JPH04275029A - Load interrupting device at time of parallel off fault - Google Patents

Load interrupting device at time of parallel off fault

Info

Publication number
JPH04275029A
JPH04275029A JP3057789A JP5778991A JPH04275029A JP H04275029 A JPH04275029 A JP H04275029A JP 3057789 A JP3057789 A JP 3057789A JP 5778991 A JP5778991 A JP 5778991A JP H04275029 A JPH04275029 A JP H04275029A
Authority
JP
Japan
Prior art keywords
load
power
amount
frequency
generator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP3057789A
Other languages
Japanese (ja)
Inventor
Hiroshi Shibata
寛 柴田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
Kawasaki Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawasaki Steel Corp filed Critical Kawasaki Steel Corp
Priority to JP3057789A priority Critical patent/JPH04275029A/en
Publication of JPH04275029A publication Critical patent/JPH04275029A/en
Pending legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

PURPOSE:To prevent troubles caused by overload by interrupting the load partially in accordance with the lowering of the supplied power, at the time of a parallel off fault happening. CONSTITUTION:In a specific system having a generator, a parallel off fault detecting means 20 detects the occurrence of a parallel off fault where power supply from another power system is stopped. A frequency detecting means 30 detects the lowered quantity of the frequency of power being supplied. And a load-quantity-to-be-interrupted determining means 40 determines a load quantity to be interrupted from the total output power of the generator and above- mentioned lowered quantity of the frequency, at the time of the parallel off fault being detected. Besides, a load interrupting means 50 selects and interrupts loads according to preset priority and thus determined interrupting quantity of load. And this prevents the overloaded state after the occurrence of the parallel off fault.

Description

【発明の詳細な説明】[Detailed description of the invention]

【0001】0001

【産業上の利用分野】本発明は、他の電力系統から電力
の供給を受けると共に、これと並列運転している発電機
を有する特定の系統に係り、特に、解列事故発生時にも
、負荷過大による発電機トリップ全停電を防止すること
ができる、解列事故発生時の負荷遮断装置に関する。
[Industrial Application Field] The present invention relates to a specific power system that receives power from another power system and has a generator operating in parallel with the power system. The present invention relates to a load shedding device in the event of a disconnection accident, which can prevent generator tripping and total power outage due to overload.

【0002】0002

【従来の技術】製鉄所等の多量の電力を消費する電力需
要家や、極力停電を避けなければならない重要保安負荷
を有する電力需要家等においては、電力会社等の電力系
統から電力の受電を行うと共に、自家用発電設備をも有
し、これら他の電力系統からの受電と自家発電とを並列
運転しているものがある。
[Prior Art] Electricity consumers such as steel mills that consume a large amount of electricity, and electricity consumers with important security loads that must avoid power outages as much as possible, receive electricity from the electricity grid of an electric power company. Some of them also have their own private power generation equipment, and operate their private power generation in parallel with receiving power from other power systems.

【0003】例えば、このような電力需要家の系統、即
ち他の電力系統から電力の供給を受けると共に、これと
並列運転している発電機を有する特定の系統においては
、通常運転時には一般にコストの安価な電力会社等の他
の電力系統からの電力の受電を主として行うものである
For example, in a power consumer's system, that is, a specific system that receives power from another power system and has a generator running in parallel with it, the cost is generally low during normal operation. It mainly receives power from other power systems such as inexpensive power companies.

【0004】又、このような電力需要家の系統において
、このような他の電力系統からの電力の受電に障害が発
生してしまった種々の事故発生時には、この事故発生前
に他の電力系統から受電された電力量分をも自家用発電
設備によって賄うというものがある。
[0004] Furthermore, in the event of various accidents occurring in such electric power consumer systems where power reception from other power systems is disrupted, it is possible that other power systems are There is a system in which the amount of electricity received from a private power generation facility is covered by private power generation equipment.

【0005】なお、このような電力会社等の他の電力系
統からの電力の供給の停止の事故を、以後、解列事故と
呼ぶ。
[0005] Such an accident in which the supply of power from another power system such as an electric power company is stopped is hereinafter referred to as a disconnection accident.

【0006】このような特定の系統において、解列事故
が発生すると、他の電力系統からの電力の供給が一時に
停止されてしまうために、自家用発電設備で賄なわなけ
ればならない電力量は急激に増加してしまう。
[0006] When a disconnection accident occurs in such a specific power system, the supply of power from other power systems is temporarily stopped, so the amount of power that must be covered by private power generation equipment rapidly increases. It will increase to.

【0007】例えば、この自家用発電設備がボイラで発
生させた蒸気をタービンへ送り発電する火力発電設備で
あった場合には、このタービンへ送られる蒸気の流入量
が急激に上昇してしまい、タービンブレードの共振や熱
歪みによってタービンを損傷してしまう恐れもある。
For example, if this private power generation equipment is a thermal power generation equipment that sends steam generated in a boiler to a turbine to generate electricity, the amount of steam flowing into the turbine will rapidly increase, causing the turbine to overflow. There is also the risk of damaging the turbine due to blade resonance and thermal distortion.

【0008】又、自家用発電設備の発電機は所定の調定
率のガバナ特性を有するものであり、所定のガバナ設定
値に調速制御されているものである。
[0008] Furthermore, the generator of the private power generation equipment has a governor characteristic of a predetermined regulation rate, and is controlled to be speed-governed to a predetermined governor setting value.

【0009】しかしながら、このような解列事故発生時
の急激な負荷の増大によっては、発電機の回転速度が低
下してしまったり、回転速度が動揺してしまい、電力系
統(発電機系統)の周波数が大きく変動してしまうとい
う問題がある。
However, due to the sudden increase in load when such a disconnection accident occurs, the rotational speed of the generator decreases or fluctuates, causing damage to the power system (generator system). There is a problem that the frequency fluctuates greatly.

【0010】又、電力系統内の合計負荷量が、解列事故
発生後の電力系統内の合計供給電力量(発電機合計出力
電力)に対して大きくなってしまった場合には、電力系
統の周波数が継続して低下してゆき、あるいは急激に低
下し、発電機トリップ全停電となってしまう恐れもある
[0010] Furthermore, if the total load in the power system becomes larger than the total amount of power supplied in the power system (total generator output power) after the disconnection accident occurs, the power system There is also the risk that the frequency will continue to drop or drop suddenly, resulting in a generator trip and total power outage.

【0011】このような電力系統の合計負荷量の、解列
事故発生後の合計供給電力量に対する超過状態を防止す
るための様々な技術が開示されている。
Various techniques have been disclosed for preventing the total load of the power system from exceeding the total amount of power supplied after a disconnection accident occurs.

【0012】例えば、従来、解列検出リレー又は周波数
低下検出リレーにより解列事故の発生が検出された場合
には、予め設定された順序に従って負荷を自動的に遮断
し、この遮断により合計負荷量が合計供給電力量を超過
しないようにしている。この遮断される負荷の合計量は
、常時当該電力系統の合計供給電力量と当該電力系統の
合計負荷量とを検出すると共に突合せて、この合計供給
電力量の70〜80%を超える合計負荷量の超過負荷量
として求められたものである。
For example, conventionally, when the occurrence of a disconnection accident is detected by a disconnection detection relay or a frequency drop detection relay, the load is automatically cut off according to a preset order, and this disconnection reduces the total load amount. is ensured that the amount of power supplied does not exceed the total amount of power supplied. The total amount of load to be cut off is determined by constantly detecting and comparing the total amount of power supplied by the power system and the total load of the power system, and determining the amount of load that exceeds 70 to 80% of the total amount of power supplied. This was determined as the excess load amount.

【0013】以下、この従来の解列事故発生時の負荷遮
断の技術を、従来の第1解列事故発生時の負荷遮断技術
と呼ぶ。
[0013] Hereinafter, this conventional technique of load shedding when a train disconnection accident occurs will be referred to as a conventional load shedding technique when a train disconnection accident occurs.

【0014】又、特開昭58−220905では、ター
ビンと発電機と被駆動機械とを連結した自家発電設備に
おいて、該発電機の電動機としての運転を行う場合に、
前記タービンの制御系に設けられた負荷制限装置を、任
意な運転状態におけるタービンに許容可能な突変負荷量
の余裕を持った制御値によって制御し、タービンの急激
な負荷上昇を防止するという技術が開示されている。
[0014] Furthermore, in JP-A No. 58-220905, in a private power generation facility in which a turbine, a generator, and a driven machine are connected, when the generator is operated as an electric motor,
A technology that prevents a sudden load increase on the turbine by controlling a load limiting device installed in the control system of the turbine with a control value that has a margin of sudden load that can be tolerated by the turbine in any operating state. is disclosed.

