JPH04351032A - Network changeover control method - Google Patents

Network changeover control method

Info

Publication number
JPH04351032A
JPH04351032A JP3152395A JP15239591A JPH04351032A JP H04351032 A JPH04351032 A JP H04351032A JP 3152395 A JP3152395 A JP 3152395A JP 15239591 A JP15239591 A JP 15239591A JP H04351032 A JPH04351032 A JP H04351032A
Authority
JP
Japan
Prior art keywords
switching control
node
nodes
network
communication
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP3152395A
Other languages
Japanese (ja)
Inventor
Masaaki Iwasaki
岩崎 雅明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Original Assignee
Fujitsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Ltd filed Critical Fujitsu Ltd
Priority to JP3152395A priority Critical patent/JPH04351032A/en
Priority to US07/891,153 priority patent/US5347271A/en
Publication of JPH04351032A publication Critical patent/JPH04351032A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • H04L45/24Multipath
    • H04L45/247Multipath using M:N active or standby paths
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • H04L45/28Routing or path finding of packets in data switching networks using route fault recovery
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q3/00Selecting arrangements
    • H04Q3/0016Arrangements providing connection between exchanges
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q3/00Selecting arrangements
    • H04Q3/0016Arrangements providing connection between exchanges
    • H04Q3/0062Provisions for network management
    • H04Q3/0075Fault management techniques
    • H04Q3/0079Fault management techniques involving restoration of networks, e.g. disaster recovery, self-healing networks

Abstract

PURPOSE:To minimize a communication error at fault changeover and to multiplex a switching control instruction onto a high speed signal by using the switching control instruction so as to recognize a destination on the occurrence of a fault and generating a transfer instruction so as to apply high speed switching control to a standby line. CONSTITUTION:A signal generating section 2-0 in a node 2 outputs a network switching control instruction and a communication section 2-3 makes communication with an adjacent node. A communication control priority deciding section 2-4 identifies the sent information to discriminate the priority and commands the signal generation to the generating section 2-0. A temporary storage section 2-5 stores various information. A fault information detection line connection control section detects it when a fault takes place and sends it to a network switching control instruction transfer circuit section in the case of the fault to be relieved or implements line connection control. A switching control instruction is generated accordingly and stored in the storage section 2-5, and the information with priority is sequentially transferred to the discrimination section 2-4. Since the information is multiplexed on the main signal with the switching control instruction only, the utilizing efficiency of the signal is enhanced.

Description

【発明の詳細な説明】[Detailed description of the invention]

【0001】0001

【産業上の利用分野】本発明はネットワーク切替制御方
法に係り、特に複数のノードを回線で接続して構成する
通信ネットワークにおいて、異常発生時に他のノードを
経由する予備ルートへの切替時間を短時間にするように
したこと及び予備ルートを最適なものにあらかじめ決定
しておくようにしたものに関する。
[Industrial Application Field] The present invention relates to a network switching control method, and in particular, in a communication network configured by connecting multiple nodes via lines, the present invention reduces the time required to switch to a backup route via another node when an abnormality occurs. The present invention relates to an arrangement in which the time is set and an optimum backup route is determined in advance.

【0002】0002

【従来の技術】近年の通信ネットワークの需要の増加及
びその重要度の増大に伴い、通信設備及び通信回線のい
かなる異常に対しても通信サービスを確保し、しかも異
常時のサービス停止期間を最小とする通信ネットワーク
が要求されている。このため一部のノードまたは回線の
異常時に、予備ルートチャンネルへ切替えることが必要
である。
[Background Art] With the increase in demand and importance of communication networks in recent years, it is necessary to ensure communication services even in the event of any abnormality in communication equipment or communication lines, and to minimize the period of service outage in the event of an abnormality. A communication network is required. Therefore, it is necessary to switch to a backup route channel when some nodes or lines become abnormal.

【0003】従来の切替制御方式では、例えば図15(
A)に示す如く、光端局中継装置100−0,100−
1・・・100−nと、光端局中継装置110−0,1
10−1〜110−nとの間に光中間局中継装置102
−0,102−1〜102−nを設けてこれらを光ファ
イバーで構成される伝送路103,103で接続してい
る。
[0003] In the conventional switching control system, for example, as shown in FIG.
As shown in A), optical terminal relay devices 100-0, 100-
1...100-n and optical terminal relay equipment 110-0,1
Optical intermediate station repeater 102 between 10-1 and 110-n
-0, 102-1 to 102-n are provided, and these are connected by transmission lines 103, 103 composed of optical fibers.

【0004】この場合、光端局中継装置100−1〜1
00−n、光中間局中継装置102−1〜102−n、
光端局中継装置110−1〜110−nにより現用回線
を構成し、光端局中継装置100−0、光中間局中継装
置102−0、光端局中継装置110−0により予備回
線を構成している。なお図15において101は切替制
御装置であり、入力側の通信チャンネルを光端局中継装
置100−1〜100−nまたは100−0と選択的に
切替制御するものである。同様に切替制御装置111は
光端局中継装置110−1〜110−nまたは110−
0と出力側の通信チャンネルを選択的に切替制御するも
のである。
In this case, optical terminal relay devices 100-1 to 1
00-n, optical intermediate station relay devices 102-1 to 102-n,
The optical terminal station relay devices 110-1 to 110-n constitute a working line, and the optical terminal station relay device 100-0, the optical intermediate station relay device 102-0, and the optical terminal station relay device 110-0 constitute a protection line. are doing. In FIG. 15, reference numeral 101 denotes a switching control device, which selectively controls switching of the communication channel on the input side to the optical terminal relay devices 100-1 to 100-n or 100-0. Similarly, the switching control device 111 is the optical terminal relay device 110-1 to 110-n or 110-n.
0 and the output side communication channel are selectively switched and controlled.

【0005】通常は、図15(A)に示す如く、現用回
線で運用されているが、例えば光中間局中継装置102
−nのルートに障害が発生すれば、図8(B)に示す如
く、切替制御装置101、111はこれを予備回線側の
光端局中継装置100−0、光中間局中継装置102−
0、光端局中継装置110−0に切替えて使用される。 そしてこの切替時間は、交換機のサービス接続を切らな
い程度に小さくする必要がある。
Normally, as shown in FIG. 15(A), it is operated on a working line;
If a failure occurs in route -n, as shown in FIG.
0, and is used by switching to the optical terminal relay device 110-0. This switching time needs to be short enough to not disconnect the service of the exchange.

【0006】ところで、従来の切替制御方式では、ひと
つのルート内(例えば数10本の光ファイバーを束ねて
ひとつの被覆に収めた通信路)に、現用回線と予備回線
を収めており、現用回線の障害時に予備回線に切替えて
いた。
By the way, in the conventional switching control system, the working line and the protection line are housed within one route (for example, a communication path in which several dozen optical fibers are bundled and housed in one coating), and the working line is The line was switched to a backup line when a failure occurred.

【0007】[0007]

【発明が解決しようとする課題】ところが土木工事など
により、誤ってルート毎、全体が切断されるという全断
のとき、予備回線も切断されるため、予備回線の意味を
なさなかった。このような全断時には人手により別ルー
トに繋ぎ変えるために、通信サービスの回復に大きな時
間がかかった。
[Problem to be Solved by the Invention] However, in the event of a complete disconnection in which an entire route is accidentally disconnected due to civil engineering work, etc., the backup line is also disconnected, making the backup line meaningless. In the event of a complete outage like this, it took a long time for communication services to be restored as they had to be manually rerouted to a different route.

【0008】このため、従来では図16(A)に示す如
く、ノード2A〜2Iを光ファイバー121により接続
してネットワークを構成するとともに、ネットワーク管
理装置120と各ノード間を点線で示す制御線122で
接続し、ネットワーク管理装置120からの接続指令に
より各ノード間の接続指示を行っている。
For this reason, conventionally, as shown in FIG. 16A, a network is constructed by connecting nodes 2A to 2I with optical fibers 121, and control lines 122 shown by dotted lines are connected between the network management device 120 and each node. The network management device 120 instructs the connection between each node based on a connection command from the network management device 120.

【0009】例えばノード2A−2D−2G−2Hを経
由する通信チャンネル(パス)4Cが形成されていると
きに、×印で示す如く、ノード2Dと2G間に、例えば
全断の如き障害が発生してこれがノード2Aに通知され
たとき、ノード2Aがネットワーク管理装置120の指
示によりノード2A−2B−2E−2Hを経由する通信
チャンネル5Cを形成するように制御が行われる。
For example, when a communication channel (path) 4C passing through nodes 2A-2D-2G-2H is formed, a failure such as a complete disconnection occurs between nodes 2D and 2G, as shown by the x mark. When this is notified to node 2A, control is performed so that node 2A forms a communication channel 5C via nodes 2A-2B-2E-2H under instructions from network management device 120.

【0010】このため、図16(B)に示す如く、ノー
ド2Aがノード2Bに対し通信チャンネル5Cを形成す
るための切替制御命令を作成してこれを転送し、ノード
2Bを切替処理する。次にノード2Eに対し同様な切替
制御命令を作成してこれを転送し、ノード2Bを切替処
理する。ノード2Hに対しても同様な切替処理を行う。 このように、従来の場合には、ノード2Aより、各ノー
ド毎に対して切替制御命令を順次作成、転送することが
必要であった。そのため所望の通信チャンネルを形成す
るために非常に時間がかかるという欠点があった。本発
明の目的は、短時間で通信チャンネルを形成することで
ある。
Therefore, as shown in FIG. 16(B), the node 2A creates a switching control command for forming a communication channel 5C with the node 2B, transfers it, and performs switching processing on the node 2B. Next, a similar switching control command is created and transferred to node 2E, and switching processing is performed on node 2B. Similar switching processing is performed for node 2H as well. As described above, in the conventional case, it was necessary to sequentially create and transfer switching control commands to each node from the node 2A. Therefore, there is a drawback that it takes a very long time to form a desired communication channel. The aim of the invention is to create a communication channel in a short time.

