JPH0639439A - Data correcting method for radius bending - Google Patents

Data correcting method for radius bending

Info

Publication number
JPH0639439A
JPH0639439A JP20006492A JP20006492A JPH0639439A JP H0639439 A JPH0639439 A JP H0639439A JP 20006492 A JP20006492 A JP 20006492A JP 20006492 A JP20006492 A JP 20006492A JP H0639439 A JPH0639439 A JP H0639439A
Authority
JP
Japan
Prior art keywords
data
bending
correction
work
correcting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP20006492A
Other languages
Japanese (ja)
Inventor
Shigeru Tokai
茂 東海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Komatsu Ltd
Original Assignee
Komatsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd filed Critical Komatsu Ltd
Priority to JP20006492A priority Critical patent/JPH0639439A/en
Publication of JPH0639439A publication Critical patent/JPH0639439A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)
  • Bending Of Plates, Rods, And Pipes (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PURPOSE:To obtain correcting data by which the productivity is improved and a bending work with a high precision is realised in a radius bending using a press brake. CONSTITUTION:When a correcting is executed, a machine is temporally stopped (S6), the bending angle is measured (S7) and the measured results are inputted in an NC controller (S8). Then, the data referring to the frequency of correcting and bending and the correcting progress for bending are stored (S9) and the data for corrected processes are calculated from the stored data (S10). When the deviation between the data for original process P1 and the data P2 for process corrected exceeds the threshold value S, the data for a buffering process by which the transfer from the data for original process to the data for corrected process is smoothly executed is calculated.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、ワークを例えばプレス
ブレーキを用いてアール曲げ加工する際の加工データの
補正方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of correcting machining data when a work is radius-bent using a press brake, for example.

【0002】[0002]

【従来の技術】従来、プレスブレーキを使用してワーク
をアール曲げ(R曲げ)加工する場合、円弧状に成形さ
れたパンチとダイを用いて1回曲げで加工したり、円弧
状に成形されたパンチと弾性体を上面に設けたダイを用
いて送り曲げで加工したりする方法が最も一般的であっ
た。ところが、このような加工方法では、ワークの形状
に合わせて金型を用意する必要がある等の問題があっ
た。
2. Description of the Related Art Conventionally, when a work is R-bent using a press brake, the work is bent once by using a punch and a die formed into an arc shape, or is formed into an arc shape. The most common method is to feed and bend the punch and the elastic body using a die provided on the upper surface. However, such a processing method has a problem that it is necessary to prepare a mold according to the shape of the work.

【0003】そこで、このような問題に対処するため、
例えば特公昭64−5968号公報に記載されているよ
うに、プレスブレーキのパンチとダイとの間にワークを
所定ピッチで送り、各ピッチ毎にパンチの先端部とダイ
の底部との接近距離を制御して鈍角の折り曲げ加工を連
続的に行うようにしたプレスブレーキによるアール曲げ
加工方法が提案されている。該公報に記載のようなアー
ル曲げ加工方法によれば、パンチとダイを変更すること
なく、異なる曲率半径の加工物を得ることが可能とな
る。
Therefore, in order to deal with such a problem,
For example, as described in JP-B-64-5968, a work is sent at a predetermined pitch between a punch of a press brake and a die, and the approach distance between the tip of the punch and the bottom of the die is set at each pitch. There has been proposed a radius bending method using a press brake, which is controlled to perform obtuse angle bending continuously. According to the radius bending method as described in this publication, it is possible to obtain a workpiece having a different radius of curvature without changing the punch and die.

【0004】ところで、上記公報に記載のようなアール
曲げ加工方法においては、ワークの目標曲げ角度,曲げ
回数,送りピッチなどから加工データ(工程データ)を
演算するようにし、また、こうして得られた加工データ
の補正に際しては、該加工データに基づいて当該工程の
曲げ加工を一通り実行した後にワークの曲げ角度等を測
定し、その測定値と目標値との偏差に基づいて補正デー
タを求めるようにするのが普通である。
By the way, in the radius bending method as described in the above publication, the processing data (process data) is calculated from the target bending angle of the work, the number of times of bending, the feed pitch, etc. When correcting the machining data, the bending angle of the workpiece is measured after performing the bending process of the process based on the machining data, and the correction data is obtained based on the deviation between the measured value and the target value. It is normal to

【0005】[0005]

【発明が解決しようとする課題】しかしながら、上記の
ように多数回のリピート動作を含む一工程の曲げ加工が
なされた後に加工データの補正を行うのでは、時間がか
かり過ぎるという問題があり、また、多数回曲げ加工を
繰り返す結果、目標値との誤差が大きくなって曲げ精度
も悪く、目的とする製品を得るためには補正を何度も繰
り返さなければならないという問題もあった。
However, there is a problem that it takes too much time to correct the machining data after performing the bending process in one step including the repeat operation a number of times as described above. As a result of repeating the bending process many times, there is a problem that the error from the target value becomes large and the bending accuracy is poor, and the correction must be repeated many times to obtain the target product.

【0006】本発明は上記問題点に鑑みてなされたもの
であって、生産性の向上が図れるとともに精度の高い曲
げ加工を実現することのできるアール曲げ加工データ補
正方法を得ることを目的とする。
The present invention has been made in view of the above problems, and an object of the present invention is to provide a radius bending data correction method capable of improving productivity and realizing highly accurate bending. .

【0007】[0007]

【課題を解決するための手段】本発明に係るアール曲げ
加工データ補正方法は、ワークをアール曲げ加工する際
曲げ加工中に加工データを補正する方法に係るものであ
って、ワークの加工途中で実際の曲げ状態に係るデータ
を測定,入力するとともに、ワークの加工経過に係るデ
ータを記憶し、これら各データに基づいて補正データを
演算することを特徴としている。
A radius bending data correction method according to the present invention relates to a method for correcting machining data during bending when a radius bending process is performed on a work. It is characterized in that data relating to the actual bending state is measured and input, data relating to the working progress of the workpiece is stored, and correction data is calculated based on each of these data.

【0008】同補正方法は、また、現在の加工データと
補正データとの間に所定値以上の差があるとき加工デー
タから補正データへの移行を緩やかに行う緩衝工程デー
タを演算するようにできる。
In the correction method, when there is a difference of a predetermined value or more between the current processed data and the corrected data, buffer process data for gently shifting the processed data to the corrected data can be calculated. .

【0009】[0009]

【作用】曲げ加工の途中で例えば曲げ角度等のワークの
実際の曲げ状態に係るデータが測定されて入力される。
そして、この入力データと、既に記憶されている例えば
それまでの曲げ回数や補正回数等の加工経過に係るデー
タとから補正データが演算され、こうして得られた補正
データに基づいて曲げ加工工程が補正される。
Operation During the bending process, data relating to the actual bending state of the work, such as the bending angle, is measured and input.
Then, the correction data is calculated from this input data and the already stored data relating to the processing progress such as the number of times of bending and the number of times of correction, and the bending process is corrected based on the correction data thus obtained. To be done.

【0010】また、現在の加工データと補正データとの
間に所定値以上の差がある時補正データへの移行を緩や
かに行う緩衝工程データを演算するようにすると、加工
データが急激に補正されるのを避けることができ、ワー
クの曲率の著しい変化による外観の劣化を防ぐことがで
きる。
Further, when there is a difference of a predetermined value or more between the current machining data and the correction data, the buffer process data for gently shifting to the correction data is calculated, so that the machining data is rapidly corrected. It is possible to prevent the deterioration of the appearance due to the remarkable change of the curvature of the work.

【0011】[0011]

【実施例】以下、実施例を図面に基づいて説明する。図
1は本発明の一実施例に係るプレスブレーキの要部側面
図である。図示のように、この実施例のプレスブレーキ
は、図示しないフレームに固定された水平テーブル1
と、該テーブル1上に配置され上面にV字状の型溝を有
するダイ2と、このダイ2の上方に対向配置され上下方
向に作動可能なラム3と、該ラム3の下部に取り付けら
れたパンチ4と、上記ダイ2およびパンチ4の後方(図
で左方)に配置され前後,上下および左右方向に移動可
能とされたバックストップ5を備えている。このような
構成の装置において、ワーク(被加工物)6をダイ2上
に水平に載置し、該ワーク6の後端部をバックストップ
5に突き当てた状態でパンチ4をワーク6に当てること
により該ワーク6の曲げ加工がなされる。その場合、加
工形状は、図示しないNC制御装置を用いてバックスト
ップ5の位置(バックストップ値;送りピッチはこの値
の変化で決まる),パンチ4の追い込み量(デプス値)
および曲げ回数(繰り返し回数)を制御することによっ
て調整される。なお、ワーク6の送りピッチをある程度
小さくすることで滑らかなアール(R)の形状の加工が
可能となる。
Embodiments Embodiments will be described below with reference to the drawings. FIG. 1 is a side view of a main part of a press brake according to an embodiment of the present invention. As shown in the figure, the press brake of this embodiment is a horizontal table 1 fixed to a frame (not shown).
A die 2 which is arranged on the table 1 and has a V-shaped die groove on the upper surface, a ram 3 which is arranged above the die 2 so as to face each other and which can be actuated in the vertical direction, The punch 4 and the back stop 5 arranged behind the die 2 and the punch 4 (to the left in the figure) and movable in the front-back, up-down and left-right directions. In the apparatus having such a configuration, the work (workpiece) 6 is horizontally placed on the die 2, and the punch 4 is applied to the work 6 while the rear end of the work 6 is abutted against the back stop 5. As a result, the work 6 is bent. In that case, the machining shape is determined by using the NC control device (not shown), the position of the backstop 5 (backstop value; the feed pitch is determined by the change in this value), and the punching amount of the punch 4 (depth value).
And the number of times of bending (the number of repetitions) are controlled. By making the feed pitch of the work 6 small to some extent, it is possible to process a smooth R shape.

【0012】上記プレスブレーキを制御するNC制御装
置には、予め数種類の曲げパターンが登録されるととも
に、これらの各曲げパターン毎の標準曲げ工程がテーブ
ルとして登録されている。ここで、標準曲げ工程とは、
ワーク6とパンチ4やラム3,カバー等との干渉を防ぐ
ために、Rの曲げ作業を例えば2工程もしくは3工程に
分割するとか、分割なしで行うか等といった種別や、端
部にストレート部を形成するか否かによって端部の角曲
げを最初に行うかアール曲げを最初に行うか等といった
種別に応じて予め設定された工程をいう。この標準曲げ
工程の一例を図2に示す。この図に示すのは両端部に角
曲げ部を有する曲げパターンでかつ角曲げ(図中、第1
〜4工程目に相当する。)を最初に行う場合であって、
Rの曲げ作業を2工程に分割した(2分割)ものの例で
ある。このように、2分割の場合、Rの曲げ作業は、A
点(分割位置)より左側の曲げ工程(第5〜6工程目)
と右側の曲げ工程(第8〜9工程目)に分割される。な
お、図2において左側はプレスブレーキの後方を、右側
は同前方をそれぞれ示し、R曲げ作業時ワークは後方か
ら前方へ向けて送られる。
In the NC controller for controlling the press brake, several kinds of bending patterns are registered in advance, and standard bending processes for each of these bending patterns are registered as a table. Here, the standard bending process is
In order to prevent the work 6 from interfering with the punch 4, the ram 3, the cover, etc., the type of bending work of R is divided into, for example, two or three steps, or without division, and a straight portion is provided at the end. It refers to a step that is set in advance according to the type such as whether to perform the corner bending first or the radius bending first depending on whether or not it is formed. An example of this standard bending process is shown in FIG. Shown in this figure is a bending pattern that has corner bending parts at both ends, and
Corresponds to the fourth step. ) Is done first,
It is an example of what the R bending work is divided into two steps (two divisions). Thus, in the case of dividing into two, the bending work of R is A
Bending process on the left side of the point (division position) (5th-6th process)
And the right bending process (8th to 9th processes). In FIG. 2, the left side shows the rear side of the press brake and the right side shows the front side thereof, and the work is fed from the rear side to the front side during the R bending work.

【0013】上記登録データのほか、NC制御装置に
は、また、プレスブレーキの能力,曲げ長さ,フレーム
ギャップ,サイドフレーム間寸法,テーブル形状,ラム
形状といった機械条件に関するデータが登録され、さら
に、加工限界テーブルとして、バックストップ5の突き
当て限界(上下方向の可動限界)や移動限界(前後方向
の可動限界)に関するデータが登録されている。
In addition to the above registration data, the NC controller also registers data relating to mechanical conditions such as press brake capacity, bending length, frame gap, side frame dimensions, table shape, and ram shape. As the processing limit table, data relating to the abutting limit of the backstop 5 (upward and downward movable limit) and movement limit (forward and backward movable limit) are registered.

【0014】そして、NC制御装置は、上記登録データ
と外部からキー入力されるワーク条件,金型条件および
加工条件等のデータに基づいて、加工時における工程分
割数およびワーク上の分割位置に係るデータや曲げ始
め,曲げ終わりの補正工程を含むNC工程データを自動
演算し、この工程データに基づいてプレスブレーキはア
ール曲げ加工を実行する。
Then, the NC control device relates to the number of process divisions and division positions on the work at the time of machining, based on the registration data and data such as work conditions, mold conditions and machining conditions keyed from the outside. The NC process data including the data and the correction process of the bending start and the bending end are automatically calculated, and the press brake executes the radius bending process based on this process data.

【0015】本実施例では、より高精度のアール曲げ加
工を行うために、例えば図2に示す標準曲げ工程のう
ち、第6工程や第8工程のように一工程中で曲げ加工を
繰り返し実行する工程において、その工程の途中で加工
データを補正するようにしている。その場合、機械を一
時的に停止させてワーク6の曲げ角度を測定し、その測
定データをNC制御装置へ入力するようにし、併せて、
NC制御装置に、それまでの曲げ回数や補正回数等の加
工経過に係るデータを記憶するようにしている。そし
て、これらのデータに基づいて補正工程データが演算さ
れ、この補正工程データでNCプログラムが再起動され
る。さらに、本実施例では、現在の工程データと演算に
より求められた補正工程データとの間の偏差が大きい場
合には、現在の工程データから滑らかに補正工程データ
へ移行することができるよう緩衝工程データが演算され
る。
In the present embodiment, in order to perform more accurate round bending, for example, in the standard bending process shown in FIG. 2, the bending process is repeatedly executed in one process such as the sixth process and the eighth process. In the process, the processing data is corrected during the process. In that case, the machine is temporarily stopped, the bending angle of the work 6 is measured, and the measurement data is input to the NC control device.
The NC control device is configured to store data relating to the progress of processing such as the number of times of bending and the number of corrections performed so far. Then, the correction process data is calculated based on these data, and the NC program is restarted with this correction process data. Further, in the present embodiment, when the deviation between the current process data and the correction process data obtained by the calculation is large, the buffer process is performed so that the current process data can be smoothly transferred to the correction process data. The data is calculated.

【0016】図3は上述のような工程データの補正を実
行するためのフローチャートである。なお、S1〜S1
4は各ステップを示す。このフローにおいて、スタート
すると、まず、S1で曲げ回数のカウンタBNCをリセ
ットし、S2で曲げ加工を実行する。このように曲げ加
工が実行されると、S3でカウンタBNCを自動的にカ
ウントアップし、次いで、S4でカウンタBNCの値が
目標曲げ回数に達したかどうかを見る。そして、目標曲
げ回数に達していれば、このフローを終了し、一方、目
標曲げ回数に達していなければ、次に、S5で補正を実
行するか否かを判定する。ここで、補正実行の有無の判
断は、例えば実際の曲げアールと目標アールとの誤差や
実際の曲げ角度と目標曲げ角度との誤差等に基づき作業
者によりなされる。
FIG. 3 is a flow chart for executing the correction of the process data as described above. Note that S1 to S1
4 indicates each step. In this flow, when started, first, the bending number counter BNC is reset in S1, and the bending process is executed in S2. When the bending process is executed in this way, the counter BNC is automatically incremented in S3, and then it is checked in S4 whether the value of the counter BNC has reached the target number of bends. Then, if the target number of bends has been reached, this flow is ended, while if the target number of bends has not been reached, it is next determined in S5 whether or not to perform correction. Here, the determination as to whether or not the correction is performed is made by the operator based on, for example, an error between the actual bending radius and the target bending radius, an error between the actual bending angle and the target bending angle, and the like.

