JPH037800B2 - - Google Patents

Info

Publication number
JPH037800B2
JPH037800B2 JP14144084A JP14144084A JPH037800B2 JP H037800 B2 JPH037800 B2 JP H037800B2 JP 14144084 A JP14144084 A JP 14144084A JP 14144084 A JP14144084 A JP 14144084A JP H037800 B2 JPH037800 B2 JP H037800B2
Authority
JP
Japan
Prior art keywords
hole
rock
injection
filler
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP14144084A
Other languages
Japanese (ja)
Other versions
JPS6121300A (en
Inventor
Sumio Nakano
Susumu Nishida
Shigeo Kokubu
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP14144084A priority Critical patent/JPS6121300A/en
Publication of JPS6121300A publication Critical patent/JPS6121300A/en
Publication of JPH037800B2 publication Critical patent/JPH037800B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Description

【発明の詳細な説明】 本発明はロツクボルト工法に関するものであ
る。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a rock bolt construction method.

<> 発明の目的 [産業上の利用分野] 土木。<> Purpose of the invention [Industrial application field] Civil engineering.

[従来の技術] ロツクボルト工法は、トンネル工事等において
掘削面の岩盤をその深部の堅岩にボルトをもつて
締付けて掘削による岩盤のゆるみを防止し、掘削
の岩盤等の崩落を防止するものである。
[Conventional technology] The lock bolt method is a method used in tunnel construction, etc., to tighten the rock at the excavated surface with bolts to the deep hard rock to prevent the rock from loosening due to excavation, and to prevent the rock from collapsing during excavation. be.

ロツクボルトを堅岩に固定、定着させるには、
削孔した孔内にモルタル等の充填剤を注入した
後、孔内にロツクボルトを挿入し充填剤の硬化に
よつてロツクボルトを固定、定着させる方法がと
られている。
To secure and anchor the rock bolt to solid rock,
A method is used in which a filler such as mortar is injected into the drilled hole, a lock bolt is inserted into the hole, and the lock bolt is fixed and fixed by the hardening of the filler.

[本発明が解決しようとする問題点] 上記の従来の方では、注入するモルタル等の充
填剤が、孔周辺の細かいクラツクにまで侵入する
ことが難しいので、孔周辺の広い範囲にわたる定
着が困難であつた。
[Problems to be Solved by the Present Invention] In the above-mentioned conventional method, it is difficult for the injected filler such as mortar to penetrate into the fine cracks around the hole, so it is difficult to fix it over a wide area around the hole. It was hot.

また湧水が多い場合や砂糖、砂礫層等の様に固
結度の低い地盤での採用が出なかつた。
Furthermore, it could not be used in cases where there is a lot of spring water or in ground with a low degree of consolidation such as sugar or gravel layers.

[発明の目的] 本発明は以上のような点に鑑み成されたもの
で、孔周辺の広い範囲の固定化と湧水のある地盤
や固結性のとぼしい地盤への対応が可能なロツク
ボルト工法を提供するこことを目的とする。
[Object of the invention] The present invention has been made in view of the above points, and provides a rock bolt construction method that is capable of fixing a wide area around a hole and can be used on ground with spring water or poorly consolidated ground. The purpose here is to provide.

すなわち本発明は、孔内に充填剤を注入した
後、注入孔を有する中空のロツクボルトを孔内に
挿入し、ロツクボルトの注入路から地山注入剤を
圧入することを特徴とする、ロツクボルト工法に
関するものである。
That is, the present invention relates to a rock bolt construction method, which is characterized in that after a filler is injected into the hole, a hollow rock bolt having an injection hole is inserted into the hole, and a ground injection agent is press-fitted from the injection path of the rock bolt. It is something.

<> 発明の構成 [問題点を解決するための手段] 次に本発明のロツクボルト工法の実施例を説明
するが、まず使用する各装置について説明する。
<> Structure of the Invention [Means for Solving Problems] Next, an embodiment of the lock bolt construction method of the present invention will be described, but first, each device used will be described.

(イ) 削孔装置 削孔装置はケーシングKやインナーチユーブ
等を挿入しつつ穿孔を行う従来の削孔装置を使
用する。
(a) Drilling device A conventional drilling device is used that performs drilling while inserting the casing K, inner tube, etc.

(ロ) ロツクボルト(第1図) 本発明に使用するロツクボルト1は基端にボ
ルトねじ部11を有し、その先端を尖鋭に形成
した中空の円柱体の部材である。
(B) Lock bolt (FIG. 1) The lock bolt 1 used in the present invention is a hollow cylindrical member having a bolt threaded portion 11 at its base end and having a sharp tip.

そしてその中空部分を、後述の充填剤7より
充分流動性の高い地山注入剤6の注入路12と
する。
The hollow portion is used as an injection path 12 for a rock injection agent 6 having a sufficiently higher fluidity than a filler 7 to be described later.

さらにその壁面に複数の注入孔14を開設す
る。
Furthermore, a plurality of injection holes 14 are opened in the wall surface.

そしてゴム等の弾力性を有する帯状のスリー
ブ13を環状に設置して、注入孔14を外部か
ら閉塞する。
Then, a belt-shaped sleeve 13 having elasticity such as rubber is installed in an annular manner to close the injection hole 14 from the outside.

次に上記の各装置を使用しての本発明のロツク
ボルト工法について説明する。
Next, the lock bolt construction method of the present invention using each of the above-mentioned devices will be explained.

(イ) 充填剤注入(第2図) 公知の削孔装置で削孔後、ケーシングKを後
退させつつ、インナーチユーブの空間を利用す
るなどして孔C内にモルタル等の充填剤7を注
入しつつケーシングKやインナーチユーブ等を
引抜き、削孔装置と充填剤7の置き換えを行
う。
(b) Filler injection (Figure 2) After drilling with a known hole drilling device, filler 7 such as mortar is injected into hole C by using the space of the inner tube while retracting casing K. While doing so, the casing K, inner tube, etc. are pulled out, and the hole drilling device and filler 7 are replaced.

(ロ) ロツクボルトの挿入(第3図) 充填剤7で満たされた孔C内にロツクボルト
1を、その先端から挿入する。
(b) Inserting the lock bolt (Fig. 3) Insert the lock bolt 1 into the hole C filled with the filler 7 from its tip.

その時期は充填剤7が、まだ充分に硬化して
いない時である (ハ) 地山注入剤の注入(第4図) 充填剤7が硬化しロツクボルト1と地山Aが
接着した後、またはロツクボルト1を定着した
後、ロツクボルト1の注入路12に高圧で地山
注入剤6を注入する。
This is when the filler 7 has not yet sufficiently hardened (c) Injecting the ground injection agent (Figure 4) After the filler 7 has hardened and the rock bolt 1 and the ground A have bonded together, or After fixing the rock bolt 1, a rock injection agent 6 is injected into the injection path 12 of the rock bolt 1 at high pressure.

高圧で注入12に注入された地山注入剤6は
注入孔14から弾力性を有するスリーブ13を
押し除けてロツクボルト1の外部に噴出し、硬
化している充填剤7をおし割りつつ充填剤7や
地山Aの細かい亀裂A′内に浸透し硬化する。
The rock injection agent 6 injected into the injection hole 12 at high pressure pushes the resilient sleeve 13 away from the injection hole 14 and is ejected to the outside of the lock bolt 1, breaking the hardened filler 7 and filling it. 7 and into the fine cracks A' of the ground A' and harden.

(ニ) ロツクボルトの締付け 地山注入剤6が地山Aの細かい亀裂A′内に
浸透し硬化した後、ロツクボルト1のボルトね
じ部11によつて地山Aを締付ける。
(d) Tightening the lock bolt After the rock injection agent 6 penetrates into the fine cracks A' of the rock A' and hardens, the rock A is tightened by the bolt thread part 11 of the rock bolt 1.

<> 発明の効果 本発明は以上説明したようになるので次によう
な効果を期待することができる。
<> Effects of the Invention Since the present invention has been described above, the following effects can be expected.

(イ) 流動性の低い充填剤が充填された孔内にロツ
クボルトを挿入し、充填剤が硬化または定着し
た後に地山注入剤をロツクボルトの注入路から
注入する。
(a) A rock bolt is inserted into the hole filled with a filler with low fluidity, and after the filler has hardened or settled, a rock injection agent is injected through the injection path of the rock bolt.

地山注入剤は流動性が高いので充填剤や地山
の細かい亀裂内に浸透することができる。
Because the ground injection agent has high fluidity, it can penetrate into the filler and fine cracks in the ground.

従つて孔周辺の広い範囲を定着させることが
できる。
Therefore, it is possible to fix a wide area around the hole.

(ロ) 細かい亀裂内にまで地山注入剤を浸透させる
ために、地山注入剤を高圧でロツクボルト内か
ら噴出させる。
(b) In order to penetrate the ground injection agent into the fine cracks, the ground injection agent is ejected from inside the rock bolt at high pressure.

地山注入剤は高圧で注入されるから、本来な
ら孔の入口から地山注入剤が逆流してくること
が考えられるが、本発明では孔内はすでに硬化
した充填剤で満たされているので孔の入口から
地山注入剤が漏出することがない。
Since the ground injection agent is injected under high pressure, it would normally be possible for the ground injection agent to flow back from the entrance of the hole, but in the present invention, the inside of the hole is already filled with hardened filler. The ground injection agent will not leak out from the hole entrance.

(ハ) 湧水が多い場合コンクリートまたはモルタル
吹付け等のその後の工程に障害が残るが、注入
により止水効果が得られるのでその後の工程の
作業効率が向上する。
(c) If there is a lot of spring water, problems will remain in subsequent processes such as concrete or mortar spraying, but injection will stop the water and improve work efficiency in subsequent processes.

(ニ) 固結性の乏しい地盤の場合でも注入により地
盤の改良ができ、ロツクボルトの用途を拡大す
ると同時にその効果を向上させることが出来
る。
(d) Even in the case of poorly consolidated ground, injection can improve the ground, expanding the uses of rock bolts and improving their effectiveness at the same time.

【図面の簡単な説明】[Brief explanation of drawings]

第1図:本発明に使用するロツクボルトの説明
図、第2〜4図:本発明のロツクボルト工法の説
明図 1:ロツクボルト、11:ボルトねじ部、1
2:注入路、13:スリーブ、14:注入孔、
6:地山注入剤、7:充填剤、A:地山、A′:
亀裂、C:孔、K:ケーシング。
Figure 1: An explanatory diagram of the lock bolt used in the present invention, Figures 2 to 4: An explanatory diagram of the lock bolt construction method of the present invention 1: Lock bolt, 11: Bolt threaded part, 1
2: injection path, 13: sleeve, 14: injection hole,
6: Ground injection agent, 7: Filler, A: Ground mass, A':
Crack, C: hole, K: casing.

Claims (1)

【特許請求の範囲】 1 孔内に充填剤を注入した後、 注入孔を有する中空のロツクボルトを孔内に挿
入し、 ロツクボルトの注入路から地山注入剤を圧入す
ることを特徴とする、 ロツクボルト工法。
[Claims] 1. A rock bolt characterized in that after a filler is injected into the hole, a hollow rock bolt having an injection hole is inserted into the hole, and a ground injection agent is press-fitted from the injection path of the rock bolt. Construction method.
JP14144084A 1984-07-10 1984-07-10 Rock bolt construction method Granted JPS6121300A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14144084A JPS6121300A (en) 1984-07-10 1984-07-10 Rock bolt construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14144084A JPS6121300A (en) 1984-07-10 1984-07-10 Rock bolt construction method

Publications (2)

Publication Number Publication Date
JPS6121300A JPS6121300A (en) 1986-01-29
JPH037800B2 true JPH037800B2 (en) 1991-02-04

Family

ID=15291995

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14144084A Granted JPS6121300A (en) 1984-07-10 1984-07-10 Rock bolt construction method

Country Status (1)

Country Link
JP (1) JPS6121300A (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08226118A (en) * 1991-09-27 1996-09-03 Maeda Corp Lock bolt construction method with concurrent use of chemical grouting construction method
WO2005073510A1 (en) * 2004-01-28 2005-08-11 Denki Kagaku Kogyo Kabushiki Kaisha Expandable injection bolt and grouting method using same

Also Published As

Publication number Publication date
JPS6121300A (en) 1986-01-29

Similar Documents

Publication Publication Date Title
KR100919821B1 (en) Ground enhansing apparatus with anchor rod and method thereof
CA2718556A1 (en) Corrosion-protected, self-drilling anchor and anchor subunit and method for the production thereof
CN208518690U (en) A kind of weak cementing rich water top plate anchor cable hole grouting for water blocking device
JPH037800B2 (en)
KR102185255B1 (en) Construction method of composite pile with extensioned tip
JPH1077800A (en) Anchoring material filling method and seal unit
JP6884663B2 (en) Repair / reinforcement method for existing structures
CN109083669A (en) Roadway floor prestressed grouting birdcage anchor cable construction method
JPS622120B2 (en)
JP2533884B2 (en) Construction method of columnar hardened body
JPS58110797A (en) Method of excavation construction of tunnel making primary covering precede
CA1243512A (en) Rock anchor and method of placing it
JP2617267B2 (en) Rock anchoring method for steel pipe piles
JPS62101711A (en) Earth anchor and its construction
JP4554857B2 (en) TBM ground support system
SU1523675A1 (en) Method of supportting mine workings
CN108343065A (en) The resistance to compression connection structure and construction method of secondary splitting grouting
JPH0224500A (en) Anchoring of lock bolt
JPS59179927A (en) Earth anchor bar
JP2789370B2 (en) Piling method
JP2002302945A (en) Tension member inserting construction method
JP2544702B2 (en) Pipe rod construction method
JP3125052B2 (en) Crack injection aid
KR19990086347A (en) Removal nailing method in excavation work
WO1987005647A1 (en) Improvements to ground anchors

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees