JPH06272246A - Pile head processing method for precast prestressed concrete pile - Google Patents

Pile head processing method for precast prestressed concrete pile

Info

Publication number
JPH06272246A
JPH06272246A JP6526793A JP6526793A JPH06272246A JP H06272246 A JPH06272246 A JP H06272246A JP 6526793 A JP6526793 A JP 6526793A JP 6526793 A JP6526793 A JP 6526793A JP H06272246 A JPH06272246 A JP H06272246A
Authority
JP
Japan
Prior art keywords
pile
cotter
plate
pile head
prestressed concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP6526793A
Other languages
Japanese (ja)
Other versions
JP2576756B2 (en
Inventor
Kouki Maeda
耕喜 前田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP6526793A priority Critical patent/JP2576756B2/en
Publication of JPH06272246A publication Critical patent/JPH06272246A/en
Application granted granted Critical
Publication of JP2576756B2 publication Critical patent/JP2576756B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

PURPOSE:To improve the sticking property between the inner face of a pile and placed concrete by inserting cage reinforcing bars integral with a bottom iron plate into a pile head, coupling the end face of the bottom iron plate with gaps below cotter plates, then placing concrete. CONSTITUTION:Multiple cotter plates 2 are buried along the inner periphery of a pile 1 to form a cotter plate group. Multiple cotter plate groups are buried in the axial direction of the pile 1. A support plate 5 supporting a bottom iron plate 4 is buried immediately below the lowermost cotter plate group. The precast prestressed concrete pile 1 is placed at a specific position, then the inside of the pile head is cleaned to a specific depth. Cage reinforcing bars 3 integral with the bottom iron plate 4 are inserted into the pile head, the end face of the bottom iron plate 4 is coupled and fixed to gaps between the lower faces of the cotter plates 2 and the upper face of the support plate 5, then concrete is placed at the pile head section.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、打設する既製プレスト
レストコンクリート杭の杭頭構造ならびにその既製プレ
ストレストコンクリート杭を打設したのちの杭頭処理方
法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pile head structure for ready-made prestressed concrete piles to be placed and a method for treating pile heads after placing the ready-made prestressed concrete piles.

【0002】[0002]

【従来の技術】従来の既製プレストレストコンクリート
杭の打設は打ち込み工法あるいは埋め込み工法で行わ
れ、打設後の杭頭処理は、杭径の約2倍程度まで杭内側
を清掃し、そこにカゴ鉄筋を配置してコンクリートを打
設して杭と基礎を一体化させる方法で行っている。既製
プレストレストコンクリート杭の内表面には遠心成形に
伴うレイタンスが層状に付着しており、清掃しても容易
には除去できないので、打設するコンクリートとの付着
性能を低下させている。特に、埋め込み工法では、オー
バーフローした掘削溶液(後で固形物になる)を杭の内
側に入れる場合が多く、清掃してもこの固形物を除去し
きれない。かかる幾つかの原因が重なって杭の内表面の
コンクリートとの付着性能は低下しているが、通常はこ
のままでコンクリートが打設されている。
2. Description of the Related Art Conventional prefabricated prestressed concrete piles are driven by a driving method or an embedding method. After the driving, the pile head is cleaned by cleaning the inside of the pile up to about twice the diameter of the pile and placing it in the basket. This is done by placing reinforcing bars and placing concrete to integrate the pile and foundation. Laitance due to centrifugal molding adheres to the inner surface of ready-made prestressed concrete piles in layers and cannot be easily removed even by cleaning, thus reducing the adhesion performance with the concrete to be placed. In particular, in the embedding method, the overflow drilling solution (which later becomes a solid matter) is often put inside the pile, and the solid matter cannot be completely removed even by cleaning. Although some of these causes overlap, the adhesion performance of the inner surface of the pile to concrete is deteriorated, but normally the concrete is placed as it is.

【0003】[0003]

【発明が解決しようとする課題】従って、本発明は、杭
頭部の内表面とコンクリートとの付着性能を改善しよう
とするものである。
Accordingly, the present invention is intended to improve the adhesion performance between the inner surface of the pile head and the concrete.