【0015】この特開昭58−220905の技術によ
れば、電動機として用いられている発電機への電力の供
給が遮断されるようなことがあった場合においても、タ
ービンの制御系が突変負荷量の余地を持った制御値によ
って制御されているために、急激な負荷上昇によってタ
ービンの回転速度が突発的に低下してしまうことを防止
することが可能である。
According to the technique of JP-A-58-220905, even if the power supply to the generator used as an electric motor is cut off, the control system of the turbine will not change suddenly. Since it is controlled by a control value that has a margin for the load amount, it is possible to prevent the rotational speed of the turbine from suddenly decreasing due to a sudden increase in load.

【0016】又、特開昭61−221535では、複数
の電源端と複数の負荷端とを共通に接続して、当該負荷
に電力を供給する電力系統において、前記各電源端のい
ずれか1つの電力が脱落した際には、残存する電源が過
負荷状態で耐え得る耐量と、残存する負荷を制御して前
記耐量まで減少させるための負荷の制御量とを演算する
負荷演算装置と、該負荷演算装置からの負荷制御量に応
じて負荷を制御する負荷制御装置(負荷遮断装置)とを
備え、前述のような電源の脱落の際には直ちに負荷を制
御(負荷を減らす)するという技術が開示されている。
[0016] Furthermore, in JP-A No. 61-221535, in a power system in which a plurality of power supply terminals and a plurality of load terminals are commonly connected and supplying power to the loads, any one of the power supply terminals is A load calculation device that calculates the withstand capacity that the remaining power supply can withstand in an overload state when the power is dropped, and the control amount of the load to control the remaining load and reduce it to the withstand capacity, and the load It is equipped with a load control device (load shedding device) that controls the load according to the load control amount from the computing device, and has a technology that immediately controls the load (reduces the load) in the event of a power failure as described above. Disclosed.

【0017】この特開昭61−221535の技術によ
れば、残存する電源の合計供給電力量を超過する負荷を
遮断し、残存する電源を用いて電力系統に安定して電力
を供給することが可能である。
According to the technique disclosed in Japanese Patent Application Laid-Open No. 61-221535, it is possible to cut off a load that exceeds the total amount of power supplied by the remaining power sources and stably supply power to the power grid using the remaining power sources. It is possible.

【0018】[0018]

【発明が達成しようとする課題】しかしながら、前述の
ような解列事故発生時の負荷遮断に関する技術において
は、絶えず該当する電力系統内の合計負荷量と合計供給
電力量とを求めると共に、これら合計負荷量と合計供給
電力量とを常時突合せなければならず、このため解列事
故発生時に対応する負荷遮断等の対応処置が遅れてしま
うという問題があった。
[Problem to be achieved by the invention] However, in the technology related to load shedding when a disconnection accident occurs as described above, it is necessary to constantly calculate the total load amount and the total amount of supplied power in the relevant power system, and The amount of load and the total amount of power supplied must be constantly compared, which causes a problem in that countermeasures such as load shedding in response to a disconnection accident are delayed.

【0019】又、例えば、自家用発電設備を持った製鉄
所においては、多数の負荷が広大な敷地内に散在してお
り、このような多数の負荷量をそれぞれ検出して収集す
るためには、膨大なコストがかかるだけでなく、最終的
な合計負荷量を求めるまでの演算時間が長くなってしま
うという問題もある。
[0019] Furthermore, for example, in a steelworks with in-house power generation equipment, many loads are scattered over a vast site, and in order to detect and collect the amounts of such many loads, it is necessary to There is a problem in that not only is it extremely costly, but it also takes a long time to calculate the final total load amount.

【0020】又、このようにして求められた電力系統内
の合計負荷量や、一般に複数台の発電機でなる合計供給
電力量とには、検出誤差等が生じてしまうものである。 従って、従来のこのような電力系統内の合計負荷量と合
計供給電力量とから解列事故発生後の遮断すべき負荷量
は正確に速やかに求めることは困難である。
[0020]Furthermore, detection errors and the like occur in the total load in the power system determined in this way, and in general, the total amount of power supplied by a plurality of generators. Therefore, it is difficult to accurately and quickly determine the amount of load to be cut off after a disconnection accident occurs from the total amount of load and the total amount of supplied power in the conventional power system.

【0021】又、このようにして求められた遮断すべき
負荷量に従って遮断する負荷を選択するためには、遮断
される各負荷の実際の負荷量を正確に独立して検出しな
ければならず、膨大なコストがかかる一方、正確に素早
く求めることは困難である。
[0021] Furthermore, in order to select the load to be cut off according to the load amount to be cut off determined in this way, it is necessary to accurately and independently detect the actual load amount of each load to be cut off. , which costs a huge amount of money and is difficult to obtain accurately and quickly.

【0022】本発明は、前記従来の問題点を解決するべ
くなされたもので、他の電力系統から電力の供給を受け
ると共に、これと並列運転している発電機を有する特定
の系統において、前記他の電力系統からの電力の供給が
停止した解列事故発生時に、実際の合計負荷量が不明(
不正確)であっとしても、該解列事故発生による供給電
力の低下に伴ったより適切な負荷の遮断を行って、負荷
過大による発電機トリップ全停電を防止することが可能
な解列事故発生時の負荷遮断装置を提供することを目的
とする。
The present invention has been made to solve the above-mentioned conventional problems, and in a particular system that receives power from another power system and has a generator operating in parallel with the power system, the above-mentioned When a disconnection accident occurs where power supply from other power systems is stopped, the actual total load is unknown (
In the event of a grid disconnection accident, even if the grid disconnection accident occurs, it is possible to perform more appropriate load shedding as the power supply decreases due to the grid disconnection accident, and prevent generator tripping and total power outage due to excessive load. The purpose of the present invention is to provide a load shedding device.

【0023】[0023]

【課題を達成するための手段】本発明は、他の電力系統
から電力の供給を受けると共に、これと並列運転してい
る発電機を有する特定の系統において、前記他の電力系
統からの電力の供給が停止した解列事故発生を検出する
解列事故検出手段と、前記特定の系統内で供給されてい
る電力の周波数低下量を検出する周波数検出手段と、前
記解列事故検出時に、単独運転系に移行する発電機合計
出力電力と、前記周波数低下量とから、遮断すべき負荷
量を決定する遮断負荷量決定手段とを備え、前記解列事
故発生の検出時に、前記遮断負荷量に従って、予め優先
順位をつけて設定した負荷を選択して遮断することによ
り、前記課題を達成したものである。
[Means for Accomplishing the Object] The present invention provides a method for receiving power from another power system and in a specific system having a generator operating in parallel with the power supply from the other power system. a grid disconnection accident detection means for detecting the occurrence of a grid disconnection accident in which the supply has stopped; a frequency detection means for detecting the amount of frequency reduction of the electric power supplied in the specific system; A cutoff load amount determining means for determining a load to be cut off from the total output power of the generators transferred to the system and the frequency reduction amount, and when the occurrence of the train disconnection accident is detected, according to the cutoff load amount, This problem has been achieved by selecting and cutting off loads that have been prioritized in advance.

【0024】又、前記遮断負荷量決定手段が、前回の負
荷の遮断後にも周波数低下がある場合に、再び前記遮断
負荷量を決定するものであり、新たに決定された該遮断
負荷量に従って、予め優先順位をつけて設定した負荷を
更に選択して遮断することにより、同じく、前記課題を
達成したものである。
[0024] Furthermore, the breaking load amount determining means determines the breaking load amount again when there is a frequency drop even after the previous load cutting, and according to the newly determined breaking load amount, The above-mentioned problem is also achieved by further selecting and cutting off loads that have been prioritized and set in advance.

【0025】[0025]

【作用】他の電力系統から電力の供給を受けると共に、
これと並列運転している発電機を有する特定の系統にお
いて、他の電力系統からの電力の供給が停止した解列事
故発生時には、該解列事故発生による供給電力の低下に
伴った負荷の遮断を行わなければならない。
[Operation] In addition to receiving power from other power systems,
In a specific system that has a generator operating in parallel with this, in the event of a grid disconnection accident in which the supply of power from other power systems is stopped, the load will be cut off due to the drop in power supply due to the grid disconnection accident. must be carried out.

【0026】これは、解列事故発生による供給電力の低
下に伴って、負荷が過大になってしまい、発電機トリッ
プ全停電が発生してしまうことを防止するためである。
[0026] This is to prevent the load from becoming excessive due to a drop in power supply due to the occurrence of a disconnection accident, thereby preventing the generator from tripping and causing a total power outage.

【0027】このような解列事故発生時の負荷の遮断に
際して、遮断すべき負荷量は、一般に次式により求める
ことができる。
[0027] When the load is cut off when such a train disconnection accident occurs, the amount of load to be cut off can generally be determined by the following equation.

【0028】(遮断すべき負荷量)=(合計負荷量)−
(発電機合計出力電力)×α…(1)
(Load amount to be cut off) = (Total load amount) -
(Total generator output power) x α…(1)

【0029】なお、この合計負荷量とは、解列事故発生
直前の該当系統内の負荷の合計量である。又、発電機合
計出力電力とは、この解列事故発生に伴って運転可能な
発電機の単独運転系に移行する合計出力電力である。 又、αは安全係数であり、通常70%から80%以内で
あることが好ましい。
Note that the total load amount is the total amount of load in the relevant system immediately before the occurrence of the disconnection accident. Further, the total output power of the generators is the total output power of the generators that can be operated and transferred to the isolated operation system due to the occurrence of this disconnection accident. Further, α is a safety factor, which is preferably within 70% to 80%.

【0030】解列事故発生の際に、遮断すべき負荷量を
求めるためには、前述の(1)式に示されるように、ま
ず合計負荷量と発電機合計出力電力とを求めなければな
らない。
[0030] In order to determine the amount of load to be cut off in the event of a disconnection accident, the total load amount and the total output power of the generator must first be determined, as shown in equation (1) above. .

【0031】しかしながら、広大な敷地に多数の負荷が
散在している場合等のように、この合計負荷量は容易に
求めることができないだけでなく、無視できない誤差を
含んでしまうものである。
However, in cases where a large number of loads are scattered over a vast site, the total amount of load not only cannot be easily determined, but also includes errors that cannot be ignored.

【0032】又、発電機合計出力電力を求める際にも、
得られた数値には誤差が含まれている。
[0032] Also, when calculating the total output power of the generator,
The obtained values include errors.

【0033】従って、合計負荷量が求められたとしても
、このような誤差が含まれた合計負荷量や発電機合計出
力電力とから計算された遮断すべき負荷量にも誤差が含
まれてしまう。
[0033] Therefore, even if the total load amount is determined, the error will also be included in the load amount to be cut off, which is calculated from the total load amount including such an error and the generator total output power. .

【0034】例えば、この遮断すべき負荷量が誤差によ
り大きな値とされてしまった場合には、不必要に多くの
負荷を遮断してしまうという問題がある。あるいは、こ
の遮断すべき負荷量が誤差により小さな値とされてしま
った場合には、解列事故発生後も利用可能な発電機で全
ての負荷を賄うことができず、場合によっては負荷過大
による発電機トリップ全停電状態となってしまう恐れも
ある。
For example, if the amount of load to be cut off is set to a large value due to an error, there is a problem that a large amount of load will be cut off unnecessarily. Alternatively, if the amount of load to be cut off is determined to be a small value due to an error, the available generators may not be able to cover the entire load even after the disconnection accident occurs, and in some cases, due to excessive load. There is also a risk that the generator will trip and result in a total power outage.

【0035】従って、本発明では、解列事故発生後の供
給されている電力の単位時間当りの周波数低下量と、前
述のような発電機合計出力電力とから、遮断すべき負荷
量を求めている。
Therefore, in the present invention, the amount of load to be cut off is determined from the amount of frequency reduction per unit time of the power being supplied after the occurrence of a disconnection accident and the total output power of the generator as described above. There is.

【0036】この解列事故発生後の供給されている電力
の単位時間当りの周波数低下量は、前記遮断すべき負荷
量に対応したものである。即ち、前記合計負荷量と前記
発電機合計出力電力との差により決まるものである。つ
まり、この遮断すべき負荷量が大きいとこの周波数低下
量も大きくなり、この遮断すべき負荷量が小さいとこの
周波数低下量も小さくなる。
The amount of frequency reduction per unit time of the supplied power after the occurrence of this disconnection accident corresponds to the amount of load to be cut off. That is, it is determined by the difference between the total load amount and the generator total output power. In other words, if the amount of load to be cut off is large, the amount of frequency reduction will also be large, and if the amount of load to be cut off is small, the amount of frequency reduction will also be small.

【0037】従って、この単位時間当りの周波数低下量
を検出することにより、遮断すべき負荷量を求めるよう
にしている。
Therefore, by detecting the amount of frequency drop per unit time, the amount of load to be cut off is determined.

【0038】又、この単位時間当りの周波数低下量は、
遮断すべき負荷量だけに対応するものではなく、発電機
合計出力電力の大きさにも影響されるものである。
[0038] Also, the amount of frequency reduction per unit time is:
It does not only correspond to the amount of load to be cut off, but is also affected by the magnitude of the total output power of the generator.

【0039】従って、本発明では、この遮断すべき負荷
量を求める際、解列事故発生後の供給されている電力の
単位時間当りの周波数低下量と共に、発電機合計出力電
力をも用いるようにしている。
Therefore, in the present invention, when determining the amount of load to be cut off, the total output power of the generator is used as well as the amount of frequency decrease per unit time of the power being supplied after the occurrence of the disconnection accident. ing.

【0040】従って、本発明によれば、解列事故発生時
に、実際の合計負荷量が不明(不正確)であったとして
も、該解列事故発生による供給電力の低下に伴ったより
適切な負荷の遮断を行うことができ、負荷過大による発
電機トリップ全停電を防止することができる。
Therefore, according to the present invention, even if the actual total load amount is unknown (inaccurate) when a disconnection accident occurs, a more appropriate load can be set according to the decrease in power supply due to the occurrence of the disconnection accident. This can prevent generator tripping and total power outage due to excessive load.

【0041】なお、本発明において、この発電機合計出
力電力は、各発電機の出力電力を実測して合計してもよ
い。このとき、解列事故発生後にあっては、発電機の出
力電力は変動してしまっているので、解列事故発生直前
の各発電機の出力電力の実測値の合計を、この発電機合
計出力電力としてもよい。又、この発電機合計出力電力
は、各発電機のガバナ設定値等に従った各発電機の設定
された(予想された)それぞれの出力電力の合計であっ
てもよい。本発明は、この発電機合計出力電力を求める
方法を限定するものではない。
In the present invention, the total output power of the generators may be obtained by actually measuring the output power of each generator and summing the total output power. At this time, since the output power of the generator has fluctuated after the train disconnection accident occurs, the sum of the actual measured values of the output power of each generator immediately before the train disconnection accident occurs is calculated as the total output of this generator. It can also be used as electricity. Further, the total generator output power may be the sum of the set (estimated) output power of each generator according to the governor setting value of each generator. The present invention does not limit the method of determining the total generator output power.

【0042】なお、本発明を適用して、遮断すべき負荷
量を求めて所定の負荷を遮断後にも、更に供給されてい
る電力の周波数が低下している場合には、再び同様に遮
断すべき負荷量を周波数低下量と発電機合計出力電力と
から求め、これに対応する負荷を更に遮断するようにし
てもよい。
[0042] By applying the present invention, even after determining the amount of load to be cut off and cutting off a predetermined load, if the frequency of the supplied power has further decreased, it is necessary to cut off the load in the same way again. The amount of load to be generated may be determined from the amount of frequency reduction and the total output power of the generator, and the corresponding load may be further cut off.

【0043】これによれば、解列事故発生後の負荷過大
を確実に防止することが可能である。
[0043] According to this, it is possible to reliably prevent excessive load after the occurrence of a train disconnection accident.

【0044】なお、前述のように、解列事故発生後の供
給されている電力の単位時間当りの周波数低下量は、遮
断すべき負荷量と発電機合計出力電力とに対応したもの
であるが、これ以外にも影響を及ぼす要素がある場合も
ある。例えば、この周波数低下量は、各発電機のガバナ
設定値や、ガバナ特性(初電機を調定率)や各負荷の電
源電圧と消費電力との関係等にも影響を受ける。しかし
ながら、このような要素は解列事故の発生前でも発生後
でも通常同一であるので、遮断すべき負荷量を算出する
際には、所定の定数で補正すればよい。
[0044] As mentioned above, the amount of frequency reduction per unit time of the supplied power after the occurrence of a disconnection accident corresponds to the amount of load to be cut off and the total output power of the generator. However, there may be other influencing factors as well. For example, the amount of frequency reduction is influenced by the governor setting value of each generator, the governor characteristics (adjustment rate of the first generator), the relationship between the power supply voltage and power consumption of each load, etc. However, since such factors are usually the same both before and after the occurrence of a train disconnection accident, when calculating the amount of load to be interrupted, it is only necessary to correct it using a predetermined constant.

【0045】以上、本発明は、前記発電機合計出力電力
と前記周波数低下量とから遮断すべき負荷量を決定する
ものであればよい。即ち、本発明は、解列事故発生後の
周波数低下量と発電機合計出力電力及び遮断すべき負荷
量の変化の関係に着目したものである。
As described above, the present invention is sufficient as long as it determines the amount of load to be cut off from the total output power of the generator and the amount of frequency reduction. That is, the present invention focuses on the relationship between the amount of frequency reduction after the occurrence of a disconnection accident, the total output power of the generator, and the change in the amount of load to be cut off.

【0046】[0046]

【実施例】以下、図を用いて本発明の実施例を詳細に説
明する。
Embodiments Hereinafter, embodiments of the present invention will be explained in detail with reference to the drawings.

【0047】図1は、本発明の実施例の全体ブロック図
である。
FIG. 1 is an overall block diagram of an embodiment of the present invention.

【0048】この図1の本発明が適用された負荷遮断装
置10は、解列事故検出手段20と、周波数検出手段3
0と、遮断負荷量決定手段40と、負荷遮断手段50と
により構成されている。
The load shedding device 10 shown in FIG. 1 to which the present invention is applied includes a disconnection accident detection means 20 and a frequency detection means 3
0, a shedding load determining means 40, and a load shedding means 50.

【0049】この解列事故検出手段20は、解列事故発
生による供給される電力の周波数低下や、解列事故発生
時に他の電力系統からの電力を受電している遮断器がト
リップしたときの、このトリップを検出することにより
解列事故発生を検出し、これを遮断負荷量決定手段40
に出力するものである。
The grid disconnection fault detection means 20 detects a drop in the frequency of the supplied power due to a grid disconnection accident or a trip of a circuit breaker receiving power from another power system when a grid disconnection fault occurs. , by detecting this trip, the occurrence of a train breaking accident is detected, and this is determined by the breaking load amount determining means 40.
This is what is output to.

【0050】又、周波数検出手段30は、系統内で供給
されている電力の周波数に対応した数値を得るものであ
る。
Furthermore, the frequency detection means 30 obtains a numerical value corresponding to the frequency of power supplied within the system.

【0051】なお、この周波数検出手段30は、ごく短
時間で周波数を検出するため等においては、供給されて
いる電力の周期あるいは所定サイクルに対応した周期を
測定するものであってもよい。
Note that this frequency detecting means 30 may measure the cycle of the supplied power or the cycle corresponding to a predetermined cycle in order to detect the frequency in a very short time.

【0052】遮断負荷量決定手段40は、解列事故検出
手段20からの入力と、周波数検出手段30からの入力
と、発電機合計出力電力に関する入力値あるいは予め設
定されている設定値とにより、解列事故発生による供給
電力の低下に伴った遮断すべき負荷量を決定するもので
ある。
The cutoff load amount determining means 40 uses the input from the disconnection accident detecting means 20, the input from the frequency detecting means 30, and the input value or preset value regarding the total output power of the generator. This determines the amount of load that should be cut off when the power supply decreases due to a disconnection accident.

【0053】即ち、この遮断負荷量決定手段40は、解
列事故発生時に、単独運転系に移行する発電機合計出力
電力と、周波数低下量とから、発電機の過負荷を防止す
るための遮断すべき負荷量を決定するものである。
In other words, the cutoff load amount determination means 40 determines the cutoff load amount determination unit 40 to determine the cutoff load amount to prevent overload of the generator based on the total output power of the generators transferred to the islanding system and the amount of frequency decrease when a disconnection accident occurs. This determines the amount of load to be applied.

【0054】負荷遮断手段50は、前述の手段負荷量決
定手段40から入力された遮断すべき負荷量に従って、
予め優先順位をつけて設定した負荷を選択して遮断する
遮断信号を各遮断機へ出力するものである。即ち、この
負荷遮断手段50は、各負荷毎に予め設定された優先順
位に従って、遮断すべき負荷量分の負荷を選択する。
The load shedding means 50 operates according to the amount of load to be cut off inputted from the means load amount determining means 40 described above.
A cutoff signal is output to each circuit breaker to select and cut off a load that has been prioritized in advance. That is, the load shedding means 50 selects the loads to be shelved according to the priority order set in advance for each load.

【0055】図2は、本発明の実施例の、主に入力に関
するブロック図である。
FIG. 2 is a block diagram mainly relating to inputs of an embodiment of the present invention.

【0056】この図2において、符号10、20、30
、40は、前述の図1の同符号のものと同一のものであ
る。
[0056] In this FIG.
, 40 are the same as those with the same reference numerals in FIG. 1 described above.

【0057】この図2において、周波数低下検出リレー
101と102とは、図5の電力計測用トランス(周波
数測定用)PTFを介して、対象となる電力系統の周波
数低下を検出する補助リレーである。これら周波数低下
検出リレー101と102とは、予め設定されている設
定値よりも、定格電源周波数(50Hzないしは60H
z )に対する供給されている電力の周波数低下が大き
くなったときにオン状態となるものである。
In FIG. 2, frequency drop detection relays 101 and 102 are auxiliary relays that detect a frequency drop in the target power system via the power measurement transformer (for frequency measurement) PTF shown in FIG. . These frequency drop detection relays 101 and 102 operate at a frequency lower than the rated power frequency (50Hz or 60H) than the preset value.
It turns on when the frequency drop of the supplied power with respect to z) becomes large.

【0058】この周波数低下検出リレー101は、電力
系統で供給されている電力の周波数低下から、まず解列
事故発生を検出するものである。
The frequency drop detection relay 101 first detects the occurrence of a disconnection accident from a drop in the frequency of the power supplied by the power system.

【0059】又、周波数低下検出リレー102は、前記
周波数低下検出リレー101による解列事故発生の検出
、あるいは後述する解列検出リレー110による解列事
故発生の検出後、負荷遮断装置10において、遮断すべ
き負荷量を求めて負荷を選択して遮断したにも拘らず、
電力系統内で供給されている周波数が引き続いて低下し
ていることを検出するものである。従って、この周波数
低下検出リレー102の設定は、もう1つの周波数低下
検出リレー101の設定よりも大きくなっている。
Further, the frequency drop detection relay 102 performs a shedding operation in the load shedding device 10 after the frequency drop detection relay 101 detects the occurrence of a train disconnection accident, or after the train disconnection detection relay 110 (described later) detects the occurrence of a train disconnection accident. Even though I selected and cut off the load by finding the amount of load that should be applied,
It detects that the frequency supplied within the power system continues to decrease. Therefore, the setting of this frequency drop detection relay 102 is larger than the setting of the other frequency drop detection relay 101.

【0060】解列検出リレー110は、電力会社等の他
の電力系統から電力の供給が行われている受電部分に設
けられている遮断器でのトリップから、他の電力系統か
らの電力の供給が停止した解列事故発生を検出するもの
である。
[0060] The disconnection detection relay 110 detects the supply of power from another power system when a trip occurs in a circuit breaker installed in a power receiving section to which power is supplied from another power system such as an electric power company. This is to detect the occurrence of a train disconnection accident where the train has stopped.

【0061】この解列検出リレー110は、他の電力系
統からの電力の受電部分に設けられた図5の遮断器CB
1 、CB2 毎に配置されており、該遮断器のトリッ
プ時にはオン状態となる。
This disconnection detection relay 110 is connected to the circuit breaker CB shown in FIG.
1 and CB2, and are turned on when the circuit breaker trips.

【0062】この図2のPTF回路120は、図5の電
力計測用トランス(周波数測定用)PTFを介して、系
統内で供給されている電力の単位時間当りの周波数低下
量に従って、4〜20m Aの信号を出力するものであ
る。
The PTF circuit 120 in FIG. 2 uses the power measurement transformer (for frequency measurement) PTF in FIG. It outputs the signal A.

【0063】PT回路131〜133は、それぞれ、図
5における発電機G1〜G3のそれぞれの発電機出力電
力を測定して、4〜20m Aの信号を出力するもので
ある。
The PT circuits 131 to 133 respectively measure the output power of the generators G1 to G3 in FIG. 5 and output signals of 4 to 20 mA.

【0064】これらPT回路131〜133は、それぞ
れ、図5における電力計測用トランスPT1〜PT3を
介して、発電機出力電力の計測を行う。
These PT circuits 131-133 measure the generator output power via power measuring transformers PT1-PT3 shown in FIG. 5, respectively.

【0065】負荷遮断装置10の解列事故検出手段20
は、周波数低下検出リレー101あるいは解列検出リレ
ー110により、解列事故発生の検出を行う。
[0065] Disconnection accident detection means 20 of the load shedding device 10
The occurrence of a disconnection accident is detected by the frequency drop detection relay 101 or the disconnection detection relay 110.

【0066】例えば、図5の遮断器CB1あるいはCB
2のトリップによる解列事故発生の場合には、解列検出
リレー110により、この解列事故発生を速やかに検出
することができる。
For example, the circuit breaker CB1 or CB in FIG.
In the event that a train disconnection accident occurs due to trip No. 2, the train disconnection detection relay 110 can promptly detect the train disconnection accident occurrence.

