JPH0555438B2 - - Google Patents
Info
- Publication number
- JPH0555438B2 JPH0555438B2 JP13357188A JP13357188A JPH0555438B2 JP H0555438 B2 JPH0555438 B2 JP H0555438B2 JP 13357188 A JP13357188 A JP 13357188A JP 13357188 A JP13357188 A JP 13357188A JP H0555438 B2 JPH0555438 B2 JP H0555438B2
- Authority
- JP
- Japan
- Prior art keywords
- bolt
- tower crane
- bolts
- base
- base support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000002184 metal Substances 0.000 claims description 9
- 238000000034 method Methods 0.000 claims description 3
- 230000009194 climbing Effects 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000001174 ascending effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Landscapes
- Jib Cranes (AREA)
Description
【発明の詳細な説明】
〔産業上の利用分野〕
ベース受梁の上面にブラケツトを設け、ボルト
を片端ピン型固定ボルトとしてクレーンベースと
ベース受梁の解体作業の簡略化を図ることを目的
とした発明である。[Detailed Description of the Invention] [Industrial Application Field] The purpose of this invention is to provide a bracket on the upper surface of the base support beam and use a pin-type fixing bolt at one end to simplify the dismantling work of the crane base and base support beam. It is an invention made by
現在中高層建築工事においてタワークレーンに
よるダメ工事を残さない為にマストクライミング
を採用している。タワークレーンベースAを鉄骨
梁Bで受ける際、その間にベース受梁Cを使用す
るが、タワークレーンベースAとベース受梁Cを
ボルトDとカンザシ金物Eで固定するものである
が、両端ネジ式のボルトDであるため作業に手間
が掛かり、かつ危険であるため足場を必要とす
る。従つてクライミング毎に足場の組み立て及び
解体を行わなければならないと言う欠点があつ
た。
Currently, mast climbing is used in mid-to-high-rise construction work to prevent damage caused by tower cranes. When supporting the tower crane base A with the steel beam B, a base support beam C is used between them, and the tower crane base A and the base support beam C are fixed with bolts D and metal fittings E, both ends of which are screw type. The bolt D is time-consuming and dangerous, requiring scaffolding. Therefore, there was a drawback that the scaffolding had to be assembled and dismantled for each climbing.
現在中高層建築工事において行われているタワ
ークレーンベースを鉄骨梁で受ける際、タワーク
レーンベースとベース受梁をボルトとカンザシ金
物で固定する方法は、両端ネジ式ボルトであるた
め作業に手間が掛かり、かつ危険であるため足場
を必要とし、従つてクライミング毎に足場の組み
立て解体を行わなければならないという問題点を
解決しようとする発明である。
When supporting a tower crane base with a steel beam, which is currently used in medium-to-high-rise construction work, the method of fixing the tower crane base and base support beam with bolts and metal fittings is time-consuming because it uses bolts with threads on both ends. This invention attempts to solve the problem that scaffolding is required because it is dangerous, and therefore the scaffolding must be assembled and dismantled every time a climb is performed.
この発明は2本のベース受梁の上面所定箇所に
4箇のブラケツトを設け、ブラケツトの上面には
片端ピン型固定ボルトの枢着用の軸受けを固定
し、各々の軸受けに片端ピン型固定ボルトをピン
で枢着すると共に、相対するボルトの間に十字状
に組み立てられたタワークレーンベースの端部を
挿入しボルトを立ち上がらせ、ボルトの上端にカ
ンザシ金物を孔を介して挿入しボルトにナツトを
螺合してタワークレーンベースをベース受梁に強
固に固定することにより問題点を解決したもので
ある。
In this invention, four brackets are provided at predetermined locations on the upper surfaces of two base support beams, a bearing for pivoting a one-end pin-type fixing bolt is fixed to the upper surface of the bracket, and one-end pin-type fixing bolt is attached to each bearing. While pivoting with a pin, insert the end of the tower crane base assembled in a cross shape between the opposing bolts, raise the bolt, insert a metal fitting into the upper end of the bolt through the hole, and tighten the nut onto the bolt. This problem was solved by screwing together and firmly fixing the tower crane base to the base support beam.
ベース受梁の上面に設けた、ブラケツトの相対
するボルト間に十字状に組み立てられたタワーク
レーンベースの端部を挿入しボルトを立ち上がら
せ、ボルトの上端にカンザシ金物を孔を介して挿
入しボルトにナツト螺合してタワークレーンベー
スをベース受梁に強固に固定するものである。従
つて組み立て解体が簡単で作業も容易で安全性も
高く作業足場も必要としないものでそれだけ作業
費用も安くすむものである。
Insert the end of the tower crane base assembled in a cross shape between the opposing bolts of the bracket provided on the upper surface of the base support beam, raise the bolts, insert a metal fitting into the upper end of the bolt through the hole, and then tighten the bolts. The tower crane base is firmly fixed to the base support beam by screwing the nut onto the base support beam. Therefore, it is easy to assemble and disassemble, the work is easy, the safety is high, and no work scaffolding is required, so the work cost is accordingly low.
2本のベース受梁1の上面所定箇所に4個のブ
ラケツト2を設け、ブラケツト2の上面には片端
ピン型固定ボルトの枢着用の軸受け3を固定し、
各々の軸受け3に片端ピン型固定ボルト4をピン
5で枢着すると共に、相対するボルト4の間隔を
有する孔6を穿つたカンザシ金物7及びボルト4
に螺合するナツト8を組み合わせて成るものであ
る。前記構成よりしてベース受梁1の上面に設け
た、ブラケツト2の相対するボルト4間に十字状
に組み立てられたタワークレーンベース9の端部
を挿入しボルト4を立ち上がらせ、ボルト4の上
端にカンザシ金物7を孔6を介して挿入しボルト
4にナツト8を螺合してタワークレーンベース9
をベース受梁1に強固に固定するものである。タ
ワークレーン10は第1図に示すように構築物の
上部に固定したベース11を貫通させ、タワーク
レーン10に支持部材12を固定し、ベース11
と支持部材12とを動力ジヤツキ13で連結し動
力ジヤツキ13の作動により上昇させるものであ
る。
Four brackets 2 are provided at predetermined locations on the upper surfaces of the two base support beams 1, and a bearing 3 for pivoting a pin-type fixing bolt at one end is fixed to the upper surface of the brackets 2.
A pin-type fixing bolt 4 at one end is pivotally attached to each bearing 3 by a pin 5, and a metal fitting 7 and the bolt 4 are provided with a hole 6 having a distance between the opposing bolts 4.
It is made up of a nut 8 that is screwed together. With the above structure, the end of the tower crane base 9 assembled in a cross shape is inserted between the opposing bolts 4 of the bracket 2 provided on the upper surface of the base support beam 1, the bolts 4 are raised, and the upper end of the bolt 4 is inserted. Insert the metal fitting 7 through the hole 6 and screw the nut 8 onto the bolt 4 to attach the tower crane base 9.
is firmly fixed to the base support beam 1. As shown in FIG. 1, the tower crane 10 passes through a base 11 fixed to the upper part of the structure, and a support member 12 is fixed to the tower crane 10.
and the support member 12 are connected by a power jack 13, and are raised by the operation of the power jack 13.
タワークレーンベースとベース受梁の解体作業
の簡略化を図ることが出来た。ベース受梁側のボ
ルトナツトの締め付け作業は無くなり、足場を架
ける作業を省くことができた。クライミング作業
時間が縮少し、タワークレーンの休止時間が減少
した。
We were able to simplify the dismantling work of the tower crane base and base support beam. The work of tightening bolts and nuts on the base support beam side was eliminated, and the work of constructing the scaffolding could be omitted. Climbing work time has been reduced, and tower crane downtime has been reduced.
第1図イ,ロ,ハ,ニはタワークレーンの上昇
状態を示す説明図、第2図はタワークレーンのベ
ース部分の平面図、第3図はブラケツト部分の側
面図、第4図は従来の固定方法の側面図である。
Figure 1 A, B, C, and D are explanatory diagrams showing the ascending state of the tower crane, Figure 2 is a plan view of the base part of the tower crane, Figure 3 is a side view of the bracket part, and Figure 4 is a conventional It is a side view of a fixing method.
Claims (1)
ラケツトを設け、ブラケツトの上面には片端ピン
型固定ボルトの枢着用の軸受けを固定し、各々の
軸受けに片端ピン型固定ボルトをピンで枢着する
と共に、相対するボルトの間隔を有する孔を穿つ
たカンザン金物及びボルトに螺合するナツトを組
み合わせ、相対するボルト間に十字状に組み立て
られたタワークレーンベースの端部を挿入しボル
トを立ち上がらせ、ボルトの上端にカンザシ金物
を孔を介して挿入しボルトにナツトを螺合してタ
ワークレーンベースをベース受梁に強固に固定す
ることと特徴とするタワークレーンベースの固定
方法。 2 2本のベース受梁の上面所定箇所に4個のブ
ラケツトを設け、ブラケツトの上面には片端ピン
型固定ボルトの枢着用の軸受けを固定し、各々の
軸受けに片端ピン型固定ボルトをピンで枢着する
と共に、相対するボルトの間隔を有する孔を穿つ
たカンザシ金物及びボルトに螺合するナツトを組
み合わせて成るタワークレーンベースの固定装
置。[Claims] 1. Four brackets are provided at predetermined locations on the upper surfaces of the two base support beams, and a bearing for pivoting a one-end pin-type fixing bolt is fixed on the upper surface of the bracket, and one-end pin is attached to each bearing. The end of the tower crane base is assembled in a cross shape between the opposing bolts by pivoting the type fixing bolts with pins, combining Kanzan metal fittings with holes with the spacing between the opposing bolts, and nuts that are screwed onto the bolts. A tower crane base is characterized in that the tower crane base is firmly fixed to a base support beam by inserting a part into the bolt, raising the bolt, inserting a metal fitting into the upper end of the bolt through a hole, and screwing a nut onto the bolt. fixing method. 2. Install four brackets at predetermined locations on the upper surfaces of the two base support beams, fix the bearings for pivoting the one-end pin-type fixing bolt on the top surface of the brackets, and attach the one-end pin-type fixing bolt to each bearing with a pin. A fixing device for a tower crane base, which is pivotally mounted and consists of a combination of a metal fitting with a hole drilled at a distance between opposing bolts, and a nut that is screwed into the bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP13357188A JPH01303294A (en) | 1988-05-31 | 1988-05-31 | Locking method for tower crane base and device thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP13357188A JPH01303294A (en) | 1988-05-31 | 1988-05-31 | Locking method for tower crane base and device thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH01303294A JPH01303294A (en) | 1989-12-07 |
JPH0555438B2 true JPH0555438B2 (en) | 1993-08-17 |
Family
ID=15107920
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP13357188A Granted JPH01303294A (en) | 1988-05-31 | 1988-05-31 | Locking method for tower crane base and device thereof |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH01303294A (en) |
-
1988
- 1988-05-31 JP JP13357188A patent/JPH01303294A/en active Granted
Also Published As
Publication number | Publication date |
---|---|
JPH01303294A (en) | 1989-12-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1856644B (en) | Method of conducting service on a wind turbine using equipment mounted on the hub | |
US5980160A (en) | Apparatus and method for a modular lifting and shoring system | |
US20060213145A1 (en) | Lattice-skin hybrid tower | |
CN108862045B (en) | Special-shaped steel truss girder rod piece turning device and method for turning over rod piece | |
CN109534183B (en) | Tower crane attachment device | |
CN113323365B (en) | Elevator shaft protection platform and construction method | |
CN208056592U (en) | A kind of tool-type inspection platform | |
JPH0555438B2 (en) | ||
KR100427751B1 (en) | An installation beam of tower-crane for an outer wall | |
KR200175311Y1 (en) | Scaffold for high load | |
JPH0510107Y2 (en) | ||
CN220926014U (en) | Large-span girder steel hoist and mount hoist | |
CN213771105U (en) | Manual hoisting equipment for overhauling trash rack of hydropower station | |
CN217627290U (en) | Connecting structure of attachment device | |
CN220909184U (en) | Can have enough to meet need post-positioning steel sheet of supplementary PC wall body installation | |
CN219293812U (en) | Tool for preassembling center rotary joint | |
CN220467349U (en) | Independent mast for lifting air pipe | |
CN213622950U (en) | Movable hoisting frame | |
CN220014425U (en) | Connecting mechanism applied to heavy truss type supporting beam structure | |
CN209835439U (en) | Anti-falling crane beam | |
CN210176318U (en) | Compact detachable and adjustable equipment maintenance portal frame | |
CN217393688U (en) | Anti-toppling device for injection pipe in ingot mold | |
CN218861917U (en) | Building steel structure supporting beam | |
CN113668709B (en) | Construction method for integrally hoisting roof primary and secondary structure assembly units | |
CN217232814U (en) | Adjusting device for vertical butt joint construction of prefabricated column |