JPH0569759A - Replacement for railway high voltage cable - Google Patents

Replacement for railway high voltage cable

Info

Publication number
JPH0569759A
JPH0569759A JP25712691A JP25712691A JPH0569759A JP H0569759 A JPH0569759 A JP H0569759A JP 25712691 A JP25712691 A JP 25712691A JP 25712691 A JP25712691 A JP 25712691A JP H0569759 A JPH0569759 A JP H0569759A
Authority
JP
Japan
Prior art keywords
line
old
wire
new
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP25712691A
Other languages
Japanese (ja)
Other versions
JPH0671865B2 (en
Inventor
Yoshiaki Hishinuma
好章 菱沼
Seiichi Takahashi
精一 高橋
Seisuke Kubota
誠輔 久保田
Keisuke Murayama
圭佑 村山
Masayasu Imai
正康 今井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yasuda Seisakusho Co Ltd
East Japan Railway Co
Nippon Densetsu Kogyo Co Ltd
Original Assignee
Yasuda Seisakusho Co Ltd
East Japan Railway Co
Nippon Densetsu Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yasuda Seisakusho Co Ltd, East Japan Railway Co, Nippon Densetsu Kogyo Co Ltd filed Critical Yasuda Seisakusho Co Ltd
Priority to JP25712691A priority Critical patent/JPH0671865B2/en
Publication of JPH0569759A publication Critical patent/JPH0569759A/en
Publication of JPH0671865B2 publication Critical patent/JPH0671865B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

PURPOSE:To provide a highly safe and efficient replacement method for a railway high voltage cable even during the traveling time of an electric train. CONSTITUTION:A new cable Wn is extended and an old cable Wa is removed with them supported by plural moving metallic wheels 20 which are developed by using the old cable Wa as a supporting cable for extending the new cable Wn and a new cable for the removal of an old cable respectively. Besides, the old cable and the new cable are maintained so as to be replaced with a mid supporter 1 by using the old and new cable as a supporting cable.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、鉄道用高圧線の張替
え工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for replacing a high-voltage line for railways.

【0002】[0002]

【従来の技術】鉄道用高圧線というのは、駅舎の業務用
電力や信号機の作動用電力を供給するためのもので、図
8に示すように、電車に電力を供給するトロリー線Tの
上方、あるいは側上方に2経路で架設されている。この
ように2経路としているのは、一方が何らかの原因で送
電出来なくなっても正常な他方により信号機の作動を確
保して電車の運行に支障を来さないようにするためであ
る。
2. Description of the Related Art A high-voltage railway line is used to supply electric power for commercial use at a station building and electric power for operating a traffic signal, and as shown in FIG. 8, above a trolley line T for supplying electric power to a train. Or, it is erected by two routes on the upper side. In this way, the two routes are provided so that even if one cannot transmit power for some reason, the other normally operates the traffic signal so that the operation of the train is not hindered.

【0003】この高圧線Wは、旧国鉄系の鉄道会社の場
合であると、通常、一般の送電線に比べかなり短い15
年程度という時間を区切りに張り替えるようにしてい
る。このように短い時間で張り替えるのは、電線の劣化
が進んで事故が起こり易い状態になる前に張り替えるこ
とにより、鉄道運行のより一層の安全性を図らんとした
ものである。
In the case of an old Japanese railway company, the high-voltage line W is usually considerably shorter than a general transmission line.
I try to change the time of about a year. In this way, the replacement is performed in a short time in order to further improve the safety of railway operation by replacing the wires before the deterioration of the electric wires leads to a situation where an accident is likely to occur.

【0004】このような高圧線Wの張替えは、従来よ
り、一般に引抜き工法と呼ばれる工法により行われてい
る。しかし、この工法では撤去中の旧線や延線中の新線
に大きな弛みが生じてしまい、この弛んだ電線がトロリ
ー線Tや走行中の電車Eに接触するおそれがある。この
ため、高圧線Wがトロリー線Tの上方にある場合は当
然、電車の走行時間中には工事を行えない。また、側上
方にある場合でも突然の強風等で横揺れが生じることを
考慮すると、電車の走行時間中の工事は好ましくなく、
たとえ走行時間中に行うとしても、できるだけ運転本数
の少ない時間帯を選び、しかも十分な要員を配置して電
車の接近を常に監視しつつ工事を進めなければならな
い。つまり、従来の工法であると、工事のできる時間帯
が夜間の限られた時間に制限されるし、また必要な人員
も多くならざるを得ないということである。しかるに、
昨今の労働環境の変化から、このような制限を受ける条
件の悪い作業については十分な作業人員の確保が難しく
なって来ており、工法の抜本的改良が緊急の課題となっ
て来ている。
Conventionally, the replacement of the high-voltage wire W is performed by a construction method generally called a drawing construction method. However, with this construction method, a large slack is generated in the old line being removed and the new line being extended, and this slack electric wire may come into contact with the trolley wire T and the running train E. Therefore, when the high-voltage line W is above the trolley line T, naturally, the construction cannot be performed during the traveling time of the train. Also, considering that rolling may occur due to sudden strong winds, etc. even when it is on the upper side, construction during the running time of the train is not preferable,
Even if it is done during the running time, it is necessary to select a time zone where the number of trains is as small as possible, and to allocate sufficient personnel to monitor the approach of the train at all times. In other words, with the conventional construction method, the working hours are limited to the limited hours at night, and the number of necessary personnel is inevitable. However,
Due to recent changes in the working environment, it has become difficult to secure sufficient work personnel for work under such restricted conditions, and a drastic improvement in the construction method has become an urgent issue.

【0005】[0005]

【発明が解決しようとする課題】このような事情を背景
になされたのがこの発明で、工事可能時間帯に対する制
約がなく、電車の走行時間中でも十分に安全な状態で電
線の張替えを可能であり、しかもより効率的に工事を行
えるような鉄道用高圧線の張替え工法を提供せんとする
ものである。
The present invention has been made against such a background, and there is no restriction on the workable time zone, and it is possible to change the electric wire in a sufficiently safe state even during the traveling time of the train. The purpose is to provide a method for replacing the high-voltage line for railways that enables more efficient construction.

【0006】[0006]

【課題を解決するための手段】具体的には、張り替える
べき旧線を支持している碍子金具に近接させて中間支持
器を取り付け、次いで、碍子金具から外した旧線を中間
支持器の旧線保持部に保持させ、それから、この中間支
持器で保持させた旧線を新線延線用の支持線として延線
ロープ及び複数の移動金車を作業区間に展開し、次い
で、適宜の間隔で位置決め・固定された移動金車にて支
持させつつ延線ロープにより新線を作業区間に延線し、
次いで、延線され新線を中間支持器の新線保持部に保持
させる一方で、中間支持器の旧線保持部から旧線を外し
て移動金車上に移し、それから、中間支持器で保持させ
た新線を旧線撤去用の支持線として旧線の撤去と移動金
車の回収を行い、そして、中間支持器から新線を碍子金
具に移動させるようにしてなる鉄道用高圧線の張替え工
法を提供する。
[Means for Solving the Problems] Specifically, an intermediate supporter is attached in the vicinity of an insulator metal fitting supporting an old wire to be replaced, and then the old wire removed from the insulator metal fitting is attached to the intermediate supporter. Hold the old wire held by the old wire holding part, and then use the old wire held by this intermediate support as a support wire for the new wire extension, deploy the wire rope and the plurality of movable wagons in the working section, and then A new wire is extended to the work section by a wire rope while being supported by a moving wagon that is positioned and fixed at intervals.
Next, while being extended, the new wire is held in the new wire holding part of the intermediate support, while the old wire is removed from the old wire holding part of the intermediate support and transferred to the moving rail car, and then held by the intermediate support. The new line is used as a support line for removing the old line, the old line is removed, the moving wagon is collected, and the new line is moved from the intermediate support to the insulator metal fitting. Provide a construction method.

【0007】[0007]

【作用】この工法は、前述した鉄道の高圧線が15年程
度という短いサイクルで張り替えられるという事実に着
目することにより構成されたもので、この短いサイクル
で張り替えられるため劣化程度が小さく十分な強度を保
持している旧線を新線延線用の支持線として利用するこ
とにより、効率的で、しかもトロリー線や走行電車に影
響を与えることなく、つまり時間的制約を受けることな
く工事を行えるようにしたものである。すなわち、旧線
を新線延線用の支持線として利用ているので、新線延線
用の支持線の展開及び撤去作業を省略でき、その分、作
業の合理化を図れ、また支持線で支持させた複数の移動
金車にて支持させた状態で新線の延線及び旧線の撤去作
業を行うようにしているので、新線及び旧線に大きな弛
みを生じることがなく、トロリー線や走行電車に影響を
与えずに済む。しかも、このような旧線及び新線の支持
線としての利用を旧線保持部と新線保持部を有する中間
支持器による旧線と新線の交換的保持という作業だけで
行うようにしているので、旧線の撤去と新線の延線を連
続的に行えるし、また旧線の撤去から新線の延線への切
り換えを簡単に行え、より一層作業の合理化を図れる。
This construction method was constructed by paying attention to the fact that the high-voltage line of the railway mentioned above can be re-installed in a short cycle of about 15 years. Since it is re-installed in this short cycle, the degree of deterioration is small and the strength is sufficient. By using the old line holding the cable as a support line for the new line extension, construction can be performed efficiently, without affecting the trolley wire or traveling train, that is, without time constraints. It was done like this. In other words, since the old wire is used as a support wire for the new wire extension, the work of deploying and removing the support wire for the new wire extension can be omitted, and the work can be rationalized accordingly, and the support wire is also supported. The new line and the old line are removed while being supported by a plurality of movable wagons, so there is no significant slack in the new line and the old line. It does not affect the running train. In addition, the utilization of such an old line and a new line as a support line is performed only by the work of interchangeably holding the old line and the new line by an intermediate supporter having the old line holding portion and the new line holding portion. Therefore, the removal of the old line and the extension of the new line can be performed continuously, and the switching from the removal of the old line to the extension of the new line can be easily performed to further rationalize the work.

【0008】[0008]

【実施例】以下、この発明の実施例を説明する。この工
法は、旧線の移設、延線ロープ等の展開、新線の延線、
旧線及び新線の交換的移設、旧線の撤去、新線の移設・
緊線というステップを含んでなるもので、以下各ステッ
プについて詳述する。
Embodiments of the present invention will be described below. This method is used to relocate the old line, deploy the extended rope, extend the new line,
Exchange and relocation of old and new lines, removal of old lines, relocation of new lines
Each step will be described in detail below.

【0009】旧線の移設(図1) 先ず、旧線Waを支持している碍子金具Gに近接させて
中間支持器1を碍子金具Gが取り付けられている腕金M
に取り付ける。ここで、中間支持器1は、旧線Waある
いは後述新線Wnを支持線として利用できる状態に支持
すると共に、後述の移動金車や自走機等の通過を可能と
するためのもので、図7に示すように、C字形形状の吊
下げアーム2と、吊下げアーム2に接続する受け板3
と、及び受け板3に対し着脱自在とされた2個の押さえ
板4、5とで形成されており、受け板3に設けられた2
条の半円形の溝6、7の各々に対し押さえ板4、5の各
々に設けられている1条の半円形の溝8、9がそれぞれ
組み合わさることにより円孔状の旧線保持部10及び新
線保持部11がそれぞれ形成されるようになっている。
中間支持器1の取付けが終わったら、旧線Waを碍子金
具Gから取り外して中間支持器1の旧線保持部10に保
持させる。この作業は、押さえ板4を取り外して溝6に
旧線Waを嵌め込んだ後、押さえ板4を再び取り付ける
ことにより行われる。
Relocation of the old line (FIG. 1) First, the intermediate support 1 is brought close to the insulator metal G supporting the old line Wa, and the armature M to which the insulator metal G is attached.
Attach to. Here, the intermediate supporter 1 is for supporting the old line Wa or the new line Wn described later in a state where it can be used as a support line, and for allowing passage of a moving wagon or a self-propelled machine described later, As shown in FIG. 7, a C-shaped hanging arm 2 and a receiving plate 3 connected to the hanging arm 2
And two pressing plates 4 and 5 which are detachable from the receiving plate 3 and are provided on the receiving plate 3.
By combining the semi-circular grooves 6 and 7 of the strips with the semi-circular grooves 8 and 9 of the strips provided on the pressing plates 4 and 5, respectively, the old-line holding portion 10 having a circular hole shape is combined. Also, the new line holding portion 11 is formed.
When the attachment of the intermediate support 1 is completed, the old wire Wa is removed from the insulator fitting G and held by the old wire holding portion 10 of the intermediate support 1. This operation is performed by removing the pressing plate 4 and fitting the old wire Wa into the groove 6, and then reattaching the pressing plate 4.

