JPH0366851A - Joint structure of steel pipe concrete column - Google Patents

Joint structure of steel pipe concrete column

Info

Publication number
JPH0366851A
JPH0366851A JP20266089A JP20266089A JPH0366851A JP H0366851 A JPH0366851 A JP H0366851A JP 20266089 A JP20266089 A JP 20266089A JP 20266089 A JP20266089 A JP 20266089A JP H0366851 A JPH0366851 A JP H0366851A
Authority
JP
Japan
Prior art keywords
steel
steel pipe
steel pipes
concrete
pipes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP20266089A
Other languages
Japanese (ja)
Inventor
Toshiyuki Fukumoto
敏之 福元
Naoki Tanaka
直樹 田中
Yasushi Akiyama
靖司 穐山
Akio Tomita
昭夫 富田
Kansuke Honma
完介 本間
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP20266089A priority Critical patent/JPH0366851A/en
Publication of JPH0366851A publication Critical patent/JPH0366851A/en
Pending legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

PURPOSE:To increase the easiness to execute the construction works by connecting two steel pipes using bolts which are inserted between the side faces of the steel pipes, arranging a joint steel pipe having a flange or a steel rod in the joint position of the two members, and filling with concrete. CONSTITUTION:A top plate 2 having an opening 2a is jointed to a one-side end face of each steel pipe 1. A steel rod 3 having a length straddling the ends of the two steel pipes 1 is inserted around the opening 2a of the plate 2. Then the other side steel pipe 1 is butted to the steel pipe 1 with which the plate 2 is jointed, and a backing plate 5 is installed at the periphery of the two steel pipes 1 followed by insertion of bolts 6. The insides of the steel pipes 1 are filled with concrete 4, and they are coupled together. This shortens the construction period.

Description

【発明の詳細な説明】 (産業上の利用分野) この発明は内部にコンクリートが充填されて柱を構成す
る、鋼管コンクリート柱の継手構造に関するものである
DETAILED DESCRIPTION OF THE INVENTION (Industrial Application Field) The present invention relates to a joint structure for a steel pipe concrete column, the interior of which is filled with concrete to constitute a column.

(発明が解決しようとする課題) 鋼管内にコンクリートが充填される柱の継手は通常、鋼
管の継手を応用して構成されるが、この鋼管の接続は従
来、例えば接合時の位置決めのために双方の外周に突設
されたエレクションピース間にプレートを跨設し、プレ
ートをボルト接合して仮止めした状態で、力の伝達上鋼
管を溶接することにより行われている。
(Problem to be Solved by the Invention) Column joints in which steel pipes are filled with concrete are usually constructed by applying steel pipe joints. This is done by placing a plate across the two erection pieces that protrude from the outer periphery of both sides, and welding the steel pipes together to transmit force while the plates are bolted together and temporarily secured.

ところがエレクションピースは鋼管の周面から大きく突
出するため、その仕上げ材との干渉部分を鋼管の溶接後
に切断する必要があり、この接続後の作業が付加される
ためと、鋼管の接続が溶接に依存するため上記方法は施
工性が悪く、工期の遅延を招いている。
However, since the erection piece protrudes greatly from the circumferential surface of the steel pipe, it is necessary to cut off the part where it interferes with the finishing material after welding the steel pipe, which adds additional work after connection, and because the connection of the steel pipe is difficult to weld. The above method has poor workability and delays the construction period.

この発明はこの従来方法の実情を踏まえてなされたもの
で、施工性のよい継手の構造を新たに提案しようとする
ものである。
This invention was made based on the actual situation of this conventional method, and aims to propose a new joint structure with good workability.

(課題を解決するための手段) 本発明では鋼管の接続をその側面間に挿通されるボルト
により行い、更に双方の継手位置に双方の鋼管に跨がる
長さの鋼棒、もしくはフランジを有する継手鋼管を配置
し、これらをコンクリート中に埋め込み、その付着、ま
たは定着によって力を伝達する構造とすることにより鋼
管からの部材の突出をなくし、施工性の向上を図る。
(Means for Solving the Problems) In the present invention, steel pipes are connected by bolts inserted between their sides, and furthermore, both joint positions have steel rods or flanges long enough to span both steel pipes. By arranging joint steel pipes, embedding them in concrete, and creating a structure that transmits force by adhesion or fixation, the protrusion of members from the steel pipes is eliminated and workability is improved.

