JPH04309694A - Underground space construction method - Google Patents

Underground space construction method

Info

Publication number
JPH04309694A
JPH04309694A JP3099805A JP9980591A JPH04309694A JP H04309694 A JPH04309694 A JP H04309694A JP 3099805 A JP3099805 A JP 3099805A JP 9980591 A JP9980591 A JP 9980591A JP H04309694 A JPH04309694 A JP H04309694A
Authority
JP
Japan
Prior art keywords
tunnels
external
underground space
construct
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP3099805A
Other languages
Japanese (ja)
Other versions
JPH0823266B2 (en
Inventor
Akio Shiseki
志関 彰男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Engineering and Shipbuilding Co Ltd
Toda Corp
Original Assignee
Mitsui Engineering and Shipbuilding Co Ltd
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Engineering and Shipbuilding Co Ltd, Toda Corp filed Critical Mitsui Engineering and Shipbuilding Co Ltd
Priority to JP3099805A priority Critical patent/JPH0823266B2/en
Priority to DE69212193T priority patent/DE69212193T2/en
Priority to EP92105799A priority patent/EP0507331B1/en
Priority to US07/862,944 priority patent/US5211507A/en
Priority to AT92105799T priority patent/ATE140512T1/en
Publication of JPH04309694A publication Critical patent/JPH04309694A/en
Publication of JPH0823266B2 publication Critical patent/JPH0823266B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

PURPOSE:To construct an underground space of a large cross section easily and at a low cost by connecting outside tunnels of rectangular cross section to construct an endless outside structure body and then excavating and lining the inside. CONSTITUTION:Outside tunnels 3a whose cross sections are rectangle are properly spacedly constructed using an excavator comprising a plurality of shield machines connected between a plurality of shafts properly spacedly constructed in the ground B. In the next step, the natural ground between the outside tunnels 3a is excavated, and the outside tunnels 3a are connected to each other with a concrete structure body using a connecting tool as reinforcing material in an endless state and integrated in a body to construct an outside structure bodies 3 and 3. The inside natural grounds of the outside structure bodies 3 are excavated and lined to form an inside tunnel 12 so as to construct an underground space A whose cross section is large.

Description

【発明の詳細な説明】[Detailed description of the invention]

【0001】0001

【産業上の利用分野】本発明は道路用トンネルや地下鉄
道用トンネル等の地下空間体の構築工法に関するもので
あり、特に地下鉄の駅部のようにトンネル断面を一般部
分より拡張する必要がある場合に好適な地下空間体の構
築工法に関するものである。
[Industrial Field of Application] The present invention relates to a construction method for underground space bodies such as road tunnels and subway tunnels, and in particular, it is necessary to expand the cross section of the tunnel from the general area, such as in subway station areas. The present invention relates to a method for constructing an underground space body suitable for the following cases.

【0002】0002

【従来の技術】一般に、市街地の地下に構築される道路
用トンネル及び地下鉄道用トンネル等の地下空間体、特
に大断面を必要とする駅部等の構築は、開削工法で行わ
れていた。
2. Description of the Related Art In general, underground space structures such as road tunnels and subway tunnels that are constructed underground in urban areas, especially station areas that require large cross sections, have been constructed using the cut-and-cover method.

【0003】しかし、この開削工法は施工工程が多いば
かりでなく、夜間作業が多いため工期の長期化と工費の
増大を招き、特に近年における熟練作業者の不足はその
実施を益々困難なものとしている。さらに、この開削工
法は地盤沈下、騒音、振動等が発生するため周辺への影
響が非常に大きいという問題があった。
[0003] However, this cut-and-cut construction method not only requires many construction steps, but also involves a lot of nighttime work, which leads to longer construction periods and increased construction costs.In particular, the shortage of skilled workers in recent years has made it increasingly difficult to implement. There is. Furthermore, this open-cut construction method has the problem of causing ground subsidence, noise, vibration, etc., which has a very large impact on the surrounding area.

【0004】そこで最近は、このような開削工法にかわ
ってシールド工法が実施されるようになっているが、そ
の中でも特に大断面を必要とする駅部等の構築は、図1
3に示すようなルーフシールド工法やかんざし桁工法に
よって行われたり、或は円形多連シールド工法も提案さ
れている。
[0004]Recently, shield construction methods have been implemented in place of such open cut construction methods, but among these, the construction of station areas that require particularly large cross sections is the method shown in Figure 1.
The roof shield construction method, the hairpin girder construction method as shown in 3, and the circular multiple shield construction method have also been proposed.

【0005】前記ルーフシールド工法は、適宜間隔をも
って並列に掘削したトンネル20間に、半円状のセグメ
ント30を架け渡してルーフを形成するものであり、ま
た、かんざし桁工法は適宜間隔をもって掘削したトンネ
ル20間に、かんざし桁40を架け渡すものである。さ
らに、円形多連シールド工法は円形のトンネルを複数連
接するものである。
[0005] In the roof shield construction method, a semicircular segment 30 is spanned between 20 tunnels excavated in parallel at appropriate intervals to form a roof, and in the hairpin girder construction method, tunnels are excavated at appropriate intervals. A hairpin girder 40 is spanned between the tunnels 20. Furthermore, the circular multiple shield construction method connects multiple circular tunnels.

【0006】[0006]

【発明が解決しようとする課題】しかし、上記のルーフ
シールド工法及びかんざし桁工法は並列状に掘削したト
ンネルの覆工を部分的に破壊して構築するため、固化工
法や凍結工法等で周辺地山を広範囲に渡って改良しなけ
ればならず、工費の増大及び工期の長期化を招き、かつ
安全性も低いという問題があった。
[Problems to be Solved by the Invention] However, since the roof shield construction method and the hairpin girder construction method described above are constructed by partially destroying the lining of tunnels excavated in parallel, the surrounding area is affected by the solidification method or freezing method. The problem was that the mountain had to be improved over a wide area, leading to increased construction costs and a longer construction period, as well as low safety.

【0007】また、円形多連シールド工法は、セグメン
トの形状が複雑で重量が大きく構築が困難であり、しか
も全断面掘削を前提とするので、シールド掘進機の掘削
土砂の排出などのために大規模な地上設備を必要とし、
工費がかさむとと共に工事用地が確保しがたいという問
題があった。特に、駅部のように200m〜300m程
度の拡幅が必要な部分では投資効率が非常に悪く、社会
的なニーズに応えることが出来なかった。
[0007] In addition, the circular multiple shield construction method has complicated segment shapes, is heavy, and is difficult to construct. Furthermore, since it requires excavation of the entire section, it takes a large amount of time to discharge excavated earth and sand by the shield excavation machine. Requires large-scale ground equipment,
There were problems in that construction costs were high and it was difficult to secure land for construction. In particular, investment efficiency was extremely poor in areas such as station areas that required widening of approximately 200m to 300m, and it was not possible to meet social needs.

【0008】本発明は上記のような問題点に鑑みてなさ
れたものであり、その目的は、大断面の道路用トンネル
や地下鉄道用トンネル等の地下空間体を、低コストでか
つ容易に構築できる地下空間体の構築工法を提供するこ
とである。
The present invention has been made in view of the above-mentioned problems, and its purpose is to easily construct underground space bodies such as large-section road tunnels and subway tunnels at low cost. The purpose of the present invention is to provide a method for constructing an underground space body.

【0009】[0009]

【課題を解決するための手段】以上の課題を達成するた
めの本発明の地下空間体の構築工法は、地盤中に適宜間
隔をもって構築された複数の立坑間に地下空間体を構築
する工法であって、前記立坑間にシールド掘進機を複数
連接せしめた掘進装置を用いて長方形断面の外部トンネ
ルを適宜間隔を開けて構築し、外部トンネル間の地山を
掘削して外部トンネル相互を無端状に連結・一体化した
外部構造体を構築し、該外部構造体の内側地山を掘削・
覆工して内部トンネルを構築したことを特徴とする構成
にすることである。
[Means for Solving the Problems] The method for constructing an underground space body of the present invention to achieve the above-mentioned problems is a method of constructing an underground space body between a plurality of vertical shafts built at appropriate intervals in the ground. Therefore, external tunnels with rectangular cross sections are constructed at appropriate intervals between the vertical shafts using an excavation device in which a plurality of shield tunneling machines are connected, and the ground between the external tunnels is excavated to make the external tunnels mutually endless. Build an external structure that is connected and integrated with the
The structure is characterized by an internal tunnel constructed by lining the tunnel.

【0010】0010

【作用】而して、上記構成によれば、矩形状のシールド
掘進機を複数連接した掘進装置により長方形状断面の外
部トンネルを適宜間隔を開けて構築することにより、排
土量の低減を図ることができる。したがって、地上設備
をそれほど大規模にすることなく、長方形状断面の外部
トンネルを迅速に構築することができ、任意の断面形状
・寸法を有する外部構造体の構築を可能とする。
[Operation] According to the above configuration, the amount of earth removed is reduced by constructing an external tunnel with a rectangular cross section at appropriate intervals using an excavation device in which a plurality of rectangular shield excavators are connected. be able to. Therefore, an external tunnel with a rectangular cross section can be quickly constructed without increasing the scale of above-ground facilities, and an external structure having an arbitrary cross-sectional shape and size can be constructed.

【0011】また、外部トンネル相互を連結して一体の
外部構造体を構築することにより、該外部構造体で荷重
の負担及び止水をすることができるので、外部構造体の
内側を安全でドライな状態で掘削することができ、また
掘削後の空間を覆工することによって内部トンネルを地
下空間体として利用することが可能となる。
[0011] Furthermore, by connecting the external tunnels to construct an integrated external structure, the external structure can bear the load and stop water, so the inside of the external structure can be kept safe and dry. By lining the excavated space, the internal tunnel can be used as an underground space.

【0012】また、外部構造体の内側の掘削残土を各外
部トンネル内を通じて排出すると共に、該掘削残土を各
外部トンネルの内部構築に有効利用することができるの
で、作業性及び施工性の向上を図ることができる。さら
に、外部トンネルの構築間隔を変えたり、或は覆工用セ
グメントの形状を適宜変更することにより地下空間体を
容易に拡大・縮小することができる。
[0012] In addition, the excavated soil inside the external structure can be discharged through each external tunnel, and the excavated residual soil can be effectively used for the internal construction of each external tunnel, so that workability and construction efficiency can be improved. can be achieved. Furthermore, the underground space body can be easily enlarged or reduced by changing the construction interval of the external tunnel or by appropriately changing the shape of the lining segment.

【0013】[0013]

【実施例】以下、本発明の地下空間体の構築工法の一実
施例を図面に基づいて詳細に説明する。図2は掘削工程
を示した説明図、図3は掘削順序を示した平面図、図4
〜図8は本発明の地下空間体の構築工法を示した横断面
図である。
DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the method for constructing an underground space body according to the present invention will be described in detail below with reference to the drawings. Figure 2 is an explanatory diagram showing the excavation process, Figure 3 is a plan view showing the excavation order, and Figure 4.
~FIG. 8 is a cross-sectional view showing the construction method of the underground space body of the present invention.

【0014】本発明の地下空間体Aは地中Bに所定間隔
をもって掘削した立坑1、2間に、矩形状シールド掘進
機4aを複数連接した掘進装置4により、長方形状の外
部トンネル3aを適宜間隔を開けて構築し、これら外部
トンネル3a間の地山を掘削して該外部トンネル3aを
相互に連結・一体化して無端状の外部構造体3を構築す
ると共に、該外部構造体3の内部に内部トンネル12を
掘削・覆工して構築するものである。
In the underground space body A of the present invention, a rectangular external tunnel 3a is suitably formed between vertical shafts 1 and 2 which are excavated underground B at a predetermined interval, by an excavation device 4 having a plurality of rectangular shield excavators 4a connected together. The external tunnels 3a are constructed at intervals, and the ground between these external tunnels 3a is excavated to connect and integrate the external tunnels 3a with each other to construct an endless external structure 3. The internal tunnel 12 will be excavated and lined.

【0015】次に、前記外部構造体3の構築工法を図面
を用いて具体的に説明する。図2は合計13本の外部ト
ンネル3aの配置を示したものであり、図2中■、■、
■の3箇所は比較的小断面の矩形状シールド掘進機4a
を2台連接した掘進装置4を用いて施工すると共に、図
2中■の箇所は前記と同様に縦に3台連接した掘進装置
4を用いて施工する。
Next, the construction method of the external structure 3 will be explained in detail with reference to the drawings. Figure 2 shows the arrangement of a total of 13 external tunnels 3a, and in Figure 2, ■, ■,
The three locations in ■ are rectangular shield excavators 4a with relatively small cross sections.
The excavation device 4 is constructed by using two connected excavation devices 4, and the portion marked with ■ in FIG. 2 is constructed using three excavation devices 4 connected vertically in the same manner as described above.

【0016】この外部トンネル3aの構築工法は、先ず
初めに、図2中の■−1、■−1、■−1、■−1の4
箇所を、図3の(1)に示すように立坑1側から立坑2
側へ向かって掘削して外部トンネル3aを覆工する。次
に、図2中の■−2、■−2、■−2、■−2の4箇所
を、図3の(2)に示すように立坑2側から立坑1側へ
向かって掘削して外部トンネル3aを覆工する。
The method for constructing this external tunnel 3a is as follows:
The location is from the shaft 1 side to the shaft 2 side as shown in Figure 3 (1).
Excavate toward the side and line the external tunnel 3a. Next, excavate the four locations ■-2, ■-2, ■-2, and ■-2 in Figure 2 from the shaft 2 side to the shaft 1 side as shown in (2) of Figure 3. The external tunnel 3a is lined.

【0017】次いで、図2中の■−3、■−3、■−3
の3箇所を、図3の(3)に示すように立坑1側から立
坑2側へ向かって掘削して外部トンネル3aを覆工する
と共に、図2中の■−4、■−4の2箇所を図3の(4
)に示すように立坑2側から立坑1側へ向かって掘削し
て外部トンネル3aを覆工することにより、長方形状断
面の外部トンネル3aを適宜間隔を開けて地中に構築す
る(図4)。
Next, ■-3, ■-3, ■-3 in FIG.
As shown in (3) in Figure 3, the external tunnel 3a is lined by excavating from the shaft 1 side to the shaft 2 side, and the The location is shown in Figure 3 (4
), by excavating from the shaft 2 side to the shaft 1 side and lining the external tunnel 3a, external tunnels 3a with a rectangular cross section are constructed underground at appropriate intervals (Figure 4). .

【0018】この場合、比較的小断面の矩形状シールド
掘進機4aを2〜3台連接した掘進装置4を用いている
ので、排土量を低減することができる。したがって、地
上設備も大規模にすることなく、施工性の向上を図るこ
とができる。
In this case, since the excavation device 4 in which two or three rectangular shield excavators 4a of relatively small cross section are connected is used, the amount of earth removed can be reduced. Therefore, it is possible to improve the workability without increasing the scale of the ground equipment.

【0019】また、これらの外部トンネル3aは図9に
示すように、矩形状シールド掘進機4aを2台連接した
掘進装置4で掘削孔5aを掘削し、該掘削孔5a内に鋼
製のセグメント5を覆工すると共に、該鋼製セグメント
5と掘削孔5aとの間にシールド掘進機4aの裏込注入
管4bから豆砂利コンクリート等の裏込め材6を適宜厚
さ裏込注入して構築する。
Furthermore, as shown in FIG. 9, these external tunnels 3a are constructed by excavating a bore hole 5a using an excavation device 4 which is made up of two rectangular shield excavators 4a connected together, and inserting a steel segment into the excavation hole 5a. At the same time, a suitable thickness of backfilling material 6 such as pea gravel concrete is injected between the steel segment 5 and the excavation hole 5a from the backfilling injection pipe 4b of the shield excavator 4a. do.

【0020】この裏込め材6は鋼製セグメントの防錆も
するものであり、充填不足を解消するために十分な流動
化剤が添加されている。また、この外部トンネル3aは
適宜大きさに区切って使用することもでき、かつ上記セ
グメント5は鋼製に限らず、コンクリート製のセグメン
トを用いることもできる。
[0020] This backfilling material 6 also serves to prevent the steel segments from rusting, and a sufficient amount of fluidizing agent is added to eliminate insufficient filling. Further, this external tunnel 3a can be divided into appropriate sizes for use, and the segments 5 are not limited to steel, but can also be made of concrete.

【0021】前記シールド掘進機4aは図10〜図12
に示すように、矩形の機体13前面に4つの掘削カッタ
7を設けて構成され、該シールド掘進機4をボルト接合
等により複数連接して掘進装置4を形成する。
The shield tunneling machine 4a is shown in FIGS. 10 to 12.
As shown in the figure, four excavation cutters 7 are provided on the front surface of a rectangular body 13, and a plurality of shield excavation machines 4 are connected together by bolts or the like to form an excavation device 4.

【0022】掘削カッタ7は機体13の隔壁13aに突
出したギアケース14の両側に設けた回転自在なドラム
カッタ7aと、該ドラムカッタ7aの間にドラムカッタ
7aの回転軸15に対して偏芯して設けた上下一対のリ
ングカッタ7bとにより構成され、これらドラムカッタ
7aとリングカッタ7bとは連結ギア16を介して連結
されることにより互いに同じ方向に回転する。
The excavation cutter 7 has a rotatable drum cutter 7a provided on both sides of a gear case 14 protruding from a partition wall 13a of the machine body 13, and an eccentric shaft 15 of the drum cutter 7a between the drum cutter 7a and the drum cutter 7a. The drum cutter 7a and the ring cutter 7b are connected via a connecting gear 16 to rotate in the same direction.

【0023】ドラムカッタ7aはベベルギア17a及び
その他各種のギア17bを介して隔壁13a背面のモー
タ18と連結し、該モータ18の駆動により回転して地
山を掘削し、該掘削残土は先端がドラムカッタ7aの下
部に臨んだ排泥管19により排出される。
The drum cutter 7a is connected to a motor 18 on the back of the partition wall 13a through a bevel gear 17a and various other gears 17b, and is rotated by the drive of the motor 18 to excavate the ground. Sludge is discharged through a drainage pipe 19 facing the lower part of the cutter 7a.

【0024】尚、本実施例では、同一形状・寸法の矩形
状シールド掘進機4aを2〜3台連接した掘進装置4を
用いた場合について説明したが、これに限られるもので
はなく、地下空間体Aの形状・寸法に応じて、形状・寸
法の異なる複数種類の矩形状シールド掘進機4aを組合
せた掘進装置4を任意選択することもできる。また、矩
形状シールド掘進機4aを複数連接することにより、単
一の場合に比べて地山掘削部分を減少させることができ
るので、外部構造体3の構築を容易にすることができる
[0024] In this embodiment, a case has been described in which an excavation device 4 in which two or three rectangular shield excavators 4a of the same shape and size are connected is used, but the invention is not limited to this. Depending on the shape and dimensions of the body A, it is also possible to arbitrarily select an excavation device 4 that combines a plurality of types of rectangular shield excavators 4a with different shapes and dimensions. Furthermore, by connecting a plurality of rectangular shield excavators 4a, the amount of ground excavation can be reduced compared to when a single shield excavator 4a is used, so that the construction of the external structure 3 can be facilitated.

【0025】次に、上記の方法により外部トンネル3a
を構築した後、各外部トンネル3a間を掘削して間隙部
3bを形成するが、地下水の湧水の恐れがある場合は、
ライムインジェクションパイプ等で外部トンネル3a間
の両側に薬液を注入して止水用の地盤改良を行う(図5
)。
Next, the external tunnel 3a is constructed using the above method.
After constructing the outer tunnels, excavate between each external tunnel 3a to form a gap 3b, but if there is a risk of underground water springing,
Improving the ground to stop water by injecting chemical solution into both sides of the external tunnel 3a using a lime injection pipe, etc. (Figure 5)
).

【0026】この掘削は鋼製セグメント5の一部を取り
外して形成した作業用開口部から人力により掘削し、そ
の掘削残土10は外部トンネル3aの排出口10aから
搬送車11に積み込んで搬出する。また、この掘削は抜
きぼりとし、数箇所で並行して行うことにより、作業が
一箇所に集中しないように注意する。
This excavation is carried out manually through a working opening formed by removing a part of the steel segment 5, and the excavated soil 10 is loaded onto a transport vehicle 11 and carried out from an outlet 10a of the external tunnel 3a. Also, be careful not to concentrate the work in one spot by doing this excavation in several locations in parallel.

【0027】次に、この外部トンネル3a間の掘削が終
了した後、鋼製セグメント5の適宜箇所に設けた挿入孔
に、ハイテンションボルトやPC鋼線等の連結具8を挿
入して外部トンネル3a間に架け渡す(図6)。この場
合、間隔部3bが大きい箇所はH形鋼等の鋼材を溶接し
て連結することもできる。また、この継手部分は必要耐
力に応じて適切な部材を選定することができる。
Next, after the excavation between the external tunnels 3a is completed, connecting devices 8 such as high tension bolts or PC steel wires are inserted into insertion holes provided at appropriate locations in the steel segments 5, and the external tunnels are closed. 3a (Figure 6). In this case, the portions where the spacing portion 3b is large may be connected by welding a steel material such as H-beam steel. Further, an appropriate member can be selected for this joint portion depending on the required proof strength.

【0028】次に、外部トンネル3a間に連結具8を架
け渡した後、この間隙部3bにコンクリートMを充填し
、該コンクリートMが硬化したら前記連結具8を緊張し
てプレストレスを与えることにより、外部トンネル3a
同士を一体的に連結して外部構造体3を構築する(図7
)。
Next, after the connector 8 is bridged between the external tunnels 3a, the gap 3b is filled with concrete M, and when the concrete M hardens, the connector 8 is tensed to apply prestress. Accordingly, the external tunnel 3a
The external structure 3 is constructed by integrally connecting them (Fig. 7
).

【0029】このように、適宜間隔を開けて外部トンネ
ル3aを構築した後、それらを連結・一体化して外部構
築体3を構築するので、多少の掘削誤差があっても所望
の形状・寸法を有する地下空間体Aを構築することがで
きる。
In this way, after constructing the external tunnels 3a at appropriate intervals, they are connected and integrated to construct the external structure 3, so even if there are some excavation errors, the desired shape and dimensions can be achieved. It is possible to construct an underground space body A having the following.

【0030】次に、外部構造体3の内側地山を立坑1側
から立坑2側へかけてパワーショベルPでオープン掘削
しつつ内面に内型枠9を組み立て、該内型枠9に鉄筋を
配筋すると共にコンクリートMを打設して内部トンネル
12を構築する(図8)。
Next, while open excavating the inner ground of the external structure 3 from the shaft 1 side to the shaft 2 side with a power shovel P, an inner formwork 9 is assembled on the inner surface, and reinforcing bars are attached to the inner formwork 9. The inner tunnel 12 is constructed by placing reinforcement and pouring concrete M (Fig. 8).

【0031】また、内部トンネル14内を掘削するとき
の掘削残土10は外部トンネル3a内を通じて外部に搬
出するが、この掘削残土10に固化材を混合し、それを
外部トンネル3a内に埋戻して点検通路や換気孔等を形
成することも可能である。
[0031]Also, the excavated soil 10 when excavating the inside tunnel 14 is carried outside through the external tunnel 3a, but a solidifying material is mixed with this excavated residual soil 10 and it is backfilled into the external tunnel 3a. It is also possible to form inspection passages, ventilation holes, etc.

【0032】[0032]

【発明の効果】本発明は任意の形状・寸法を有する道路
用トンネルや地下鉄道用トンネル等の地下空間体を、低
コストでかつ容易に構築することができ、しかも地下空
間体の形状・寸法に応じて比較的小断面のシールド掘進
機を連接して用いるので、排土量の低減と工期の短縮を
図ることができる。
Effects of the Invention The present invention makes it possible to easily construct underground space bodies such as road tunnels and subway tunnels having arbitrary shapes and dimensions at a low cost. Since shield tunneling machines with relatively small cross-sections are used in conjunction with each other according to the requirements, it is possible to reduce the amount of soil removed and shorten the construction period.

【0033】外部構造体の内側を安全にオープン掘削す
ることができると共に、その掘削残土を外部トンネル内
を通じて搬出できるので、作業性及び施工性の向上を図
ることができる。
[0033] Since the inside of the external structure can be safely excavated in the open and the excavated soil can be carried out through the external tunnel, workability and construction efficiency can be improved.

【0034】内部トンネルの構築後に、外部構造体を点
検通路、換気孔、排水孔等に有効利用することができ、
かつ掘削残土の処分にも利用することができる。
After constructing the internal tunnel, the external structure can be effectively used as an inspection passage, ventilation hole, drainage hole, etc.
It can also be used to dispose of excavated soil.

【0035】[0035]

【図面の簡単な説明】[Brief explanation of drawings]

【図1】地下空間体の構築工法を示す縦断面図である。FIG. 1 is a vertical sectional view showing a construction method of an underground space body.

【図2】外部トンネルの構築順序を示す説明図である。FIG. 2 is an explanatory diagram showing the order in which external tunnels are constructed.

【図3】外部トンネルの構築順序を示す平面図である。FIG. 3 is a plan view showing the order in which external tunnels are constructed.

【図4】外部トンネルを適宜間隔を開けて構築した横断
面図である。
FIG. 4 is a cross-sectional view of external tunnels constructed with appropriate spacing.

【図5】外部トンネル間に間隙部を設けた横断面図であ
る。
FIG. 5 is a cross-sectional view showing a gap between external tunnels.

【図6】外部トンネルの間隙部に連結具を架け渡した断
面図である。
FIG. 6 is a cross-sectional view of the connecting tool spanning the gap of the external tunnel.

【図7】外部トンネルの間隙部にコンクリートを打設し
た断面図である。
FIG. 7 is a sectional view of concrete being poured into the gap of the external tunnel.

【図8】外部構造体の断面図である。FIG. 8 is a cross-sectional view of the external structure.

【図9】シールド掘進機の掘削状態を示した断面図であ
る。
FIG. 9 is a sectional view showing the excavation state of the shield excavator.

【図10】掘進装置の正面図である。FIG. 10 is a front view of the excavation device.

【図11】シールド掘進機の断面図である。FIG. 11 is a sectional view of the shield tunneling machine.

【図12】図11のY−Y線断面図である。FIG. 12 is a sectional view taken along the line Y-Y in FIG. 11;

【図13】従来の地下空間体の構築工法の断面図である
FIG. 13 is a sectional view of a conventional underground space body construction method.

【符号の説明】[Explanation of symbols]

A  地下空間体 B  地盤 1、2  立坑 3  外部構造体 3a  外部トンネル 12  内部トンネル A Underground space body B Ground 1, 2 Vertical shaft 3 External structure 3a External tunnel 12 Internal tunnel

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】  地盤中に適宜間隔をもって構築された
複数の立坑間に地下空間体を構築する工法であって、前
記立坑間にシールド掘進機を複数連接せしめた掘削装置
を用いて長方形断面の外部トンネルを適宜間隔を開けて
構築し、外部トンネル間の地山を掘削して外部トンネル
相互を無端状に連結・一体化した外部構造体を構築し、
該外部構造体の内側地山を掘削・覆工して内部トンネル
を構築したことを特徴とする地下空間体の構築工法。
Claim 1: A construction method for constructing an underground space between a plurality of vertical shafts built at appropriate intervals in the ground, wherein an excavation device having a plurality of shield tunneling machines connected between the vertical shafts is used to construct an underground space body with a rectangular cross section. Construct external tunnels at appropriate intervals, excavate the ground between the external tunnels, and construct an external structure that connects and integrates the external tunnels in an endless manner.
A construction method for an underground space body, characterized in that an internal tunnel is constructed by excavating and lining the inner ground of the external structure.
【請求項2】  前記外部トンネル相互が連結具を補強
材とするコンクリート構造体で連結・一体化されること
を特徴とする請求項1記載の地下空間体の構築工法。
2. The construction method of an underground space body according to claim 1, wherein the external tunnels are connected and integrated with each other by a concrete structure using a connecting member as a reinforcing material.
JP3099805A 1991-04-05 1991-04-05 Construction method of underground space Expired - Fee Related JPH0823266B2 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP3099805A JPH0823266B2 (en) 1991-04-05 1991-04-05 Construction method of underground space
DE69212193T DE69212193T2 (en) 1991-04-05 1992-04-03 Method for producing an elongated underground large area of square or rectangular cross-section
EP92105799A EP0507331B1 (en) 1991-04-05 1992-04-03 Method of making a huge elongated space of square or rectangular cross section under the ground
US07/862,944 US5211507A (en) 1991-04-05 1992-04-03 Method of making a huge elongated space of square or rectangular cross section under the ground
AT92105799T ATE140512T1 (en) 1991-04-05 1992-04-03 METHOD FOR PRODUCING AN ELONGATED UNDERGROUND SPACE OF SQUARE OR RECTANGULAR CROSS SECTION