【0010】延線ロープ等の展開(図2) 中間支持器1で保持させた旧線Waを新線延線用の支持
線Snとして延線ロープR及び複数の移動金車20、2
0、……を作業区間に展開させる。この作業は自走機3
0を用いて行われるもので、移動金車20、20、……
を連結する連結ロープCを自走機30により牽引して移
動金車20、20、……の展開を行うと共に、この展開
されつつある移動金車20、20、……で支持させた状
態で延線ロープRを同じく自走機30により牽引して展
開する。このように移動金車20の展開と並行させて移
動金車20で支持させつつ延線ロープRの展開を行うこ
とにより延線ロープRの弛みが防止される。ここで、移
動金車20は、走行部21と、走行部21から垂設され
た支持部22とより形成されており、走行部21により
支持線Sn及び後述の支持線Saの上を走行でき、また
支持部22により延線ロープRや旧線Waあるいは新線
Wnを移動自在に支持できるようになっている。また、
この移動金車20は、図4に示すように、中間支持器1
の吊下げアーム2に当たると自動的に開く扉23を設
け、この扉23により閉空間24を形成することにより
脱線を防止する構造とすればより好ましい。 移動金車20、20、……の展開が終わったら、これを
所定の間隔で位置決め・固定させる。この位置決め・固
定のためには、図3に示すように、連結ロープCを支柱
Pに固定し、さらに必要に応じて各移動金車20の走行
部21に設けた適宜のブレーキ手段で各移動金車20を
個々に旧線Waつまり支持線Snに固定する。尚、図は
簡略化されており、3本の支柱P及び中間支持器1が一
箇所の支柱Pにしか示されていないが、実際にはもっと
多くの支柱があり、また各支柱ごとに中間支持器1が設
けられる。
Development of a wire-drawing rope and the like (FIG. 2) The old wire Wa held by the intermediate support 1 is used as a support wire Sn for drawing a new wire, and the wire-drawing rope R and a plurality of movable metal wheels 20, 2
Deploy 0, ... in the work section. This work is self-propelled machine 3
It is carried out using 0, and it is a mobile wagon 20, 20, ...
While pulling the connecting rope C for connecting the mobile wagons 20, 20, ... While deploying the mobile wagons 20, 20, .. Similarly, the wire rope R is pulled by the self-propelled machine 30 and deployed. In this way, the wire rope R is unfolded while being supported by the mobile money wheel 20 in parallel with the expansion of the mobile wire wheel 20, whereby slack of the wire rope R is prevented. Here, the mobile gold wheel 20 is formed of a traveling portion 21 and a support portion 22 vertically provided from the traveling portion 21, and can travel on the support line Sn and a support line Sa described later by the traveling portion 21. Further, the supporting portion 22 can movably support the extended rope R, the old wire Wa, or the new wire Wn. Also,
As shown in FIG. 4, this movable wheel & pinion 20 has an intermediate support 1
It is more preferable to provide a door 23 that automatically opens when it hits the hanging arm 2 and form a closed space 24 by this door 23 to prevent derailment. When the mobile gold wheels 20, 20, ... Are unfolded, they are positioned and fixed at predetermined intervals. In order to perform this positioning / fixing, as shown in FIG. 3, the connecting rope C is fixed to the support P, and if necessary, each movement is performed by an appropriate braking means provided on the traveling portion 21 of each movable rail 20. The gold wheel 20 is individually fixed to the old line Wa, that is, the support line Sn. Although the figure is simplified and the three columns P and the intermediate support 1 are shown only in one column P, there are actually more columns, and each column has an intermediate column. A support 1 is provided.

【0011】新線の延線(図3) 後端に新線Wnを接続した延線ロープRを引き抜くこと
により新線Wnを延線する。この新線Wnの延線は移動
金車20の支持部22により所定の間隔で支持されつつ
行われるので、延線ロープRの場合と同様に新線Wnに
大きな弛みを生じさせることがない。
The new wire Wn is extended by pulling out the extended rope R having the new wire Wn connected to the rear end of the new wire (FIG. 3) . Since the extension of the new wire Wn is performed while being supported by the support portion 22 of the movable wheel 20 at a predetermined interval, the new wire Wn is not greatly loosened as in the case of the extension rope R.

【0012】旧線及び新線の交換的移設(図4) 先ず、延線された新線Wnを中間支持器1の新線保持部
11に前述の旧線Waの移設の場合と同様にして保持さ
せる。次いで、前述の移設の場合とは逆にして旧線Wa
を中間支持器1の旧線保持部10から外して移動金車2
0、20、……の支持部22上に移す。
Interchangeable relocation of old line and new line (FIG. 4) First, the extended new line Wn is transferred to the new line holding portion 11 of the intermediate support 1 in the same manner as the above-mentioned relocation of the old line Wa. Hold it. Next, the old line Wa
Is removed from the old line holding portion 10 of the intermediate supporter 1
It is transferred onto the supporting portion 22 of 0, 20, ....

【0013】旧線の撤去(図5) 前述のようにして中間支持器1で保持させた新線Wnを
旧線撤去用の支持線Saとして旧線Waの撤去及び移動
金車20、20、……の回収を行う。それには、旧線W
aの先端に図示せぬ先導ロープを接続して巻き取ると同
時に、連結ロープCも巻き取る。連結ロープCからの移
動金車20の分離は、連結ロープCの巻取り作業に並行
して点線で囲んだエリアにおいて行う。この際、旧線W
aが移動金車20により所定の間隔で支持されているの
で、そこに弛みの生じないことは新線Wnの場合と同様
である。尚、旧線Wa及び連結ロープCの後端に接続さ
れているのは制動器31である。
Removal of the old line (FIG. 5) The new line Wn held by the intermediate support 1 as described above is used as a support line Sa for removing the old line, and the removal of the old line Wa and the movable rail cars 20, 20, ... is collected. For that, the old line W
A leading rope (not shown) is connected to the tip of a and wound up, and at the same time, the connecting rope C is also wound up. The transfer wheel 20 is separated from the connecting rope C in an area surrounded by a dotted line in parallel with the winding operation of the connecting rope C. At this time, the old line W
Since a is supported by the movable gold wheel 20 at a predetermined interval, no slack is generated there, as in the case of the new line Wn. The brake 31 is connected to the old line Wa and the rear end of the connecting rope C.

【0014】新線の移設・緊線(図6) 旧線Wa及び移動金車20の撤去が終わったら、新線W
nを中間支持器1の新線保持部11から外して碍子金具
Gに取り付け、それから緊線を行い、作業終了となる。
New line relocation / tightening line (Fig. 6) After the removal of the old line Wa and the moving wagon 20, the new line W
n is detached from the new wire holding portion 11 of the intermediate supporter 1 and attached to the insulator metal fitting G, and then a tight wire is attached to complete the work.

【0015】[0015]

【発明の効果】以上説明したようにこの発明による鉄道
用高圧線の張替え工法は、新線の延線については旧線
を、また旧線の撤去については新線をそれぞれ支持線に
用いて展開した複数の移動金車にて支持させた状態で新
線の延線及び旧線の撤去作業を行うようにしているの
で、新線及び旧線の弛みによるトロリー線や走行電車へ
の影響がなく、したがって工事可能時間帯に対する制約
を受けずに済み、よりよい作業条件での作業を可能と
し、また、旧線を新線延線用の支持線として利用してい
るので、新線延線用支持線の展開及び撤去作業が不要と
なり、作業の合理化を大きく図れ、さらに、旧線及び新
線の支持線としての利用を中間支持器による旧線と新線
の交換的保持という作業だけで行うようにしているの
で、旧線の撤去と新線の延線を連続的に行えるし、また
旧線の撤去から新線の延線への切り換えを簡単に行え、
より一層作業の合理化を図れる。
As described above, the method for replacing the high-voltage line for railway according to the present invention is developed by using the old line for the extension of the new line and the new line for the removal of the old line as the support lines. Because the new line and the old line are removed while being supported by multiple moving wagons, there is no effect on the trolley line and traveling trains due to the looseness of the new line and the old line. Therefore, it is possible to work under better working conditions without being restricted by the workable time zone. Also, since the old wire is used as a support wire for the new wire extension, it can be used for new wire extension. The work for deploying and removing the support line is not required, and the work can be greatly rationalized. Furthermore, the use of the old line and the new line as the support line is performed only by the work of holding the old line and the new line by exchange with the intermediate support. The old line is removed and the new line is extended. To the carried out continuously, also easy to switch to the extended line of the new line from the removal of the old line,
The work can be further streamlined.

【0016】[0016]

【図面の簡単な説明】[Brief description of drawings]

【図1】旧線の中間支持器への移設についての説明図で
ある。
FIG. 1 is an explanatory diagram of transfer of an old line to an intermediate supporter.

【図2】延線ロープ及び移動金車の展開についての説明
図である。
FIG. 2 is an explanatory diagram of the development of a wire drawing rope and a traveling wagon.

【図3】新線の延線についての説明図である。FIG. 3 is an explanatory diagram of an extension of a new line.

【図4】旧線及び新線の交換的移設についての説明図で
ある。
FIG. 4 is an explanatory diagram of exchange transfer of an old line and a new line.

【図5】旧線及び移動金車の撤去についての説明図であ
る。
FIG. 5 is an explanatory diagram of removal of an old line and a moving wagon.

【図6】新線の移設についての説明図である。FIG. 6 is an explanatory diagram of relocation of a new line.

【図7】中間支持器の概略斜視図である。FIG. 7 is a schematic perspective view of an intermediate supporter.

【図8】鉄道用高圧線の設置状態を示す図である。FIG. 8 is a diagram showing an installed state of a railway high-voltage line.

【符号の説明】[Explanation of symbols]

1 中間支持器 10 旧線保持部 11 新線保持部 20 移動金車 Wa 旧線 Wn 新線 G 碍子金具 Sn 新線延線用の支持線 Sa 旧線撤去用の支持線 1 Intermediate support 10 Old line holding part 11 New line holding part 20 Moving money wheel Wa Old line Wn New line G Insulator metal fitting Sn New line Support line for extending wire Sa Old line removing line

───────────────────────────────────────────────────── フロントページの続き (72)発明者 高橋 精一 東京都千代田区丸の内一丁目6番5号 東 日本旅客鉄道株式会社内 (72)発明者 久保田 誠輔 東京都千代田区丸の内一丁目6番5号 東 日本旅客鉄道株式会社内 (72)発明者 村山 圭佑 東京都台東区池之端一丁目2番23号 日本 電設工業株式会社内 (72)発明者 今井 正康 東京都葛飾区堀切3丁目27番12号 株式会 社安田製作所内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Seiichi Takahashi 1-6-5 Marunouchi, Chiyoda-ku, Tokyo Within East Japan Railway Company (72) Seisuke Kubota 1--6, Marunouchi, Chiyoda-ku, Tokyo # 5 East Japan Railway Company (72) Inventor Keisuke Murayama 1-22 Ikenohata, Taito-ku, Tokyo Nihon Densetsu Kogyo Co., Ltd. (72) Masayasu Imai 3-27-12 Horikiri, Katsushika-ku, Tokyo No. Stock Company Yasuda Factory

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 張り替えるべき旧線を支持している碍子
金具に近接させて中間支持器を取り付け、次いで、碍子
金具から外した旧線を中間支持器の旧線保持部に保持さ
せ、それから、この中間支持器で保持させた旧線を新線
延線用の支持線として延線ロープ及び複数の移動金車を
作業区間に展開し、次いで、適宜の間隔で位置決め・固
定された移動金車にて支持させつつ延線ロープにより新
線を作業区間に延線し、次いで、延線され新線を中間支
持器の新線保持部に保持させる一方で、中間支持器の旧
線保持部から旧線を外して移動金車上に移し、それか
ら、中間支持器で保持させた新線を旧線撤去用の支持線
として旧線の撤去と移動金車の回収を行い、そして、中
間支持器から新線を碍子金具に移動させるようにしてな
る鉄道用高圧線の張替え工法。
1. An intermediate support is attached in the vicinity of an insulator fitting supporting an old wire to be replaced, and then the old wire removed from the insulator fitting is held in an old wire holding portion of the intermediate support, and then The old wire held by this intermediate support is used as a support wire for the new wire and a wire rope and a plurality of movable wagons are deployed in the working section, and then the movable wire is positioned and fixed at an appropriate interval. The new wire is extended to the working section by the wire rope while being supported by the car, and then the extended new wire is held by the new wire holding part of the intermediate support while the new wire is held by the old wire holding part of the intermediate support. Remove the old line and transfer it to the moving wagon, and then remove the old line as a support line for removing the old line and collect the moving wagon, and then use the intermediate support Renewal of high-voltage line for railway which is designed to move new line from insulator to insulator The construction method.
JP25712691A 1991-09-10 1991-09-10 High-voltage line replacement method for railways Expired - Fee Related JPH0671865B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25712691A JPH0671865B2 (en) 1991-09-10 1991-09-10 High-voltage line replacement method for railways

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25712691A JPH0671865B2 (en) 1991-09-10 1991-09-10 High-voltage line replacement method for railways

Publications (2)

Publication Number Publication Date
JPH0569759A true JPH0569759A (en) 1993-03-23
JPH0671865B2 JPH0671865B2 (en) 1994-09-14

Family

ID=17302094

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25712691A Expired - Fee Related JPH0671865B2 (en) 1991-09-10 1991-09-10 High-voltage line replacement method for railways

Country Status (1)

Country Link
JP (1) JPH0671865B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2004858C2 (en) * 2010-06-09 2011-12-15 Konink Bam Groep Nv METHOD FOR INSTALLING OR REPLACING A SUPPORT CABLE OF A TOP-LINE SYSTEM FOR AN ELECTRIC-DRIVEN VEHICLE.
CN103594961A (en) * 2013-11-01 2014-02-19 国家电网公司 Method for replacing cable
CN110690664A (en) * 2019-10-10 2020-01-14 国网冀北电力有限公司唐山供电公司 Cross-road pay-off structure and pay-off method for power distribution network
CN111907378A (en) * 2020-08-10 2020-11-10 中铁电气化局集团有限公司沈阳电气化工程分公司 Passenger-cargo collinear carrier cable and contact line synchronous replacement construction process

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2004858C2 (en) * 2010-06-09 2011-12-15 Konink Bam Groep Nv METHOD FOR INSTALLING OR REPLACING A SUPPORT CABLE OF A TOP-LINE SYSTEM FOR AN ELECTRIC-DRIVEN VEHICLE.
CN103594961A (en) * 2013-11-01 2014-02-19 国家电网公司 Method for replacing cable
CN110690664A (en) * 2019-10-10 2020-01-14 国网冀北电力有限公司唐山供电公司 Cross-road pay-off structure and pay-off method for power distribution network
CN111907378A (en) * 2020-08-10 2020-11-10 中铁电气化局集团有限公司沈阳电气化工程分公司 Passenger-cargo collinear carrier cable and contact line synchronous replacement construction process
CN111907378B (en) * 2020-08-10 2023-03-03 中铁电气化局集团有限公司沈阳电气化工程分公司 Passenger-cargo collinear carrier cable and contact line synchronous replacement construction process

Also Published As

Publication number Publication date
JPH0671865B2 (en) 1994-09-14

Similar Documents

Publication Publication Date Title
CN111923964B (en) Car-buckling method and system based on subway fault and emergency condition
US20160075258A1 (en) Gantry type movable catenary system at a railway crossing
JPH10510698A (en) Switching system for high-speed passenger transportation systems
JP2009113691A (en) Ground power supply system of battery-driven type vehicle in railroad vehicle
JP2007060854A (en) Motor car traveling system
JPH0569759A (en) Replacement for railway high voltage cable
CN110481594A (en) A kind of rail clip repair apparatus and its repair method
JP4349529B2 (en) Suspension pulley device used in the overhead ground wire replacement method and overhead ground wire replacement method
CN114872748A (en) Magnetic suspension high-speed bus public transportation system based on composite special-shaped flange track
KR100842282B1 (en) Bypass distributing apparatus for uninterruptible electric power and its construction method
EP1510430B1 (en) Process of flexible responsibility allocation for control centers
KR101880691B1 (en) Worktable carriage system for suspension bridge cable and Repairing method of suspension bridge cable using worktable carriage
EP3756935A1 (en) Electrification of a railway network using existing charging stations
JP2909814B2 (en) How to update a railway bridge
JP3560815B2 (en) Trolley line straightening machine
CN217517273U (en) Maintenance tool for rail transit overhaul
EP3269583B1 (en) Side current collector for a rail vehicle
SU1342770A1 (en) Method of mounting the contact wire suspension of electric railways
JP2002069938A (en) Transferable sound proof device
NL2004858C2 (en) METHOD FOR INSTALLING OR REPLACING A SUPPORT CABLE OF A TOP-LINE SYSTEM FOR AN ELECTRIC-DRIVEN VEHICLE.
GB2357271A (en) Power rail earthing mechanism
SU1375497A1 (en) Device for arresting railway trains
JP2000166039A (en) Sheave fixing universal machine
Arriojas Newark City subway overhead contact system conversion project
Griffith Single-phase electrification on the Pennsylvania Railroad

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19950328

LAPS Cancellation because of no payment of annual fees