JPH06240873A - Execution of work for ceiling - Google Patents

Execution of work for ceiling

Info

Publication number
JPH06240873A
JPH06240873A JP5028971A JP2897193A JPH06240873A JP H06240873 A JPH06240873 A JP H06240873A JP 5028971 A JP5028971 A JP 5028971A JP 2897193 A JP2897193 A JP 2897193A JP H06240873 A JPH06240873 A JP H06240873A
Authority
JP
Japan
Prior art keywords
ceiling
equipment
base frame
apparatuses
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP5028971A
Other languages
Japanese (ja)
Inventor
Kinji Tsutsui
欣二 筒井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP5028971A priority Critical patent/JPH06240873A/en
Publication of JPH06240873A publication Critical patent/JPH06240873A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PURPOSE:To improve the safety of working and workability by attaching apparatuses such as air-conditioning apparatuses and electric apparatuses at a position close to the ground, finishing a ceiling, and moving the ceiling of a large- space structure to the specified height with lifting means, and fixing the ceiling. CONSTITUTION:This method is different from a conventional method, wherein the ceiling of the structure having the large space is constructed by providing scaffolds. Apparatuses, which are provided at the ceiling, and ceiling finishing materials are assembled on a bed frame 5 on a plane, which is slightly smaller than the planar periphery of a structure A. Thus, the apparatuses and the like are attached in the vicinity of the ground. Then, the frame is lifted through suspending members 4 with lifting devices 1 such as chain blocks, which are suspended from the ceiling (b) through wires 2. The suspending members 4 and suspending members 4a of the bed frame 5 are connected. After the apparatuses, which are provided at the specified positions, are connected to a main-body facility in this way, the lifting devices are removed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は体育館、競技場等の大空
間を有する構築物を構築する際に、その天井を架設する
天井の施工方法に係るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a ceiling for constructing a structure having a large space such as a gymnasium or a stadium.

【0002】[0002]

【従来の技術】従来、大空間構築物に架設する天井の施
工に際しては、躯体工事の完了後、室内天井の所定の高
さに、クレーン車と高所作業車を使用して空調設備機器
や電気設備機器を先付けするための鉄骨枠を取付け、次
いで前記各機器の取付けに都合のよい高さに構築物の平
面的にほぼ全面を占める足場ステージを仮設して前記各
機器を取付け、次いで天井仕上げをするために前記足場
ステージを作業に都合のよい高さまで下げて天井下地枠
の組立て、天井ボード等を施工して足場ステージを解体
撤去して施工することが一般的である。
2. Description of the Related Art Conventionally, when constructing a ceiling to be erected in a large space structure, after completion of the skeleton construction, a crane truck and an aerial work vehicle are used at a predetermined height of the indoor ceiling to install air conditioning equipment and electric equipment. Attach a steel frame for pre-installing equipment, and then temporarily install a scaffolding stage that occupies almost the entire plane of the structure at a height convenient for mounting each equipment, and then mount each equipment, and then finish the ceiling. In order to do so, it is common to lower the scaffold stage to a height convenient for work, assemble the ceiling base frame, construct a ceiling board, etc., and dismantle and remove the scaffold stage.

【0003】また本出願人は特願平4−210335号
において、施工階床1上においてぶどう棚兼足場を組立
て、昇降手段を介して天井近傍の上部施工部まで吊上
げ、所要の高所作業を行ない、次いで同ぶどう棚兼足場
を吊下ろしてその上に天井裏のダクト、設備機器を載架
し、昇降手段を介し、前記ぶどう棚兼足場を上階施工部
まで吊り上げ、前記設備機器を所定位置に取付けたの
ち、再びぶどう棚兼足場を施工床面に下降せしめ、前記
の操作を繰り返して天井部の設備機器の施工を完了した
のち、施工階床面において本設の天井を前記ぶどう棚兼
足場の下面に組立てて所要の位置まで吊上げて固定する
天井施工法を提案した。
Further, the applicant of the present invention, in Japanese Patent Application No. 4-210335, assembles a grape rack / scaffold on the construction floor 1 and lifts it to the upper construction part near the ceiling through the elevating means to carry out the required work at high places. Then, suspend the same grape shelf and scaffolding, mount the above-ceiling duct and equipment on it, and lift the grape shelf and scaffolding to the upper floor construction section through the elevating means, and specify the equipment After mounting it at the position, lower the grape shelf and scaffolding to the construction floor again, repeat the above operation to complete the construction of the equipment on the ceiling, and then install the main ceiling on the construction floor to the grape rack. We proposed a ceiling construction method in which it is assembled on the lower surface of the combined scaffold and lifted and fixed to the required position.

【0004】[0004]

【発明が解決しようとする課題】しかしながら前者の方
法においては、先づ躯体の建方完了後、天井内に設置す
る空調設備機器や電気設備機器を先付する鉄骨枠の組立
が、室内天井の所定の高さにクレーン車と高所作業車を
使用して行なわれ、また空調機器や電気設備機器がかな
りの重量物で、その揚重が高所作業となり、危険を伴う
作業となる。
However, in the former method, after the construction of the frame is completed first, the assembly of the steel frame to which the air conditioning equipment and the electric equipment installed in the ceiling are attached first is It is carried out at a predetermined height by using a crane truck and an aerial work vehicle, and the air conditioning equipment and electric equipment equipment are considerable heavy objects, and the lifting work becomes a work at a high place, which is a dangerous work.

【0005】また天井仕上げをするための足場ステージ
を仮設して、天井作業の姿勢を確保するため、その都度
ステージの高さを調整しなければならず余計な労力を必
要とし、また足場ステージの仮設、解体と資材の搬送が
煩雑である。また後者の方法においては、天井裏に設備
する空調機器を、ぶどう棚を吊足場に利用して、昇降装
置によって吊足場に空調機器を搭載して天井裏に取付
け、吊足場を搬送の手段として利用しているので、昇降
装置の安全対策が大掛りなものとなる。
Further, a scaffolding stage for finishing the ceiling is temporarily installed, and in order to secure the posture of the ceiling work, the height of the stage must be adjusted each time, and extra labor is required. Temporary installation, dismantling and transportation of materials are complicated. In the latter method, the air conditioner installed in the ceiling is used, the grape shelf is used as a suspension scaffold, and the air conditioner is mounted on the suspension scaffold by the lifting device and attached to the ceiling, and the suspension scaffold is used as a transportation means. Since it is used, the safety measures for the lifting device will be large.

【0006】本発明は前記従来技術の有する問題点に鑑
みて提案されたもので、その目的とする処は、大空間構
築物の天井を地上に近い位置で、空調設備機器や電気設
備機器等の機器の取付け、天井仕上げを施し、吊上げ手
段によって所定の高さまで移動させて固定するようにし
て、作業の安全と、作業性の向上が図られる天井の施工
方法を提供する点にある。
The present invention has been proposed in view of the above problems of the prior art, and its object is to place the ceiling of a large space structure at a position close to the ground, such as air conditioner equipment and electric equipment. It is an object of the present invention to provide a ceiling construction method in which work is safe and workability is improved by mounting the equipment, finishing the ceiling, and moving the equipment to a predetermined height and fixing it by the lifting means.

【0007】[0007]

【課題を解決するための手段】前記の目的を達成するた
め、本発明に係る天井の施工方法によれば、構築物の上
部屋根より天井昇降装置を吊設する工程と、天井に設置
される設備機器、或は天井仕上げ材を保持する下地枠を
前記構築物の平面周辺よりやや小さい平面上において床
上で組立てる工程と、前記昇降装置によって前記下地枠
を前記設備機器の取付位置まで上昇させる工程と、上昇
した前記下地枠を天井仕上げ材取付け位置まで上昇させ
る工程と、前記下地枠に天井仕上げ材を取付ける工程
と、前記工程によって組立てられた天井を前記昇降装置
を介して所定の天井高さまで上昇する工程と、同天井を
設置する上部屋根より吊設された吊材によって前記下地
枠とを接続し、かくして所定位置に設置された設備機器
と本体施設とを接続して前記昇降装置を撤去する工程と
より構成されている。
In order to achieve the above object, according to the method of constructing a ceiling according to the present invention, a step of suspending a ceiling elevating device from an upper roof of a structure and equipment installed on the ceiling. A step of assembling a foundation frame holding equipment or a ceiling finishing material on the floor on a plane slightly smaller than the plane periphery of the construction, and a step of raising the foundation frame by the lifting device to a mounting position of the facility equipment; A step of raising the raised base frame to a ceiling finishing material mounting position, a step of attaching a ceiling finish material to the foundation frame, and a ceiling assembled by the step is raised to a predetermined ceiling height via the elevating device. The process and the base frame are connected by the suspending material suspended from the upper roof where the same ceiling is installed, thus connecting the facility equipment installed at the predetermined position and the main facility. It is more configuration and the step of removing the said lifting device Te.

【0008】[0008]

【作用】本発明は前記したように、構築物の平面周辺よ
りやや小さい平面上において、天井下地枠を床上で組立
て、同下地枠に取付けられる設備機器や天井仕上げ材の
取付けに適した高さにまで、構築物の上部より吊設され
た前記昇降装置によって上昇させるようにしたので、作
業姿勢が良好な高さに保持され、高所作業がなくなり、
作業効率が向上し、安全性が改善される。
As described above, the present invention assembles the ceiling base frame on the floor on a plane slightly smaller than the periphery of the structure, and makes the height suitable for mounting equipment and ceiling finishing materials to be mounted on the base frame. Up to the lifting device suspended from the upper part of the structure, the work posture is maintained at a good height, and work in high places disappears.
Work efficiency is improved and safety is improved.

【0009】また前記下地枠に設備機器の取付と付帯工
事と天井仕上げが完了した時点で、前記昇降装置を介し
て所定の天井高さまで上昇させて、天井を設置する上部
屋根より吊設された吊材と前記下地枠とを接続し、所定
の位置に設置された前記機器と本体施設とを接続するこ
とによって、前記下地枠の昇降工程が1回で完了するの
で、昇降装置が簡略化され、操作も簡略化され、従って
作業工程が単純化され、工期短縮の効果も向上する。
Further, when the installation of the equipment and the auxiliary work and the ceiling finishing are completed on the base frame, the ceiling frame is lifted to a predetermined ceiling height through the elevating device and suspended from the upper roof for installing the ceiling. By connecting the hanging material and the base frame, and connecting the equipment installed at a predetermined position and the main body facility, the lifting process of the base frame is completed in one time, so that the lifting device is simplified. As a result, the operation is simplified, the work process is simplified, and the effect of shortening the construction period is improved.

【0010】[0010]

【実施例】以下本発明を図示の実施例について説明す
る。図1乃至図3は本発明に係る天井の施工方法の工程
を示し、図1においてAは体育館や競技場等の構築物
で、同躯体Aを構成する壁a、屋根b、及び床cが構築
された後、天井を設置する上部屋根bより電動チエンブ
ロック等よりなる昇降装置1をワイヤ2で吊設するとと
もに、吊材4を所定間隔毎に吊設する。
The present invention will be described below with reference to the illustrated embodiments. 1 to 3 show steps of a method for constructing a ceiling according to the present invention. In FIG. 1, A is a structure such as a gymnasium or a stadium, and a wall a, a roof b, and a floor c constituting the body A are constructed. After that, the lifting device 1 composed of an electric chain block or the like is hung by the wire 2 from the upper roof b on which the ceiling is installed, and the hanging members 4 are hung at predetermined intervals.

【0011】次いで天井に設置する空調設備や照明機
器、或は天井の仕上げ材を保持する下地枠5を、前記構
築物Aの平面周辺よりやや小さい平面において、前記床
c上において組立て前記昇降装置1によたチェーン3を
吊下げて前記下地枠5に固定して、前記天井に設置する
空調設備、或は照明機器の取付けに適した作業高さ、
1.2mまで上昇させる。この際、下地枠5の上面に落
下防止用の防護ネット及び足場板を装備する。同防護ネ
ット及び足場板は、後の工程において記述する天井吊上
げ後の上部屋根bより懸吊された吊材4と天井の下地枠
5の吊材4aとを連結させる際の足場となる。
Next, the air-conditioning equipment and lighting equipment installed on the ceiling, or the base frame 5 for holding the finishing material for the ceiling is assembled on the floor c in a plane slightly smaller than the plane periphery of the building A, and the lifting device 1 is assembled. The chain 3 is suspended and fixed to the base frame 5, and the working height is suitable for mounting an air conditioner installed on the ceiling or a lighting device,
Raise to 1.2m. At this time, a protective net and a scaffolding plate for preventing fall are provided on the upper surface of the base frame 5. The protective net and the scaffolding plate serve as a scaffold for connecting the suspending material 4 suspended from the upper roof b after the ceiling is suspended and the suspending material 4a of the base frame 5 on the ceiling, which will be described in a later step.

【0012】次いで下地枠5に空調機器6、或は照明機
器を所定の位置に設置し、同機器間を接続する配管、配
線工事を同時に施し、次いで次の天井仕上げ材を取付け
るため、更に床より2.1m上昇させて天井仕上げ材7
を施工する。(図2参照) なお前記空調機器6は、蒸気を熱源とする輻射暖房パネ
ルを使用しており、図4の空調機器配置スペース6′に
一方向に一定間隔に配設されるものであり、天井仕上材
7が所定位置に固定された後、夫々に空調機器6に蒸気
発生装置の本体設備と接続する。しかしながら前記空調
機器6のみならず、他の空調設備システムにも応用され
る。
Next, the air conditioner 6 or the lighting device is installed at a predetermined position on the base frame 5, piping and wiring work for connecting the devices are simultaneously performed, and then the next ceiling finishing material is attached. 2.1m higher and ceiling finishing material 7
Construct. (See FIG. 2) The air conditioner 6 uses a radiant heating panel that uses steam as a heat source, and is arranged in the air conditioner installation space 6 ′ in FIG. 4 at regular intervals in one direction. After the ceiling finishing material 7 is fixed at a predetermined position, each is connected to the air conditioning equipment 6 and the main equipment of the steam generator. However, it is applied not only to the air conditioner 6 but also to other air conditioning equipment systems.

【0013】次いで、前工程で空調機器6或は照明機器
と、同機器の付帯設備と天井仕上げ材7が施工された天
井の下地枠5を前記昇降装置1によって所定の天井高さ
まで上昇させて、天井を設置する上部屋根bより吊設さ
れた吊材4によって前記下地枠5と吊材4aとを係合
し、固定し、前記機器と、同機器の本体設備との接続を
完了し、しかるのち前記昇降装置1を撤去する。
Then, in the previous step, the air conditioner 6 or the lighting equipment, and the ceiling base frame 5 on which the accessory equipment of the equipment and the ceiling finishing material 7 have been installed are raised to a predetermined ceiling height by the elevating device 1. , The base frame 5 and the suspension member 4a are engaged and fixed by the suspension member 4 suspended from the upper roof b on which the ceiling is installed, and the connection between the device and the main equipment of the device is completed, Then, the lifting device 1 is removed.

【0014】なお構築物Aの平面周辺よりやや小さい平
面に設けた他の天井部は、金属製の補助天井10やその
他の天井材で吊上げ途上に組立て、所定の位置で固定す
るか、或は吊上げられた天井を固定した後に設置しても
よい。図4は昇降装置の吊設部と天井構造の断面を示
し、1aはチェーンブロック、11は天井材吊材を示す
ものである。
The other ceiling portion provided on a plane slightly smaller than the periphery of the plane of the structure A is assembled with the auxiliary ceiling 10 made of metal or other ceiling material while being lifted, and fixed at a predetermined position or lifted. It may be installed after fixing the ceiling. FIG. 4 is a cross-sectional view of the suspension part and the ceiling structure of the lifting device, where 1a is a chain block and 11 is a ceiling material suspension material.

【0015】[0015]

【発明の効果】本発明によれば前記したように、大空間
の天井を、足場を架設して施工する従来の施工法とは異
り、構築物の平面周辺よりやや小さい平面上において、
下地枠上に天井に設置される設備機器や天井仕上げ材を
組立てることによって、前記機器を地上付近で取付け、
更に天井仕上げを作業の姿勢に合わせて作業ができ、こ
の結果、高所作業がなくなり、作業効率が向上するとと
もに、仕上げ精度が改善され、作業管理も容易になる。
As described above, according to the present invention, unlike the conventional construction method in which the ceiling of a large space is constructed by installing scaffolds, on a plane slightly smaller than the plane periphery of the structure,
By assembling the equipment and ceiling finishing material installed on the ceiling on the base frame, the equipment is installed near the ground,
Furthermore, the ceiling finishing can be performed according to the work posture, and as a result, work at high places is eliminated, work efficiency is improved, finishing accuracy is improved, and work management is facilitated.

【0016】また前記作業が一括して地上部で行なわ
れ、一気に天井の高さまで吊上げて天井を設置する上部
屋根より吊下された吊材と、下地枠の吊材とを接続し、
前記機器と本体設備とを接続して作業を完了するように
したので、工程が簡略化されるとともに、昇降装置も軽
微なものとなり、経済性が向上される。
Further, the above-mentioned work is collectively carried out on the above-ground part, and the suspending material suspended from the upper roof for suspending the ceiling to install the ceiling is connected to the suspending material of the base frame,
Since the work is completed by connecting the equipment and the main body equipment, the process is simplified, and the lifting device is also small, so that the economical efficiency is improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】下地枠を地上部で組立てる工程を示す断面図で
ある。
FIG. 1 is a cross-sectional view showing a process of assembling a base frame on the ground.

【図2】下地枠に設備機器と天井仕上げ材を施工する工
程を示す断面図である。
FIG. 2 is a cross-sectional view showing a process of constructing equipment and a ceiling finishing material on a base frame.

【図3】施工完了時の状態を示す断面図である。FIG. 3 is a cross-sectional view showing a state at the time of completion of construction.

【図4】昇降装置と天井構造の詳細を示す縦断面図であ
る。
FIG. 4 is a vertical cross-sectional view showing details of a lifting device and a ceiling structure.

【符号の説明】[Explanation of symbols]

1 昇降装置 2 ワイヤ 3 チェーン 4 吊材 4a 吊材 5 下地枠 6 空調機器 6′ 空調機器配置スペース 7 天井仕上げ材 10 補助天井 11 天井材吊材 A 構築物 a 壁 b 屋根 c 床 1 Lifting device 2 Wire 3 Chain 4 Suspending material 4a Suspending material 5 Base frame 6 Air conditioning equipment 6'Air conditioning equipment arrangement space 7 Ceiling finishing material 10 Auxiliary ceiling 11 Ceiling material Suspending material A Construction a Wall b Roof c Floor

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 構築物の上部屋根より天井昇降装置を吊
設する工程と、天井に設置される設備機器、或は天井仕
上げ材を保持する下地枠を前記構築物の平面周辺よりや
や小さい平面上において床上で組立てる工程と、前記昇
降装置によって前記下地枠を前記設備機器の取付位置ま
で上昇させる工程と、上昇した前記下地枠を天井仕上げ
材取付け位置まで上昇させる工程と、前記下地枠に天井
仕上げ材を取付ける工程と、前記工程によって組立てら
れた天井を前記昇降装置を介して所定の天井高さまで上
昇する工程と、同天井を設置する上部屋根より吊設され
た吊材によって前記下地枠とを接続し、かくして所定位
置に設置された設備機器と本体施設とを接続して前記昇
降装置を撤去する工程とよりなることを特徴とする天井
の施工方法。
1. A process of suspending a ceiling elevating device from the upper roof of a structure, and an equipment installed on the ceiling or a base frame for holding a ceiling finishing material on a plane slightly smaller than the plane periphery of the structure. A step of assembling on the floor; a step of raising the base frame to the mounting position of the equipment by the lifting device; a step of raising the raised base frame to a ceiling finishing material mounting position; and a ceiling finishing material on the base frame. A step of mounting, a step of raising the ceiling assembled in the step to a predetermined ceiling height through the elevating device, and a step of connecting the base frame with a suspending material suspended from an upper roof on which the ceiling is installed A method of constructing a ceiling, comprising the steps of connecting the equipment and the main body facility thus installed at a predetermined position and removing the lifting device.
JP5028971A 1993-02-18 1993-02-18 Execution of work for ceiling Pending JPH06240873A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5028971A JPH06240873A (en) 1993-02-18 1993-02-18 Execution of work for ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5028971A JPH06240873A (en) 1993-02-18 1993-02-18 Execution of work for ceiling

Publications (1)

Publication Number Publication Date
JPH06240873A true JPH06240873A (en) 1994-08-30

Family

ID=12263310

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5028971A Pending JPH06240873A (en) 1993-02-18 1993-02-18 Execution of work for ceiling

Country Status (1)

Country Link
JP (1) JPH06240873A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011032024A (en) * 2009-07-31 2011-02-17 Tokyo Electron Ltd Method of assembling transfer mechanism, and transfer chamber
CN103711246A (en) * 2013-11-09 2014-04-09 无锡汉佳半导体科技有限公司 Suspended ceiling device of fast-mounting operation room

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011032024A (en) * 2009-07-31 2011-02-17 Tokyo Electron Ltd Method of assembling transfer mechanism, and transfer chamber
CN103711246A (en) * 2013-11-09 2014-04-09 无锡汉佳半导体科技有限公司 Suspended ceiling device of fast-mounting operation room

Similar Documents

Publication Publication Date Title
KR102063433B1 (en) vertical refloat method of the integrated module for plumbing fixture
JPH07292986A (en) Device and method for constructing long-span roof
JPH06240873A (en) Execution of work for ceiling
JP6151528B2 (en) Air conditioning unit construction method
JP3073155B2 (en) How to set product groups for construction buildings
JP3229947U (en) Yagura mechanism
JP4027170B2 (en) External scaffold device and construction method of external scaffold device
JP2649032B2 (en) Ceiling construction method
JP2002310473A (en) Method for installing fan filter unit and hoisting machine used in method
JPH0657954A (en) Working method of structure ceiling
JPH0742979A (en) Installation method of fan filter unit
US20190127995A1 (en) Rigging Lift and Method of Use
JPH10292619A (en) Self-climbing hanging scaffold unit for use in hanging scaffold constructing system corresponding to large space
JP2779258B2 (en) Roof lift-up method
JP2738254B2 (en) How to bring in the unit room
JP2011106114A (en) Method for constructing stage for high-place work
JPH04237761A (en) Method for constructing high place facility
JPH09310484A (en) Large space applicable suspended scaffold constructing system
JP2770695B2 (en) How to bring in the unit room
JP2007247215A (en) Duct construction method
JP2021152304A (en) Method for constructing equipment shelf
JP2001329686A (en) Construction method for scaffold placed on elevated working platform
JP2579241B2 (en) Construction method of ceiling work
JP2997022B2 (en) Plumbing method and plumbing equipment structure
JP2024095072A (en) How to carry in or out heavy items