JPH04301103A - Steam turbine controller for combined power generation plant - Google Patents

Steam turbine controller for combined power generation plant

Info

Publication number
JPH04301103A
JPH04301103A JP8724991A JP8724991A JPH04301103A JP H04301103 A JPH04301103 A JP H04301103A JP 8724991 A JP8724991 A JP 8724991A JP 8724991 A JP8724991 A JP 8724991A JP H04301103 A JPH04301103 A JP H04301103A
Authority
JP
Japan
Prior art keywords
steam
load
control means
steam turbine
load control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP8724991A
Other languages
Japanese (ja)
Inventor
Kazuya Shiozaki
和也 塩崎
Norihiro Uchida
典弘 内田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP8724991A priority Critical patent/JPH04301103A/en
Publication of JPH04301103A publication Critical patent/JPH04301103A/en
Pending legal-status Critical Current

Links

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

PURPOSE:To fully open a steam regulating valve in the shortest time by providing two sets of load control means which controls a load controller at a change rate determined by a steam metal temperature, and at a maximum change rate within a range that can stably control the drum level of a waste heat recovery boiler, respectively so as to increase the pressure of the steam regulating valve. CONSTITUTION:A first load control means 12A is provided so that output deviations of an integrator 18 and a setter 16 are inputted into a change rate limiter 17, and are compared with a set value which is a change rate determined by a steam metal temperature, then its output signal is transmitted to the integrator 18. Furthermore, a second load control means 12B is provided so that output deviations of a setter 20 and the integrator 18 are inputted into a change rate limiter 21, and are compared with a set value which is a change rate within a range in which the drum level of a waste heat recovery boiler 1, can stably controlled then its output signal is transmitted to the integrator 18. The first load control means 12A is selected by a switch 19 at normal increase of load while the second load control means 12B is selected when a high-speed load increase mode is selected, so that a steam regulating valve can be opened at a desired rate.

Description

【発明の詳細な説明】[Detailed description of the invention]

【0001】[発明の目的][Object of the invention]

【産業上の利用分野】本発明は、コンバインド発電プラ
ントの蒸気タービン制御装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a steam turbine control system for a combined power generation plant.

【0002】0002

【従来の技術】図3に、コンバインド発電プラントの蒸
気サイクルの一般的な系統図を示す。
2. Description of the Related Art FIG. 3 shows a general system diagram of a steam cycle of a combined power generation plant.

【0003】排熱回収ボイラ1は、ガスタービンからの
排熱エネルギーにより蒸気を発生する。この排熱回収ボ
イラ1内の高圧ドラム2および低圧ドラム3で発生した
蒸気を蒸気タービン4の高圧蒸気加減弁5および低圧蒸
気加減弁6に各々通して蒸気タービン4に供給する。そ
して、蒸気エネルギーを蒸気タービン4の回転エネルギ
ーに変換し、蒸気タービン4と同一軸で連結されている
発電機7から電気を出力する。また、高圧ドラム2およ
び低圧ドラム3で発生した蒸気は、高圧蒸気加減弁5お
よび低圧蒸気加減弁6の手前に設けられている高圧蒸気
バイパス弁8および低圧蒸気バイパス弁9により直接復
水器10に供給できるようにしている。
The exhaust heat recovery boiler 1 generates steam using exhaust heat energy from a gas turbine. Steam generated in the high-pressure drum 2 and low-pressure drum 3 in the exhaust heat recovery boiler 1 is supplied to the steam turbine 4 by passing through the high-pressure steam control valve 5 and the low-pressure steam control valve 6 of the steam turbine 4, respectively. Then, the steam energy is converted into rotational energy of the steam turbine 4, and electricity is output from the generator 7 connected to the steam turbine 4 on the same axis. Further, the steam generated in the high pressure drum 2 and the low pressure drum 3 is directly transferred to the condenser 10 by a high pressure steam bypass valve 8 and a low pressure steam bypass valve 9 provided before the high pressure steam control valve 5 and the low pressure steam control valve 6. We are making it possible to supply the following.

【0004】上記した蒸気サイクルの高圧蒸気加減弁5
および低圧蒸気加減弁6の制御ブロック構成図を図4に
示す。
[0004] High pressure steam control valve 5 of the above-mentioned steam cycle
FIG. 4 shows a control block diagram of the low pressure steam control valve 6.

【0005】なお、高圧蒸気加減弁5および低圧蒸気加
減弁6の制御ブロックの内容は、実質的に同等であるた
め、図では便宜上蒸気加減弁の制御ブロックとして示し
ている。
The contents of the control blocks for the high-pressure steam regulating valve 5 and the low-pressure steam regulating valve 6 are substantially the same, and therefore, for convenience, they are shown as control blocks for the steam regulating valve in the figure.

【0006】図示する如く、速度制御器11の出力信号
と負荷制御器12の出力信号とを加算した信号と、負荷
制限器13と蒸気圧力制御器14との各々の信号が低値
選択器15に入力され、この低値選択器15が蒸気加減
弁開度設定信号を選択する。
As shown in the figure, a signal obtained by adding the output signal of the speed controller 11 and the output signal of the load controller 12, and the respective signals of the load limiter 13 and the steam pressure controller 14 are output to a low value selector 15. The low value selector 15 selects the steam control valve opening setting signal.

【0007】負荷制御器12は、負荷制御器12の出力
信号と設定器16の出力信号との偏差を変化率制限器1
7に入力し、その出力信号を積分器18に入力し、その
出力信号を負荷制御器12の出力信号とする。
The load controller 12 controls the deviation between the output signal of the load controller 12 and the output signal of the setting device 16 by using a change rate limiter 1.
7, its output signal is input to the integrator 18, and the output signal is used as the output signal of the load controller 12.

【0008】負荷制限器13は、負荷制御器12の出力
信号に図示省略した極性がプラスのバイアス信号を加算
した値に追従し、通常の運転では低値選択器15で選択
されることはない。
The load limiter 13 follows the value obtained by adding a bias signal (not shown) with a positive polarity to the output signal of the load controller 12, and is not selected by the low value selector 15 during normal operation. .

【0009】蒸気圧力制御器14は、排熱回収ボイラ1
を安定に運転を継続するために必要な最低蒸気圧力値が
設定されている。そして、蒸気圧力実測値がその設定値
を下回った場合に、蒸気加減弁を閉方向に動作させて最
低蒸気圧力を確保する。
The steam pressure controller 14 is connected to the exhaust heat recovery boiler 1.
The minimum steam pressure value required to continue stable operation is set. When the actual steam pressure value falls below the set value, the steam control valve is operated in the closing direction to ensure the minimum steam pressure.

【0010】なお、通常、蒸気圧力制御器14は負荷制
御器12の出力信号に図示省略した極性がプラスのバイ
アス信号を加算した値に追従し、蒸気圧力実測値がその
設定値を下回った場合に、追従を解除し動作する。
[0010] Normally, the steam pressure controller 14 follows the output signal of the load controller 12 plus a bias signal with a positive polarity (not shown), and when the actual steam pressure value falls below the set value. , the tracking is canceled and the operation starts.

【0011】上記構成で、ガスタービンが起動後、ガス
タービンの負荷を上昇させ、排熱回収ボイラ1に入るガ
スタービンの排熱ガス熱量を増加させ、高圧ドラム2お
よび低圧ドラム3内の水を徐々に蒸発させる。その後、
高圧ドラム2から出力される高圧蒸気が蒸気タービン4
を起動できる状態になると、高圧蒸気加減弁5の速度制
御器11の出力を増加させて定格速度に到達させる。
[0011] With the above configuration, after the gas turbine is started, the load on the gas turbine is increased, the amount of heat of the gas turbine exhaust gas entering the exhaust heat recovery boiler 1 is increased, and the water in the high pressure drum 2 and the low pressure drum 3 is Evaporate gradually. after that,
High pressure steam output from the high pressure drum 2 is transferred to a steam turbine 4.
When it becomes ready to start, the output of the speed controller 11 of the high pressure steam control valve 5 is increased to reach the rated speed.