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3099805A JPH0823266B2 (en) 1991-04-05 1991-04-05 Construction method of underground space

Publications (2)

Publication Number Publication Date
JPH04309694A true JPH04309694A (en) 1992-11-02
JPH0823266B2 JPH0823266B2 (en) 1996-03-06

Family

ID=14257090

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3099805A Expired - Fee Related JPH0823266B2 (en) 1991-04-05 1991-04-05 Construction method of underground space

Country Status (1)

Country Link
JP (1) JPH0823266B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09317397A (en) * 1996-05-29 1997-12-09 Shimizu Corp Large cross-sectional tunnel and constructing method thereof
JP2012117275A (en) * 2010-11-30 2012-06-21 Kumagai Gumi Co Ltd Method for forming underground space in ground
CN104047621A (en) * 2013-03-14 2014-09-17 上海市城市建设设计研究总院 Construction method of cross aisle with high cross section under excavation conditions of basement with small clear distance at top
JP2019094697A (en) * 2017-11-24 2019-06-20 株式会社Ihi建材工業 Construction method of large cross section tunnel and excavation device for large cross section tunnel

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6210398A (en) * 1985-07-03 1987-01-19 日立建機株式会社 Tunnel excavator
JPH02144499A (en) * 1988-11-25 1990-06-04 Taisei Corp Construction of underground space

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6210398A (en) * 1985-07-03 1987-01-19 日立建機株式会社 Tunnel excavator
JPH02144499A (en) * 1988-11-25 1990-06-04 Taisei Corp Construction of underground space

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09317397A (en) * 1996-05-29 1997-12-09 Shimizu Corp Large cross-sectional tunnel and constructing method thereof
JP2012117275A (en) * 2010-11-30 2012-06-21 Kumagai Gumi Co Ltd Method for forming underground space in ground
CN104047621A (en) * 2013-03-14 2014-09-17 上海市城市建设设计研究总院 Construction method of cross aisle with high cross section under excavation conditions of basement with small clear distance at top
CN104047621B (en) * 2013-03-14 2015-12-23 上海市城市建设设计研究总院 Based on the maximum section of passenger flow adit construction method of top small interval basement excavation condition
JP2019094697A (en) * 2017-11-24 2019-06-20 株式会社Ihi建材工業 Construction method of large cross section tunnel and excavation device for large cross section tunnel

Also Published As

Publication number Publication date
JPH0823266B2 (en) 1996-03-06

Similar Documents

Publication Publication Date Title
JP3893056B2 (en) Construction method of underground structure
JPH04309694A (en) Underground space construction method
JPH05280297A (en) Construction method of underground space body
JP2979044B2 (en) Large-scale underground structures and their construction methods
JPH04309692A (en) Underground space construction method
JP2004060266A (en) Non-open-cut construction method for underground structure
KR100990430B1 (en) Construction method for underground structure
JPH04309693A (en) Underground space construction method
JP2016156169A (en) Joining method
KR100235237B1 (en) The construction method of the structure for forming tunnel
JP2005146756A (en) Earth retaining impervious wall construction method and earth retaining impervious wall formed by it
JP3584416B2 (en) Tunnel and its construction method
JP2007231641A (en) Collapse prevention construction method for dike
JP2617418B2 (en) Construction method of underground large space structure
JP3646698B2 (en) Construction method for underground structures
JP2002146775A (en) Diaphragm-wall construction method
JP3113981B2 (en) Tunnel construction method
JP2804422B2 (en) Foundation construction method
JP2013221240A (en) Tunnel widening method and tunnel widening structure
JPH01304295A (en) Method of constructing tunnel
JPS5929760B2 (en) How to excavate underground storage cavities
JP2000110158A (en) Retaining wall construction method using oblique wall
JPH0813540A (en) Multishaft drilling machine
JP2004250897A (en) Earth retaining wall construction method
JPH0434209Y2 (en)

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19980113

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees