JPH04358011A - Device for charging raw material - Google Patents

Device for charging raw material

Info

Publication number
JPH04358011A
JPH04358011A JP16005691A JP16005691A JPH04358011A JP H04358011 A JPH04358011 A JP H04358011A JP 16005691 A JP16005691 A JP 16005691A JP 16005691 A JP16005691 A JP 16005691A JP H04358011 A JPH04358011 A JP H04358011A
Authority
JP
Japan
Prior art keywords
bunker
raw material
opening
furnace
internal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP16005691A
Other languages
Japanese (ja)
Other versions
JPH0694567B2 (en
Inventor
Keiichi Kumagai
熊谷 敬一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp filed Critical IHI Corp
Priority to JP16005691A priority Critical patent/JPH0694567B2/en
Publication of JPH04358011A publication Critical patent/JPH04358011A/en
Publication of JPH0694567B2 publication Critical patent/JPH0694567B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Manufacture Of Iron (AREA)
  • Blast Furnaces (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

PURPOSE:To secure uniform charging of raw material to circumferential direction in a furnace and to shorten charging process together with improvement in excess filling capacity in the case of charging into the furnace by dividing plural kinds of raw materials to one side or both sides of ores and cokes. CONSTITUTION:In inner part of an outer bunker 38 having flow control gate 37 at the lower end and enabling storing of the raw material 21 in the inner part, an opening/closing body 43 having the opening parts 67, 69 at the upper and lower ends and enabling opening/closing to the opening part 69 at the lower end is provided, and also an inner bunker 44 enabling storing of the other raw material 22 with the outer bunker 38 is concentrically arranged in least at one set.

Description

【発明の詳細な説明】[Detailed description of the invention]

【0001】0001

【産業上の利用分野】本発明は、銑鉄製造用溶鉱炉や冶
金・精錬用竪型炉などに原料を装入するための原料装入
装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a raw material charging device for charging raw materials into blast furnaces for producing pig iron, vertical furnaces for metallurgy and refining, and the like.

【0002】0002

【従来の技術】従来の原料装入装置には並列バンカー式
のものと、センターフィード式のものがある。
2. Description of the Related Art Conventional raw material charging devices include a parallel bunker type and a center feed type.

【0003】図9は並列バンカー式の原料装入装置の例
である。
FIG. 9 shows an example of a parallel bunker type raw material charging device.

【0004】図中1は銑鉄製造用溶鉱炉や冶金・精錬用
竪型炉などの炉であり、該炉1の上部には、切換えシュ
ート2によって交互に原料3を供給され、図示しない圧
力調整手段によって内部の圧力を調整可能な二基の並列
なバンカー4,5と、二基のバンカー4,5からの原料
3を、炉1内部に水平旋回及び上下揺動自在に配置され
た分配シュート6へ導く集合ホッパー7と、分配シュー
ト6を水平旋回及び上下揺動させる駆動装置8とが設け
られ、原料装入装置9が構成されている。
In the figure, reference numeral 1 denotes a furnace such as a blast furnace for producing pig iron or a vertical furnace for metallurgy and refining. In the upper part of the furnace 1, raw materials 3 are alternately supplied by a switching chute 2, and a pressure regulating means (not shown) is provided. The raw material 3 from the two bunkers 4 and 5 is transferred to a distribution chute 6 arranged horizontally and vertically swingably inside the furnace 1. A raw material charging device 9 is provided with a collecting hopper 7 that guides the raw material to the raw material, and a drive device 8 that horizontally rotates and vertically swings the distribution chute 6.

【0005】尚、10はバンカー4,5の上端に設けら
れたシール弁、11はバンカー4,5の下端に設けられ
た流量調整ゲートであり、12はシール弁である。
Note that 10 is a seal valve provided at the upper end of the bunkers 4 and 5, 11 is a flow rate adjustment gate provided at the lower end of the bunkers 4 and 5, and 12 is a seal valve.

【0006】そして、炉1に原料3を装入する場合には
、先ず、バンカー4側のシール弁10,12を閉じたま
まの状態でバンカー4内部の圧力を図示しない圧力調整
手段によって大気圧まで下げた後バンカー4側のシール
弁10を開いて、図示しない原料槽からの原料3をバン
カー4へ供給し、供給完了後バンカー4側のシール弁1
0を閉じる。
When charging the raw material 3 into the furnace 1, first, with the seal valves 10 and 12 on the bunker 4 side closed, the pressure inside the bunker 4 is adjusted to atmospheric pressure by a pressure regulating means (not shown). After lowering the material to the level, the seal valve 10 on the side of the bunker 4 is opened to supply the raw material 3 from the raw material tank (not shown) to the bunker 4, and after the supply is completed, the seal valve 10 on the side of the bunker 4 is opened.
Close 0.

【0007】次に、図示しない圧力調整手段によってバ
ンカー4内部の圧力を炉1内部の圧力と等しい圧力まで
上げ(均圧操作)、バンカー4の下端のシール弁12を
開き次いで流量調整ゲート11を予め設定された開度迄
開く。
Next, the pressure inside the bunker 4 is raised to a pressure equal to the pressure inside the furnace 1 by a pressure adjustment means (not shown) (pressure equalization operation), the seal valve 12 at the lower end of the bunker 4 is opened, and the flow rate adjustment gate 11 is opened. Opens to a preset opening degree.

【0008】すると、バンカー4内部の原料3は集合ホ
ッパー7を介して分配シュート6へ導かれ、駆動装置8
によって水平旋回及び上下揺動されている分配シュート
6によって炉1内部へ装入される。
Then, the raw material 3 inside the bunker 4 is guided to the distribution chute 6 via the collection hopper 7, and is driven by the drive device 8.
The material is charged into the furnace 1 through the distribution chute 6, which is rotated horizontally and swung vertically by the arrows.

【0009】そして、バンカー4内部から炉1への原料
3の装入中に、前記と同様にしてバンカー5へ原料3を
供給し、以後、バンカー4,5を交互に用いて、炉1内
部への原料3の装入を行う。
Then, while the raw material 3 is being charged from the inside of the bunker 4 to the furnace 1, the raw material 3 is supplied to the bunker 5 in the same manner as described above. Charge raw material 3 to the tank.