【0012】ここで、発電機7を電力系統に併入し、初
負荷を確保するまでの起動を負荷制御器12にて行う。 蒸気タービン4が初負荷の保持を完了すると、高圧蒸気
加減弁5および低圧蒸気加減弁6の負荷制御器12内の
設定器16を全開もしくは相当値に設定する。これによ
り、変化率制限器17の蒸気タービンメタル温度から決
められた負荷上昇率に相当する変化率で負荷制御器12
の出力信号が増加し、高圧蒸気加減弁5および低圧蒸気
加減弁6が徐々に開く。その後、全開若しくは相当値に
到達すると、蒸気タービン4の起動が完了する。
[0012] At this point, the generator 7 is connected to the power system, and the load controller 12 starts up the generator 7 until the initial load is secured. When the steam turbine 4 has completed maintaining the initial load, the setter 16 in the load controller 12 of the high pressure steam control valve 5 and the low pressure steam control valve 6 is set to fully open or an equivalent value. As a result, the load controller 12 changes at a rate of change corresponding to the load increase rate determined from the steam turbine metal temperature of the rate of change limiter 17.
The output signal increases, and the high pressure steam control valve 5 and the low pressure steam control valve 6 gradually open. Thereafter, when the full opening or equivalent value is reached, the startup of the steam turbine 4 is completed.

【0013】ところで、高圧蒸気バイパス弁8および低
圧蒸気バイパス弁9では、高圧ドラム2および低圧ドラ
ム3の出口圧力を所定値に維持するように図示省略した
制御手段が設けられている。この制御手段の所定値は、
蒸気タービン4の起動後、高圧蒸気バイパス弁8および
低圧蒸気バイパス弁9が確実に全閉するために、高圧ド
ラム2および低圧ドラム3の定格圧力値よりも多少高い
値に設定されている。つまり、高圧蒸気加減弁5が開く
ことにより、高圧ドラム2の出口蒸気圧力が降下するの
で、これを補償すべく高圧蒸気バイパス弁8を閉める。
By the way, the high pressure steam bypass valve 8 and the low pressure steam bypass valve 9 are provided with control means (not shown) so as to maintain the outlet pressures of the high pressure drum 2 and the low pressure drum 3 at predetermined values. The predetermined value of this control means is
After the steam turbine 4 is started, the high pressure steam bypass valve 8 and the low pressure steam bypass valve 9 are set to a value somewhat higher than the rated pressure values of the high pressure drum 2 and the low pressure drum 3 in order to ensure that they are fully closed. That is, when the high pressure steam control valve 5 opens, the steam pressure at the outlet of the high pressure drum 2 decreases, so the high pressure steam bypass valve 8 is closed to compensate for this.

【0014】一方、低圧側も同様の動作をする。蒸気加
減弁が急激に開くと蒸気バイパス弁制御の遅れにより蒸
気圧力が急低下し、地熱回収ボイラ1のドラムレベル制
御が不安定になるが通常の負荷変化率では蒸気加減弁が
ゆっくり開くため上記の状況は発生しない。
On the other hand, the low pressure side operates in a similar manner. If the steam control valve opens suddenly, the steam pressure will drop suddenly due to the delay in steam bypass valve control, and the drum level control of geothermal recovery boiler 1 will become unstable.However, at normal load change rates, the steam control valve opens slowly, so the above will occur. This situation will not occur.

【0015】以上説明したコンバインド発電プラントは
、通常の火力発電に比べ起動時間が短いことから電力需
要に対応して昼間だけ運転したり、電力需要がピークに
なる時期だけ運転するなどの運用が一般に多い。実際の
電力需要が予測した電力需要よりも大幅に多い場合や、
他の発電所が緊急停止した場合など、起動時間が短い利
点を有効に利用するため中央給電指令所から急速な負荷
上昇を要求されることがある。特に、ピーク運用に使用
されるコンバインド発電プラントはその傾向が高い。ま
た、近年の電力需要の増加に伴い、上記の要求がさらに
強まってきている。
[0015] Since the combined power generation plant described above has a shorter start-up time than normal thermal power generation, it is generally operated in response to power demand by operating only during the day or only during periods of peak power demand. many. If the actual power demand is significantly higher than the predicted power demand,
When other power plants undergo an emergency shutdown, the central power dispatch center may request a rapid load increase in order to take advantage of the short start-up time. This is especially true for combined power plants used for peak operation. Furthermore, with the increase in demand for electric power in recent years, the above requirements have become even stronger.

【0016】[0016]

【発明が解決しようとする課題】しかしながら、上記し
た従来の蒸気タービン制御装置では次の問題がある。
However, the conventional steam turbine control device described above has the following problems.

【0017】従来の蒸気タービン制御装置の変化率制限
器17は、蒸気タービンのメタル温度により決められた
温度に基づいて負荷上昇率を定めている。このため蒸気
タービンのメタル温度が低いとき、負荷上昇率が低く抑
えられ、中央給電指令所等からの負荷上昇の要求に対応
できないという問題がある。
The rate of change limiter 17 of the conventional steam turbine control device determines the rate of load increase based on the temperature determined by the metal temperature of the steam turbine. For this reason, when the metal temperature of the steam turbine is low, the load increase rate is suppressed to a low level, and there is a problem in that it is not possible to respond to a load increase request from a central power dispatch center or the like.

【0018】通常、蒸気タービンは一定の寿命、即ち、
一定の回数の起動、停止が保証されており、これを充足
するように蒸気タービンのメタル温度によって負荷上昇
率が決められている。ところが、蒸気タービンの寿命を
若干犠牲にしても負荷上昇を優先させなければならない
状況の場合、従来の蒸気タービン制御装置では対処でき
なかった。
[0018] Normally, a steam turbine has a certain lifespan, that is,
A fixed number of startups and stops are guaranteed, and the load increase rate is determined by the steam turbine metal temperature to satisfy this requirement. However, in a situation where priority must be given to increasing the load even if it means sacrificing the life of the steam turbine, conventional steam turbine control devices cannot cope with the situation.

【0019】そこで、本発明は、中央給電指令所等から
の負荷上昇要求を充足し、電力の安定供給に対処できる
コンバインド発電プラントの蒸気タービン制御装置を提
供することを目的とする。
SUMMARY OF THE INVENTION Accordingly, an object of the present invention is to provide a steam turbine control device for a combined power generation plant that can satisfy load increase requests from a central power dispatch center and the like and can cope with a stable supply of electric power.

【0020】[発明の構成][Configuration of the invention]

【課題を解決するための手段】ガスタービンサイクルお
よび蒸気タービンサイクルが排熱回収ボイラを介して結
合され、排熱回収ボイラからの蒸気を蒸気タービンに導
くための蒸気加減弁と、この蒸気加減弁を通常運転時に
速度制御器の出力信号と負荷制御器の出力信号との加算
値に基づく加減弁開度設定信号により開閉制御する蒸気
タービン制御装置において、負荷制御器を蒸気タービン
メタル温度により定まる変化率で蒸気加減弁を上昇させ
るための第1の負荷制御手段と、負荷制御器を排熱回収
ボイラのドラムレベルが安定に制御できる範囲の最大の
変化率で蒸気加減弁を上昇させるための第2の負荷制御
手段と、第1の負荷制御手段または第2の負荷制御手段
のいずれかに切替える切替手段とを設けるようにしたも
のである。
[Means for Solving the Problems] A gas turbine cycle and a steam turbine cycle are coupled via an exhaust heat recovery boiler, and a steam control valve is provided for guiding steam from the waste heat recovery boiler to a steam turbine, and this steam control valve is provided. In a steam turbine control device that controls the opening and closing of the load controller during normal operation using a regulating valve opening setting signal based on the sum of the output signal of the speed controller and the output signal of the load controller, the load controller is controlled by a change determined by the steam turbine metal temperature. a first load control means for raising the steam control valve at a rate of change; The load control means is provided with two load control means and a switching means for switching to either the first load control means or the second load control means.

【0021】[0021]

【作用】上記構成により、第2の負荷制御手段の高速負
荷上昇モードに切り替わると、第1の負荷制御手段の蒸
気加減弁開度上昇率がタービンメタル温度により決定さ
れたゆっくりした変化率から排熱回収ボイラのドラムレ
ベル制御を安定にできる範囲の最大上昇率である速い変
化率に切り替わり、蒸気加減弁を最短時間で全開に到達
させる。
[Operation] With the above configuration, when the second load control means is switched to the high-speed load increase mode, the rate of increase in the opening of the steam control valve of the first load control means is changed from the slow rate of change determined by the turbine metal temperature. The drum level control of the heat recovery boiler switches to a fast rate of change, which is the maximum rate of increase within the range that can be stabilized, and the steam control valve reaches full open in the shortest possible time.

【0022】[0022]

【実施例】以下、本発明の実施例を図面を参照して説明
する。
Embodiments Hereinafter, embodiments of the present invention will be described with reference to the drawings.

【0023】図1は本発明の一実施例を示すコンバイン
ド発電プラントの蒸気タービン制御装置の制御ブロック
構成図である。図4と同一符号は、同一部分または相当
部分を示し、この部分の説明を省略する。
FIG. 1 is a control block configuration diagram of a steam turbine control device for a combined power generation plant showing one embodiment of the present invention. The same reference numerals as those in FIG. 4 indicate the same or corresponding parts, and the explanation of these parts will be omitted.

【0024】図4と異なる点は、従来の負荷制御器12
の機能を第1の負荷制御手段12Aとし、新たに第2の
負荷制御手段12Bを設けた点である。本実施例は、高
速負荷上昇モードが選択された場合、若しくは中央給電
指令所等より高速負荷上昇モードが要求された場合に高
速負荷上昇のための第2の負荷制御手段12Bに切替え
るようにしている。さらに、本実施例は蒸気圧力が所定
の変化率を越えて急低下した場合に、負荷上昇変化率が
零に設定された設定器23の出力が積分器18に入力す
るようにしている。
The difference from FIG. 4 is that the conventional load controller 12
The function of the first load control means 12A is changed to that of the first load control means 12A, and a second load control means 12B is newly provided. In this embodiment, when the high-speed load increase mode is selected or when the high-speed load increase mode is requested by a central power dispatch center or the like, the switch is made to the second load control means 12B for high-speed load increase. There is. Further, in this embodiment, when the steam pressure suddenly decreases beyond a predetermined rate of change, the output of the setter 23 with the load increase rate set to zero is input to the integrator 18.

【0025】第2の負荷制御手段12Bは、設定器20
、変化率制限器21、スイッチ22および設定器23で
構成される。
The second load control means 12B includes a setting device 20.
, a change rate limiter 21, a switch 22, and a setting device 23.

【0026】ここで、設定器20は、所定の設定値を出
力する。変化率制限器21は、設定器20の出力と積分
器18の出力との偏差を入力する。この変化率制限器2
1の設定値は排熱回収ボイラ1のドラムレベル制御を安
定にできる範囲の変化率としている。スイッチ22は、
変化率制限器21の出力と設定器23の出力を切り替え
る。設定器23は、所定の設定値を出力する。
Here, the setting device 20 outputs a predetermined setting value. The rate of change limiter 21 inputs the deviation between the output of the setter 20 and the output of the integrator 18 . This rate of change limiter 2
The set value 1 is a rate of change within a range that allows stable drum level control of the exhaust heat recovery boiler 1. The switch 22 is
The output of the rate of change limiter 21 and the output of the setter 23 are switched. The setting device 23 outputs a predetermined setting value.

【0027】なお、上記した構成は、高圧蒸気加減弁5
および低圧蒸気加減弁6について実質上同一であり、実
際には各々に設けられる。排熱回収ボイラ1の出口蒸気
圧力は、高圧蒸気加減弁5の場合、高圧ドラム2の出口
蒸気圧力であり、低圧蒸気加減弁6の場合、低圧ドラム
3出口蒸気圧力である。
[0027] The above-mentioned configuration is similar to that of the high-pressure steam control valve 5.
and the low pressure steam control valve 6 are substantially the same, and are actually provided for each. In the case of the high pressure steam control valve 5, the outlet steam pressure of the exhaust heat recovery boiler 1 is the outlet steam pressure of the high pressure drum 2, and in the case of the low pressure steam control valve 6, it is the outlet steam pressure of the low pressure drum 3.

【0028】上記構成で、通常の負荷上昇時にはスイッ
チ19が第1の負荷制御手段12A側を選択する。この
とき第1の負荷制御手段12Aに備えられた設定器16
の出力と積分器18の出力との偏差が変化率制限器17
に出力される。変化率制限器17では、蒸気タービンメ
タル温度から決められた負荷上昇率に相当する変化率で
制限されて積分器18に出力される。
With the above configuration, the switch 19 selects the first load control means 12A side when the load normally increases. At this time, the setting device 16 provided in the first load control means 12A
The deviation between the output of the integrator 18 and the output of the integrator 18 is the rate of change limiter 17
is output to. The rate of change limiter 17 limits the rate of change to a rate of change corresponding to the rate of increase in load determined from the steam turbine metal temperature and outputs it to the integrator 18 .

【0029】一方、高速負荷上昇モードを選択した場合
または中央給電指令所等から高速負荷上昇モードが要求
された場合にはスイッチ19が第2の負荷制御手段12
B側を選択する。この場合、第2の負荷制御手段12B
の設定器20の出力と積分器18の出力との偏差が変化
率制限器21に出力される。この結果、積分器18の入
力が通常の変化率で制御する第1の負荷制御手段12A
の出力から高速の変化率で制御する第2の負荷制御手段
12Bの出力に切り替わる。これにより蒸気加減弁を高
速の変化率で開けることができ最短時間で起動する。
On the other hand, when the high-speed load increase mode is selected or when the high-speed load increase mode is requested from the central power dispatch center or the like, the switch 19 switches to the second load control means 12.
Select side B. In this case, the second load control means 12B
The deviation between the output of the setter 20 and the output of the integrator 18 is output to the rate of change limiter 21. As a result, the first load control means 12A controls the input of the integrator 18 at a normal rate of change.
The output of the second load control means 12B is switched from the output of the second load control means 12B which is controlled at a high rate of change. This allows the steam control valve to be opened at a high rate of change and to start up in the shortest possible time.

【0030】また、高速の変化率で蒸気加減弁を開けて
いるとき、排熱回収ボイラ1のドラムレベル制御を安定
にできる範囲を越えて蒸気圧力が急低下しようとした場
合にはスイッチ22を設定器23側に切替える。このと
きには設定器23の設定値、つまり、負荷上昇変化率が
零の値が積分器18に出力される。このため、積分器1
8の出力は所定値となり蒸気加減弁の開動作を一時停止
させる。これにより蒸気圧力の急低下を防ぎドラムレベ
ル制御を安定に維持させる。
Further, when the steam control valve is opened at a high rate of change, if the steam pressure is about to drop suddenly beyond the range that can stabilize the drum level control of the exhaust heat recovery boiler 1, the switch 22 can be turned off. Switch to the setting device 23 side. At this time, the set value of the setter 23, that is, the value at which the load increase change rate is zero, is output to the integrator 18. Therefore, integrator 1
The output of No. 8 becomes a predetermined value, and the opening operation of the steam control valve is temporarily stopped. This prevents a sudden drop in steam pressure and maintains stable drum level control.

【0031】排熱回収ボイラ出口圧力が異常に低下した
場合は、従来通り低値選択器15により蒸気圧力制御器
14の信号が選択され、最低蒸気圧力を維持する。この
結果、排熱回収ボイラの運転すなわちドラムレベル制御
を安定に維持する。
When the exhaust heat recovery boiler outlet pressure drops abnormally, the signal of the steam pressure controller 14 is selected by the low value selector 15 as in the conventional manner to maintain the lowest steam pressure. As a result, the operation of the exhaust heat recovery boiler, that is, drum level control, is maintained stably.

