JPH0525927A - Assembling and disassembling of prefabricated scaffolding - Google Patents

Assembling and disassembling of prefabricated scaffolding

Info

Publication number
JPH0525927A
JPH0525927A JP18238191A JP18238191A JPH0525927A JP H0525927 A JPH0525927 A JP H0525927A JP 18238191 A JP18238191 A JP 18238191A JP 18238191 A JP18238191 A JP 18238191A JP H0525927 A JPH0525927 A JP H0525927A
Authority
JP
Japan
Prior art keywords
frame
floor
building
ground
assembling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP18238191A
Other languages
Japanese (ja)
Inventor
Yuko Nomura
裕晧 野村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP18238191A priority Critical patent/JPH0525927A/en
Publication of JPH0525927A publication Critical patent/JPH0525927A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PURPOSE:To improve safety of assembling work and to save labor by enabling assembling and disassembling of a prefabricated scaffolding on the ground. CONSTITUTION:A plurality of parallel standards 4 are connected one by one by a brace 5 and a ledger 6 or a scaffold board to assemble a floor A. To increase the floor A upward, a standard 4 is added to the lower end of the standard 4 in the state of being hung by a crane, and a lower floor A is assembled. By repeating this one by one, assembling work can be conducted on the ground without requiring work at a high position, which enables improvement in safety and labor saving. Also, in disassembling a prefabricated scaffolding, the whole body is hung by the crane, the lower floor is disassembled in the state of floating above the ground, and lowering of the prefabricated scaffolding and disassembling of the lower floor are repeated.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、建築物の作業足場と
なる枠組足場を組立てる工法及び解体工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction method and a dismantling construction method for assembling a frame scaffold which is a working scaffold for a building.

【0002】[0002]

【従来の技術】建築物の作業足場として構築される枠組
足場は、並列する複数に建枠をブレースと布枠又は歩み
板で結合して階床を組み立て、この階床を複数段積み重
ねることにより所定の高さに構築するものである。
2. Description of the Related Art A frame scaffold constructed as a work scaffold for a building is constructed by connecting a plurality of building frames in parallel with a brace and a cloth frame or a step board to assemble a floor, and stacking the floors in plural stages. It is constructed at a predetermined height.

【0003】従来、上記のような枠組足場を組立てるに
は、先ず地上において最下位の階床を組み立て、次に各
資材を階床上に持上げて上階の階床を組立て、これを上
方に順次繰返しながら所望の高さに組立てるものであ
る。
Conventionally, in order to assemble the above-mentioned frame scaffolding, first, the lowest floor on the ground is assembled, then each material is lifted onto the floor to assemble the upper floor, and this is sequentially arranged upward. It is repeatedly assembled to a desired height.

【0004】また、構築後の枠組足場を解体するには、
最上位の階床から順に解体を行ない、各資材を地上へ降
すことによって行なうものである。
In addition, in order to dismantle the frame scaffold after construction,
This is done by dismantling the highest floor in order and dropping each material to the ground.

【0005】[0005]

【発明が解決しようとする課題】ところで、上記した従
来の組立方法は、組立てが上方に進むに従って各資材を
持上げなければならず、しかも組立が高所作業となるた
め、作業能率が極めて悪く、手間と時間がかかると共
に、危険をともなうという問題がある。
By the way, in the above-mentioned conventional assembling method, each material has to be lifted as the assembling progresses upward, and the assembling requires high work, resulting in extremely poor work efficiency. There is a problem that it takes time and labor and is dangerous.

【0006】また、従来の解体方法は、上部階床から解
体して行くため、各資材をクレーンで地下に降さなけれ
ばならず、解体が高所作業となるため、作業化に手間と
時間がかかり危険をともなうという問題がある。
Further, in the conventional dismantling method, since the dismantling is performed from the upper floor, it is necessary to drop each material to the basement with a crane, and dismantling requires work at a high place. There is a problem that it is overloaded and dangerous.

【0007】そこで、この発明は、安全に能率よく枠組
足場を構築することができる組立工法と、枠組足場を安
全に能率よく解体できる解体工法を提供することを課題
としている。
[0007] Therefore, an object of the present invention is to provide an assembly method capable of safely and efficiently constructing a frame scaffold and a dismantling method capable of safely and efficiently disassembling the frame scaffold.

【0008】[0008]

【課題を解決するための手段】上記のような課題を解決
するため、第1の発明は、並列する複数の建枠をブレー
スと布枠又は歩み板で順次結合して枠組足場の階床を組
み立て、増床時にこれをクレーンで吊り上げ保持した状
態で各建枠の下に建枠を継ぎ足して下位の階床を組み立
て、これを繰り返して階床を増やして行く方法を採用し
たものである。
In order to solve the above problems, a first aspect of the present invention relates to a floor of a frame scaffold by sequentially connecting a plurality of parallel construction frames with a brace and a cloth frame or a step board. When assembling and expanding the floor, it is lifted by a crane and held to add a building frame under each building frame to assemble a lower floor, and this is repeated to increase the floors.

【0009】同じく第2の発明は、並列する複数の建枠
をブレースと布枠又は歩み板で順次結合して階床を組
み、これを複数段積み重ねて構築した枠組足場の解体に
際し、枠組足場をクレーンで吊り上げ保持した状態で下
位の階床から順に解体する方法を採用したものである。
Similarly, a second aspect of the invention is to dispose a frame scaffold constructed by stacking a plurality of stages in parallel by connecting a plurality of parallel construction frames with a brace and a cloth frame or a step board and stacking the floors. It is a method of dismantling the lower floors in order with the cranes being lifted and held by a crane.

【0010】[0010]

【作用】[Action]

第1の発明 地上において、並列配置した建枠をブレースと布枠又は
歩み板で順次結合して階床を組み立て、階床を上方に増
やすには、地上の階床をクレーンで吊り上げて保持し、
各建枠の下端に建枠の上端を接続して継ぎ足すと共に、
隣接する建枠をブレースと布枠又は歩み板で結合して階
床を組立て、全体を地上に下せば一階床分が増えた枠組
足場となる。
1st Invention On the ground, assembling the floors by sequentially connecting the building frames arranged in parallel with the brace and the cloth frame or the step board, and in order to increase the floors upward, the floors on the ground are lifted and held by a crane. ,
While connecting the upper end of the building frame to the lower end of each building frame and adding it,
If the floors are assembled by connecting adjacent building frames with braces and cloth frames or walking boards, and the whole floor is put on the ground, it becomes a frame scaffolding with an increase of one floor.

【0011】このように、クレーンによる枠組足場の吊
り上げと、建枠下端に対する建枠の継ぎ足しによる階床
の組立てにより、階床の増加を枠組足場の下から行な
え、これによって組立作業が地上において行なえること
になり、資材の持上げや高所作業の必要をなくし、作業
の能率と安全性を向上させる。
As described above, the floors can be increased from below the frame scaffolds by lifting the frame scaffolds by the crane and assembling the floors by adding the building frames to the lower ends of the building frames, whereby the assembling work can be performed on the ground. This eliminates the need to lift materials and work in high places, improving work efficiency and safety.

【0012】第2の発明 地上に構築した枠組足場の解体に際し、枠組足場全体を
クレーンで吊り上げて地上から浮かし、最下位階床を解
体する。
Second invention When dismantling the frame scaffold constructed on the ground, the entire frame scaffold is lifted by a crane and floated from the ground to dismantle the lowest floor.

【0013】この後、枠組足場全体を階床の高さ分だけ
下し、下位階床を解体し、これを繰返して行なうことに
より、解体作業が地上において行なえ、高所作業をなく
して安全性と能率を向上させる。
After that, the entire frame scaffolding is lowered by the height of the floor, the lower floors are dismantled, and this is repeated, so that dismantling work can be performed on the ground and safety is avoided by eliminating work at high places. And improve efficiency.

【0014】[0014]

【実施例】以下、この発明の実施例を添付図面に基づい
て説明する。
Embodiments of the present invention will be described below with reference to the accompanying drawings.

【0015】図1と図2のように、枠組足場1は、一対
の縦柱2、2の上部を横桟3で結合した門型や鳥居型に
形成されたパイプ製の建枠4と、対向状に並列する建枠
4の縦柱2を互に連結するブレース5と、対向する建枠
4の横桟3間に架設する布枠6又は歩み板と、上下の建
枠4を互に連結するジョイント7とを用いて組立てられ
ることになる。
As shown in FIGS. 1 and 2, the frame scaffold 1 comprises a pipe-shaped building frame 4 formed in a gate type or a torii type in which the upper portions of a pair of vertical columns 2 and 2 are connected by a horizontal crosspiece 3, The brace 5 connecting the vertical columns 2 of the building frames 4 arranged in parallel to each other, the cloth frame 6 or the walking board laid between the horizontal rails 3 of the facing building frame 4, and the upper and lower building frames 4 to each other. It will be assembled using the connecting joint 7.

【0016】上記建枠4を対向状に起立させ、これをブ
レース5と布枠6又は歩み板で結合することによって階
床Aが形成され、建枠4の数を選ぶことにより、平面的
に必要な長さの階床Aを得ることができる。
A floor A is formed by erecting the building frames 4 so as to face each other and connecting them with the braces 5 and the cloth frames 6 or step plates. The floor A of the required length can be obtained.

【0017】上記建枠4には図3のように、両縦柱2、
2の上端にジョイント7が固定され、このジョイント7
の上半部を上位建枠の下端に挿入して結合することによ
り、上下の建枠4を互に接続することができるようにな
っている。
As shown in FIG. 3, both the vertical columns 2,
A joint 7 is fixed to the upper end of 2, and the joint 7
The upper and lower building frames 4 can be connected to each other by inserting the upper half part of the upper building frame into the lower end of the upper building frame and connecting them.

【0018】ジョイント7は図4に示すように、縦柱2
が外嵌する接続パイプ8の中間部外周面に縦柱2の端部
を受ける突条9を周設すると共に、接続パイプ8の内部
にロックユニット10を収納して形成され、接続パイプ
8は縦柱2の上端に下半部を嵌合し、その下端を径方向
に貫通するピン11によって縦柱2に固定されている。
The joint 7 is, as shown in FIG.
Is formed by accommodating the lock unit 10 inside the connection pipe 8 while surrounding the projection 9 for receiving the end of the vertical column 2 on the outer peripheral surface of the intermediate portion of the connection pipe 8 to which the connection pipe 8 is fitted. The lower half part is fitted to the upper end of the vertical column 2, and the lower end is fixed to the vertical column 2 by a pin 11 penetrating in the radial direction.

【0019】上記ロックユニット10は、上下に長い帯
板状に形成した本体12と、この本体12の表面側で上
端に突設した結合金属ピン13と、本体12の表面側で
中間部の位置に突設した操作ボタン14と、本体12の
背面側に取付けたばね15とで構成され、接続パイプ8
には、突条9の部分に操作ボタン14の嵌合孔16と、
上部外周面に金属結合ピン13の貫通孔17とが設けら
れている。
The lock unit 10 has a main body 12 formed in the shape of a vertically long strip, a coupling metal pin 13 protruding from the upper surface of the main body 12 at the upper end, and an intermediate position on the front surface of the main body 12. It is composed of an operation button 14 projecting on the rear side and a spring 15 attached to the back side of the main body 12,
Includes a fitting hole 16 for the operation button 14 in the protrusion 9.
A through hole 17 for the metal connecting pin 13 is provided on the outer peripheral surface of the upper portion.

【0020】また、縦柱2の下端側には、接続パイプ8
の上半部に外嵌挿したとき、貫通孔17と対応する位置
に金属結合ピン13が嵌合する結合孔18が設けられて
いる。
On the lower end side of the vertical column 2, a connecting pipe 8 is provided.
A coupling hole 18 into which the metal coupling pin 13 fits is provided at a position corresponding to the through hole 17 when the metal coupling pin 13 is externally fitted and inserted.

【0021】前記ロックユニット10は接続パイプ8内
へ組込むことによって、ばね10で本体12が常時押圧
され、操作ボタン14が嵌合孔16から突条9の外面に
突出し、金属結合ピン13が貫通孔17から外部に突出
していると共に、操作ボタン14を押込むと、この操作
ボタン14の上面に設けた段部14aが嵌合孔16の上
部内端面に係合し、結合ピン13が貫通孔17から接続
パイプ8の内部に没入した状態が保持され、接続パイプ
8の上半部と上位縦柱2の抜き差しが支障なく行なえる
ようになっている。
When the lock unit 10 is assembled in the connecting pipe 8, the main body 12 is constantly pressed by the spring 10, the operation button 14 projects from the fitting hole 16 to the outer surface of the ridge 9, and the metal connecting pin 13 penetrates. When the operation button 14 is pushed in while protruding to the outside from the hole 17, the stepped portion 14a provided on the upper surface of the operation button 14 engages with the upper inner end surface of the fitting hole 16, and the coupling pin 13 is inserted into the through hole. The state of being immersed in the inside of the connection pipe 8 from 17 is maintained, and the upper half of the connection pipe 8 and the upper vertical column 2 can be inserted and removed without any trouble.

【0022】また、接続パイプ8と上位縦柱2の結合
は、操作ボタン14を押し下げて段部14aの係止を解
けばよく、金属結合ピン13は縦柱2の結合孔18に嵌
合することになる。
To connect the connection pipe 8 and the upper vertical column 2, the operation button 14 may be pushed down to unlock the stepped portion 14a, and the metal connecting pin 13 fits into the connecting hole 18 of the vertical column 2. It will be.

【0023】次に、枠組足場の組立工法を説明する。Next, a method for assembling the frame scaffold will be described.

【0024】先ず、地上において対向させた建枠4をブ
レース5と布枠6又は歩み板で結合し、これを平面的に
必要な長さだけ繰返すことによって枠組足場の階床Aを
組立てる。
First, the building frame 4 of the frame scaffolding is assembled by connecting the building frames 4 opposed to each other on the ground with the brace 5 and the cloth frame 6 or the step board, and repeating this planarly for the required length.

【0025】階床Aを上に増やすには、図1と図2に示
すように、クレーンのフック21に吊り下げた吊り金具
22と各建枠4の上部をロープやワイヤ23で接続し、
仮設足場全体を建枠4の高さ寸法よりも少し高い量だけ
吊り下げて保持する。
In order to increase the floor A upward, as shown in FIGS. 1 and 2, the hanging metal fittings 22 hung on the hooks 21 of the crane and the upper parts of the respective building frames 4 are connected by ropes or wires 23,
The entire temporary scaffold is suspended and held by an amount slightly higher than the height of the building frame 4.

【0026】この状態で各建枠4の下端に地上から建枠
4を継ぎ足す。この継ぎ足しは、縦柱2の上端に取付け
たジョイント7におけるロックユニット10の操作ボタ
ン14を押込んで係止し、金属結合ピン13を没入させ
ておき、持上げた建枠4のジョイント7を上位建枠4に
おける縦柱2の下端に差し込み、この差し込み状態で操
作ボタン14を操作して係止を解き、金属結合ピン13
を貫通孔17と結合孔18にわたって嵌合させれば、ジ
ョイント7を介して上下の建枠4が連結され、図1によ
うに下位の建枠4は吊り下げられた状態になる。
In this state, the building frames 4 are added to the lower end of each building frame 4 from the ground. In this extension, the operation button 14 of the lock unit 10 in the joint 7 attached to the upper end of the vertical column 2 is pushed and locked, the metal coupling pin 13 is immersed, and the joint 7 of the lifted building frame 4 is constructed in a higher order. Insert into the lower end of the vertical column 2 in the frame 4, and operate the operation button 14 in this inserted state to release the lock,
Is fitted over the through hole 17 and the coupling hole 18, the upper and lower building frames 4 are connected via the joint 7, and the lower building frame 4 is suspended as shown in FIG.

【0027】このようにして、吊り上げた各建枠4の下
端に建枠4を連結すると共に、隣接する建枠相互をブレ
ース5と布枠6又は歩み板で結合すれば階床Aが組上が
り、この後全体を下降させて接地させれば、階床Aが一
段増えた枠組足場となる。
In this way, the floor A is assembled by connecting the building frames 4 to the lower ends of the hoisted building frames 4 and connecting the adjacent building frames with the brace 5 and the cloth frame 6 or the step board. After that, if the whole is lowered and brought into contact with the ground, the floor A becomes a frame scaffolding with a further increase.

【0028】上記のように、階床Aを上方に順次増やす
には、クレーンでの吊り上げと、下方からの継ぎ足しを
順次繰り返して行なえればよく、作業は地上にてすべて
実施できる。
As described above, in order to sequentially increase the floor A upward, it is sufficient to carry out lifting by a crane and replenishment from below in sequence, and all the work can be performed on the ground.

【0029】なお、枠組足場はクレーンでの吊り上げに
より、ジョイント7の部分に引張り荷重がかかることに
なるが、ジョイント7は図4に示したように、接続パイ
プ8と下位建枠の上端がピン11によって、また、接続
パイプ8と上位建枠の下端とは金属結合ピン13によっ
て結合されているため、接続部分の耐引張り強度が強
く、クレーンでの吊り上げが支障なく行なえる。
In the frame scaffolding, a tensile load is applied to the joint 7 portion by hoisting it with a crane. However, as shown in FIG. 4, the joint pipe 8 and the upper end of the lower building frame are pinned. Since the connection pipe 8 and the lower end of the upper building frame are connected by the metal connecting pin 11, the connection portion has a high tensile strength and the crane can be lifted without any trouble.

【0030】また、枠組足場の吊り上げ時において、ジ
ョイント7にかかる引張り荷重をなくすには、図2に一
点鎖線で示すように、吊り金具22に取付けたロープ2
3又はワイヤの枠組足場への接続を最下位建枠の位置に
なるよう選べばよい。
In order to eliminate the tensile load applied to the joint 7 when the frame scaffold is hoisted, the rope 2 attached to the hoisting metal fitting 22 as shown by the chain line in FIG.
3 or wire connections to the frame scaffold may be chosen to be at the lowest building position.

【0031】上記のように組立てた枠組足場の解体は、
組立て時と同様、枠組足場全体をクレーンで吊り上げた
状態で、最下位の階床から順に分解して行けばよい。
The disassembly of the frame scaffold assembled as described above is
As with assembly, the entire frame scaffolding can be lifted by a crane and disassembled in order from the lowest floor.

【0032】即ち、枠組足場全体を地上から浮くように
クレーンで吊り上げ、最下位の階床を解体すると、枠組
足場を階床の高さ分だけ下して下位の階床を解体し、こ
れを順次繰返すことにより、地上での作業によって解体
が行なえる。
That is, when the entire frame scaffold is lifted by a crane so as to float above the ground and the lowest floor is dismantled, the frame scaffold is lowered by the height of the floor to dismantle the lower floor, and By repeating it in sequence, dismantling can be performed by work on the ground.

【0033】なお、解体時におけるロープ又はワイヤの
枠組足場に対する接続は、上部階床の建枠に設定してお
けばよい。
The connection of the rope or wire to the frame scaffold at the time of disassembly may be set in the building frame of the upper floor.

【0034】[0034]

【効果】以上のように、この発明によると、枠組足場の
組立て及び解体がすべて地上において行なえ、組立時及
び解体時の高所作業が一切不要になるので、足場組立て
及び解体の安全性を大幅に向上させることができる。
[Effect] As described above, according to the present invention, the assembly and dismantling of the frame scaffolding can be performed on the ground altogether, and no work at a high place is required at the time of assembling and dismantling, so that the safety of scaffolding assembly and dismantling is greatly improved. Can be improved.

【0035】また、枠組足場を構成する各資材を組立て
及び解体の進行と共に上げ下しするというような作業が
不要となり、しかも組立作業及び解体作業が地上で行な
えるので、作業能率が向上し、省力化を図ることができ
る。
Further, the work of raising and lowering each material constituting the frame scaffolding as the assembly and dismantling progress is unnecessary, and since the assembling work and the dismantling work can be performed on the ground, the work efficiency is improved, Labor saving can be achieved.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の組立工法を示す組立途中の正面図FIG. 1 is a front view during assembly showing the assembly method of the present invention.

【図2】同上の側面図FIG. 2 is a side view of the above.

【図3】上下建枠の接続部分を示す拡大縦断面図FIG. 3 is an enlarged vertical cross-sectional view showing a connecting portion of upper and lower building frames.

【図4】同上におけるジョイント部分の拡大縦断面図FIG. 4 is an enlarged vertical sectional view of a joint portion of the above.

【符号の説明】[Explanation of symbols]

1 枠組足場 2 縦柱 4 建枠 5 ブレース 6 布枠 7 ジョイント 8 接続パイプ A 階床 1 framework scaffolding 2 vertical columns 4 building frames 5 braces 6 cloth frame 7 joint 8 connection pipes A floor

