Japan
Prior art keywords
segment
radius
segments
curvature
key segment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP3147665A
Other languages
Japanese (ja)
Other versions
JP2837289B2 (en
Inventor
Munetaka Ozeki
宗孝 大関
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ishikawajima Kenzai Kogyo Co Ltd
Ishikawajima Construction Materials Co Ltd
Original Assignee
Ishikawajima Kenzai Kogyo Co Ltd
Ishikawajima Construction Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ishikawajima Kenzai Kogyo Co Ltd, Ishikawajima Construction Materials Co Ltd filed Critical Ishikawajima Kenzai Kogyo Co Ltd
Priority to JP3147665A priority Critical patent/JP2837289B2/en
Publication of JPH05133196A publication Critical patent/JPH05133196A/en
Application granted granted Critical
Publication of JP2837289B2 publication Critical patent/JP2837289B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

PURPOSE:To improve the workability of assembly largely by previously arranging a lastly set key segment at a position outer than the original position of setting, setting other segments and inserting the segments from the outer section of a ring body. CONSTITUTION:Segments 11 are formed in an arcuate slab shape having the radius of curvature R1 of an internal surface and the radius of curvature R2 of an external surface, and joint hardwares 16 are buried onto the line of a concentric radius R3 to the circular arc of the internal surface. Segments 12 are formed in an arcuate slab shape having the radius of curvature of R4 of the internal surface and the radius of curvature R5 of the external surface, and the joint hardwares 16 are buried onto the line of a concentric radius R6 to the circular arc of the internal surface. Segments 13 are also formed in the arcuate slab shape similarly, and sections 13a having the radius of curvature larger than the segments 11 are formed at end sections adjacent to a key segment 14. The key segment 14 is inserted in the axial direction of an excavated hole so that an external surface is brought into contact with a table plate 10 in a clearance 15 on the outside of the segments 12, 13, dropped into joining end faces 12a, 13a, and wedge-coupled.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、円弧版状のセグメント
を掘削穴の軸方向に沿った接合端面で順次連結してリン
グ体を構築するシールド工法におけるセグメントの組立
方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a segment assembling method in a shield construction method for constructing a ring body by sequentially connecting arcuate segment segments at joint end faces along the axial direction of an excavation hole.

【0002】[0002]

【従来の技術】従来におけるシールド工法におけるセグ
メントの組立方法としては、図5及び図6に示すような
ものが知られている。
2. Description of the Related Art As a conventional method for assembling a segment in a shield construction method, one shown in FIGS. 5 and 6 is known.

【0003】図5に示すものにおいて、最後にセットす
るセグメント(以下、キーセグメントという。)1は掘
削穴の周方向に沿った断面が略台形状の形状をしてい
る。セグメント2を掘削穴の下部から接合していくと、
掘削穴の上部に、キーセグメント1の外形形状に対応し
た空所が形成されるようになっている。この空所内にキ
ーセグメント1を掘削穴の内部から挿入しセグメント2
と相互に連結するようにしている。
In the one shown in FIG. 5, a segment (hereinafter referred to as a key segment) 1 to be set last has a substantially trapezoidal cross section along the circumferential direction of the excavation hole. When joining segment 2 from the bottom of the drill hole,
A space corresponding to the outer shape of the key segment 1 is formed in the upper part of the drill hole. The key segment 1 is inserted from the inside of the drill hole into this void, and the segment 2
I am trying to connect with each other.

【0004】図6に示すものにおいて、キーセグメント
3は掘削穴の軸方向に沿うに従って漸次断面積が減少す
るような形状となっている。上述の例と同様に、セグメ
ント4を掘削穴の下部から順次接合していくと、掘削穴
の上部にキーセグメント3の外形形状に対応した空所が
形成されるようになっている。この空所内に、キーセグ
メント3を掘削穴の軸方向に沿って挿入し、このキーセ
グメント3とセグメント4とを連結するようにしてい
る。
In the structure shown in FIG. 6, the key segment 3 has such a shape that its cross-sectional area gradually decreases along the axial direction of the drill hole. Similar to the above-mentioned example, when the segments 4 are sequentially joined from the lower part of the excavation hole, a space corresponding to the outer shape of the key segment 3 is formed in the upper part of the excavation hole. The key segment 3 is inserted into the void along the axial direction of the drill hole to connect the key segment 3 and the segment 4.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、図5に
示す従来のシールド工法におけるセグメントの組立方法
では、キーセグメント1を掘削穴の内部に落とし込むよ
うな荷重が作用したときには、キーセグメント1自体が
その接合面でずれて掘削穴の内部に向かって動いてしま
うことがある。すなわち、キーセグメント1が掘削穴の
内側方向に向かうにつれて裾広がりとなった台形形状を
しているので、掘削穴の内側方向へのいわゆるくさび効
果が得られないという欠点がある。
However, in the segment assembling method in the conventional shield construction method shown in FIG. 5, when a load such as dropping the key segment 1 into the excavation hole is applied, the key segment 1 itself is The joint surface may shift and move toward the inside of the drill hole. That is, since the key segment 1 has a trapezoidal shape in which the skirt becomes wider toward the inner side of the drill hole, there is a drawback that a so-called wedge effect in the inner direction of the drill hole cannot be obtained.

【0006】また、図6に示す従来のシールド工法にお
けるセグメントの組立方法では、キーセグメント3が掘
削穴の軸方向に沿って断面積が漸次減少するような形状
になっているので、キーセグメント3に掘削穴の軸方向
に沿った荷重が作用して、キーセグメント3が少し掘削
穴の軸方向に動くと、キーセグメント3に隣接するセグ
メント4の接合端面との間に隙間が生ずる。この結果、
キーセグメント3の接合端面とセグメント4の接合端面
とに摩擦力が働かなくなり、掘削穴の軸方向沿った荷重
に対して組付強度が弱くなるという欠点がある。
Further, in the segment assembling method in the conventional shield construction method shown in FIG. 6, since the key segment 3 has such a shape that its cross-sectional area gradually decreases along the axial direction of the drill hole, the key segment 3 When a load along the axial direction of the excavation hole is applied to the key segment 3 and the key segment 3 slightly moves in the axial direction of the excavation hole, a gap is created between the key segment 3 and the joint end surface of the segment 4 adjacent to the key segment 3. As a result,
There is a drawback that the frictional force does not act on the joint end surface of the key segment 3 and the joint end surface of the segment 4, and the assembling strength becomes weak against the load along the axial direction of the drill hole.

【0007】本発明は、上記事情に鑑みてなされたもの
で、キーセグメントを、隣接するセグメントの接合端面
に強固に接続することができ、しかも、作業性のよいシ
ールド工法におけるセグメントの組立方法に関する。
The present invention has been made in view of the above circumstances, and relates to a method of assembling a segment in a shield construction method which can firmly connect a key segment to a joint end surface of an adjacent segment and has good workability. ..

【0008】[0008]

【課題を解決するための手段】本発明のシールド工法に
おけるセグメントの組立方法は、円弧版状のセグメント
を掘削穴の軸方向に沿った接合端面で順次連結してリン
グ体を構築するものにおいて、最後に連結するセグメン
トに隣接するセグメントの曲率半径を大きくして前記掘
削穴の内側とセグメントの組付位置との間に隙間が形成
されるようにするとともに、前記最後に連結するセグメ
ントにおける掘削穴の軸方向に沿った2つの接合端面
を、前記曲率半径を大きくした円弧部の法線方向に対し
て角度をつけ、最後にセットするキーセグメントを本来
のセット位置よりも外方に配置させておき、他のセグメ
ントをセットしたのち、前記最後にセットするセグメン
トを前記リング体の外方から嵌め込むことを特徴とす
る。
A method for assembling segments in a shield construction method of the present invention is to construct a ring body by sequentially connecting arc-shaped segment segments at joint end faces along the axial direction of a drill hole. The radius of curvature of the segment adjacent to the last connected segment is increased so that a gap is formed between the inside of the drill hole and the assembly position of the segment, and the drill hole in the last connected segment Angle the two joint end faces along the axial direction with respect to the normal direction of the arc portion with the larger radius of curvature, and arrange the key segment to be set finally outside the original setting position. Then, after setting other segments, the last set segment is fitted from the outside of the ring body.

【0009】[0009]

【作用】本発明のシールド工法におけるセグメント組立
方法では、セグメントを掘削穴の内面に組み付け、最後
にキーセグメントを組み付けてリング体を構築する。
According to the segment assembling method in the shield construction method of the present invention, the segment is assembled to the inner surface of the excavation hole, and finally the key segment is assembled to construct the ring body.

【0010】この際、キーセグメントに隣接するセグメ
ントの曲率半径が他のセグメントよりも大きくなってお
り、掘削穴の内面とキーセグメント取付位置のとの間に
隙間が形成され、この隙間にキーセグメントが掘削穴の
軸方向から挿入される。
At this time, the radius of curvature of the segment adjacent to the key segment is larger than that of the other segments, and a gap is formed between the inner surface of the excavation hole and the mounting position of the key segment. Is inserted from the axial direction of the drill hole.

【0011】この後、キーセグメントの支持を解放する
と、キーセグメントは重力の作用により下方に落下し、
キーセグメントの接合端面が隣接するセグメントの接合
端面にくさび結合する。この結果、キーセグメント及び
セグメントにより形成されたリング体の剛性が向上す
る。
After that, when the support of the key segment is released, the key segment falls downward due to the action of gravity,
The joint end face of the key segment is wedge-bonded to the joint end face of the adjacent segment. As a result, the rigidity of the key segment and the ring body formed by the segment is improved.

【0012】[0012]

【実施例】以下に、図面を参照して、本発明の一実施例
について説明する。図1は掘削穴をその軸方向から見た
正面図、図2はキーセグメントの形状を示す斜視図、図
3はセグメントにより構築された覆工体を外面からみた
斜視図、図4はキーセグメントの取付構造を示す拡大正
面図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. 1 is a front view of a drill hole viewed from its axial direction, FIG. 2 is a perspective view showing the shape of a key segment, FIG. 3 is a perspective view of a lining body constructed by the segment from the outside, and FIG. 4 is a key segment. FIG. 3 is an enlarged front view showing the mounting structure of FIG.

【0013】図1に示すように、シールドマシンのリン
グ状をしたテールプレート10内には、それぞれコンク
リート製のセグメント11、セグメント12、セグメン
ト13及びキーセグメント14をその掘削穴の軸方向に
沿った接合端面で接合してリング体Aが構築されてい
る。
As shown in FIG. 1, a segment 11, a segment 12, a segment 13, and a key segment 14 made of concrete are respectively provided in a ring-shaped tail plate 10 of a shield machine along the axial direction of the drill hole. The ring body A is constructed by joining at the joining end faces.

【0014】セグメント11は、内面の曲率半径がR1
で外面の曲率半径がR2の円弧版状をなしており、掘削
穴に組み付けた際に掘削穴の周方向に沿う接合端面に
は、内面の円弧と同心状の半径R3の線上に継手金具1
6が埋設されている。セグメント12は、内面の曲率半
径がR4で外面の曲率半径がR5の円弧版状をなしてお
り、内面の円弧と同心状の半径R6の線上に継手金具1
6が埋設されている。
The radius of curvature of the inner surface of the segment 11 is R1.
The outer surface has a circular arc plate shape with a radius of curvature of R2, and when assembled in a drill hole, the joint end face along the circumferential direction of the drill hole has a fitting metal fitting 1 on the line of radius R3 concentric with the arc of the inner surface.
6 is buried. The segment 12 has an arc plate shape with an inner surface having a radius of curvature R4 and an outer surface having a radius of curvature R5, and the joint metal fitting 1 is placed on a line having a radius R6 concentric with the inner surface arc.
6 is buried.

【0015】ここで、セグメント12の曲率半径R4,
R5は、セグメント11の曲率半径R1,R2よりも大き
く形成されている。セグメント13も同様に円弧版状を
しており、キーセグメント14に隣接する端部には、そ
の曲率半径がセグメント12の曲率半径R4,R5と同じ
部分すなわち曲率半径がセグメント11の曲率半径R
1,R2よりも大きな部分13aが形成されている。な
お、セグメント13にも、周方向に沿って継手金具16
が埋設されている。
Here, the radius of curvature R4 of the segment 12
R5 is formed larger than the radius of curvature R1 and R2 of the segment 11. Similarly, the segment 13 also has an arc plate shape, and at the end portion adjacent to the key segment 14, the radius of curvature is the same as the radius of curvature R4, R5 of the segment 12, that is, the radius of curvature R of the segment 11 is the radius of curvature.
A portion 13a larger than 1 and R2 is formed. It should be noted that the segment 13 also has a joint fitting 16 along the circumferential direction.
Is buried.

【0016】このように、セグメント12,13の曲率
半径をセグメント11の曲率半径よりも大きくしている
ので、セグメント12,13の外周面とテールプレート
10との間には、図4に示すように、セグメント11の
外周面とテールプレート10との間隔よりも大きな間隙
15が形成されている。なお、図1及び図4中の2点鎖
線は、セグメント11の円弧を延長したものである。
As described above, since the radii of curvature of the segments 12 and 13 are made larger than the radius of curvature of the segment 11, between the outer peripheral surface of the segments 12 and 13 and the tail plate 10, as shown in FIG. Further, a gap 15 larger than the gap between the outer peripheral surface of the segment 11 and the tail plate 10 is formed. The two-dot chain line in FIGS. 1 and 4 is an extension of the arc of the segment 11.

【0017】さらに、キーセグメント14の掘削穴の軸
方向に沿った2つの接合端面14a,14bは、接合端
面14a,14b間の間隔が掘削穴の内部から内壁に近
付くにつれて漸次大きくなるようなテーパ面となってい
る。
Further, the two joining end surfaces 14a, 14b along the axial direction of the drill hole of the key segment 14 are tapered such that the distance between the joining end surfaces 14a, 14b gradually increases as the distance from the inside of the drill hole approaches the inner wall. Is a face.

【0018】図3に示すように、キーセグメント14の
取付位置は、掘削穴の軸方向に沿って千鳥配置となるよ
うになっている。
As shown in FIG. 3, the mounting positions of the key segments 14 are staggered along the axial direction of the drill hole.

【0019】なお、本実施例では、継手金具16を埋設
する位置を、セグメント11では半径R3、セグメント
13では異なる半径R4の円弧上に位置するようにして
いるが、セグメント13においてもセグメント11と同
様に半径R3の線上に位置するようにしてもよい。
In this embodiment, the position where the fitting 16 is embedded is located on an arc having a radius R3 in the segment 11 and a different radius R4 in the segment 13. Similarly, it may be located on the line of radius R3.

【0020】図4を参照して、本実施例におけるキーセ
グメント14の組付順序を説明する。すなわち、キーセ
グメント14は、セグメント12,13の外側の間隙1
5に、外側の面をテールプレート10に接触するように
浮かせて掘削穴の軸方向に挿入される。この後、キーセ
グメント14をセグメント12,13の接合端面12
a,13aに落とし込む。この結果、キーセグメント1
4のテーパ状の接合端面14a,14bが、隣接するセ
グメント12,13の接合端面12a,13aにくさび
結合する。この後、図示しない継手金具によって相互に
連結される。
The assembling order of the key segment 14 in this embodiment will be described with reference to FIG. That is, the key segment 14 has a gap 1 outside the segments 12, 13.
5, the outer surface is floated so as to contact the tail plate 10, and is inserted in the axial direction of the drill hole. Then, the key segment 14 is attached to the joint end surface 12 of the segments 12 and 13.
a, 13a. As a result, key segment 1
The tapered joint end surfaces 14a and 14b of No. 4 are wedge-bonded to the joint end surfaces 12a and 13a of the adjacent segments 12 and 13. After that, they are connected to each other by unillustrated joint fittings.

【0021】本実施例では、キーセグメント14に隣接
するセグメント12,13に曲率半径の大きな部分を形
成し、掘削穴内面とセグメント12,13との間に間隙
15を形成し、この間隙15内にキーセグメント14を
挿入して落とし込むようにしているので、キーセグメン
ト14の挿入や組み付けが容易となり、キーセグメント
14の組付作業性を向上させることができる。
In this embodiment, a segment having a large radius of curvature is formed in the segments 12 and 13 adjacent to the key segment 14, and a gap 15 is formed between the inner surface of the drill hole and the segments 12 and 13. Since the key segment 14 is inserted and dropped in, the key segment 14 can be easily inserted and assembled, and the assembling workability of the key segment 14 can be improved.

【0022】さらに、キーセグメント14の接合端面1
4a,14bをテーパ状に形成し、セグメント12,1
3の接合端面12a,13a間にキーセグメント14を
落とし込んで、接合端面どうしをくさび結合させるよう
にしているので、セグメント11,12,13及びキー
セグメント14により構成されたリングの剛性が高ま
る。
Further, the joining end surface 1 of the key segment 14
4a and 14b are formed in a tapered shape, and the segments 12 and 1 are
Since the key segment 14 is dropped between the joining end faces 12a and 13a of No. 3 so as to wedge-join the joining end faces, the rigidity of the ring formed by the segments 11, 12, 13 and the key segment 14 is increased.

【0023】[0023]

【発明の効果】以上説明したように、本発明のシールド
工法におけるセグメントの組立方法によれば、最後に連
結するセグメントに隣接するセグメントの曲率半径を大
きくして前記掘削穴の内側とセグメントの組付位置との
間に隙間が形成されるようにするとともに、前記最後に
連結するセグメントにおける掘削穴の軸方向に沿った2
つの接合端面を、前記曲率半径を大きくした円弧部の法
線方向に対して角度をつけ、最後にセットするキーセグ
メントを本来のセット位置よりも外方に配置させてお
き、他のセグメントをセットしたのち、前記最後にセッ
トするセグメントを前記リング体の外方から嵌め込むよ
うにしているので、セグメントの組付作業性が大幅に向
上するともに、剛性の高いリング体を掘削穴の内面に構
築することができる。
As described above, according to the segment assembling method in the shield construction method of the present invention, the radius of curvature of the segment adjacent to the last connected segment is increased so that the inside of the excavation hole and the segment are assembled. A gap is formed between the drilling hole and the attaching position, and 2 along the axial direction of the drill hole in the last connecting segment.
Angle the two joining end faces with respect to the normal direction of the arc part with the larger radius of curvature, and arrange the key segment to be set last outside the original set position and set the other segments. After that, since the segment to be set last is fitted from the outside of the ring body, the workability of assembling the segment is significantly improved and a ring body with high rigidity is constructed on the inner surface of the drill hole. You can

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例にかかるキーセグメントの組
付構造を示す図であって、掘削穴をその軸方向から見た
正面図である。
FIG. 1 is a view showing an assembling structure of a key segment according to an embodiment of the present invention, and is a front view of a drill hole viewed from its axial direction.

【図2】本発明の一実施例にかかるキーセグメントの組
付構造を示す図であって、キーセグメントの形状を示す
斜視図である。
FIG. 2 is a view showing a key segment assembling structure according to an embodiment of the present invention, and is a perspective view showing a shape of the key segment.

【図3】本発明の一実施例にかかるキーセグメントの組
付構造を示す図であって、セグメントにより構築された
覆工体を外面からみた斜視図である。
FIG. 3 is a view showing an assembly structure of a key segment according to an embodiment of the present invention, and is a perspective view of a lining body constructed by the segments as seen from the outer surface.

【図4】本発明の一実施例にかかるキーセグメントの組
付構造を示す図であって、キーセグメントの取付構造を
示す拡大正面図である。
FIG. 4 is a view showing an assembling structure of a key segment according to an embodiment of the present invention, which is an enlarged front view showing a mounting structure of the key segment.

【図5】従来のキーセグメントの取付構造を示す斜視図
である。
FIG. 5 is a perspective view showing a conventional key segment mounting structure.

【図6】従来のキーセグメントの取付構造を示す斜視図
である。
FIG. 6 is a perspective view showing a conventional key segment attachment structure.

【符号の説明】[Explanation of symbols]

11 セグメント 12 セグメント 12a 接合端面 13 セグメント 13a 接合端面 14 キーセグメント 14a,14b…接合端面 15 間隙 A リング体 11 segment 12 segment 12a joining end face 13 segment 13a joining end face 14 key segment 14a, 14b ... joining end face 15 gap A ring body

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 円弧版状のセグメントを掘削穴の軸方向
に沿った接合端面で順次連結してリング体を構築するシ
ールド工法におけるセグメントの組立方法において、最
後に連結するセグメントに隣接するセグメントの曲率半
径を大きくして前記掘削穴の内側とセグメントの組付位
置との間に隙間が形成されるようにするとともに、前記
最後に連結するセグメントにおける掘削穴の軸方向に沿
った2つの接合端面を、前記曲率半径を大きくした円弧
部の法線方向に対して角度をつけ、最後にセットするキ
ーセグメントを本来のセット位置よりも外方に配置させ
ておき、他のセグメントをセットしたのち、前記最後に
セットするセグメントを前記リング体の外方から嵌め込
むことを特徴とするシールド工法におけるセグメントの
組立方法。
1. A method of assembling a segment in a shield construction method in which arc-shaped segments are sequentially connected at a joint end surface along an axial direction of an excavation hole to construct a ring body. A large radius of curvature is formed so that a gap is formed between the inside of the drill hole and the assembly position of the segment, and two joint end faces along the axial direction of the drill hole in the last connected segment. Is angled with respect to the normal direction of the arc portion with the radius of curvature increased, the key segment to be set last is placed outside the original set position, and after setting other segments, A segment assembling method in a shield construction method, characterized in that the finally set segment is fitted from the outside of the ring body.
JP3147665A 1991-06-19 1991-06-19 Segment assembly method in shield method Expired - Fee Related JP2837289B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3147665A JP2837289B2 (en) 1991-06-19 1991-06-19 Segment assembly method in shield method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3147665A JP2837289B2 (en) 1991-06-19 1991-06-19 Segment assembly method in shield method

Publications (2)

Publication Number Publication Date
JPH05133196A true JPH05133196A (en) 1993-05-28
JP2837289B2 JP2837289B2 (en) 1998-12-14

Family

ID=15435506

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3147665A Expired - Fee Related JP2837289B2 (en) 1991-06-19 1991-06-19 Segment assembly method in shield method

Country Status (1)

Country Link
JP (1) JP2837289B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014025293A (en) * 2012-07-27 2014-02-06 Kajima Corp Shield machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014025293A (en) * 2012-07-27 2014-02-06 Kajima Corp Shield machine

Also Published As

Publication number Publication date
JP2837289B2 (en) 1998-12-14

Similar Documents

Publication Publication Date Title
JP2664653B2 (en) Pile joint structure
JPH05133196A (en) Assembling method of segment in method of shielding construction
JP3628411B2 (en) segment
JP4074488B2 (en) Steel segment and manufacturing method thereof
JP2658759B2 (en) Two-way wedge joint structure of shield segment
JP3652091B2 (en) Ductile cast iron pipe for propulsion method
JPS6219700Y2 (en)
JP2720205B2 (en) Shield segment
JP2843889B2 (en) Concrete segment and joint structure of concrete segment
JP2829683B2 (en) Lining structure
JP3410437B2 (en) Segment ring and segment ring lining method
JPH05336642A (en) Receiving metal mounter
JP3819103B2 (en) segment
JPH11193693A (en) Segment joint structure, segment and segment assembling method
JP2528400B2 (en) Segment connection structure
JPH041348A (en) Centrifugal cast-steel pipe
JP3842074B2 (en) Segment connection structure
JP2670483B2 (en) Joining structure of inner wall in tubular wall for lining excavation hole
JPH10259694A (en) Joint structure for segment
JPH0315654Y2 (en)
JPS605169Y2 (en) Flexible joint structure for concrete pipes
JPH0470412A (en) Steel pipe pile
JP2000240398A (en) Joint structure of segments
JPS60137292U (en) Backfill jig
JPH01256699A (en) Reinforced concrete segment

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19980908

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees