JPH0621444B2 - Construction method of dam body using steel pipe sheet pile and straight sheet pile - Google Patents

Construction method of dam body using steel pipe sheet pile and straight sheet pile

Info

Publication number
JPH0621444B2
JPH0621444B2 JP1032592A JP3259289A JPH0621444B2 JP H0621444 B2 JPH0621444 B2 JP H0621444B2 JP 1032592 A JP1032592 A JP 1032592A JP 3259289 A JP3259289 A JP 3259289A JP H0621444 B2 JPH0621444 B2 JP H0621444B2
Authority
JP
Japan
Prior art keywords
sheet pile
steel pipe
straight
dam body
pipe sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP1032592A
Other languages
Japanese (ja)
Other versions
JPH02213509A (en
Inventor
順一 浜砂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toa Corp
Original Assignee
Toa Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toa Corp filed Critical Toa Corp
Priority to JP1032592A priority Critical patent/JPH0621444B2/en
Publication of JPH02213509A publication Critical patent/JPH02213509A/en
Publication of JPH0621444B2 publication Critical patent/JPH0621444B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Revetment (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、矢板を打設し、その前後に捨石マウンド、ブ
ロック及び砂などの堤体材料を設置して堤体を構築する
際に、波浪に対して安定した施工のできる鋼管矢板と直
線矢板を用いた堤体の施工方法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Industrial field of use] The present invention, when a sheet pile is placed, and before and after it to construct a levee body by installing levee materials such as rubble mound, blocks and sand, The present invention relates to a method for constructing a dam body using a steel pipe sheet pile and a straight sheet pile that can be stably constructed against waves.

〔従来の技術〕 従来、防波堤や埋立護岸を構築するのに、矢板を打設
し、その背後に捨石マウンドを設けたり、砂を投入した
りしている。
[Prior Art] Conventionally, in order to construct a breakwater or a reclaimed seawall, a sheet pile is placed, a rubble mound is provided behind it, and sand is thrown in.

また、堤体下部の波浪などによる洗掘防止対策として、
洗掘防止用の矢板を傾斜堤の内部にその水底地盤中にそ
の下端が貫入するように打設することが行われている。
In addition, as a measure to prevent scouring due to waves etc. under the bank,
It has been practiced to place a scour prevention sheet pile inside a sloping dike so that its lower end penetrates into the water bottom ground.

このような堤体を施工する際には、まず、海底地盤に矢
板を打設し、その後に捨石マウンドを設けたり、砂を投
入し、前面にブロックを投入することになるので、矢板
を打設してから捨石マウンドを設けたり、砂を投入する
までの間、打設された矢板は波浪に対して非常に不安定
な状態になり、安定した作業ができないという問題があ
る。
When constructing such a levee body, first, a sheet pile is driven on the seabed ground, then a rubble mound is provided, sand is thrown in, and a block is thrown in the front. There is a problem that the pile sheet piles are extremely unstable against waves during the period from the installation to the installation of a rubble mound and the addition of sand, which makes stable work impossible.

〔発明の解決しようとする課題〕[Problems to be Solved by the Invention]

本発明は、前記従来の問題点を解消するためになされた
ものであり、矢板を打設して堤体を構築する際に、波浪
に対して安定した状態で施工することのできる堤体の施
工方法を提供することを解決課題としたものである。
The present invention has been made to solve the above-mentioned conventional problems, and when constructing a dam body by driving a sheet pile, it is possible to construct a dam body in a stable state against waves. The problem to be solved is to provide a construction method.

〔課題を解決するための手段〕[Means for Solving the Problems]

上記の課題を解決するための手段として、本発明の堤体
の施工方法は、天端が水面上に位置する鋼管矢板と、天
端が水底面からやや上方に位置する直線矢板とを交互に
連続して水底地盤に打設して鋼管矢板間に空間を設けた
後、その直線矢板上に適宜な高さの直線矢板を突き合せ
し、その突き合せた直線矢板の天端よりやや下の高さま
でその前後に捨石マウンド、砂及びブロック等の堤体材
料を設置する作業を、上記鋼管矢板の天端まで堤体材料
が設置されるまで繰返し行うことを特徴としたものであ
り、堤体の施工中の波浪は各鋼管矢板間の直線矢板上を
通過するので鋼管矢板に波浪などの大きな力がかからず
に、安定した状態で堤体の施工ができることになる。
As a means for solving the above problems, the method of constructing a dam body of the present invention includes a steel pipe sheet pile whose top is located above the water surface, and a straight sheet pile whose top is located slightly above the bottom of the water. After continuously setting the space between the steel pipe sheet piles on the bottom of the water, place a straight sheet pile with an appropriate height on the straight sheet pile, and place it slightly below the top of the straight sheet piles. It is characterized in that the work of installing levee materials such as rubble mound, sand, and blocks before and after the height is repeated until the levee material is installed up to the top end of the steel pipe sheet pile. Since the waves during construction pass over the straight sheet piles between the steel pipe sheet piles, it is possible to construct the dam body in a stable state without applying large force such as waves to the steel pipe sheet piles.

〔実施例〕〔Example〕

以下図面を参照して本発明の方法を適用して堤体を構築
する際の一実施例について説明する。
An example of constructing a bank by applying the method of the present invention will be described below with reference to the drawings.

まず、この実施例における堤体の施工方法を各手順ごと
に説明すると、第1手順として、第1図の正面図及び第
2図の側断面図に示すごとく、天端が水面W.L上に位
置する鋼管矢板1と、天端が水底地盤Bからやや上方に
位置する直線矢板2とを第3図の拡大平面図に示すごと
く、それぞれ各側端部に設けた継手3を介して交互に連
続して水底地盤Bに打設する。
First, a method of constructing a bank in this embodiment will be described step by step. As a first step, as shown in the front view of FIG. 1 and the side sectional view of FIG. As shown in the enlarged plan view of FIG. 3, a steel pipe sheet pile 1 located on L and a straight sheet pile 2 having a top end located slightly above the water bottom ground B are connected through joints 3 provided at respective side end portions. And continuously piling on the submarine ground B.

次に、第2手順として、第4図の正面図及び第5図の側
断面図に示すごとく、適宜な高さの直線矢板2Aを上記
の水底地盤Bに打設済の直線矢板2の天端上に突き合せ
するが、この場合、止水を要求される場合にはパッキン
などの継手を介して突き合せするものとする。
Next, as a second step, as shown in the front view of FIG. 4 and the side sectional view of FIG. 5, a straight sheet pile 2A having an appropriate height is placed on the above-mentioned water bottom ground B to obtain the ceiling of the straight sheet pile 2 already installed. Butts are made on the ends, but in this case, when water stoppage is required, butts should be made through a joint such as packing.

上記の直線矢板2Aの突き合せの行われた水底地盤Bの
後面には捨石マウンド4を設けたり、砂を投入し、一
方、その水底地盤Bの前面には被覆ブロック5を敷設の
上にブロック6を直線矢板2Aの天端よりやや下の高さ
まで設置する。
A rubble mound 4 is provided on the rear surface of the bottom seabed B where the straight line sheet piles 2A have been butt-mounted, or sand is thrown in, while a covering block 5 is laid on the front surface of the bottom seabed B to be laid on top of it. 6 is installed to a height slightly below the top of the straight sheet pile 2A.

次に、第3手順として、第6図の正面図及び第7図の側
断面図のごとく、適宜な高さの直線矢板2Bを第2手順
の直線矢板2A上に突き合せし、その前後面に、第2手
順で説明したような捨石マウンド4、砂、及びブロック
6等の堤体材料を直線矢板2Bの天端よりやや下の高さ
まで設置する。
Next, as a third procedure, as shown in the front view of FIG. 6 and the side sectional view of FIG. 7, a straight sheet pile 2B having an appropriate height is abutted on the straight sheet pile 2A of the second procedure, and its front and rear faces. Then, the levee materials such as the rubble mound 4, the sand, and the block 6 as described in the second procedure are installed to a height slightly lower than the top end of the straight sheet pile 2B.