【0011】しかし従来では、このネットワーク切替制
御命令は、図17(A)に示す如く、データ多重化部1
30により、同図(B)に示す如き、固定化された信号
フレームフォーマットで形成される。
However, in the past, this network switching control command was issued to the data multiplexer 1 as shown in FIG. 17(A).
30, the signal frame is formed in a fixed signal frame format as shown in FIG. 3(B).

【0012】すなわち、主信号に多重化される制御情報
としては、図17(B)に示す如く、切替制御命令、警
報情報、回線設定情報、試験制御情報、その他の情報(
2個分)等により、信号フレームを形成する。そしてこ
れらの情報の容量は、図17(A)に示す如く、切替制
御命令分として512kbps、警報情報分として12
8kbps、回線設定情報分として256kbps、試
験制御情報分として128kbps、その他の情報用と
して256kbps×2割当てられ、1792kbps
の信号フレームとなって主信号へさらに多重化される。
That is, as shown in FIG. 17(B), the control information multiplexed on the main signal includes switching control commands, alarm information, line setting information, test control information, and other information (
2), etc., to form a signal frame. As shown in FIG. 17(A), the capacity of this information is 512 kbps for switching control commands and 12 kbps for alarm information.
8 kbps, 256 kbps for line setting information, 128 kbps for test control information, 256 kbps x 2 allocated for other information, 1792 kbps
signal frame and is further multiplexed into the main signal.

【0013】この信号フレームフォーマットは、固定フ
ォーマットのため、普段は使用しない回線設定情報や試
験制御情報等に対しても常にその回線容量を確保してお
り、それぞれの必要最低限のデータ速度をそれぞれ多重
化するため、全体として大きな容量とならざるを得なか
った。したがって、本発明の第2の目的は、切替制御命
令を効率的に送出することである。
[0013] Since this signal frame format is a fixed format, line capacity is always secured even for line setting information, test control information, etc. that are not normally used, and the minimum data speed required for each is set individually. Due to multiplexing, the overall capacity had to be large. Therefore, a second object of the present invention is to efficiently send switching control commands.

【0014】[0014]

【課題を解決するための手段】本発明では、図1(A)
に示す如く、ノード2に信号作成部2−0と、事故検出
部2−1と、ネットワーク(NT)データ保持部2−2
を設ける。事故検出部2−1が障害を検出したとき、ノ
ード2はこれをネットワーク管理装置1に通知する。ネ
ットワーク管理装置1は、その障害の場所と、ノード2
の通信先に応じて予備回線ルートのデータをノード2に
送出する。ノード2はこれをNTデータ保持部2−2に
一時保持し、図1(B)に示す如きフォーマットの切替
制御命令を信号作成部2−0で作成する。
[Means for Solving the Problems] In the present invention, FIG.
As shown in the figure, the node 2 includes a signal generation section 2-0, an accident detection section 2-1, and a network (NT) data holding section 2-2
will be established. When the accident detection unit 2-1 detects a failure, the node 2 notifies the network management device 1 of this. The network management device 1 determines the location of the failure and the node 2.
Data on the backup line route is sent to node 2 according to the communication destination. The node 2 temporarily stores this in the NT data holding unit 2-2, and creates a switching control command in the format shown in FIG. 1(B) in the signal creating unit 2-0.

【0015】例えば、ネットワーク構成が、図16(A
)に示す場合において、ノード2A−2B−2E−2H
で示す通信チャンネルを形成する場合、ノード2Aの信
号作成部2−0では図1(B)に示すフォーマットの切
替制御命令Aを作成するが、このとき、アドレス部A−
2には2Bだけを記入する。そして制御部A−3にはノ
ード2A−2B間の通信を行うための制御情報を記入し
、ネットワークアドレス部A−4にノード2B、2E、
2Hを記入する。そして切替制御命令部A−5には、切
替制御命令と、接続方向やチャンネル番号をノード別に
記入する。そしてエラーチェック部A−6と、開始・終
了を示すフラグ部A−1、A−7を付加して切替制御命
令Aが作成される。ノード2Aではノード2D側からノ
ード2B側に対する切替処理が行われ、この切替制御命
令Aがノード2Bに転送される。
For example, the network configuration is shown in FIG.
), in the case shown in node 2A-2B-2E-2H
When forming the communication channel shown in , the signal creation unit 2-0 of the node 2A creates the switching control command A in the format shown in FIG.
In 2, enter only 2B. Control information for communicating between the nodes 2A and 2B is written in the control section A-3, and nodes 2B, 2E, and
Fill in 2H. In the switching control command section A-5, the switching control command, connection direction, and channel number are entered for each node. Then, a switching control command A is created by adding an error check section A-6 and flag sections A-1 and A-7 indicating start and end. In the node 2A, switching processing from the node 2D side to the node 2B side is performed, and this switching control command A is transferred to the node 2B.

【0016】ノード2Bではこの切替制御命令Aを受け
てネットワークアドレス部A−4まで解読したとき、回
送先が2Eであることを認識し、図1(B)のBに示す
如き制御命令の作成を始める。初めに開始用フラグ部B
−1を作成し、アドレス部B−2には2Eを記入し、制
御部B−3にはノード2Bと2E間の通信を行うための
制御情報を記入し、ネットワークアドレス部B−4には
ノード2E、2Hを記入する。このときまでに切替制御
命令Aの切替制御命令部A−5が読み出されているので
、これにもとづきノード2E、2Hに対する切替制御命
令が記入され、エラーチェック部とデータの終了を示す
フラグ部が付加された命令が次のノード2Eに回送され
る。勿論ノード2Bではノード2Aから転送された命令
による切替処理が行われる。
When the node 2B receives this switching control command A and decodes the network address part A-4, it recognizes that the forwarding destination is 2E, and creates a control command as shown in B of FIG. 1(B). Start. First, start flag part B
-1, write 2E in the address part B-2, write control information for communication between nodes 2B and 2E in the control part B-3, and write in the network address part B-4 the control information for communication between nodes 2B and 2E. Enter nodes 2E and 2H. Since the switching control command part A-5 of the switching control command A has been read by this time, the switching control commands for nodes 2E and 2H are written based on this, and the error check part and the flag part indicating the end of data are written. The instruction to which is added is forwarded to the next node 2E. Of course, the switching process is performed in the node 2B according to the command transferred from the node 2A.

【0017】ノード2Eでも同様な命令回送と切替処理
が行われ、ノード2Hではノード2Eより回送された命
令にもとづき切替処理が行われる。
Similar command forwarding and switching processing is performed at node 2E, and switching processing is performed at node 2H based on the command forwarded from node 2E.

【0018】[0018]

【作用】このように本発明によれば初めのノード2Aか
らは1回だけ切替制御命令が送出されるだけであり、し
かもこれを受取ったノードではそのネットワークアドレ
ス部をみて、命令の回送先を認識し、回送命令の作成を
始める。そして切替制御命令のみで送信データを作成し
送出するので、従来のように警報情報、回線設定情報、
試験制御情報等の部分をフレームに用意する必要もなく
、速く切替制御命令を各ノードに順次転送することがで
き、したがって予備回線を使用した通信チャンネルを速
く設定することができる。
[Operation] According to the present invention, the switching control command is sent only once from the first node 2A, and the node that receives it looks at the network address part and determines the destination of the command. Recognize it and start creating forwarding instructions. Since the transmission data is created and sent using only the switching control command, alarm information, line setting information,
There is no need to prepare portions such as test control information in the frame, and switching control commands can be sequentially transferred to each node quickly, so a communication channel using a protection line can be quickly set up.

【0019】[0019]

【実施例】本発明の一実施例を図2〜図7にもとづき説
明する。図2はノードのデータ多重化部説明図、図3は
ネットワーク切替制御命令転送回路説明図、図4はネッ
トワーク切替制御命令ノードアドレス指定方式説明図、
図5はネットワーク管理装置構成例、図6はノード装置
例、図7は切替制御部・通信アダプタ構成図である。
[Embodiment] An embodiment of the present invention will be described based on FIGS. 2 to 7. FIG. 2 is an explanatory diagram of a data multiplexing section of a node, FIG. 3 is an explanatory diagram of a network switching control command transfer circuit, and FIG. 4 is an explanatory diagram of a network switching control command node address designation system.
FIG. 5 is a configuration example of a network management device, FIG. 6 is an example of a node device, and FIG. 7 is a configuration diagram of a switching control unit/communication adapter.

【0020】図2において、2はノードのデータ多重化
部、2−3は通信部、2−4は通信制御・優先判定部、
2−5は一時記憶部である。
In FIG. 2, 2 is a data multiplexing section of the node, 2-3 is a communication section, 2-4 is a communication control/priority determination section,
2-5 is a temporary storage section.

【0021】通信部2−3は隣接ノードとの通信を行う
ものであり、一時記憶部2−5のデータをシリアルデー
タとして通信を行い、例えば1792kbpsの信号を
送出して、主信号に更らに多重化するものである。
[0021] The communication unit 2-3 is for communicating with adjacent nodes, and performs communication using the data in the temporary storage unit 2-5 as serial data, and sends out a signal of, for example, 1792 kbps, which is added to the main signal. It is multiplexed into

【0022】例えば信号作成部2−0で作成された、図
1(B)に示す如き、ネットワーク切替制御命令をシリ
アル出力するが、信号作成部2−0で作成された信号は
、このネットワーク切替制御命令に限定されるものでは
なく、警報情報、回線設定情報、試験制御情報その他の
情報が作成されるので、一般的には図2(B)に示す如
きフレームフォーマットでこれらの信号を示す。
For example, the network switching control command created by the signal creation unit 2-0 as shown in FIG. 1(B) is serially output. Since the information is not limited to control commands, but also alarm information, line setting information, test control information, and other information, these signals are generally shown in a frame format as shown in FIG. 2(B).

【0023】通信制御・優先判定部2−4は、各種情報
源から伝達された切替制御命令、警報情報、回線設定情
報等各種の情報を識別してその優先順位を判別し、これ
らのデータ送出要求に応じた信号の作成を信号作成部2
−0に指示するものである。なお、優先順位は、切替制
御命令が1位であり、以下警報情報、回線設定情報、試
験制御情報の順位である。
[0023] The communication control/priority determination unit 2-4 identifies various types of information such as switching control commands, alarm information, and line setting information transmitted from various information sources, determines their priorities, and transmits these data. Signal creation unit 2 creates signals according to requests.
-0. In terms of priority, the switching control command is first, followed by alarm information, line setting information, and test control information.

【0024】一時記憶部2−5は、前記切替制御命令や
警報情報等の各信号を作成するために必要な各種情報が
一時保持されるメモリである。例えば図9に示す如きネ
ットワークにおいて、ノード2Dと2G間に×印で示す
障害が発生したとき、ノード2Aでは、ノード2B−2
E−2Hを経由するルートで通信チャンネルを形成する
ことが、この一時記憶部2−5に記入される。通信制御
・優先判定部2−4は、これらの情報を信号作成部2−
0に送出し、図1(B)に示す如きネットワーク切替用
の切替制御命令が作成される。このようにして、各種情
報の中で優先権を持つ情報が順次転送される。
[0024] The temporary storage section 2-5 is a memory in which various information necessary for creating each signal such as the switching control command and alarm information is temporarily held. For example, in the network shown in FIG. 9, when a failure indicated by an x occurs between nodes 2D and 2G, node 2A
The fact that a communication channel will be formed via the route via E-2H is written in this temporary storage section 2-5. The communication control/priority determination unit 2-4 transmits this information to the signal generation unit 2-4.
0, and a switching control command for network switching as shown in FIG. 1(B) is created. In this way, information having priority among various types of information is sequentially transferred.

【0025】このようにして、図17に示す如く、従来
の場合には、切替制御命令の外に警報情報、回線設定情
報、その他の情報の区分も用意したフォーマットで主信
号に多重化されたものが、例えば切替制御命令のみで主
信号に多重化されるので、信号の利用効率を高めること
ができる。
In this way, as shown in FIG. 17, in the conventional case, in addition to switching control commands, alarm information, line setting information, and other information are multiplexed in a format that is multiplexed onto the main signal. Since the signals are multiplexed into the main signal using only the switching control command, for example, the efficiency of signal utilization can be increased.

【0026】図3において、Aはネットワーク切替制御
命令転送回路部、Bは障害情報検出・回線接続制御部で
あり、ノード内に設けられている。
In FIG. 3, A is a network switching control command transfer circuit section, and B is a failure information detection/line connection control section, which are provided within the node.

【0027】図中、他図と同記号部は同一部分を示し、
2−6は優先決定・回送ルート設定データ記憶部、2−
7は障害情報検出・回線接続制御部Bとの通信を行う通
信部、2−8は中央処理部(CPU)、2−9は通信部
である。また2−3B〜2−3Dは隣接ノードとの通信
を行うものであり、図2における通信部2−3に対応す
る。
[0027] In the figures, the same symbols as in other figures indicate the same parts,
2-6 is a priority determination/forwarding route setting data storage unit, 2-
Reference numeral 7 designates a communication unit that communicates with the failure information detection/line connection control unit B, 2-8 a central processing unit (CPU), and 2-9 a communication unit. Further, 2-3B to 2-3D communicate with adjacent nodes, and correspond to the communication unit 2-3 in FIG.

【0028】障害情報検出・回線接続制御部Bは、障害
が発生したときこれを検出して、救済しなければならな
い障害に対してはこれをネットワーク切替制御命令転送
回路部Aに伝達したり、回線接続制御を行うものである
The fault information detection/line connection control section B detects a fault when it occurs, and transmits this to the network switching control command transfer circuit section A for a fault that requires relief. It performs line connection control.

【0029】ネットワーク切替制御命令転送回路部Aは
、前記の救済しなければならない障害発生報告を受けた
とき、これに応じて図1(B)に示す如き切替制御命令
を作成し送出したり、あるいは他のノードから伝達され
た切替制御命令を他のノードに転送するものである。 このため、障害情報検出・回線接続制御部Bから伝達さ
れた情報を一時記憶部2−5に保持したり、他のノード
から伝達された切替制御情報を一時記憶部2−5に保持
する。なお一時記憶部2−5に保持されているデータを
、通信部2−3B、2−3C、2−3D及び通信部2−
7から同時に送出することが可能である。
When the network switching control command transfer circuit unit A receives the above-mentioned report of the occurrence of a fault that must be relieved, it creates and sends a switching control command as shown in FIG. 1(B) in response to the report, and Alternatively, a switching control command transmitted from another node is transferred to another node. Therefore, the information transmitted from the fault information detection/line connection control section B is held in the temporary storage section 2-5, and the switching control information transmitted from other nodes is held in the temporary storage section 2-5. Note that the data held in the temporary storage section 2-5 is stored in the communication sections 2-3B, 2-3C, 2-3D and the communication section 2-3.
It is possible to transmit from 7 at the same time.

【0030】また優先決定/回送ルート設定データ記憶
部2−6には、切替制御命令、警報情報、回線設定情報
、試験制御情報等に対する優先順位が記入されたり、切
替制御命令を作成する場合に必要な回送ルート設定デー
タが記入されている。したがって、信号作成部2−0は
、これに応じて、図1(B)に示す如き切替制御命令を
作成したり、あるいは、一時記憶部2−5に保持された
他のノードからの切替制御情報により転送用の切替制御
命令を作成する。
In addition, the priority determination/forwarding route setting data storage section 2-6 records priorities for switching control commands, alarm information, line setting information, test control information, etc., and when creating switching control commands. Necessary forwarding route setting data is entered. Therefore, in response to this, the signal generation unit 2-0 generates a switching control command as shown in FIG. A switching control command for transfer is created based on the information.

【0031】次に図4により、本発明において転送され
る命令がどのようにネットワークアドレスが変化するの
かを説明する。
Next, with reference to FIG. 4, a description will be given of how the network address of a transferred command changes in the present invention.

【0032】図4は、#1で示すノードより切替制御命
令をノード#2、ノード#3に下記のケースで送出され
る場合を示す。
FIG. 4 shows a case in which a switching control command is sent from the node #1 to nodes #2 and #3 in the following cases.

【0033】(1) はノード#1からノード#2に出
力する場合であり、ノード#2で切替制御処理が行われ
る。 この図4の(1)で示されるデータ部の前の+はノード
アドレスとデータの続きを示している。
(1) is a case of outputting from node #1 to node #2, and switching control processing is performed at node #2. The + in front of the data section shown in (1) in FIG. 4 indicates the continuation of the node address and data.

【0034】(2) はノード#1からノード#2を経
由してノード#3に切替制御命令が転送される場合を示
す。 この場合、図4(B)の左側に示すように、そのネット
ワークアドレスにはノード#2、ノード#3の順にデー
タを転送することを示す#2+#3が記入され、切替制
御命令には切替制御に必要なコマンドとか切替情報等の
データが記入されている。そして初めにアドレスされた
ノード#2にこれが伝達されると、図4(B)の右側に
示す如く、ネットワークアドレスと切替制御命令の部分
が書替えられる。即ち、ネットワークアドレスは次に転
送すべき#3が記入され、切替制御命令にはデータ部の
後にノード#2を経由して転送されたことを示す「+#
2」が追加されている。そしてノード#3は、これに応
じて切替制御処理を行う。
(2) shows a case where a switching control command is transferred from node #1 to node #3 via node #2. In this case, as shown on the left side of FIG. 4(B), #2+#3 indicating that data is transferred in the order of node #2 and node #3 is entered in the network address, and the switching control command is Data such as commands and switching information necessary for control are entered. When this is transmitted to the first addressed node #2, the network address and switching control command portions are rewritten as shown on the right side of FIG. 4(B). That is, #3 to be transferred next is entered in the network address, and "+#" indicating that the data was transferred via node #2 is written in the switching control command after the data part.
2" has been added. Then, node #3 performs switching control processing in response to this.

【0035】(3) はノード#1からノード#2及び
ノード#3にそれぞれ切替制御命令が転送される場合を
示す。この場合、ネットワークアドレスとしては#2&
#3が記入され、切替制御命令としてはコマンドや各ノ
ード毎の切替情報等のデータが記入されている。なお&
は処理を行うことを示す記号である。ノード#2ではこ
れを受取り、切替制御命令を実行処理するとともに、ノ
ード#3に転送する。このときネットワークアドレスに
は#3が記入され、切替制御命令としてはコマンドやノ
ード#3の切替情報等のデータに加えて、ノード#2で
処理を行ったことを示す&#2が付加されている。
(3) shows the case where switching control commands are transferred from node #1 to node #2 and node #3, respectively. In this case, the network address is #2 &
#3 is entered, and data such as commands and switching information for each node are entered as switching control instructions. In addition&
is a symbol indicating that processing is to be performed. Node #2 receives this, executes the switching control command, and transfers it to node #3. At this time, #3 is entered in the network address, and in addition to data such as commands and switching information for node #3 as a switching control command, &#2 is added to indicate that the process was performed at node #2. There is.

【0036】(4) はノード#2においてノード#3
と図示省略した他のノードへの分岐路が存在するような
場合にノード#1−#2−#3というルートを番号#1
001であらかじめきめておき、ノード#2では処理が
行われず、ノード#3で処理が行われるケースを示す。 この番号により転送ルートを定めておくことにより、多
数のノードを経由する転送パスを+とか&により指定す
ればデータが長くなるのに比較して、短いデータでネッ
トワークアドレスを指示することができる。しかも途中
で分岐するなど複雑な回送ルートに対しても、一回のデ
ータにより転送可能で、大幅に時間を短縮することがで
きる。
(4) is node #3 in node #2
If there is a branch route to other nodes (not shown), the route of nodes #1-#2-#3 is designated as number #1.
001 is predetermined, the process is not performed at node #2, and the process is performed at node #3. By determining a transfer route using this number, it is possible to specify a network address using short data, compared to specifying a transfer path that passes through many nodes using + or &, which would result in long data. Furthermore, data can be transferred in one go even for complicated routes such as branches along the way, which can significantly reduce time.

【0037】(5) はノード#2において、(4)と
同様な分岐路が存在する場合にノード#1−#2−#3
というルートを番号#1002であらかじめきめておき
、ノード#2でもノード#3でもそれぞれ処理を行うケ
ースを示す。
(5) In node #2, if a branch similar to (4) exists, nodes #1-#2-#3
A case is shown in which the route is predetermined with number #1002 and processing is performed at both node #2 and node #3.

【0038】図5に、図1に示すネットワーク管理装置
1の具体的構成を示す。図5において、1−1はCPU
、1−2はバス、1−3はメモリ、1−4はディスプレ
イ、1−5はキーボード、1−6はプリンタ、1−7は
通信アダプタ、1−8はハードディスク制御部、1−9
はハードディスク、1−10は磁気テープ制御部、1−
11は磁気テープ装置である。
FIG. 5 shows a specific configuration of the network management device 1 shown in FIG. 1. In Figure 5, 1-1 is the CPU
, 1-2 is a bus, 1-3 is a memory, 1-4 is a display, 1-5 is a keyboard, 1-6 is a printer, 1-7 is a communication adapter, 1-8 is a hard disk control unit, 1-9
is a hard disk, 1-10 is a magnetic tape control unit, 1-
11 is a magnetic tape device.

【0039】ネットワーク管理装置1は、ネットワーク
に障害が発生したときその予備回線のネットワークを指
示するあるいは、あらかじめ予備回線を決定し各ノード
へ通知しておくものである。そのために図16において
、例えば通信チャンネル4cの予備回線として通信チャ
ンネル5cを記憶しておいたり、通信チャンネル5aの
予備回線として通信チャンネル4aを記憶しておくもの
である。そしてこれら予備回線は、例えばハードディス
ク1−9にあらかじめ記憶しておき、ノードからの障害
発生通知が通信アダプタ1−7を経由してCPU1−1
に通知されたとき、CPU1−1はその予備回線の通信
チャンネルをハードディスク制御部1−8を経由してハ
ードディスク1−9から読み出し、これを通信アダプタ
1−7を経由して最初に切替制御命令を出力するノード
に通知する。例えば、図16に示される現用の通信チャ
ンネル4cに障害発生の通知を受けたとき、ネットワー
ク管理装置1は、ノード2Aに対し通信チャンネル5c
を通知する。
[0039] The network management device 1 is used to instruct a protection line network when a failure occurs in the network, or to determine a protection line in advance and notify each node. To this end, in FIG. 16, for example, communication channel 5c is stored as a backup line for communication channel 4c, and communication channel 4a is stored as a backup line for communication channel 5a. These backup lines are stored in advance in, for example, the hard disk 1-9, and failure occurrence notifications from the nodes are sent to the CPU 1-1 via the communication adapter 1-7.
When notified, the CPU 1-1 reads the communication channel of the backup line from the hard disk 1-9 via the hard disk controller 1-8, and first issues a switching control command via the communication adapter 1-7. Notify the node that outputs. For example, when receiving a notification that a failure has occurred in the currently used communication channel 4c shown in FIG.
Notify.

【0040】なお、現用回線に対し、予備回線をどのよ
うにしてルート決めするのかということについては、後
述する。
Note that how to route the protection line to the working line will be described later.

【0041】またメモリ1−3はCPU1−1の主記憶
装置であり、CPU1−1を制御するプログラムの外に
、ノードに送出するデータやノードから伝送されたデー
タが一時的に保持される。
The memory 1-3 is the main storage device of the CPU 1-1, and in addition to programs that control the CPU 1-1, data to be sent to the node and data transmitted from the node are temporarily held.

【0042】ディスプレイ1−4は各種の表示を行うも
のであり、例えばオペレータに対し必要な入力事項を表
示したり、通信チャンネルの状態等を表示するものであ
る。キーボード1−5は必要な情報を入力するものであ
り、プリンタ1−6は必要な情報を印刷出力するもので
ある。
The display 1-4 displays various types of information, such as displaying necessary input items for the operator, the status of communication channels, and the like. The keyboard 1-5 is used to input necessary information, and the printer 1-6 is used to print out the necessary information.

【0043】磁気テープ制御部1−10は磁気テープ装
置1−11に対しリード・ライトを行うものであり、例
えばプログラム読み出しなどを行う。
The magnetic tape control section 1-10 performs read/write operations on the magnetic tape device 1-11, and performs, for example, program reading.

【0044】なお、上記説明ではハードディスク1−9
に予備回線の通信チャンネルを格納する例について説明
したが、勿論これを磁気テープ装置1−11に記入する
こともできるし、ハードディスク1−9にプログラムを
格納しておくこともできる。
[0044] In the above explanation, hard disks 1-9
An example has been described in which the communication channel of the protection line is stored in the magnetic tape device 1-11, but it is also possible to store the program in the hard disk 1-9.

【0045】図6及び図7によりノードの具体的構成に
ついて説明する。図6はノードの構成を示し、図7はそ
のうちの切替制御部と通信アダプタの構成を示す。
The specific configuration of the node will be explained with reference to FIGS. 6 and 7. FIG. 6 shows the configuration of a node, and FIG. 7 shows the configuration of a switching control unit and a communication adapter.

【0046】図6において、2−11は切替制御部、2
−12は通信アダプタ、2−13は回線の送受信部、2
−14は多重分離部、2−15はクロス・コネクト・ス
イッチ、2−16はユーザ端末とのチャネル・インタフ
ェ−ス部である。
In FIG. 6, 2-11 is a switching control unit;
-12 is a communication adapter, 2-13 is a line transmitting/receiving unit, 2
-14 is a demultiplexing section, 2-15 is a cross connect switch, and 2-16 is a channel interface section with the user terminal.

【0047】切替制御部2−11は、各ノード間を接続
する通信チャンネルを形成するためにクロス・コネクト
・スイッチを切替制御するものであり、通信アダプタ2
−12から伝達される切替制御命令にもとづく制御を行
うものであって、図7に示す如く、CPU3−1、バス
3−2、主メモリ3−3、プログラム・メモリ3−4、
ネットワーク・データ・メモリ3−5、通信インタフェ
−ス部3−6等を具備する。ネットワーク・データ・メ
モリ3−5には、通信インタフェ−ス部3−6を経由し
て通信アダプタ2−12から伝達された切替制御用のデ
ータが記入され、これに応じてCPU3−1はプログラ
ム・メモリ3−4に記入された切替制御用プログラムに
もとづき、クロス・コネクト・スイッチ2−15を制御
する。
The switching control section 2-11 controls switching of the cross connect switch to form a communication channel connecting each node, and controls the switching of the cross connect switch to form a communication channel connecting each node.
-12, and as shown in FIG.
It includes a network data memory 3-5, a communication interface section 3-6, and the like. The network data memory 3-5 is filled with switching control data transmitted from the communication adapter 2-12 via the communication interface section 3-6, and the CPU 3-1 executes the program accordingly. - Controls the cross connect switch 2-15 based on the switching control program written in the memory 3-4.

【0048】通信アダプタ2−12はノード2とネット
ワーク管理装置1との間の通信制御を行ったり、他のノ
ードとの通信制御を行うものであり、図7に示す如く、
RAM4−1、優先判定・転送路メモリ4−2、制御部
4−3、通信インタフェ−ス部4−4を具備する。
The communication adapter 2-12 controls communication between the node 2 and the network management device 1, and controls communication with other nodes, as shown in FIG.
It includes a RAM 4-1, a priority determination/transfer path memory 4-2, a control section 4-3, and a communication interface section 4-4.

【0049】RAM4−1は例えばノード間の通信デー
タや、ネットワーク管理装置1との間の通信データが一
時保持されるものである。
The RAM 4-1 temporarily stores, for example, communication data between nodes and communication data with the network management device 1.

【0050】優先判定・転送路メモリ4−2は、切替制
御命令、警報情報、回線設定情報、試験制御情報等の各
種のデータが伝送されたとき、どれを優先的に転送する
のかを判定するための優先順位が記入されたり、切替制
御命令を作成する場合に必要な回送ルート設定データが
記入されている。
The priority determination/transfer path memory 4-2 determines which data to transfer preferentially when various data such as switching control commands, alarm information, line setting information, test control information, etc. are transmitted. In addition, the priority order for each transfer is entered, and forwarding route setting data necessary for creating a switching control command is entered.

【0051】制御部4−3は、通信アダプタ2−12を
総合的に制御するものであって、プロセッサで構成され
ている。また通信インタフェ−ス4−4はネットワーク
管理装置1と通信を行うときのインタフェ−ス、隣接ノ
ードと通信を行うときのインタフェ−スあるいは切替制
御部2−11と通信を行うときのインタフェ−スとなる
ものである。
The control section 4-3 controls the communication adapter 2-12 comprehensively, and is composed of a processor. Further, the communication interface 4-4 is an interface for communicating with the network management device 1, an interface for communicating with an adjacent node, or an interface for communicating with the switching control unit 2-11. This is the result.

【0052】通信チャンネルに障害が発生すれば、切替
制御部2−11にこれが通知され、CPU3−1がこれ
を判別して通信アダプタ2−12に報告する。通信アダ
プタ2−12ではネットワーク管理装置1にこれを報告
する。そしてネットワーク管理装置1ではその障害の発
生した通信チャンネルの予備回線を通信アダプタ2−1
2に通知する。
[0052] If a failure occurs in the communication channel, this is notified to the switching control section 2-11, and the CPU 3-1 determines this and reports it to the communication adapter 2-12. The communication adapter 2-12 reports this to the network management device 1. Then, the network management device 1 connects the backup line of the communication channel where the failure occurred to the communication adapter 2-1.
Notify 2.

【0053】この通知にもどづき通信アダプタ2−12
ではこの通知を一旦RAM4−1に格納する。制御部4
−3はこの予備回線のデータにもとづき、例えば図1(
B)に示す如き構成の切替制御命令を作成し、これを隣
接ノードに送出するとともに、自ノードについての切替
制御データを切替制御部2−11に送出し、切替制御が
行われる。
[0053] Based on this notification, the communication adapter 2-12
Then, this notification is temporarily stored in the RAM 4-1. Control unit 4
-3 is based on the data of this protection line, for example, Figure 1 (
A switching control command having the configuration shown in B) is created and sent to the adjacent node, and switching control data regarding the own node is sent to the switching control unit 2-11 to perform switching control.

【0054】ところで、前記切替制御命令を受取った隣
接ノードでは、通信アダプタで図1(B)に示す如く、
そのネットワークアドレスを受信したとき、その制御部
4−3で切替制御命令を作成開始する。そして切替制御
命令にもとづき自ノードでの切替制御は、その切替制御
部で遂行される。
By the way, in the adjacent node that received the switching control command, the communication adapter performs the following operations as shown in FIG. 1(B).
When the network address is received, the control unit 4-3 starts creating a switching control command. Based on the switching control command, switching control at the own node is performed by the switching control unit.

【0055】このようにしてネットワーク管理装置1か
ら予備回線のデータを受信したノードからは1回の切替
制御命令を出力するのみでよく、しかもこれを受取った
隣接ノードでは、ネットワークアドレスを受信した時点
で次のノードに対する切替制御命令を作成開始できるの
で、高速に予備回線に切替制御できる。
[0055] In this way, the node that has received the protection line data from the network management device 1 only needs to output a switching control command once, and the adjacent node that has received this command will receive the network address immediately after receiving the network address. Since the creation of a switching control command for the next node can be started at , switching control to a protection line can be performed at high speed.

【0056】ところでネットワークにおいて現用回線に
全断の如き障害が発生すれば、直ちに予備回線に切替え
ることが必要である。そのためネットワークにおいて、
事前に現用回線に対する予備回線を用意しておくことが
必要である。予備回線もまた複数ルート用意することが
必要である。また現用回線から予備回線への切替も短時
間で行うことが必要である。
By the way, if a failure such as a complete cut-out occurs in the working line in the network, it is necessary to immediately switch to the protection line. Therefore, in the network,
It is necessary to prepare a backup line for the working line in advance. It is also necessary to prepare multiple routes for backup lines. It is also necessary to switch from the working line to the protection line in a short time.

【0057】実際問題として、図8に示すネットワーク
図において、現用回線C−Dを予備回線として用意して
いる現用回線は、■−■、■−■、■−■、■−1−■
−2、■−1−■−2の如く、多数ある。なお図8にお
いて■−1−■−2及び■−1−■−2は区間KLを一
緒に使用している状態である。そして点線で示すのが予
備回線である。
As a practical matter, in the network diagram shown in FIG. 8, the working lines for which the working line C-D is prepared as a protection line are ■-■, ■-■, ■-■, and ■-1-■.
There are many such as -2, ■-1-■-2. In FIG. 8, ■-1-■-2 and ■-1-■-2 are in a state where the section KL is used together. The dotted line indicates the protection line.

【0058】したがって、このような場合、現用回線C
−D間に障害が発生したとき、現用回線ならず、予備回
線にも与える影響は非常に大きく、事前に対策をたてる
ことが必要である。このため本発明では後述するように
、ノード間の最短区間の回線設定をどのようにするのか
、また、予備回線をどのように設定するのかをもその目
的としている。ここで最短区間とは、物理的に回線ルー
トが短かいということではなく、中継するノード数が最
小であることを意味する。これは切替遅延時間はノード
数が多い程長時間かかることになる。
Therefore, in such a case, the working line C
When a failure occurs between -D, it has a very large effect not only on the working line but also on the protection line, so it is necessary to take countermeasures in advance. Therefore, as will be described later, the purpose of the present invention is to determine how to set up the shortest section between nodes and how to set up a protection line. Here, the shortest section does not mean that the line route is physically short, but means that the number of relaying nodes is the minimum. This means that the larger the number of nodes, the longer the switching delay time will take.

【0059】説明簡略化のため、図9に示す如きネット
ワークにおいて、ノードAとノードZ間に通信チャンネ
ルを決定する手法について、図9〜図12にもとづき説
明する。
To simplify the explanation, a method for determining a communication channel between node A and node Z in a network as shown in FIG. 9 will be explained based on FIGS. 9 to 12.

【0060】図9は現用・予備ルート決定手順を示すネ
ットワーク構成図の一例、図10及び図11は現用・予
備の通信チャンネルを決定するためのフローチャート、
図12はこのフローチャートで作成されるテーブル、レ
ジスタ、カウンタ等を示す。
FIG. 9 is an example of a network configuration diagram showing the procedure for determining the working and backup routes, and FIGS. 10 and 11 are flowcharts for determining the working and backup communication channels.
FIG. 12 shows tables, registers, counters, etc. created in this flowchart.

【0061】本発明における通信チャンネル決定の手法
を、図9及び図12(A)により、図12におけるノー
ドA、Z間に通信チャンネルを設定する場合について説
明する。
The method of determining a communication channel in the present invention will be explained with reference to FIGS. 9 and 12(A) for the case where a communication channel is set between nodes A and Z in FIG. 12.

【0062】図12(A)において、テーブルANはノ
ードAからの各距離、各方向において分析すべきノード
の名称を示し、テーブルZNはノードZからの各距離、
各方向において分析すべきノードの名称を示す。そして
テーブルAPはノードAからの各距離、各方向において
、分析すべきノードの、ノードAからの繋がりをノード
名の列で示し、テーブルZPはノードZからの各距離、
各方向において分析すべきノードの、ノードZからの繋
がりを、ノード名の列で示すものである。ここで距離と
は分析中のノードがノードAまたはZから何番目のとこ
ろに位置しているのかを示す。
In FIG. 12A, table AN shows names of nodes to be analyzed at each distance from node A and in each direction, and table ZN shows names of nodes to be analyzed at each distance from node Z,
Indicates the name of the node to be analyzed in each direction. The table AP shows the connection of the node to be analyzed from the node A in each direction and at each distance from the node A, and the table ZP shows each distance from the node Z,
The connection of nodes to be analyzed in each direction from node Z is shown by a column of node names. Here, the distance indicates the position of the node under analysis from node A or Z.

【0063】■最初に各テーブルを初期化し、図12(
A)に示す如く、テーブルANとAPには初期値として
Aを記入し、テーブルZNとZPには初期値としてZを
記入する。そしてテーブルANにノードAからの距離1
のノードとしてノードB、B′、B″を記入し、テーブ
ルAPにはノードBまでの繋がりAB、ノードB′まで
の繋がりAB′、ノードB″までの繋がりAB″を記入
する。
■First, initialize each table and perform the process shown in Figure 12 (
As shown in A), A is entered as an initial value in tables AN and AP, and Z is entered as an initial value in tables ZN and ZP. And in the table AN, the distance from node A is 1
Nodes B, B', and B'' are entered as nodes in the table AP, and connections AB to node B, AB' to node B', and AB'' to node B'' are entered in the table AP.

【0064】■またテーブルZNにノードZからの距離
1のノードとしてノードD、D′、D″を記入し、テー
ブルZPにはノードDまでの繋がりZD、ノードD′ま
での繋がりZD′、ノードD″までの繋がりZD″を記
入する。そしてこれらの各繋がりがテーブルAPに記入
されたものと連絡するか否か調らべる。
■Additionally, nodes D, D', and D'' are entered in table ZN as nodes with a distance of 1 from node Z, and in table ZP, connection ZD to node D, connection ZD' to node D', and node Enter the connections ZD'' up to D''. Then check whether each of these connections communicates with what was entered in the table AP.

【0065】■次にテーブルANに、ノードB、B′、
B″からそれぞれ距離1のノードであるC、C′、E、
F、G、Hを記入する。そしてテーブルAPにはこれら
の各ノードまでの繋がりABC、ABC′、AB′E、
AB′F、AB″G、AB″Hを記入する。そしてこれ
らの各繋がりがテーブルZPに記入されたものと連絡す
るか否か調らべる。
■Next, in table AN, nodes B, B',
C, C', E, which are nodes each at a distance of 1 from B''
Fill in F, G, and H. And in the table AP, the connections to each of these nodes are ABC, ABC', AB'E,
Enter AB'F, AB''G, AB''H. It is then checked whether each of these connections communicates with those entered in the table ZP.

【0066】■そしてテーブルZNに、ノードD、D′
、D″からそれぞれ距離1のノードであるC、I、C′
、J、K、Lを記入する。そしてテーブルZPにはこれ
らの各ノードまでの繋がりZDC、ZDI、ZD′C′
、ZD′J、ZD″K、ZD″Lを記入する。そしてこ
れらの各繋がりがテーブルANに記入されたものと連絡
するか否か調らべる。
[0066] Then, in table ZN, nodes D and D'
, D'', which are nodes C, I, and C', each having a distance of 1 from
, J, K, and L. Table ZP contains the connections ZDC, ZDI, ZD'C' to each of these nodes.
, ZD′J, ZD″K, and ZD″L. It is then checked whether each of these connections contacts something entered in the table AN.

【0067】これにより、初めにノードCで連絡するこ
とがわかりABCDZの通信チャンネルが得られる。
[0067] As a result, it is known that communication will be made at node C first, and the ABCDZ communication channel is obtained.

【0068】このようにして初めに現用の通信チャンネ
ルを得たあとに、今度はこの現用の通信チャンネルをす
べて断状態と仮定して、ノードA、Z間の予備の通信チ
ャンネルを同様の手法で得る。さらに次の予備回線を得
るときには、この予備の通信チャンネルをも断状態に仮
定して別の通信チャンネルを得て、これを第2の予備通
信チャンネルとする。
After first obtaining a working communication channel in this way, it is assumed that all working communication channels are disconnected, and a spare communication channel between nodes A and Z is obtained in the same manner. obtain. Furthermore, when obtaining the next protection line, this protection communication channel is assumed to be disconnected, another communication channel is obtained, and this is used as the second protection communication channel.

【0069】このような演算は、例えば図5に示すネッ
トワーク管理装置で行う。このとき、図9で示す如きネ
ットワークのデータは、例えばハードディスク1−9に
保持されており、演算に際してはメモリ1−3に記憶さ
れる。またこの演算を行うプログラムは、これまたハー
ドディスク1−9に格納しておき、演算に際しメモリ1
−3に記憶する。
Such calculations are performed, for example, by the network management device shown in FIG. At this time, network data as shown in FIG. 9 is held, for example, in a hard disk 1-9, and is stored in a memory 1-3 during calculation. The program for performing this calculation is also stored in the hard disk 1-9, and the memory 1-9 is used for the calculation.
-3.

【0070】この現用あるいは予備の通信チャンネルを
演算するためのプログラムは、図10及び図11で示す
フローチャートに示されている。
A program for calculating this working or backup communication channel is shown in the flowcharts shown in FIGS. 10 and 11.

【0071】(1) 初めに、メモリ1−3上に、ノー
ドAからの距離、つまり分析中のノードがノードAから
何個目の所に位置しているのかを示すAL用の領域と、
ノードZからの距離つまり分析中のノードがノードAか
ら何個目の所に位置しているのかを示すZL用の領域と
、ノードAからの各距離において、分析すべきノードが
何個存在するのかを示すAD用の領域と、ノードZから
の各距離において分析すべきノードが何個存在するのか
を示すZD用の領域と、図12(A)に示すテーブルA
N、ZN、AP、ZPを用意する。さらに図12(C)
に示す、ノードAまたはZからの分析中の距離について
、分析すべきノードそれぞれを調べるための繰り返し変
数i用の領域と、ノードAまたはZからの分析中の距離
でのノードについて、伝送路により隣接するノードを調
べるための繰り返し数j用の領域と、ノードAまたはZ
からの分析中の距離以下の距離をそれぞれ調べるための
繰り返し数m用の領域と、ノードAまたはZからの分析
中の距離以下の各ノードをそれぞれ調べるための繰り返
し数n用の領域を用意する。
(1) First, on the memory 1-3, there is an area for AL indicating the distance from node A, that is, how many places from node A the node under analysis is located;
An area for ZL that indicates the distance from node Z, that is, how many nodes from node A the node under analysis is located at, and how many nodes to analyze exist at each distance from node A. an area for AD that shows how many nodes there are to analyze at each distance from node Z, an area for ZD that shows how many nodes there are to analyze at each distance from node Z, and table A shown in FIG. 12(A).
Prepare N, ZN, AP, and ZP. Furthermore, Figure 12(C)
For the distance under analysis from node A or Z, shown in FIG. an area for the number of iterations j for examining adjacent nodes, and an area for node A or Z
Prepare an area for the number of repetitions m to examine each distance less than or equal to the distance under analysis from node A or Z, and an area for n number of repetitions to examine each node less than or equal to the distance under analysis from node A or Z. .

【0072】そしてまずノードAからの距離(伝送路数
)を初期化してAL=0とし、ノードZからの距離(伝
送路数)を初期化してZL=0とし、ノードAからの方
向数(ノード数)を初期化してAD(AL)=1とし、
ノードZからの方向数(ノード数)を初期化してZD(
ZL)=1とする。
First, the distance from node A (number of transmission lines) is initialized to AL=0, the distance from node Z (number of transmission lines) is initialized to ZL=0, and the number of directions from node A ( initialize the number of nodes) and set AD(AL)=1,
Initialize the number of directions (number of nodes) from node Z and set ZD(
ZL)=1.

【0073】またノードAからの各方向の先端(ノード
名)を初期化して AN(AL,AD(AL)−1)=“A”とし、ノード
Zからの各方向の先端(ノード名)を初期化して ZN(ZL,ZD(ZL)−1)=“Z”とする。そし
てノードAから各方向の先端までの道順(ノード名列)
を初期化して AP(AL,AD(AL)−1)=“A”とし、ノード
Zから各方向の先端までの道順(ノード名列)を初期化
して ZP(ZL,ZD(ZL)−1)=“Z”とする。
[0073] Also, initialize the tips (node names) in each direction from node A to AN(AL, AD(AL)-1) = "A", and set the tips (node names) in each direction from node Z to Initialize and set ZN (ZL, ZD (ZL) - 1) = "Z". And the route from node A to the tip in each direction (node name string)
Initialize and set AP (AL, AD (AL) - 1) = "A", initialize the route (node name string) from node Z to the tip in each direction and set ZP (ZL, ZD (ZL) - 1) )=“Z”.

【0074】これにより図12(A)のテーブルAN、
ZN、AP、ZPにおいて、それぞれ距離が0の状態と
なる。
As a result, the table AN in FIG. 12(A),
In ZN, AP, and ZP, each distance becomes 0.

【0075】(2) 次にノードAからの各方向の先端
ノードに伝送路が接続されていて、ノードAより1伝送
路分だけ遠いノード名およびその総数を計算する。
(2) Next, calculate the names and total number of nodes that are connected to the end nodes in each direction from node A by one transmission path and are further away from node A by one transmission path.

【0076】ノードAより1伝送路分だけ遠いノード名
は、B、B′、B″あり、その道順はAB、AB′、A
B″である。そしてこれらがすでに通過したものかどう
かチェックされ、通過しないものを図12(A)のテー
ブルAN、APにおいてそれぞれ距離が1の位置に登録
される。そしてこれがノードZについてのテーブルZN
、ZPに登録されたものと一致しているか調べられる。 一致すれば終了する。
The names of the nodes that are one transmission line away from node A are B, B', and B'', and their routes are AB, AB', and A.
B''. Then, it is checked whether these have already passed or not, and those that have not passed are registered at the position where the distance is 1 in the tables AN and AP in FIG. 12(A).This is the table for node Z. ZN
, it can be checked to see if it matches what is registered in ZP. If they match, it ends.

【0077】(3) それからノードZからの各方向の
先端ノードに伝送路が接続されていて、ノードZより1
伝送路分だけ遠いノード名およびその総数を計算する。
(3) Then, transmission lines are connected to the end nodes in each direction from node Z, and from node Z to
Calculate the names of nodes that are far away by the length of the transmission path and the total number of nodes.

【0078】ノードZより1伝送路分だけ遠いノード名
はD、D′、D″あり、その道順はZD、ZD′、ZD
″である。そしてこれらがすでに通過したものかどうか
チェックされ通過しないものを図12(A)のテーブル
ZN、ZPにおいてそれぞれ距離が1の位置に登録され
る。そしてこれがノードAについてのテーブルAN、A
Pに登録されたものと一致しているか調べられる。一致
していれば終了する。
The names of the nodes that are one transmission path away from node Z are D, D', and D'', and the routes are ZD, ZD', and ZD.
''.Then, it is checked whether these have already passed or not, and those that have not passed are registered at the position where the distance is 1 in the tables ZN and ZP of FIG. A
It can be checked whether it matches what is registered in P. If they match, it ends.

【0079】一致しなければ、次に上記(2)、(3)
と同様のことが一致するまで繰り返される。この例では
距離2の位置で一致する。
If they do not match, then perform the steps (2) and (3) above.
The same thing is repeated until a match is made. In this example, they match at a distance of 2.

【0080】このとき、ノードCとC′の2つの点で一
致するが、この場合、先に一致検出したものを使用して
もよく、また、一致したルートの空きチャンネルを比較
して、その多い方を使用してもよい。
[0080] At this time, there is a match at two points, nodes C and C'. You may use the larger number.

【0081】ところで、図13に示す如く、ノード31
−32−33を接続する通信ルート35の通信チャンネ
ル数が12チャンネルであり、ノード34−32−33
−35を接続する通信ルート36の通信チャンネル数が
7チャンネルの場合、ノード32−33の通信チャンネ
ル数は19チャンネルである。
By the way, as shown in FIG.
- The number of communication channels of the communication route 35 connecting the nodes 32-33 is 12, and the nodes 34-32-33
When the number of communication channels of the communication route 36 connecting the nodes 32-35 is 7, the number of communication channels of the nodes 32-33 is 19.