【0010】又、図10はセンターフィード式の原料装
入装置の例であり、炉1の上方には図示しない原料槽か
らの原料3を搬送する原料コンベア12が配設され、該
原料コンベア12の下部には下端部に原料ゲート13を
備えた上部バンカー14が設けられ、上部バンカー14
の下方には、上端に上部シール弁15が配設され、下端
部に原料コントロールゲート16及び下部シール弁18
を備え、図示しない圧力調整手段によって内部の圧力を
調整可能な下部バンカー17が設けられている。
FIG. 10 shows an example of a center feed type raw material charging device, in which a raw material conveyor 12 for conveying raw material 3 from a raw material tank (not shown) is disposed above the furnace 1. An upper bunker 14 having a raw material gate 13 at the lower end is provided at the lower part of the upper bunker 14.
An upper seal valve 15 is provided at the upper end, and a raw material control gate 16 and a lower seal valve 18 are provided at the lower end.
A lower bunker 17 is provided, the internal pressure of which can be adjusted by a pressure adjustment means (not shown).

【0011】そして、炉1に原料3を装入する場合には
、先ず、上部バンカー14下端部の原料ゲート13及び
上部シール弁15を閉じた状態で、図示しない原料槽か
ら原料コンベア12を介して原料3を上部バンカー14
へ供給する。
When charging the raw material 3 into the furnace 1, the raw material 3 is first transferred from a raw material tank (not shown) via the raw material conveyor 12 with the raw material gate 13 and the upper seal valve 15 at the lower end of the upper bunker 14 closed. The raw material 3 is transferred to the upper bunker 14.
supply to

【0012】次に、下部バンカー17下端部の原料コン
トロールゲート16、下部シール弁18及び上部シール
弁15を閉じた状態で図示しない圧力調整手段によって
下部バンカー17内部の圧力を大気圧まで下げ(排圧操
作)、上部シール弁15及び原料ゲート13を順に開い
て、上部バンカー14内部の原料3を下部バンカー17
へ供給する。
Next, with the raw material control gate 16, lower seal valve 18 and upper seal valve 15 at the lower end of the lower bunker 17 closed, the pressure inside the lower bunker 17 is lowered to atmospheric pressure (exhausted) by a pressure regulating means (not shown). pressure operation), the upper seal valve 15 and the raw material gate 13 are opened in sequence, and the raw material 3 inside the upper bunker 14 is transferred to the lower bunker 17.
supply to

【0013】その後、原料ゲート13及び上部シール弁
15を順に閉じて、図示しない圧力調整手段によって下
部バンカー17内部の圧力を炉1内部の圧力と等しい圧
力まで上げ(均圧操作)、下部シール弁18を開き、次
いで原料コントロールゲート16を炉1の操業状態に応
じ予め設定された開度に調整する。
Thereafter, the raw material gate 13 and the upper seal valve 15 are closed in order, and the pressure inside the lower bunker 17 is raised to a pressure equal to the pressure inside the furnace 1 by a pressure regulating means (not shown) (pressure equalization operation), and the lower seal valve is closed. 18 is opened, and then the raw material control gate 16 is adjusted to a preset opening depending on the operating state of the furnace 1.

【0014】すると、下部バンカー17内部の原料3は
分配シュート6を介して炉1内部に装入される。
Then, the raw material 3 inside the lower bunker 17 is charged into the furnace 1 through the distribution chute 6.

【0015】下部バンカー17からの原料3の装入中に
、前記と同様にして上部バンカー14内部に例えば前記
とは別の種類の原料3を供給し、以後上記を繰返して、
炉1内部への原料3の装入を行う。
While charging the raw material 3 from the lower bunker 17, for example, a different type of raw material 3 from the above is supplied into the upper bunker 14 in the same manner as described above, and the above is repeated thereafter.
The raw material 3 is charged into the furnace 1.

【0016】図11はセンターフィード式の原料装入装
置の他の例であり、上部バンカー14の上部に回転シュ
ート19を配設すると共に、上部バンカー14下端部の
原料ゲート13などを複数化したものである。
FIG. 11 shows another example of a center feed type raw material charging device, in which a rotary chute 19 is provided at the top of the upper bunker 14, and a plurality of raw material gates 13, etc. at the lower end of the upper bunker 14 are provided. It is something.

【0017】[0017]

【発明が解決しようとする課題】しかしながら、上記従
来の原料装入装置には、以下のような問題があった。
[Problems to be Solved by the Invention] However, the above-mentioned conventional raw material charging apparatus has the following problems.

【0018】即ち、並列バンカー式の原料装入装置には
、並列に配置された二つのバンカー4,5から集合ホッ
パー7を介して原料3を分配シュート6へ送給している
関係上、分配シュート6へ入る原料3が集合ホッパー7
を通る時に水平方向の運動成分を持ってしまうので、炉
1に対する原料3の分布が全周均一でなくなり、全周均
一で安定した操業を保つことが困難となってしまうとい
う問題があった。
That is, in the parallel bunker type raw material charging device, since the raw material 3 is fed from the two bunkers 4 and 5 arranged in parallel to the distribution chute 6 via the collection hopper 7, the distribution Raw material 3 entering chute 6 is collected in hopper 7
Since the raw material 3 has a horizontal motion component when passing through the furnace 1, the distribution of the raw material 3 to the furnace 1 is not uniform all the way around, which makes it difficult to maintain stable operation with uniformity all around.

【0019】又、センターフィード式の原料装入装置に
は、上部バンカー14へ供給された原料3を下部バンカ
ー17を介して炉1へ装入するまでの間に、下部バンカ
ー17をシリーズで均圧操作排圧操作したりするなどの
圧力調整が必要となるので、1回の装入サイクルが長く
なるという問題があり、原料3として大粒焼結鉱と小粒
焼結鉱を分割して装入する場合や、高品位コークスと低
品位コークスを分割して装入する場合などのように、複
数種類の原料3を順番に装入したいという場合、即ち、
各原料3について装入サイクルを複数回行うことにより
所定の量の原料の装入工程が完了するというような場合
に、装入工程に長い時間を要していた。
Furthermore, in the center feed type raw material charging device, the lower bunker 17 is leveled in series before the raw material 3 supplied to the upper bunker 14 is charged into the furnace 1 via the lower bunker 17. Since pressure adjustment such as pressure operation and exhaust pressure operation is required, there is a problem that one charging cycle becomes long, so large-grained sintered ore and small-sized sintered ore are charged separately as raw material 3. When you want to charge multiple types of raw materials 3 in order, such as when charging high-grade coke and low-grade coke separately,
In the case where the charging process for a predetermined amount of raw material is completed by carrying out the charging cycle multiple times for each raw material 3, the charging process takes a long time.

