JPH05280812A JP4174315A JP17431592A JPH05280812A JP H05280812 A JPH05280812 A JP H05280812A JP 4174315 A JP4174315 A JP 4174315A JP 17431592 A JP17431592 A JP 17431592A JP H05280812 A JPH05280812 A JP H05280812A
Authority
JP
Japan
Prior art keywords
pump down
compressor
low pressure
heat exchanger
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP4174315A
Other languages
Japanese (ja)
Other versions
JP2760219B2 (en
Inventor
Takuboku Ochi
拓木 越智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daikin Industries Ltd
Original Assignee
Daikin Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daikin Industries Ltd filed Critical Daikin Industries Ltd
Publication of JPH05280812A publication Critical patent/JPH05280812A/en
Application granted granted Critical
Publication of JP2760219B2 publication Critical patent/JP2760219B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2400/00General features or devices for refrigeration machines, plants or systems, combined heating and refrigeration systems or heat-pump systems, i.e. not limited to a particular subgroup of F25B
    • F25B2400/19Pumping down refrigerant from one part of the cycle to another part of the cycle, e.g. when the cycle is changed from cooling to heating, or before a defrost cycle is started

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

PURPOSE:To realize pump-down operation for recovering refrigerant surely and without freezing a cooled medium. CONSTITUTION:The controller is equipped with a win refrigerant circuit 2 having a first solenoid valve 20RW and a heat exchanger 11 for cooling water on the side of water and with a bypass circuit 3 having a second solenoid valve 20RB and a heat exchanger 12 for cooling brine on the side of brine. A low pressure sensor LP for detecting the suction pressure of a compressor 21 is also provided. A first means of executing pump-down 62 is provided, which receives a start signal from a pump-down starting means 41 and thereupon actuates a 21 and ends the pup-down when the suction pressure of the compressor 21 reaches a first low pressure based on the freezing point of water. In addition, a second means of executing pump-down 43 is provided, which, after the pump-down by the first means of executing pump-down 62 has been ended, actuates the compressor 21 and ends the pump-down when the suction pressure of the compressor 21 has declined to a second low pressure lower than the first low pressure.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、空気調和装置の運転制
御装置に関し、特に、ポンプダウン運転の制御対策に係
るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an operation control device for an air conditioner, and more particularly to control measures for pump down operation.

【0002】[0002]

【従来の技術】一般に、空気調和装置には、実開昭63
−120063号公報に開示されているように、圧縮機
と、四路切換弁と、熱源側熱交換器と、受液器と、電磁
弁と、膨脹機構と、利用側熱交換器とが順に接続されて
冷媒の可逆運転可能に構成されたものある。そして、上
記圧縮機の停止時や起動時等において、液バックを防止
するために、ポンプダウン運転を行うようにしている。
つまり、上記電磁弁を閉鎖して圧縮機を駆動し、利用側
熱交換器の冷媒を受液器に回収するようにしている。
2. Description of the Related Art Generally, an air conditioner has an actual construction of 63
As disclosed in JP-A-120063, a compressor, a four-way switching valve, a heat source side heat exchanger, a liquid receiver, a solenoid valve, an expansion mechanism, and a use side heat exchanger are sequentially arranged. Some of them are connected so that the refrigerant can be reversibly operated. The pump down operation is performed in order to prevent liquid back when the compressor is stopped or started.
That is, the solenoid valve is closed to drive the compressor, and the refrigerant in the utilization side heat exchanger is collected in the liquid receiver.

【0003】[0003]

【発明が解決しようとする課題】上述した空気調和装置
において、ポンプダウン運転を実行する際、バイパス回
路を介して受液器内の冷媒ガスを電磁弁より下流側の液
管に流入させて冷媒を回収するようにしている。しかし
ながら、このポンプダウン運転時における高圧圧力につ
いては何ら考慮されておらず、完全な冷媒回収を行うこ
とができないという問題があった。つまり、ポンプダウ
ン運転を開始すると、利用側熱交換器の圧力は瞬時に低
下するものの、冷媒が沸騰せずに該利用側熱交換器内に
残るという問題があった。特に、圧縮機の吸込圧力であ
る低圧圧力によってポンプダウン運転を終了するように
している場合、ポンプダウン運転時間が短く、例えば、
30秒で終了し、冷媒を確実に回収することができなか
った。
In the above-described air conditioner, when the pump down operation is executed, the refrigerant gas in the receiver is caused to flow into the liquid pipe downstream of the solenoid valve via the bypass circuit. Are being collected. However, no consideration was given to the high pressure during the pump down operation, and there was a problem that the complete refrigerant recovery could not be performed. That is, when the pump down operation is started, the pressure of the usage-side heat exchanger instantly drops, but there is a problem that the refrigerant does not boil and remains in the usage-side heat exchanger. In particular, when the pump down operation is terminated by the low pressure which is the suction pressure of the compressor, the pump down operation time is short, for example,
It was completed in 30 seconds and the refrigerant could not be reliably recovered.

【0004】また、上記空気調和装置においては、利用
側熱交換器が1台のみ設けられている場合の他、2台の
利用側熱交換器が並列に設けられている場合がある。そ
して、該1台の利用側熱交換器が水を冷却する水側熱交
換器に、他方の利用側熱交換器がブラインを冷却するブ
ライン側熱交換器に構成されているものがある。
Further, in the above air conditioner, there may be a case where only one use-side heat exchanger is provided and a case where two use-side heat exchangers are provided in parallel. Then, there is one in which the one use side heat exchanger is configured as a water side heat exchanger for cooling water, and the other use side heat exchanger is configured as a brine side heat exchanger for cooling brine.

【0005】その際、上記ポンプダウン運転を行うよう
にすると、水とブラインとの凍結温度が異なるので、圧
縮機を停止させる低圧圧力をブラインの凍結温度に基づ
いて設定すると、水側熱交換器の冷却温度が低下し過
ぎ、水が凍結するという問題がある。また逆に、水の凍
結温度に対応して低圧圧力を設定すると、ブラインの冷
媒温度が低いので、ブライン側熱交換器の冷媒を充分に
回収することができないという問題がある。
At that time, when the pump down operation is performed, the freezing temperatures of water and brine are different. Therefore, if the low pressure for stopping the compressor is set based on the freezing temperature of brine, the water side heat exchanger is set. However, there is a problem that the cooling temperature is too low and the water freezes. On the other hand, when the low pressure is set in accordance with the freezing temperature of water, the refrigerant temperature of the brine is low, so that the refrigerant in the brine side heat exchanger cannot be sufficiently recovered.

【0006】本発明は、斯かる点に鑑みてなされたもの
で、確実な冷媒回収を行うようにする一方、凍結温度が
異なる2つの被冷却媒体を冷却する2台の利用側熱交換
器において、該被冷却媒体が凍結することなくポンプダ
ウン運転を行うようすることを目的とするものである。
[0006] The present invention has been made in view of the above problems, and in two heat exchangers on the use side for cooling two coolants having different freezing temperatures while ensuring reliable refrigerant recovery. The purpose is to perform pump down operation without freezing of the cooled medium.

【0007】[0007]

【課題を解決するための手段】上記の目的を達成するた
めに、本発明が講じた手段は、圧縮機の吐出圧力を制御
する一方、低圧圧力が異なる2種類のポンプダウン運転
を実行するようにしたものである。
In order to achieve the above object, the means taken by the present invention controls the discharge pressure of the compressor while performing two types of pump down operation with different low pressures. It is the one.

【0008】具体的に、図1に示すように、請求項1に
係る発明が講じた手段は、先ず、圧縮機(21)と、回転数
の可変なファン(22)が付設された熱源側熱交換器(23)
と、全閉可能な膨脹機構(2a)と、被冷却媒体を冷却する
利用側熱交換器(11)とが冷媒の流通可能に順に接続され
て主冷媒回路(2) を備えている。更に、上記熱源側熱交
換器(23)を含む液溜め部(24)が上記主冷媒回路(2) の液
ラインに設けられ、該液溜め部(24)のガス出口にはガス
通路(27)が接続され、該ガス通路(27)は、開閉機構(20R
P)が設けられると共に、上記主冷媒回路(2) の低圧ガス
ラインに接続されている空気調和装置を対象としてい
る。
Specifically, as shown in FIG. 1, the means taken by the invention according to claim 1 is as follows. First, a compressor (21) and a heat source side provided with a fan (22) with a variable rotation speed. Heat exchanger (23)
The expansion mechanism (2a) that can be fully closed and the utilization side heat exchanger (11) that cools the medium to be cooled are connected in sequence so that the refrigerant can flow, and the main refrigerant circuit (2) is provided. Furthermore, a liquid reservoir (24) including the heat source side heat exchanger (23) is provided in the liquid line of the main refrigerant circuit (2), and a gas passage (27) is provided at the gas outlet of the liquid reservoir (24). ) Is connected, and the gas passage (27) is connected to the opening / closing mechanism (20R
P) is provided and the air conditioner is connected to the low pressure gas line of the main refrigerant circuit (2).

【0009】そして、上記圧縮機(21)の吐出圧力を検出
する高圧検出手段(HP)が設けられている。更に、ポンプ
ダウン運転を実行すべくポンプダウン信号を受けると、
該ポンプダウン信号の出力時の状態から上記ファン(22)
の回転数を低下させる高圧制御手段(44)が設けられてい
る。加えて、該高圧制御手段(44)のファン制御後に上記
高圧検出手段(HP)の検出吐出圧力が所定圧力になると、
上記膨脹機構(2a)を全閉にすると共に、上記ガス通路(2
7)の開閉機構(20RP)を開放し、上記圧縮機(21)を所定容
量で駆動してポンプダウン運転を実行するポンプダウン
実行手段(48)が設けられた構成としている。
A high pressure detecting means (HP) for detecting the discharge pressure of the compressor (21) is provided. Furthermore, when the pump down signal is received to execute the pump down operation,
The fan (22) from the state when the pump down signal is output
High-voltage control means (44) for reducing the number of rotations is provided. In addition, when the detected discharge pressure of the high pressure detection means (HP) reaches a predetermined pressure after the fan control of the high pressure control means (44),
The expansion mechanism (2a) is fully closed, and the gas passage (2
The opening / closing mechanism (20RP) of 7) is opened, and a pump down execution means (48) for executing the pump down operation by driving the compressor (21) with a predetermined capacity is provided.

【0010】また、請求項2に係る発明が講じた手段
は、図2に示すように、先ず、圧縮機(21)と、回転数の
可変なファン(22)が付設された熱源側熱交換器(23)と、
全閉可能な第1膨脹機構(2a)と、所定の凍結温度の第1
被冷却媒体を冷却する第1利用側熱交換器(11)とが冷媒
の流通可能に順に接続された主冷媒回路(2) が設けられ
ている。更に、全閉可能な第2膨脹機構(2b)と、上記第
1被冷却媒体より凍結温度が低い第2被冷却媒体を冷却
する第2利用側熱交換器(12)とが冷媒の流通可能に上記
第1膨脹機構(2a)と第1利用側熱交換器(11)とに対して
並列に接続されたバイパス回路(3) が設けられている。
その上、上記熱源側熱交換器(23)を含み、上記主冷媒回
路(2) の液ラインに設けられた液溜め部(24)と、該液溜
め部(24)のガス出口と上記主冷媒回路(2) の低圧ガスラ
インとに接続されると共に、開閉機構(20RP)が設けられ
ているガス通路(27)とを備え、上記両膨脹機構(2a, 2b)
を開閉制御して第1利用側熱交換器(11)と第2利用側熱
交換器(12)との何れかに冷媒を流通させるようにした空
気調和装置を対象としている。
Further, the means taken by the invention according to claim 2 is, as shown in FIG. 2, first, a heat source side heat exchange provided with a compressor (21) and a fan (22) having a variable rotational speed. Vessel (23),
The first expansion mechanism (2a) that can be fully closed, and the first expansion mechanism with a predetermined freezing temperature
A main refrigerant circuit (2) is provided in which a first utilization side heat exchanger (11) for cooling the medium to be cooled is connected in sequence so that the refrigerant can flow. Further, the second expansion mechanism (2b) that can be fully closed and the second usage-side heat exchanger (12) that cools the second cooled medium whose freezing temperature is lower than the first cooled medium can flow the refrigerant. A bypass circuit (3) is provided in parallel with the first expansion mechanism (2a) and the first utilization side heat exchanger (11).
Moreover, a liquid reservoir (24) including the heat source side heat exchanger (23) provided in the liquid line of the main refrigerant circuit (2), a gas outlet of the liquid reservoir (24), and the main The expansion circuit (2a, 2b) is connected to the low pressure gas line of the refrigerant circuit (2) and has a gas passage (27) provided with an opening / closing mechanism (20RP).
The present invention is intended for an air conditioner in which the refrigerant is controlled to open and close to allow the refrigerant to flow through either the first utilization side heat exchanger (11) or the second utilization side heat exchanger (12).

【0011】そして、上記圧縮機(21)の吸込圧力を検出
する低圧検出手段(LP)と、上記圧縮機(21)の吐出圧力を
検出する高圧検出手段(HP)と、ポンプダウン運転を実行
すべくポンプダウン信号を受けると、該ポンプダウン信
号の出力時の状態から上記ファン(22)の回転数を低下さ
せる高圧制御手段(44)とが設けられている。更に、該高
圧制御手段(44)のファン制御後に上記高圧検出手段(HP)
の検出吐出圧力が所定圧力になると、上記両膨脹機構(2
a, 2b)を閉鎖すると共に、上記ガス通路(27)の開閉機構
(20RP)を開放してポンプダウン運転の開始信号を出力す
るポンプダウン開始手段(45)が設けられている。加え
て、該ポンプダウン開始手段(41)の開始信号を受けて圧
縮機(21)を所定容量で駆動すると共に、上記低圧検出手
段(LP)の検出吸込圧力が上記第1被冷却媒体の凍結温度
に基づく第1低圧圧力に相当するとポンプダウン運転を
終了する第1実行手段(46)と、該第1実行手段(46)によ
るポンプダウン運転の終了後に上記圧縮機(21)の待機時
間が経過すると該圧縮機(21)を所定容量で駆動すると共
に、上記低圧検出手段(LP)の検出吸込圧力が第1低圧圧
力より低い第2低圧圧力に相当するとポンプダウン運転
を終了する第2実行手段(47)とが設けられた構成として
いる。
A low pressure detecting means (LP) for detecting the suction pressure of the compressor (21), a high pressure detecting means (HP) for detecting the discharge pressure of the compressor (21), and a pump down operation are executed. In order to do so, there is provided a high voltage control means (44) for reducing the rotation speed of the fan (22) from the state when the pump down signal is output. Further, after the fan control of the high pressure control means (44), the high pressure detection means (HP)
When the detected discharge pressure of 2 becomes a predetermined pressure, both expansion mechanisms (2
a, 2b) and the opening / closing mechanism of the gas passage (27).
Pump down start means (45) for opening the (20 RP) and outputting a start signal for pump down operation is provided. In addition, the compressor (21) is driven with a predetermined capacity in response to the start signal of the pump down starting means (41), and the suction pressure detected by the low pressure detecting means (LP) freezes the first cooled medium. A first execution means (46) for ending the pump down operation when the first low pressure based on the temperature is reached, and a waiting time of the compressor (21) after the end of the pump down operation by the first execution means (46). When the time has passed, the compressor (21) is driven with a predetermined capacity, and when the detected suction pressure of the low pressure detection means (LP) corresponds to the second low pressure lower than the first low pressure, the pump down operation is finished. Means (47) are provided.

【0012】また、請求項3に係る発明が講じた手段
は、図3に示すように、先ず、圧縮機(21)と、熱源側熱
交換器(23)と、全閉可能な第1膨脹機構(2a)と、所定の
凍結温度の第1被冷却媒体を冷却する第1利用側熱交換
器(11)とが冷媒の流通可能に順に接続された主冷媒回路
(2) を備えている。更に、全閉可能な第2膨脹機構(2b)
と、上記第1被冷却媒体より凍結温度が低い第2被冷却
媒体を冷却する第2利用側熱交換器(12)とが冷媒の流通
可能に上記第1膨脹機構(2a)と第1利用側熱交換器(11)
とに対して並列に接続されたバイパス回路(3) を備えて
いる。その上、上記熱源側熱交換器(23)を含み、上記主
冷媒回路(2) の液ラインに設けられた液溜め部(24)を備
え、上記両膨脹機構(2a, 2b)を開閉制御して上記第1利
用側熱交換器(11)と第2利用側熱交換器(12)との何れか
に冷媒を流通させるようにした空気調和装置を対象とし
ている。
As shown in FIG. 3, the means taken by the invention according to claim 3 is such that, first, the compressor (21), the heat source side heat exchanger (23), and the first expansion which can be fully closed. A main refrigerant circuit in which a mechanism (2a) and a first usage-side heat exchanger (11) that cools a first medium to be cooled having a predetermined freezing temperature are connected in order so that refrigerant can flow.
(2) is provided. Furthermore, the second expansion mechanism (2b) that can be fully closed
And a second usage-side heat exchanger (12) for cooling a second cooled medium having a freezing temperature lower than that of the first cooled medium so that the refrigerant can flow therethrough and the first expansion mechanism (2a) and the first utilization. Side heat exchanger (11)
It has a bypass circuit (3) connected in parallel with and. Furthermore, the heat source side heat exchanger (23) is included, the liquid reservoir part (24) provided in the liquid line of the main refrigerant circuit (2) is provided, and the both expansion mechanisms (2a, 2b) are controlled to open and close. The present invention is intended for an air conditioner in which a refrigerant is allowed to flow through either the first utilization side heat exchanger (11) or the second utilization side heat exchanger (12).

【0013】そして、上記圧縮機(21)の吸込圧力を検出
する低圧検出手段(LP)と、上記両膨脹機構(2a, 2b)を閉
鎖してポンプダウン運転の開始信号を出力するポンプダ
ウン開始手段(41)とが設けられている。更に、該ポンプ
ダウン開始手段(41)の開始信号を受けて圧縮機(21)を所
定容量で駆動すると共に、上記低圧検出手段(LP)の検出
吸込圧力が上記第1被冷却媒体の凍結温度に基づく第1
低圧圧力になるとポンプダウン運転を終了する第1ポン
プダウン実行手段(42)が設けられている。加えて、該第
1ポンプダウン実行手段(42)によるポンプダウン運転の
終了後に上記圧縮機(21)の待機時間が経過すると該圧縮
機(21)を所定容量で駆動すると共に、上記低圧検出手段
(LP)の検出吸込圧力が第1低圧圧力より低い第2低圧圧
力になるとポンプダウン運転を終了する第2ポンプダウ
ン実行手段(43)が設けられた構成としている。
Then, the low pressure detecting means (LP) for detecting the suction pressure of the compressor (21) and the both expansion mechanisms (2a, 2b) are closed to start a pump down operation for outputting a pump down operation start signal. Means (41) are provided. Further, the compressor (21) is driven with a predetermined capacity in response to the start signal of the pump down starting means (41), and the suction pressure detected by the low pressure detecting means (LP) is the freezing temperature of the first cooled medium. First based on
A first pump down execution means (42) for terminating the pump down operation when the pressure becomes low is provided. In addition, when the waiting time of the compressor (21) elapses after the pump down operation by the first pump down execution means (42) is finished, the compressor (21) is driven with a predetermined capacity and the low pressure detection means is also provided.
The second pump down execution means (43) is provided to terminate the pump down operation when the detected suction pressure of (LP) becomes the second low pressure lower than the first low pressure.

【0014】また、請求項4に係る発明が講じた手段
は、上記請求項3の発明において、第1ポンプダウン実
行手段(42)は、ポンプダウン開始手段(41)の開始信号を
受けて圧縮機(21)を駆動する初期駆動手段(42a) と、低
圧検出手段(LP)の検出吸込圧力が第1低圧圧力になると
圧縮機(21)を停止させる停止手段(42b) と、該低圧検出
手段(LP)の検出吸込圧力が所定の起動圧力なると圧縮機
(21)を起動させる再起動手段(42c) と、圧縮機(21)の駆
動回数が所定回数になるとポンプダウン運転を終了させ
る終了手段(42d) とより構成されている。一方、第2ポ
ンプダウン実行手段(43)は、上記第1ポンプダウン実行
手段(42)によるポンプダウン運転の終了後に圧縮機(21)
の待機時間が経過すると該圧縮機(21)を駆動する初期駆
動手段(43a) と、上記低圧検出手段(LP)の検出吸込圧力
が第2低圧圧力になると圧縮機(21)を停止させる停止手
段(43b) と、該低圧検出手段(LP)の検出吸込圧力が所定
の起動圧力なると圧縮機(21)を起動させる再起動手段(4
3c) と、圧縮機(21)の駆動回数が所定回数になるとポン
プダウン運転を終了させる終了手段(43d) とより構成さ
れている。
Further, the means taken by the invention according to claim 4 is the invention according to claim 3, wherein the first pump down execution means (42) compresses in response to a start signal from the pump down start means (41). Initial drive means (42a) for driving the machine (21), stop means (42b) for stopping the compressor (21) when the suction pressure detected by the low pressure detection means (LP) reaches the first low pressure, and the low pressure detection When the suction pressure detected by the means (LP) reaches the specified starting pressure, the compressor
The restarting means (42c) starts the (21), and the ending means (42d) ends the pump down operation when the compressor (21) is driven a predetermined number of times. On the other hand, the second pump down execution means (43) is provided with the compressor (21) after completion of the pump down operation by the first pump down execution means (42).
When the standby time elapses, the initial driving means (43a) for driving the compressor (21) and the stop for stopping the compressor (21) when the suction pressure detected by the low pressure detecting means (LP) becomes the second low pressure Means (43b) and restarting means (4) for starting the compressor (21) when the suction pressure detected by the low pressure detecting means (LP) reaches a predetermined starting pressure.
3c) and a termination means (43d) for terminating the pump down operation when the number of times the compressor (21) is driven reaches a predetermined number.

【0015】[0015]

【作用】上記の構成により、請求項1に係る発明では、
ポンプダウン信号が出力されると、先ず、高圧制御手段
(44)が、熱源側熱交換器(23)のファン(22)の回転数を低
下して高圧圧力を上昇させる。その後、ポンプダウン実
行手段(48)は、高圧検出手段(HP)の検出高圧圧力が所定
圧力になると、膨脹機構(2a)を全閉にする一方、開閉機
構(20RP)を開放してガス通路(27)を連通させる。そし
て、該ポンプダウン実行手段(48)は、圧縮機(21)を所定
容量で駆動してポンプダウン運転を実行することにな
る。
With the above structure, in the invention according to claim 1,
When the pump down signal is output, first, the high voltage control means
The (44) lowers the rotation speed of the fan (22) of the heat source side heat exchanger (23) to increase the high pressure. After that, when the high pressure detected by the high pressure detecting means (HP) reaches a predetermined pressure, the pump down executing means (48) fully closes the expansion mechanism (2a) while opening the opening and closing mechanism (20RP) to open the gas passage. Connect (27). Then, the pump down execution means (48) drives the compressor (21) with a predetermined capacity to execute the pump down operation.

【0016】特に、請求項2に係る発明では、請求項1
の発明における高圧制御手段(44)がファン(22)を制御し
た後、ポンプダウン開始手段(45)が開始信号を出力する
と、最初に第1実行手段(46)がポンプダウン運転を行
い、低圧検出手段(LP)の検出吸込圧力が第1低圧圧力以
下になると、圧縮機(21)を停止する。その後、第2実行
手段(47)が圧縮機(21)の待機時間の経過後にポンプダウ
ン運転を実行し、つまり、圧縮機(21)を駆動し、低圧検
出手段(LP)の検出吸込圧力が第2低圧圧力以下になる
と、圧縮機(21)を停止してポンプダウン運転が終了する
ことになる。
Particularly, in the invention according to claim 2, claim 1
When the pump down start means (45) outputs a start signal after the high pressure control means (44) in the invention of claim 1 controls the fan (22), the first execution means (46) first performs the pump down operation, and the low pressure When the detected suction pressure of the detection means (LP) becomes equal to or lower than the first low pressure, the compressor (21) is stopped. After that, the second execution means (47) executes the pump down operation after the waiting time of the compressor (21) elapses, that is, the compressor (21) is driven, and the suction pressure detected by the low pressure detection means (LP) is When the pressure becomes equal to or lower than the second low pressure, the compressor (21) is stopped and the pump down operation ends.

【0017】また、請求項3に係る発明では、先ず、運
転の終了時等において、ポンプダウン開始手段(41)が両
膨脹機構(2a, 2b)を閉鎖し、最初に第1ポンプダウン実
行手段(42)がポンプダウン運転を行い、特に、請求項4
に係る発明では、初期駆動手段(42a) が圧縮機(21)を駆
動した状態において、低圧検出手段(LP)の検出信号を受
けて圧縮機(21)の吸込圧力が第1低圧圧力以下か否かを
判定し、該吸込圧力が第1低圧圧力以下になると、停止
手段(42b) が圧縮機(21)を停止する。その後、再起動手
段(42c) は、上記吸込圧力が第1低圧圧力より大きくな
ると、圧縮機(21)を起動させる。そして、圧縮機(21)の
駆動が所定回数になるまで、上述の動作を繰り返すこと
になる。つまり、吸込圧力が第1低圧圧力になると圧縮
機(21)を停止し、吸込圧力が起動圧力になると圧縮機(2
1)を起動する動作を繰返すことになる。
Further, in the invention according to claim 3, first, at the end of the operation, the pump down starting means (41) closes both expansion mechanisms (2a, 2b), and first, the first pump down executing means. (42) performs pump down operation, and in particular, claim 4
In the invention according to claim 1, in the state where the initial drive means (42a) drives the compressor (21), whether the suction pressure of the compressor (21) is the first low pressure pressure or less in response to the detection signal of the low pressure detection means (LP). When it is judged whether or not the suction pressure becomes equal to or lower than the first low pressure, the stop means (42b) stops the compressor (21). Then, the restarting means (42c) starts the compressor (21) when the suction pressure becomes higher than the first low pressure. Then, the above operation is repeated until the compressor (21) is driven a predetermined number of times. That is, when the suction pressure becomes the first low pressure, the compressor (21) is stopped, and when the suction pressure becomes the starting pressure, the compressor (2) is stopped.
The operation to activate 1) will be repeated.

【0018】その後、上記第1ポンプダウン実行手段(4
2)の終了手段(42d) がポンプダウン運転の終了を判定す
ると、第2ポンプダウン実行手段(43)が圧縮機(21)の待
機時間の経過後にポンプダウン運転を実行することにな
る。つまり、第2ポンプダウン実行手段(43)の初期駆動
手段(43a) が圧縮機(21)を駆動し、低圧検出手段(LP)の
検出信号を受けて圧縮機(21)の吸込圧力が第2低圧圧力
以下になると、停止手段(43b) が圧縮機(21)を停止す
る。その後、再起動手段(43c) は、上記吸込圧力が第2
低圧圧力より大きくなると、圧縮機(21)を起動させる。
そして、圧縮機(21)の駆動が所定回数になるまで、上述
の動作を繰り返すことになる。つまり、吸込圧力が第2
低圧圧力になると圧縮機(21)を停止し、吸込圧力が起動
圧力値になると圧縮機(21)を起動する動作を繰り返すこ
とになる。そして、上記第2ポンプダウン実行手段(43)
の終了手段(43d) によってポンプダウン運転が終了する
ことになる。
Thereafter, the first pump down execution means (4
When the ending means (42d) of 2) determines that the pump down operation has ended, the second pump down executing means (43) executes the pump down operation after the waiting time of the compressor (21) has elapsed. That is, the initial drive means (43a) of the second pump down execution means (43) drives the compressor (21), and the suction pressure of the compressor (21) is changed to the first by receiving the detection signal of the low pressure detection means (LP). 2 When the pressure becomes lower than the low pressure, the stop means (43b) stops the compressor (21). After that, the restarting means (43c) has the suction pressure of the second
When it becomes higher than the low pressure, the compressor (21) is started.
Then, the above operation is repeated until the compressor (21) is driven a predetermined number of times. That is, the suction pressure is the second
When the low pressure is reached, the compressor (21) is stopped, and when the suction pressure reaches the starting pressure value, the operation of starting the compressor (21) is repeated. The second pump down execution means (43)
The pump down operation is ended by the ending means (43d).

【0019】[0019]

【発明の効果】従って、請求項1に係る発明によれば、
ポンプダウン運転の開始時に高圧制御手段(44)によって
ファン(22)の回転数を低下するようにしたために、主冷
媒回路の高圧圧力を一旦上昇させるので、冷媒を液溜め
部(24)に回収し易くなり、また、ガス通路(27)を設ける
ことにより、低圧圧力の低下を遅延させることができ、
ポンプダウン運転時間を長くすることができる。この結
果、利用側熱交換器(11)内の冷媒を確実に回収すること
ができることから、ポンプダウン運転を確実に行うこと
ができる。特に、上記低圧圧力によってポンプダウン運
転を終了するようにしている場合、該ポンプダウン運転
時間を確実に長くすることができることから、確実な冷
媒回収を行うことができる。
Therefore, according to the invention of claim 1,
Since the rotation speed of the fan (22) is lowered by the high pressure control means (44) at the start of the pump down operation, the high pressure of the main refrigerant circuit is once increased, so that the refrigerant is collected in the liquid reservoir (24). In addition, by providing the gas passage (27), it is possible to delay the decrease in low pressure,
The pump down operation time can be extended. As a result, the refrigerant in the utilization side heat exchanger (11) can be reliably recovered, so that the pump down operation can be reliably performed. In particular, when the pump down operation is terminated by the low pressure, the pump down operation time can be surely lengthened, so that reliable refrigerant recovery can be performed.

【0020】また、請求項2及び3に係る発明によれ
ば、第1低圧圧力に基づいてポンプダウン運転を行った
のち、第2低圧圧力に基づいてポンプダウン運転を行う
ようにしたために、凍結温度の高い被冷却媒体が凍結す
ることなくポンプダウン運転を行うことができる。その
上、上記凍結温度の低い被冷却媒体を冷却する利用側熱
交換器の冷媒をも確実に回収することができるので、ポ
ンプダウン運転を確実に行うことができる。
According to the second and third aspects of the present invention, the pump down operation is performed based on the first low pressure, and then the pump down operation is performed based on the second low pressure. The pump-down operation can be performed without freezing the medium to be cooled having a high temperature. In addition, since the refrigerant of the utilization side heat exchanger that cools the medium to be cooled having a low freezing temperature can be reliably recovered, the pump down operation can be reliably performed.

【0021】また、請求項4に係る発明によれば、圧縮
機(21)の駆動を複数回行うので、冷媒の回収を確実に行
うことができることから、液バック等を確実に防止する
ことができる。
Further, according to the invention of claim 4, since the compressor (21) is driven a plurality of times, it is possible to surely recover the refrigerant, so that it is possible to reliably prevent liquid backing. it can.

【0022】[0022]

【実施例】以下、本発明の実施例を図面に基づいて詳細
に説明する。先ず、図4乃至図10は、請求項3及び4
に係る発明の実施例を示し、図4に示すように、 (1)
は、空気調和装置であって、水側熱交換器(11)とブライ
ン側熱交換器(12)とを備えたものである。該空気調和装
置(1) は、主冷媒回路(2) にバイパス回路(3) が接続さ
れて構成されており、該主冷媒回路(2) は、圧縮機(21)
と、ファン(22)が付設された熱源側熱交換器(23)と、液
溜め部である受液器(24)と、第1電磁弁(20RW)と、感温
式の第1膨脹弁(25)と、利用側熱交換器である水側熱交
換器(11)とが順に冷媒配管によって直列に接続されて構
成されている。
Embodiments of the present invention will now be described in detail with reference to the drawings. First, FIGS. 4 to 10 show claims 3 and 4.
As shown in FIG. 4, there is shown an embodiment of the invention according to (1)
Is an air conditioner including a water side heat exchanger (11) and a brine side heat exchanger (12). The air conditioner (1) is configured by connecting a bypass circuit (3) to a main refrigerant circuit (2), and the main refrigerant circuit (2) includes a compressor (21).
A heat source side heat exchanger (23) with a fan (22) attached, a liquid receiver (24) as a liquid reservoir, a first solenoid valve (20RW), and a temperature-sensitive first expansion valve (25) and a water side heat exchanger (11) which is a utilization side heat exchanger are sequentially connected in series by a refrigerant pipe.

【0023】また、上記バイパス回路(3) は、一端が主
冷媒回路(2) における受液器(24)と第1電磁弁(20RW)と
の間に、他端が圧縮機(21)の吸込側に接続されて上記第
1電磁弁(20RW)と第1膨脹弁(25)と水側熱交換器(11)に
対して並列に設けられている。該バイパス回路(3) は、
第2電磁弁(20RB)と、感温式の第2膨脹弁(31)と、利用
側熱交換器であるブライン側熱交換器(12)と、逆止弁(3
2)とが冷媒配管によって直列に接続されて構成されてい
る。
The bypass circuit (3) has one end between the liquid receiver (24) and the first solenoid valve (20RW) in the main refrigerant circuit (2) and the other end of the compressor (21). It is connected to the suction side and is provided in parallel with the first electromagnetic valve (20RW), the first expansion valve (25) and the water side heat exchanger (11). The bypass circuit (3) is
A second solenoid valve (20RB), a temperature-sensitive second expansion valve (31), a brine side heat exchanger (12) which is a use side heat exchanger, and a check valve (3
2) and are connected in series by a refrigerant pipe.

【0024】そして、上記空気調和装置(1) は、圧縮機
(21)で圧縮した高圧冷媒を熱源側熱交換器(23)で凝縮し
た後、第1又は第2電磁弁(20RW, 20RB)の何れかを開放
し、一方の膨脹弁(25, 31)で減圧している。その後、水
側熱交換器(11)又はブライン側熱交換器(12)の何れかで
液冷媒を蒸発した後、ガス冷媒を圧縮機(21)に戻すよう
にしている。また、上記ブライン側熱交換器(12)は、夜
間においてブラインを冷却して冷熱を蓄える一方、水側
熱交換器(11)は、昼間においてブラインの冷熱が不足す
ると水を冷却するようにしており、上記第1電磁弁(20R
W)と第1膨脹弁(25)とで膨脹機構である第1膨脹機構(2
a)を、また、上記第2電磁弁(20RB)と第2膨脹弁(31)と
で第2膨脹機構(2b)を構成している。
The air conditioner (1) is a compressor
After the high-pressure refrigerant compressed in (21) is condensed in the heat source side heat exchanger (23), either the first or the second solenoid valve (20RW, 20RB) is opened and one expansion valve (25, 31) is opened. It is decompressed with. After that, the liquid refrigerant is evaporated in either the water side heat exchanger (11) or the brine side heat exchanger (12), and then the gas refrigerant is returned to the compressor (21). Further, the brine side heat exchanger (12) cools the brine at night to store cold heat, while the water side heat exchanger (11) cools water when the cold heat of the brine is insufficient in the daytime. Cage, the first solenoid valve (20R
W) and the first expansion valve (25) are the first expansion mechanism (2)
The second expansion mechanism (2b) is constituted by the second electromagnetic valve (20RB) and the second expansion valve (31).

【0025】また、上記圧縮機(21)には、3つの電磁弁
を有する容量調節機構(26)が設けられ、該容量調節機構
(26)は、上記圧縮機(21)の容量を12%と40%と70%と 1
00%とに切換えるように構成されている。更に、上記圧
縮機(21)の吐出側の冷媒配管には、高圧圧力センサ(HP)
が、吸込側の冷媒配管には、低圧センサ(LP)がそれぞれ
設けられ、該高圧圧力センサ(HP)は、圧縮機(21)の吐出
圧力である高圧圧力を検出する高圧検出手段を構成し、
また、上記低圧センサ(LP)は、圧縮機(21)の吸込圧力で
ある低圧圧力を検出する低圧検出手段を構成し、上記高
圧圧力センサ(HP)の高圧信号及び低圧センサ(LP)の低圧
信号がコントローラ(4) に入力されている。
Further, the compressor (21) is provided with a capacity adjusting mechanism (26) having three solenoid valves.
(26) The capacity of the compressor (21) is 12%, 40%, 70% and 1%.
It is configured to switch to 00%. Furthermore, the refrigerant pipe on the discharge side of the compressor (21) has a high pressure sensor (HP).
However, the suction side refrigerant pipe is provided with a low pressure sensor (LP), respectively, the high pressure sensor (HP) constitutes a high pressure detection means for detecting the high pressure which is the discharge pressure of the compressor (21). ,
Further, the low pressure sensor (LP) constitutes a low pressure detection means for detecting a low pressure which is a suction pressure of the compressor (21), a high pressure signal of the high pressure sensor (HP) and a low pressure of the low pressure sensor (LP). Signal is input to controller (4).

【0026】該コントローラ(4) は、上記容量調節機構
(26)に容量信号を出力して圧縮機(21)の容量を切換える
と共に、上記両電磁弁(20RW, 20RB)に開閉信号を出力し
て水側熱交換器(11)又はブライン側熱交換器(12)の何れ
かに冷媒が流れるように制御している。
The controller (4) is the above capacity adjusting mechanism.
A capacity signal is output to (26) to switch the capacity of the compressor (21), and an open / close signal is output to both solenoid valves (20RW, 20RB) to heat-exchange the water side heat exchanger (11) or the brine side. The refrigerant is controlled to flow into any of the vessels (12).

【0027】更に、上記コントローラ(4) には、ポンプ
ダウン開始手段(41)と、第1ポンプダウン実行手段(42)
と、第2ポンプダウン実行手段(43)とが設けられ、上記
圧縮機(21)の停止時及び起動時にポンプダウン運転を行
い、圧縮機(21)への液バックを防止すると共に、上記水
側熱交換器(11)における熱交換時においてブライン側熱
交換器(12)に溜った冷媒を回収してガス欠を防止するよ
うにしている。
Further, the controller (4) includes a pump down start means (41) and a first pump down execution means (42).
And a second pump down executing means (43) are provided to perform a pump down operation when the compressor (21) is stopped or started to prevent liquid backing to the compressor (21) and to At the time of heat exchange in the side heat exchanger (11), the refrigerant accumulated in the brine side heat exchanger (12) is recovered to prevent gas shortage.

【0028】該ポンプダウン開始手段(41)は、圧縮機(2
1)の停止時又は起動時にポンプダウン運転の開始信号を
出力する他、上記低圧センサ(LP)の検出信号により水側
熱交換器(11)の熱交換時に低圧圧力が所定値である3.0K
g/cm2 G 以下になると、第1電磁弁(20RW)及び第2電磁
弁(20RB)を閉鎖してポンプダウン運転の開始信号を出力
するように構成されている。
The pump down starting means (41) is a compressor (2
In addition to outputting the start signal of pump down operation at the time of stop or start of 1), the low pressure is a predetermined value at the time of heat exchange of the water side heat exchanger (11) by the detection signal of the low pressure sensor (LP) 3.0 K
When it becomes g / cm 2 G or less, the first solenoid valve (20RW) and the second solenoid valve (20RB) are closed to output the start signal of the pump down operation.

【0029】上記第1ポンプダウン実行手段(42)は、ポ
ンプダウン開始手段(41)の開始信号を受けて圧縮機(21)
を所定容量で駆動してポンプダウン運転を実行させると
共に、低圧センサ(LP)の検出低圧圧力が所定の第1低圧
値、例えば、水側熱交換器(11)のおける水の凍結温度に
基づく2.5Kg/cm2 G 以下になると圧縮機(21)の駆動を停
止してポンプダウン運転を終了するように構成されてい
る。具体的に、該第1ポンプダウン実行手段(42)は、初
期駆動手段(42a) と、停止手段(42b) と、再起動手段(4
2c) と、終了手段(42d) とより構成されており、圧縮機
(21)の駆動を複数回、例えば、3回行うようにしてい
る。
The first pump down execution means (42) receives the start signal from the pump down start means (41) and the compressor (21).
Is driven at a predetermined capacity to execute pump down operation, and the low pressure detected by the low pressure sensor (LP) is based on a predetermined first low pressure value, for example, the freezing temperature of water in the water side heat exchanger (11). When the pressure is 2.5 Kg / cm 2 G or less, the drive of the compressor (21) is stopped and the pump down operation is terminated. Specifically, the first pump down execution means (42) includes an initial drive means (42a), a stop means (42b), and a restart means (4
2c) and termination means (42d)
The driving of (21) is performed a plurality of times, for example, three times.

【0030】つまり、上記初期駆動手段(42a) は、ポン
プダウン開始手段(41)の開始信号を受けて圧縮機(21)を
駆動するように構成されている。また、上記停止手段(4
2b)は、低圧圧力が2.5Kg/cm2 G の第1低圧圧力以下に
なると圧縮機(21)の駆動を停止するように構成されてい
る。また、上記再起動手段(42c) は、圧縮機(21)停止手
段(42b) により圧縮機(21)が停止して3分の待機時間が
経過した後、低圧圧力が3.5Kg/cm2 G より大きくなると
圧縮機(21)を起動するように構成されている。更に、上
記終了手段(42d) は、ポンプダウン運転時における圧縮
機(21)の駆動回数が複数回、例えば、3回になるとポン
プダウン運転を終了させるように構成されている。
That is, the initial drive means (42a) is configured to drive the compressor (21) in response to the start signal of the pump down start means (41). In addition, the stop means (4
2b) is configured to stop driving the compressor (21) when the low pressure becomes equal to or lower than the first low pressure of 2.5 kg / cm 2 G. Further, the restarting means (42c) has a low pressure of 3.5 Kg / cm 2 G after a waiting time of 3 minutes has elapsed since the compressor (21) was stopped by the compressor (21) stopping means (42b). It is configured to start the compressor (21) when it gets larger. Further, the termination means (42d) is configured to terminate the pump down operation when the compressor (21) is driven a plurality of times during the pump down operation, for example, three times.

【0031】一方、上記第2ポンプダウン実行手段(43)
は、第1ポンプダウン実行手段(42)のポンプダウン運転
の終了後に上記圧縮機(21)の待機時間が経過すると、該
圧縮機(21)を所定容量で駆動してポンプダウン運転を実
行させると共に、低圧センサ(LP)の検出低圧圧力が所定
の第2低圧圧力、例えば、ブライン側熱交換器(12)のお
けるブラインの凍結温度に基づく1.0Kg/cm2 G 以下にな
ると圧縮機(21)の駆動を停止してポンプダウン運転を終
了するように構成されている。具体的に、該第2ポンプ
ダウン実行手段(43)は、初期駆動手段(43a) と、停止手
段(43b) と、再起動手段(43c) と、終了手段(43d) とを
備えており、圧縮機(21)の起動を複数回、例えば、3回
行うようにしている。
On the other hand, the second pump down execution means (43)
When the waiting time of the compressor (21) elapses after the pump down operation of the first pump down execution means (42) ends, the compressor (21) is driven with a predetermined capacity to execute the pump down operation. At the same time, when the low pressure detected by the low pressure sensor (LP) becomes a predetermined second low pressure, for example, 1.0 Kg / cm 2 G or less based on the freezing temperature of brine in the brine side heat exchanger (12), the compressor (21 2) is stopped and the pump down operation is ended. Specifically, the second pump down execution means (43) includes an initial drive means (43a), a stop means (43b), a restart means (43c), and an end means (43d), The compressor (21) is started a plurality of times, for example, three times.

【0032】つまり、上記初期駆動手段(43a) は、第1
ポンプダウン実行手段(42)のポンプダウン運転の終了後
に上記圧縮機(21)の待機時間が経過すると、該圧縮機(2
1)を駆動するように構成されている。また、上記停止手
段(43b) は、低圧圧力が1.0Kg/cm2 G の第1低圧圧力以
下になると圧縮機(21)の駆動を停止するように構成され
ている。また、上記再起動手段(43c) は、停止手段(43
b) により圧縮機(21)が停止して3分の待機時間が経過
した後、低圧圧力が2.5Kg/cm2 G より大きくなると圧縮
機(21)を起動するように構成されている。更に、上記終
了手段(43d) は、ポンプダウン運転時における圧縮機(2
1)の駆動回数が複数回、例えば、3回になるとポンプダ
ウン運転を終了させるように構成されている。
That is, the initial drive means (43a) is the first
When the waiting time of the compressor (21) elapses after the pump down operation of the pump down execution means (42) is finished, the compressor (2
1) is configured to drive. The stopping means (43b) is configured to stop the driving of the compressor (21) when the low pressure becomes equal to or lower than the first low pressure of 1.0 kg / cm 2 G. Further, the restart means (43c) is a stop means (43c).
After b), the compressor (21) is stopped and after a waiting time of 3 minutes, the compressor (21) is started when the low pressure becomes higher than 2.5 Kg / cm 2 G. Further, the termination means (43d) is provided for the compressor (2
The pump down operation is terminated when the number of times of driving in 1) becomes a plurality of times, for example, three times.

【0033】次に、上記空気調和装置(1) におけるポン
プダウン運転の制御動作について説明する。図5乃至図
8は、水側熱交換器(11)における水冷却運転時のポンプ
ダウン運転を示しており、先ず、スタートしてステップ
ST1において、圧縮機(21)をオフ状態にすると共に、図
示しないウォータポンプ及びブラインポンプをオフ状態
にし、且つ第1電磁弁(20RW)及び第2電磁弁(20RB)をオ
フ状態にする。その後、ステップST2に移り、水側熱交
換器(11)及びブライン側熱交換器(12)の何れを選択する
かの選択スイッチを操作し、現在、水冷却運転を行うの
で、水側熱交換器(11)を選択する。
Next, the control operation of the pump down operation in the air conditioner (1) will be described. 5 to 8 show the pump down operation during the water cooling operation in the water side heat exchanger (11). First, start and step
In ST1, the compressor (21) is turned off, the water pump and the brine pump (not shown) are turned off, and the first solenoid valve (20RW) and the second solenoid valve (20RB) are turned off. After that, the process proceeds to step ST2, and the selection switch for selecting either the water side heat exchanger (11) or the brine side heat exchanger (12) is operated, and the water cooling operation is currently performed. Select the vessel (11).

【0034】続いて、ステップST3に移り、運転ボタン
をオンすると、ステップST4に移り、容量調節機構(26)
によって圧縮機(21)の容量を12%に設定すると共に、ウ
ォータポンプをオンし、第1電磁弁(20RW)及び第2電磁
弁(20RB)をオフ状態のままで、タイマAをスタートして
ポンプダウン起動を始めるべくポンプダウン運転を開始
する。このステップST4よりステップST5に移り、タイ
マAが30秒をカウントしたか否かを判定し、30秒が経過
するまで、このステップST5に待機して、30秒が経過す
ると、ステップST6に移ることになる。
Then, when the operation button is turned on at step ST3, the operation proceeds to step ST4, where the capacity adjusting mechanism (26)
Set the capacity of the compressor (21) to 12%, turn on the water pump, start the timer A with the first solenoid valve (20RW) and the second solenoid valve (20RB) in the off state. Start pump down operation to start pump down start. From this step ST4, it moves to step ST5, it judges whether or not the timer A counts 30 seconds, waits for this step ST5 until 30 seconds elapse, and when 30 seconds elapse, it moves to step ST6 become.

【0035】該ステップST6においては、圧縮機(21)の
容量を40%に設定すると共に、タイマBをスタートした
後、ステップST7に移り、低圧センサ(LP)の検出信号を
受けて圧縮機(21)の吸込圧力である低圧圧力が2.5Kg/cm
2 G 以下か否かを判定し、該低圧圧力が2.5Kg/cm2 G 以
下になるまでステップST7に待機して、該低圧圧力が2.
5Kg/cm2 G 以下になると、ステップST8に移ることにな
る。
In step ST6, the capacity of the compressor (21) is set to 40%, the timer B is started, and then the process proceeds to step ST7, in which the compressor (21) receives the detection signal of the low pressure sensor (LP). The low pressure, which is the suction pressure of 21), is 2.5 Kg / cm.
It is determined whether or not it is 2 G or less, and the low pressure is waited in step ST7 until the low pressure becomes 2.5 kg / cm 2 G or less, and the low pressure is 2.
When it becomes 5 Kg / cm 2 G or less, the process moves to step ST8.

【0036】該ステップST8においては、第1電磁弁(2
0RW)をオンして主冷媒回路(2) を冷媒の流通可能にした
後、ステップST9に移り、低圧センサ(LP)が検出した低
圧圧力が3.5Kg/cm2 G より大きいか否かを判定し、該低
圧圧力が3.5Kg/cm2 G より大きくなるまでステップST9
に待機して、該低圧圧力が3.5Kg/cmより大きくなると、
ステップST10に移ることになる。
In step ST8, the first solenoid valve (2
0RW) to turn on the main refrigerant circuit (2) to allow the refrigerant to flow, then move to step ST9 to determine whether the low pressure detected by the low pressure sensor (LP) is higher than 3.5 Kg / cm 2 G. Then, step ST9 until the low pressure becomes higher than 3.5 Kg / cm 2 G.
When the low pressure becomes higher than 3.5 Kg / cm,
It will move to step ST10.

【0037】その後、ステップST10において、再び第1
電磁弁(20RW)をオフした後、ステップST11に移り、再び
低圧センサ(LP)が検出する低圧圧力が2.5Kg/cm2 G 以下
か否かを判定し、該低圧圧力が2.5Kg/cm2 G 以下になる
までステップST11に待機して、該低圧圧力が2.5Kg/cm2
G 以下になると、ステップST12に移り、再度第1電磁弁
(20RW)をオンし、ステップST13において、タイマBが3
分をカウントしたか否かを判定する。そして、該タイマ
Bが3分をカウントしていない場合には、ステップST13
からステップST9に戻り、上述した動作を繰り返す一
方、3分をカウントしている場合には、ステップST13か
らステップST14に移ることになる。
Then, in step ST10, the first
After turning off the solenoid valve (20RW), the process proceeds to step ST11, and it is determined again whether the low pressure detected by the low pressure sensor (LP) is 2.5 Kg / cm 2 G or less, and the low pressure is 2.5 Kg / cm 2 Wait in step ST11 until the pressure becomes G or less, and the low pressure is 2.5 kg / cm 2
When it becomes less than G, move to step ST12 and re-start the first solenoid valve.
(20RW) is turned on, and timer B is set to 3 in step ST13.
Determine whether or not minutes have been counted. If the timer B does not count 3 minutes, step ST13
Then, the process returns to step ST9 to repeat the above-mentioned operation, and when 3 minutes are counted, the process proceeds from step ST13 to step ST14.

【0038】該ステップST14においては、圧縮機(21)の
容量を70%に設定すると共に、タイマCをスタートした
後、ステップST15に移り、該タイマCが3分をカウント
したか否かを判定して、3分をカウントするまでステッ
プST15に待機し、3分をカウントすると、ポンプダウン
起動を終了してステップST16に移り、通常のサーモ運転
を行い、水側熱交換器(11)で水を冷却することになる。
In step ST14, the capacity of the compressor (21) is set to 70%, the timer C is started, and then the process proceeds to step ST15 to determine whether or not the timer C has counted 3 minutes. Then, it waits in step ST15 until it counts 3 minutes, and when it counts 3 minutes, it finishes the pump down start and moves to step ST16 to perform normal thermostat operation, and run the water side heat exchanger (11) with water. Will be cooled.

【0039】このサーモ運転時において、低圧圧力が異
常に低下した場合、又は運転が停止された場合にポンプ
ダウン運転を行うようになっている。つまり、常に低圧
センサ(LP)が低圧圧力を検出しており、上記ステップST
16からステップST17に移り、該低圧圧力が3.0Kg/cm2 G
以下になったか否かを判定し、該低圧圧力が3.0Kg/cm2
G より大きい場合には、ステップST17からステップST16
に戻り、通常のサーモ運転を継続する一方、冷媒がブラ
イン側熱交換器(12)に溜ってガス欠状態になり、上記低
圧圧力が3.0Kg/cm2 G 以下になると、ステップST18から
ステップST30までのポンプダウン運転を行うことにな
る。
During the thermostat operation, the pump-down operation is performed when the low pressure is abnormally lowered or when the operation is stopped. In other words, the low pressure sensor (LP) always detects low pressure,
From 16 to step ST17, the low pressure is 3.0 Kg / cm 2 G
It is judged whether or not the pressure is below, and the low pressure is 3.0 kg / cm 2
If larger than G, step ST17 to step ST16
Returning to, while continuing the normal thermooperation, the refrigerant is in a gas shortage state accumulated in the brine side heat exchanger (12), the low pressure becomes 3.0Kg / cm 2 G or less, step ST18 to step ST30 Pump down operation up to.

【0040】また、このポンプダウン運転の終了後はス
テップST31からステップST33までの動作を行った後、ス
テップST34において、通常のサーモ運転を実行し、この
サーモ運転時において、ステップST35で運転の停止ボタ
ンがオンされると、該ステップST35からステップST18に
移り、ポンプダウン運転が実行されることになる。
After the pump down operation is completed, the operation from step ST31 to step ST33 is performed, and then the normal thermo-operation is executed in step ST34, and the operation is stopped in step ST35 during this thermo-operation. When the button is turned on, the process moves from step ST35 to step ST18, and the pump down operation is executed.

【0041】このポンプダウン運転は、本発明の特徴と
するところであり、このポンプダウン運転について説明
する。
This pump down operation is a feature of the present invention, and the pump down operation will be described.

【0042】該ポンプダウン運転は、ポンプダウン開始
手段(41)が第1電磁弁(20RW)及び第2電磁弁(20RB)をオ
フして開始信号を出力することにより開始される。つま
り、上記ステップST18において、圧縮機(21)の容量を40
%に設定し、第1電磁弁(20RW)をオフし、ブラインポン
プをオンする。この際、現在、第2電磁弁(20RB)は既に
オフしているので、オフ動作を行うことはなく、また、
ブラインをブライン側熱交換器(12)に供給してポンプダ
ウン運転を行う。
The pump down operation is started when the pump down starting means (41) turns off the first solenoid valve (20RW) and the second solenoid valve (20RB) and outputs a start signal. That is, in step ST18, the capacity of the compressor (21) is set to 40
%, The first solenoid valve (20RW) is turned off, and the brine pump is turned on. At this time, since the second solenoid valve (20RB) has already been turned off at this time, it is not turned off.
The brine is supplied to the brine side heat exchanger (12) to perform pump down operation.

【0043】その後、ステップST19に移り、最初に第1
ポンプダウン実行手段(42)がポンプダウン運転を行い、
先ず、初期駆動手段(42a) が圧縮機(21)を駆動した状態
において、低圧センサ(LP)の検出信号を受けて圧縮機(2
1)の吸込圧力である低圧圧力が2.5Kg/cm2 G 以下か否か
を判定し、該低圧圧力が2.5Kg/cm2 G 以下になるまでス
テップST19に待機して、該低圧圧力が2.5Kg/cm2 G 以下
になると、ステップST20に移ることになる。そして、こ
の低圧圧力の2.5Kg/cm2 G は、水の凍結温度に基づいて
設定されており、ポンプダウン運転時に水側熱交換器(1
1)において凍結が生じないようにしている。
After that, the process proceeds to step ST19, and first, the first
Pump down execution means (42) performs pump down operation,
First, while the initial drive means (42a) is driving the compressor (21), the compressor (2) receives the detection signal of the low pressure sensor (LP).
Low pressure is a suction pressure of 1) it is determined whether 2.5 Kg / cm 2 G or less, waiting to step ST19 until the low pressure is below 2.5 Kg / cm 2 G, the low pressure is 2.5 When it becomes Kg / cm 2 G or less, the process moves to step ST20. And, this low pressure of 2.5 Kg / cm 2 G is set based on the freezing temperature of water, and the water side heat exchanger (1
Freezing does not occur in 1).

【0044】続いて、上記ステップST20において、停止
手段(42b) が圧縮機(21)を停止すると共に、タイマDを
スタートさせると共に、カウンタAのカウントを開始し
た後、ステップST21に移り、タイマDが3分をカウント
したか否かを判定し、圧縮機(21)の待機時間である3分
が経過するまで、このステップST21に待機して、この3
分が経過すると、ステップST22に移ることになる。
Then, in step ST20, the stopping means (42b) stops the compressor (21), starts the timer D, starts the counting of the counter A, and then proceeds to step ST21 to set the timer D. Determines whether or not it has counted 3 minutes, and waits at this step ST21 until 3 minutes, which is the waiting time of the compressor (21), elapses.
When the minutes have passed, the process moves to step ST22.

【0045】このステップST22において、再起動手段(4
2c) は、上記低圧センサ(LP)の低圧圧力が3.5Kg/cm2 G
より大きくなったか否かを判定しており、該低圧圧力が
3.5Kg/cm2 G より大きくなるまでステップST22に待機し
て、該低圧圧力が3.5Kg/cm2G より大きくなるとステッ
プST23に移り、圧縮機(21)の容量を40%に設定して起動
させることになる。
In step ST22, the restart means (4
2c), the low pressure of the low pressure sensor (LP) is 3.5 Kg / cm 2 G
It is determined whether or not it has become larger, and the low pressure is
Standby in step ST22 until it becomes larger than 3.5 Kg / cm 2 G, and when the low pressure becomes larger than 3.5 Kg / cm 2 G, move to step ST23 and set the capacity of the compressor (21) to 40% and start it. I will let you.

【0046】その後、上記ステップST23からステップST
24に移り、カウンタAが3回になったか否かを判定し、
つまり、終了手段(42d) がポンプダウン運転の終了であ
るか否かを判定しており、圧縮機(21)を3回駆動するま
でステップST19に戻り、上述の動作を繰り返すことにな
る。換言すると、低圧圧力が2.5Kg/cm2 G なると圧縮機
(21)を停止し、低圧圧力が3.5Kg/cm2 G になると圧縮機
(21)を起動する動作を3回繰り返すことになる。
After that, the above steps ST23 to ST
Moving to 24, it is judged whether the counter A has reached 3 times,
That is, the termination means (42d) determines whether or not the pump down operation is terminated, and the process returns to step ST19 until the compressor (21) is driven three times, and the above operation is repeated. In other words, when the low pressure becomes 2.5 Kg / cm 2 G, the compressor
When (21) is stopped and the low pressure becomes 3.5 Kg / cm 2 G, the compressor
The operation of starting (21) is repeated three times.

【0047】その後、上記第1ポンプダウン実行手段(4
2)の終了手段(42d) がポンプダウン運転の終了を判定す
ると、上記ステップST24からステップST25に移り、第2
ポンプダウン実行手段(43)が圧縮機(21)の待機時間の経
過後にポンプダウン運転を実行することになる。つま
り、上記ステップST24において、カウンタAが3回をカ
ウントすると、第2ポンプダウン実行手段(43)の初期駆
動手段(43a) がステップST23において既にポンプダウン
運転を開始しており、ステップST25に移り、低圧センサ
(LP)の検出信号を受けて圧縮機(21)の吸込圧力である低
圧圧力が1.0Kg/cm2 G 以下か否かを判定し、該低圧圧力
が1.0Kg/cm2 G 以下になるまでステップST25に待機し
て、該低圧圧力が1.0Kg/cm2 G 以下になると、ステップ
ST26に移ることになる。そして、この低圧圧力の1.0Kg/
cm2 G は、ブラインの凍結温度に基づいて設定されてお
り、ポンプダウン運転時にブライン側熱交換器(12)の冷
媒が回収できるようにしている。その上、上記水側熱交
換器(11)には、冷媒が残存していないので、この第2ポ
ンプダウン実行手段(43)によって水側熱交換器(11)が凍
結することはない。
Thereafter, the first pump down execution means (4
When the end means (42d) of 2) determines the end of the pump down operation, the process proceeds from step ST24 to step ST25, where the second
The pump down execution means (43) will execute the pump down operation after the waiting time of the compressor (21) has elapsed. That is, when the counter A counts three times in step ST24, the initial drive means (43a) of the second pump down execution means (43) has already started the pump down operation in step ST23, and the process proceeds to step ST25. , Low pressure sensor
Low pressure is a suction pressure of the detection signals received by the compressor (21) of (LP), it is determined whether 1.0 Kg / cm 2 G or less, until the low pressure is below 1.0 Kg / cm 2 G Stand by at step ST25, when the low pressure becomes 1.0 Kg / cm 2 G or less, step
It will move to ST26. And this low pressure 1.0Kg /
The cm 2 G is set based on the freezing temperature of the brine so that the refrigerant in the brine side heat exchanger (12) can be recovered during the pump down operation. Moreover, since no refrigerant remains in the water side heat exchanger (11), the water side heat exchanger (11) is not frozen by the second pump down execution means (43).

【0048】続いて、上記ステップST26において、停止
手段(43b) が圧縮機(21)を停止すると共に、タイマEを
スタートさせると共に、カウンタBのカウントを開始し
た後、ステップST27に移り、タイマEが3分をカウント
したか否かを判定し、圧縮機(21)の待機時間である3分
が経過するまで、このステップST27に待機して、この3
分が経過すると、ステップST28に移ることになる。
Subsequently, in step ST26, the stopping means (43b) stops the compressor (21), starts the timer E, starts the counting of the counter B, and then proceeds to step ST27 to move to the timer E. Determines whether or not it has counted 3 minutes, and waits at this step ST27 until 3 minutes, which is the waiting time of the compressor (21), elapses.
After a lapse of minutes, the process moves to step ST28.

【0049】このステップST28において、再起動手段(4
3c) は、上記低圧センサ(LP)の低圧圧力が2.5Kg/cm2 G
より大きくなったか否かを判定しており、該低圧圧力が
2.5Kg/cm2 G より大きくなるまでステップST28に待機し
て、該低圧圧力が2.5Kg/cm2G より大きくなるとステッ
プST29に移り、圧縮機(21)の容量を40%に設定して起動
させることになる。
In this step ST28, the restart means (4
3c), the low pressure of the low pressure sensor (LP) is 2.5 kg / cm 2 G
It is determined whether or not it has become larger, and the low pressure is
Stand by in step ST28 until it becomes larger than 2.5 kg / cm 2 G, and when the low pressure becomes larger than 2.5 kg / cm 2 G, move to step ST29 and set the capacity of compressor (21) to 40% and start it. I will let you.

【0050】その後、上記ステップST29からステップST
30に移り、カウンタDが3回になったか否かを判定し、
つまり、終了手段(43d) がポンプダウン運転の終了であ
るか否かを判定しており、圧縮機(21)を3回起動するま
でステップST25に戻り、上述の動作を繰り返すことにな
る。換言すると、低圧圧力が1.0Kg/cm2 G なると圧縮機
(21)を停止し、低圧圧力が2.5Kg/cm2 G になると圧縮機
(21)を起動する動作を3回繰り返すことになる。
After that, from step ST29 to step ST
Moving to 30, it is determined whether the counter D has reached 3 times,
That is, the termination means (43d) determines whether or not the pump down operation is terminated, and returns to step ST25 until the compressor (21) is started three times, and the above-described operation is repeated. In other words, when the low pressure reaches 1.0 Kg / cm 2 G, the compressor
When (21) is stopped and the low pressure becomes 2.5 Kg / cm 2 G, the compressor
The operation of starting (21) is repeated three times.

【0051】このステップST18からステップST30までに
よってポンプダウン運転が終了することになり、該ステ
ップST30からステップST31に移り、ポンプダウン停止か
否かを判定し、つまり、停止ボタンをオンした後のポン
プダウン運転の終了であるかいなかを判定する。そし
て、上記サーモ運転時における低圧圧力の低下によるポ
ンプダウン運転である場合には、ステップST31からステ
ップST32に移り、再度、サーモ運転を開始すべく第1電
磁弁(20RW)をオンすると共に、ブラインポンプをオフし
て、タイマFをスタートさせる。
The pump down operation is ended by this step ST18 to step ST30, and the process proceeds from step ST30 to step ST31 to judge whether or not the pump down is stopped, that is, the pump after the stop button is turned on. It is determined whether or not the down driving has ended. Then, in the case of the pump down operation due to the decrease in the low pressure during the thermostat operation, the process moves from step ST31 to step ST32, and the first solenoid valve (20RW) is turned on again to start the thermostat operation, and the brine Turn off pump and start timer F.

【0052】その後、圧縮機(21)の待機時間である3分
が経過するまで、ステップST33に待機し、この3分が経
過すると、ステップST33からステップST34に移り、サー
モ運転を行うことになる。
After that, the process waits in step ST33 until the waiting time of the compressor (21), 3 minutes, elapses, and when this 3 minutes elapses, the process moves from step ST33 to step ST34 to perform the thermostat operation. ..

【0053】また、このサーモ運転時において、ステッ
プST35で停止ボタンがオンされると、上記ステップST18
に移り、ポンプダウン運転が開始されることになる。そ
して、このポンプダウン運転が終了すると、上記ステッ
プST31の判定がYESとなり、該ステップST31からステ
ップST36に移り、ブラインポンプ及びウォータポンプを
オフすると共に、圧縮機(21)を停止して空調運転を終了
することになる。
When the stop button is turned on in step ST35 during this thermostat operation, the above-mentioned step ST18
Then, the pump down operation will be started. Then, when this pump down operation is completed, the determination in step ST31 is YES, the process moves from step ST31 to step ST36, the brine pump and water pump are turned off, and the compressor (21) is stopped to perform the air conditioning operation. It will end.

【0054】図9及び図10は、ブライン側熱交換器(1
2)におけるブライン冷却運転時、つまり、蓄熱運転時の
ポンプダウン運転を示しており、先ず、スタートしてス
テップST41において、圧縮機(21)をオフ状態にすると共
に、図示しないウォータポンプ及びブラインポンプをオ
フ状態にし、且つ第1電磁弁(20RW)及び第2電磁弁(20R
B)をオフ状態にする。その後、ステップST42に移り、水
側熱交換器(11)及びブライン側熱交換器(12)の何れを選
択するかの選択スイッチを操作し、現在、ブライン冷却
運転を行うので、ブライン側熱交換器(12)を選択する。
9 and 10 show the brine side heat exchanger (1
2) Shows the pump down operation during the brine cooling operation in 2), that is, during the heat storage operation.First, in step ST41, the compressor (21) is turned off, and a water pump and a brine pump (not shown) are shown. Is turned off, and the first solenoid valve (20RW) and the second solenoid valve (20R
Turn off B). After that, the process proceeds to step ST42, where the selection switch for selecting either the water side heat exchanger (11) or the brine side heat exchanger (12) is operated, and since the brine cooling operation is currently performed, the brine side heat exchange is performed. Select the vessel (12).

【0055】続いて、ステップST43に移り、運転ボタン
をオンすると、ステップST44に移り、容量調節機構(26)
によって圧縮機(21)の容量を12%に設定すると共に、ウ
ォータポンプ及びブラインポンプをオンし、第1電磁弁
(20RW)及び第2電磁弁(20RB)をオフ状態のままで、タイ
マAをスタートしてポンプダウン起動を始めるべくポン
プダウン運転を開始する。このステップST44よりステッ
プST45に移り、タイマAが30秒をカウントしたか否かを
判定し、30秒が経過するまで、このステップST45に待機
して、30秒が経過すると、ステップST46に移ることにな
る。
Then, when the operation button is turned on in step ST43, the process proceeds to step ST44, and the capacity adjusting mechanism (26)
Set the capacity of the compressor (21) to 12%, turn on the water pump and brine pump, and set the first solenoid valve.
With (20RW) and the second solenoid valve (20RB) kept in the off state, the timer A is started to start the pump down operation to start the pump down activation. From this step ST44, it moves to step ST45, it judges whether or not the timer A has counted 30 seconds, waits for this step ST45 until 30 seconds elapse, and when 30 seconds elapse, it moves to step ST46. become.

【0056】このステップST46からステップST58まで
は、本発明の特徴とするポンプダウン運転制御であっ
て、該ポンプダウン運転は、運転の起動時の他、運転停
止時においても行われる。そこで、このポンプダウン運
転について説明する。このポンプダウン運転は、上述し
た水冷却運転時と同様であって、第1ポンプダウン実行
手段(42)と第2ポンプダウン実行手段(43)とを行う。該
ポンプダウン運転は、ステップST46において、ポンプダ
ウン開始手段(41)が第2電磁弁(20RB)をオフし、圧縮機
(21)の容量を40%に設定し、ブラインポンプをオンす
る。この際、現在、第1電磁弁(20RW)は既にオフし、ウ
ォータポンプはオンしているので、そのままステップST
47に移ることになる。
This step ST46 to step ST58 is the pump down operation control which is the feature of the present invention, and the pump down operation is performed not only when the operation is started but also when the operation is stopped. Therefore, this pump down operation will be described. This pump down operation is the same as the water cooling operation described above, and the first pump down execution means (42) and the second pump down execution means (43) are performed. In the pump down operation, in step ST46, the pump down starting means (41) turns off the second solenoid valve (20RB), and the compressor
Set the capacity of (21) to 40% and turn on the brine pump. At this time, since the first solenoid valve (20RW) is already off and the water pump is on at this time, step ST
I will move to 47.

【0057】その後、最初に第1ポンプダウン実行手段
(42)がポンプダウン運転を行い、先ず、初期駆動手段(4
2a) が圧縮機(21)を駆動した状態において、低圧センサ
(LP)の検出信号を受けて圧縮機(21)の吸込圧力である低
圧圧力が2.5Kg/cm2 G 以下か否かを判定し、該低圧圧力
が2.5Kg/cm2 G 以下になるまでステップST47に待機し
て、該低圧圧力が2.5Kg/cm2 G 以下になると、停止手段
(42b) が圧縮機(21)を停止すると共に、タイマDをスタ
ートさせると共に、カウンタAのカウントを開始した
後、タイマDが3分をカウントしたか否かを判定する
(ステップST48,ステップST49)。
After that, first, the first pump down execution means
(42) performs the pump down operation, and first, the initial drive means (4
When the compressor (21) is driven by 2a), the low pressure sensor
Low pressure is a suction pressure of the detection signals received by the compressor (21) of (LP), it is determined whether 2.5 Kg / cm 2 G or less, until the low pressure is below 2.5 Kg / cm 2 G Waiting at step ST47, when the low pressure becomes 2.5 Kg / cm 2 G or less, the stopping means
(42b) stops the compressor (21), starts the timer D, and starts counting the counter A, and then determines whether or not the timer D has counted 3 minutes (step ST48, step ST49). ).

【0058】この3分が経過すると、再起動手段(42c)
は、上記低圧センサ(LP)の低圧圧力が3.5Kg/cm2 G より
大きくなったか否かを判定しており、該低圧圧力が3.5K
g/cm2 G より大きくなると、圧縮機(21)の容量を40%に
設定して起動させる。その後、カウンタAが3回になっ
たか否かを判定し、圧縮機(21)を3回駆動するまでステ
ップST47に戻り、上述の動作を繰り返すことになる。つ
まり、低圧圧力が2.5Kg/cm2 G なると圧縮機(21)を停止
し、低圧圧力が3.5Kg/cm2 G になると圧縮機(21)を起動
する動作を3回繰り返すことになる(ステップST50〜ス
テップST52)。
After the lapse of 3 minutes, the restart means (42c)
Is determining whether or not the low pressure of the low pressure sensor (LP) is higher than 3.5 Kg / cm 2 G, and the low pressure is 3.5 Kg / cm 2 G.
When it becomes larger than g / cm 2 G, the capacity of the compressor (21) is set to 40% to start. After that, it is determined whether or not the counter A has reached three times, and the process returns to step ST47 until the compressor (21) is driven three times, and the above operation is repeated. That is, stop the low pressure is 2.5 Kg / cm 2 G compressor (21), will be repeated three times the operation of low pressure is started to be a 3.5 Kg / cm 2 G compressor (21) (step ST50 to step ST52).

【0059】その後、上記第1ポンプダウン実行手段(4
2)の終了手段(42d) がポンプダウン運転の終了を判定す
ると、第2ポンプダウン実行手段(43)が圧縮機(21)の待
機時間の経過後にポンプダウン運転を実行することにな
る。つまり、第2ポンプダウン実行手段(43)の初期駆動
手段(43a) がステップST51において既にポンプダウン運
転を開始し、低圧センサ(LP)の検出信号を受けて圧縮機
(21)の吸込圧力である低圧圧力が1.0Kg/cm2 G 以下か否
かを判定し、該低圧圧力が1.0Kg/cm2 G 以下になるまで
ステップST53に待機して、該低圧圧力が1.0Kg/cm2 G 以
下になると、停止手段(43b) が圧縮機(21)を停止すると
共に、タイマEをスタートさせると共に、カウンタBの
カウントを開始した後、タイマEが3分をカウントした
か否かを判定する(ステップST54,ステップST55)。
Thereafter, the first pump down execution means (4
When the ending means (42d) of 2) determines that the pump down operation has ended, the second pump down executing means (43) executes the pump down operation after the waiting time of the compressor (21) has elapsed. That is, the initial drive means (43a) of the second pump down execution means (43) has already started the pump down operation in step ST51, and receives the detection signal of the low pressure sensor (LP) and receives the compressor signal.
Low pressure is a suction pressure (21), it is determined whether 1.0 Kg / cm 2 G or less, waiting to step ST53 until the low pressure is below 1.0 Kg / cm 2 G, the low pressure When it becomes 1.0 Kg / cm 2 G or less, the stopping means (43b) stops the compressor (21), starts the timer E, starts the counting of the counter B, and then the timer E counts 3 minutes. It is determined whether or not (step ST54, step ST55).

【0060】この3分が経過すると、再起動手段(43c)
は、上記低圧センサ(LP)の低圧圧力が2.5Kg/cm2 G より
大きくなったか否かを判定しており、該低圧圧力が2.5K
g/cm2 G より大きくなると、圧縮機(21)の容量を40%に
設定して起動させる。その後、カウンタDが3回になっ
たか否かを終了手段(43d) が判定し、圧縮機(21)を3回
起動するまでステップST53に戻り、上述の動作を繰り返
すことになる。つまり、低圧圧力が1.0Kg/cm2 G なると
圧縮機(21)を停止し、低圧圧力が2.5Kg/cm2 Gになると
圧縮機(21)を起動する動作を3回繰り返すことになる
(ステップST56〜ステップST58)。
After the lapse of 3 minutes, the restart means (43c)
Determines whether or not the low pressure of the low pressure sensor (LP) is higher than 2.5 Kg / cm 2 G, and the low pressure is 2.5 Kg / cm 2 G.
When it becomes larger than g / cm 2 G, the capacity of the compressor (21) is set to 40% to start. After that, the ending means (43d) determines whether or not the counter D has reached three times, and the process returns to step ST53 until the compressor (21) is started three times, and the above operation is repeated. That is, when the low pressure becomes 1.0 Kg / cm 2 G, the compressor (21) is stopped, and when the low pressure becomes 2.5 Kg / cm 2 G, the operation of starting the compressor (21) is repeated three times (step. ST56 to step ST58).

【0061】このステップST46からステップST58までに
よってポンプダウン運転が終了することになり、該ステ
ップST58からステップST59に移り、ポンプダウン停止か
否かを判定し、つまり、停止ボタンをオンした後のポン
プダウン運転の終了であるかいなかを判定する。そし
て、上記運転起動時である場合には、ステップST59から
ステップST60に移り、サーモ運転を開始すべく第2電磁
弁(20RB)をオンする。
The pump down operation is ended by this step ST46 to step ST58, and the process proceeds from step ST58 to step ST59 to judge whether or not the pump down is stopped, that is, the pump after the stop button is turned on. It is determined whether or not the down driving has ended. Then, when the operation is started, the process proceeds from step ST59 to step ST60, and the second solenoid valve (20RB) is turned on to start the thermo-operation.

【0062】また、このサーモ運転時において、ステッ
プST62で停止ボタンがオンされると、上記ステップST46
に移り、ポンプダウン運転が開始されることになる。そ
して、このポンプダウン運転が終了すると、上記ステッ
プST59の判定がYESとなり、該ステップST59からステ
ップST63に移り、ブラインポンプ及びウォータポンプを
オフすると共に、圧縮機(21)を停止して空調運転を終了
することになる。
When the stop button is turned on in step ST62 during the thermostat operation, step ST46 described above is performed.
Then, the pump down operation will be started. Then, when the pump down operation is completed, the determination in step ST59 is YES, the process proceeds from step ST59 to step ST63, the brine pump and the water pump are turned off, and the compressor (21) is stopped to perform the air conditioning operation. It will end.

【0063】従って、上記実施例によれば、第1ポンプ
ダウン実行手段(42)によって第1低圧圧力に基づいてポ
ンプダウン運転を行ったのち、第2ポンプダウン実行手
段(43)が第2低圧圧力に基づいてポンプダウン運転を行
うようにしたために、凍結温度の高い水が凍結すること
なくポンプダウン運転を行うことができる。その上、凍
結温度の低いブラインを冷却するブライン側熱交換器(1
2)の冷媒をも確実に回収することができるので、ポンプ
ダウン運転を確実に行うことができる。また、上記第1
ポンプダウン実行手段(42)及び第2ポンプダウン実行手
段(43)が、圧縮機(21)の駆動を複数回行うので、冷媒の
回収を確実に行うことができることから、液バック等を
確実に防止することができる。
Therefore, according to the above embodiment, after the first pump down execution means (42) performs the pump down operation based on the first low pressure, the second pump down execution means (43) causes the second low pressure. Since the pump down operation is performed based on the pressure, the pump down operation can be performed without freezing water having a high freezing temperature. In addition, a brine side heat exchanger (1
Since the refrigerant of 2) can be reliably recovered, the pump down operation can be reliably performed. Also, the first
Since the pump down executing means (42) and the second pump down executing means (43) drive the compressor (21) a plurality of times, it is possible to reliably recover the refrigerant, so that liquid backing is surely performed. Can be prevented.

【0064】図11乃至図16は、請求項1及び2に係
る発明の実施例を示しており、ポンプダウン運転時に高
圧圧力を制御するようにしたものである。具体的に、図
4に示すように、熱源側熱交換器(23)のファン(22)は、
インバータ(2b)によって回転数の可変に制御可能に構成
される一方、受液器(24)のガス出口には、ガス通路(27)
が接続されている。そして、該ガス通路(27)は、開閉機
構である第3電磁弁(20RP)が設けられると共に、圧縮機
(21)の吸込側である主冷媒回路(2) の低圧ガスラインに
接続され、該第3電磁弁(20RP)がポンプダウン運転時に
開動して受液器(24)内のガス圧力低下させるようにして
いる。
11 to 16 show an embodiment of the invention according to claims 1 and 2, wherein the high pressure is controlled during pump down operation. Specifically, as shown in FIG. 4, the fan (22) of the heat source side heat exchanger (23) is
The inverter (2b) is configured so that the number of rotations can be variably controlled, while the gas outlet of the liquid receiver (24) has a gas passage (27).
Are connected. The gas passage (27) is provided with a third solenoid valve (20RP) which is an opening / closing mechanism, and a compressor.
It is connected to the low pressure gas line of the main refrigerant circuit (2) which is the suction side of (21), and the third solenoid valve (20RP) is opened during pump down operation to reduce the gas pressure in the receiver (24). I am trying.

【0065】一方、上記コントローラ(4) には、高圧制
御手段(44)が設けられると共に、ポンプダウン開始手段
(45)と第1実行手段(46)と第2実行手段(47)とよりなる
ポンプダウン実行手段(48)が設けられおり、該高圧制御
手段(44)は、ポンプダウン運転を実行すべくポンプダウ
ン信号を受けると、該ポンプダウン信号の出力時の状態
から上記ファン(22)の回転数を低下させるように構成さ
れている。また、上記ポンプダウン開始手段(45)は、該
高圧制御手段(44)のファン制御後に上記高圧圧力センサ
(HP)の検出高圧圧力が所定圧力になると、例えば、 20K
g/cm2 G 以上になると、上記第1電磁弁(20RW)及び第2
電磁弁(20RB)を閉鎖すると共に、上記ガス通路(27)の第
3電磁弁(20RP)を開動してポンプダウン運転の開始信号
を出力するように構成されている。
On the other hand, the controller (4) is provided with a high pressure control means (44) and a pump down start means.
A pump down execution means (48) including (45), first execution means (46) and second execution means (47) is provided, and the high pressure control means (44) is to execute the pump down operation. When the pump down signal is received, the rotation speed of the fan (22) is reduced from the state when the pump down signal is output. Further, the pump down start means (45) is the high pressure sensor after fan control of the high pressure control means (44).
When the high pressure detected by (HP) reaches the specified pressure, for example, 20K
Above g / cm 2 G, the above 1st solenoid valve (20RW) and 2nd solenoid valve
The electromagnetic valve (20RB) is closed and the third electromagnetic valve (20RP) of the gas passage (27) is opened to output a pump down operation start signal.

【0066】更に、上記第1実行手段(46)は、該ポンプ
ダウン開始手段(45)の開始信号を受けて圧縮機(21)を所
定容量で駆動すると共に、上記低圧センサ(LP)の検出低
圧圧力が上記第1被冷却媒体である水の凍結温度に基づ
く第1低圧圧力に相当するとポンプダウン運転を終了す
るように構成されている。また、上記第2実行手段(47)
は、該第1実行手段(46)によるポンプダウン運転の終了
後に上記圧縮機(21)の待機時間が経過すると該圧縮機(2
1)を所定容量で駆動すると共に、上記低圧センサ(LP)の
検出低圧圧力が第1低圧圧力より低い第2低圧圧力に相
当するとポンプダウン運転を終了するように構成されて
いる。
Further, the first execution means (46) receives the start signal of the pump down start means (45) to drive the compressor (21) with a predetermined capacity, and detects the low pressure sensor (LP). When the low-pressure pressure corresponds to the first low-pressure pressure based on the freezing temperature of the water as the first medium to be cooled, the pump down operation is terminated. The second executing means (47)
When the waiting time of the compressor (21) elapses after the pump down operation by the first executing means (46) is finished, the compressor (2
1) is driven with a predetermined capacity, and when the low pressure detected by the low pressure sensor (LP) corresponds to a second low pressure lower than the first low pressure, the pump down operation is terminated.

【0067】次に、上記空気調和装置(1) におけるポン
プダウン運転の制御動作について説明する。図11乃至
図14は、水側熱交換器(11)における水冷却運転時のポ
ンプダウン運転を示しており、先ず、スタートからステ
ップST117までは図5及び図6に示す前実施例のステッ
プST17までと同様に動作しており、先ず、圧縮機(21)並
びに図示しないウォータポンプ及びブラインポンプをオ
フ状態にし、且つ第1電磁弁(20RW)及び第2電磁弁(20R
B)の他、第3電磁弁(20RP)をオフ状態にする(ステップ
ST101参照)。
Next, the control operation of the pump down operation in the air conditioner (1) will be described. 11 to 14 show the pump down operation during the water cooling operation in the water side heat exchanger (11). First, from the start to step ST117, step ST17 of the previous embodiment shown in FIG. 5 and FIG. The compressor (21) and the water pump and brine pump (not shown) are turned off, and the first solenoid valve (20RW) and the second solenoid valve (20R) are operated.
In addition to B), the third solenoid valve (20RP) is turned off (see step ST101).

【0068】その後、選択スイッチを操作して水側熱交
換器(11)を選択して運転ボタンをオンすると、圧縮機(2
1)の容量を12%に設定すると共に、ウォータポンプをオ
ンし、第1電磁弁(20RW)及び第2電磁弁(20RB)をオフ状
態のままで、ポンプダウン起動を始めるべくポンプダウ
ン運転を開始する(ステップST102〜ステップST104参
照)。そして、タイマAが30秒をカウントすると、圧縮
機(21)の容量を40%に設定した後、低圧センサ(LP)の検
出低圧圧力が2.5Kg/cm2 G 以下になると、第1電磁弁(2
0RW)をオンして主冷媒回路(2) を冷媒の流通可能にした
後、上記検出低圧圧力が3.5Kg/cmより大きくなると、第
1電磁弁(20RW)をオフし、また、該検出低圧圧力が2.5K
g/cm2 G 以下になると、再度第1電磁弁(20RW)をオンす
る(ステップST105〜ステップST112参照)。
After that, when the selection switch is operated to select the water side heat exchanger (11) and the operation button is turned on, the compressor (2
Set the capacity of 1) to 12%, turn on the water pump, and leave the first solenoid valve (20RW) and the second solenoid valve (20RB) in the off state to start pump down operation to start pump down. Start (see steps ST102 to ST104). Then, when the timer A counts 30 seconds, after setting the capacity of the compressor (21) to 40%, when the low pressure detected by the low pressure sensor (LP) becomes 2.5 Kg / cm 2 G or less, the first solenoid valve (2
(0RW) to turn on the main refrigerant circuit (2) to allow the refrigerant to flow, and when the detected low pressure becomes higher than 3.5 Kg / cm, the first solenoid valve (20RW) is turned off and the detected low pressure is decreased. Pressure is 2.5K
When it becomes g / cm 2 G or less, the first solenoid valve (20RW) is turned on again (see step ST105 to step ST112).

【0069】続いて、タイマBが3分をカウントする
と、圧縮機(21)の容量を70%に設定した後、タイマCが
3分をカウントすると、ポンプダウン起動を終了して通
常のサーモ運転を行い、水側熱交換器(11)で水を冷却す
ることになる(ステップST113〜ステップST116参
照)。このサーモ運転時において、低圧圧力が異常に低
下した場合、又は運転が停止された場合にポンプダウン
運転を行うようになっている。つまり、通常のサーモ運
転時において、冷媒がブライン側熱交換器(12)に溜って
ガス欠状態になり、上記低圧圧力が3.0Kg/cm2 G 以下に
なると(ステップST117参照)、本実施例の特徴とする
ステップST118からステップST131までのポンプダウン
運転を行うことになる。
Subsequently, when the timer B counts 3 minutes, the capacity of the compressor (21) is set to 70%, and when the timer C counts 3 minutes, the pump down start is terminated and the normal thermostat operation is performed. Then, the water is cooled by the water side heat exchanger (11) (see steps ST113 to ST116). During this thermostat operation, the pump-down operation is performed when the low pressure is abnormally reduced or when the operation is stopped. That is, when the refrigerant accumulates in the brine side heat exchanger (12) and becomes out of gas during the normal thermostat operation, and the low pressure becomes 3.0 kg / cm 2 G or less (see step ST117), the present embodiment is performed. The pump down operation from Step ST118 to Step ST131, which is the characteristic of the above, is performed.

【0070】また、上記ポンプダウン起動後は、前実施
例の図6と同様に動作し、ステップST132からステップ
ST133までの動作を行った後、通常のサーモ運転を実行
し、運転の停止ボタンがオンされると(ステップST135
〜ステップST136参照)、上記ステップST118からのポ
ンプダウン運転が実行されることになる。
After the pump down is started, the same operation as in FIG. 6 of the previous embodiment is performed, and after the operations from step ST132 to step ST133 are performed, the normal thermostat operation is executed and the operation stop button is When turned on (step ST135
(See step ST136), the pump down operation from step ST118 is executed.

【0071】そこで、本発明の特徴とするポンプダウン
運転について説明する。該ポンプダウン運転は、ポンプ
ダウン信号を受けると、例えば、ステップST117におけ
る低圧センサ(LP)の検出低圧圧力が3.0Kg/cm2 G 以下に
なると、ステップST118において、高圧制御手段(44)
が、ポンプダウン信号の出力時の状態から熱源側のファ
ン(22)の回転数のみを低下させる。その後、ステップS
T119に移り、高圧圧力センサ(HP)の検出する高圧圧力が
20Kg/cm2 G 以上か否かを判定し、該高圧圧力が 20Kg/
cm2 G になるまでステップST119に待機する。そして、
該高圧圧力が 20Kg/cm2 G になると、ステップST119か
らステップST120に移り、ポンプダウン開始手段(45)が
第1電磁弁(20RW)及び第2電磁弁(20RB)をオフすると共
に、第3電磁弁(20RP)をオンして開始信号を出力するこ
とにより開始される。つまり、ポンプダウン運転を開始
する際、高圧圧力を一旦上昇させた後、上記ステップS
T120において、圧縮機(21)の容量を40%に設定し、第1
電磁弁(20RW)をオフし、ブラインポンプをオンする一
方、第3電磁弁(20RP)をオンしてガス通路(27)を連通さ
せ、タイマXのカウントを開始する。この際、現在、第
2電磁弁(20RB)は既にオフしているので、オフ動作を行
うことはなく、また、ブラインをブライン側熱交換器(1
2)に供給してポンプダウン運転を行う。
The pump down operation, which is a feature of the present invention, will be described. When the pump down signal is received, for example, when the low pressure detected by the low pressure sensor (LP) in step ST117 becomes 3.0 Kg / cm 2 G or less, in step ST118, the high pressure control means (44)
However, only the rotation speed of the heat source side fan (22) is decreased from the state when the pump down signal is output. After that, step S
Move to T119, the high pressure detected by the high pressure sensor (HP)
It is judged whether the pressure is 20 Kg / cm 2 G or more, and the high pressure is 20 Kg / cm 2.
Wait at step ST119 until it reaches cm 2 G. And
When the high pressure becomes 20 kg / cm 2 G, the process proceeds from step ST119 to step ST120, and the pump down start means (45) turns off the first solenoid valve (20RW) and the second solenoid valve (20RB), and the third It is started by turning on the solenoid valve (20RP) and outputting a start signal. That is, when the pump down operation is started, after the high pressure is once increased, the above step S
At T120, set the capacity of the compressor (21) to 40%, and
The solenoid valve (20RW) is turned off and the brine pump is turned on, while the third solenoid valve (20RP) is turned on to connect the gas passage (27), and the timer X starts counting. At this time, since the second solenoid valve (20RB) has already been turned off at this time, the off operation is not performed, and the brine is removed from the brine side heat exchanger (1
Supply to 2) and perform pump down operation.

【0072】その後、ステップST121に移り、最初に第
1実行手段(46)がポンプダウン運転を行い、圧縮機(21)
を駆動した状態において、低圧センサ(LP)の検出信号を
受けて圧縮機(21)の吸込圧力である低圧圧力が2.5Kg/cm
2 G 以下か否かを判定し、該低圧圧力が2.5Kg/cm2 G 以
下になるまでステップST122に移り、該ステップST122
において、上記タイマXが3分をカウントしたか否かを
判定し、該タイマXが3分をカウントするまで上記ステ
ップST121に戻り、このステップST121とステップST1
22との動作を繰返すことになる。そして、上記低圧圧力
が2.5Kg/cm2 G以下になるか、又は、タイマXが3分を
カウントすると、上記低圧圧力が2.5Kg/cm2 G に相当し
たとして第1実行手段(46)のポンプダウン運転が終了
し、ステップST123に移ることになる。この低圧圧力の
2.5Kg/cm2 G は、前実施例と同様に、水の凍結温度に基
づいて設定されており、ポンプダウン運転時に水側熱交
換器(11)において凍結が生じないようにしている。
After that, the routine proceeds to Step ST121, and the first executing means (46) first carries out the pump down operation, and the compressor (21)
In the state of driving, the low pressure pressure which is the suction pressure of the compressor (21) is 2.5 Kg / cm upon receiving the detection signal of the low pressure sensor (LP).
It is determined whether the pressure is 2 G or less, and the process proceeds to step ST122 until the low pressure becomes 2.5 kg / cm 2 G or less.
In step S121, it is determined whether or not the timer X has counted 3 minutes, and the process returns to step ST121 until the timer X has counted 3 minutes, and steps ST121 and ST1
The operation with 22 will be repeated. Then, when the low pressure becomes 2.5 Kg / cm 2 G or less, or when the timer X counts 3 minutes, it is determined that the low pressure is equivalent to 2.5 Kg / cm 2 G and the first executing means (46) The pump down operation ends, and the process moves to step ST123. Of this low pressure
2.5 Kg / cm 2 G is set based on the freezing temperature of water as in the previous example, and prevents freezing in the water side heat exchanger (11) during pump down operation.

【0073】続いて、上記ステップST123において、第
2実行手段(47)のポンプダウン運転が開始され、圧縮機
(21)を停止すると共に、一旦第3電磁弁(20RP)をオフ
し、タイマDをスタートさせた後、ステップST124に移
り、タイマDが3分をカウントしたか否かを判定し、圧
縮機(21)の待機時間である3分が経過するまで、このス
テップST124に待機して、この3分が経過すると、ステ
ップST125に移ることになる。このステップST125にお
いて、圧縮機(21)の容量を40%に設定し、再度第3電磁
弁(20RP)をオンしてガス通路(27)を連通させ、タイマY
のカウントを開始する。
Subsequently, in step ST123, the pump down operation of the second executing means (47) is started, and the compressor is started.
(21) is stopped, the third solenoid valve (20RP) is once turned off, and the timer D is started. Then, the process proceeds to step ST124, and it is determined whether or not the timer D has counted 3 minutes. It waits in this step ST124 until the waiting time of (21), 3 minutes, elapses, and when this 3 minutes elapses, it moves to step ST125. In this step ST125, the capacity of the compressor (21) is set to 40%, the third solenoid valve (20RP) is turned on again to connect the gas passage (27), and the timer Y
Start counting.

【0074】その後、上記ステップST121からステップ
ST125までの動作と同様に、ステップST126において、
低圧センサ(LP)の検出信号を受けて圧縮機(21)の吸込圧
力である低圧圧力が1.0Kg/cm2 G 以下か否かを判定し、
該低圧圧力が1.0Kg/cm2 G 以下になるまでステップST1
27に移り、該ステップST127において、上記タイマYが
3分をカウントしたか否かを判定し、該タイマYが3分
をカウントするまで上記ステップST126に戻り、このス
テップST126とステップST127との動作を繰返すことに
なる。そして、上記低圧圧力が1.0Kg/cm2 G 以下になる
か、又は、タイマYが3分をカウントすると、上記低圧
圧力が1.0Kg/cm2 G に相当したとして第2実行手段(47)
のポンプダウン運転が終了し、ステップST128に移るこ
とになる。そして、この低圧圧力の1.0Kg/cm2 G は、前
実施例と同様に、ブラインの凍結温度に基づいて設定さ
れており、ポンプダウン運転時にブライン側熱交換器(1
2)の冷媒が回収できるようにしている。その上、上記水
側熱交換器(11)には、冷媒が残存していないので、この
第2実行手段(47)によって水側熱交換器(11)が凍結する
ことはない。
Thereafter, in the same way as the operations from step ST121 to step ST125, at step ST126,
Upon receiving the detection signal of the low pressure sensor (LP), it is determined whether the low pressure, which is the suction pressure of the compressor (21), is 1.0 Kg / cm 2 G or less,
Step ST1 until the low pressure becomes 1.0 Kg / cm 2 G or less
Moving to 27, in step ST127, it is determined whether or not the timer Y has counted 3 minutes, the process returns to step ST126 until the timer Y counts 3 minutes, and the operations of step ST126 and step ST127 Will be repeated. Then, when the low pressure becomes 1.0 Kg / cm 2 G or less, or when the timer Y counts 3 minutes, it is considered that the low pressure corresponds to 1.0 Kg / cm 2 G, and the second executing means (47)
The pump down operation of is finished, and the process proceeds to step ST128. Then, this low pressure 1.0 Kg / cm 2 G is set based on the freezing temperature of the brine, as in the previous example, and the brine side heat exchanger (1
The refrigerant of 2) is designed to be recovered. Moreover, since no refrigerant remains in the water side heat exchanger (11), the water side heat exchanger (11) will not be frozen by the second execution means (47).

【0075】次いで、上記ステップST128において、圧
縮機(21)を停止すると共に、第3電磁弁(20RP)をオフ
し、タイマEをスタートした後、ステップST129に移
り、タイマEが3分をカウントしたか否かを判定し、圧
縮機(21)の待機時間である3分が経過するまで、このス
テップST129に待機して、この3分が経過すると、ステ
ップST130に移ることになる。 このステップST130に
おいて、上記低圧センサ(LP)の低圧圧力が2.5Kg/cm2 G
より大きくなったか否かを判定しており、該低圧圧力が
2.5Kg/cm2 G より大きくなるまでステップST130に待機
して、該低圧圧力が2.5Kg/cm2 G より大きくなるとステ
ップST131に移り、圧縮機(21)の容量を40%に設定して
起動させることになる。
Next, in step ST128, the compressor (21) is stopped, the third solenoid valve (20RP) is turned off, and the timer E is started. Then, the process proceeds to step ST129, and the timer E counts 3 minutes. It is determined whether or not it has been done, and it waits in this step ST129 until the waiting time of the compressor (21), 3 minutes, elapses, and when this 3 minutes elapses, it moves to step ST130. In this step ST130, the low pressure of the low pressure sensor (LP) is 2.5 kg / cm 2 G.
It is determined whether or not it has become larger, and the low pressure is
Stand by at step ST130 until it becomes larger than 2.5Kg / cm 2 G, and when the low pressure becomes larger than 2.5Kg / cm 2 G, move to step ST131 and set the capacity of the compressor (21) to 40% and start it. I will let you.

【0076】このステップST118からステップST131ま
でによってポンプダウン運転が終了することになり、該
ステップST131からステップST132に移り、前実施例に
おける図8の動作と同様に、ポンプダウン停止か否かを
判定する。そして、上記サーモ運転時における低圧圧力
の低下によるポンプダウン運転である場合には、ステッ
プST132からステップST133に移り、第1電磁弁(20RW)
をオンすると共に、ブラインポンプをオフする。その
後、圧縮機(21)の待機時間であるタイマFの3分が経過
すると、サーモ運転を行うことになり、このサーモ運転
時において、停止ボタンがオンされると、上記ステップ
ST118に移り、ポンプダウン運転が開始されることにな
る(ステップST134〜ステップST136参照)。一方、こ
のポンプダウン運転が終了すると、上記ステップST132
からステップST137に移り、ブラインポンプ及びウォー
タポンプをオフすると共に、圧縮機(21)を停止して空調
運転を終了することになる。
The pump down operation is completed by the steps ST118 to ST131, and the process moves from the step ST131 to the step ST132 to determine whether or not the pump down is stopped, as in the operation of FIG. 8 in the previous embodiment. To do. Then, in the case of the pump down operation due to the decrease in the low pressure during the thermo operation, the process proceeds from step ST132 to step ST133, and the first solenoid valve (20RW)
Is turned on and the brine pump is turned off. After that, when 3 minutes of the timer F, which is the waiting time of the compressor (21), elapses, the thermostat operation is performed. When the stop button is turned on during the thermostat operation, the process proceeds to step ST118, and the pump is operated. The down operation is started (see steps ST134 to ST136). On the other hand, when the pump down operation is completed, the above step ST132
From Step ST137, the brine pump and the water pump are turned off, the compressor (21) is stopped, and the air conditioning operation is ended.

【0077】図15及び図16は、ブライン側熱交換器
(12)におけるブライン冷却運転時、つまり、蓄熱運転時
のポンプダウン運転を示しており、スタートしてステッ
プST145では、図9におけるステップST45までと同様に
動作し、先ず、圧縮機(21)をオフ状態にすると共に、図
示しないウォータポンプ及びブラインポンプをオフ状態
にし、且つ第1電磁弁(20RW)、第2電磁弁(20RB)及び第
3電磁弁(20RP)をオフ状態にする(ステップST141参
照)。
15 and 16 show the brine side heat exchanger.
It shows the pump down operation in the brine cooling operation in (12), that is, in the heat storage operation. In step ST145, the operation is the same as that up to step ST45 in FIG. 9, and the compressor (21) is first operated. The water pump and the brine pump (not shown) are turned off, and the first solenoid valve (20RW), the second solenoid valve (20RB), and the third solenoid valve (20RP) are turned off (step ST141). reference).

【0078】その後、選択スイッチを操作してブライン
側熱交換器(12)を選択し、運転ボタンをオンすると、圧
縮機(21)の容量を12%に設定すると共に、ウォータポン
プ及びブラインポンプをオンし、第1電磁弁(20RW)及び
第2電磁弁(20RB)をオフ状態のままでポンプダウン運転
を開始する(ステップST142〜ステップST144参照)。
そして、タイマAが30秒をカウントすると、ステップS
T145からステップST146に移り、ポンプダウン起動か否
かを判定する。
After that, when the selection switch is operated to select the brine side heat exchanger (12) and the operation button is turned on, the capacity of the compressor (21) is set to 12%, and the water pump and the brine pump are turned on. When turned on, the pump down operation is started with the first solenoid valve (20RW) and the second solenoid valve (20RB) kept in the off state (see steps ST142 to ST144).
When timer A counts 30 seconds, step S
The process moves from T145 to step ST146, and it is determined whether or not the pump down is activated.

【0079】このポンプダウン運転制御は、本発明の特
徴とするところであって、該ポンプダウン運転は、運転
の起動時の他、運転停止時などにおいても行われる。そ
こで、このポンプダウン運転について説明する。このポ
ンプダウン運転は、上述した水冷却運転時と同様であっ
て、第1実行手段(46)と第2実行手段(47)とを行う。
This pump down operation control is a feature of the present invention, and the pump down operation is performed not only when the operation is started but also when the operation is stopped. Therefore, this pump down operation will be described. This pump down operation is similar to the above-described water cooling operation, and the first execution means (46) and the second execution means (47) are performed.

【0080】該ポンプダウン運転は、ステップST147に
おいて、上記ステップST146のポンプダウン信号を受け
ると、高圧制御手段(44)が、ポンプダウン信号の出力時
の状態から熱源側のファン(22)の回転数のみを低下させ
る。その後、高圧圧力センサ(HP)の検出する高圧圧力が
20Kg/cm2 G 以上か否かを判定し、該高圧圧力が 20Kg/
cm2 G になると、ポンプダウン開始手段(45)が第1電磁
弁(20RW)及び第2電磁弁(20RB)をオフすると共に、第3
電磁弁(20RP)をオンして開始信号を出力する(ステップ
ST148〜ステップST149参照)。つまり、ポンプダウン
運転を開始する際、上記水冷却運転時と同様に高圧圧力
を一旦上昇させた後、圧縮機(21)の容量を40%に設定
し、第2電磁弁(20RB)をオフし、ウォータポンプをオン
する一方、第3電磁弁(20RP)をオンしてガス通路(27)を
連通させ、タイマPのカウントを開始する。この際、現
在、第1電磁弁(20RW)は既にオフし、ブラインポンプは
オンしている。
In the pump down operation, when the pump down signal of step ST146 is received in step ST147, the high pressure control means (44) rotates the fan (22) on the heat source side from the state when the pump down signal is output. Only reduce the number. After that, the high pressure detected by the high pressure sensor (HP)
It is judged whether the pressure is 20 Kg / cm 2 G or more, and the high pressure is 20 Kg / cm 2.
At cm 2 G, the pump down starting means (45) turns off the first solenoid valve (20RW) and the second solenoid valve (20RB), and the third
The solenoid valve (20RP) is turned on and a start signal is output (see steps ST148 to ST149). In other words, when starting the pump down operation, after raising the high pressure once as in the water cooling operation, set the capacity of the compressor (21) to 40% and turn off the second solenoid valve (20RB). Then, while turning on the water pump, the third solenoid valve (20RP) is turned on to communicate the gas passage (27), and the timer P starts counting. At this time, at present, the first solenoid valve (20RW) is already off and the brine pump is on.

【0081】その後、最初に第1実行手段(46)がポンプ
ダウン運転を行い、圧縮機(21)を駆動した状態におい
て、低圧センサ(LP)の検出信号を受けて圧縮機(21)の吸
込圧力である低圧圧力が2.5Kg/cm2 G 以下か否かを判定
する。そして、上記低圧圧力が2.5Kg/cm2 G 以下になる
か、又は、タイマPが3分をカウントすると、上記低圧
圧力が2.5Kg/cm2 G に相当したとして第1実行手段(46)
のポンプダウン運転が終了することになる(ステップS
T150〜ステップST152参照)。
Thereafter, the first executing means (46) first performs the pump down operation to drive the compressor (21), and in response to the detection signal of the low pressure sensor (LP), the suction of the compressor (21) is received. Determine whether the low pressure, which is the pressure, is 2.5 Kg / cm 2 G or less. Then, when the low pressure becomes 2.5 kg / cm 2 G or less, or when the timer P counts 3 minutes, it is determined that the low pressure corresponds to 2.5 kg / cm 2 G, and the first executing means (46)
The pump down operation of is ended (step S
See T150 to step ST152).

【0082】続いて、上記第2実行手段(47)のポンプダ
ウン運転が開始され、圧縮機(21)を停止すると共に、一
旦第3電磁弁(20RP)をオフし、タイマDをスタートさ
せ、圧縮機(21)の待機時間である3分が経過すると、圧
縮機(21)の容量を40%に設定し、再度第3電磁弁(20RP)
をオンしてガス通路(27)を連通させ、タイマQのカウン
トを開始する(ステップST153〜ステップST154参
照)。
Then, the pump down operation of the second executing means (47) is started, the compressor (21) is stopped, the third electromagnetic valve (20RP) is once turned off, and the timer D is started. After 3 minutes, which is the waiting time of the compressor (21), the capacity of the compressor (21) is set to 40% and the third solenoid valve (20RP) is set again.
Is turned on to connect the gas passage (27) to start counting of the timer Q (see steps ST153 to ST154).

【0083】その後、上記低圧センサ(LP)の検出信号を
受けて圧縮機(21)の吸込圧力である低圧圧力が1.0Kg/cm
2 G 以下か否かを判定し、該低圧圧力が1.0Kg/cm2 G 以
下になるまで、上記タイマQが3分をカウントしたか否
かを判定する。そして、上記低圧圧力が1.0Kg/cm2 G 以
下になるか、又は、タイマQが3分をカウントすると、
上記低圧圧力が1.0Kg/cm2 G に相当したとして第2実行
手段(47)のポンプダウン運転が終了することになる(ス
テップST155〜ステップST156参照)。
After that, the low pressure pressure which is the suction pressure of the compressor (21) is 1.0 kg / cm upon receiving the detection signal of the low pressure sensor (LP).
It is determined whether or not it is 2 G or less, and it is determined whether or not the timer Q has counted 3 minutes until the low pressure becomes 1.0 Kg / cm 2 G or less. Then, when the low pressure becomes 1.0 kg / cm 2 G or less, or when the timer Q counts 3 minutes,
The pump-down operation of the second executing means (47) is terminated assuming that the low pressure is equivalent to 1.0 kg / cm 2 G (see steps ST155 to ST156).

【0084】次いで、上記圧縮機(21)を停止すると共
に、第3電磁弁(20RP)をオフし、タイマEをスタート
し、圧縮機(21)の待機時間である3分が経過すると、ポ
ンプダウン停止か否かを判定する(ステップST157〜ス
テップST158参照)。そして、上記運転起動時である場
合には、サーモ運転を開始すべく圧縮機(21)を起動する
と共に、第2電磁弁(20RB)をオンする(ステップST159
参照)。また、このサーモ運転時において、停止ボタン
がオンされると、上記ステップST146に移り、ポンプダ
ウン運転が開始される一方、このポンプダウン運転が終
了すると、ブラインポンプ及びウォータポンプをオフす
ると共に、圧縮機(21)を停止して空調運転を終了するこ
とになる(ステップST159〜ステップST162参照)。
Next, the compressor (21) is stopped, the third solenoid valve (20RP) is turned off, the timer E is started, and when the waiting time of the compressor (21) of 3 minutes has elapsed, the pump is stopped. It is determined whether or not the down is stopped (see steps ST157 to ST158). Then, when the operation is started, the compressor (21) is started to start the thermo-operation, and the second solenoid valve (20RB) is turned on (step ST159).
reference). When the stop button is turned on during the thermostat operation, the process proceeds to step ST146 to start the pump down operation, while when the pump down operation ends, the brine pump and the water pump are turned off and the compression is performed. The machine (21) is stopped to end the air conditioning operation (see steps ST159 to ST162).

【0085】従って、上記実施例によれば、ポンプダウ
ン運転の開始時に高圧制御手段(44)によってファン(22)
の回転数を低下するようにしたために、主冷媒回路(2)
の高圧圧力を一旦上昇させるので、冷媒を液溜め部(24)
に回収し易くなり、また、ガス通路(27)を設けることに
より、低圧圧力の低下を遅延させることができ、ポンプ
ダウン運転時間を長くすることができる。この結果、各
利用側熱交換器(11, 12)内の冷媒を確実に回収すること
ができることから、ポンプダウン運転を確実に行うこと
ができる。特に、上記低圧圧力によってポンプダウン運
転を終了するようにしている場合、該ポンプダウン運転
時間を確実に長くすることができ、確実な冷媒回収を行
うことができる。また、第1実行手段(46)によって第1
低圧圧力に基づいてポンプダウン運転を行ったのち、第
2実行手段(47)が第2低圧圧力に基づいてポンプダウン
運転を行うようにしたために、凍結温度の高い水が凍結
することなく、その上、凍結温度の低いブラインを冷却
するブライン側熱交換器(12)の冷媒をも確実に回収する
ことができる。
Therefore, according to the above embodiment, the fan (22) is controlled by the high pressure control means (44) at the start of the pump down operation.
Since the number of rotations of the main refrigerant circuit (2)
Since the high pressure of is temporarily increased, the refrigerant is stored in the liquid reservoir (24).
Moreover, by providing the gas passageway (27), it is possible to delay the drop of the low pressure and delay the pump down operation time. As a result, the refrigerant in each of the use side heat exchangers (11, 12) can be reliably recovered, so that the pump down operation can be reliably performed. In particular, when the pump down operation is terminated by the low pressure, the pump down operation time can be surely lengthened, and reliable refrigerant recovery can be performed. In addition, the first execution means (46) makes the first
After performing the pump down operation based on the low pressure, the second executing means (47) performs the pump down operation based on the second low pressure, so that the water having a high freezing temperature does not freeze, In addition, the refrigerant in the brine side heat exchanger (12) that cools the brine having a low freezing temperature can be reliably recovered.

【0086】尚、上記実施例においては、水とブライン
とを冷却するようにしたが、本発明は、凍結温度が異な
る2種類の被冷却媒体を冷却するものであればよい。ま
た、本実施例において、各膨脹機構(2a, 2b)は、電磁弁
(20RW, 20RB)と膨脹弁(25, 31)とを用いたが、本発明
は、開閉手段と膨脹機構との機能を有する1つの電動膨
脹弁を用いてもよい。また、液溜め部は、受液器(24)に
限られるものではない。また、請求項1に係る発明は、
1つの利用側熱交換器を有するものにも適用することが
できることは勿論である。
Although water and brine are cooled in the above embodiment, the present invention is only required to cool two types of cooled media having different freezing temperatures. Further, in this embodiment, each expansion mechanism (2a, 2b) is a solenoid valve.
Although (20RW, 20RB) and the expansion valve (25, 31) are used, one electric expansion valve having the functions of the opening / closing means and the expansion mechanism may be used in the present invention. Further, the liquid reservoir is not limited to the liquid receiver (24). The invention according to claim 1 is
Needless to say, the present invention can be applied to one having one utilization side heat exchanger.

【図面の簡単な説明】[Brief description of drawings]

【図1】請求項1に係る発明の構成を示すブロック図で
ある。
FIG. 1 is a block diagram showing a configuration of an invention according to claim 1.

【図2】請求項2に係る発明の構成を示すブロック図で
ある。
FIG. 2 is a block diagram showing a configuration of an invention according to claim 2;

【図3】請求項3及び4に係る発明の構成を示すブロッ
ク図である。
FIG. 3 is a block diagram showing a configuration of an invention according to claims 3 and 4.

【図4】空気調和装置の冷媒回路図である。FIG. 4 is a refrigerant circuit diagram of the air conditioner.

【図5】水冷却運転時のポンプダウン運転制御を示す制
御フロー図である。
FIG. 5 is a control flow chart showing pump down operation control during water cooling operation.

【図6】水冷却運転時のポンプダウン運転制御を示す制
御フロー図である。
FIG. 6 is a control flow chart showing pump down operation control during water cooling operation.

【図7】水冷却運転時のポンプダウン運転制御を示す制
御フロー図である。
FIG. 7 is a control flow diagram showing pump down operation control during water cooling operation.

【図8】水冷却運転時のポンプダウン運転制御を示す制
御フロー図である。
FIG. 8 is a control flow diagram showing pump down operation control during water cooling operation.

【図9】ブライン冷却運転時のポンプダウン運転制御を
示す制御フロー図である。
FIG. 9 is a control flow chart showing pump down operation control during brine cooling operation.

【図10】ブライン冷却運転時のポンプダウン運転制御
を示す制御フロー図である。
FIG. 10 is a control flow chart showing pump down operation control during brine cooling operation.

【図11】図11〜図16は、第2の実施例を示し、図
9は、水冷却運転時のポンプダウン運転制御を示す制御
フロー図である。
11 to 16 show a second embodiment, and FIG. 9 is a control flow chart showing pump down operation control during water cooling operation.

【図12】水冷却運転時のポンプダウン運転制御を示す
制御フロー図である。
FIG. 12 is a control flow chart showing pump down operation control during water cooling operation.

【図13】水冷却運転時のポンプダウン運転制御を示す
制御フロー図である。
FIG. 13 is a control flowchart showing pump down operation control during water cooling operation.

【図14】水冷却運転時のポンプダウン運転制御を示す
制御フロー図である。
FIG. 14 is a control flowchart showing pump down operation control during water cooling operation.

【図15】ブライン冷却運転時のポンプダウン運転制御
を示す制御フロー図である。
FIG. 15 is a control flow chart showing pump-down operation control during brine cooling operation.

【図16】ブライン冷却運転時のポンプダウン運転制御
を示す制御フロー図である。
FIG. 16 is a control flow chart showing pump down operation control during brine cooling operation.

【符号の説明】 1 空気調和装置 2 主冷媒回路 2a 第1膨脹機構 2b 第2膨脹機構 3 バイパス回路 11 水側熱交換器(利用側熱交換器) 12 ブライン側熱交換器(利用側熱交換器) 21 圧縮機 23 熱源側熱交換器 24 受液器(液溜め部) 25 第1膨脹弁 27 ガス通路 31 第2膨脹弁 41 ポンプダウン開始手段 42 第1ポンプダウン実行手段 42a,43a 初期駆動手段 42b,43b 停止手段 42c,43c 再起動手段 42d,43d 終了手段 43 第2ポンプダウン実行手段 44 高圧制御手段 45 ポンプダウン開始手段 46 第1実行手段 47 第2実行手段 20RW 第1電磁弁 20RW 第2電磁弁 20RP 第3電磁弁(開閉機構) HP 高圧センサ(高圧検出手段) LP 低圧センサ(低圧検出手段)[Description of symbols] 1 air conditioner 2 main refrigerant circuit 2a first expansion mechanism 2b second expansion mechanism 3 bypass circuit 11 water side heat exchanger (use side heat exchanger) 12 brine side heat exchanger (use side heat exchanger) 21 Compressor 23 Heat source side heat exchanger 24 Liquid receiver (reservoir part) 25 First expansion valve 27 Gas passage 31 Second expansion valve 41 Pump down start means 42 First pump down execution means 42a, 43a Initial drive Means 42b, 43b Stopping means 42c, 43c Restarting means 42d, 43d Ending means 43 Second pump down executing means 44 High pressure control means 45 Pump down starting means 46 First executing means 47 Second executing means 20RW First solenoid valve 20RW No. 2 Solenoid valve 20RP Third solenoid valve (Opening / closing mechanism) HP High pressure sensor (High pressure detection means) LP Low pressure sensor (Low pressure detection means)

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 圧縮機(21)と、回転数の可変なファン(2
2)が付設された熱源側熱交換器(23)と、全閉可能な膨脹
機構(2a)と、被冷却媒体を冷却する利用側熱交換器(11)
とが冷媒の流通可能に順に接続されて主冷媒回路(2) が
構成される一方、 上記熱源側熱交換器(23)を含む液溜め部(24)が上記主冷
媒回路(2) の液ラインに設けられ、 該液溜め部(24)のガス出口にはガス通路(27)が接続さ
れ、該ガス通路(27)は、開閉機構(20RP)が設けられると
共に、上記主冷媒回路(2) の低圧ガスラインに接続され
ている空気調和装置であって、 上記圧縮機(21)の吐出圧力を検出する高圧検出手段(HP)
と、 ポンプダウン運転を実行すべくポンプダウン信号を受け
ると、該ポンプダウン信号の出力時の状態から上記ファ
ン(22)の回転数を低下させる高圧制御手段(44)と、 該高圧制御手段(44)のファン制御後に上記高圧検出手段
(HP)の検出吐出圧力が所定圧力になると、上記膨脹機構
(2a)を全閉にすると共に、上記ガス通路(27)の開閉機構
(20RP)を開放し、上記圧縮機(21)を所定容量で駆動して
ポンプダウン運転を実行するポンプダウン実行手段(48)
とを備えていることを特徴とする空気調和装置の運転制
御装置。
1. A compressor (21) and a fan (2
2) attached to the heat source side heat exchanger (23), fully expandable expansion mechanism (2a), and use side heat exchanger (11) for cooling the medium to be cooled
The main refrigerant circuit (2) is formed by connecting and in order to allow the refrigerant to flow, while the liquid reservoir (24) including the heat source side heat exchanger (23) is connected to the main refrigerant circuit (2). A gas passage (27) is connected to the gas outlet of the liquid reservoir (24) provided in the line, and the gas passage (27) is provided with an opening / closing mechanism (20RP) and the main refrigerant circuit (2). ) Is an air conditioner connected to the low pressure gas line, and is a high pressure detecting means (HP) for detecting the discharge pressure of the compressor (21).
And a high pressure control means (44) for reducing the rotation speed of the fan (22) from the state at the time of outputting the pump down signal when receiving the pump down signal for executing the pump down operation, and the high pressure control means ( 44) After the fan control, the above high voltage detection means
When the discharge pressure detected by (HP) reaches the specified pressure, the expansion mechanism
(2a) is fully closed and the gas passage (27) opening / closing mechanism
(20RP) is opened, the pump down execution means (48) for executing the pump down operation by driving the compressor (21) with a predetermined capacity.
An operation control device for an air conditioner, comprising:
【請求項2】 圧縮機(21)と、回転数の可変なファン(2
2)が付設された熱源側熱交換器(23)と、全閉可能な第1
膨脹機構(2a)と、所定の凍結温度の第1被冷却媒体を冷
却する第1利用側熱交換器(11)とが冷媒の流通可能に順
に接続された主冷媒回路(2) と、 全閉可能な第2膨脹機構(2b)と、上記第1被冷却媒体よ
り凍結温度が低い第2被冷却媒体を冷却する第2利用側
熱交換器(12)とが冷媒の流通可能に上記第1膨脹機構(2
a)と第1利用側熱交換器(11)とに対して並列に接続され
たバイパス回路(3) と、 上記熱源側熱交換器(23)を含み、上記主冷媒回路(2) の
液ラインに設けられた液溜め部(24)と、 該液溜め部(24)のガス出口と上記主冷媒回路(2) の低圧
ガスラインとに接続されると共に、開閉機構(20RP)が設
けられているガス通路(27)とを備え、 上記両膨脹機構(2a, 2b)を開閉制御して上記第1利用側
熱交換器(11)と第2利用側熱交換器(12)との何れかに冷
媒を流通させるようにした空気調和装置であって、 上記圧縮機(21)の吸込圧力を検出する低圧検出手段(LP)
と、 上記圧縮機(21)の吐出圧力を検出する高圧検出手段(HP)
と、 ポンプダウン運転を実行すべくポンプダウン信号を受け
ると、該ポンプダウン信号の出力時の状態から上記ファ
ン(22)の回転数を低下させる高圧制御手段(44)と、 該高圧制御手段(44)のファン制御後に上記高圧検出手段
(HP)の検出吐出圧力が所定圧力になると、上記両膨脹機
構(2a, 2b)を閉鎖すると共に、上記ガス通路(27)の開閉
機構(20RP)を開放してポンプダウン運転の開始信号を出
力するポンプダウン開始手段(45)と、 該ポンプダウン開始手段(41)の開始信号を受けて圧縮機
(21)を所定容量で駆動すると共に、上記低圧検出手段(L
P)の検出吸込圧力が上記第1被冷却媒体の凍結温度に基
づく第1低圧圧力に相当するとポンプダウン運転を終了
する第1実行手段(46)と、 該第1実行手段(46)によるポンプダウン運転の終了後に
上記圧縮機(21)の待機時間が経過すると該圧縮機(21)を
所定容量で駆動すると共に、上記低圧検出手段(LP)の検
出吸込圧力が第1低圧圧力より低い第2低圧圧力に相当
するとポンプダウン運転を終了する第2実行手段(47)と
を備えていることを特徴とする空気調和装置の運転制御
装置。
2. A compressor (21) and a fan (2
2) is attached to the heat source side heat exchanger (23), and the first can be fully closed
A main refrigerant circuit (2) in which an expansion mechanism (2a) and a first usage-side heat exchanger (11) for cooling a first cooling medium having a predetermined freezing temperature are connected in sequence so that refrigerant can flow, The second expansion mechanism (2b) that can be closed and the second utilization side heat exchanger (12) that cools the second cooled medium whose freezing temperature is lower than the first cooled medium allow the refrigerant to flow therethrough. 1 expansion mechanism (2
a) and a first utilization side heat exchanger (11), a bypass circuit (3) connected in parallel, and a heat source side heat exchanger (23), and a liquid of the main refrigerant circuit (2). The liquid reservoir (24) provided in the line, the gas outlet of the liquid reservoir (24) and the low pressure gas line of the main refrigerant circuit (2) are connected, and an opening / closing mechanism (20RP) is provided. And a gas passage (27) that is installed in the first utilization side heat exchanger (11) and the second utilization side heat exchanger (12) by controlling the opening and closing of the expansion mechanisms (2a, 2b). An air conditioner adapted to circulate a refrigerant to a low pressure detecting means (LP) for detecting the suction pressure of the compressor (21).
And a high pressure detection means (HP) for detecting the discharge pressure of the compressor (21)
And a high pressure control means (44) for reducing the rotation speed of the fan (22) from the state at the time of outputting the pump down signal when receiving the pump down signal for executing the pump down operation, and the high pressure control means ( 44) After the fan control, the above high voltage detection means
When the detected discharge pressure of (HP) reaches a predetermined pressure, both the expansion mechanisms (2a, 2b) are closed, and the opening / closing mechanism (20RP) of the gas passage (27) is opened to give a start signal for pump down operation. A pump down start means (45) for outputting and a compressor upon receiving a start signal from the pump down start means (41).
(21) is driven with a predetermined capacity, and the low pressure detection means (L
A first execution means (46) for ending the pump down operation when the detected suction pressure of (P) corresponds to the first low pressure based on the freezing temperature of the first cooled medium, and a pump by the first execution means (46). When the waiting time of the compressor (21) elapses after the end of the down operation, the compressor (21) is driven at a predetermined capacity, and the suction pressure detected by the low pressure detecting means (LP) is lower than the first low pressure pressure. An operation control device for an air conditioner, comprising: a second execution means (47) for terminating the pump-down operation when the pressure is equivalent to 2 low pressures.
【請求項3】 圧縮機(21)と、熱源側熱交換器(23)と、
全閉可能な第1膨脹機構(2a)と、所定の凍結温度の第1
被冷却媒体を冷却する第1利用側熱交換器(11)とが冷媒
の流通可能に順に接続された主冷媒回路(2) と、 全閉可能な第2膨脹機構(2b)と、上記第1被冷却媒体よ
り凍結温度が低い第2被冷却媒体を冷却する第2利用側
熱交換器(12)とが冷媒の流通可能に上記第1膨脹機構(2
a)と第1利用側熱交換器(11)とに対して並列に接続され
たバイパス回路(3) と、 上記熱源側熱交換器(23)を含み、上記主冷媒回路(2) の
液ラインに設けられた液溜め部(24)とを備え、 上記両膨脹機構(2a, 2b)を開閉制御して上記第1利用側
熱交換器(11)と第2利用側熱交換器(12)との何れかに冷
媒を流通させるようにした空気調和装置であって、 上記圧縮機(21)の吸込圧力を検出する低圧検出手段(LP)
と、 上記両膨脹機構(2a, 2b)を閉鎖してポンプダウン運転の
開始信号を出力するポンプダウン開始手段(41)と、 該ポンプダウン開始手段(41)の開始信号を受けて圧縮機
(21)を所定容量で駆動すると共に、上記低圧検出手段(L
P)の検出吸込圧力が上記第1被冷却媒体の凍結温度に基
づく第1低圧圧力になるとポンプダウン運転を終了する
第1ポンプダウン実行手段(42)と、 該第1ポンプダウン実行手段(42)によるポンプダウン運
転の終了後に上記圧縮機(21)の待機時間が経過すると該
圧縮機(21)を所定容量で駆動すると共に、上記低圧検出
手段(LP)の検出吸込圧力が第1低圧圧力より低い第2低
圧圧力になるとポンプダウン運転を終了する第2ポンプ
ダウン実行手段(43)とを備えていることを特徴とする空
気調和装置の運転制御装置。
3. A compressor (21), a heat source side heat exchanger (23),
The first expansion mechanism (2a) that can be fully closed, and the first expansion mechanism with a predetermined freezing temperature
A main refrigerant circuit (2) in which a first use-side heat exchanger (11) for cooling the medium to be cooled is connected in sequence so that the refrigerant can flow, a second expansion mechanism (2b) that can be fully closed, The first expansion mechanism (2) allows the refrigerant to flow to and from the second utilization side heat exchanger (12) that cools the second cooled medium whose freezing temperature is lower than that of the first cooled medium.
a) and a first utilization side heat exchanger (11), a bypass circuit (3) connected in parallel, and a heat source side heat exchanger (23), and a liquid of the main refrigerant circuit (2). A liquid reservoir (24) provided in the line, and controlling opening and closing of the expansion mechanisms (2a, 2b) to control the first and second heat exchangers (11) and (12). ) And an air conditioner that allows the refrigerant to flow through any one of, and low pressure detection means (LP) for detecting the suction pressure of the compressor (21).
A pump down start means (41) for closing the expansion mechanisms (2a, 2b) and outputting a start signal for pump down operation; and a compressor receiving the start signal from the pump down start means (41).
(21) is driven with a predetermined capacity, and the low pressure detection means (L
A first pump down execution means (42) for ending the pump down operation when the detected suction pressure of (P) becomes the first low pressure based on the freezing temperature of the first cooled medium, and the first pump down execution means (42) When the waiting time of the compressor (21) elapses after the pump down operation by (1) is finished, the compressor (21) is driven at a predetermined capacity, and the suction pressure detected by the low pressure detecting means (LP) is the first low pressure pressure. An operation control device for an air conditioner, comprising: a second pump down execution means (43) for ending the pump down operation when the second lower pressure becomes lower.
【請求項4】 請求項3記載の空気調和装置の運転制御
装置において、第1ポンプダウン実行手段(42)は、ポン
プダウン開始手段(41)の開始信号を受けて圧縮機(21)を
駆動する初期駆動手段(42a) と、低圧検出手段(LP)の検
出吸込圧力が第1低圧圧力になると圧縮機(21)を停止さ
せる停止手段(42b) と、上記低圧検出手段(LP)の検出吸
込圧力が所定の起動圧力なると圧縮機(21)を起動させる
再起動手段(42c) と、圧縮機(21)の駆動回数が所定回数
になるとポンプダウン運転を終了させる終了手段(42d)
とより構成される一方、 第2ポンプダウン実行手段(43)は、上記第1ポンプダウ
ン実行手段(42)によるポンプダウン運転の終了後に圧縮
機(21)の待機時間が経過すると該圧縮機(21)を駆動する
初期駆動手段(43a) と、低圧検出手段(LP)の検出吸込圧
力が第2低圧圧力になると圧縮機(21)を停止させる停止
手段(43b) と、上記低圧検出手段(LP)の検出吸込圧力が
所定の起動圧力なると圧縮機(21)を起動させる再起動手
段(43c)と、圧縮機(21)の駆動回数が所定回数になると
ポンプダウン運転を終了させる終了手段(43d) とより構
成されていることを特徴とする空気調和装置の運転制御
装置。
4. The operation control device for an air conditioner according to claim 3, wherein the first pump down execution means (42) drives the compressor (21) in response to a start signal from the pump down start means (41). The initial drive means (42a), the low pressure detection means (LP), and the stop means (42b) that stops the compressor (21) when the suction pressure reaches the first low pressure, and the low pressure detection means (LP). Restarting means (42c) for starting the compressor (21) when the suction pressure reaches a predetermined starting pressure, and ending means (42d) for ending the pump down operation when the number of times the compressor (21) is driven reaches a predetermined number of times.
On the other hand, the second pump down execution means (43) is configured such that when the waiting time of the compressor (21) elapses after the pump down operation by the first pump down execution means (42) is finished, 21) for driving the initial drive means (43a), a stop means (43b) for stopping the compressor (21) when the detected suction pressure of the low pressure detection means (LP) becomes the second low pressure pressure, and the low pressure detection means ( (LP) restarting means (43c) for starting the compressor (21) when the suction pressure detected reaches a predetermined starting pressure, and ending means for ending the pump down operation when the number of times the compressor (21) is driven reaches a predetermined number of times. 43d) An air conditioner operation control device comprising:
JP4174315A 1992-02-04 1992-07-01 Operation control device for air conditioner Expired - Fee Related JP2760219B2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP4-19053 1992-02-04
JP1905392 1992-02-04

Publications (2)

Publication Number Publication Date
JPH05280812A true JPH05280812A (en) 1993-10-29
JP2760219B2 JP2760219B2 (en) 1998-05-28

Family

ID=11988690

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4174315A Expired - Fee Related JP2760219B2 (en) 1992-02-04 1992-07-01 Operation control device for air conditioner

Country Status (1)

Country Link
JP (1) JP2760219B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2853957A1 (en) * 2003-02-24 2004-10-22 Denso Corp REFRIGERATION CYCLE SYSTEM
JP2005321194A (en) * 2005-08-01 2005-11-17 Daikin Ind Ltd Air conditioner
JP2009133623A (en) * 2009-03-23 2009-06-18 Daikin Ind Ltd Refrigerating device
WO2009151087A1 (en) * 2008-06-13 2009-12-17 三菱重工業株式会社 Refrigeration device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2853957A1 (en) * 2003-02-24 2004-10-22 Denso Corp REFRIGERATION CYCLE SYSTEM
JP2005321194A (en) * 2005-08-01 2005-11-17 Daikin Ind Ltd Air conditioner
WO2009151087A1 (en) * 2008-06-13 2009-12-17 三菱重工業株式会社 Refrigeration device
JP2009300009A (en) * 2008-06-13 2009-12-24 Mitsubishi Heavy Ind Ltd Refrigerating device
EP2302309A4 (en) * 2008-06-13 2017-06-21 Mitsubishi Heavy Industries, Ltd. Refrigeration device
JP2009133623A (en) * 2009-03-23 2009-06-18 Daikin Ind Ltd Refrigerating device

Also Published As

Publication number Publication date
JP2760219B2 (en) 1998-05-28

Similar Documents

Publication Publication Date Title
EP1598610B1 (en) Apparatus and method for controlling heating operation in heat pump system
JPH07120121A (en) Drive controller for air conditioner
US7730729B2 (en) Refrigerating machine
WO2003085332A1 (en) Refrigerator
JPH079331B2 (en) Operation control method for heat pump type air conditioner
JP3341404B2 (en) Operation control device for air conditioner
JP2760219B2 (en) Operation control device for air conditioner
JP4167083B2 (en) Air conditioner and method for controlling defrost of air conditioner
JP2003172560A (en) Air-conditioner
JP4269476B2 (en) Refrigeration equipment
JPH05312428A (en) Operation controller for air conditioner
JP3742925B2 (en) Refrigeration equipment
JP3092601B2 (en) Binary refrigeration equipment
EP0077414B1 (en) Air temperature conditioning system
JP3114618B2 (en) Ice storage device
JP3341495B2 (en) Operation control device for air conditioner
JPH09243211A (en) Control method of air conditioner
JPH09222271A (en) Refrigerator
JP3063746B2 (en) Refrigeration equipment
JPH048704B2 (en)
JPH0526543A (en) Refrigerating plant
JPH0579901B2 (en)
JP2669069B2 (en) Heating and cooling machine
JP3684719B2 (en) Heating and cooling machine
JPH0772647B2 (en) Pressure equalizer for air conditioner

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19980217

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080320

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090320

Year of fee payment: 11

LAPS Cancellation because of no payment of annual fees