【0017】そして、S5の判定がNOすなわち補正を
実行しないというときには、S2へ戻って次の曲げ加工
に移行し、一方、YESすなわち補正を実行するという
ときには、S6で機械を一時的に停止させ、次いで、S
7で曲げ角度を測定し、S8でその測定結果をNC制御
装置へ入力する。曲げ角度の測定に際しては、図4に示
すような角度計測器7(例えば丸井計器(株)製「デジ
タル・プロトラクター」)が用いられる。この角度計測
器7は、本体8と該本体8に対して回動自在に取り付け
られた可動プレート9を備え、図示のように本体8と可
動プレート9との間にアール曲げ加工されたワーク6を
沿わせることにより曲げ角度θを測定するよう構成した
ものである。なお、測定されたデータは液晶表示部10
にデジタル表示される。また、この角度計測器7によっ
て測定されたデータの入力は、マニュアルによって行っ
てもいいし、角度計測器7に設けられた図示しないデー
タ出力釦を用いて自動的に行うようにしてもいい。
If the determination in S5 is NO, that is, if correction is not to be executed, the process returns to S2 to proceed to the next bending process, while if YES is to execute correction, the machine is temporarily stopped in S6. , Then S
The bending angle is measured in 7 and the measurement result is input to the NC controller in S8. When measuring the bending angle, an angle measuring device 7 (for example, "Digital Protractor" manufactured by Marui Keiki Co., Ltd.) as shown in FIG. 4 is used. The angle measuring device 7 includes a main body 8 and a movable plate 9 rotatably attached to the main body 8, and as shown in the drawing, a work 6 that is R-bent between the main body 8 and the movable plate 9. Is arranged to measure the bending angle θ. The measured data is displayed on the liquid crystal display unit 10.
Is displayed digitally. The data measured by the angle measuring instrument 7 may be input manually or automatically using a data output button (not shown) provided in the angle measuring instrument 7.

【0018】次のステップS9では、補正回数,曲げ回
数,曲げ角度等の曲げ補正経過に係るデータを記憶す
る。そして、次いで、S10で、記憶されたデータから
補正工程データを演算する。次に、S11で現在の工程
データP1 と補正後の工程データP2 との偏差が所定の
閾値S以上になっているかどうかを見て、YESすなわ
ちP1 −P2 ≧Sというときには、S12で現在の工程
データP1 から補正後の工程データP2 への移行を緩や
かに行うための緩衝工程データを演算し、次いで、S1
3で補正工程データを出力する。一方、S11の判定が
NOすなわちP1−P2 <Sというときには、偏差が所
定値未満であるのでそのままS13へ進んで補正工程デ
ータを出力する。そして、その後、S14で機械の運転
を再スタートしてS2へ戻る。
In the next step S9, data relating to the bending correction progress such as the number of corrections, the number of bendings, and the bending angle is stored. Then, in step S10, the correction process data is calculated from the stored data. Next, to see if the deviation between the process data P 2 and the corrected current process data P 1 in S11 is equal to or greater than a predetermined threshold value S, when referred YES, that P 1 -P 2 ≧ S is, S12 At step S1, buffer process data for gradual transition from the current process data P 1 to the corrected process data P 2 is calculated, and then S1
In 3, the correction process data is output. On the other hand, when the determination in S11 is NO, that is, P 1 -P 2 <S, the deviation is less than the predetermined value, so the process directly proceeds to S13 and the correction process data is output. Then, after that, the operation of the machine is restarted in S14 and the process returns to S2.

【0019】図3のS10に係る補正工程データの演算
は図5に示すフローに従ってなされる。このフローにお
いては、まず、S101で図3のS9にて記憶された曲
げ補正経過に係るデータから、前回の補正点から今回の
中断点までの曲げ回数BNx を読み取り、次いで、S1
02で既に入力された曲げ角度のデータを読み取る。そ
して、S103で、上記各データを用い前回の補正点か
ら今回の中断点までの曲げ角度WAx を演算により求め
る。
The calculation of the correction process data in S10 of FIG. 3 is performed according to the flow shown in FIG. In this flow, first, in S101, the number of times of bending BN x from the previous correction point to the current interruption point is read from the data relating to the bending correction process stored in S9 of FIG. 3, and then S1
In 02, the bending angle data already input is read. Then, in step S103, the bending angle WA x from the previous correction point to the current interruption point is calculated by using the above data.

【0020】上記曲げ角度WAx の求め方を図6を参照
しながら以下に説明する。この図は、3回目の補正を行
う場合について示している。図示のように、今回(3回
目)の中断時におけるワーク6の曲げ角度MA(3)と
相対する内角角度C(3)は、 C(3)=180°−MA(3) ・・・・ となり、したがって、今回曲げられたワークの曲げ角度
と相対する内角角度WB(3)は、 WB(3)=C(3)−C(2) ・・・・ となる。ここで、C(2)は前回(2回目)中断時の曲
げ角度MA(2)と相対する内角角度である。
A method of obtaining the bending angle WA x will be described below with reference to FIG. This figure shows the case where the third correction is performed. As shown in the figure, the internal angle C (3) facing the bending angle MA (3) of the work 6 at the time of this (third) interruption is C (3) = 180 ° −MA (3) ... Therefore, the internal angle WB (3) facing the bending angle of the workpiece bent this time is WB (3) = C (3) −C (2) ... Here, C (2) is an internal angle angle that is opposed to the bending angle MA (2) at the time of the previous (second) interruption.

【0021】また、前回補正点から今回中断点までの推
定曲げ角度WA(3)は、円弧を多角形近似すると、 WA(3)=180°−WB(3) ・・・・ で与えられる。よって、上記から、中断時におけ
るワーク6の曲げ角度MA(2),MA(3)を測定す
ると、前回の補正点から今回の中断点までの曲げ角度W
A(3)(一般的にはWAx )を求めることができる。
The estimated bending angle WA (3) from the previous correction point to the current interruption point is given by WA (3) = 180 ° −WB (3) ... When the arc is approximated to a polygon. Therefore, from the above, when the bending angles MA (2) and MA (3) of the work 6 at the time of interruption are measured, the bending angle W from the previous correction point to the current interruption point W
A (3) (generally WA x ) can be obtained.

【0022】図5のフローに戻って、上記のようにS1
03で曲げ角度WAx が求められると、次に、S104
へ進んで、中断点までの曲げ回数BNx ,曲げ角度WA
x および送りピッチから前回の補正点から今回の中断点
までの曲げ条件を推定し、補正データを演算する。そし
て、次に、S105で、現在の工程データに上で求めた
補正データを加えて補正工程データを演算して、このフ
ローを終了する。
Returning to the flow of FIG. 5, as described above, S1
When the bending angle WA x is obtained in 03, next, S104
Go to, and bend number BN x , bend angle WA to the break point
The bending condition from the previous correction point to the current interruption point is estimated from x and the feed pitch, and the correction data is calculated. Then, in step S105, the correction process data obtained above is added to the current process data to calculate the correction process data, and the flow ends.

【0023】また、図3のS12に係る緩衝工程データ
の演算は図7に示すフローに従ってなされる。このフロ
ーにおいては、まず、S201で、緩衝工程数NBP
を、現在の工程データP1 と補正後の工程データP2
の差(P1 −P2 )を予め設定された変化の許容値Cで
除した値として演算し、次いで、S202で、緩衝工程
用補正値VBPを、P1 −P2 を緩衝工程数NBPで除
した値として演算する。そして、S203で、現在の工
程データP1 から補正値VBPを順次減算することによ
り緩衝工程数NBPの数だけ順次緩衝工程データを演算
し、このフローを終了する。
The calculation of the buffer process data in S12 of FIG. 3 is performed according to the flow shown in FIG. In this flow, first, in S201, the number of buffering steps NBP
Is calculated as a value obtained by dividing a difference (P 1 −P 2 ) between the current process data P 1 and the corrected process data P 2 by a preset allowable change value C, and then, in S202, buffering is performed. The process correction value VBP is calculated as a value obtained by dividing P 1 -P 2 by the buffer process number NBP. Then, in S203, the correction value VBP is sequentially subtracted from the current process data P 1 to successively calculate the buffer process data by the number of the buffer process number NBP, and this flow is ended.

【0024】[0024]

【発明の効果】本発明は以上のように構成されており、
アール曲げ加工の途中でワークの曲げ状態に係るデータ
を入力して加工データを逐次補正するようにしたので、
生産性の向上が図れるとともに精度の高い曲げ加工を実
現することができる。また、現在の加工データと補正デ
ータとの間に所定値以上の差がある時補正データへの移
行を緩やかに行う緩衝工程データを演算するようにする
と、ワークの曲率が著しく変化するといったようなこと
がなく、外観品質の高い製品を得ることができる。
The present invention is configured as described above,
Since the data related to the bending state of the work is input during the R-bending process and the processing data is corrected sequentially,
The productivity can be improved and highly accurate bending can be realized. In addition, when the buffer process data that gently shifts to the correction data is calculated when there is a difference of a predetermined value or more between the current machining data and the correction data, the curvature of the work may be remarkably changed. And a product with high appearance quality can be obtained.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例に係るプレスブレーキの要部
側面図
FIG. 1 is a side view of a main part of a press brake according to an embodiment of the present invention.

【図2】本発明の一実施例におけるアール曲げ加工の標
準曲げ工程の一例を示す図
FIG. 2 is a diagram showing an example of a standard bending process of radius bending in one embodiment of the present invention.

【図3】本発明の一実施例のアール曲げ加工における工
程データの補正を実行するためのフローチャート
FIG. 3 is a flowchart for executing correction of process data in the R-bending process according to the embodiment of the present invention.

【図4】本発明の一実施例のアール曲げ加工に使用する
角度計測器の正面図
FIG. 4 is a front view of an angle measuring device used for radius bending according to an embodiment of the present invention.

【図5】本発明の一実施例のアール曲げ加工における補
正工程データを演算するためのフローチャート
FIG. 5 is a flowchart for calculating correction process data in the radius bending process according to the embodiment of the present invention.

【図6】本発明の一実施例のアール曲げ加工において前
回の補正点から今回の中断点までの曲げ角度の求め方を
説明する図
FIG. 6 is a diagram illustrating a method of obtaining a bending angle from a previous correction point to a current interruption point in the radius bending process according to the embodiment of the present invention.

【図7】本発明の一実施例のアール曲げ加工における緩
衝工程データを演算するためのフローチャート
FIG. 7 is a flowchart for calculating buffer process data in the R-bending process according to the embodiment of the present invention.

【符号の説明】[Explanation of symbols]

2 ダイ 4 パンチ 5 バックストップ 6 ワーク 7 角度計測器 2 Die 4 Punch 5 Back stop 6 Work 7 Angle measuring instrument

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 ワークをアール曲げ加工する際曲げ加工
中に加工データを補正する方法であって、前記ワークの
加工途中で実際の曲げ状態に係るデータを測定,入力す
るとともに前記ワークの加工経過に係るデータを記憶
し、これらの各データに基づいて補正データを演算する
ことを特徴とするアール曲げ加工データ補正方法。
1. A method for correcting machining data during bending when a work is bent, wherein data relating to an actual bending state is measured and input during the machining of the work and the machining progress of the work. Is stored, and correction data is calculated based on each of these data.
【請求項2】 現在の加工データと補正データとの間に
所定値以上の差があるとき前記加工データから前記補正
データへの移行を緩やかに行う緩衝工程データを演算す
るようにした請求項1記載のアール曲げ加工データ補正
方法。
2. A buffer process data for gradual transition from the processing data to the correction data is calculated when there is a difference of a predetermined value or more between the current processing data and the correction data. The method for correcting the radius bending data described.
JP20006492A 1992-07-28 1992-07-28 Data correcting method for radius bending Pending JPH0639439A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20006492A JPH0639439A (en) 1992-07-28 1992-07-28 Data correcting method for radius bending

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20006492A JPH0639439A (en) 1992-07-28 1992-07-28 Data correcting method for radius bending

Publications (1)

Publication Number Publication Date
JPH0639439A true JPH0639439A (en) 1994-02-15

Family

ID=16418245

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20006492A Pending JPH0639439A (en) 1992-07-28 1992-07-28 Data correcting method for radius bending

Country Status (1)

Country Link
JP (1) JPH0639439A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003062618A (en) * 2001-08-24 2003-03-05 Amada Co Ltd Device for bending
KR100440982B1 (en) * 2001-11-27 2004-07-21 박홍순 Automatic correction method for rotation angle of cutting blade and apparatus therefor
JP2011206804A (en) * 2010-03-30 2011-10-20 Tadano Ltd Pressing method of plate material, boom, and pressing device of plate material
JP2012240111A (en) * 2011-05-24 2012-12-10 Amada Co Ltd Bending material, bending method, graphic preparing device and press brake
JP2013103239A (en) * 2011-11-11 2013-05-30 Miraikikai Inc Bending device and bending method
JP2016059935A (en) * 2014-09-17 2016-04-25 株式会社アマダホールディングス Press brake and multi-stage bending method
JP2018114527A (en) * 2017-01-18 2018-07-26 川崎重工業株式会社 Bending method and bending device
JP2020001053A (en) * 2018-06-26 2020-01-09 川崎重工業株式会社 Bending method and bending system
WO2022203084A1 (en) * 2021-03-25 2022-09-29 川崎重工業株式会社 Workpiece transport method, workpiece transport device, and workpiece transport program

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003062618A (en) * 2001-08-24 2003-03-05 Amada Co Ltd Device for bending
KR100440982B1 (en) * 2001-11-27 2004-07-21 박홍순 Automatic correction method for rotation angle of cutting blade and apparatus therefor
JP2011206804A (en) * 2010-03-30 2011-10-20 Tadano Ltd Pressing method of plate material, boom, and pressing device of plate material
JP2012240111A (en) * 2011-05-24 2012-12-10 Amada Co Ltd Bending material, bending method, graphic preparing device and press brake
JP2013103239A (en) * 2011-11-11 2013-05-30 Miraikikai Inc Bending device and bending method
JP2016059935A (en) * 2014-09-17 2016-04-25 株式会社アマダホールディングス Press brake and multi-stage bending method
JP2018114527A (en) * 2017-01-18 2018-07-26 川崎重工業株式会社 Bending method and bending device
JP2020001053A (en) * 2018-06-26 2020-01-09 川崎重工業株式会社 Bending method and bending system
WO2022203084A1 (en) * 2021-03-25 2022-09-29 川崎重工業株式会社 Workpiece transport method, workpiece transport device, and workpiece transport program

Similar Documents

Publication Publication Date Title
JP3741474B2 (en) Bending order selection method and selection apparatus for bending machine
EP0923755B1 (en) Bending simulation method and apparatus therefor
CA2185430A1 (en) Press brake
JP2002059216A (en) Method and apparatus for straightening plane body
JPH0639439A (en) Data correcting method for radius bending
JPH02142620A (en) Method of bending sheet piece at fixed angle of bending
EP1044737B1 (en) Method and apparatus for controlling sheet shape in sheet rolling
CN113172132B (en) Bending machine die size deviation self-calculation method
JPH07265957A (en) Press brake
JPH0639440A (en) Data preparing method for radius bending
US20030069661A1 (en) High performance machine with reduced setting-up time for programmed sheet bending
JP3666925B2 (en) Automatic correction method of die drive-in amount
JP2001025822A (en) Method for positioning abutting rod of back gage device, backgage device, bending method and bending machine
JP2023062509A (en) Press work assistance system and press work assistance method
JP4761659B2 (en) Bending method and single elongation value specifying device in bending apparatus
JPH09201623A (en) Bending method in metal-plate bending machine and metal-plate bending machine applying the bending method
JPH0824955A (en) Bending device
JP2002082710A (en) Method and system for bending
JP7345018B1 (en) Bending method
JP6894951B2 (en) Bending method and bending system
US11565297B2 (en) Bending machine and method for controlling the bending machine
JP3946482B2 (en) D value correction device for bending
JP2005205450A (en) Method for correcting die-face shape of mold, and its program
JPH09295060A (en) D value controller in bending machine
JPH06304662A (en) Method for controlling bending position of work in nc press brake

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20011002