【0020】更に、炉1内部に原料3の棚吊り現象(炉
1内部では原料3が燃焼又は還元、溶融されて減少して
行くが、時として炉1上方で原料3が互に係止・拘束し
合って棚がかかったような状態となり、該棚によって見
掛け上の原料レベルが一定に保持される現象)が発生し
、原料3の棚が崩れて炉1内部の原料レベルが急激に低
下してしまった時などに、多量の原料3を緊急に炉1内
へ装入する必要があるが、前記したように1回のサイク
ルタイムが長いので、これに対応することが困難であり
、即ち、オーバーフィリング能力が低かった。
Furthermore, there is a phenomenon in which the raw materials 3 are suspended inside the furnace 1 (inside the furnace 1, the raw materials 3 are burned, reduced, or melted and reduced, but sometimes the raw materials 3 are stuck to each other above the furnace 1). A phenomenon occurs in which the shelf for raw material 3 collapses and the raw material level inside the furnace 1 suddenly drops. It is necessary to urgently charge a large amount of raw material 3 into the furnace 1 in the event of a failure, but as mentioned above, one cycle time is long, so it is difficult to deal with this. That is, the overfilling ability was low.

【0021】本発明は、上述の実情に鑑み、原料の炉円
周方向に対する均一装入性の確保と、鉱石又はコークス
の一方又は両方に複数種類の原料を分割して装入する場
合の装入工程の短縮とオーバーフィリング能力の向上を
両立し得るようにした原料装入装置を提供することを目
的とするものである。
[0021] In view of the above-mentioned circumstances, the present invention aims to ensure uniform charging of raw materials in the circumferential direction of the furnace, and to improve charging when a plurality of types of raw materials are dividedly charged into one or both of ore or coke. The object of the present invention is to provide a raw material charging device that can both shorten the charging process and improve overfilling capacity.

【0022】[0022]

【課題を解決するための手段】請求項1の発明は、下端
に流調ゲートを有して内部に原料を貯溜可能な外部バン
カーの内部に、上下端が開口で且つ下端に開口を開閉可
能な開閉体を有すると共に内部に外部バンカーとは別の
原料を貯溜可能な内部バンカーを、少なくとも一基以上
同心状に配設したことを特徴とする原料装入装置にかか
るものである。
[Means for Solving the Problem] The invention as claimed in claim 1 provides an external bunker having a flow control gate at the lower end and capable of storing raw materials inside, the upper and lower ends of which are open, and the opening at the lower end that can be opened and closed. This invention relates to a raw material charging device characterized in that at least one internal bunker, which has an openable/closable body and is capable of storing raw materials other than the external bunker, is arranged concentrically.

【0023】請求項2の発明は、内部バンカーの上端の
開口を内部バンカーの中央部直径より小さくし昇降可能
な円錐状開閉体によって開閉可能となるように配設した
請求項1記載の原料装入装置にかかるものである。
The invention according to claim 2 provides the raw material equipment according to claim 1, wherein the opening at the upper end of the internal bunker is made smaller than the diameter of the central part of the internal bunker and is arranged to be opened and closed by a conical opening/closing body that can be raised and lowered. This applies to the input device.

【0024】請求項3の発明は、内部バンカーの下端に
下方へ進むに従い縮径するテーパ状の絞り部を形成し、
且つ、内部バンカー下端の開閉体は下方へ進むに従い拡
径して内部バンカー下端の開口よりも大きくなる傾斜面
を有する請求項1又は2記載の原料装入装置にかかるも
のである。
According to the third aspect of the present invention, a tapered constriction portion whose diameter decreases as it goes downward is formed at the lower end of the internal bunker,
The raw material charging device according to claim 1 or 2, wherein the opening/closing body at the lower end of the internal bunker has an inclined surface whose diameter increases as it moves downward and becomes larger than the opening at the lower end of the internal bunker.

【0025】[0025]

【作用】請求項1の発明によれば、外部バンカーと内部
バンカーを同心状に配設したことにより下部バンカーの
均圧排圧操作1回で、複数の原料を装入することが可能
になる。
According to the first aspect of the invention, by arranging the outer bunker and the inner bunker concentrically, it becomes possible to charge a plurality of raw materials with one pressure equalization and evacuation operation of the lower bunker.

【0026】請求項2の発明によれば、円錐開閉体の傾
斜面により、外部バンカーと内部バンカーとの間の原料
も内部バンカーの内側の原料も円周方向に均等に原料が
分配される。
According to the second aspect of the invention, the raw material between the outer bunker and the inner bunker and the raw material inside the inner bunker are evenly distributed in the circumferential direction by the inclined surface of the conical opening/closing body.

【0027】かつ任意の量の原料を外部バンカーと内部
バンカーの間及び内部バンカーの内に貯溜させるべく切
替が可能となる。
[0027] Also, it becomes possible to switch between the external bunker and the internal bunker and to store an arbitrary amount of raw material in the internal bunker.

【0028】請求項3の発明によれば、内部バンカーの
下端に設けられた開閉体の、下方へ進むに従い拡径して
内部バンカー下端の開口よりも大きくなる円錐面により
、内部バンカー下端の開口と開閉体との間の原料が噛み
込み及びブリッジが防止され、内部バンカー下端の開口
が確実に開閉される。かつ流調ゲートに対して全周から
均等に原料を供給することができるので、原料の水平方
向運動成分の均等化が可能になり分配シュートを経て炉
内に分配される原料の円周方向に均一な分布を達成でき
る。
According to the third aspect of the invention, the opening at the lower end of the internal bunker is opened by the conical surface of the opening/closing body provided at the lower end of the internal bunker, which expands in diameter as it goes downward and becomes larger than the opening at the lower end of the internal bunker. This prevents the raw material from being caught between the opening and closing body and the bridging, and the opening at the lower end of the internal bunker is reliably opened and closed. In addition, since the raw material can be evenly supplied from the entire circumference to the flow control gate, it is possible to equalize the horizontal movement component of the raw material, and the raw material that is distributed into the furnace through the distribution chute is distributed in the circumferential direction. Uniform distribution can be achieved.

【0029】[0029]

【実施例】以下、本発明の実施例を図面を参照しつつ説
明する。
Embodiments Hereinafter, embodiments of the present invention will be described with reference to the drawings.

【0030】図1〜図3は、本発明の第一の実施例であ
る。
1 to 3 show a first embodiment of the present invention.

【0031】銑鉄製造用溶鉱炉や冶金・精錬用竪型炉な
どの炉20の上方には、図示しない原料槽からの原料2
1,22を送給する原料コンベア23が配設されており
、該原料コンベア23の下部には、水平旋回しつつ原料
21,22を分配可能な旋回シュート24及び上部バン
カ−25が配設されている。
Above the furnace 20, such as a blast furnace for producing pig iron or a vertical furnace for metallurgy and refining, raw material 2 from a raw material tank (not shown) is placed.
A raw material conveyor 23 for feeding the raw materials 1 and 22 is disposed, and a rotating chute 24 and an upper bunker 25 that can horizontally rotate and distribute the raw materials 21 and 22 are disposed below the raw material conveyor 23. ing.

【0032】該上部バンカ−25は、中空円筒状をして
上下端が開口し、下端に下方へ進むに従って縮径するテ
ーパ状の絞り部26が形成され、且つ、下端開口に原料
ゲート27を設けた外部バンカー28と、該外部バンカ
ー28の内部に支持架構29を介して同心状に配置され
、中空円筒状をして上下端が開口し、下端にテーパ状の
絞り部30が形成され、且つ、下端開口に円錐状のベル
31を開閉可能に設けた内部バンカー32とによって構
成されており、又、前記旋回シュート24は、図示しな
いダンパによって外部バンカー28と内部バンカー32
に2種類の原料21,22を選択的に供給可能な二つの
排出口33,34を備えている。
The upper bunker 25 has a hollow cylindrical shape with upper and lower ends open, and a tapered constriction part 26 whose diameter decreases as it goes downward is formed at the lower end, and a raw material gate 27 is provided at the lower end opening. The external bunker 28 is provided, and the external bunker 28 is arranged concentrically via a support frame 29 inside the external bunker 28, has a hollow cylindrical shape, has upper and lower ends open, and has a tapered constriction part 30 formed at the lower end. Further, the rotary chute 24 is configured with an internal bunker 32 having a conical bell 31 provided at its lower end opening so as to be openable and closable, and the rotating chute 24 is connected to an external bunker 28 and an internal bunker 32 by a damper (not shown).
It is equipped with two discharge ports 33 and 34 that can selectively supply two types of raw materials 21 and 22.

【0033】前記上部バンカ−25の下部には、下部バ
ンカ−45が設けられており、下部バンカー45は、中
空円筒状をして上端の開口に上部シール弁35を有し、
且つ、下端に下方へ進むに従って縮径するテーパ状の絞
り部36が形成され、且つ、下端開口に開度を調整可能
な流調ゲート37及び下部シール弁49が設けられてい
て、図示しない圧力調整手段によって内部の圧力を調整
可能な外部バンカー38を備えている。内部バンカー4
4は外部バンカー38と同時に均圧及び排圧するための
通気孔71を設ける。
A lower bunker 45 is provided below the upper bunker 25, and the lower bunker 45 has a hollow cylindrical shape and has an upper seal valve 35 at an opening at its upper end.
In addition, a tapered constriction part 36 whose diameter decreases as it goes downward is formed at the lower end, and a flow control gate 37 and a lower seal valve 49 whose opening degree can be adjusted are provided at the lower end opening, and a pressure control valve (not shown) is provided. An external bunker 38 is provided, the internal pressure of which can be adjusted by adjusting means. internal bunker 4
4 is provided with a vent hole 71 for equalizing and discharging the pressure at the same time as the external bunker 38.

【0034】又、下部バンカー45は、該外部バンカー
38の内部に、支持架構39を介して同心状に配置され
、中空円筒状をして、上端に上方へ進むに従って縮径す
るテーパ状の絞り部40が形成され、且つ、内部に前記
絞り部40とほぼ連続する傾斜面68を有する円錐状の
ストンボックスなどの開閉体41(以後、ストンボック
ス41という)が上端開口67から突出収納自在に設け
られ、下端に下方へ進むに従って縮径するテーパ状の絞
り部42が形成され、且つ、下端の下部に下方へ進むに
従い拡径して下端開口69よりも大きくなる傾斜面70
を有する円錐状のベルなどの開閉体43(以後、ベル4
3という)が設けられた内部バンカー44を備えている
The lower bunker 45 is arranged concentrically inside the outer bunker 38 via the support frame 39, and has a hollow cylindrical shape, and has a tapered diaphragm at the upper end that decreases in diameter as it moves upward. An opening/closing body 41 (hereinafter referred to as a stone box 41) such as a conical stone box having a slope 68 that is substantially continuous with the converging portion 40 is protruded from an upper end opening 67 and can be freely stored. A tapered constriction part 42 is formed at the lower end and the diameter thereof decreases as it goes downward, and an inclined surface 70 that increases in diameter as it goes downward and becomes larger than the lower end opening 69 is formed at the lower part of the lower end.
An opening/closing body 43 such as a conical bell (hereinafter referred to as bell 4)
3) is provided with an internal bunker 44.

【0035】上部バンカ−25のベル31及び下部バン
カー45のストンボックス41及びベル43は、図2・
図3に示すように、支持架構29,39にシリンダなど
の昇降装置46,47などを介して昇降可能に支持され
ている。
The bell 31 of the upper bunker 25 and the stone box 41 and bell 43 of the lower bunker 45 are shown in FIG.
As shown in FIG. 3, it is supported by support frames 29 and 39 via elevating devices 46 and 47 such as cylinders so that it can be raised and lowered.

