に代えて若しくは各回動指
令に加算して出力する切替手段と、 を具えたパワーショベルにおける作業機制御装置。
2. A mode selection for selecting a semi-automatic mode in a power shovel for rotating and controlling a bucket, an arm, and a boom based on each work machine rotation command generated in association with an operation of a work machine operation lever of a power shovel. Means, digging depth setting means for setting the digging depth from the digging start position, and digging start position of n points on the moving path of the bucket blade edge suitable for the digging depth according to the digging depth First storage means that stores the position as a reference and stores the bucket attitude when the bucket blade edge is located at each of these points, and angle detection that detects the bucket angle, arm angle, and boom angle of the power shovel, respectively. Means, and the bucket angle, arm angle, and boom angle detected by the angle detection means at the time of selection of the semi-automatic mode by the mode selection means. Input means for inputting the initial bucket angle, arm angle, and boom angle, the positions of n points read from the storage means in relation to the excavation depth set by the excavation depth setting means, and the initial First computing means for computing the positions of the n points with respect to the boom rotation point from the bucket blade tip positions obtained based on the bucket angle, the arm angle, and the boom angle of each, and each calculated by the first computing means. The bucket angle, the arm angle, and the boom angle when the bucket blade point is moved to the position and the bucket attitude is set to the bucket attitude that is read from the first storage unit for each position. Angle, arm angle and boom angle,
..., second calculation means for calculating the nth bucket angle, the arm angle, and the boom angle, and when the arm angle changes from the initial arm angle to the first arm angle by the operation of the arm operation lever, In accordance with the change, the bucket angle and the boom angle are gradually changed from the initial bucket angle and the boom angle to the first bucket angle and the boom angle, respectively.
When the arm angle changes from the nth arm angle to the nth arm angle, the bucket angle and the boom angle are gradually changed from the n−1th bucket angle and the boom angle to the nth bucket angle and the boom angle, respectively. Third calculation means for calculating an automatic bucket rotation command and an automatic boom rotation command to be changed, and the semi-automatic mode is selected by the mode selection means,
And when the arm operation lever is operated to the excavation side, a switching means for outputting the automatic bucket rotation command and the automatic boom rotation command instead of or by adding to each rotation command by manual operation, respectively. A work equipment control device for a power shovel.
【請求項3】バケット角の初期設定を指令する指令手段
と、 前記指令手段によってバケット角の初期設定が指令され
ると、該指令時点におけるアーム回動点とバケット刃先
位置とを結ぶ線分に対してバケット底板がほぼ直交する
自動バケット回動指令を算出する第4の演算手段と、 前記自動バケット回動指令を手動操作によるバケット回
動指令に代えて出力する第2の切替手段とを有する特許
請求の範囲第(2)項記載のパワーショベルにおける作
業機制御装置。
3. A command means for commanding an initial setting of a bucket angle, and when the command means commands an initial setting of the bucket angle, a line segment connecting the arm rotation point and the bucket blade tip position at the time of the command is formed. On the other hand, it has a fourth calculation means for calculating an automatic bucket rotation command in which the bucket bottom plate is substantially orthogonal, and a second switching means for outputting the automatic bucket rotation command in place of the bucket rotation command by manual operation. A working machine control device for a power shovel according to claim (2).
【請求項4】バケット角の初期設定を指令する指令手段
と、 掘削深さに応じて掘削開始位置におけるバケット姿勢を
記憶する第2の記憶手段と、 前記指令手段によってバケット角の初期設定が指令され
ると、予め設定された掘削深さに基づいて前記第2の記
憶手段から読み出したバケット姿勢と実機のバケット姿
勢とが一致するための自動バケット回動指令を算出する
第5の演算手段と、 前記自動バケット回動指令を手動操作によるバケット回
動指令に代えて出力する第3の切替手段とを有する特許
請求の範囲第(2)項記載のパワーショベルにおける作
業機制御装置。
4. A command means for instructing an initial setting of a bucket angle, a second storage means for storing a bucket attitude at an excavation start position according to an excavation depth, and an initial setting of a bucket angle by the command means. Then, a fifth calculation means for calculating an automatic bucket rotation command for matching the bucket attitude read from the second storage means with the bucket attitude of the actual machine based on a preset excavation depth. The work implement control device for a power shovel according to claim (2), further comprising: a third switching unit that outputs the automatic bucket rotation command in place of the bucket rotation command by a manual operation.
JP3487386A 1986-02-19 1986-02-19 Work machine control method and apparatus in power shovel Expired - Lifetime JPH0689551B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3487386A JPH0689551B2 (en) 1986-02-19 1986-02-19 Work machine control method and apparatus in power shovel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3487386A JPH0689551B2 (en) 1986-02-19 1986-02-19 Work machine control method and apparatus in power shovel

Publications (2)

Publication Number Publication Date
JPS62194332A JPS62194332A (en) 1987-08-26
JPH0689551B2 true JPH0689551B2 (en) 1994-11-09

Family

ID=12426267

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3487386A Expired - Lifetime JPH0689551B2 (en) 1986-02-19 1986-02-19 Work machine control method and apparatus in power shovel

Country Status (1)

Country Link
JP (1) JPH0689551B2 (en)

Also Published As

Publication number Publication date
JPS62194332A (en) 1987-08-26

Similar Documents

Publication Publication Date Title
KR910009255B1 (en) Control device for a power shovel
EP0380665B1 (en) Method and apparatus for controlling working units of power shovel
US5178510A (en) Apparatus for controlling the hydraulic cylinder of a power shovel
JP2682891B2 (en) Excavator control equipment for power shovel
WO1998059118A1 (en) Device for controlling limited-area excavation with construction machine
US5201177A (en) System for automatically controlling relative operational velocity of actuators of construction vehicles
KR100191392B1 (en) Excavation area setting system for area limiting excavation control in construction machines
JP3441886B2 (en) Automatic trajectory control device for hydraulic construction machinery
JPH0689550B2 (en) Work machine control method and apparatus in power shovel
JPH0689551B2 (en) Work machine control method and apparatus in power shovel
JPS63194032A (en) Controller for service machine for power shovel
JPH0689549B2 (en) Work machine control device for power shovel
JP2677812B2 (en) Control equipment for hydraulic machines
JP2553329B2 (en) Power shovel controller
JP3713358B2 (en) Front control device for construction machinery
JPH083187B2 (en) Power shovel bucket angle controller
JPH0788671B2 (en) Power shovel working machine control method and device
JPH0788672B2 (en) Power shovel work machine controller
JPH0788674B2 (en) Power shovel work machine controller
JP2687169B2 (en) Slope work control device for construction machinery
JPH02232430A (en) Controller for depth of excavation of hydraulic shovel
JPH0823155B2 (en) Work machine control device
JPH01239231A (en) Bucket ground angle control device of construction machine
JPS62164921A (en) Controller for master lever type power shovel
JP2605172B2 (en) Work machine trajectory control device