JPH041328A - Construction of strut base for cable way - Google Patents

Construction of strut base for cable way

Info

Publication number
JPH041328A
JPH041328A JP10028390A JP10028390A JPH041328A JP H041328 A JPH041328 A JP H041328A JP 10028390 A JP10028390 A JP 10028390A JP 10028390 A JP10028390 A JP 10028390A JP H041328 A JPH041328 A JP H041328A
Authority
JP
Japan
Prior art keywords
cable
strut
foundation
concrete
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10028390A
Other languages
Japanese (ja)
Inventor
Katsuhiro Shimamura
島村 克弘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP10028390A priority Critical patent/JPH041328A/en
Publication of JPH041328A publication Critical patent/JPH041328A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PURPOSE:To raise the accuracy of setting position for struts by a method in which an angle part is set on the center of a cable on the bottom of a foundation pit, a strut with a notch is installed on the angle part, the installing position of a strut is adjusted, and concrete is placed. CONSTITUTION:An angle part 1 is set on the center of a cable, and a strut 7 with a notch 2 is installed on the part 1. In this case, the strut 7 is moved along the part 1, a cable 6 is adjusted to be on a normal position by a stay 4, and concrete 5 is placed. In adjusting the position of the cable 6, the cable 6 is horizontally moved to slide it to the longitudinal direction of the part 1, and the cable 6 is also moved vertically to move the part 2 sidewards. After the installing position of the strut 7 is determined, it is fixed by foundation concrete.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、索道用支柱基礎の構築方法に関する。[Detailed description of the invention] [Industrial application field] The present invention relates to a method of constructing a support support foundation for a cableway.

〔従来の技術〕[Conventional technology]

第4図において、支柱しの設置の際に、コンクリートの
基礎10を埋設し、基礎に埋め込んだアンカーボルト9
で支柱底部のフランジ15を接合していた。
In Figure 4, when installing the support, a concrete foundation 10 is buried, and anchor bolts 9 are embedded in the foundation.
The flange 15 at the bottom of the column was joined.

なお、14は索条である。In addition, 14 is a cable.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

前述の従来技術には、次のような問題点がある。 The above-mentioned conventional technology has the following problems.

(1)  コンクリート基礎10の製作時の誤差、埋設
時の誤差により索条14の位置が正規の位置からずれる
場合がある。そこで位置修正のためにフランジ15と基
礎100間にくさび(図示せず)を入れるなどする。こ
れは、不安定であり、応力集中が生じたりする。
(1) The position of the cable 14 may deviate from the normal position due to errors in manufacturing the concrete foundation 10 and errors in burying the concrete foundation 10. Therefore, a wedge (not shown) is inserted between the flange 15 and the foundation 100 to correct the position. This is unstable and causes stress concentration.

(2)索道稼動時の振動により、アンカーボルト9のゆ
るみが生ずる。
(2) The anchor bolts 9 become loose due to vibrations during cableway operation.

(3)埋設された基礎10とアンカーボルト9で接合す
るため、支柱12下端部が複雑になり、溶接部13など
の精度維持が要求される。
(3) Since it is connected to the buried foundation 10 using the anchor bolt 9, the lower end of the column 12 becomes complicated, and it is required to maintain the accuracy of the welded portion 13, etc.

(4)部品数及び作業が多いので、時間と人手がかかる
(4) Since the number of parts and work is large, it takes time and manpower.

〔課題を解決するための手段〕[Means to solve the problem]

第2図に示す如く、アングル材1を索条中心上に設置し
、その上に切り込み2の入った支柱7を据え付け、ステ
ー4で索条6が正規の位置にくるように調節し、コンク
リート5を打設する。
As shown in Fig. 2, an angle member 1 is installed on the center of the cable, a post 7 with a notch 2 is installed on it, and the stay 4 is adjusted so that the cable 6 is in the correct position. 5.

〔作用〕[Effect]

支柱据付時に、アングル材1上に載せた支柱を同アング
ル材に沿って移動させることにより、支柱の据付位置を
容易に調整することができる。
When installing the support, the installation position of the support can be easily adjusted by moving the support placed on the angle member 1 along the angle member.

支柱の据付位置が決定した後は、基礎コンクリートによ
り固定される。
Once the installation location of the pillars has been determined, they will be fixed with foundation concrete.

〔実施例〕〔Example〕

第1図、第2図において、1はアングル材、2は支柱の
切り込み、3は鉄板、4はステー、5はコンクリート、
6は索条、7は支柱、8はアングルの頂点である。
In Figures 1 and 2, 1 is an angle material, 2 is a notch in the support, 3 is a steel plate, 4 is a stay, 5 is concrete,
6 is the cable, 7 is the strut, and 8 is the vertex of the angle.

索条位置調整の際、索条平行方向については、アングル
材1の長手方向に滑動させ、索条直角方向については、
アングル材1を横方向に移動させる。
When adjusting the cable position, slide the angle member 1 in the longitudinal direction in the parallel direction of the cable, and slide it in the longitudinal direction of the cable in the perpendicular direction.
The angle member 1 is moved laterally.

圧索支柱の場合は、第3図に示す如く、コンクリートに
埋まる部分にスタッドパー16を接合し、張力に対抗す
る。
In the case of a pressure cable strut, as shown in FIG. 3, a stud par 16 is connected to the part buried in concrete to resist tension.

〔発明の効果〕〔Effect of the invention〕

本発明による索道用支柱基礎の構築方法は、地面に支柱
の基礎穴を掘削し、前記基礎穴の底部に索条の垂直下方
で且つ索条の方向にアングル材を配置し、前記アングル
材上に同アングル材に適合した切り込みを下端部に設け
た支柱を載せ、索条平行方向及び索条直角方向に自由度
を持たせた状態で索条位置が正規の位置と一致するよう
にステーで調整した後、前記基礎穴にコンクリートを打
設することにより、次の効果を有する。
The method for constructing a support support foundation for a cableway according to the present invention is to excavate a support hole in the ground, place an angle member vertically below and in the direction of the cable at the bottom of the foundation hole, and place an angle member above the angle member. Place a strut with a notch on the lower end that is compatible with the angle material, and place the stay so that the cable position matches the regular position with a degree of freedom in the cable parallel direction and cable perpendicular direction. After making the adjustments, pouring concrete into the foundation hole has the following effects.

(1)支柱設置位蓋の精度が増す。(1) The accuracy of the cover when installing the pillar increases.

(2)従来の構造に比ベリプ、7ランジ及びアンカーボ
ルトが不必要となる。
(2) Verip, 7-lunge, and anchor bolts are no longer necessary in the conventional structure.

(3)従来工法では、掘削後、コンクリート基礎を埋設
し、士をかぶせるが、本発明では直接コンクリートを打
設するため、土をかぶせる必要がなくなる。
(3) In conventional construction methods, after excavation, a concrete foundation is buried and covered with soil, but in the present invention, concrete is directly poured, so there is no need to cover with soil.

(4)コンクリート打設時に正確な位置にあるため、位
置修正による応力集中が減少する。
(4) Since it is in an accurate position when concrete is placed, stress concentration due to position correction is reduced.

【図面の簡単な説明】[Brief explanation of drawings]

Jg1図は本発明の実施例に係る索道用支柱(受索)基
礎の正面図、第2図は第1図の要部を拡大した斜視図、
第3図は本発明による索道用支柱(圧索)基礎の構造図
、第4図は従来の索道用支柱基礎の構造図である。 1・・・アングル材    2・・・支柱の切り込み4
・・・ステー       5・・・コンクリート7・
・・支柱 第3図
Figure Jg1 is a front view of a cableway support (cable receiver) foundation according to an embodiment of the present invention, Figure 2 is an enlarged perspective view of the main part of Figure 1,
FIG. 3 is a structural diagram of a cableway strut (pressure cable) foundation according to the present invention, and FIG. 4 is a structural diagram of a conventional cableway strut foundation. 1... Angle material 2... Notch in post 4
... Stay 5... Concrete 7.
・・Strut Diagram 3

Claims (1)

【特許請求の範囲】[Claims] 地面に支柱の基礎穴を掘削し、前記基礎穴の底部に索条
の垂直下方で且つ索条の方向にアングル材を配置し、前
記アングル材上に同アングル材に適合した切り込みを下
端部に設けた支柱を載せ、索条平行方向及び索条直角方
向に自由度を持たせた状態で、索条位置が正規の位置と
一致するようにステーで調整した後、前記基礎穴にコン
クリートを打設することを特徴とする索道用支柱基礎の
構築方法。
Drill a foundation hole for the support column in the ground, place an angle material at the bottom of the foundation hole vertically below the cable and in the direction of the cable, and make a notch on the angle material that fits the angle material at the lower end. Place the prepared support and adjust the stay with the stay so that the cable position matches the normal position with a degree of freedom in the cable parallel direction and cable perpendicular direction, and then pour concrete into the foundation hole. A method for constructing a support foundation for a cableway, characterized by:
JP10028390A 1990-04-18 1990-04-18 Construction of strut base for cable way Pending JPH041328A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10028390A JPH041328A (en) 1990-04-18 1990-04-18 Construction of strut base for cable way

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10028390A JPH041328A (en) 1990-04-18 1990-04-18 Construction of strut base for cable way

Publications (1)

Publication Number Publication Date
JPH041328A true JPH041328A (en) 1992-01-06

Family

ID=14269869

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10028390A Pending JPH041328A (en) 1990-04-18 1990-04-18 Construction of strut base for cable way

Country Status (1)

Country Link
JP (1) JPH041328A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5448412A (en) * 1992-07-13 1995-09-05 Asahi Kogaku Kogyo Kabushiki Kaisha Telephoto zoom lens system
KR100395172B1 (en) * 2000-07-22 2003-08-25 세종기술주식회사 Method for constructing basic concrete structure of pole in electric railroads by using disposable form and concrete structure thereof
JP2021130986A (en) * 2020-02-20 2021-09-09 Ykk Ap株式会社 Support structure of column and installation method of column

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5448412A (en) * 1992-07-13 1995-09-05 Asahi Kogaku Kogyo Kabushiki Kaisha Telephoto zoom lens system
KR100395172B1 (en) * 2000-07-22 2003-08-25 세종기술주식회사 Method for constructing basic concrete structure of pole in electric railroads by using disposable form and concrete structure thereof
JP2021130986A (en) * 2020-02-20 2021-09-09 Ykk Ap株式会社 Support structure of column and installation method of column

Similar Documents

Publication Publication Date Title
JP3175586B2 (en) Column and pile connection method
JPH041328A (en) Construction of strut base for cable way
JP2002097718A (en) Erection method for steel-pipe column
JP4416141B2 (en) How to install seismic isolation devices
JP2567631Y2 (en) Level adjuster for steel foundation beams
JPS59179937A (en) Placement of anchor bolt
JP3612600B2 (en) Unit anchor and structural steel foundation beam
JP2630623B2 (en) Anchor bolt installation method and anchor bolt support device used for it
JPH1181343A (en) Embedded footing
JPH09189132A (en) Fixing method of column base for steel frame column
JP2813605B2 (en) Construction foundation and construction method
JPH10317391A (en) Foundation structure for steel tower and method for constructing the same
JP3890666B2 (en) Joining method and structure of the structural column and main body steel in the reverse driving method
JP3236950B2 (en) Embedded column base and method of construction
JPH10311045A (en) Surface table construction method and device for erecting post
JPS61233131A (en) Foundation structure of pole
JP3700119B2 (en) Pillar construction method
JP3005885B2 (en) How to build the foundation of a structure
JP7362448B2 (en) Construction method of seismic isolation foundation beam
JPH0384165A (en) Execution of setting of anchor bolt and setting apparatus therefor
JPH03199529A (en) Mat foundation using steel structure
JPH07116714B2 (en) Anchor bolt fixing device
JP3232487B2 (en) Construction method of column base and column base structure
JPH04128430A (en) Concrete foundation
JPS6192265A (en) Root winding method of iron pillar leg