【0067】又、解列検出リレー110で解列事故発生
が検出されていないにも拘らず、例えば、解列事故発生
を原因とするような系統内で供給されている電力の周波
数低下が発生した場合には、周波数低下検出リレー10
1によりこの解列事故発生を検出する。
[0067]Also, even though the occurrence of a grid disconnection accident has not been detected by the grid disconnection detection relay 110, for example, a frequency drop in the power being supplied within the grid occurs due to the grid disconnection accident. In this case, the frequency drop detection relay 10
1 to detect the occurrence of this train disconnection accident.

【0068】更に、この負荷遮断装置10の解列事故検
出手段20は、解列事故検出後、遮断すべき負荷量を求
めて負荷を選択して遮断したにも拘らず、更に系統内に
供給されている電力の周波数が低下する場合には、これ
を周波数低下検出リレー102で検出する。
Furthermore, after detecting the disconnection accident, the disconnection accident detecting means 20 of the load shedding device 10 determines the amount of load to be disconnected, selects the load, and disconnects the load, but no further supply is supplied to the system. When the frequency of the power being used decreases, this is detected by the frequency decrease detection relay 102.

【0069】このように周波数低下検出リレー102で
引き続いて周波数低下が検出された場合は、前回の負荷
の遮断では、十分な負荷量の遮断が行われなかった場合
等である。
If the frequency drop detection relay 102 continuously detects a frequency drop in this manner, it is likely that a sufficient amount of load was not cut off in the previous load cutoff.

【0070】このように、前回の負荷遮断装置10によ
る負荷の遮断後も電力の周波数低下が発生してしまう原
因としては、前回の負荷遮断装置10による負荷遮断の
際、決定された遮断すべき負荷量に誤差があった場合や
、前回の負荷遮断装置10による遮断が行われた負荷の
実際の負荷量が予想よりも小さく、この遮断により合計
負荷量を十分に低減できなかった場合等である。
As described above, the reason why the power frequency decreases even after the previous load shedding by the load shedding device 10 occurs is that If there is an error in the load amount, or if the actual load amount of the load that was previously sheared by the load shedding device 10 is smaller than expected, and the total load amount cannot be sufficiently reduced by this shedding, etc. be.

【0071】負荷遮断装置10の周波数検出手段30は
、PTF回路120からの入力に従って、系統内で供給
されている電力の単位時間当りの周波数低下量を求める
ものである。
The frequency detecting means 30 of the load shedding device 10 determines the amount of frequency reduction per unit time of the power supplied within the system according to the input from the PTF circuit 120.

【0072】即ち、PTF回路120から入力される4
〜20m Aの信号から、実際の周波数に対応した数値
(信号)を求めるものである。
That is, 4 input from the PTF circuit 120
A numerical value (signal) corresponding to the actual frequency is determined from a signal of ~20mA.

【0073】なお、この周波数検出手段30で求められ
た単位時間当りの周波数低下量は、後述する遮断負荷量
決定手段40において、遮断すべき負荷量を決定するた
めに主に用いられる。
The amount of frequency decrease per unit time determined by the frequency detecting means 30 is mainly used by the cutoff load amount determining means 40, which will be described later, to determine the amount of load to be cut off.

【0074】更に、この周波数検出手段30で求められ
た単位時間当りの周波数低下量は、解列事故検出手段2
0においても用いられる。即ち、解列事故検出手段20
は、周波数検出手段30からの単位時間当りの周波数低
下量の入力を、周波数低下検出リレー101あるいは1
02のバックアップとしても用いている。
Furthermore, the amount of frequency decrease per unit time determined by the frequency detecting means 30 is determined by the train disconnection accident detecting means 2.
Also used in 0. That is, the train disconnection accident detection means 20
inputs the amount of frequency decrease per unit time from the frequency detection means 30 to the frequency decrease detection relay 101 or 1.
It is also used as a backup for 02.

【0075】負荷遮断装置10の遮断負荷量決定手段4
0は、解列事故検出手段20からの入力と、PT回路1
31〜133からのそれぞれの入力と、周波数検出手段
30からの入力とにより、解列事故発生時の遮断すべき
負荷量を決定するものである。
Shedding load amount determining means 4 of load shedding device 10
0 is the input from the disconnection accident detection means 20 and the PT circuit 1
The amount of load to be cut off in the event of a train disconnection accident is determined based on the inputs from 31 to 133 and the frequency detection means 30.

【0076】即ち、この遮断負荷量決定手段40は、前
述の解列事故検出手段20からの入力により、解列事故
発生の検出を行う。又、この遮断負荷量決定手段40は
、PT回路131〜133からの入力に従って得られる
発電機合計出力電力を常時保持(記憶)しておき、解列
事故検出時には、該解列事故検出直前の発電機合計出力
電力を遮断すべき負荷量の演算の際に用いる。又、この
遮断負荷量決定手段40は、周波数検出手段30から周
波数低下量を入力する。
That is, the breaking load amount determining means 40 detects the occurrence of a train breaking accident based on the input from the train breaking accident detecting means 20 described above. In addition, this cutoff load amount determination means 40 always holds (memorizes) the generator total output power obtained according to the input from the PT circuits 131 to 133, and when a disconnection fault is detected, it Used when calculating the amount of load that should cut off the total output power of the generator. Further, the breaking load amount determining means 40 receives the frequency reduction amount from the frequency detecting means 30.

【0077】従って、この遮断負荷量決定手段40は、
このようなそれぞれの入力に従って、解列事故検出時に
、単独運転系に移行する発電機合計出力電力と、周波数
低下量とから、この解列事故発生による供給電力の低下
に伴った遮断すべき負荷量を決定する。
Therefore, this breaking load amount determining means 40 is as follows:
According to each of these inputs, when a disconnection accident is detected, the load that should be cut off due to the drop in power supply due to the occurrence of the disconnection accident is calculated based on the total output power of the generators that will be transferred to the islanding system and the amount of frequency reduction. Determine the amount.

【0078】図3は、本発明の実施例の、主に出力に関
するブロック図である。
FIG. 3 is a block diagram mainly relating to output of an embodiment of the present invention.

【0079】この図3において、負荷遮断装置10の出
力は、前述の図1や図2に示される遮断負荷量決定手段
40に従った、各遮断器L1〜Ln の遮断信号の出力
となっている。
In FIG. 3, the output of the load breaking device 10 is the output of the breaking signal of each circuit breaker L1 to Ln according to the breaking load amount determining means 40 shown in FIGS. 1 and 2 described above. There is.

【0080】この図3の負荷遮断装置10の負荷遮断手
段50においては、各遮断器L1〜Ln に対応した負
荷毎に、解列事故発生時の遮断の優先順位と、負荷容量
即ちこの負荷の遮断により系統内の合計負荷量が軽減さ
れる電力量(必ずしもこの負荷の最大負荷量ではない)
とが予め設定されている。
In the load shedding means 50 of the load shedding device 10 shown in FIG. 3, for each load corresponding to each circuit breaker L1 to Ln, the priority of shedding in the event of a disconnection accident and the load capacity, that is, the load of this load are determined. The amount of electricity by which the total load in the system is reduced by interruption (not necessarily the maximum load of this load)
is set in advance.

【0081】又、この負荷遮断手段50には、各負荷毎
、即ち各遮断器L1〜Ln 毎に、遮断設定スイッチS
W1〜SWn が設けられている。
The load breaking means 50 also includes a breaking setting switch S for each load, that is, for each circuit breaker L1 to Ln.
W1 to SWn are provided.

【0082】この遮断設定スイッチSW1〜SWn は
、それぞれオン・オフ接点を2回路有するものである。
Each of the cutoff setting switches SW1 to SWn has two circuits of on/off contacts.

【0083】この遮断設定スイッチSW1〜SWn の
1つのオン・オフ接点は、この図3に示される如く、各
負荷毎の遮断器L1〜Ln への遮断信号の回路に用い
られて、それぞれの負荷遮断リレーR1〜Rn の接点
と直列に接続されている。又、この遮断設定スイッチS
W1〜SWn のもう1つのオン・オフ接点は、当該負
荷遮断手段50の制御手段に入力されており、当該負荷
遮断手段50の、前述の遮断負荷量決定手段40からの
遮断負荷量に従った、遮断すべき負荷の選択条件として
用いられるようになっている。
As shown in FIG. 3, one on/off contact of each of the cutoff setting switches SW1 to SWn is used for the circuit of the cutoff signal to the circuit breakers L1 to Ln for each load. It is connected in series with the contacts of cutoff relays R1 to Rn. Also, this cutoff setting switch S
Another on/off contact of W1 to SWn is inputted to the control means of the load shedding means 50, and the load shedding of the load shedding means 50 is performed according to the shedding load amount from the shedding load amount determination means 40 mentioned above. , is used as a selection condition for the load to be cut off.

【0084】従って、この図3の負荷遮断手段50は、
設定された負荷の遮断の優先順位と、遮断負荷量と、遮
断設定スイッチSW1 〜SWn とに従い、負荷遮断
リレーR1 〜Rn の接点を選択してオン状態として
、各遮断器L1 〜Ln へ選択して遮断信号を出力す
る。
Therefore, the load shedding means 50 of FIG.
According to the set load shedding priority, the amount of load to be cut off, and the cutoff setting switches SW1 to SWn, the contacts of the load cutoff relays R1 to Rn are selected and turned on, and the contacts of the load cutoff relays R1 to Rn are selected to the respective circuit breakers L1 to Ln. outputs a cutoff signal.

【0085】なお、図1〜図3の遮断負荷量決定手段4
0及び負荷遮断手段50は、周波数低下検出リレー10
1、あるいは解列検出リレー110による解列事故検出
時に遮断すべき負荷量を求めて負荷を選択して遮断する
(以降、これを一次制御と呼ぶ)と共に、この後におい
ても、系統内で供給されている電力に周波数低下がある
場合には、更に遮断すべき負荷量を求めて負荷を選択し
て遮断するようになっている(以降、これを二次制御と
呼ぶ)。
Note that the breaking load amount determining means 4 in FIGS. 1 to 3
0 and the load cutoff means 50 are the frequency drop detection relay 10
1, or when a disconnection fault is detected by the disconnection detection relay 110, the amount of load to be disconnected is determined, the load is selected and disconnected (hereinafter referred to as primary control), and even after this, the load is not supplied within the system. If there is a frequency drop in the power being used, the amount of load to be cut off is further determined and the load is selected and cut off (hereinafter, this is referred to as secondary control).

【0086】なお、以上図1〜図3を用いて説明した本
発明の実施例の負荷遮断装置10においては、高速処理
が可能なマイクロプロセッサを用いた、デジタル処理に
よって主に構成されている。
The load shedding device 10 according to the embodiment of the present invention described above with reference to FIGS. 1 to 3 is mainly constructed by digital processing using a microprocessor capable of high-speed processing.

【0087】図4は、本発明の実施例に用いられる遮断
負荷量決定手段における周波数低下量と、遮断負荷量と
の関係を示すグラフである。
FIG. 4 is a graph showing the relationship between the amount of frequency reduction and the amount of breaking load in the breaking load amount determining means used in the embodiment of the present invention.

【0088】この図4において、符号A〜Dは、周波数
検出手段30で求められた周波数低下量ΔFと、解列事
故発生による供給電力の低下に伴った遮断すべき負荷量
ΔLとの関係を示している。遮断負荷量決定手段40に
おいて、遮断すべき負荷量を求める際には、符号A〜D
のいずれかの関係が選択されるが、この選択は、主とし
て単独運転系に移行する発電機合計出力電力に従ったも
のであり、又、解列事故発生時の系統の他の状況をも考
慮している。
In FIG. 4, symbols A to D indicate the relationship between the frequency drop amount ΔF found by the frequency detection means 30 and the load amount ΔL to be cut off due to a drop in power supply due to the occurrence of a disconnection accident. It shows. In the cutoff load amount determining means 40, when determining the load amount to be cut off, codes A to D are used.
One of these relationships is selected, but this selection is mainly based on the total output power of the generators that will transition to the islanding system, and also takes into account other conditions of the system at the time of the disconnection accident. are doing.

【0089】なお、この図4に示されるような、周波数
低下量と遮断負荷量との関係は、負荷遮断装置10の遮
断負荷量決定手段40内部に、データテーブルあるいは
マップとして記憶されている。
The relationship between the frequency reduction amount and the shedding load amount as shown in FIG. 4 is stored in the shedding load amount determination means 40 of the load shedding device 10 as a data table or map.

【0090】図5は、本発明の実施例が対象とする電力
系統の系統図である。
FIG. 5 is a system diagram of a power system targeted by an embodiment of the present invention.

【0091】以降、この電力系統を単独系と呼ぶ。Hereinafter, this power system will be referred to as an independent system.

【0092】この図5の単独系は、電力会社の電力系統
から遮断器CB1、CB2を経て電力の供給を受けると
共に、これと並列運転している合計3台の発電機G1〜
G3を有している。
The independent system shown in FIG. 5 receives power from the power company's power system via circuit breakers CB1 and CB2, and also has a total of three generators G1 to G1 operating in parallel.
It has G3.

【0093】電力会社から供給される電力及び発電機G
1及びG2から供給される電力は、110kvの電圧で
ある。又、発電機G3から供給される電力の電圧は66
kvである。
[0093] Electric power and generator G supplied by the electric power company
The power supplied from G1 and G2 is at a voltage of 110kv. Also, the voltage of the power supplied from generator G3 is 66
kv.

【0094】トランスT1〜T5は、110kvの電圧
から66kvの電圧へと降圧するものである。又、トラ
ンスT6及びT7は、更に低い電圧に降圧するトランス
である。
The transformers T1 to T5 step down the voltage from 110 kV to 66 kV. Further, transformers T6 and T7 are transformers that step down the voltage to an even lower voltage.

【0095】この図5においては、単独系には合計4個
の負荷のみが図示されているが、この単独系には更に多
くの負荷が接続されている。
In FIG. 5, only a total of four loads are shown in the single system, but many more loads are connected to the single system.

【0096】この図5に示される単独系においては、遮
断器CB1及びCB2へ、前述の図2の解列検出リレー
110が接続されている。
In the single system shown in FIG. 5, the above-described disconnection detection relay 110 of FIG. 2 is connected to circuit breakers CB1 and CB2.

【0097】又、発電機G1〜G3には、それぞれ、電
力計測用トランスPT1〜PT3が設けられている。 又、これら電力計測用トランスPT1〜PT3は、それ
ぞれ、前述の図2のPT回路131〜133に入力され
ている。
[0097] The generators G1 to G3 are also provided with power measuring transformers PT1 to PT3, respectively. Further, these power measurement transformers PT1 to PT3 are inputted to the aforementioned PT circuits 131 to 133 in FIG. 2, respectively.

【0098】又、この図5の単独系の110kvのとこ
ろには、電力計測用トランス(周波数測定用)PTFが
接続されている。この電力計測用トランスPTFは、前
述の図2のPTF回路120に接続されている。
Further, a power measurement transformer (for frequency measurement) PTF is connected to the 110kV portion of the independent system in FIG. This power measurement transformer PTF is connected to the PTF circuit 120 of FIG. 2 described above.

【0099】なお、この110kvの電力計測用トラン
スPTFの接続部分には、前述の図2の周波数低下検出
リレー101及び102も取付けられている。
Note that the frequency drop detection relays 101 and 102 of FIG. 2 described above are also attached to the connection portion of this 110 kv power measuring transformer PTF.

【0100】以下、図1〜図5を用いて説明した本発明
の実施例における、解列事故発生例を説明する。
[0100] Hereinafter, an example of a train breaking accident occurring in the embodiment of the present invention described using FIGS. 1 to 5 will be described.

【0101】この解列事故発生例における諸条件は、次
の通りである。
[0101] The various conditions in this example of the occurrence of a train disconnection accident are as follows.

【0102】解列事故発生直前の発電機合計主力電力P
G=200MW 解列事故発生直前の合計負荷量PL=250MW解列事
故発生直前の負荷L1=30MW負荷L2=40MW 負荷L3=50MW 負荷遮断手段50の遮断設定スイッチSW1〜SW3は
全てオン状態
[0102] Generator total main power P immediately before the disconnection accident occurred
G = 200 MW Total load immediately before the train disconnection accident PL = 250 MW Load immediately before the train disconnection accident occurs L1 = 30 MW Load L2 = 40 MW Load L3 = 50 MW The cutoff setting switches SW1 to SW3 of the load cutoff means 50 are all in the ON state

【0103】負荷過大時の負荷遮断順序(優先順位)は
、負荷L1、負荷L2、負荷L3・・・の順序である。
[0103] The load shedding order (priority order) when the load is excessive is the order of load L1, load L2, load L3, and so on.

【0104】なお、負荷PLの負荷量(数値)は、負荷
遮断装置10においては、未知の値である。
Note that the load amount (numerical value) of the load PL is an unknown value in the load shedding device 10.

【0105】又、この解列事故発生例は、発電機G1〜
G3から電力が供給されていると共に、遮断器CB1と
CB2とにより電力会社の電力系統から電力の供給を受
けている状態から、何等かの原因で遮断器CB1とCB
2とが同時にトリップすることにより、発電機G1〜G
3のみによる電力の供給を行う状態となるというもので
ある。
[0105] In addition, this example of a disconnection accident occurred in generators G1 to
While power is being supplied from G3, circuit breakers CB1 and CB2 are receiving power from the power company's power system, and for some reason, circuit breakers CB1 and CB
2 trip at the same time, the generators G1 to G
In this case, the state is such that power is supplied only by 3.

【0106】このような解列事故が発生すると、この単
独系における合計供給電力量は、発電機G1〜G3のみ
による200MWとなってしまう。
[0106] If such a disconnection accident occurs, the total amount of power supplied in this single system will be 200 MW due to only the generators G1 to G3.

【0107】即ち、このような解列事故発生後には、合
計供給電力量である発電機合計出力電力と合計負荷量と
の関係は、200MW<250MWとなり、負荷過大状
態となってしまう。
That is, after such a disconnection accident occurs, the relationship between the total output power of the generators, which is the total amount of power supplied, and the total load becomes 200 MW<250 MW, resulting in an overload state.

【0108】従って、このような解列事故発生後には、
各発電機の回転速度は低下してゆき、これに伴って供給
されている電力の周波数も低下していく。
[0108] Therefore, after such a train breaking accident occurs,
The rotational speed of each generator decreases, and the frequency of the power being supplied also decreases accordingly.

【0109】一方、本実施例の負荷遮断装置10は、遮
断器CB1とCB2とのトリップを解列検出リレー11
0を経由して、解列事故検出手段20により検出する。
On the other hand, the load breaking device 10 of this embodiment detects the tripping of the circuit breakers CB1 and CB2 by the disconnection detection relay 11.
0, and is detected by the train breaking accident detection means 20.

【0110】又、電力計測用トランスPTFと、PTF
回路120と、周波数検出手段30とにより、供給され
ている電力の単位時間当りの周波数低下量を検出すると
共に、電力計測用トランスPT1〜3とPT回路131
〜133とにより計測され合算され、遮断負荷量決定手
段40内で保持(記憶)されている解列事故発生直前の
発電機合計出力電力を用いて、解決事故発生による供給
電力の低下に伴った、遮断すべき負荷量を遮断負荷量決
定手段40において決定する。
[0110] Also, power measurement transformer PTF and PTF
The circuit 120 and the frequency detection means 30 detect the amount of frequency reduction per unit time of the supplied power, and the power measurement transformers PT1 to PT3 and the PT circuit 131
- 133 and are stored (stored) in the breaking load determining means 40, using the generator total output power immediately before the occurrence of the disconnection accident, to determine whether the power supply has decreased due to the occurrence of the resolved accident. , the load amount to be cut off is determined by the cutoff load amount determining means 40.

【0111】例えば、この遮断負荷量決定手段40で決
定された遮断すべき負荷量が30MWであったとすると
、負荷遮断手段50により負荷L1に対する負荷遮断指
令が出力され、遮断器L1がトリップさせられる。
For example, if the amount of load to be cut off determined by the cutoff load amount determination means 40 is 30 MW, the load cutoff means 50 outputs a load cutoff command for the load L1, and the circuit breaker L1 is tripped. .

【0112】このような一次制御後の合計供給電力量で
ある発電機合計出力電力PGと、合計負荷量PLとの関
係は、200MW<220MWとなる。即ち、この一次
制御後においても、負荷過大状態が継続してしまってい
る。これは、前述の一次制御において求められた遮断す
べき負荷量が小さかったためである。
The relationship between the generator total output power PG, which is the total amount of power supplied after such primary control, and the total load amount PL is 200 MW<220 MW. That is, even after this primary control, the overload state continues. This is because the amount of load to be cut off determined in the above-mentioned primary control was small.

【0113】このような負荷過大状態により、単独系の
周波数は規定の周波数に回復せず、引き続いて低下して
いく。
[0113] Due to such an overloaded state, the frequency of the independent system does not recover to the specified frequency and continues to decrease.

【0114】このように供給されている電力の周波数が
引き続いて低下して、周波数低下検出リレー102の設
定値以下となると、この周波数低下検出リレー102は
オン状態となり、負荷遮断装置10は二次制御を開始す
る。
[0114] When the frequency of the supplied electric power continues to decrease and becomes equal to or less than the set value of the frequency decrease detection relay 102, the frequency decrease detection relay 102 is turned on, and the load shedding device 10 is switched on. Start control.

【0115】この二次制御においては、前述の一次制御
において用いられた発電機合計出力電力PGの値と、電
力計測用トランスPTFとPTF回路120と周波数検
出手段30とにより新たに求められた単位時間当りの周
波数低下量とにより、この二次制御における遮断すべき
負荷量が遮断負荷量決定手段40で決定される。
In this secondary control, the value of the generator total output power PG used in the above-mentioned primary control and the unit newly determined by the power measuring transformer PTF, PTF circuit 120, and frequency detection means 30 are used. The load amount to be cut off in this secondary control is determined by the cutoff load amount determining means 40 based on the amount of frequency decrease per time.

【0116】続いて、負荷遮断遮断50は、遮断負荷量
決定手段40で求められたこの遮断負荷量に従って、更
に負荷への負荷遮断指令を出力する。
Subsequently, the load shedding 50 further outputs a load shedding command to the load in accordance with the shedding load amount determined by the shedding load amount determining means 40.

【0117】例えば、この二次制御において決定された
遮断負荷量が40MWであった場合には、負荷遮断手段
50から負荷L2へ負荷遮断指令が出力される。
For example, if the amount of load shedding determined in this secondary control is 40 MW, a load shedding command is output from the load shedding means 50 to the load L2.

【0118】この負荷遮断指令により負荷L2の遮断後
の二次制御が完了した時点においては、合計供給電力量
である発電機合計出力電力と合計負荷量との関係は、2
00MW>180MWとなり、負荷過大状態は解消され
る。
[0118] At the time when the secondary control after cutting off load L2 is completed by this load cutting command, the relationship between the generator total output power, which is the total amount of supplied power, and the total load amount is 2.
00MW>180MW, and the overload condition is resolved.

【0119】従って、この二次制御後においては、単独
系内の負荷の減少により発電機の回転速度が復帰(上昇
)して、供給されている電力の周波数が規定値まで復帰
することができ、この後、発電機は安定な運転を行うこ
とが可能である。
[0119] Therefore, after this secondary control, the rotational speed of the generator is restored (increased) due to the reduction in the load within the single system, and the frequency of the supplied power can be restored to the specified value. , After this, the generator can operate stably.

【0120】以上説明したように、本発明の実施例によ
れば、解列事故発生による供給電力の低下に伴ったより
適切な負荷の遮断を行って、負荷過大状態を解消して発
電機の安定な運転を図ることが可能である。
As explained above, according to the embodiment of the present invention, more appropriate load shedding is performed in response to a drop in power supply due to the occurrence of a disconnection accident, and the overload condition is resolved to stabilize the generator. It is possible to achieve safe driving.

【0121】なお、以上説明した本発明の実施例におい
て、周波数検出手段30は、単位時間当りの周波数低下
量を検出するものであるが、本発明の周波数検出手段は
これに限定するものではない。即ち、系統内で供給され
ている電力の周波数の低下の度合を把握するものであれ
ばよく、例えば、規定周波数に対する周波数低下量であ
ってもよく、単なる測定された周波数等であってもよい
[0121] In the embodiment of the present invention described above, the frequency detection means 30 detects the amount of frequency decrease per unit time, but the frequency detection means of the present invention is not limited to this. . In other words, it is sufficient to grasp the degree of decrease in the frequency of power supplied within the grid; for example, it may be the amount of frequency decrease with respect to a specified frequency, or it may be simply a measured frequency. .

【0122】又、本発明の遮断負荷量決定手段において
、解列事故検出時に、周波数低下量のみを用いて(発電
機合計出力電力の値は用いず)演算を行うようにした場
合には、具体的な数値としての遮断すべき負荷量を求め
ることは困難であるが、しかしながら、この遮断すべき
負荷量の度合程度は求めることが可能であることを発明
者は見出だしている。即ち、遮断すべき負荷量が多いか
少ないか程度は検出することが可能である。
[0122] Furthermore, in the cutoff load amount determination means of the present invention, when a disconnection accident is detected, calculation is performed using only the amount of frequency decrease (without using the value of the generator total output power). Although it is difficult to determine the amount of load to be interrupted as a specific numerical value, the inventor has discovered that it is possible to determine the degree of the amount of load to be interrupted. That is, it is possible to detect whether the amount of load to be cut off is large or small.

【0123】[0123]

【発明の効果】以上図1〜図3を用いて説明した通り、
本発明によれば、他の電力系統から電力の供給を受ける
と共に、これと並列運転している発電機を有する特定の
系統において、前記他の電力系統からの電力の供給が停
止した解列事故発生時に、実際の合計負荷量が不明(不
正確)であったとしても、該解列事故発生による供給電
力の低下に伴ったより適切な負荷の遮断を行って、負荷
過大による発電機トリップ全停電を防止することができ
るという優れた効果を得ることができる。
[Effect of the invention] As explained above using FIGS. 1 to 3,
According to the present invention, in a specific system that receives power from another power system and has a generator operating in parallel with the power system, a disconnection accident occurs in which the supply of power from the other power system stops. Even if the actual total load is unknown (inaccurate) at the time of occurrence, more appropriate load shedding will be carried out as the power supply decreases due to the occurrence of the disconnection accident, and generator tripping due to excessive load will result in total power outage. An excellent effect can be obtained in that it can prevent.

【図面の簡単な説明】[Brief explanation of the drawing]

【図1】図1は、本発明の実施例の全体ブロック図であ
る。
FIG. 1 is an overall block diagram of an embodiment of the present invention.

【図2】図2は、前記実施例の、主として入力に関する
ブロック図である。
FIG. 2 is a block diagram mainly related to inputs of the embodiment.

【図3】図3は、前記実施例の、主として出力に関する
ブロック図である。
FIG. 3 is a block diagram mainly related to output of the embodiment.

【図4】図4は、本発明の実施例に用いられる遮断負荷
量決定手段における周波数低下量と、遮断負荷量との関
係を示すグラフである。
FIG. 4 is a graph showing the relationship between the amount of frequency reduction and the amount of breaking load in the breaking load amount determining means used in the embodiment of the present invention.

【図5】図5は、前記実施例が対象とする電力系統の系
統図である。
FIG. 5 is a system diagram of an electric power system targeted by the embodiment.

【符号の説明】[Explanation of symbols]

10…負荷遮断装置、 20…解列事故検出手段、 30…周波数検出手段、 40…遮断負荷量決定手段、 50…負荷遮断手段、 101、102…周波数低下検出リレー、110…解列
検出リレー、 120…PTF回路、 131〜133…PT回路、 CB1、CB2…遮断器、 L1〜L3…負荷(あるいは、これら各負荷の遮断器)
、 PTF…電力計測用トランス(周波数測定用)、PT1
〜3…電力計測用トランス、 G1〜3…発電機、 T1〜T7…トランス、 SW1〜SWn …遮断設定スイッチ、R1〜Rn …
負荷遮断リレー。
DESCRIPTION OF SYMBOLS 10... Load shedding device, 20... Line disconnection accident detection means, 30... Frequency detection means, 40... Load shedding amount determination means, 50... Load shedding means, 101, 102... Frequency drop detection relay, 110... Line disconnection detection relay, 120...PTF circuit, 131-133...PT circuit, CB1, CB2...breaker, L1-L3...load (or the breaker for each of these loads)
, PTF...Power measurement transformer (for frequency measurement), PT1
~3...Power measurement transformer, G1~3...Generator, T1~T7...Transformer, SW1~SWn...Shutoff setting switch, R1~Rn...
Load shedding relay.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】他の電力系統から電力の供給を受けると共
に、これと並列運転している発電機を有する特定の系統
において、前記他の電力系統からの電力の供給が停止し
た解列事故発生を検出する解列事故検出手段と、前記特
定の系統内で供給されている電力の周波数低下量を検出
する周波数検出手段と、前記解列事故検出時に、単独運
転系に移行する発電機合計出力電力と、前記周波数低下
量とから、遮断すべき負荷量を決定する遮断負荷量決定
手段とを備え、前記解列事故発生の検出時に、前記遮断
負荷量に従って、予め優先順位をつけて設定した負荷を
選択して遮断することを特徴とする解列事故発生時の負
荷遮断装置。
Claim 1: In a specific system that receives power from another power system and has a generator operating in parallel with the power system, a disconnection accident occurs in which the supply of power from the other power system stops. a frequency detection means for detecting the amount of frequency reduction of the electric power supplied in the specific system; and a generator total output that shifts to the islanding system when the grid disconnection accident is detected. A cutoff load amount determining means is provided for determining a load amount to be cut off from the electric power and the frequency drop amount, and when the occurrence of the train disconnection accident is detected, priority is set in advance according to the cutoff load amount. A load shedding device in the event of a train breaking accident, which is characterized by selectively shedding a load.
【請求項2】請求項1において、前記遮断負荷量決定手
段が、前回の負荷の遮断後にも周波数低下がある場合に
、再び前記遮断負荷量を決定するものであり、新たに決
定された該遮断負荷量に従って、予め優先順位をつけて
設定した負荷を更に選択して遮断することを特徴とする
解列事故発生時の負荷遮断装置。
2. In claim 1, the breaking load amount determination means determines the breaking load amount again when there is a frequency drop even after the previous load cutting, and A load shedding device in the event of a train disconnection accident, characterized by further selecting and shedding loads that are prioritized and set in advance according to the shedding load amount.
JP3057789A 1991-02-28 1991-02-28 Load interrupting device at time of parallel off fault Pending JPH04275029A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3057789A JPH04275029A (en) 1991-02-28 1991-02-28 Load interrupting device at time of parallel off fault

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3057789A JPH04275029A (en) 1991-02-28 1991-02-28 Load interrupting device at time of parallel off fault

Publications (1)

Publication Number Publication Date
JPH04275029A true JPH04275029A (en) 1992-09-30

Family

ID=13065654

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3057789A Pending JPH04275029A (en) 1991-02-28 1991-02-28 Load interrupting device at time of parallel off fault

Country Status (1)

Country Link
JP (1) JPH04275029A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10243560A (en) * 1997-02-27 1998-09-11 Meidensha Corp Device for interrupting load for industrial power generator plant
US7372787B2 (en) 2003-03-25 2008-05-13 Samsung Electronics Co., Ltd. Optical disc recording and reproducing apparatus permitting recording tests using external buffer memory and method of driving the apparatus
WO2008126399A1 (en) * 2007-04-06 2008-10-23 Kabushiki Kaisha Toshiba Plant controller and plant control method
JP2009124911A (en) * 2007-11-16 2009-06-04 Kazuo Sato Power-feeding controller
JP2019193552A (en) * 2015-12-17 2019-10-31 ニュースケール パワー エルエルシー Multi-modular power plant with dedicated electrical grid

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10243560A (en) * 1997-02-27 1998-09-11 Meidensha Corp Device for interrupting load for industrial power generator plant
US7372787B2 (en) 2003-03-25 2008-05-13 Samsung Electronics Co., Ltd. Optical disc recording and reproducing apparatus permitting recording tests using external buffer memory and method of driving the apparatus
WO2008126399A1 (en) * 2007-04-06 2008-10-23 Kabushiki Kaisha Toshiba Plant controller and plant control method
JP2009124911A (en) * 2007-11-16 2009-06-04 Kazuo Sato Power-feeding controller
JP2019193552A (en) * 2015-12-17 2019-10-31 ニュースケール パワー エルエルシー Multi-modular power plant with dedicated electrical grid

Similar Documents

Publication Publication Date Title
CA2677330C (en) Fuse saving power distribution system fault protection
US9178350B2 (en) Electric distribution system protection
JP2001224134A (en) Method and apparatus for control of parallel-off of generator
JPH04275029A (en) Load interrupting device at time of parallel off fault
CN115421002B (en) Short-circuit fault line selection method, system, equipment and medium for low-voltage direct-current distribution network
JP2011097797A (en) Protection system of loop system
CN110112771B (en) Method and device for detecting running state of generator by excitation device of generator in nuclear power plant
WO2024105897A1 (en) Reverse electric power breaker/relay and method for cutting off reverse electric power in reverse electric power breaker/relay
Begovic et al. On wide area protection
JPH08103024A (en) System stabilization control method
JP2860740B2 (en) Grid connection protection detector
JP2000156935A (en) Method and apparatus for controlling self power generation system
JP4063224B2 (en) Overcurrent protection system
JP2023147430A (en) Bus voltage abnormality detection device and bus voltage abnormality detection method
JP2024084884A (en) Selective load shedding system and method
JP3167166B2 (en) Load selective cut-off device
JP3397608B2 (en) Power grid connection protection device
JP3313454B2 (en) Load selection cut-off device
JPS5939809Y2 (en) Power system stabilizer
JPH09117063A (en) Protective system for system interconnection
JP2023074142A (en) Transformer control device
Hill et al. Upgrading power system protection
JPH0572168B2 (en)
JPS6311027A (en) Power system controller
JP2005020945A (en) In-house electric-power monitoring and controlling system