以下、上記第2手順の作業及び第3手順の作業を繰返
し、鋼管矢板1の天端まで突き合された直線矢板2Cの
前後面に、捨石マウンド4、砂、ブロック6等の堤体材
料が設置されるまで上記の作業を行い、第8図の正面図
及び第9図の側断面図に示す最終手順で、波浪Wが押寄
せる前面側の上面を消波ブロック7等の堤体材料で覆う
ことにより所定の堤体が完成する。
Hereinafter, the work of the second procedure and the work of the third procedure are repeated, and the levee materials such as the rubble mound 4, the sand, and the block 6 are attached to the front and rear surfaces of the straight sheet pile 2C that is butted to the top end of the steel pipe sheet pile 1. The above work is carried out until installation, and by the final procedure shown in the front view of FIG. 8 and the side sectional view of FIG. A predetermined bank is completed by covering it.

〔発明の効果〕〔The invention's effect〕

以上に説明した本発明の鋼管矢板と直線矢板を用いた堤
体の施工方法によれば、 (1).堤体の施工に当り、鋼管矢板と鋼管矢板の間に空
間を積極的に設けることにより、波浪をその空間を通さ
せて鋼管矢板に波浪の全部を衝突させず、施工中の鋼管
矢板への波浪による抵抗を極力少なくさせることができ
る。
According to the method of constructing a dam body using the steel pipe sheet pile and the straight sheet pile of the present invention described above, (1). When constructing the cut-off wall, by positively providing a space between the steel pipe sheet piles and the steel pipe sheet piles, the waves are not allowed to pass through the space and the steel pipe sheet piles are not collided with all of the waves. The resistance due to waves can be reduced as much as possible.

(2).鋼管矢板への波浪の抵抗を低減させながら、鋼管
矢板間に直線矢板を少しずつ継ぎ足し、継ぎ足しの都度
その直線矢板の天端よりやゝ下の高さまでその前後に堤
体材料を設置するようにしたから直線矢板には直接波浪
の力が作用せず、安定的に直線矢板を設置できる。しか
も直線矢板を少しずつ継ぎ足しながらその足元にその都
度堤体材料を設置するので安定状態で堤体の施工がで
き、施工作業の能率向上を可能にする。
(2). While reducing the resistance of waves to the steel pipe sheet piles, add straight sheet piles between the steel pipe sheet piles little by little, and at each addition, install the dam material before and after the top of the straight sheet piles to a height slightly below it. Therefore, the force of the waves does not act directly on the straight sheet pile, and the straight sheet pile can be stably installed. Moreover, since the material of the dam body is installed at each foot while adding the straight sheet piles little by little, the dam body can be constructed in a stable state and the efficiency of the construction work can be improved.

【図面の簡単な説明】[Brief description of drawings]