【0004】[0004]

【課題を解決するための手段】本発明に第1発明は、杭
内面の円周に沿って複数個のコッタープレートが埋設さ
れ、このコッタープレート群が杭軸方向に複数群埋設さ
れ、最下段のコッタープレート群のすぐ下方に底鉄板を
支持する支持プレートが埋設されている既製プレストレ
ストコンクリート杭を所定位置に打設した後、杭頭内側
を所定の深さまで清掃し、杭頭内側に底鉄板と一体とな
ったカゴ鉄筋を挿入し、底鉄板端面をコッタープレート
下面と支持プレート上面との間隙に嵌合して固定したあ
と杭頭部にコンクリートを打設することを特徴とする既
製プレストレストコンクリート杭の杭頭処理方法であ
る。
According to a first aspect of the present invention, a plurality of cotter plates are embedded along the circumference of the inner surface of the pile, and a plurality of the cotter plate groups are embedded in the pile axial direction. Immediately below the cotter plate group, after placing a pre-stressed concrete pile in which a support plate that supports the bottom iron plate is embedded in place, clean the inside of the pile head to a predetermined depth, and then place the bottom iron plate inside the pile head. Ready-made prestressed concrete characterized by inserting a basket rebar integrated with the bottom iron plate into the gap between the bottom surface of the cotter plate and the top surface of the support plate, and then placing concrete into the pile head. This is a pile head treatment method.

【0005】第1発明は、既製プレストレストコンクリ
ート杭側の改良とカゴ鉄筋側の改良とに分けることがで
きる。まず、既製プレストレストコンクリート杭側の改
良は、杭内面の円周に沿って複数個のコッタープレート
を1群として埋設し、このコッタープレート群を杭軸方
向に複数群設置し、さらに、最下段のコッタープレート
群のすぐ下方に底鉄板を支持する支持プレートを設け
た、点である。そして、カゴ鉄筋側の改良は、その底に
底鉄板を溶接などにより固着し、底鉄板の形状を杭内側
に挿入でき、所定の位置まで挿入して円周方向に回転さ
せたとき、その端部が最下段のコッタープレート下面と
支持プレート上面との間隙に嵌合できる形状とした、点
である。この両面の改良が相まって、カゴ鉄筋は杭内側
にしっかりと拘束され、後打ちコンクリートの杭頭部内
表面との付着性能はコッタープレートにより、大幅に改
善される。この結果、カゴ鉄筋の定着長は杭径と同じ程
度にまで短くすることができ、その副次効果として杭頭
部内側の清掃部の体積、面積を少なくすることができ
る。さらに、カゴ鉄筋に底鉄板を一体化させることによ
りコンクリート打設時の底型枠は不要になる。
The first invention can be divided into an improvement on the side of a pre-stressed concrete pile and an improvement on the side of a cage rebar. First of all, the improvement of the prestressed concrete pile side is to embed a plurality of cotter plates as a group along the circumference of the inner surface of the pile, install this group of cotter plates in the pile axial direction, and further, at the bottom stage. The point is that a support plate for supporting the bottom iron plate is provided immediately below the cotter plate group. And the improvement of the basket rebar side is that the bottom iron plate is fixed to the bottom by welding etc., the shape of the bottom iron plate can be inserted inside the pile, and when it is inserted to a predetermined position and rotated in the circumferential direction, its end The point is that the shape is such that it can be fitted into the gap between the lower surface of the lowermost cotter plate and the upper surface of the support plate. Combined with the improvement of both sides, the cage rebar is firmly restrained inside the pile, and the adhesion performance of the post-cast concrete with the inner surface of the pile head is greatly improved by the cotter plate. As a result, the fixing length of the cage reinforcing bar can be shortened to the same extent as the pile diameter, and as a secondary effect, the volume and area of the cleaning portion inside the pile head can be reduced. Furthermore, by integrating the bottom iron plate with the cage rebar, the bottom formwork for concrete placement becomes unnecessary.