【0082】このようなとき、ノード31−32間で障
害が発生すれば、各チャンネル単位で切替制御命令を出
していたので12回これを出力していたので切替制御に
長時間を必要としていた。
[0082] In such a case, if a failure occurred between nodes 31 and 32, a switching control command was issued for each channel, which was output 12 times, requiring a long time for switching control. .

【0083】本発明はこれを改善するため、1回の切替
制御命令により1通信ルートの全チャンネルを切替制御
するように構成するものである。つまり通信ルートを1
つのグループとして通信チャンネルを切替えるようにす
る。
[0083] In order to improve this problem, the present invention is configured to control switching of all channels of one communication route by one switching control command. In other words, the communication route is 1
Switch communication channels as a group.

【0084】このため、本発明では、このグループ切替
制御命令として切替コマンド+グループ名を記入してお
く。そしてこのグループの通信ルートの各ノードではそ
のメモリにグループを構成するチャネル番号を記憶して
おき、このグルーピング方式の切替制御命令が伝達され
たとき、CPUはこれを解読してグループ名でメモリを
アクセスし、グループを構成するチヤネル番号を認識し
てその各チヤネルに対する切替制御を行うものである。
Therefore, in the present invention, the switching command+group name is entered as the group switching control command. Each node on the communication route of this group stores the channel numbers that make up the group in its memory, and when this grouping method switching control command is transmitted, the CPU decodes this and stores the memory using the group name. It accesses, recognizes the channel numbers that make up the group, and performs switching control for each channel.

【0085】例えば図14(A)に示す如く、ノードA
−B−Cを現用回線としノードA−D−E−Cを予備通
信ルートとして、3チャンネル使用している場合につい
て説明する。
For example, as shown in FIG. 14(A), node A
A case will be described in which three channels are used, with -B-C as the working line and nodes A-D-E-C as the backup communication route.

【0086】図14(B)に示す如く、ノードAでは、
ユーザ端末用通信チャンネル4、5、6によりそれぞれ
ユーザ#1、#2、#3が接続され、現用回線であるノ
ードB側の通信チャンネル3、4、5によりノードBと
通信チャンネルを形成する。ノードBではこれをノード
Cと通信チャンネル6、8、9に接続して現用回線であ
る通信チャンネルを形成し、ノードCではユーザ端末用
通信チャンネル1、7、9によりそれぞれユーザ#1、
#2、#3と接続している。
As shown in FIG. 14(B), at node A,
Users #1, #2, and #3 are connected to user terminal communication channels 4, 5, and 6, respectively, and a communication channel is formed with node B using communication channels 3, 4, and 5 on the node B side, which are working lines. In node B, this is connected to node C and communication channels 6, 8, and 9 to form a communication channel that is a working line, and in node C, communication channels 1, 7, and 9 for user terminals are connected to users #1 and 9, respectively.
Connected to #2 and #3.

【0087】この状態で、図14(C)に示す如く、ノ
ードAにてこの現用の通信回線に異常検出し、全体を切
替制御する必要ありと判断されたとき、ノードAから予
備回線の通信ルートであるノードDに切替制御命令が送
出される。そしてノードAでは、図17(B)に示す如
く、ユーザ#1、#2、#3が接続されているユーザ端
末用通信チャンネル4、5、6をそれぞれノードD側の
通信チャンネル14、15、16に切替接続する。
In this state, as shown in FIG. 14(C), when node A detects an abnormality in the current communication line and determines that it is necessary to perform overall switching control, node A transfers communication on the protection line. A switching control command is sent to node D, which is the root. In node A, as shown in FIG. 17(B), communication channels 4, 5, and 6 for user terminals to which users #1, #2, and #3 are connected are connected to communication channels 14, 15, and 15 on node D side, respectively. Switch connection to 16.

【0088】ノードDでは、切替制御命令を受けたとき
、CPUはLのグループ名(例えば#3)が記入されて
いることにもとづきグルーピング方式の切替制御である
ことを認識し、メモリをグループ名でアクセスしてその
グループを形成する通信チャンネルが14、15、16
であることを認識し、図14(B)に示す如き通信ルー
トを形成する。
In node D, when receiving the switching control command, the CPU recognizes that grouping type switching control is being performed based on the fact that the group name of L (for example, #3) is written, and stores the memory in the group name. The communication channels accessed by and forming the group are 14, 15, and 16.
14(B), and forms a communication route as shown in FIG. 14(B).

【0089】この切替制御命令は、ノードE、ノードC
にも順次伝達される。そしてノードEでもノードDと同
様な制御が行われ、通信チャンネル14、15、16に
よる通信ルートが形成される。
[0089] This switching control command
It will also be transmitted sequentially. The same control as that of node D is performed at node E, and a communication route using communication channels 14, 15, and 16 is formed.

【0090】ノードCではこれを解読してメモリをアク
セスし、E側の通信チャンネル14、15、16で受け
るとともに、通信チャンネル14をユーザ端末用通信チ
ャンネル1に接続してユーザ#1と接続し、通信チャン
ネル15をユーザ端末用通信チャンネル7に接続してユ
ーザ#2と接続し、通信チャンネル16をユーザ端末用
通信チャンネル9に接続してユーザ#3と接続する。こ
のようにして全局切替制御が完了する。
Node C decodes this, accesses the memory, receives it on communication channels 14, 15, and 16 on the E side, and connects communication channel 14 to user terminal communication channel 1 to connect to user #1. , the communication channel 15 is connected to the user terminal communication channel 7 to connect to the user #2, and the communication channel 16 is connected to the user terminal communication channel 9 to connect to the user #3. In this way, all-station switching control is completed.

【0091】このようにして予備回線を使用して通信が
行われているとき、それまでの現用回線に存在した異常
が回復すると、ノードAは、今度はノードD、ノードE
、ノードCに対し、同様のグルーピング方式の切戻命令
を送出する。そしてノードAを初めの現用回線に切戻制
御を実行する。この切戻制御はノードD、ノードE、ノ
ードCでも同様に実行され、全局切戻制御が完了する。 この切戻制御により現用回線に復帰することにより、そ
れまで使用していた予備のルートを、他の通信回線が予
備のルートとして使用することの妨害にならない。
[0091] While communication is being performed using the protection line in this way, when the abnormality that existed in the working line until then is recovered, node A will now communicate with nodes D and E.
, sends a similar grouping-based failback command to node C. Then, control is executed to switch node A back to the original working line. This failback control is similarly executed at nodes D, E, and C, and the all-station failover control is completed. By returning to the working line through this cutback control, it does not interfere with other communication lines using the previously used backup route as a backup route.

【0092】[0092]

【発明の効果】本発明によれば、伝送路の断などの障害
に対して切替制御命令を受信中に次の伝送路への回送を
開始するとともに、切替制御命令を高い通信速度の信号
へ多重化することができる。
According to the present invention, in response to a failure such as a disconnection of a transmission line, forwarding to the next transmission line is started while a switching control command is being received, and the switching control command is transferred to a high communication speed signal. Can be multiplexed.

【0093】しかも1つの情報転送で複数のノードに転
送することができ、複数の隣接するノードに対して一括
して切替制御命令を転送することができる。したがって
通信サービスを救済する際に、切替時間を短縮でき、障
害に対する切替の際に起る通信エラーを最小にすること
ができる。
Furthermore, one piece of information can be transferred to a plurality of nodes, and a switching control command can be transferred to a plurality of adjacent nodes at once. Therefore, when a communication service is to be rescued, the switching time can be shortened, and communication errors that occur when switching due to a failure can be minimized.

【0094】しかも、本発明によれば伝送路の断などの
障害に対して、あらかじめ別の道順を準備し、これに切
替えることにより通信サービスを救済することができる
。さらにノード間の現用の通信回線を最短コースで設定
することができるのみならず、現用回線に対する予備回
線の冗長度を小さくすることにより、所要の通信需要に
対して少ない費用で通信ネットワークを構築できる。
Furthermore, according to the present invention, in the event of a failure such as a transmission line disconnection, communication services can be saved by preparing another route in advance and switching to it. Furthermore, not only can the working communication line between nodes be set up in the shortest possible route, but by reducing the redundancy of the protection line with respect to the working line, it is possible to construct a communication network at a lower cost to meet the required communication demand. .

【0095】また複数のチャンネルを束ねて切替処理す
ることと、切替制御命令を予備回線ルートで転送するこ
とにより、切替え時間を短縮化でき、障害に対する切替
えの際に起きる通信エラーを最小とすることができる。
Furthermore, by bundling a plurality of channels for switching processing and transferring switching control commands through a backup line route, switching time can be shortened and communication errors that occur during switching due to failures can be minimized. Can be done.

【図面の簡単な説明】[Brief explanation of drawings]

【図1】本発明の原理構成図である。FIG. 1 is a diagram showing the principle configuration of the present invention.

【図2】本発明におけるノードのデータ多重化部説明図
である。
FIG. 2 is an explanatory diagram of a data multiplexing section of a node in the present invention.

【図3】本発明におけるネットワーク切替制御命令転送
回路説明図である。
FIG. 3 is an explanatory diagram of a network switching control command transfer circuit according to the present invention.

【図4】本発明におけるネットワーク切替制御命令ノー
ドアドレス指定方式説明図である。
FIG. 4 is an explanatory diagram of a network switching control command node addressing method according to the present invention.

【図5】本発明におけるネットワーク管理装置構成例で
ある。
FIG. 5 is an example of the configuration of a network management device according to the present invention.

【図6】本発明におけるノード装置例である。FIG. 6 is an example of a node device according to the present invention.

【図7】本発明における切替制御部・通信アダプタ構成
図である。
FIG. 7 is a configuration diagram of a switching control unit/communication adapter in the present invention.

【図8】予備回線の決定状態を示すネットワーク構成図
である。
FIG. 8 is a network configuration diagram showing a determination state of a protection line.

【図9】現用・予備ルート決定手順を示すネットワーク
構成図である。
FIG. 9 is a network configuration diagram showing a procedure for determining a working/backup route.

【図10】現用・予備ルート決定アルゴリズムの処理フ
ローチャート(その1)である。
FIG. 10 is a processing flowchart (part 1) of the working/protection route determination algorithm.

【図11】現用・予備ルート決定アルゴリズムの処理フ
ローチャート(その2)である。
FIG. 11 is a processing flowchart (Part 2) of the current/backup route determination algorithm.

【図12】本発明で使用される各テーブル及びメモリ領
域説明図である。
FIG. 12 is an explanatory diagram of each table and memory area used in the present invention.

【図13】通信チャンネル説明図である。FIG. 13 is an explanatory diagram of communication channels.

【図14】本発明のグルーピング切替制御説明図である
FIG. 14 is an explanatory diagram of grouping switching control of the present invention.

【図15】従来の高速光通信システム構成図である。FIG. 15 is a configuration diagram of a conventional high-speed optical communication system.

【図16】従来のネットワーク切替制御方式の説明図で
ある。
FIG. 16 is an explanatory diagram of a conventional network switching control method.

【図17】従来のネットワーク切替制御命令多重化手段
の説明図である。
FIG. 17 is an explanatory diagram of a conventional network switching control command multiplexing means.

【符号の説明】[Explanation of symbols]

1  ネットワーク管理装置 2  ノード 2−0  信号作成部 2−1  事故検出部 2−2  NTデータ保持部 1 Network management device 2 Node 2-0 Signal creation section 2-1 Accident detection section 2-2 NT data holding section

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】  複数のノードを伝送路にて接続して構
成されている通信ネットワークのノードまたは、伝送路
の障害時に現用回線から予備回線に切替えるネットワー
ク切替制御方法において、ノード2に信号作成手段2−
0を設け、ノードまたは伝送路の異常時に、切替制御命
令を回線接続先の複数のノードが記入されるネットワー
クアドレス部と、切替制御命令部を具備するように構成
し、ネットワークアドレス部で指定されたノードにおい
てこの切替制御命令をネットワークアドレス部まで受信
したときに、次のノードに対して転送する切替制御命令
を作成開始することを特徴とするネットワーク切替制御
方法。
Claim 1. In a network switching control method for switching from a working line to a protection line in the event of a failure in a node of a communication network configured by connecting a plurality of nodes via a transmission line or a transmission line, the node 2 is provided with a signal generating means. 2-
0 is provided, and in the event of an abnormality in a node or a transmission path, the switching control command is configured to include a network address part in which a plurality of nodes to which the line is connected is written, and a switching control command part, and the switching control command is specified in the network address part. A network switching control method characterized in that when a node receives this switching control command up to the network address part, it starts creating a switching control command to be transferred to the next node.
【請求項2】  前記切替制御命令は最初のノードより
1回だけ出力され、次のノードはこの切替制御命令にも
とづき転送すべき切替制御命令を作成出力することを特
徴とする請求項1記載のネットワーク切替制御方法。
2. The switching control command according to claim 1, wherein the switching control command is outputted only once from the first node, and the next node creates and outputs the switching control command to be transferred based on this switching control command. Network switching control method.
【請求項3】  現用回線に対する予備回線データをネ
ットワーク管理手段(1)で保持し、障害が発生したと
き、ネットワーク管理手段(1)からこの予備回線デー
タをノードに送出するようにしたことを特徴とするネッ
トワーク切替制御方法。
[Claim 3] The protection line data for the working line is held in the network management means (1), and when a failure occurs, the protection line data is sent from the network management means (1) to the node. A network switching control method.
【請求項4】  通信回線でグループを構成するチャネ
ルをあらかじめ記憶しておき、現用・予備の回線切替の
とき、グループ毎に切替制御命令を出力して、グループ
毎に切替制御することを特徴とする請求項1記載のネッ
トワーク切替制御方法。
4. Channels constituting groups of communication lines are stored in advance, and when switching between working and backup lines, a switching control command is output for each group to control switching for each group. The network switching control method according to claim 1.
【請求項5】  2つのノード間を接続する現用または
予備ルートを決定するとき、2つのノードより単位距離
毎にノード名及び伝送路を記憶し、すでに通過したノー
ドを除いて両ノードから共通に接続されるノードを検出
して伝送路を構成することを特徴とするネットワーク切
替制御方法。
5. When determining a working or backup route connecting two nodes, the node name and transmission route are stored for each unit distance from the two nodes, and the route is shared between both nodes except for nodes that have already been passed. A network switching control method characterized by detecting connected nodes and configuring a transmission path.
【請求項6】  両ノードから共通に接続されるノード
を検出して伝送路を得るとき、その現用回線に対する予
備回線の比率が小さいことを特徴とする請求項5記載の
ネットワーク切替制御方法。
6. The network switching control method according to claim 5, wherein when a transmission path is obtained by detecting a node commonly connected to both nodes, the ratio of the protection line to the working line is small.
JP3152395A 1991-05-28 1991-05-28 Network changeover control method Withdrawn JPH04351032A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP3152395A JPH04351032A (en) 1991-05-28 1991-05-28 Network changeover control method
US07/891,153 US5347271A (en) 1991-05-28 1992-05-28 Network switching contorol method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3152395A JPH04351032A (en) 1991-05-28 1991-05-28 Network changeover control method

Publications (1)

Publication Number Publication Date
JPH04351032A true JPH04351032A (en) 1992-12-04

Family

ID=15539581

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3152395A Withdrawn JPH04351032A (en) 1991-05-28 1991-05-28 Network changeover control method

Country Status (2)

Country Link
US (1) US5347271A (en)
JP (1) JPH04351032A (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5444693A (en) * 1992-04-27 1995-08-22 At&T Corp. System for restoration of communications networks
US5577196A (en) * 1993-04-07 1996-11-19 Sprint Communications Co. L.P. Intelligent digital signal hitless protection switch
US5506956A (en) * 1993-04-07 1996-04-09 Sprint Communications Company L.P. Error correction and channel restoration apparatus for T1 digital links
JP2629584B2 (en) * 1993-10-29 1997-07-09 日本電気株式会社 Trunk line uncut bypass method
US5495471A (en) * 1994-03-09 1996-02-27 Mci Communications Corporation System and method for restoring a telecommunications network based on a two prong approach
US5987521A (en) 1995-07-10 1999-11-16 International Business Machines Corporation Management of path routing in packet communications networks
US5796718A (en) * 1996-09-30 1998-08-18 Mci Communications Corporation Method of and system for intelligent access line protect switching
JPH11184814A (en) * 1997-12-22 1999-07-09 Hitachi Ltd Terminal switch device
US8199649B2 (en) * 2001-03-28 2012-06-12 Alcatel Lucent Method and apparatus for rerouting a connection in a data communication network based on a user connection monitoring function
US6766482B1 (en) 2001-10-31 2004-07-20 Extreme Networks Ethernet automatic protection switching
US8199731B2 (en) * 2006-01-25 2012-06-12 Motorola Mobility, Inc. Method and apparatus for facilitating switched packet data services on multiple networks

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2553193B2 (en) * 1989-03-30 1996-11-13 日本電気株式会社 Protection line control method for network control path network
US5235599A (en) * 1989-07-26 1993-08-10 Nec Corporation Self-healing network with distributed failure restoration capabilities
US4999829A (en) * 1989-11-06 1991-03-12 At&T Bell Laboratories Automatic fault recovery in a packet network
DE69132388T2 (en) * 1990-06-18 2001-03-01 Fujitsu Ltd Switchback system for an ATM network

Also Published As

Publication number Publication date
US5347271A (en) 1994-09-13

Similar Documents

Publication Publication Date Title
JP2784080B2 (en) Ring network, fault recovery method therefor, and node used in ring network
JP2826907B2 (en) Signal protection and monitoring system
CN106533811B (en) SDH-based redundant communication system and redundancy protection method thereof
JPH0637781A (en) Ring node and method fro transfer of communication circuit
US11121959B2 (en) Built in alternate links within a switch
JPH06205028A (en) Method and equipment for selective subordinate changeover in bilateral ring transmission system
JP2003101559A (en) Ring switching method and apparatus
JPH04351032A (en) Network changeover control method
JP3574425B2 (en) Packet Processing Method Using Multi-Fault-Tolerant Network Structure
JP2001268011A (en) Optical node system, and connection method for switch
JP4855878B2 (en) Multi-ring network system
JP2001186159A (en) Ring transmission system and its squelch method
WO2005026904A2 (en) Programmable delay, transparent switching multi-port interface line card
JP2003087279A (en) Transmission device
JP6258683B2 (en) Optical transmission system
JP2015012573A (en) Optical network system
US11825247B2 (en) Wiring information generation system, and wiring information generation method
JP3541206B2 (en) Data protection method in data transmission device
JP3366214B2 (en) Multiplexing transmission equipment
JPS641987B2 (en)
JP3717286B2 (en) Network reconfiguration method
JP2867865B2 (en) Protection line switching control method
JP7193759B2 (en) FAILURE DETERMINATION SYSTEM AND FAILURE DETERMINATION METHOD
JPH11234275A (en) Method or device for displaying transmission route in switching network, and method for detecting fault position using the same
JP3787810B2 (en) Squelch method for ring transmission system

Legal Events

Date Code Title Description
A300 Application deemed to be withdrawn because no request for examination was validly filed

Free format text: JAPANESE INTERMEDIATE CODE: A300