鋼棒は鋼管の一方側の端面に接合される、開口を有する
トッププレートに挿通され、この鋼棒を用いる場合、ト
ッププレート側の鋼管に他方側の鋼管を突き合わせて両
鋼管の外周に添え板を跨設し、対向する添え板間にボル
トを挿通して両鋼管が接続される。
The steel rod is inserted into a top plate with an opening that is joined to the end face of one side of the steel pipe. When using this steel rod, the steel pipe on the other side is butted against the steel pipe on the top plate side, and a splint is attached to the outer periphery of both steel pipes. Both steel pipes are connected by inserting bolts between the opposing splints.

継手鋼管は柱を構成する鋼管に内接し、両端にコンクリ
ート中に定着されて力を伝達する、開口を有するフラン
ジが接合される。
The joint steel pipe is inscribed in the steel pipe constituting the column, and flanges with openings are connected to both ends of the pipe, which are anchored in concrete to transmit force.

ボルトは継手鋼管を貫通し、鋼管の側面間に挿通されて
鋼管を接続する。
The bolt passes through the joint steel pipe and is inserted between the sides of the steel pipe to connect the steel pipes.

(実施例) 以下本発明を一実施例を示す図面に基づいて説明する。(Example) The present invention will be explained below based on the drawings showing one embodiment.

まず第1請求項記載の発明を説明する。First, the invention described in claim 1 will be explained.

この発明は第1図に示すように接続される鋼管1.1の
一方側の端面に開口を有するトッププレート2を接合し
、これに鋼棒3を挿通し、コンクリート4中に埋設され
る鋼棒3の付着耐力により力の伝達を行う構造としたも
のである。
As shown in FIG. 1, this invention connects a top plate 2 having an opening on one end surface of a steel pipe 1.1 to be connected, and inserts a steel rod 3 into the top plate 2 to insert a steel rod 3 into the concrete 4. The structure is such that force is transmitted by the adhesion strength of the rod 3.

トッププレート2には図示するように中央部にコンクリ
ート4の流動性を確保するための開口2aが明けられて
おり、開口2a回りに両鋼管1. 1の端部間に跨がる
長さを有する鋼棒3が貫通して挿通される。
As shown in the figure, the top plate 2 has an opening 2a in the center to ensure fluidity of the concrete 4, and both steel pipes 1. A steel rod 3 having a length spanning between the ends of the steel rod 3 is inserted through the steel rod 3 .

他方側の鋼管1はトッププレート2が接合された鋼管1
に突き合わせられ、両鋼管1.1の外周に跨設される添
え板5間にボルト6を挿通することにより仮接続される
。更に両鋼管1゜1は内部にコンクリート4が充填され
ることにより連結される。
The steel pipe 1 on the other side is the steel pipe 1 to which the top plate 2 is joined.
The two steel pipes 1.1 are brought into contact with each other, and a bolt 6 is inserted between the splint plates 5, which are disposed straddling the outer peripheries of both steel pipes 1.1, thereby temporarily connecting the steel pipes 1.1. Furthermore, both steel pipes 1.1 are connected by filling the inside with concrete 4.

この鋼管1.1を接続する添え仮5とボルト6はコンク
リート4の充填完了までに必要とされるもので、コンク
リート4充填後は鋼棒3によって力の伝達が行われるこ
とになるため大きな耐力は必要とされない。
The splints 5 and bolts 6 that connect the steel pipes 1.1 are required until the filling of the concrete 4 is completed, and after filling the concrete 4, the force will be transmitted by the steel rods 3, so the yield strength will be large. is not required.

この力の伝達は、鋼棒3の付着耐力、もしくは端部に形
成されるフック等による定着によって行われる。
This force is transmitted by the adhesion strength of the steel rod 3 or by anchoring with a hook or the like formed at the end.

次に第2請求項記載の発明を説明する。Next, the invention described in the second claim will be explained.

この発明は第2図に示すように一方の鋼管1に、これに
内接する継手鋼管7を取り付け、その両端面に接合され
た第1請求項記載発明におけるトッププレート2と同様
の、開口7bを有するフランジ7a、7aがコンクリー
ト4中に定着されることにより力の伝達を行う構造とし
たものである。
As shown in FIG. 2, this invention attaches a joint steel pipe 7 inscribed in one steel pipe 1, and has an opening 7b similar to the top plate 2 in the first claimed invention joined to both end faces of the joint steel pipe 7. The flanges 7a, 7a are fixed in the concrete 4 to transmit force.

継手鋼管7は図示するように両鋼管1.1の端部間に跨
がる長さを持ち、−吉例の鋼管1に端面より突出して予
め接続される。
As shown, the joint steel pipe 7 has a length spanning between the ends of both steel pipes 1.1, and is connected to the steel pipe 1 in advance by protruding from the end face thereof.

継手鋼管7は第2図に示すように鋼管Iの側面間を貫通
するボルト6により、もしくは第3図に示すように溶接
等により鋼管1に仮止めされている。
The joint steel pipe 7 is temporarily fixed to the steel pipe 1 by bolts 6 passing between the sides of the steel pipe I as shown in FIG. 2, or by welding or the like as shown in FIG.

第3図−■は継手鋼管7を隅肉溶接により、■はプラグ
溶接によりそれぞれ鋼管1に接合した場合である。
In FIG. 3, ■ shows the case where the joint steel pipe 7 is joined to the steel pipe 1 by fillet welding, and ■ shows the case where the joint steel pipe 7 is joined to the steel pipe 1 by plug welding.

他方側の鋼管1は第2図−■に示すように一方側の鋼管
1から突出した部分に第1請求項発明と同じくボルト6
を貫通させることにより仮接続される。
As shown in FIG.
A temporary connection is made by penetrating the

鋼管1.1の接続後、内部にコンクリート4を充填して
継手が完了する。
After connecting the steel pipes 1.1, concrete 4 is filled inside to complete the joint.

力の伝達は前記した通り継手鋼管7のフランジ7aがコ
ンクリート4中に埋設されることによって行われること
になる。
As described above, the force is transmitted by embedding the flange 7a of the joint steel pipe 7 in the concrete 4.

(発明の効果) この発明は以上の通りであり、接続される鋼管の一方側
に取り付けられた鋼棒、または継手鋼管がコンクリート
中に埋め込まれることによって力の伝達を行う構造とし
、鋼管の接続はボルトにより行われるため施工性がよく
、工期の短縮化を図ることができる。
(Effects of the Invention) The present invention is as described above, and has a structure in which a steel rod attached to one side of the steel pipes to be connected or a joint steel pipe is embedded in concrete to transmit force, and the steel pipes are connected. Since it is done with bolts, it is easy to construct and can shorten the construction period.

【図面の簡単な説明】[Brief explanation of drawings]

第1図−I、IIは第1請求項記載発明の実施例を示し
たそれぞれ平面図、立面図、第2図−I、IIは第2請
求項記載発明の実施例を示したそれぞれ平面図、立面図
、第3図−I、Itは他の継手鋼管の接合例を示した立
面図である。 1・・・・・・鋼管、2・・・・・・トソブプレート、
2a・・・・・・開口、3・・・・・・鋼棒、4・・・
・・・コンクリート、5・・・・・・添え板、6・・・
・・・ボルト、7・・・・・・継手鋼管、7a・・・・
・・フランジ、7b・・・・・・開口。
Figures 1-I and II are a plan view and an elevation view, respectively, showing an embodiment of the invention described in the first claim, and Figures 2-I, II are plane views, respectively, showing an embodiment of the invention described in the second claim. Figures, elevation views, and Figure 3-I and It are elevational views showing another example of joining steel pipes. 1... Steel pipe, 2... Tosob plate,
2a...Opening, 3...Steel bar, 4...
...Concrete, 5...Splice plate, 6...
... Bolt, 7... Joint steel pipe, 7a...
...Flange, 7b...Opening.

Claims (2)

【特許請求の範囲】[Claims] (1)柱を構成する、互いに接続される鋼管の一方側の
端面に開口を有するトッププレートを接合するとともに
、トッププレートに両鋼管間の力を伝達する、双方の鋼
管に跨がる長さの鋼棒を挿通し、この鋼管に他方側の鋼
管を突き合わせて両鋼管の外周に添え板を跨設し、対向
する添え板間にボルトを挿通して両鋼管を接続し、鋼管
内にコンクリートを充填してなる鋼管コンクリート柱の
継手構造。
(1) Length that straddles both steel pipes that connects the top plate that has an opening on one end of the steel pipes that make up the column and that transmits the force between the two steel pipes to the top plate. A steel rod is inserted into the steel pipe, the steel pipe on the other side is butted against this steel pipe, a splint is placed across the outer periphery of both steel pipes, a bolt is inserted between the opposing splints to connect both steel pipes, and concrete is placed inside the steel pipe. A joint structure of steel pipes and concrete columns filled with.
(2)柱を構成する、互いに接続される鋼管の一方側に
これに内接し、両端に開口を有するフランジが接合され
、両鋼管間の力を伝達する、双方の鋼管に跨がる長さの
継手鋼管を端面から他方側へ突出させて接合し、この継
手鋼管と他方側の鋼管とをその外周間にボルトを挿通し
て接続し、鋼管内にコンクリートを充填してなる鋼管コ
ンクリート柱の継手構造。
(2) A length extending over both steel pipes that constitutes a column and is inscribed on one side of the steel pipes that are connected to each other and has a flange that has openings at both ends joined and that transmits the force between the two steel pipes. A steel pipe concrete column is constructed by connecting a joint steel pipe by protruding from the end face to the other side, connecting this joint steel pipe and the steel pipe on the other side by inserting a bolt between their outer peripheries, and filling the steel pipe with concrete. Joint structure.
JP20266089A 1989-08-04 1989-08-04 Joint structure of steel pipe concrete column Pending JPH0366851A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20266089A JPH0366851A (en) 1989-08-04 1989-08-04 Joint structure of steel pipe concrete column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20266089A JPH0366851A (en) 1989-08-04 1989-08-04 Joint structure of steel pipe concrete column

Publications (1)

Publication Number Publication Date
JPH0366851A true JPH0366851A (en) 1991-03-22

Family

ID=16461034

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20266089A Pending JPH0366851A (en) 1989-08-04 1989-08-04 Joint structure of steel pipe concrete column

Country Status (1)

Country Link
JP (1) JPH0366851A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0559763A (en) * 1991-09-03 1993-03-09 Kajima Corp Structure of joint for steel pipe concrete column
JPH0565739A (en) * 1991-09-09 1993-03-19 Kajima Corp Joint structure of steel pipe with concrete
CN105133792A (en) * 2015-08-28 2015-12-09 河海大学 Steel reinforced concrete cross-shaped column with honeycomb-type web and construction method thereof
CN108412128A (en) * 2018-04-19 2018-08-17 重庆大学 A kind of connection structure of steel core concrete column

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0559763A (en) * 1991-09-03 1993-03-09 Kajima Corp Structure of joint for steel pipe concrete column
JPH0565739A (en) * 1991-09-09 1993-03-19 Kajima Corp Joint structure of steel pipe with concrete
CN105133792A (en) * 2015-08-28 2015-12-09 河海大学 Steel reinforced concrete cross-shaped column with honeycomb-type web and construction method thereof
CN108412128A (en) * 2018-04-19 2018-08-17 重庆大学 A kind of connection structure of steel core concrete column

Similar Documents

Publication Publication Date Title
JP3237050B2 (en) Mortar-filled rebar joint
JPH0748879A (en) Connecting method and connecting structure for member
JPH09203143A (en) Connection method of perpendicular part of wall plate of wall precast reinforced concrete
JP3793852B2 (en) Method of joining concrete structures between blocks using precast concrete blocks
JPH0366851A (en) Joint structure of steel pipe concrete column
JPH07292783A (en) Connective structure of prestressed concrete members
JPH10273976A (en) Earthquake resistant reinforcing device for concrete column
JP3290636B2 (en) Joint structure between steel column base and foundation concrete
JP2545626Y2 (en) PC beam
JPS6127365Y2 (en)
JPH0393950A (en) Joint structure for steel pipe type concrete column
JPS5968476A (en) Method and apparatus for connecting precast concrete member and reinforcing rod
JPH07292858A (en) Structure for connecting pc member
JPH08120790A (en) Coupling fitting for construction member
JPS5817846Y2 (en) Column and beam joining equipment
JPH07247602A (en) Connection method and tool for concrete products
JPS63167834A (en) Precast reinforced concrete beam member
JP2729706B2 (en) How to build reinforced concrete beams
JPH059363Y2 (en)
JPH02269241A (en) Connecting method for precast concrete slab
SU947323A1 (en) Butt joint of prefabricated ferroconcrete columns
JP2651318B2 (en) Joining method of precast concrete beam and precast concrete beam
JPH04353149A (en) Precast reinforced concrete beam and its jointment
JPS5845371Y2 (en) PC board joint structure
JPH0453223B2 (en)