【0036】尚、旋回シュート24と上部バンカー25
と下部バンカー45は同一の軸中心線を共有するように
配置されている。又、図中50は上部バンカー25の支
持架構29に、旋回シュート24の排出口34の真下に
位置するよう固定された固定ストンボックスである。
Furthermore, the turning chute 24 and the upper bunker 25
and the lower bunker 45 are arranged so as to share the same axis center line. Further, numeral 50 in the figure is a fixed stone box fixed to the support frame 29 of the upper bunker 25 so as to be located directly below the discharge port 34 of the swing chute 24.

【0037】次に、作動について説明する。Next, the operation will be explained.

【0038】先ず、上部バンカー25の原料ゲート27
及びベル31を閉じた状態にして、旋回シュート24が
内部に備えている図示しないダンパを排出口33側へ切
換え、図示しない原料槽からの原料21を原料コンベア
23を介して水平旋回されている旋回シュート24へと
投入する。
First, the raw material gate 27 of the upper bunker 25
With the bell 31 closed, a damper (not shown) provided inside the rotating chute 24 is switched to the discharge port 33 side, and the raw material 21 from the raw material tank (not shown) is horizontally rotated via the raw material conveyor 23. It is thrown into the rotating chute 24.

【0039】すると、旋回シュート24へ投入された原
料21は、旋回シュート24の排出口33を通って上部
バンカー25の外部バンカー28と内部バンカー32と
の間の空間に円周均等に供給される。
Then, the raw material 21 introduced into the rotating chute 24 is uniformly supplied to the space between the outer bunker 28 and the inner bunker 32 of the upper bunker 25 through the discharge port 33 of the rotating chute 24. .

【0040】所定量の原料21が外部バンカー28と内
部バンカー32との間の空間に供給されたら、旋回シュ
ート24が内部に備えている図示しないダンパを排出口
34側へ切換えることにより、前記とは異なる原料槽か
らの別の原料22、例えば、前記原料21が大粒焼結鉱
ならば細粒焼結鉱、高品位コークスならば低品位コーク
スを、前記と同様にして原料コンベア23及び旋回シュ
ート24を介して、内部バンカー32の内部へ供給する
When a predetermined amount of the raw material 21 is supplied to the space between the outer bunker 28 and the inner bunker 32, the above-mentioned operation is performed by switching the damper (not shown) provided inside the rotating chute 24 to the discharge port 34 side. is another raw material 22 from a different raw material tank, for example, if the raw material 21 is large-grained sintered ore, fine-grained sintered ore, if the raw material 21 is high-grade coke, low-grade coke is transferred to the raw material conveyor 23 and the rotating chute in the same manner as above. 24 into the interior of the internal bunker 32.

【0041】原料22が内部バンカー32の内部へ供給
されたら、上部シール弁35及び下部シール弁49並び
に流調ゲート37を閉じた状態において、図示しない圧
力調整手段により下部バンカー45の内部の圧力を大気
圧まで下げ(排圧操作)、更に、ストンボックス41及
びベル43を実線で示す位置に昇降して内部バンカー4
4の上下端開口67,69を閉じた状態として、上部シ
ール弁35を開き、次に上部バンカー25の流調ゲート
27を開く。
Once the raw material 22 is supplied into the internal bunker 32, with the upper seal valve 35, lower seal valve 49, and flow control gate 37 closed, the pressure inside the lower bunker 45 is adjusted by a pressure regulating means (not shown). Lower the pressure to atmospheric pressure (exhaust pressure operation), and then move the stone box 41 and bell 43 up and down to the position shown by the solid line to reach the inner bunker 4.
With the upper and lower end openings 67 and 69 of 4 closed, the upper seal valve 35 is opened, and then the flow control gate 27 of the upper bunker 25 is opened.

【0042】すると、上部バンカー25の外部バンカー
28と内部バンカー32との間の原料21が、先ず、流
調ゲート27、上部シール弁35を介して下部バンカー
45のストンボックス41上へ落下し、ストンボックス
41の傾斜面68に案内されて外部バンカー38と内部
バンカー44との間の空間へ供給される。
Then, the raw material 21 between the outer bunker 28 and the inner bunker 32 of the upper bunker 25 first falls onto the stone box 41 of the lower bunker 45 via the flow control gate 27 and the upper seal valve 35. It is guided by the inclined surface 68 of the stone box 41 and supplied to the space between the outer bunker 38 and the inner bunker 44.

【0043】この際、ストンボックス41に内部バンカ
ー44の絞り部40とほぼ連続する傾斜面68を形成し
たので、原料21が傾斜面68に沿って、前記空間へ周
方向均等に供給される。
At this time, since the stone box 41 has an inclined surface 68 that is substantially continuous with the constricted portion 40 of the internal bunker 44, the raw material 21 is uniformly supplied to the space along the inclined surface 68 in the circumferential direction.

【0044】上部バンカー25の外部バンカー28と内
部バンカー32との間から原料21がなくなったら、今
度は、下部バンカー45のベル41を仮想線で示す位置
まで下降して上端開口67を開き、その後、上部バンカ
ー25のベル31を仮想線で示す位置まで下降する。
When the raw material 21 disappears from between the outer bunker 28 and the inner bunker 32 of the upper bunker 25, the bell 41 of the lower bunker 45 is lowered to the position shown by the imaginary line to open the upper end opening 67, and then , the bell 31 of the upper bunker 25 is lowered to the position shown by the imaginary line.

【0045】これによって、上部バンカー25の内部バ
ンカー32の下端が開口し、内部バンカー32内部に貯
溜された原料22がベル31、流調ゲート27、上部シ
ール弁35を介して下部バンカー45の内部バンカー4
4へ供給される。
As a result, the lower end of the inner bunker 32 of the upper bunker 25 is opened, and the raw material 22 stored inside the inner bunker 32 flows into the lower bunker 45 via the bell 31, the flow control gate 27, and the upper seal valve 35. bunker 4
4.

【0046】上部バンカー25の内部バンカー32から
原料22がなくなったら、上部バンカー25の原料ゲー
ト27を閉じ、次に、上部シール弁35を閉じて、図示
しない圧力調整手段により下部バンカー45の圧力を炉
20の内部の圧力まで上げ(均圧操作)、しかる後に、
下部シール弁49を開き、次に、下部バンカー45の流
調ゲート37を開く。
When the raw material 22 is exhausted from the internal bunker 32 of the upper bunker 25, the raw material gate 27 of the upper bunker 25 is closed, then the upper seal valve 35 is closed, and the pressure of the lower bunker 45 is adjusted by a pressure regulating means (not shown). Raise the pressure to the inside of the furnace 20 (pressure equalization operation), and then,
The lower seal valve 49 is opened, and then the flow control gate 37 of the lower bunker 45 is opened.