図面は本発明の方法を適用して堤体を構築する一実施例
における各手順を示す一連の説明図であり、第1図は第
1手順の正面図、第2図は第1図の側断面図、第3図は
第1図の拡大平面図、第4図は第2手順の正面図、第5
図は第4図の側断面図、第6図は第3手順の正面図、第
7図は第6図の側断面図、第8図は最終手順の正面図、
第9図は第8図の側断面図である。 1……鋼管矢板、2,2A,2B,2C……直線矢板、
4……捨石マウンド、5……被覆ブロック、6……ブロ
ック、7……消波ブロック、B……水底地盤、W.L…
…水面。
The drawings are a series of explanatory views showing each procedure in one embodiment for constructing a dam body by applying the method of the present invention. FIG. 1 is a front view of the first procedure, and FIG. 2 is a side of FIG. Sectional view, FIG. 3 is an enlarged plan view of FIG. 1, FIG. 4 is a front view of the second procedure, and FIG.
FIG. 6 is a side sectional view of FIG. 4, FIG. 6 is a front view of the third procedure, FIG. 7 is a side sectional view of FIG. 6, and FIG. 8 is a front view of the final procedure.
FIG. 9 is a side sectional view of FIG. 1 ... Steel pipe sheet pile, 2, 2A, 2B, 2C ... Straight sheet pile,
4 ... Rubble mound, 5 ... Covered block, 6 ... Block, 7 ... Dissipating block, B ... Underwater ground, W. L ...
... water surface.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】天端が水面上に位置する鋼管矢板と、天端
が水底面からやや上方に位置する直線矢板とを交互に水
底地盤に打設して鋼管矢板間に空間を設けた後、該直線
矢板上に適宜な高さの直線矢板を突き合せ、その天端よ
りやや下の高さまでその前後に堤体材料を設置する作業
を、鋼管矢板の天端まで堤体材料が設置されるまで繰返
し行う鋼管矢板と直線矢板を用いた堤体の施工方法。
1. A steel pipe sheet pile whose top is located above the water surface and a straight sheet pile whose top end is located slightly above the bottom of the water are alternately placed on the water bottom ground to provide a space between the steel pipe sheet piles. , A straight sheet pile of an appropriate height is abutted on the straight sheet pile, the work to install the dam material to the front and back to a height slightly lower than the top end, the dam material is installed to the top end of the steel pipe sheet pile Method of constructing a dam body using steel pipe sheet piles and straight sheet piles.
JP1032592A 1989-02-14 1989-02-14 Construction method of dam body using steel pipe sheet pile and straight sheet pile Expired - Fee Related JPH0621444B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1032592A JPH0621444B2 (en) 1989-02-14 1989-02-14 Construction method of dam body using steel pipe sheet pile and straight sheet pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1032592A JPH0621444B2 (en) 1989-02-14 1989-02-14 Construction method of dam body using steel pipe sheet pile and straight sheet pile

Publications (2)

Publication Number Publication Date
JPH02213509A JPH02213509A (en) 1990-08-24
JPH0621444B2 true JPH0621444B2 (en) 1994-03-23

Family

ID=12363130

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1032592A Expired - Fee Related JPH0621444B2 (en) 1989-02-14 1989-02-14 Construction method of dam body using steel pipe sheet pile and straight sheet pile

Country Status (1)

Country Link
JP (1) JPH0621444B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7172754B2 (en) * 2019-03-08 2022-11-16 日本製鉄株式会社 Embankment reinforcement structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57146808A (en) * 1981-03-07 1982-09-10 Penta Ocean Constr Co Ltd Steel plate cell work

Also Published As

Publication number Publication date
JPH02213509A (en) 1990-08-24

Similar Documents

Publication Publication Date Title
JP2001107319A (en) Aseismic reinforcing method of pier and aseismic reinforced structure
JPH0621444B2 (en) Construction method of dam body using steel pipe sheet pile and straight sheet pile
JPS6311710A (en) Earthquake-proofing and reinforcing work for existing structure
JP2860396B2 (en) Water sheet pile wall structure with a slit for wave dissipation on top
JPS605072Y2 (en) Sheet pile type wall structure
JP7495904B2 (en) Improvement structure and method of existing wharf
US2338110A (en) Graving dry dock and method of construction
JP4320972B2 (en) Landfill soil runoff prevention structure for quay and revetment
JPS62237983A (en) Wall body for preventing leakage of waste
JPH05331840A (en) Inter-element joint of steel-made underground continuous wall and construction thereof
US715557A (en) Means for forming beaches.
JPS626011A (en) Scouring prevention work for caisson foundation
JPS6330444B2 (en)
JPH07305322A (en) Construction method of control type revetment
JP2537415B2 (en) Flexible mound basic structure
JPH0443123B2 (en)
JPS6051210A (en) Construction of breakwater
Brater Low cost shore protection used on the Great Lakes
JPS6033927B2 (en) Foot-hardening method for rubble foundations of underwater structures and foot-hardening bags used in the method
JPS5844802B2 (en) Ganpekino hokiyoukohou
JPS58767B2 (en) Construction method of underground continuous water-stop wall
JPS621914A (en) Scouring preventing work for caisson foundation
JPS60258314A (en) Underwater joining method for waterproof sheet
JPH0325564B2 (en)
JPS5911013B2 (en) Earth retaining method

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees