JPH0633610A - Lift-up device of top house for construction of building - Google Patents

Lift-up device of top house for construction of building

Info

Publication number
JPH0633610A
JPH0633610A JP20695792A JP20695792A JPH0633610A JP H0633610 A JPH0633610 A JP H0633610A JP 20695792 A JP20695792 A JP 20695792A JP 20695792 A JP20695792 A JP 20695792A JP H0633610 A JPH0633610 A JP H0633610A
Authority
JP
Japan
Prior art keywords
lift
guide unit
building
shed
pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP20695792A
Other languages
Japanese (ja)
Inventor
Sumio Fukuda
澄男 福田
Shuichi Ueno
修一 植野
Michiaki Kawaoka
道顕 河岡
Mitsushi Suda
充司 須田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP20695792A priority Critical patent/JPH0633610A/en
Publication of JPH0633610A publication Critical patent/JPH0633610A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PURPOSE:To simplify operation by a method in which the structure of a top house is such as to freely open, close or move working field all or partly on smaller places. CONSTITUTION:A pin 8b is drawn out of an upper guide unit 8 to release the connection with a guide post 7 for operation, whereupon an expandible rod 10 is extended downwards from a motor cylinder 10 and the upper guide unit 8 raises to lift up the top house. At the time when the guide unit 8 rises, the pin 8b is inserted, and the pin 9b of the lower guide unit 9 is pulled out to release the connection. An expandible rod 10a is withdrawn and the lower guide unit 9 is raised. At the time when the guide unit 9 rises, the pin 9b is inserted. Such serial operations repeated several times to raise a climbing device D to lift up the top house.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、建物の構築作業用上屋
のリフトアップ装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a lift-up device for a building construction work shed.

【0002】[0002]

【従来の技術】一般のRC(鉄筋コンクリート)造等の
建物は、順次上階に向けて構築する、いわゆる最上階先
行工法を採用しており、最上階の構築現場は、常に風雨
に曝されたり、暑さ寒さが厳しい環境にある。その結
果、工事が天候に左右され易く、また過酷な労働環境に
あるので、作業員の確保が困難である等の問題があっ
た。
2. Description of the Related Art A general RC (reinforced concrete) building or the like employs a so-called top-floor preceding construction method, which is constructed sequentially toward upper floors. The top-floor construction site is always exposed to wind and rain. The environment is severe in the heat and cold. As a result, the construction is apt to be affected by the weather and the working environment is harsh, so that it is difficult to secure workers.

【0003】従来、このような問題を解消する対策とし
て、構築中の最上階部分に固定式上屋を設置したり、水
平に移動する上屋を設置したり、あるいは大型クレーン
等のリフトアップ装置を用いたリフトアップ式の上屋を
設置したものがあった。
Conventionally, as a measure for solving such a problem, a fixed-type shed is installed on the uppermost floor part under construction, a shed that moves horizontally is installed, or a lift-up device such as a large crane is installed. There was one that installed a lift-up type shed using.

【0004】しかしながら、上記従来の上屋は、高さの
高い建物には適用し難く、躯体の盛り替えにクレーン等
を用いた解体、移動、組立が必要であり、また設備が大
がかりであったり、資機材の搬出入のための開口部が小
さい等の問題点があった。
However, the above-mentioned conventional shed is difficult to apply to a tall building, and it requires dismantling, moving and assembling using a crane or the like to replace the skeleton, and the equipment is large. However, there was a problem that the opening for loading and unloading materials and equipment was small.

【0005】[0005]

【発明が解決しようとする課題】本発明は、上記従来の
問題点を解決するためになされたもので、その目的とす
るところは、上屋の構造を、作業現場の全域あるいは一
部を自由に開閉したり、移動可能とすることにより、簡
易で場所をとらない、建物の構築作業用上屋のリフトア
ップ装置を提供することにある。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems of the prior art. The object of the present invention is to freely change the structure of the shed and the whole or part of the work site. (EN) A simple and space-saving lift-up device for a building construction work by opening and closing or moving.

【0006】[0006]

【課題を解決するための手段】本発明の建物の構築作業
用上屋リフトアップ装置は、上屋の閉じた位置の建物の
桁行側に設けた少なくとも2本のガイドポストと、該ガ
イドポストに沿って上昇するクライミング装置と、該ク
ライミング装置を駆動する手段からなることを特徴とす
る。上記クライミング装置は、上方ガイドユニットと、
伸縮作動手段と、下方ガイドユニットからなる。上記伸
縮作動手段は、モートルシリンダと伸縮ロッドからな
る。上記駆動手段は、ギヤードモータと、該ギヤードモ
ータにより回転され上記伸縮ロッドを作動させるドライ
ブシャフトからなる。
SUMMARY OF THE INVENTION A building lift-up apparatus for building construction work according to the present invention is provided with at least two guide posts provided on the girder side of the building in a closed position of the building and the guide posts. It is characterized in that it comprises a climbing device that rises along with it, and means for driving the climbing device. The climbing device includes an upper guide unit,
It is composed of a telescopic operating means and a lower guide unit. The expansion / contraction operating means includes a motor cylinder and an expansion / contraction rod. The driving means includes a geared motor and a drive shaft that is rotated by the geared motor and operates the telescopic rod.

【0007】[0007]

【実施例】以下、本発明の一実施例について図面を参照
しながら説明する。図1において、Aは構築中の建物で
あって、その周囲には仮設足場Bが組み付けられてい
る。建物Aは最上階先行工法により構築されるものであ
れば、RC造、SRC(鉄骨鉄筋コンクリート)造ある
いはS(鉄骨)造等いずれでもよい。尚、上記仮設足場
Bを省略した無足場工法であってもよい。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. In FIG. 1, A is a building under construction, and a temporary scaffold B is assembled around it. The building A may be RC structure, SRC (steel frame reinforced concrete) structure, S (steel frame) structure, or the like as long as it is constructed by the top floor preceding construction method. Incidentally, a non-scaffolding construction method in which the temporary scaffold B is omitted may be used.

【0008】Cは上屋であって、鉄骨トラスの柱脚部1
aと屋根部1bから構成された複数の門型の骨組構造枠
1と(図2参照)、これらの骨組構造枠1の屋根部1b
の間に張装された膜材2から構成されていて、全体とし
てアコーデオン方式に開閉可能に構成されている。この
膜材2は防火および防炎加工を施した恒久膜材である。
膜材2は、柱脚部1aの間にも張装してもよい。特に、
豪雪地域には、上記骨組構造枠1に融雪ヒータを取り付
けて融雪可能とする。
C is a shed and is a column base 1 of a steel truss.
a and a plurality of gate-shaped frame structure frames 1 configured with a roof part 1b (see FIG. 2), and roof parts 1b of these frame structure frames 1
It is composed of the film material 2 stretched between the two, and is constructed so as to be opened and closed in an accordion system as a whole. This film material 2 is a permanent film material that has been fireproofed and flameproofed.
The film material 2 may be stretched between the column bases 1a. In particular,
In the heavy snow region, a snow melting heater is attached to the frame structure frame 1 to enable snow melting.

【0009】図3からも明らかなように、開閉方向に対
して中央部と両側部の骨組構造枠1同士は筋交1cによ
り一体的に補強されていて、膜材2′は折り畳まれな
い。尚、転倒等の危険性がなければ、これらの筋交1c
による補強は必ずしも必要ではなく、特に、中央部のそ
れは省略してもよい。
As is clear from FIG. 3, the frame structure frames 1 in the central portion and both side portions in the opening / closing direction are integrally reinforced by the braces 1c, and the membrane material 2'is not folded. If there is no risk of falling, etc., these braces 1c
It is not always necessary to reinforce, and in particular, that in the central part may be omitted.

【0010】上記骨組構造枠1の数を増減させることに
より、建物Aの桁行方向の長さに合わせて、上屋Cの開
閉方向の長さを調節することができる。また、上記骨組
構造枠1の屋根部1bのトラス骨組を増減することによ
り、建物Aの梁間方向の長さに合わせて、上屋Cのスパ
ン方向の調節をすることができる。さらに、骨組構造枠
1の柱脚部1aの長さを変えることにより、上屋Cの高
さも調節することができる。従って、平面形状や大きさ
の異なる別の建物にも転用が可能である。
By increasing or decreasing the number of the frame structure frames 1, the length of the roof C in the opening / closing direction can be adjusted according to the length of the building A in the girder direction. Further, by increasing or decreasing the truss frame of the roof portion 1b of the frame structure frame 1, the span direction of the roof C can be adjusted according to the length of the building A in the beam direction. Furthermore, by changing the length of the column base 1a of the frame structure frame 1, the height of the shed C can also be adjusted. Therefore, it can be diverted to another building having a different planar shape and size.

【0011】図4に示すように、上記骨組構造枠1の柱
脚部1aの下端には、走行車輪3が取り付けられてい
て、レール4上を転動しながら移動するようになってい
る。5はサイドローラであって、レール4の腹部を両側
から挟むように配置され、強風等による上屋Cの浮き上
がりを防止している。
As shown in FIG. 4, traveling wheels 3 are attached to the lower ends of the column bases 1a of the frame structure frame 1 so as to move on the rails 4 while rolling. Reference numeral 5 denotes a side roller, which is arranged so as to sandwich the abdomen of the rail 4 from both sides, and prevents the roof C from being lifted up by a strong wind or the like.

【0012】上記レール4はH型鋼等からなる走行桁6
上に固定されている。この走行桁6は、図2からも明ら
かなように、桁行方向の仮設足場Bに取り付けられてい
る。仮設足場Bを省略するときは、建物Aの躯体に直接
取り付ける。図3において、6aは桁受用ブラケットで
あって、高さ調節用のジャッキが付設してある。
The rail 4 is a running girder 6 made of H-shaped steel or the like.
It is fixed on. As is clear from FIG. 2, the traveling girder 6 is attached to the temporary scaffold B in the girder row direction. When the temporary scaffold B is omitted, it is directly attached to the building A structure. In FIG. 3, reference numeral 6a is a girder receiving bracket to which a height adjusting jack is attached.

【0013】本実施例の上屋Cは以上のように構成され
ているので、図1(A)に示す閉じた状態から、両側部
の骨組構造枠1を上記走行桁6に沿って移動させると、
途中の膜材2がアコーデオン式に順次開いて、図1
(B)に示す全開した状態になり、建物Aの最上階での
構築現場の全体を覆い、風雨や寒暖に影響されることな
く計画的に施工を行なうことができる。上屋Cの開閉
は、電動ウインチ等の電動式駆動装置で行なうとよい。
Since the roof C of this embodiment is constructed as described above, the frame structure frames 1 on both sides are moved along the running girders 6 from the closed state shown in FIG. 1 (A). When,
Membrane material 2 on the way opens sequentially in an accordion manner,
The fully opened state shown in (B) covers the entire construction site on the top floor of the building A, and the construction can be performed systematically without being affected by wind, rain, and temperature. The opening and closing of the shed C may be performed by an electric drive device such as an electric winch.

【0014】また、上屋Cを部分的に開くことにより、
現場を部分的に開放してクレーン等による資機材の搬入
搬出作業を行なうこともできる。このように、上屋C
は、アコーデオン式に開いたり閉じたりする他に、特に
閉じた状態で全体として移動することも可能である。
尚、通常のセット時は、図3に示すように、ワイヤWに
より建物Aの躯体に固定しておく。
By partially opening the shed C,
It is also possible to partially open the site and carry in and out work of materials and equipment using a crane or the like. In this way, shed C
In addition to opening and closing in an accordion manner, it is also possible to move as a whole, especially in the closed state.
In addition, at the time of normal setting, as shown in FIG. 3, it is fixed to the body of the building A by the wire W.

【0015】次に、上記上屋Cのリフトアップについて
説明する。
Next, the lift-up of the above-mentioned shed C will be described.

【0016】桁行方向の仮設足場Bの外側にH型鋼から
なる2本のガイドポスト7が立設されている。2本のガ
イドポスト7の間隔は、上屋Cを閉じた状態(図5の状
態)の幅(長さ)にほぼ合わせて設置されている。ガイ
ドポスト7は必要に応じて本数を増やすことができる。
本実施例では、ガイドポスト7を建物Aのほぼ中央部に
設置しているが、桁行方向の仮設足場Bの外側であれ
ば、いずれの位置であってもよい。7aは筋交である。
Two guide posts 7 made of H-shaped steel are erected on the outside of the temporary scaffold B in the column direction. The distance between the two guide posts 7 is set so as to substantially match the width (length) of the closed roof C (state of FIG. 5). The number of guide posts 7 can be increased if necessary.
In this embodiment, the guide post 7 is installed in the substantially central portion of the building A, but it may be located at any position outside the temporary scaffold B in the girder direction. 7a is a brace.

【0017】図5および図6からも明かなように、上記
ガイドポスト7には、クライミング装置Dが取り付けら
れている。このクライミング装置Dは、図7に拡大して
示すように、上部ガイドユニット8と、下部ガイドユニ
ット9と、モートルシリンダ10等から構成されてい
る。上部ガイドユニット8の上には、走行桁6およびレ
ール4が敷設されている。
As is clear from FIGS. 5 and 6, a climbing device D is attached to the guide post 7. As shown in an enlarged view in FIG. 7, the climbing device D includes an upper guide unit 8, a lower guide unit 9, a motor cylinder 10 and the like. A running girder 6 and a rail 4 are laid on the upper guide unit 8.

【0018】上部ガイドユニット8には、図8に拡大し
て示すように、4個のガイドローラ8aが設けられてい
る。該ガイドローラ8aは上記ガイドポスト7のフラン
ジ外面に転接しながら、ガイドポスト7に沿って上部ガ
イドユニット8を上下に案内して移動せしめるようにな
っている。このガイドユニット8にはピン8bを挿入す
るための穴8cがあけてあると共に、上記ガイドポスト
7のウエブにも穴7bがあけてあって、ピン8aが抜き
差し自在に挿入されている。図7に示すように、下部ガ
イドユニット9も、同様に4個のガイドローラ9aを備
え、ピン9bが抜き差し自在に挿入されている。
As shown in the enlarged view of FIG. 8, the upper guide unit 8 is provided with four guide rollers 8a. The guide roller 8a rolls on the outer surface of the flange of the guide post 7 and guides the upper guide unit 8 up and down along the guide post 7 to move it. The guide unit 8 has a hole 8c for inserting the pin 8b, and the web of the guide post 7 has a hole 7b so that the pin 8a can be inserted and removed. As shown in FIG. 7, the lower guide unit 9 also includes four guide rollers 9a in the same manner, and the pin 9b is inserted therein so as to be freely inserted and removed.

【0019】図7に示すように、上記ガイドユニット8
の外側にはギヤボックス11が取り付けられていて、ド
ライブシャフト12の回転駆動力によりモートルシリン
ダ10内の伸縮ロッド10aを伸縮作動せしめる。該伸
縮ロッド10aの先端部は、連結ピン10bを介して下
部ガイドユニット9に連結されている。
As shown in FIG. 7, the guide unit 8
A gear box 11 is attached to the outer side of the shaft, and the telescopic rod 10a in the motor cylinder 10 is caused to expand and contract by the rotational driving force of the drive shaft 12. The tip of the telescopic rod 10a is connected to the lower guide unit 9 via a connecting pin 10b.

【0020】図5に示すように、左右のクライミング装
置Dのドライブシャフト12は、中間に配置されたブレ
ーキ付のギヤードモータ13により同時に回転駆動され
る。13aはカップリングである。
As shown in FIG. 5, the drive shafts 12 of the left and right climbing devices D are simultaneously rotated by a geared motor 13 with a brake arranged in the middle. 13a is a coupling.

【0021】本実施例のクライミング装置Dおよびその
駆動システムは以上のように構成されているので、図9
に示すように、建物Aの最上階A′の構築作業がある程
度進行した段階で、上屋Cのリフトアップ作業を開始す
る。
Since the climbing device D and its drive system of this embodiment are constructed as described above, FIG.
As shown in FIG. 3, the lift-up work of the shed C is started when the construction work of the uppermost floor A ′ of the building A has progressed to some extent.

【0022】まず、図10に示すように、上記上屋Cに
装備したガーダー14aおよび巻き上げ装置14bから
構成された簡易クレーン14により、仮設足場B′を吊
り揚げて、上記最上階A′の外側にセットする。続い
て、同様にガイドポスト7′を吊り揚げて、上記ガイド
ポスト7上に継ぎ足す。
First, as shown in FIG. 10, the temporary scaffold B'is hoisted by the simple crane 14 composed of the girder 14a and the hoisting device 14b mounted on the above-mentioned shed C, and the outside of the top floor A '. Set to. Then, similarly, the guide post 7 ′ is lifted up and added onto the guide post 7.

【0023】図11に示すように、上記ガイドポスト
7′を壁繋ぎ材15により建物A′の躯体に固定すると
共に、図3に示すように、左右のガイドポスト7′を相
互に筋交7aにより補強する。リフトアップの準備が完
了すると、上記ワイヤWを外して、上屋Cを閉じると共
に、リフトアップ部分のレール4および走行桁6を両側
のそれ等から切り離す。切り離した両側のレール4およ
び走行桁6は、別途のクレーンあるいは上記簡易クレー
ン14で盛り替えて取り付ける。
As shown in FIG. 11, the guide post 7'is fixed to the body of the building A'by the wall tie member 15, and as shown in FIG. 3, the left and right guide posts 7'are braced to each other 7a. To reinforce. When the preparation for the lift-up is completed, the wire W is removed, the roof C is closed, and the rail 4 and the traveling girder 6 of the lift-up portion are separated from those on both sides. The separated rails 4 and running girders 6 on both sides are remounted by a separate crane or the simple crane 14 and attached.

【0024】リフトアップ操作は、まず、図12(A)
に示すように、上部ガイドユニット8からピン8bを引
き抜いて、ガイドポスト7に対する連結を解除する。下
部ガイドユニット9はガイドポスト7に連結固定したま
まである。
The lift-up operation is first shown in FIG.
As shown in, the pin 8b is pulled out from the upper guide unit 8 to release the connection with the guide post 7. The lower guide unit 9 remains fixedly connected to the guide post 7.

【0025】この状態で、ギヤードモータ13(図5参
照)を作動させると、左右のドライブシャフト12が回
転して左右のクライミング装置Dを同時に作動させる。
ドライブシャフト12の回転力により、伸縮ロッド10
aがモートルシリンダ10から下方に伸びる。下方ガイ
ドユニット9が固定されているので、伸縮ロッド10a
が伸びると、図12(B)に示すように、その反作用で
上方ガイドユニット8が上昇する。これと同時に、走行
桁6が上昇して、上屋Cをリフトアップする。上方ガイ
ドユニット8が上昇して、その穴8cがガイドポスト7
の穴7aに一致したところで、ピン8bを差し込んで、
上方ガイドユニット8をガイドポスト7に連結固定す
る。
When the geared motor 13 (see FIG. 5) is operated in this state, the left and right drive shafts 12 rotate and the left and right climbing devices D are simultaneously operated.
The expansion / contraction rod 10 is driven by the rotational force of the drive shaft 12.
a extends downward from the motor cylinder 10. Since the lower guide unit 9 is fixed, the telescopic rod 10a
When is extended, the upper guide unit 8 is raised by its reaction as shown in FIG. At the same time, the traveling girder 6 rises and lifts the shed C. The upper guide unit 8 rises and the hole 8c is formed in the guide post 7.
Insert the pin 8b into the hole 7a,
The upper guide unit 8 is connected and fixed to the guide post 7.

【0026】次に、下方ガイドユニット9のピン9bを
引き抜いて、連結を解除する。続いて、上記ギヤードモ
ータ13を逆方向に回転させると、ドライブシャフト1
2が逆転して伸縮ロッド10aをモートルシリンダ10
内に引っ込める。伸縮ロッド10aが引っ込むと、図1
2(C)に示すように、下方ガイドユニット9が上昇す
る。下方ガイドユニット9が上昇して、その穴9aがガ
イドポスト7の穴7aに一致したところで、ピン9bを
差し込んで、再び、下方ガイドユニット9をガイドポス
ト7に連結固定する。
Next, the pin 9b of the lower guide unit 9 is pulled out to release the connection. Subsequently, when the geared motor 13 is rotated in the opposite direction, the drive shaft 1
2 is reversed and the telescopic rod 10a is attached to the motor cylinder 10
Retract inside. When the telescopic rod 10a is retracted, as shown in FIG.
As shown in 2 (C), the lower guide unit 9 rises. The lower guide unit 9 rises, and when the hole 9a thereof coincides with the hole 7a of the guide post 7, the pin 9b is inserted, and the lower guide unit 9 is fixedly connected to the guide post 7 again.

【0027】上述のような図12の(A)から(C)に
示す一連の動作を、必要回数だけ繰り返して、クライミ
ング装置Dをガイドポスト7に沿って上昇せしめ、上屋
Cをリフトアップする。上昇した上屋Cは、図1(B)
のように再び開いて、ワイヤWにより固定してから使用
する。
The above-described series of operations shown in FIGS. 12A to 12C are repeated as many times as necessary to raise the climbing device D along the guide posts 7 and lift the shed C. . The raised roof C is shown in Fig. 1 (B).
It is used again after it is opened again and fixed by the wire W.

【0028】上述のリフトアップ操作において、左右の
クライミング装置Dを1個のギヤードモータ13により
同時に作動せしめ、走行桁6を水平状態に保ちながらリ
フトアップしているが、建物Aの反対側に位置する2個
のクライミング装置Dについても、同様に共通のギヤー
ドモータ13により同時駆動する。
In the above-described lift-up operation, the left and right climbing devices D are simultaneously operated by one geared motor 13 to lift the running girder 6 while keeping it horizontal, but it is located on the opposite side of the building A. Similarly, the two gearing devices D to be driven are simultaneously driven by the common geared motor 13.

【0029】図13に示すように、建物Aの両側のギヤ
ードモータ13は、中央操作盤16により同調させて、
4個のクライミング装置Dのタイミングを合わせて作動
せしめ、その結果、上屋C全体が水平状態を保ちながら
安全にリフトアップされるようにする。
As shown in FIG. 13, the geared motors 13 on both sides of the building A are synchronized by the central operation panel 16,
The four climbing devices D are operated at the same timing, so that the entire shed C can be safely lifted up while maintaining the horizontal state.

【0030】上記実施例では、ギヤードモータ13およ
びモートルシリンダ10等の機械方式によりリフトアッ
プを行っているが、これに限定するものではなく、例え
ば、油圧シリンダ等による油圧駆動によってもよい。こ
の場合、上記クライミング装置Dのモートルシリンダ1
0を油圧シリンダとし、上記ギヤードモータ13を油圧
ポンプ盤として構成する。尚、適宜レベルセンサーによ
り上昇中の上屋Cが所定傾斜量を超えた場合、操作を停
止させたり、レベルを合わせるように駆動せしめる。
In the above embodiment, the mechanical system such as the geared motor 13 and the motor cylinder 10 is used for the lift-up, but the lift-up is not limited to this, and may be hydraulically driven by a hydraulic cylinder, for example. In this case, the motor cylinder 1 of the climbing device D
0 is a hydraulic cylinder, and the geared motor 13 is a hydraulic pump panel. Incidentally, when the level C of the rising roof C exceeds a predetermined inclination amount by a level sensor, the operation is stopped or the level C is driven so as to adjust the level.

【0031】図14は、各クライミング装置Dを独立し
たモートルシリンダ10または油圧シリンダとし、中央
操作盤17に直結させて制御する、別の実施例を示す。
本実施例においても、レベルセンサーにより上屋Cの傾
きをチェックしながら上昇制御する。
FIG. 14 shows another embodiment in which each climbing device D is an independent motor cylinder 10 or hydraulic cylinder and is directly connected to the central operation panel 17 for control.
Also in this embodiment, the level sensor controls the ascent while checking the inclination of the roof C.

【0032】強風あるいは暴風時には、図15に示すよ
うに、上屋Cを閉じた状態でリフトダウンして、安全を
図ると共に、工事現場の養生も兼ねる。
In the case of a strong wind or a strong wind, as shown in FIG. 15, the roof C is closed and lifted down to ensure safety and also as a cure at the construction site.

【0033】建築工事が終了すると、骨組材や膜材を屋
上で解体した後、上記リフトアップ装置を逆に作動させ
て地上に降下させ、撤去する。
After the construction work is completed, the frame material and the film material are dismantled on the rooftop, and then the above lift-up device is operated in reverse to lower the ground material and remove it.

【0034】[0034]

【発明の効果】1)リフトアップ時には、上屋を閉じて
いるので、リフトアップ装置の幅が狭くて済み、小型で
簡易に構成できる。 2)リフトアップ時に、レッカー等の大型揚重機を必要
としない。 3)躯体の上昇に合わせて上屋をリフトアップすること
ができる。
1) Since the roof is closed during the lift-up, the width of the lift-up device can be narrowed, and the device can be made compact and simple. 2) A large lifter such as a tow truck is not required when lifting up. 3) The shed can be lifted up as the skeleton rises.

【図面の簡単な説明】[Brief description of drawings]

【図1】(A)は本発明の伸縮上屋を閉じた状態の一実
施例の斜視図、(B)は上屋を開いた状態の斜視図であ
る。
FIG. 1A is a perspective view of an embodiment of the present invention in which a telescopic shed is closed, and FIG. 1B is a perspective view in which the shed is opened.

【図2】建物の妻側から見た上屋の端面図である。FIG. 2 is an end view of the shed seen from the wife side of the building.

【図3】建物の桁側から見た上屋の側面図である。FIG. 3 is a side view of the shed seen from the girder side of the building.

【図4】上屋の下端部の走行移動装置の拡大説明図であ
る。
FIG. 4 is an enlarged explanatory view of the traveling moving device at the lower end of the shed.

【図5】クライミング装置の正面図である。FIG. 5 is a front view of a climbing device.

【図6】クライミング装置の側面図である。FIG. 6 is a side view of the climbing device.

【図7】一部を破断した上昇装置の拡大側面図である。FIG. 7 is an enlarged side view of the lifting device with a part broken away.

【図8】図7のイーイ線に沿った拡大断面図である。FIG. 8 is an enlarged cross-sectional view taken along the line EE in FIG.

【図9】リフトアップ操作前の装置の側面図である。FIG. 9 is a side view of the device before the lift-up operation.

【図10】最上部のガイドポストの取付作業の説明図で
ある。
FIG. 10 is an explanatory diagram of a work of mounting the uppermost guide post.

【図11】最上部のガイドポストの取付完了の説明図で
ある。
FIG. 11 is an explanatory diagram of completion of attachment of the uppermost guide post.

【図12】上昇装置の作用説明図である。FIG. 12 is a view for explaining the action of the lifting device.

【図13】制御盤によるリフトアップ制御の説明図であ
る。
FIG. 13 is an explanatory diagram of lift-up control by a control panel.

【図14】リフトアップ制御の別の実施例の説明図であ
る。
FIG. 14 is an explanatory diagram of another embodiment of lift-up control.

【図15】上屋をリフトダウンした状態の説明図であ
る。
FIG. 15 is an explanatory diagram showing a state where the shed is lifted down.

【符号の説明】[Explanation of symbols]

1 上屋 1a 柱脚部 1b 屋根部 1c 筋交 2 膜材 2′ 膜材 3 走行車輪 4 レール 5 サイドローラ 6 走行桁 6a 桁受用ブラケット 7 ガイドポスト 7a 筋交 7b 穴 8 上部ガイドユニット 8a ガイドローラ 8b ピン 8c 穴 9 下部ガイドユニット 9a ガイドローラ 9b ピン 10 モートルシリンダ 10a 伸縮ロッド 10b 連結ピン 11 ギヤボックス 12 ドライブシャフト 13 ギヤードモータ 13a カップリング 14 簡易クレーン 14a ガーダー 14b 巻き上げ装置 15 壁繋ぎ材 16 中央操作盤 17 中央操作盤 A 建物 B 仮設足場 C 上屋 D クライミング装置 W ワイヤ 1 Shed 1a Column base 1b Roof 1c Brace 2 Membrane material 2'Membrane material 3 Traveling wheel 4 Rail 5 Side roller 6 Traveling girder 6a Girder receiving bracket 7 Guide post 7a Bracing 7b Hole 8 Upper guide unit 8a Guide roller 8b pin 8c hole 9 lower guide unit 9a guide roller 9b pin 10 motor cylinder 10a telescopic rod 10b connecting pin 11 gear box 12 drive shaft 13 geared motor 13a coupling 14 simple crane 14a girder 14b hoisting device 15 wall connecting material 16 central operation panel 17 Central control panel A Building B Temporary scaffolding C Shed D Climbing device W Wire

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 上屋の閉じた位置の建物の桁行側に設け
た少なくとも2本のガイドポストと、該ガイドポストに
沿って上昇するクライミング装置と、該クライミング装
置を駆動する手段からなることを特徴とする建物の構築
作業用上屋のリフトアップ装置。
1. A structure comprising at least two guide posts provided on a side of a girder of a building in a closed position of a shed, a climbing device that rises along the guide posts, and means for driving the climbing device. A lift-up device for a roof for the construction work of the characteristic building.
【請求項2】 上記クライミング装置が、上方ガイドユ
ニットと、伸縮作動手段と、下方ガイドユニットからな
ることを特徴とする請求項1に記載の建物の構築作業用
上屋のリフトアップ装置。
2. The lift-up device for a building construction work shelter according to claim 1, wherein the climbing device comprises an upper guide unit, a telescopic operation means, and a lower guide unit.
【請求項3】 上記伸縮作動手段が、モートルシリンダ
と伸縮ロッドからなることを特徴とする請求項2に記載
の建物の構築作業用上屋のリフトアップ装置。
3. The lift-up device for a building construction work shelter according to claim 2, wherein the expansion / contraction operation means comprises a motor cylinder and an expansion / contraction rod.
【請求項4】 上記駆動手段が、ギヤードモータと、該
ギヤードモータにより回転され上記伸縮ロッドを作動さ
せるドライブシャフトからなることを特徴とする請求項
1、2または3に記載の建物の構築作業用上屋のリフト
アップ装置。
4. The building construction work according to claim 1, 2 or 3, wherein the drive means comprises a geared motor and a drive shaft which is rotated by the geared motor and actuates the telescopic rod. Lift-up device for the shed.
JP20695792A 1992-07-13 1992-07-13 Lift-up device of top house for construction of building Pending JPH0633610A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20695792A JPH0633610A (en) 1992-07-13 1992-07-13 Lift-up device of top house for construction of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20695792A JPH0633610A (en) 1992-07-13 1992-07-13 Lift-up device of top house for construction of building

Publications (1)

Publication Number Publication Date
JPH0633610A true JPH0633610A (en) 1994-02-08

Family

ID=16531815

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20695792A Pending JPH0633610A (en) 1992-07-13 1992-07-13 Lift-up device of top house for construction of building

Country Status (1)

Country Link
JP (1) JPH0633610A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102312579A (en) * 2011-07-15 2012-01-11 长沙科达建设机械制造有限公司 Automatic floor inner crawling device for concrete distributing machine
CN114568995A (en) * 2022-04-01 2022-06-03 武昌理工学院 High-rise curtain wall automatic cleaning robot based on guide rod structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102312579A (en) * 2011-07-15 2012-01-11 长沙科达建设机械制造有限公司 Automatic floor inner crawling device for concrete distributing machine
CN114568995A (en) * 2022-04-01 2022-06-03 武昌理工学院 High-rise curtain wall automatic cleaning robot based on guide rod structure

Similar Documents

Publication Publication Date Title
US5255489A (en) Construction apparatus for buildings and constructing method therewith
JP3172719B2 (en) Building construction safety fence
JPH0633610A (en) Lift-up device of top house for construction of building
JPH0633609A (en) Top house system for constructing operation of building
JP2553545Y2 (en) Simple crane of a building construction work shed
JP3732586B2 (en) Method and apparatus for constructing steel structure
JP3053143B2 (en) Building shed for building construction with lift-up device
JPH0571225A (en) Temporarily set roof of complete weather type
JPH0633611A (en) Lift-up system of top house for construction of building
JPH0833032B2 (en) Construction method of building frame
JP3231511B2 (en) Lift-up device for all-weather temporary roof
JP2836369B2 (en) Roof structure of temporary beam assembly device for building construction
JPH04213668A (en) Building construction method using floor climbing type movable jib crane
JPH1144095A (en) Automatic lift for construction, self-lifting type curing net and self-lifting type exterior scaffold
JPH07292994A (en) Roofed cover device for openable construction
WO2011120511A2 (en) Construction system with large parts fabricated on site
JP3239154B2 (en) Lift-up device for all-weather temporary roof
JPH0791078A (en) Lifting type opening roof for mounting
JPH0673894A (en) Lift up device
JPH086461B2 (en) Climbing all-weather temporary roof
JP2934567B2 (en) Work gondola for multi-story parking lot construction
JPH08246712A (en) Temporary roof device
JPH06167122A (en) Temporary roof device
JP3439545B2 (en) Construction method of multi-story parking lot
JP2635286B2 (en) Temporary roof for construction site