【0006】第2発明は、既製プレストレストコンクリ
ート杭側の改良にかかるもので、杭頭内面を保護シート
で覆った状態で既製プレストレストコンクリート杭を打
設するものである。前述のように打設後の杭頭内側には
土砂、掘削溶液固化物などが詰まっており、これらを排
出し、清掃したのちコンクリートを打設するのである
が、本発明においては杭頭内面にコッタープレートが埋
設されていて清掃し難い箇所が多くなる。このため、杭
頭内面の汚染を予防し、清掃作業を簡略化しようとする
ものである。
A second aspect of the present invention relates to an improvement on the side of a prefabricated prestressed concrete pile, in which a prefabricated prestressed concrete pile is driven with the inner surface of the pile head covered with a protective sheet. As mentioned above, the inside of the pile head after casting is filled with soil, drilling solution solidified matter, etc., these are discharged, and concrete is placed after cleaning, but in the present invention, the inside surface of the pile head is Since the cotter plate is buried, there are many places that are difficult to clean. Therefore, the inside of the pile head is prevented from being contaminated and the cleaning work is simplified.

【0007】[0007]

【実施例】以下図面を参照しながら本発明を説明する。DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to the drawings.

【0008】図1(a)は本発明で使用する既製プレス
トレストコンクリート杭の杭頭部にカゴ鉄筋を挿入して
静置した状態を示す立断面図であり、図1(b)は既製
プレストレストコンクリート杭の杭頭内面を保護シート
で覆った状態を示す立断面図である。
FIG. 1 (a) is an elevational sectional view showing a state in which a cage rebar is inserted into the pile head of a ready-made prestressed concrete pile used in the present invention and left standing, and FIG. 1 (b) is a ready-made prestressed concrete. It is an elevation sectional view showing the state where the pile head inner surface of the pile was covered with the protection sheet.

【0009】図2(a)は図1(a)のA−A矢視図で
あり、図2(b)は図1(a)のB−B矢視図であり、
図2(c)は底鉄板の平面図である。(なお、矢視図で
はカゴ鉄筋は省略してある。)まず、既製プレストレス
トコンクリート杭の杭頭部について説明する。
FIG. 2A is a view taken along the line AA of FIG. 1A, and FIG. 2B is a view taken along the line BB of FIG. 1A.
FIG. 2C is a plan view of the bottom iron plate. (Note that the cage rebar is omitted in the view of the arrow.) First, the pile head of the pre-stressed concrete pile will be described.

【0010】既製プレストレストコンクリート杭1の内
面に4個のコッタープレート2を1群として3群のコッ
タープレート2が上、中、下段に埋設されている。軸方
向で見てコッタープレート2が埋設されていない箇所を
塞ぐよう4個の支持プレート5がコッタープレート2の
直下に埋設されている。1群のコッタープレート2の個
数、群数は既製プレストレストコンクリート杭1の径な
どに応じて適宜決定される。支持プレート5は軸方向で
見てコッタープレート2が埋設されていない箇所を塞
ぎ、カゴ鉄筋を支持するものであるのでコッタープレー
ト2の1群の個数と同数埋設され、コッタープレート2
が埋設されていない箇所の円周方向の弧長に比較して弧
長を長くしておくのが好ましい。また、数個の支持プレ
ート5を円周方向に連結してその個数を少なくしても良
く、全円周にわたる1個の環状のプレートとしておいて
も良い。これらのプレートは既製プレストレストコンク
リート杭1の補強筋(図示せず)に溶接などにより固着
されている。
On the inner surface of the pre-stressed concrete pile 1, three cotter plates 2 are embedded in the upper, middle and lower stages, with four cotter plates 2 as one group. Four support plates 5 are embedded right under the cotter plate 2 so as to close a portion where the cotter plate 2 is not embedded in the axial direction. The number of cotter plates 2 in one group and the number of groups are appropriately determined according to the diameter of the pre-stressed concrete piles 1 and the like. Since the support plates 5 block the places where the cotter plates 2 are not embedded when viewed in the axial direction and support the cage rebars, the support plates 5 are embedded in the same number as the number of one group of the cotter plates 2.
It is preferable to make the arc length longer than the arc length in the circumferential direction of the portion where is not buried. Further, several support plates 5 may be connected in the circumferential direction to reduce the number thereof, or one annular plate may be provided over the entire circumference. These plates are fixed to the reinforcing bars (not shown) of the pre-stressed concrete pile 1 by welding or the like.

【0011】図1(b)に既製プレストレストコンクリ
ート杭の杭頭内面を保護シート8で覆った例を示した
が、この保護シート8は筒状の保護シート8を直接杭頭
内面に接着してもよいが、筒状の保護シート8の両端に
予め環状プレート9を取りつけて置き、この環状プレー
ト9を杭頭内面に接着など取りつける方が操作が容易で
ある。
FIG. 1 (b) shows an example in which the inner surface of the pile head of a prefabricated prestressed concrete pile is covered with a protective sheet 8. This protective sheet 8 is formed by directly bonding the tubular protective sheet 8 to the inner surface of the pile head. However, it is easier to operate by attaching the annular plates 9 to both ends of the tubular protection sheet 8 in advance and attaching the annular plates 9 to the inner surface of the pile head.

【0012】つぎに、カゴ鉄筋底部についてついて説明
する。
Next, the basket rebar bottom will be described.

【0013】カゴ鉄筋3の底には底鉄板4が溶接されて
いる。図2(c)に示すように、底鉄板4の周端にはコ
ッタープレート2の1群の個数に対応した数の切り込み
6が設けられており、その切り込み6の形状はコッター
プレート2の断面形状と相似しており、底鉄板4と一体
となったカゴ鉄筋がコッタープレート2に邪魔されるこ
となく杭頭内側に挿入できるようになっている。このカ
ゴ鉄筋は杭頭内側の支持プレート5の位置まで挿入され
円周方向に回転してその端部をコッタープレート2の下
面と支持プレート5の上面との間隙7に嵌合して杭1に
固定される。
A bottom iron plate 4 is welded to the bottom of the basket reinforcing bar 3. As shown in FIG. 2 (c), the bottom iron plate 4 is provided with a number of notches 6 at the peripheral edge corresponding to the number of one group of the cotter plate 2, and the shape of the notch 6 is a cross section of the cotter plate 2. It is similar to the shape, and the cage rebar integrated with the bottom iron plate 4 can be inserted into the inside of the pile head without being disturbed by the cotter plate 2. This basket rebar is inserted up to the position of the support plate 5 inside the pile head and is rotated in the circumferential direction so that its end is fitted into the gap 7 between the lower surface of the cotter plate 2 and the upper surface of the support plate 5 to form the pile 1. Fixed.

【0014】本発明の施工順序について図3を参照して
説明する。
The construction sequence of the present invention will be described with reference to FIG.

【0015】(1)既製プレストレストコンクリート杭
1の杭頭内側の土砂、固化物などを排出する。保護シー
トを使用した場合は保護シートを撤去する。杭頭内面を
清掃する。(図3(a)) (2)カゴ鉄筋3を吊り下げながら既製プレストレスト
コンクリート杭1の杭頭内側に挿入する。(図3
(b)) (3)カゴ鉄筋3が支持プレート5のの位置に到達した
らカゴ鉄筋3を円周方向に回転して底鉄板4の端部をコ
ッタープレート2の下面と支持プレート5の上面との間
隙7に嵌合する。(図3(c)) (4)既製プレストレストコンクリート杭1の杭頭部に
コンクリートを打設して作業を完了する。(図3
(d))
(1) Discharging sediment, solidified matter, etc. inside the pile heads of the prefabricated prestressed concrete pile 1. If a protective sheet is used, remove it. Clean the inside of the pile head. (Fig. 3 (a)) (2) Insert the cage rebar 3 inside the pile head of the ready-made prestressed concrete pile 1 while suspending it. (Fig. 3
(B)) (3) When the cage rebar 3 reaches the position of the support plate 5, the basket rebar 3 is rotated in the circumferential direction so that the end portions of the bottom iron plate 4 become the lower surface of the cotter plate 2 and the upper surface of the support plate 5. It fits in the gap 7. (Fig. 3 (c)) (4) Concrete is placed on the pile head of the pre-stressed concrete pile 1 to complete the work. (Fig. 3
(D))

【0016】[0016]

【発明の効果】後打ちコンクリートの杭頭部内表面との
付着性能が向上し、カゴ鉄筋の定着長を杭径と同じ程度
にまで短くすることができ、その副次効果として杭頭部
内側の清掃部の体積、面積を少なくすることができる。
さらに、コンクリート打設時の底型枠を無くすることが
できる。
The adhesion performance of the post-cast concrete to the inner surface of the pile head is improved, and the anchor length of the cage rebar can be shortened to the same level as the pile diameter. The volume and area of the cleaning section can be reduced.
Furthermore, the bottom formwork at the time of pouring concrete can be eliminated.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明で使用する既製プレストレストコンクリ
ート杭の杭頭部ならびにカゴ鉄筋の立断面図であり、
(a)既製プレストレストコンクリート杭の杭頭部にカ
ゴ鉄筋を挿入して静置した状態を示し、(b)は既製プ
レストレストコンクリート杭の杭頭内面を保護シートで
覆った状態を示す。
FIG. 1 is a vertical cross-sectional view of a pile head and a basket rebar of a ready-made prestressed concrete pile used in the present invention,
(A) The state which inserted the basket rebar into the pile head of the ready-made prestressed concrete pile and left still, (b) shows the state which covered the pile head inner surface of the ready-made prestressed concrete pile with the protective sheet.

【図2】(a)は図1(a)のA−A矢視図であり、
(b)は図1(a)のB−B矢視図であり、(c)は底
鉄板の平面図である。
FIG. 2A is a view taken along the line AA of FIG.
(B) is a BB arrow view of FIG.1 (a), (c) is a top view of a bottom iron plate.

【図3】本発明の施工順序を示す立断面図である。FIG. 3 is a vertical cross-sectional view showing a construction order of the present invention.

【符号の説明】[Explanation of symbols]

1・・既製プレストレストコンクリート杭、2・・コッ
タープレート、3・・カゴ鉄筋、4・・底鉄板、5・・
支持プレート、6・・底鉄板切り込み、7・・コッター
プレート下面と支持プレート上面との間隙、8・・保護
シート、9・・環状プレート
1 ・ ・ Prepared prestressed concrete piles 2 ・ ・ Cotter plates 3 ・ ・ Cage rebars 4 ・ ・ Bottom iron plates 5 ・ ・
Support plate, 6 ... Bottom iron plate notch, 7 ... Gap between lower surface of cotter plate and upper surface of support plate, 8 ... Protective sheet, 9 ... Annular plate

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 杭内面の円周に沿って複数個のコッター
プレートが埋設され、このコッタープレート群が杭軸方
向に複数群埋設され、最下段のコッタープレート群のす
ぐ下方に底鉄板を支持する支持プレートが埋設されてい
る既製プレストレストコンクリート杭を所定位置に打設
した後、杭頭内側を所定の深さまで清掃し、杭頭内側に
底鉄板と一体となったカゴ鉄筋を挿入し、底鉄板端面を
コッタープレート下面と支持プレート上面との間隙に嵌
合して固定したあと杭頭部にコンクリートを打設するこ
とを特徴とする既製プレストレストコンクリート杭の杭
頭処理方法
1. A plurality of cotter plates are embedded along the circumference of the inner surface of the pile, and a plurality of cotter plate groups are embedded in the pile axial direction, and a bottom iron plate is supported immediately below the bottom cotter plate group. After driving a prefabricated prestressed concrete pile in which the support plate is buried in place, clean the inside of the pile head to a predetermined depth, insert the basket rebar integrated with the bottom iron plate inside the pile head, Pile head treatment method for ready-made prestressed concrete piles, characterized in that the end surface of the iron plate is fitted and fixed in the gap between the lower surface of the cotter plate and the upper surface of the support plate, and then concrete is placed on the pile head.
【請求項2】 杭頭内面を保護シートで覆った状態の既
製プレストレストコンクリート杭を所定位置に打設し、
カゴ鉄筋の挿入前に保護シートを撤去することを特徴と
する請求項1記載の既製プレストレストコンクリート杭
の杭頭処理方法
2. A prefabricated prestressed concrete pile in which the inner surface of the pile head is covered with a protective sheet is placed at a predetermined position,
The method for treating a pile head of a prefabricated prestressed concrete pile according to claim 1, wherein the protective sheet is removed before inserting the basket reinforcing bar.
JP6526793A 1993-03-24 1993-03-24 Pile head treatment method for ready-made prestressed concrete pile Expired - Lifetime JP2576756B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6526793A JP2576756B2 (en) 1993-03-24 1993-03-24 Pile head treatment method for ready-made prestressed concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6526793A JP2576756B2 (en) 1993-03-24 1993-03-24 Pile head treatment method for ready-made prestressed concrete pile