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 並列する複数の建枠をブレースと布枠又
は歩み板で順次結合して枠組足場の階床を組み立て、増
床時にこれをクレーンで吊り上げ保持した状態で各建枠
の下に建枠を継ぎ足して下位の階床を組み立て、これを
繰り返して階床を増やして行くことを特徴とする枠組足
場の組立工法。
1. A floor of a frame scaffolding is assembled by sequentially connecting a plurality of parallel building frames with a brace and a cloth frame or a step board, and when the floors of the framed scaffolding are suspended and held by a crane, they are placed under each building frame. A method for assembling a frame scaffold, which is characterized by adding building frames to assemble lower floors, and repeating this to increase floors.
【請求項2】 並列する複数の建枠をブレースと布枠又
は歩み板で順次結合して階床を組み、これを複数段積み
重ねて構築した枠組足場の解体に際し、枠組足場をクレ
ーンで吊り上げ保持した状態で下位の階床から順に解体
することを特徴とする枠組足場の解体工法。
2. When disassembling a frame scaffold constructed by stacking a plurality of stages in which a plurality of parallel building frames are connected in sequence with a brace and a cloth frame or a step board and the floors are stacked, the frame scaffold is lifted and held by a crane. The method of dismantling the frame scaffold, which is characterized by disassembling the lower floors in that order.
JP18238191A 1991-07-23 1991-07-23 Assembling and disassembling of prefabricated scaffolding Pending JPH0525927A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18238191A JPH0525927A (en) 1991-07-23 1991-07-23 Assembling and disassembling of prefabricated scaffolding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18238191A JPH0525927A (en) 1991-07-23 1991-07-23 Assembling and disassembling of prefabricated scaffolding

Publications (1)

Publication Number Publication Date
JPH0525927A true JPH0525927A (en) 1993-02-02

Family

ID=16117321

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18238191A Pending JPH0525927A (en) 1991-07-23 1991-07-23 Assembling and disassembling of prefabricated scaffolding

Country Status (1)

Country Link
JP (1) JPH0525927A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0882087A (en) * 1994-09-13 1996-03-26 Kajima Corp Method for erecting framed scaffold and method for demolishing same
KR20010105570A (en) * 2000-05-16 2001-11-29 박재영 Jig for pulling up a strut and a strut lift-up construction method using the same
JP2010222884A (en) * 2009-03-24 2010-10-07 Sano Kasetsu Kogyo:Kk Assembling and demolition method for scaffold
FR3005083A1 (en) * 2013-04-30 2014-10-31 Godon Sas FRAME FOR TURNING ROTOR COMPRISING ELASTIC LATCHING MEANS AND METHOD OF MOUNTING THE SAME

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0882087A (en) * 1994-09-13 1996-03-26 Kajima Corp Method for erecting framed scaffold and method for demolishing same
KR20010105570A (en) * 2000-05-16 2001-11-29 박재영 Jig for pulling up a strut and a strut lift-up construction method using the same
JP2010222884A (en) * 2009-03-24 2010-10-07 Sano Kasetsu Kogyo:Kk Assembling and demolition method for scaffold
FR3005083A1 (en) * 2013-04-30 2014-10-31 Godon Sas FRAME FOR TURNING ROTOR COMPRISING ELASTIC LATCHING MEANS AND METHOD OF MOUNTING THE SAME
WO2014177462A1 (en) * 2013-04-30 2014-11-06 Godon Sas Frame for a shoring tower, comprising resilient locking means, and method for assembling said frame

Similar Documents

Publication Publication Date Title
US3302749A (en) Derrick scaffold structure
CN107761961A (en) A kind of electronic climbing frame monolithic construction method of high-rise building
CN212246007U (en) Be used for tower crane bracket welded portable platform
JPH0525927A (en) Assembling and disassembling of prefabricated scaffolding
CN111622347A (en) Cross-shaped node connecting structure of assembled frame structure and construction method thereof
WO2023173676A1 (en) Space truss support platform, system and method for super-deep slurry wall
CN212405472U (en) Cross node connection structure of assembled frame structure
CN215291319U (en) Multi-point elevator shaft construction lifting platform
CN210438301U (en) Light slat lifting device for building partition wall
CN216516907U (en) High-altitude convenient cantilever frame
JPS6168971A (en) Assembling and disassembling of frame scaffold
JP4011722B2 (en) Hanging stairs
KR100948447B1 (en) The upper part of truss dismantling device and method
JP2000120367A (en) External fastening liner plate and method for using it
CN218714945U (en) Assembled building combination is from promoting protection frame
CN217299872U (en) Shaft hydraulic comprehensive distribution platform
CN215107235U (en) High-altitude cantilever structure formwork support platform
CN114439248B (en) Steel column installation method
JP2817208B2 (en) Construction method of rack steel frame
JP2003034939A (en) Underground inverted construction method
CN214302864U (en) Well operation combination steel platform
CN217326481U (en) I-steel subassembly fast combination construction structures
JPH03125755A (en) Constructing method for cylindrical multistoried structure
JP4065798B2 (en) Prop work scaffold and method for constructing support work scaffold
CN114215351A (en) High-altitude convenient cantilever frame