JPH04203039A JP33419090A JP33419090A JPH04203039A JP H04203039 A JPH04203039 A JP H04203039A JP 33419090 A JP33419090 A JP 33419090A JP 33419090 A JP33419090 A JP 33419090A JP H04203039 A JPH04203039 A JP H04203039A
Authority
JP
Japan
Prior art keywords
column
concrete
floor slab
hollow member
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP33419090A
Other languages
Japanese (ja)
Other versions
JP2990216B2 (en
Inventor
Norie Yukimura
幸村 憲衛
Shuichi Ueno
修一 植野
Chihiro Kato
千博 加藤
Masataka Otsu
大津 雅敬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP2334190A priority Critical patent/JP2990216B2/en
Publication of JPH04203039A publication Critical patent/JPH04203039A/en
Application granted granted Critical
Publication of JP2990216B2 publication Critical patent/JP2990216B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

PURPOSE:To shorten a term of works by a method wherein beam forms are erected between the head parts of columns, a beam prefabricated reinforcing bar and a half PC floor slab member are set, and a half PC column hollow member is mounted on the periphery of column reinforcing bars to place concrete in the members. CONSTITUTION:Beam forms 1 are erected between the head parts of columns 2, beam prefabricated reinforcing bars are set in the beam forms 1, and a half PC floor slab member 5 is set on the beam forms 1. Column reinforcing bars 6 are joined with the heads of the columns 2, and a half PC column hollow member 7 is mounted to the periphery of the column reinforcing bars 6. Concrete C is placed in the beam forms 1, the half PC floor slab member 5, and the half PC column hollow member 7 at a time. This method enables shortening of a term of works.

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は、鉄筋コンクリート造建物の構築工法に関する
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a construction method for a reinforced concrete building.

[従来の技術] 従来の鉄筋コンクリート造建物の構築工法としては、柱
等の垂直部材と、梁や床スラブ等の水平部材とを、各々
分離してコンクリート打設するか、または、柱型枠の頭
部に梁型枠を取り付け、該梁型枠の上に床スラブ型枠あ
るいは半PC床スラブ部材をセットして、コンクリート
を一度に打設する方法があった。
[Conventional technology] Conventional construction methods for reinforced concrete buildings include separately pouring concrete into vertical members such as columns and horizontal members such as beams and floor slabs, or by pouring concrete into column formwork. There was a method in which a beam form was attached to the head, a floor slab form or a semi-PC floor slab member was set on top of the beam form, and concrete was poured all at once.

[発明が解決しようとする課題] しかしながら、上記コンクリートの分離打設による構築
工法は、コンクリートの品質は保証されるが、コンクリ
ート打設を2回に分けて行うため、工期が長くなる等の
問題点があり、また、床スラブ上から水平部材と垂直部
材とを同時にコンクリート打設する工法は、工程上の利
点があるものの、梁下部分の柱コンクリート打設を過密
状態の梁筋を通して行わなければならないため、コンク
リートの品質を確保することが困難である等の問題点が
あった。
[Problems to be Solved by the Invention] However, although the above-mentioned construction method using separate pouring of concrete guarantees the quality of the concrete, there are problems such as a longer construction period because the concrete is poured in two steps. In addition, although the method of pouring concrete for horizontal and vertical members simultaneously from above the floor slab has process advantages, it requires concrete pouring of the pillars at the bottom of the beams through overcrowded beam reinforcements. There were problems such as difficulty in ensuring the quality of concrete because of the high quality of concrete.

本発明は、上記従来の問題点を解決するためになされた
もので、その目的とするところは、打設コンクリートの
品質を確保すると共に、コンクリート打設の工程を短縮
して工期を短くすることができる鉄筋コンクリート造建
物の構築工法を提供することにある。
The present invention was made to solve the above-mentioned conventional problems, and its purpose is to ensure the quality of poured concrete and shorten the construction period by shortening the concrete pouring process. The purpose of the present invention is to provide a construction method for reinforced concrete buildings that allows for the construction of reinforced concrete buildings.