【0047】すると、下部バンカー45の外部バンカー
38と内部バンカー44との間の空間へ供給された原料
21が、先ず、流調ゲート37、下部シール弁49を介
して、分配シュート48上へ落下し、分配シュート48
から炉20の内部へ装入される。
Then, the raw material 21 supplied to the space between the outer bunker 38 and the inner bunker 44 of the lower bunker 45 first falls onto the distribution chute 48 via the flow control gate 37 and the lower seal valve 49. and distribution chute 48
From there, it is charged into the furnace 20.

【0048】下部バンカー45の外部バンカー38と内
部バンカー44との間の原料21がなくなったら、ベル
43を仮想線で示す位置まで下降して下端開口69を開
き、内部バンカー44の原料22をベル43、流調ゲー
ト37、下部シール弁49、分配シュート48を介して
炉20の内部へ装入する。
When the raw material 21 between the outer bunker 38 and the inner bunker 44 of the lower bunker 45 is exhausted, the bell 43 is lowered to the position shown by the imaginary line, the lower end opening 69 is opened, and the raw material 22 of the inner bunker 44 is removed from the bell. 43, and is charged into the furnace 20 via the flow control gate 37, the lower seal valve 49, and the distribution chute 48.

【0049】この際、ベル43に傾斜面70を形成して
いるので、原料22が周方向に均等に分散された状態で
内部バンカー44から落下する。
At this time, since the bell 43 has the inclined surface 70, the raw material 22 falls from the internal bunker 44 in a state where it is evenly distributed in the circumferential direction.

【0050】原料22が炉20の内部へ装入されたら、
1回の装入サイクルが完了する。
Once the raw material 22 is charged into the furnace 20,
One charging cycle is completed.

【0051】そして、下部バンカー45からの原料21
,22の炉20への装入中に、前記と同様にして上部バ
ンカー25に原料を供給することにより次の装入サイク
ルが開始される。
Then, the raw material 21 from the lower bunker 45
, 22 into the furnace 20, the next charging cycle is started by supplying raw material to the upper bunker 25 in the same manner as described above.

【0052】この際、下部バンカー45において、外部
バンカー38の内部に内部バンカー44を同心状に二重
に配置したので、原料21,22に不均等な水平方向の
運動成分を持たせずに、流調ゲート37から水平旋回及
び上下揺動されている分配シュート48へと落下させる
ことができ、よって、原料21,22の炉20の円周方
向に対する分布が安定・確実になり、原料20,21を
炉20の中に円周方向均等に装入することが可能となる
At this time, in the lower bunker 45, since the inner bunker 44 is arranged concentrically double inside the outer bunker 38, the raw materials 21 and 22 are prevented from having uneven horizontal movement components. The raw materials 21 and 22 can be dropped from the flow control gate 37 to the distribution chute 48 which is horizontally rotated and vertically swung, so that the distribution of the raw materials 21 and 22 in the circumferential direction of the furnace 20 is stable and reliable. 21 into the furnace 20 evenly in the circumferential direction.

【0053】又、下部バンカー45において、外部バン
カー38の内部に内部バンカー44を同心状に設けたの
で、1回の装入サイクルで炉20内に二種類の原料21
,22を装入することが可能となり、その分、原料21
,22装入時に必要となる均圧操作、排圧操作の回数が
半減されるので、装入工程及び時間が短縮されることに
よりオーバーフィリング能力(炉20の内に定常時以上
の量の原料21,22を装入する能力)が向上される。
Furthermore, in the lower bunker 45, since the inner bunker 44 is provided concentrically inside the outer bunker 38, two types of raw materials 21 are placed in the furnace 20 in one charging cycle.
, 22 can be charged, and the raw material 21 can be charged accordingly.
, 22 The number of pressure equalization operations and pressure evacuation operations required at the time of charging is halved, so the charging process and time are shortened, resulting in overfilling capacity (the amount of raw material in the furnace 20 that is greater than that at normal times) is reduced by half. 21, 22) is improved.

【0054】更に、下部バンカー45の内部バンカー4
4の下端開口69に、下方へ進むに従って拡径し下端開
口69よりも拡がる傾斜面70を有するベル43を開閉
可能に設けたので、下端開口69とベル43との間に原
料22の噛み込み及びブリッジが起こりにくく、下端開
口69を確実に開閉することができる。
Furthermore, the inner bunker 4 of the lower bunker 45
A bell 43 having an inclined surface 70 whose diameter increases as it goes downward and becomes wider than the lower end opening 69 is provided in the lower end opening 69 of 4 so that it can be opened and closed. Also, bridging is less likely to occur, and the lower end opening 69 can be opened and closed reliably.

【0055】図4・図5は、本発明の第二の実施例であ
り、上部バンカー25を半径方向に延びる仕切板51を
用いて複数(2種類)の原料21,22を貯溜可能な室
52,53に仕切り、上部バンカー25の上方に1つの
排出口を有する分配シュート24を設けた他は、前記実
施例とほぼ同様の構成を備えており、同様の作用・効果
を得ることができる。
FIGS. 4 and 5 show a second embodiment of the present invention, in which an upper bunker 25 is formed into a chamber capable of storing a plurality of (two types) raw materials 21 and 22 using a partition plate 51 extending in the radial direction. 52 and 53 and a distribution chute 24 having one discharge port above the upper bunker 25, the structure is almost the same as that of the previous embodiment, and the same functions and effects can be obtained. .

【0056】尚、各室52,53に選択的に原料21,
22投入する際には、分配シュート24の回転を停止し
、排出口を室52,53のどちらか一方の上方で停止さ
せておくようにする。又は室52内に均等に分配するた
めに連続又は断続に原料落下位置を移動させる。
[0056] The raw material 21,
22, the rotation of the distribution chute 24 is stopped and the discharge port is stopped above one of the chambers 52 and 53. Alternatively, the raw material dropping position may be moved continuously or intermittently in order to distribute the raw material evenly within the chamber 52.

【0057】又、図中54,55は各室52,53と流
調ゲート27との間に設けられた原料ゲートである。
Further, reference numerals 54 and 55 in the figure are raw material gates provided between the respective chambers 52 and 53 and the flow control gate 27.

【0058】図6〜図8は、本発明の第三の実施例であ
り、上部バンカー25及び下部バンカー45のそれぞれ
に対し、外部バンカー28,38の内部に内部バンカー
56,57及び58,59を二重に設けて、三種類の原
料60,61,62を貯溜し、外側の原料60,61,
62から順番に炉20に対して装入できるようにした他
は、前記実施例とほぼ同様の構成を備えており、同様の
作用・効果を得ることができる。
FIGS. 6 to 8 show a third embodiment of the present invention, in which internal bunkers 56, 57 and 58, 59 are provided inside external bunkers 28, 38 for upper bunker 25 and lower bunker 45, respectively. are provided twice to store three types of raw materials 60, 61, 62, and the outer raw materials 60, 61,
The structure is substantially the same as that of the embodiment described above, except that it can be charged into the furnace 20 in order starting from 62, and the same functions and effects can be obtained.

【0059】この場合において、上部バンカー25及び
下部バンカー45のベル63,64は、図7・図8に示
すように、二重構造になっており、それぞれシリンダな
どの昇降装置65,66によって昇降可能に支持されて
、外方の原料60,61,62から先に排出し得るよう
になっている。
In this case, the bells 63 and 64 of the upper bunker 25 and the lower bunker 45 have a double structure, as shown in FIGS. 7 and 8, and are lifted and lowered by lifting devices 65 and 66 such as cylinders, respectively. The outer raw materials 60, 61, and 62 can be discharged first.

【0060】尚、本発明は、上述の実施例にのみ限定さ
れるものではなく、内部バンカーを多重に設けて多数種
類の原料を装入できるようにしても良いこと、上部バン
カーの構造は任意であること、上部バンカーを省略して
コンベア及びコンベアシュートから直接原料をストンボ
ックス41上に導入することも可能である。その他、本
発明の要旨を逸脱しない範囲内において種々変更を加え
得ることは勿論である。
It should be noted that the present invention is not limited to the above-described embodiments, and that the internal bunker may be provided in multiple layers so that many kinds of raw materials can be charged therein, and that the structure of the upper bunker may be arbitrarily selected. However, it is also possible to omit the upper bunker and introduce the raw material directly onto the stone box 41 from the conveyor and conveyor chute. It goes without saying that various other changes may be made without departing from the gist of the present invention.

【0061】[0061]

【発明の効果】以上説明したように、請求項1の発明に
よれば、原料の炉内での円周方向に対する均一装入性の
確保と、鉱石、コークスの一方又は両方に複数種類の原
料を分割装入する場合の装入工程の短縮とそれに伴うオ
ーバーフィリング能力の向上を両立し得るという優れた
効果を奏し得、請求項2の発明によれば、円錐状開閉体
により原料を均等に分散させることができかつ所定の量
の原料を外部バンカーと内部バンカーに貯溜することが
できるという優れた効果を奏し得、請求項3の発明によ
れば、内部バンカー下端開口よりも拡がる傾斜面を備え
た開閉体により下端開口と開閉体との間の原料噛み込み
及びブリッジが防止され確実に下端開口を開閉し得かつ
流調ゲートに対して全周から均等に原料を供給すること
ができて原料の水平方向運動成分の均等化が可能になり
分配シュートを経て炉内に分配される原料の円周方向均
一な分布を達成できるという優れた効果を奏し得る。
As explained above, according to the invention of claim 1, it is possible to ensure uniform charging of raw materials in the circumferential direction in the furnace, and to ensure that a plurality of types of raw materials are used in one or both of ore and coke. According to the invention of claim 2, the material can be evenly distributed by the conical opening/closing body. It has the excellent effect of being able to disperse and store a predetermined amount of raw material in the external bunker and the internal bunker. The provided opening/closing body prevents the raw material from being caught in or bridging between the lower end opening and the opening/closing body, making it possible to reliably open and close the lower end opening and supplying raw materials evenly from the entire circumference to the flow control gate. It is possible to equalize the horizontal motion component of the raw material, and it is possible to achieve an excellent effect of achieving uniform distribution in the circumferential direction of the raw material distributed into the furnace via the distribution chute.

【図面の簡単な説明】[Brief explanation of drawings]

【図1】本発明の第一の実施例の全体側断面図である。FIG. 1 is an overall side sectional view of a first embodiment of the present invention.

【図2】図1のベル及びストンボックスの昇降機構部分
を示す正面図である。
FIG. 2 is a front view showing a lifting mechanism portion of the bell and stone box in FIG. 1;

【図3】図1のベル及びストンボックスの昇降機構部分
を示す側面図である。
3 is a side view showing a lifting mechanism portion of the bell and stone box in FIG. 1; FIG.

【図4】本発明の第二の実施例の全体側断面図である。FIG. 4 is an overall side sectional view of a second embodiment of the invention.

【図5】図4のV−V矢視図である。FIG. 5 is a view taken along the line V-V in FIG. 4;

【図6】本発明の第三の実施例の全体側断面図である。FIG. 6 is an overall side sectional view of a third embodiment of the present invention.

【図7】図6のベル及びストンボックスの昇降機構部分
を示す正面図である。
7 is a front view showing a lifting mechanism portion of the bell and stone box in FIG. 6; FIG.

【図8】図6のベル及びストンボックスの昇降機構部分
を示す側面図である。
8 is a side view showing a lifting mechanism portion of the bell and stone box of FIG. 6; FIG.

【図9】従来の並列バンカー式原料装入装置の概略全体
側断面図である。
FIG. 9 is a schematic overall side sectional view of a conventional parallel bunker type raw material charging device.

【図10】従来のセンターフィード式原料装入装置の概
略全体側断面図である。
FIG. 10 is a schematic overall side sectional view of a conventional center-feed raw material charging device.

【図11】従来のセンターフィード式の原料装入装置の
他の例における概略全体側断面図である。
FIG. 11 is a schematic overall side sectional view of another example of a conventional center-feed type raw material charging device.

【符号の説明】[Explanation of symbols]

21,22,60,61,62 原料 37 流調ゲート 38 外部バンカー 40,42 絞り部 41 開閉体(ストンボックス) 43,63,64 開閉体(ベル) 44,58,59 内部バンカー 67 上端開口 68,70 傾斜面 69 下端開口 21, 22, 60, 61, 62 Raw materials 37 Flow control gate 38 External bunker 40, 42 Aperture part 41 Opening/closing body (stone box) 43, 63, 64 Opening/closing body (bell) 44,58,59 Internal bunker 67 Upper end opening 68,70 Slope 69 Lower end opening

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】  下端に流調ゲートを有して内部に原料
を貯溜可能な外部バンカーの内部に、上下端が開口で且
つ下端に開口を開閉可能な開閉体を有すると共に内部に
外部バンカーとは別の原料を貯溜可能な内部バンカーを
、少なくとも一基以上同心状に配設したことを特徴とす
る原料装入装置。
Claim 1: An external bunker having a flow control gate at the lower end and capable of storing raw materials therein, has an opening at the upper and lower ends and an opening/closing body that can open and close the opening at the lower end, and an external bunker inside. A raw material charging device characterized in that at least one internal bunker capable of storing another raw material is arranged concentrically.
【請求項2】  内部バンカーの上端の開口を内部バン
カーの中央部直径より小さくし昇降可能な円錐状開閉体
によって開閉可能となるように配設した請求項1記載の
原料装入装置。
2. The raw material charging device according to claim 1, wherein the opening at the upper end of the internal bunker is made smaller than the diameter of the central part of the internal bunker and is arranged to be opened and closed by a conical opening/closing body that can be raised and lowered.
【請求項3】  内部バンカーの下端に下方へ進むに従
い縮径するテーパ状の絞り部を形成し、且つ、内部バン
カー下端の開閉体は下方へ進むに従い拡径して内部バン
カー下端の開口よりも大きくなる傾斜面を有する請求項
1又は2記載の原料装入装置。
3. A tapered constriction part is formed at the lower end of the internal bunker, and the opening/closing body at the lower end of the internal bunker expands in diameter as it progresses downward, and the opening/closing body at the lower end of the internal bunker expands in diameter as it progresses downward. The raw material charging device according to claim 1 or 2, having an inclined surface that increases in size.
JP16005691A 1991-06-03 1991-06-03 Raw material charging device Expired - Lifetime JPH0694567B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16005691A JPH0694567B2 (en) 1991-06-03 1991-06-03 Raw material charging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16005691A JPH0694567B2 (en) 1991-06-03 1991-06-03 Raw material charging device

Publications (2)

Publication Number Publication Date
JPH04358011A true JPH04358011A (en) 1992-12-11
JPH0694567B2 JPH0694567B2 (en) 1994-11-24

Family

ID=15706956

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16005691A Expired - Lifetime JPH0694567B2 (en) 1991-06-03 1991-06-03 Raw material charging device

Country Status (1)

Country Link
JP (1) JPH0694567B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008202081A (en) * 2007-02-19 2008-09-04 Jfe Steel Kk Apparatus for charging raw material into bell-less blast furnace
EP2543581A1 (en) 2011-07-07 2013-01-09 Honda Motor Co., Ltd. Cowl structure of saddle-ride type vehicle
JP2014077195A (en) * 2012-09-18 2014-05-01 Jfe Steel Corp Method for charging raw material in blast furnace
WO2020027465A1 (en) * 2018-07-30 2020-02-06 주식회사 포스코 Raw material storage device and raw material storage method
JP2021505838A (en) * 2017-12-07 2021-02-18 ポール ワース エス.アー. Charge system for shaft melt reduction furnace

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008202081A (en) * 2007-02-19 2008-09-04 Jfe Steel Kk Apparatus for charging raw material into bell-less blast furnace
EP2543581A1 (en) 2011-07-07 2013-01-09 Honda Motor Co., Ltd. Cowl structure of saddle-ride type vehicle
JP2014077195A (en) * 2012-09-18 2014-05-01 Jfe Steel Corp Method for charging raw material in blast furnace
JP2021505838A (en) * 2017-12-07 2021-02-18 ポール ワース エス.アー. Charge system for shaft melt reduction furnace
WO2020027465A1 (en) * 2018-07-30 2020-02-06 주식회사 포스코 Raw material storage device and raw material storage method
KR20200013465A (en) * 2018-07-30 2020-02-07 주식회사 포스코 Apparatus for storing raw material and method for storing raw material

Also Published As

Publication number Publication date
JPH0694567B2 (en) 1994-11-24

Similar Documents

Publication Publication Date Title
US3921831A (en) Device for distributing raw materials into blast furnace
JPH04358011A (en) Device for charging raw material
US4067452A (en) Charging apparatus for receptacle
US3302805A (en) Materials distributor of a blast furnace
JP2008202081A (en) Apparatus for charging raw material into bell-less blast furnace
JP4296912B2 (en) Raw material charging method for vertical furnace
JP4608906B2 (en) Raw material charging method for bell-less blast furnace
US2671017A (en) Method of charging a blast furnace
JPH0421814Y2 (en)
JPS586910A (en) Charging device for raw material into blast furnace
JP2001279309A (en) Method for charging raw material into blast furnace
JPS60251208A (en) Method for charging raw material to blast furnace
JPS63100113A (en) Bell-less charging apparatus in blast furnace
JPS61157604A (en) Introducting method of raw material for blast furnace
JPH0329311Y2 (en)
JP2892065B2 (en) Bell-less blast furnace raw material charging method
JPH0222409A (en) Furnace top charging apparatus in blast furnace
JPH04235206A (en) Method and apparatus for charging raw material in bellless blast furnace
JPH02305911A (en) Bell-less type raw material charging method for vertical furnace
JPH0967606A (en) Device for charging raw material into vertical type furnace
KR20020037545A (en) Method for charging the charging materials into the blast furnace
JPS6031065Y2 (en) Bellless charging device with multiple upper hoppers
SU1659492A1 (en) Blast furnace charging gear
US1938580A (en) Blast furnace and process of charging same
US3542219A (en) Raw material charging apparatus in a shaft furnace