Publications (2)

Publication Number Publication Date
JPH06272246A true JPH06272246A (en) 1994-09-27
JP2576756B2 JP2576756B2 (en) 1997-01-29

Family

ID=13281984

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6526793A Expired - Lifetime JP2576756B2 (en) 1993-03-24 1993-03-24 Pile head treatment method for ready-made prestressed concrete pile

Country Status (1)

Country Link
JP (1) JP2576756B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003027418A (en) * 2001-07-11 2003-01-29 Nippon Concrete Ind Co Ltd Concrete structure and method for constructing the same
CN102220761A (en) * 2011-04-12 2011-10-19 泰州润伟机械有限公司 Prestressed concrete tubular pile end plate
JP2014227735A (en) * 2013-05-23 2014-12-08 株式会社大林組 Pile foundation structure and method for constructing pile foundation structure
CN110984138A (en) * 2019-11-29 2020-04-10 中建八局第四建设有限公司 Method for manufacturing PHS hollow square pile concrete pile core supporting plate component
CN113846991A (en) * 2021-09-22 2021-12-28 浙江化工工程地质勘察院有限公司 Borehole inner wall reinforcing structure and method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003027418A (en) * 2001-07-11 2003-01-29 Nippon Concrete Ind Co Ltd Concrete structure and method for constructing the same
JP4519368B2 (en) * 2001-07-11 2010-08-04 日本コンクリート工業株式会社 Concrete structure and construction method thereof
CN102220761A (en) * 2011-04-12 2011-10-19 泰州润伟机械有限公司 Prestressed concrete tubular pile end plate
JP2014227735A (en) * 2013-05-23 2014-12-08 株式会社大林組 Pile foundation structure and method for constructing pile foundation structure
CN110984138A (en) * 2019-11-29 2020-04-10 中建八局第四建设有限公司 Method for manufacturing PHS hollow square pile concrete pile core supporting plate component
CN113846991A (en) * 2021-09-22 2021-12-28 浙江化工工程地质勘察院有限公司 Borehole inner wall reinforcing structure and method
CN113846991B (en) * 2021-09-22 2023-05-02 浙江化工工程地质勘察院有限公司 Reinforcing structure and reinforcing method for inner wall of drill hole

Also Published As

Publication number Publication date
JP2576756B2 (en) 1997-01-29

Similar Documents

Publication Publication Date Title
JP2576755B2 (en) Pile head treatment method for ready-made prestressed concrete pile
JP2576756B2 (en) Pile head treatment method for ready-made prestressed concrete pile
JP3728653B2 (en) Bonding structure between flat slab and concrete-filled steel pipe column and flat slab construction method
JP2576757B2 (en) Pile head treatment method for ready-made prestressed concrete pile
KR100661301B1 (en) Support structure for concreting in a head of steel pile and construction method using it
JPH09273161A (en) Pile hear reinforcing construction
JPH08296209A (en) Method for reinforcing foundation part of elevated bridge
JPH1018424A (en) Root wrapping reinforcing structure of column base of steel post or the like
JPS6354093B2 (en)
JP2000192472A (en) Method for immersing immersing body, and its immersing body
JP4030723B2 (en) Foundation using foundation pole pile and method for forming foundation pile
JPH0337603B2 (en)
JPH0718675A (en) Sc pile and executing method thereof
JPH0643219Y2 (en) Core body attached to the inner circumference of the head of a concrete pile
JPH06330522A (en) Pile head joint construction
JP3767776B2 (en) Fixing member of reinforced concrete column reinforcement and seismic reinforcement method
JP2796694B2 (en) Formwork for sub pipe protection concrete construction
JP4045623B2 (en) Construction method of reinforced concrete underground floor and underground structure constructed by this method
JPH07113220B2 (en) Beam construction method
JPH10231527A (en) Deep foundation construction for steel tower
JP3022082U (en) Concrete pile pile head cement removal device
JPH01219214A (en) Pile head processing method for cast-in-place concrete pile
JPH073816A (en) Form for pile head filling concrete
JP2581832Y2 (en) Rebar basket for pole
JPS62253821A (en) Construction of concrete floor slab

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19960917