[!1題を解決するだめの手段] 本発明の鉄筋コンクリート造建物の構築工法は、柱の頭
部間に梁型枠を建込むと共に該型枠内に梁プレハブ鉄筋
をセットし、該梁型枠上に半PC床スラブ部材をセット
し、上記柱の頭部上に柱筋を接合すると共に該柱鉄筋の
周囲に半PC柱中空部材を取り付け、上記梁型枠内と半
PC床スラブ部材上と牛PC柱中空部材内にコンクリー
トを一度に打設することを特徴とする。
[! A method for constructing a reinforced concrete building according to the present invention is to erect a beam formwork between the heads of columns, set beam prefabricated reinforcing bars within the formwork, and set the beam formwork on top of the beam formwork. Set the half-PC floor slab member on the top of the column, connect the column reinforcement on the head of the column, attach the half-PC column hollow member around the column reinforcing bar, and connect the inside of the beam form and on the half-PC floor slab member. It is characterized by pouring concrete into the hollow PC column member at once.

また、柱の頭部間に梁型枠を建込むと共に該型枠内に梁
プレハブ鉄筋をセットし、該梁型枠上に半PC床スラブ
部材をセットし、上記柱の頭部上に柱筋を接合すると共
に該柱鉄筋の周囲に牛PC柱中空部材を取り付け、まず
スラブ下まで梁型枠にコンクリートを打設し、続いて、
半PC柱中空部材内へのコンクリート打設を行い、最後
に半PC床スラブ部材上にコンクリートを打設すること
を特徴とする。
In addition, a beam formwork is erected between the heads of the columns, prefabricated beam reinforcing bars are set in the formwork, a semi-PC floor slab member is set on the beam formwork, and a beam formwork is placed between the heads of the columns. At the same time as joining the reinforcing bars, a cow PC column hollow member is attached around the column reinforcing bars, first concrete is poured into the beam formwork to the bottom of the slab, and then,
The method is characterized in that concrete is poured into the half-PC column hollow member, and finally concrete is poured onto the half-PC floor slab member.

さらに、上記半PC柱中空部材の脚部下方にメタルラ゛
ス等のノロ流出防止手段を施したことを特徴とする。
Furthermore, the present invention is characterized in that a means for preventing slag from flowing out, such as a metal lace, is provided below the legs of the half-PC column hollow member.

[実施例1 以下、本発明の一実施例について図面を参照しながら説
明する。
[Embodiment 1] Hereinafter, an embodiment of the present invention will be described with reference to the drawings.

第1図において、1は梁型枠であって、何工程で構築さ
れた柱2の頭部間に建込む。3は上記梁型枠1の支保工
である。
In Fig. 1, 1 is a beam formwork, which is erected between the heads of columns 2 constructed in which process. 3 is a support for the beam formwork 1.

上記梁型枠1の建込みが完了すると、第2図に示すよう
に、該梁型枠1内に予め工場あるいは現場の地上等で地
組みした梁プレノ)ブ鉄筋4をセントする。
When the erection of the beam form 1 is completed, as shown in FIG. 2, a beam pre-shaped reinforcing bar 4, which has been assembled in advance at a factory or on the ground at the site, is inserted into the beam form 1, as shown in FIG.

続いて、第3図に示すように、予め工場あるblは現場
の地上等にて製造した半PC床スラブ部材5を、上記梁
型枠1上にセットする。
Subsequently, as shown in FIG. 3, a semi-PC floor slab member 5 previously manufactured on the ground at the factory is set on the beam form 1.

半PC床スラブ部材5のセットが完了すると、第4図に
示すように、柱鉄筋6を上記柱2の頭部に接合すると共
に、該柱鉄筋6の周囲に、予め工場あるいは現場の地上
等で製造した牛PC柱中空部材7を取り付ける。該牛P
C柱中空部材7は複数の部材を組み付けて構成したもの
、あるいは、一体の中空部材のいずれでもよい。
When the setting of the semi-PC floor slab member 5 is completed, as shown in FIG. Attach the cow PC column hollow member 7 manufactured in . The cow P
The C-pillar hollow member 7 may be constructed by assembling a plurality of members, or may be an integral hollow member.

以上のように、梁型枠1と牛PC床スフブ部材5と牛P
C柱中空部材7の取付けが完了すると、第5図に示すよ
うに、該梁型枠1内および半PC床スラブ部材5上およ
び牛PC柱中空部材7内に、コンクリ−)Cを一度に打
設する。この場合、梁型枠1内および半PC床スラブ部
材5上にはコンクリートポンプ(図示せず)により打設
し、半PC柱中空部材7内にはコンクリートパケット(
図示せず)により打設して、打設方法を変力てもよい。
As described above, the beam formwork 1, the cow PC floor substructure member 5, and the cow P
When the installation of the C-column hollow member 7 is completed, as shown in FIG. Pour concrete. In this case, a concrete pump (not shown) is used to pour concrete into the beam formwork 1 and onto the semi-PC floor slab member 5, and a concrete packet (
(not shown), and the casting method may be variable force.

また、第6図に示すように、上記半PC柱中空部材7の
脚部下方にメタルラス8を取り付け、該牛PC柱中空部
材7内に打設したコンクリートのノロが流出しないよう
にするとよい。
Further, as shown in FIG. 6, it is preferable to attach a metal lath 8 below the leg of the semi-PC column hollow member 7 to prevent the concrete slag cast inside the cow PC column hollow member 7 from flowing out.

上記実施例ではコンクリートを一度に打設したが、まず
スラブ下まで梁型枠j内にコンクリートCを打設し、続
いて、半PC柱中空部材7内へのコンクリ−)Cの打設
を行い、最後に半PC床スラブ部材5上にコンクリ−)
Cを打設するようにしてもよい。
In the above example, concrete was poured at once, but concrete C was first poured into the beam formwork j to the bottom of the slab, and then concrete C was poured into the hollow member 7 of the semi-PC column. and finally concrete on the semi-PC floor slab member 5)
C may be poured.

[発明の効果1 (1)コンクリートの打設が1回で行えるため、工程の
短縮を図ることができる。
[Effect of the invention 1 (1) Since concrete can be placed in one time, the process can be shortened.

(2)柱コンクリートが過密配筋状態での打設ではない
ので、骨材分離等が生じないため、高品質を確保するこ
とがで終る。
(2) Since the column concrete is not placed in an overcrowded reinforcement condition, aggregate separation does not occur, so high quality can be ensured.

(3)柱には半PC柱中空部材を採用したので、省力化
を図ることがで外る。
(3) Since a semi-PC column hollow member is used for the column, labor savings can be achieved.

(4)高層鉄筋コンクリート造の集合住宅や高層事務所
ビル等の施工法に採用できる。
(4) It can be adopted as a construction method for high-rise reinforced concrete housing complexes, high-rise office buildings, etc.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図ないし第5図は本発明方法の一実施例を順次示す
施工説明図、第6図は半PC柱中空部材の脚部下部の拡
大説明図である。 1・−・梁型枠、2・・・柱、3・・・支保工、4・・
・梁鉄筋、5・・・半PC床スラブ部材、6・・・柱鉄
筋、7・・・半PC柱中空部材、8・・・メタルラス、
C・・・コンクリート。
1 to 5 are construction explanatory diagrams sequentially showing one embodiment of the method of the present invention, and FIG. 6 is an enlarged explanatory diagram of the lower part of the leg of a half-PC column hollow member. 1... Beam formwork, 2... Column, 3... Shoring, 4...
・Beam reinforcing bar, 5... Half PC floor slab member, 6... Column reinforcing bar, 7... Half PC column hollow member, 8... Metal lath,
C...Concrete.

Claims (1)

【特許請求の範囲】 1、柱の頭部間に梁型枠を建込むと共に該型枠内に梁プ
レハブ鉄筋をセットし、該梁型枠上に半PC床スラブ部
材をセットし、上記柱の頭部上に柱筋を接合すると共に
該柱鉄筋の周囲に半PC柱中空部材を取り付け、上記梁
型枠内と半PC床スラブ部材上と半PC柱中空部材内に
コンクリートを一度に打設することを特徴とする鉄筋コ
ンクリート造建物の構築工法。 2、柱の頭部間に梁型枠を建込むと共に該型枠内に梁プ
レハブ鉄筋をセットし、該梁型枠上に半PC床スラブ部
材をセットし、上記柱の頭部上に柱筋を接合すると共に
該柱鉄筋の周囲に半PC柱中空部材を取り付け、まずス
ラブ下まで梁型枠にコンクリートを打設し、続いて、半
PC柱中空部材内へのコンクリート打設を行い、最後に
半PC床スラブ部材上にコンクリートを打設することを
特徴とする鉄筋コンクリート造建物の構築工法。 3、上記半PC柱中空部材の脚部下方にメタルラス等の
ノロ流出防止手段を施したことを特徴とする請求項1ま
たは2に記載の鉄筋コンクリート造建物の構築工法。
[Claims] 1. A beam formwork is erected between the heads of the columns, a beam prefabricated reinforcing bar is set within the formwork, a semi-PC floor slab member is set on the beam formwork, and the above-mentioned column At the same time as joining the column reinforcement on the head of the column, a half-PC column hollow member is attached around the column reinforcing bar, and concrete is poured at once inside the beam formwork, on the half-PC floor slab member, and inside the half-PC column hollow member. A construction method for reinforced concrete buildings characterized by the construction of 2. Erect a beam formwork between the heads of the columns, set the beam prefabricated reinforcing bars in the formwork, set a semi-PC floor slab member on the beam formwork, and place the pillars on the heads of the columns. While joining the reinforcing bars, a semi-PC column hollow member is attached around the column reinforcing bar, first, concrete is poured into the beam formwork to the bottom of the slab, and then concrete is poured into the semi-PC column hollow member, A construction method for a reinforced concrete building characterized by finally placing concrete on a semi-PC floor slab member. 3. The method for constructing a reinforced concrete building according to claim 1 or 2, characterized in that a means for preventing slag from flowing out, such as metal lath, is provided below the legs of the half-PC column hollow member.
JP2334190A 1990-11-30 1990-11-30 Construction method of reinforced concrete building Expired - Fee Related JP2990216B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2334190A JP2990216B2 (en) 1990-11-30 1990-11-30 Construction method of reinforced concrete building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2334190A JP2990216B2 (en) 1990-11-30 1990-11-30 Construction method of reinforced concrete building

Publications (2)

Publication Number Publication Date
JPH04203039A true JPH04203039A (en) 1992-07-23
JP2990216B2 JP2990216B2 (en) 1999-12-13

Family

ID=18274549

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2334190A Expired - Fee Related JP2990216B2 (en) 1990-11-30 1990-11-30 Construction method of reinforced concrete building

Country Status (1)

Country Link
JP (1) JP2990216B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007092452A (en) * 2005-09-29 2007-04-12 Okumura Corp Construction method of multilayer building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007092452A (en) * 2005-09-29 2007-04-12 Okumura Corp Construction method of multilayer building

Also Published As

Publication number Publication date
JP2990216B2 (en) 1999-12-13

Similar Documents

Publication Publication Date Title
CN106049754B (en) The assembled section of the standard of assembly concrete combined column and the combined column being made up of assembly section
JPH04203039A (en) Builidng method for reinforced concrete building
JP2000160687A (en) Construction method for composite structure and precast concrete column
JPH01214641A (en) Construction of steel-pipe precast concrete pole
JPH03279533A (en) Constructing method for rigid-frame type rc super-high building
JP2000017727A (en) Skelton constructing method of steel frame and reinforced concrete
JPH0452815B2 (en)
JPH0598653A (en) Steel pipe concrete pillar in underground inverter construction method
JPH02282538A (en) Construction method of reinforced concrete-made building frame
JPH02229337A (en) Constructing technique for concrete column
JP2651506B2 (en) How to apply underground beams
JP2715162B2 (en) Reinforcement method for joints between piles and foundations
JPH04237731A (en) Constructing method for rc pillar with core reinforcement bar
JPH04371613A (en) Execution method of post steel anchor section
JPH06995B2 (en) Method for joining columns and PC beams
JPH06307014A (en) Method of building steelwork reinforced concrete column
JP2629496B2 (en) Construction method of structure
JPH11303397A (en) Construction method of reinforced concrete building
JPH04309630A (en) Skeleton construction method using pc member
JPH03187436A (en) Supporting member for construction pillar of reinforced concrete building
JPS62182329A (en) Construction of concrete structure
JPH03161657A (en) Temporarily set support for erecting slab semi-pca plate
JPH04149365A (en) Construction method of beam
JP2001032376A (en) Floor slab frame and construction method for skeleton
JPS6221940B2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071015

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081015

Year of fee payment: 9