【0032】このように、通常は第1の負荷制御手段1
2Aが選択され、蒸気加減弁の開度上昇率がタービンメ
タル温度で決定されたゆっくりした変化率で加減弁が開
く。ところが、高速負荷上昇モードがスイッチ選択され
たときまたは中央給電指令所等から高速負荷上昇モード
の要求があったときは第2の負荷制御手段12Bが選択
され、排熱回収ボイラ1のドラムレベル制御を安定にで
きる範囲の最大上昇の速い変化率で蒸気加減弁が最短時
間で全開に達することができる。従って、蒸気タービン
の寿命を若干犠牲にしつつ負荷上昇を優先して中央給電
指令所等の負荷上昇の要求に対応することができる。
In this way, normally the first load control means 1
2A is selected, and the steam control valve opens at a slow rate of change determined by the turbine metal temperature. However, when the switch selects the high-speed load increase mode or when there is a request for the high-speed load increase mode from a central power dispatch center or the like, the second load control means 12B is selected and the drum level control of the waste heat recovery boiler 1 is performed. The steam control valve can reach full open in the shortest possible time with a fast rate of change of maximum rise within the range that can stabilize the steam. Therefore, it is possible to respond to requests for increased load from the central power dispatch center and the like by giving priority to increased load while sacrificing the life of the steam turbine to some extent.

【0033】図2は本発明の他の実施例を示すコンバイ
ンド発電プラントの蒸気タービン制御装置の制御ブロッ
ク構成図である。
FIG. 2 is a control block configuration diagram of a steam turbine control device for a combined power generation plant showing another embodiment of the present invention.

【0034】図1と異なる点は、設定器16と変化率制
限器17とが通常モードと高速負荷上昇モードとを共用
した点である。即ち、変化率制限器17を設定する変化
率は蒸気タービンメタル温度により決定された変化率が
設定された設定器24と、排熱回収ボイラ1のドラムレ
ベルが安定に制御できる範囲の最大の変化率が設定され
た設定器25をスイッチ19により切り替える。この実
施例でも図1に示す実施例と同様に実施できる。
The difference from FIG. 1 is that the setting unit 16 and rate of change limiter 17 share the normal mode and the high-speed load increase mode. That is, the rate of change that is set by the rate of change limiter 17 is determined by the rate of change determined by the steam turbine metal temperature set by the setter 24, and the maximum change within the range in which the drum level of the exhaust heat recovery boiler 1 can be stably controlled. The setting device 25 in which the rate has been set is switched by the switch 19. This embodiment can also be implemented in the same manner as the embodiment shown in FIG.

【0035】[0035]

【発明の効果】以上説明したように本発明によれば、コ
ンバインドサイクルの安定した運転を維持しながら蒸気
タービンを最短時間で起動させることができ、急速な負
荷上昇要求に対処することができる。従って、実際の電
力需要が予測した電力需要よりも大幅に多い場合や他の
発電所が緊急停止した場合でも安定した電力供給を図る
ことができる。
As described above, according to the present invention, it is possible to start the steam turbine in the shortest possible time while maintaining stable operation of the combined cycle, and it is possible to cope with a request for a rapid increase in load. Therefore, even if the actual power demand is significantly higher than the predicted power demand or if other power plants are forced to stop, a stable power supply can be achieved.

【図面の簡単な説明】[Brief explanation of drawings]

【図1】本発明の一実施例を示すコンバインド発電プラ
ントの蒸気タービン制御装置の制御ブロック構成図であ
る。
FIG. 1 is a control block configuration diagram of a steam turbine control device for a combined power plant showing an embodiment of the present invention.

【図2】本発明の他の実施例を示すコンバインド発電プ
ラントの蒸気タービン制御装置の制御ブロック構成図で
ある。
FIG. 2 is a control block configuration diagram of a steam turbine control device for a combined power plant showing another embodiment of the present invention.

【図3】コンバインド発電プラントの蒸気サイクルを示
す系統図である。
FIG. 3 is a system diagram showing a steam cycle of a combined power generation plant.

【図4】従来例を示すコンバインド発電プラントの蒸気
タービン制御装置の制御ブロック図である。
FIG. 4 is a control block diagram of a steam turbine control device for a combined power plant showing a conventional example.

【符号の説明】[Explanation of symbols]

11    速度制御器 12    負荷制御器 12A    第1の負荷制御手段 12B    第2の負荷制御手段 13    負荷制限器 14    蒸気圧力制御器 15    低値選択器 16    設定器 17    変化率制限器 18    積分器 19    スイッチ 20    設定器 21    変化率制限器 22    スイッチ 23    設定器 11 Speed controller 12 Load controller 12A First load control means 12B Second load control means 13 Load limiter 14 Steam pressure controller 15 Low value selector 16 Setting device 17 Rate of change limiter 18 Integrator 19 Switch 20 Setting device 21 Rate of change limiter 22 Switch 23 Setting device

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】  ガスタービンサイクルおよび蒸気ター
ビンサイクルが排熱回収ボイラを介して結合され、前記
排熱回収ボイラからの蒸気を蒸気タービンに導くための
蒸気加減弁と、この蒸気加減弁を通常運転時に速度制御
器の出力信号と負荷制御器の出力信号との加算値に基づ
く加減弁開度設定信号により開閉制御するコンバインド
発電プラントの蒸気タービン制御装置において、前記負
荷制御器を蒸気タービンメタル温度により定まる変化率
で前記蒸気加減弁を上昇させるための第1の負荷制御手
段と、前記負荷制御器を前記排熱回収ボイラのドラムレ
ベルが安定に制御できる範囲の最大の変化率で前記蒸気
加減弁を上昇させるための第2の負荷制御手段と、前記
第1の負荷制御手段または前記第2の負荷制御手段のい
ずれかに切替える切替手段とを備えたことを特徴とする
コンバインド発電プラントの蒸気タービン制御装置。
1. A gas turbine cycle and a steam turbine cycle are coupled via an exhaust heat recovery boiler, and a steam control valve is provided for guiding steam from the waste heat recovery boiler to the steam turbine, and the steam control valve is operated normally. In a steam turbine control device for a combined power generation plant, the load controller is controlled depending on the steam turbine metal temperature. a first load control means for raising the steam control valve at a predetermined rate of change; and a first load control means for increasing the steam control valve at a maximum rate of change within a range in which the drum level of the exhaust heat recovery boiler can be stably controlled. A steam turbine for a combined power generation plant, characterized in that the steam turbine is equipped with a second load control means for increasing the load, and a switching means for switching to either the first load control means or the second load control means. Control device.
JP8724991A 1991-03-28 1991-03-28 Steam turbine controller for combined power generation plant Pending JPH04301103A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8724991A JPH04301103A (en) 1991-03-28 1991-03-28 Steam turbine controller for combined power generation plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8724991A JPH04301103A (en) 1991-03-28 1991-03-28 Steam turbine controller for combined power generation plant

Publications (1)

Publication Number Publication Date
JPH04301103A true JPH04301103A (en) 1992-10-23

Family

ID=13909528

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8724991A Pending JPH04301103A (en) 1991-03-28 1991-03-28 Steam turbine controller for combined power generation plant

Country Status (1)

Country Link
JP (1) JPH04301103A (en)

Similar Documents

Publication Publication Date Title
JPH04301103A (en) Steam turbine controller for combined power generation plant
JP2578328B2 (en) Output control method for back pressure turbine generator
JPS628605B2 (en)
JP2892427B2 (en) Steam turbine controller
JP3792853B2 (en) Combined cycle control device and gas turbine control device
JPS6239655B2 (en)
JPS61106903A (en) Speed governing type change-over device
JPS60228711A (en) Turbine bypass control device for combined cycle electric power plant
JPH05272361A (en) Load controller of combined-cycle power generating plant
JPH0467001B2 (en)
JP2620124B2 (en) Bleed turbine control method and apparatus
JPS61167102A (en) Governing system changeover device
JPH0719007A (en) Turbine control device
JPH09189204A (en) Steam turbine control device
JPH03215198A (en) Load controller for combined cycle plant
JPS6239654B2 (en)
JPH08189993A (en) Turbine speed controller
JPH0642706A (en) Circuit for setting and controlling steam temperature in boiler
JPS60164604A (en) Purchasing electric power control method
JPS62157219A (en) Waste heat turbine pre-pressure controller
JPH04259609A (en) Combined cycle control device
JPH07332021A (en) Frequency controller for combined cycle electric power plant
JPH07103808B2 (en) Load back-up method when the system frequency drops sharply
JPH01269093A (en) Feed water controller for nuclear reactor
JPS58160516A (en) Control device for gas turbine exhaust temperature