JPH035511A - Permeability test device of ground - Google Patents

Permeability test device of ground

Info

Publication number
JPH035511A
JPH035511A JP14041689A JP14041689A JPH035511A JP H035511 A JPH035511 A JP H035511A JP 14041689 A JP14041689 A JP 14041689A JP 14041689 A JP14041689 A JP 14041689A JP H035511 A JPH035511 A JP H035511A
Authority
JP
Japan
Prior art keywords
water
test
water level
electrode
test well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP14041689A
Other languages
Japanese (ja)
Other versions
JP2700184B2 (en
Inventor
Takeshi Miyamoto
武司 宮本
Noriji Miyake
紀治 三宅
Fumiaki Hirano
平野 文昭
Yonosuke Hosaka
保坂 陽之助
Masaru Amano
賢 天野
Satoshi Takahashi
諭 高橋
Katsuyuki Tamaoki
克之 玉置
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP14041689A priority Critical patent/JP2700184B2/en
Publication of JPH035511A publication Critical patent/JPH035511A/en
Application granted granted Critical
Publication of JP2700184B2 publication Critical patent/JP2700184B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Measurement Of Levels Of Liquids Or Fluent Solid Materials (AREA)

Abstract

PURPOSE:To improve reliability of a test by knowing a water level through a current value running in a circuit composed of a lower electrode, upper electrode and a common electrode, that are hung down in a test well, and by determining the operation of a storage pump based on the current value so as to keep the water level to a set value. CONSTITUTION:A permeability test device is composed of a lifting pipe 3 whose one end is buried in a water column in a test well, a storage pump 11 connected to the lifting pipe 3, and of an upper electrode 7, a lower electrode 6 as well as a common electrode 5 that are hung down in the test well. When the upper electrode 7 and the lower electrode 6 touch the water column in the test well, it is discriminated by a storage pump control means 18 that the current value running in a circuit reaches an upper limit region current value, and the direction for operation is sent to the storage pump 11. When the water level is lowered, it is discriminated that it is a lower limit region current value, and the direction for stop is sent thereto. Water level can thus be kept almost constant, and various calculation methods can be applied, whereby reliability of the test can be improved.

Description

【発明の詳細な説明】 「産業上の利用分野J 本発明は、施工現場で行う地盤の透水試験に使用する、
地盤の透水試験装置に関するものである。
[Detailed description of the invention] "Industrial field of application J The present invention is used for ground permeability tests conducted at construction sites.
This relates to a ground permeability test device.

「従来の技術] 地盤の透水試験には多孔式透水試験と単孔式透水試験と
がある。多孔式透水試験は、透水係数あるいは透水量係
数と、貯留係数(地下水位低下工法において水位低下量
を算定するのに必要な定数)の両者を求められることが
でき、かつ、前記試験結果の精度も良い。しかし、試験
規模が大きくなり経費がかさむという欠点がある。また
、透水性が低い地盤(例えば、透水係数がlO−′オー
ダー以下の土の地a)においては、簡便な現場透水試験
方法はなかった。そのため現場では、単孔式透水試験を
採用することが多い。単孔式透水試験には、 (1)注水法、 (2)回復法、(変水位法)、 (3)揚水法(定水量法、定木順法) による試験方法が提供されている。
``Prior art'' Ground permeability tests include multi-hole permeability tests and single-hole permeability tests.The multi-hole permeability tests measure the permeability coefficient or water permeability coefficient, and the storage coefficient (in the groundwater level lowering method, the amount of water level reduction). It is possible to obtain both the constants necessary to calculate the (For example, there is no simple on-site permeability test method for soils with a permeability coefficient of the order of lO-' or lower (a). Therefore, in the field, single-hole permeability tests are often adopted.Single-hole permeability tests The following testing methods are provided: (1) water injection method, (2) recovery method (variable water level method), and (3) pumping method (constant water flow method, fixed tree method).

「発明が解決しようとする課題」 しかしながら、従来の単孔式透水試験の試験方法及び当
該単孔式透水試験に使用する透水試験装置には以下に掲
げる欠点がある。
"Problems to be Solved by the Invention" However, the conventional single-hole water permeability test method and the water permeability test apparatus used for the single-hole water permeability test have the following drawbacks.

(1)注水法の欠点。(1) Disadvantages of the water injection method.

(イ)注水法では、ポーリング孔内に泥水やスライム等
による目詰まりや泥膜の形成が生じ、地盤の透水性が損
なわれ、実際の透水係数よりも低い数値が得られること
が多い。したがって、注水法による地盤の透水試験によ
り得られた試験結果の信頼性は低い。
(a) In the water injection method, the poling hole is clogged with muddy water, slime, etc., and a mud film is formed, impairing the permeability of the ground, and often resulting in a value lower than the actual permeability coefficient. Therefore, the reliability of test results obtained by ground permeability tests using the water injection method is low.

(2)回復法(変水位法)及び当該回復法による透水試
験に使用する透水試験装置の欠点。
(2) Disadvantages of the recovery method (variable water level method) and the water permeability test equipment used for water permeability tests using the recovery method.

(イ)回復法では、透水係数あるいは透水量係数しか求
めることができず、貯留係数を求めることはできない。
(b) With the recovery method, only the hydraulic conductivity or permeability coefficient can be determined, and the storage coefficient cannot be determined.

(ロ)回復法では、透水係数あるいは透水量係数の算定
に適用できる解析法の種類や数が限定される。そのため
複数の解析法による算定結果の相互チエツクを行うこと
ができず、得られた透水係数等の信頼性は低い。
(b) In the recovery method, the types and number of analytical methods that can be applied to calculate the hydraulic conductivity or permeability coefficient are limited. Therefore, it is not possible to mutually check calculation results obtained by multiple analysis methods, and the reliability of the obtained hydraulic conductivity is low.

(ハ)回復法では、通常ベイラーを用いて試験井戸から
揚水し、揚水停止後に試験井戸の水位を手動で測定する
ため、揚水中に前記水位を測定することは困難であり、
そのため、前記水位を制御することは不可能である。
(c) In the recovery method, water is usually pumped from a test well using a bailer, and the water level in the test well is manually measured after pumping has stopped, so it is difficult to measure the water level during pumping.
Therefore, it is impossible to control the water level.

したがって、水位の低下し過ぎによるボイリング(地下
水が土粒子を攪拌しながら涌き出す現象)発生等のため
地盤を乱し、透水性を損なう場合がある。まI;、揚水
停止と同時に直後に水位の測定を開始することが困難で
あるが、水位の変化は湯水停止直後が尤も激しいので、
水位の測定結果に大きな誤差を生じることになる。した
がって、回復法による地盤の透水試験により得られた、
測定結果の信頼性は低い。
Therefore, the ground may be disturbed due to boiling (a phenomenon in which groundwater flows up while agitating soil particles) due to an excessively low water level, which may impair water permeability. However, it is difficult to start measuring the water level at the same time as the water pumping stops, but since the water level changes most drastically immediately after the hot water stops,
This will cause a large error in the water level measurement results. Therefore, the results obtained from the ground permeability test using the recovery method.
The reliability of the measurement results is low.

(3)揚水法(定水量法、定木順法)及び当該揚水法に
よる透水試験に使用する透水試験装置の欠点。
(3) Disadvantages of the pumping method (constant water flow method, fixed tree method) and the water permeability testing equipment used for water permeability testing using the pumping method.

(イ)揚水法では、通常水中ポンプを試験井戸内に設置
して揚水する。しかし、本願出願時点で一般的に用いら
れているポンプの中で最小径のものは7cmである。そ
のため試験井戸の直径は最低10cm以上必要になる。
(b) In the pumping method, a submersible pump is usually installed in the test well to pump water. However, among the pumps commonly used at the time of filing of this application, the smallest diameter is 7 cm. Therefore, the diameter of the test well must be at least 10 cm.

したがって、直径の大きな試験井戸でなければ地盤の透
水試験に揚水法を採用することができない。
Therefore, the pumping method cannot be used for ground permeability testing unless the test well is large in diameter.

(ロ)揚水法では、ポンプの揚水流量を調整して試験井
戸内の水位を制御する。そのため、前記試験井戸内の水
位を所定の水位に設定するには、ポンプによる揚水流量
と前記試験井戸内の水位の関係を予め把握しておかなけ
ればならない。しかし、当該関係を把握するための作業
は面倒であり、かつ、相当の時間を要する。また、揚水
流量と前記水位との関係は時間と共に変化するので、前
記水位を長期間所定の位置に正確に維持し続けることも
困難である。
(b) In the pumping method, the water level in the test well is controlled by adjusting the pumping flow rate. Therefore, in order to set the water level in the test well to a predetermined water level, it is necessary to know in advance the relationship between the pumping flow rate by the pump and the water level in the test well. However, the work to understand this relationship is troublesome and requires a considerable amount of time. Further, since the relationship between the pumped water flow rate and the water level changes over time, it is difficult to accurately maintain the water level at a predetermined position for a long period of time.

(ハ)揚水法では、第6図に示すように棒状電極30を
有する水位制御装置40により試験井戸C内の水位を所
定の範囲に保つことがまれにある。
(c) In the pumping method, as shown in FIG. 6, the water level in the test well C is rarely maintained within a predetermined range by a water level control device 40 having a rod-shaped electrode 30.

前記棒状電極30は、複数の棒状の電極301を接続す
ることにより、所要の長さにし、用いるちのである。そ
のため前記棒状電極30の長さを一度所要の長さに設定
すると、その後に前記棒状電極30の長さを変更するの
に相当の手間を必要とする。また、前記棒状の電極30
1の長さは1m程度であるので、各棒状電極30の間の
間隔を1m以下とすることはできない。したがって、前
記水位の変動範囲は大きい。また、各棒状電極30の間
の間隔を自由に定めることもできない。
The rod-shaped electrode 30 is made into a desired length by connecting a plurality of rod-shaped electrodes 301 and used. Therefore, once the length of the rod-shaped electrode 30 is set to a required length, considerable effort is required to change the length of the rod-shaped electrode 30 thereafter. Moreover, the rod-shaped electrode 30
1 is about 1 m, the interval between each rod-shaped electrode 30 cannot be less than 1 m. Therefore, the variation range of the water level is large. Moreover, the interval between each rod-shaped electrode 30 cannot be determined freely.

一方、前記棒状電極30を用いて前記水位を所定の範囲
に維持する場合、前記試験井戸C内に前記棒状電極30
を3本挿入しなければならない。
On the other hand, when maintaining the water level within a predetermined range using the rod-shaped electrode 30, the rod-shaped electrode 30 is
You must insert three.

そのため、この方法により地盤の透水試験を行うには前
記試験井戸Cの直径は大きなものでなければならない。
Therefore, in order to conduct a ground permeability test using this method, the diameter of the test well C must be large.

本発明は、従来技術の有するこのような問題点に鑑みて
なされたものであり、その目的とするところは、従来の
地盤試験方法に用いられる透水試験装置に比べ操作性、
作業性に優れ、かつ、信頼性の高い試験結果を得ること
ができる地盤の透水試験装置を提供することを目的とし
ている。
The present invention has been made in view of the above-mentioned problems of the prior art, and its purpose is to improve operability and ease of use compared to water permeability testing equipment used in conventional ground testing methods.
The purpose of the present invention is to provide a ground water permeability testing device that has excellent workability and can obtain highly reliable test results.

「課題を解決するための手段」 本発明の要旨は、一端が試験井戸内の水柱に没している
揚水管と、当該揚水管に接続している揚水ポンプと、前
記試験井戸内の所定の位置に設けI;上位電極と、当該
上位電極よりも下方に位置する下位電極と、前記試験井
戸内の水柱に電気的に接触する共通電極と、前記上位電
極及び前記下位電極と、前記共通電極とにより構成する
回路内に流れる電流値が、前記上位電極及び下位電極が
前記試験井戸内の水柱に電気的に接している場合に得ら
れる上限領域電流値であることを弁別して前記揚水ポン
プに稼働指令信号を出し、前記電流値が、前記上位電極
及び前記下位電極が前記試験井戸内の水柱に電気的に接
していない場合に得られる下限領域電流値であることを
弁別して前記揚水ポンプに停止指令信号を出す揚水ポン
プ制御手段とからなる地盤の透水試験装置に存在する。
"Means for Solving the Problems" The gist of the present invention is to provide a pumping pipe whose one end is submerged in a water column in a test well, a pump connected to the pumping pipe, and a predetermined pump in the test well. an upper electrode, a lower electrode located below the upper electrode, a common electrode in electrical contact with the water column in the test well, the upper electrode and the lower electrode, and the common electrode; and the current value flowing in the circuit configured by the pump is determined to be an upper limit region current value obtained when the upper electrode and the lower electrode are in electrical contact with the water column in the test well, and outputting an operation command signal, and discriminating that the current value is a lower limit region current value obtained when the upper electrode and the lower electrode are not electrically in contact with the water column in the test well, and applying the current value to the pump; It exists in a ground permeability testing device consisting of a pump control means that issues a stop command signal.

「作用」 以下、第1図を参照して本発明の作用について説明する
"Operation" The operation of the present invention will be explained below with reference to FIG.

下位電極6及び上位電極7が試験井戸C内の水柱に電気
的に接している場合、揚水ポンプ制御手段18は、前記
上位電極7及び前記下位電極6と、共通電極5とにより
構成する回路内に流れる電流値が上限領域電流値である
ことを弁別して前記揚水ポンプ11に稼働指令信号を出
す。当該稼働指令信号に応答して前記揚水ポンプ11は
稼働し、前記試験井戸C内の水を揚水する。その結果、
前記水位は、初期水位り、から下がり始める。
When the lower electrode 6 and the upper electrode 7 are in electrical contact with the water column in the test well C, the pump control means 18 operates within a circuit constituted by the upper electrode 7 and the lower electrode 6, and the common electrode 5. It is determined that the current value flowing in is the upper limit region current value, and an operation command signal is issued to the water pump 11. In response to the operation command signal, the water pump 11 operates and pumps water in the test well C. the result,
The water level begins to fall from the initial water level.

当該揚水により前記試験井戸C内の水位が下がり、前記
上位電極7及び前記下位電極6が前記試験井戸C内の水
柱に電気的に按しなくなると、前記揚水ポンプ制御手段
18は、前記上位電極7及び前記下位電極6と、共通電
極5とにより構成する回路内に流れる電流値が下限領域
電流値であることを弁別して前記揚水ポンプ11に停止
指令信号を出す。当該停止指令信号に応答して前記揚水
ポンプ11は稼働を停止し、前記試験井戸C内の水の揚
水を止める。その結果、前記水位の位置は、制御下限水
位り、となる。
When the water level in the test well C falls due to the pumping and the upper electrode 7 and the lower electrode 6 no longer electrically apply to the water column in the test well C, the pump control means 18 controls the upper electrode 7, the lower electrode 6, and the common electrode 5, it is determined that the current value flowing in the circuit constituted is the lower limit region current value, and a stop command signal is issued to the water pump 11. In response to the stop command signal, the water pump 11 stops operating and stops pumping water in the test well C. As a result, the position of the water level becomes the control lower limit water level.

前記揚水ポンプ11が停止すると、前記試験井戸C内の
水位は、時間の経過に伴い地下水の前記試験井戸C内へ
の透水により前記制御上限水位L1まで上昇する。そし
て、前記上位電極7及び前記下位室[6が前記試験井戸
C内の水柱に電気的に接すると前記理由により前記揚水
ポンプ11は稼働する。
When the water pump 11 stops, the water level in the test well C rises to the control upper limit water level L1 as groundwater permeates into the test well C over time. When the upper electrode 7 and the lower chamber [6 are in electrical contact with the water column in the test well C, the water pump 11 is activated for the reason described above.

前記揚水ボンダ11が前記動作を繰り返すことにより前
記試験井戸C内の水位は水位制御範囲Δh(前記制御上
限水位L1と前記制御下限水位り。
As the pumping bonder 11 repeats the above operation, the water level in the test well C is within the water level control range Δh (the control upper limit water level L1 and the control lower limit water level).

との間隔)の間において上昇と下降を繰り返す。It repeats rising and falling during the interval between

ここで、前記水位制御範囲Δhの値を小さくすることに
より前記水位はほぼ一定とみなすことができる。
Here, by reducing the value of the water level control range Δh, the water level can be considered to be substantially constant.

その結果、本発明にかかる地盤への透水試験装置により
透水試験を行えば、当該透水試験の試験結果にたいして
、通常の変水位法、定水量法のみならず、定木順法、平
衡法等の算定方法も適用することが可能となる。
As a result, if a permeability test is performed using the ground permeability testing device according to the present invention, the results of the permeability test will be evaluated not only by the usual variable water level method and constant water flow method, but also by the fixed tree order method, equilibrium method, etc. Calculation methods can also be applied.

「実施例」 以下、本発明の一実施例について図面を参照して詳細に
説明する。ただし、本実施例に記載されている構成部品
の寸法、材質、形状、その相対配置などは、特に特定的
な記載がないかぎりは、この発明の範囲をそれらのみに
限定する趣旨のものではなく、単なる説明例にすぎない
"Example" Hereinafter, an example of the present invention will be described in detail with reference to the drawings. However, the dimensions, materials, shapes, relative arrangements, etc. of the component parts described in this example are not intended to limit the scope of this invention to only those, unless otherwise specified. , is merely an illustrative example.

第1図に示すように、本実施例にかかる地盤の透水試験
装置は、共通電極5、下位電極6、上位電極7等を試験
井戸Cの中に吊下し、揚水ポンプ11、吸水ポンプ14
、揚水ポンプ制御手段18等を前記試験井戸Cの開口部
に近設している。
As shown in FIG. 1, the ground permeability test device according to this embodiment has a common electrode 5, a lower electrode 6, an upper electrode 7, etc. suspended in a test well C, and a water pump 11, a water suction pump 14
, a pump control means 18, etc. are installed near the opening of the test well C.

前記試験井戸Cは、第1図に示すようにポーリング孔B
の側面に、地表面から、山砂層D1、遮水層D8、珪砂
層り、を形成している。前記遮水層D2は前記試験井戸
Cの側面が地下水の前記試験井戸C内への透水による崩
壊を防止する。珪砂層D3はフィルターとしての役割を
有する。山砂層D1は埋戻し材である。なお、試験井戸
Cは、適当な掘削機械及び器具を用いて不透水性地盤A
までポーリングを行うことにより掘削する。
The test well C is a poling hole B as shown in FIG.
From the ground surface, a mountain sand layer D1, an impermeable layer D8, and a silica sand layer are formed on the sides of the ground. The impermeable layer D2 prevents the side surface of the test well C from collapsing due to permeation of groundwater into the test well C. The silica sand layer D3 has a role as a filter. The mountain sand layer D1 is a backfilling material. In addition, test well C was constructed in impermeable ground A using appropriate excavation machinery and equipment.
Excavate by polling until

本実施例にかかる地盤の透水試験装置は、第1図に示す
ように一端が試験井戸内の水柱に没している揚水管3と
、当該揚水管3に接続している前記揚水ポンプ11と、
前記試験井戸C内の所定の位置に設けた上位電極7と、
当該上位電極7よりも下方に位置する下位電極6と、前
記試験井戸C内の水柱に電気的に接触する共通電極5と
、前記上位電極7及び前記下位電極6と、前記共通電極
5とにより構成する回路内に流れる電流値が、前記上位
電極7及び下位電極6が前記試験井戸C内の水柱に電気
的に接している場合に得られる上限領域電流値であるこ
とを弁別して前記揚水ポンプ11に稼働指令信号を出し
、前記電流値が、前記上位電極7及び前記下位電極6が
前記試験井戸C内の水柱に電気的に接していない場合に
得られる下限領域電流値であることを弁別して前記揚水
ポンプ11に停止指令信号を出す揚水ポンプ制御手段1
8とからなり、前記揚水ポンプ11、前記揚水ポンプ制
御手段18は、前記試験井戸Cの開口部に近設している
。さらに、本実施例にかかる地盤の透水試験装置には、
前記試験井戸Cの中にある間隙水圧計1と、当該間隙水
圧計1に電気的に接続して前記試験井戸Cの開口部に近
設している間隙水圧記録装置19と、前記揚水管3に設
けている逆止弁4及びバルブ12と、前記揚水管3から
分岐する枝管13と、前記枝管13に接続している吸水
ポンプ14と、前記枝管13に設けているバルブ15と
、前記揚水ポンプ11に接続している排水管16と、前
記排水管16に設けているバルブ17と、前記各電極5
.6.7及び前記間隙水圧計1を吊下するそれぞれの導
線2.8.9、lOとを有している。
As shown in FIG. 1, the ground permeability testing device according to this embodiment includes a pumping pipe 3 whose one end is submerged in the water column in the test well, and the pumping pump 11 connected to the pumping pipe 3. ,
an upper electrode 7 provided at a predetermined position within the test well C;
A lower electrode 6 located below the upper electrode 7, a common electrode 5 electrically contacting the water column in the test well C, the upper electrode 7 and the lower electrode 6, and the common electrode 5. The pump pump determines that the current value flowing in the constituent circuit is the upper limit region current value obtained when the upper electrode 7 and the lower electrode 6 are in electrical contact with the water column in the test well C. 11, and a valve indicating that the current value is a lower limit region current value obtained when the upper electrode 7 and the lower electrode 6 are not in electrical contact with the water column in the test well C. Lift pump control means 1 that separately issues a stop command signal to the lift pump 11
The water pump 11 and the water pump control means 18 are located close to the opening of the test well C. Furthermore, the ground permeability test device according to this example includes:
A pore water pressure gauge 1 located in the test well C, a pore water pressure recording device 19 electrically connected to the pore water pressure gauge 1 and located near the opening of the test well C, and the pumping pipe 3 a check valve 4 and a valve 12 provided in the pumping pipe 3, a branch pipe 13 branching from the pumping pipe 3, a water suction pump 14 connected to the branch pipe 13, and a valve 15 provided in the branch pipe 13. , a drain pipe 16 connected to the water pump 11, a valve 17 provided in the drain pipe 16, and each of the electrodes 5.
.. 6.7 and respective conducting wires 2.8.9 and 10 for suspending the pore water pressure gauge 1.

前記地盤の透水試験装置を前記試験井戸Cに設置するに
は次のように行う。
The ground permeability test device is installed in the test well C as follows.

まず、間隙水圧計1を、前記試験井戸C内に吊下するこ
とにより適宜の位置に設ける。前記間隙水圧計1を吊下
するには、計測した間隙水圧を電気的信号により前記間
隙水圧計1に伝達する、絶縁性材料で被覆した導線2に
より行う。なお、前記試験井戸が深い場合には、ワイヤ
ー等により吊下することも可能である。前記適宜の位置
は、間隙水圧を計測することがでさる位置とする。
First, the pore water pressure gauge 1 is installed at an appropriate position by suspending it within the test well C. The pore water pressure gauge 1 is suspended by a conductor 2 coated with an insulating material, which transmits the measured pore water pressure to the pore water pressure gauge 1 by an electrical signal. Note that if the test well is deep, it is also possible to suspend it using a wire or the like. The appropriate position is a position where the pore water pressure can be measured.

次いで、揚水管3の一端を前記試験井戸C内に吊下する
ことにより所要の位置に設ける。前記揚水管3の当該一
端には逆止弁4を設けている。揚水停止中に前記揚水管
3の中にある水が前記試験井戸C内へ逆流するのを防止
するためである。本実施例では作業性を鑑み前記揚水管
3に可撓性を有するものである水道ホース(ゴムホース
)を用いたが、塩化ビニール管、鋼管等を用いることも
可能である。前記所要の位置は、後記の共通電極5の位
置よりも下方となるような位置とする。なお1本実施例
においては、前記揚水管3の単位断面積当たりの流量が
、101/minとなるように前記揚水管3の管径を定
めているが、施工条件等に応じ、本発明を実施するうえ
で好適な、当該能の数値に基づき前記管径を定めること
もできる。
Next, one end of the lift pipe 3 is suspended in the test well C to be placed at a required position. A check valve 4 is provided at one end of the water pump 3. This is to prevent the water in the pumping pipe 3 from flowing back into the test well C during the suspension of pumping. In this embodiment, a flexible water hose (rubber hose) was used as the water pump 3 in view of workability, but it is also possible to use a vinyl chloride pipe, a steel pipe, or the like. The required position is a position below the position of the common electrode 5, which will be described later. In this embodiment, the diameter of the lift pipe 3 is determined so that the flow rate per unit cross-sectional area of the lift pipe 3 is 101/min. The pipe diameter can also be determined based on the numerical value of the performance that is suitable for implementation.

次いで、前記各電極5,6.7を前記試験井戸C内に吊
下する。
Each of the electrodes 5, 6.7 is then suspended in the test well C.

前記各電極5,6.7を吊下するには、次のように行う
In order to suspend each of the electrodes 5, 6.7, the following procedure is performed.

まず、前記共通電極5と前記下位電極6との間の間隔、
及び、前記下位電極6と前記上位電極7との間の間隔を
定める。
First, the distance between the common electrode 5 and the lower electrode 6,
Then, a distance between the lower electrode 6 and the upper electrode 7 is determined.

本実施例においては、前記共通電極5と前記下位電極6
との間の間隔を10cmとしている。
In this embodiment, the common electrode 5 and the lower electrode 6
The distance between them is 10cm.

前記下位電極6と前記上位電極7との間の間隔、即ち、
前記水位制御範囲Δhの値は、前記試験井戸C内の水位
を一定とみなすためには小さいほうが良い。しかし、前
記水位制御範囲Δhの値が小さすぎると、例えば、3m
m以下であると、前記試験井戸C内の水面の乱れ等によ
り後記揚水ポンプ11の稼働に誤動作を生じる。したが
って、前記水位制御範囲Δhの値は、前記試験井戸C内
の水位をほぼ一定とみなすことに支障がない範囲〔前記
試験井戸C内の自然水位から前記各電極5゜6.7まで
の距離の5%以下、望ましくは1%1″↓下]であって
、かつ、後記揚水ポンプ11の誤動作が生ずる可能性が
極めて少ない値(l cm以上)とする。本実施例にお
いては、当該百分率に基づき、前記水位制御範囲Δhは
15cmとしている。なお、本発明については、前記共
通電極5と前記下位電極6との間の間隔、及び、前記水
位制御範囲Δhを、本発明にかかる試験装置を使用する
うえで好適な数値を選択することが可能である。
The distance between the lower electrode 6 and the upper electrode 7, i.e.
The value of the water level control range Δh is preferably small in order to consider the water level in the test well C to be constant. However, if the value of the water level control range Δh is too small, for example, 3 m
If it is less than m, a malfunction will occur in the operation of the water pump 11 described later due to turbulence of the water surface in the test well C, etc. Therefore, the value of the water level control range Δh is within a range where the water level in the test well C is considered to be approximately constant [distance from the natural water level in the test well C to each electrode 5°6.7 5% or less, preferably 1% 1"↓ below], and a value (1 cm or more) that is extremely unlikely to cause malfunction of the water pump 11 described later. In this embodiment, the percentage is Based on this, the water level control range Δh is set to 15 cm.In the present invention, the distance between the common electrode 5 and the lower electrode 6 and the water level control range Δh are set to It is possible to select a suitable value for use.

次いで、当該定めによる間隔となるように、前記各電極
5,6.7を配置する。次いで、各前記電極5,6.7
に接続している導線8,9.10に、ビニールテープを
巻くことにより束ねる。本実施例においては前記導線を
ビニールテープを用いて束ねたが他の方法、例えば紐、
ワイヤー、鋼線等により束ねることも可能である。ここ
で、各前電極5,6.7が前記試験井戸Cへ接触するの
を防止するための措置を講することもできる。
Next, the electrodes 5, 6.7 are arranged so as to be spaced apart from each other according to the specified distance. Then each said electrode 5, 6.7
Bundle the conductive wires 8, 9, and 10 connected to the wires by wrapping them with vinyl tape. In this example, the conductor wires were bundled using vinyl tape, but other methods such as strings, strings, etc.
It is also possible to bundle with wire, steel wire, etc. Here, measures can also be taken to prevent each front electrode 5, 6.7 from coming into contact with the test well C.

なお、各前記導線8,9.10は、絶縁性材料で被覆し
たものであり、前記各電極5,6.−7に電気的に接続
している。
Note that each of the conductive wires 8, 9, 10 is coated with an insulating material, and each of the electrodes 5, 6, . -7 is electrically connected.

次いで、束ねた各前記電極5を、前記試験井戸C内に吊
下する。前記上位電極7を所定の位置になるように吊下
すれば、他の各前記電極5.6も所定の位置に設けるこ
とができる。各前記電極5゜6.7を吊下するには、前
記導線8,9.10を使用している。なお、前記試験井
戸が深い場合には、前記共通電極5、前記下位電極6、
前記上位電極7は、ワイヤー等により吊下すればよい。
Next, each of the bundled electrodes 5 is suspended in the test well C. If the upper electrode 7 is suspended in a predetermined position, each of the other electrodes 5.6 can also be provided in a predetermined position. The conductive wires 8, 9.10 are used to suspend each of the electrodes 5°6.7. Note that when the test well is deep, the common electrode 5, the lower electrode 6,
The upper electrode 7 may be suspended by a wire or the like.

なお、本実施例においては、地上で各前記電極5,6.
7の間の各間隔に配置し、固定した債、前記試験井戸C
内に吊下したが、本発明においては各前記電極5,6.
7をそれぞれ吊下することもでき、また、当該吊下の順
序は問わない。
In this embodiment, each of the electrodes 5, 6.
7 and fixed bonds at each interval between the test wells C.
However, in the present invention, each of the electrodes 5, 6.
7 can be hung individually, and the order of hanging does not matter.

次いで、前記揚水管3の前記能の一端を地盤A上に設置
した揚水ポンプ11に接続する。当該揚水ポンプ11に
は、揚水量と経費を考慮し、なるべく小型のものを用い
る。蓋し、本実施例においては、前記Δhの値を小さく
しているので、前記試験井戸C内、の水位の揚水量は少
量で済み、そのため揚水力の小さい小型で、かつ、安価
のポンプを使用することができるからである。
Next, one end of the capacity of the lift pipe 3 is connected to a lift pump 11 installed on the ground A. The pump 11 should be as small as possible in consideration of pumping volume and costs. In this example, since the value of Δh is small, the amount of water pumped in the test well C is small, and therefore a small and inexpensive pump with low pumping power is used. This is because it can be used.

また、前記揚水ポンプ11の設置する場所については、
地MAの透水試験を行ううえで支障がない場所とする。
In addition, regarding the location where the water pump 11 is installed,
The location should be one where there is no problem in conducting water permeability tests for the ground MA.

また、前記揚水管3に設けているバルブと前記揚水ポン
プ11との間に枝管13の一端を接続し、当該能の一端
を吸水ポンプ14に接続する。前記揚水ポンプllへ呼
び水を送るI;めである。
Further, one end of a branch pipe 13 is connected between a valve provided on the water pump 3 and the water pump 11, and one end of the branch pipe 13 is connected to a water suction pump 14. This is to send priming water to the water pump ll.

なお、15.17はバルブであり、16は排水管である
。また、本実施例にかかる地盤の透水試験装置には、前
記枝管13、前記揚水ポンプ14、前記バルブ15を備
えているが、本発明にかかる地盤の透水試験装置ついて
はそれらを備えていなくとも実施することが可能である
Note that 15 and 17 are valves, and 16 is a drain pipe. Further, although the ground permeability testing device according to this embodiment is equipped with the branch pipe 13, the pump 14, and the valve 15, the ground permeability testing device according to the present invention does not need to be equipped with these. It is possible to implement it.

次いで、前記上位電極7、前記下位電極6、前記共通電
極5をそれぞれ吊下している3本の前記導線8.9、l
Oの一端を地盤A上に設置した揚水ポンプ制御手段18
に電気的に接続する。前記揚水ポンプ制御手段18も地
盤Aの透水試験に支障がない場所に設置する。
Next, the three conductive wires 8.9 and 1 suspending the upper electrode 7, the lower electrode 6, and the common electrode 5, respectively.
Lifting pump control means 18 with one end of O installed on ground A
electrically connected to. The water pump control means 18 is also installed in a location that does not interfere with the permeability test of the ground A.

次いで、前記揚水ポンプ制御手段18と前記揚水ポンプ
11とを電気的に接続する。
Next, the lift pump control means 18 and the lift pump 11 are electrically connected.

最後に、前記間隙水圧計1を吊下している前記導線2を
間隙水圧記録装置19に電気的に接続する。前記間隙水
圧記録装置19も地盤Aの透水試験に支障がない場所に
設置する。ここで、前記間隙水圧記録装置19は、その
記録方法として、電気式、機械式を問わない。
Finally, the conducting wire 2 suspending the pore water pressure gauge 1 is electrically connected to the pore water pressure recording device 19. The pore water pressure recording device 19 is also installed in a location that does not interfere with the water permeability test of the ground A. Here, the recording method of the pore water pressure recording device 19 may be an electric type or a mechanical type.

なお、各前記電極5,6.7の腐食を防止するため本実
施例においては電流源供給手段の電流として、交流を用
いているが、直流を使用することも可能である。
In order to prevent corrosion of each of the electrodes 5, 6.7, in this embodiment, alternating current is used as the current of the current source supply means, but direct current may also be used.

次に、本実施例にかかる地盤の透水試験装置の作用につ
いて説明する。
Next, the operation of the ground permeability test device according to this embodiment will be explained.

以上のように構成した地盤の透水試験装置が作動すると
、前記上位電極7及び前記下位電極6が試験井戸C内の
水柱に電気的に接している場合、揚水ポンプ制御手段1
8は、前記上位電極7及び前記下位電極6と、前記共通
電極5とにより構成する回路内に流れる電流値が上限領
域電流値であることを弁別して前記揚水ポンプ11に稼
働指令信号を出す。当該稼働指令信号に応答して揚水ポ
ンプ11は稼働し、前記試験井戸C内の水を揚水する。
When the ground permeability test device configured as described above is operated, if the upper electrode 7 and the lower electrode 6 are in electrical contact with the water column in the test well C, the pump control means 1
8 discriminates that the current value flowing in the circuit constituted by the upper electrode 7, the lower electrode 6, and the common electrode 5 is the upper limit region current value, and issues an operation command signal to the water pump 11. In response to the operation command signal, the water pump 11 operates and pumps water in the test well C.

その結果、前記水位は、前記初期水位L0から下がり始
める。
As a result, the water level begins to fall from the initial water level L0.

当該揚水により前記試験井戸C内の水位が下がり、前記
上位電極7及び前記下位電極6が前記試験井戸C内の水
柱に電気的に接しなくなると、前記揚水ポンプ制御手段
18は、前記上位電極7及び前記下位電極6と、共通電
極5とにより構成する回路内に流れる電流値が下限領域
電流値であることを弁別して前記揚水ポンプ11に停止
指令信号を出す。当該停止指令信号に応答して前記揚水
ポンプ11は稼働を停止、前記試験井戸C内の揚水を停
止する。その結果、前記水位の位置は前記制御下限範囲
L!となる。
When the water level in the test well C falls due to the pumping and the upper electrode 7 and the lower electrode 6 are no longer in electrical contact with the water column in the test well C, the pump control means 18 controls the upper electrode 7 It discriminates that the current value flowing in the circuit constituted by the lower electrode 6 and the common electrode 5 is the lower limit region current value, and issues a stop command signal to the water pump 11. In response to the stop command signal, the water pump 11 stops operating and stops pumping water in the test well C. As a result, the position of the water level is within the control lower limit range L! becomes.

前記揚水ポンプ11が停止すると、前記試験井戸C内の
水位は、時間が経過するのに伴い地下水の透水により前
記制御上限水位L1まで上昇する。
When the water pump 11 stops, the water level in the test well C rises to the control upper limit water level L1 due to permeation of groundwater as time passes.

そして、前記上位電極7及び前記下位電極6が前記試験
井戸C内の水柱に電気的に接すると前記理由により前記
揚水ポンプ11は稼働する。
When the upper electrode 7 and the lower electrode 6 electrically contact the water column in the test well C, the water pump 11 is activated for the reason described above.

前記揚水ポンプ11が前記動作を繰り返すことにより前
記試験井戸C内の水位は前記水位制御範囲Δhの間にお
いて上昇と下降とを繰り返す。ここで、前記水位制御範
囲Δhの間隔値を小さくしているので前記水位はほぼ一
定とみなすことができる。
As the water pump 11 repeats the above operation, the water level in the test well C repeatedly rises and falls within the water level control range Δh. Here, since the interval value of the water level control range Δh is made small, the water level can be considered to be substantially constant.

その結果、本実施例である地盤の透水試験装置により得
られた試験結果にたいして、通常の変水位法、定水量法
のみならず、定木順法、平衡法等の算定方法を適用する
ことが可能となる。
As a result, it is possible to apply not only the usual variable water level method and constant water flow method, but also calculation methods such as the fixed tree method and the equilibrium method to the test results obtained by the ground permeability testing device of this example. It becomes possible.

さらに、本実施例においては、各前記電極5゜6.7を
吊下している前記導線8,9.10は、第6図に示す棒
状電極30よりも細い。したがって、前記棒状電極30
を使用することができない細い井戸にも、本実施例にか
かる地盤の透水試験装置を使用することが可能となる。
Furthermore, in this embodiment, the conductive wires 8, 9, 10 suspending each of the electrodes 5.degree. 6.7 are thinner than the rod-shaped electrodes 30 shown in FIG. Therefore, the rod-shaped electrode 30
The ground permeability test device according to this embodiment can be used even in narrow wells where it is not possible to use a ground permeability test device.

また、各前記電極5,6.7は、各前記導線8゜9、l
Oにより前記試験井戸C内に吊下することとしているの
で、各前記電極5,6.7の間の各間隔を自由に設定す
ることが可能となり、かつ、棒状電極よりも短い間隔と
することが可能となる。その結果、地盤の透水試験に要
する時間を短縮するこ、とが可能となる。蓋し、前記試
験井戸C内の水位の回復時間Δtを短くすることが可能
となるからである。
Further, each of the electrodes 5, 6.7 is connected to each of the conductive wires 8°9, l.
Since the electrodes are suspended in the test well C by O, it is possible to freely set the intervals between each of the electrodes 5, 6.7, and the intervals are shorter than those of the rod-shaped electrodes. becomes possible. As a result, it becomes possible to shorten the time required for ground permeability testing. This is because it becomes possible to cover the test well C and shorten the recovery time Δt of the water level in the test well C.

また、本実施例においては、前記Δhの値を小さくして
いるので、前記試験井戸C内の水位の揚水量は少量で済
み、そのため揚水力の小さい小型で、かつ、安価の揚水
ポンプ11を使用することが可能となる。
In addition, in this embodiment, since the value of Δh is small, the amount of water pumped in the test well C is small, and therefore a small and inexpensive pump 11 with low pumping power is used. It becomes possible to use it.

次ぎに、本実施例の効果について説明する。Next, the effects of this embodiment will be explained.

本実施例にかかる地盤の透水試験装置は以上のように構
成しているので、以下に掲げる効果を奏する。
Since the ground water permeability testing device according to this embodiment is configured as described above, it achieves the following effects.

前記透水試験装置には前記上位電極7等を導線により吊
下して設けているので、前記上位電極7その結果、現場
地盤Aの情況に対応して、前記上位電極7等の位置を所
要の位置に正確、かつ、容易に設けることができる。
Since the water permeability testing device is provided with the upper electrode 7 etc. hanging from a conductor, the upper electrode 7 etc. can be adjusted to the required position in accordance with the situation of the ground A at the site. It can be placed accurately and easily in position.

また、前記水位制御範囲Δhの値を、上述のように前記
揚水ボンダ11の誤作動を防止したうえで可能な限り小
さくしているので、試験井戸C内の水位を一定とみなす
ことができる揚水試験を行うことができ、以下に掲げる
種々の方法による算定を行うことができる。
In addition, since the value of the water level control range Δh is made as small as possible after preventing malfunction of the pumping bonder 11 as described above, the pumping water level in the test well C can be regarded as constant. Tests can be conducted and calculations can be made using the various methods listed below.

(1)通常の単孔式透水試験のうち変水位法(回復法) 前記水位の回復時間(前記水位が下限から上限に達する
までの時間)にもとづく透水係数の算定。
(1) Variable water level method (recovery method) of the normal single hole permeability tests Calculation of the permeability coefficient based on the recovery time of the water level (the time it takes for the water level to reach the upper limit from the lower limit).

(2)定木順法(Jacob&Lohmanの式) 揚水量(湧水量Q、)の経時変化にもとづく、透水係数
と貯留係数の算定。
(2) Fixed tree order method (Jacob &Lohman's formula) Calculation of hydraulic conductivity and storage coefficient based on changes in pumped water amount (spring water amount Q,) over time.

(3)平衡法(Thiem法) Q、と平均降下水位Saにもとづく透水係数の算定。(3) Equilibrium method (Thiem method) Calculation of the hydraulic conductivity based on Q and the average falling water level Sa.

(4)定水量法(Theisの回復法)揚水ポンプ11
の停止後の水位回復過程にもとづく透水係数の算定。
(4) Constant water flow method (Theis recovery method) Lifting pump 11
Calculation of hydraulic conductivity based on the water level recovery process after the shutdown.

(5)定水量法(Jacob法、Theisの揚水法) 揚水開始直後の水位低下(L6〜Ll)過程に基づく透
水係数の貯留係数の算定。
(5) Constant water flow method (Jacob method, Theis pumping method) Calculation of the storage coefficient of the hydraulic conductivity based on the process of lowering the water level (L6 to Ll) immediately after the start of pumping.

以上のように、本実施例にかかる地盤の透水試験装置を
揚水法による地盤Aの透水試験に用いると、貯留係数を
求めることがでる。
As described above, when the ground permeability test device according to the present embodiment is used for a water permeability test of the ground A using the pumping method, the storage coefficient can be determined.

さらに、複数の解析法による算定結果の相互比較を行う
ことが可能であるので、信頼性の高い試験結果を得るこ
とができる。特に、通常の多孔式透水試験の実施が困難
な透水性の低い地盤Aにおいて、本実施例である地盤の
透水試験装置を用いて揚水試験を行うと、貯留係数も求
めることができるので、前記地盤の透水試験装置は、透
水性の低い地盤Aにおいて大きな意義を有する。
Furthermore, since it is possible to mutually compare calculation results obtained by multiple analysis methods, highly reliable test results can be obtained. In particular, when performing a pumping test using the ground permeability testing device of this example in ground A with low permeability, where it is difficult to conduct a normal porous permeability test, the storage coefficient can also be determined. A ground permeability testing device has great significance in ground A, which has low permeability.

なお、前記透水試験装置は、長時間継続して揚水をする
ことができるので低透水性地盤Aにおける多孔式透水試
験にも使用することができる。
In addition, since the water permeability test device can pump water continuously for a long time, it can also be used for a porous water permeability test in low water permeability ground A.

また、前記揚水ポンプ11は、前記試験井戸C内ではな
く地盤A上に設けており、かつ、前記透水試験装置に用
いる前記上位電極7、揚水管3等の径は比較的小径であ
るので、内径40mm程度のボーりフグ孔Bや、ウェル
ポイントライザーパイプ等においても前記透水試験装置
を使用することができる。
In addition, the water pump 11 is installed on the ground A rather than in the test well C, and the upper electrode 7, water pump 3, etc. used in the water permeability test device have relatively small diameters. The water permeability test device can also be used in a bored puffer hole B having an inner diameter of about 40 mm, a well point riser pipe, etc.

まt;、各前記電極5.6.7は、各前記導線8゜9、
toにより前記試験井戸C内に吊下することとしている
ので、各前記電極5,6.7の間の各間隔を自由に設定
することが可能となり、かつ、棒状電極よりも短い間隔
とすることが可能となる。その結果、地盤の透水試験に
要する時間を短縮することが可能となる。
Each of the electrodes 5.6.7 is connected to each of the conductive wires 8.9,
Since the electrodes 5 and 6.7 are suspended in the test well C, the intervals between each of the electrodes 5, 6.7 can be freely set, and the intervals can be shorter than those of the rod-shaped electrodes. becomes possible. As a result, it becomes possible to shorten the time required for ground permeability testing.

また、前記透水試験装置の共通電極5、下位電極6、上
位電極7、揚水ポンプ11等には小型で安価なものを用
いることができる。その結果、比較的小さいスペースで
、かつ、比較的少ない費用で地盤Aの透水試験を行うこ
とができる。
Moreover, small and inexpensive items can be used for the common electrode 5, lower electrode 6, upper electrode 7, water pump 11, etc. of the water permeability testing apparatus. As a result, the permeability test of the ground A can be performed in a relatively small space and at a relatively low cost.

また、前記透水試験装置は比較的簡単な構成となってい
るので、−人でも地盤Aの透水試験を行うことができる
Furthermore, since the water permeability testing device has a relatively simple configuration, even a person can conduct the water permeability test of the ground A.

また、前記試験装置を地盤Aの透水試験に用いれば、揚
水開始と同時に試験井戸Cの水位を測定できるので揚水
中の前記水位や揚水停止直後の前記水位を測定できる。
Furthermore, if the testing device is used for a water permeability test of the ground A, the water level in the test well C can be measured at the same time as pumping starts, so the water level during pumping or immediately after pumping stops can be measured.

その結果、誤差が少なく精度が良い試験結果を得ること
ができる。
As a result, highly accurate test results with few errors can be obtained.

さらに、前記間隙水圧記録装置19は、前記間隙水圧計
1により計測した間隙水圧を自動的に記録するので、試
験者の試験に対する労力を軽減することかできる。また
、本実施例にかかる前記透水試験装置の前記揚水管3に
は逆止弁4を設けているので、揚水した水が前記試験井
戸C内に逆流するのを防止する。また、前記揚水管3に
は吸水ポンプ14につながる枝管13を設けているので
、呼び水を揚水ポンプ11に送り、湯水ポンプ11の稼
働の開始を容易にする。
Furthermore, since the pore water pressure recording device 19 automatically records the pore water pressure measured by the pore water pressure gauge 1, it is possible to reduce the labor of the tester for testing. Further, since the water pumping pipe 3 of the water permeability test apparatus according to this embodiment is provided with a check valve 4, the pumped water is prevented from flowing back into the test well C. Further, since the water pump 3 is provided with a branch pipe 13 connected to the water suction pump 14, priming water is sent to the water pump 11, thereby facilitating the start of operation of the hot water pump 11.

また、各前記電極5,6.7を吊下している前記導線8
,9.10は、第6図に示す棒状電極30よりも細い。
Further, the conductive wire 8 suspending each of the electrodes 5, 6.7
, 9.10 are thinner than the rod-shaped electrode 30 shown in FIG.

したがって、前記棒状電極30を使用することができな
い細い井戸にも、本実施例にかかる地盤の透水試験装置
を使用することができる。
Therefore, the ground water permeability test device according to this embodiment can be used even in narrow wells where the rod-shaped electrode 30 cannot be used.

なお、第4図に示すように前記上位電極7等をポリエチ
レンシート、塩化ビニール等の絶縁性材料でできたパイ
プまたはシート等の保護部材20で覆うことにより、前
記試験井戸Cの側面へ接触することによる誤動作等を防
止することができる。
In addition, as shown in FIG. 4, by covering the upper electrode 7 etc. with a protective member 20 such as a pipe or sheet made of an insulating material such as a polyethylene sheet or vinyl chloride, it is brought into contact with the side surface of the test well C. Malfunctions caused by this can be prevented.

また、前記下位電極6と前記上位電極7とを第5図に示
すような構造とすることもできる。まt;、前記共通電
極5を地盤Aに埋設することも可能である。
Further, the lower electrode 6 and the upper electrode 7 may have a structure as shown in FIG. 5. It is also possible to bury the common electrode 5 in the ground A.

「発明の効果」 本発明は、以上のように構成しているので、以下に掲げ
る効果を奏する。
"Effects of the Invention" Since the present invention is configured as described above, it achieves the following effects.

本発明にかかる地盤の透水試験装置には上位電極等を導
線等、により吊下して設けることができるので、前記上
位電極等の位置を自由に設定し、変更することができる
。その結果、現場地盤の情況に対応して、前記上位電極
等の位置を所要の位置に正確、かつ、容易に設けること
ができる。
Since the ground water permeability test device according to the present invention can be provided with an upper electrode suspended from a conducting wire or the like, the position of the upper electrode etc. can be freely set and changed. As a result, the position of the upper electrode etc. can be accurately and easily provided at a required position in accordance with the ground conditions at the site.

まt;、揚水量は、第2図に示すような水位変化の記録
より、次式を用いて簡単に計算することができるので、
揚水量測定のための特別な手段や操作が不要である。
The amount of pumped water can be easily calculated using the following formula from the record of water level changes as shown in Figure 2.
No special means or operations are required to measure the amount of pumped water.

Q、= [Δh−A]/Δ t Q。Q, = [Δh-A]/Δt Q.

Δ h Δ を 2揚水量、湧水量(mll/s) 工井戸の断面積 (amす :水位制御範囲 (cm) :水位がΔh回復するのに要する時間 (s) また、水位制御範囲の値を小さくすることにより、実用
上、試験井戸内の水位が一定とみなすことができる揚水
試験を行うことができ、以下に掲げる種々の方法による
算定を行うことができる。
Δ h Δ is 2 pumped water volume, spring water volume (ml/s) Cross-sectional area of well (ams: Water level control range (cm): Time required for water level to recover Δh (s) Also, value of water level control range By reducing , it is possible to conduct a pumping test in which the water level in the test well can be considered to be constant in practice, and calculations can be made using the various methods listed below.

(1)通常の単孔式透水試験のうちの定水位法(回復法
) 前記水位の回復時間(前記水位が下限から上限に達する
までの時間)にもとづく透水係数の算定。
(1) Constant water level method (recovery method) of normal single hole permeability tests Calculation of permeability coefficient based on the recovery time of the water level (time taken for the water level to reach the upper limit from the lower limit).

(2)定水量法(Jacob&Lohmanの式) 揚水量(湧水量Q、)の経時変化にもとづく、透水係数
と貯留係数の算定。
(2) Constant water flow method (Jacob &Lohman's formula) Calculation of hydraulic conductivity and storage coefficient based on changes over time in the amount of pumped water (spring water amount Q,).

(3)平衡法(Thiem法) 長時間揚水し湧水量が安定したときの、湧水量Q、と平
均降下水位Saについて得られるデータにもとづく透水
係数の算定。
(3) Equilibrium method (Thiem method) Calculation of hydraulic conductivity based on data obtained regarding spring water volume Q and average falling water level Sa when water is pumped for a long time and the spring water volume is stable.

(4)定水量法(Theisの回復法)揚水ポンプ停止
後の水位が回復過程にもとづく透水係数の算定。
(4) Constant water flow method (Theis recovery method) Calculation of hydraulic conductivity based on the process of water level recovery after the pump stops.

(5)定水量法(Jacob法、Theisの揚水法) 揚水開始直後の水位低下(L、〜L、)過程に基づく透
水係数の貯留係数の算定。
(5) Constant water flow method (Jacob method, Theis pumping method) Calculation of the storage coefficient of hydraulic conductivity based on the process of lowering the water level (L, ~L,) immediately after the start of pumping.

以上のように、本発明にかかる地盤の透水試験装置を揚
水法による地盤の透水試験に用いると、貯留係数を求め
ることができる。さらに、複数の解析法による算定結果
の相互比較を行うことが可能であるので、信頼性の高い
試験結果を得ることができる。特に、通常の多孔式透水
試験の実施が困難な透水性の低い地盤において、本発明
にかかる地盤の透水試験装置を用いて揚水試験を行うと
、貯留係数も求めることができるので、前記地盤の透水
試験装置は、透水性の低い地盤において大きな意義を有
する。さらに、前記透水試験装置は長時間継続して揚水
をすることができるので低透水性地盤における多孔式透
水試験も使用することができる。なお、第2図は本実施
例である地盤の透水試験装置を使用して地盤の透水試験
を行った結果を示すグラフであり、第3図は各解析法で
利用する、地盤の透水試験のデータの部位を示すグラフ
である。
As described above, when the ground water permeability test device according to the present invention is used for a ground water permeability test using the pumping method, the storage coefficient can be determined. Furthermore, since it is possible to mutually compare calculation results obtained by multiple analysis methods, highly reliable test results can be obtained. In particular, when performing a pumping test using the ground permeability test device according to the present invention in ground with low permeability where it is difficult to conduct a normal porous permeability test, the storage coefficient can also be determined. Permeability test equipment has great significance in ground with low permeability. Furthermore, since the water permeability test device can pump water continuously for a long period of time, it is also possible to use a porous water permeability test in low water permeability ground. Furthermore, Figure 2 is a graph showing the results of a ground permeability test using the ground permeability test device of this example, and Figure 3 is a graph showing the results of a ground permeability test used in each analysis method. It is a graph showing parts of data.

また、前記揚水ポンプは、前記試験井戸内ではなく地盤
上にもうけており、かつ、前記透水試験装置に用いる前
記上位電極、前記下位電極、前記共通電極、揚水管等の
径は比較的小径であるので、内径40mm程度のポーリ
ング孔や、ウェルポイントライザーパイプ等においても
前記透水試験装置を使用することができる。
Further, the lift pump is installed on the ground rather than in the test well, and the diameters of the upper electrode, lower electrode, common electrode, pumping pipe, etc. used in the permeability test device are relatively small. Therefore, the water permeability test device can be used even in poling holes with an inner diameter of about 40 mm, well point riser pipes, etc.

また、前記透水試験装置の共通電極、下位電極、上位電
極、揚水ポンプ等には小型で安価なものを用いることが
できる。その結果、比較的小さいスペースで、かつ、比
較的少ない費用で地盤の透水試験を行うことができる。
Moreover, small and inexpensive items can be used for the common electrode, lower electrode, upper electrode, water pump, etc. of the water permeability testing apparatus. As a result, a ground permeability test can be performed in a relatively small space and at a relatively low cost.

また、前記透水試験装置は比較的簡単な構成となってい
るので、−人でも地盤の透水試験を行うことができる。
Furthermore, since the water permeability testing device has a relatively simple configuration, even a person can perform the water permeability test of the ground.

また、前記試験装置を地盤の透水試験に用いれば、揚水
と同時に試験井戸の水位を測定できるので揚水中の前記
水位や揚水停止直後の前記水位を測定できる。その結果
、誤差が少なく精度が良い試験結果を得ることができる
Moreover, if the test device is used for a ground permeability test, the water level in the test well can be measured at the same time as pumping, so the water level during pumping or immediately after pumping has stopped can be measured. As a result, highly accurate test results with few errors can be obtained.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は実施例である地盤の透水試験装置を試験井戸に
設置した状態を示す概略断面図、第2図は実施例である
地盤の透水試験装置を使用して地盤の透水試験を行った
結果を示すグラフ、第3図は各解析法で利用する、地盤
の透水試験のデータの部位を示すグラフ、第4図は実施
例である、上位電極等を合成樹脂等でできたパイプ等に
より覆った状態を示す斜視図、第5図は上位電極及び下
位電極の他の実施例を示す概略図、第6図は従来例であ
る棒状電極の概略図である。 A・・・・・・地盤、 B・・・・・・ポーリング孔、 C・・・・・・試験井戸、 Dl・・・・・・山砂層、 D、・・・・・・遮水モルタル、 D、・・・・・・珪砂層、 Lo・・・・・・初期水位、 L、・・・・・・制御上限水位、 L、・・・・・・制御下限水位、 Δh・・・・・・水位制御範囲、 1・・・・・・間隙水圧計、 2.8.9.10・・・・・・導線、 3・・・・・・揚水管、 4・・・・・・逆止弁、 5・・・・・・共通電極、 6・・・・・・下位電極、 7・・・・・・上位電極、 11・・・・・・揚水ポンプ、 12.15.17・・・・・・バルブ、13・・・・・
・枝管、 14・・・・・・吸水ポンプ、 16・・・・・・排水管、 18・・・・・・揚水ポンプ制御手段、19・・・・・
・間隙水圧記録装置、 20・・・・・・保護部材、 30・・・・・・棒状電極 301・・・・・・棒状の電極、 40・・・・・・水位制御装置
Figure 1 is a schematic cross-sectional view showing the ground permeability test device installed in a test well, and Figure 2 is a ground permeability test using the ground permeability test device as an example. Graph showing the results. Figure 3 is a graph showing the parts of ground permeability test data used in each analysis method. Figure 4 is an example. FIG. 5 is a schematic diagram showing another embodiment of the upper electrode and lower electrode, and FIG. 6 is a schematic diagram of a conventional rod-shaped electrode. A: Ground, B: Poring hole, C: Test well, Dl: Mountain sand layer, D: Waterproof mortar , D,... Silica sand layer, Lo... Initial water level, L,... Control upper limit water level, L,... Control lower limit water level, Δh... ... Water level control range, 1 ... Pore water pressure gauge, 2.8.9.10 ... Conductor, 3 ... Lifting pipe, 4 ... Check valve, 5... Common electrode, 6... Lower electrode, 7... Upper electrode, 11... Water pump, 12.15.17. ...Valve, 13...
- Branch pipe, 14... Water suction pump, 16... Drain pipe, 18... Water pump control means, 19...
- Pore water pressure recording device, 20... protection member, 30... rod-shaped electrode 301... rod-shaped electrode, 40... water level control device

Claims (1)

【特許請求の範囲】[Claims]  一端が試験井戸内の水柱に没している揚水管と、当該
揚水管に接続している揚水ポンプと、前記試験井戸内の
所定の位置に設けた上位電極と、当該上位電極よりも下
方に位置する下位電極と、前記試験井戸内の水柱に電気
的に接触する共通電極と、前記上位電極及び前記下位電
極と、前記共通電極とにより構成する回路内に流れる電
流値が、前記上位電極及び下位電極が前記試験井戸内の
水柱に電気的に接している場合に得られる上限領域電流
値であることを弁別して前記揚水ポンプに稼働指令信号
を出し、前記電流値が、前記上位電極及び前記下位電極
が前記試験井戸内の水柱に電気的に接していない場合に
得られる下限領域電流値であることを弁別して前記揚水
ポンプに停止指令信号を出す揚水ポンプ制御手段とから
なる地盤の透水試験装置。
A lift pipe with one end submerged in the water column in the test well, a lift pump connected to the lift pipe, an upper electrode installed at a predetermined position in the test well, and a lower electrode than the upper electrode. A current value flowing in a circuit constituted by a lower electrode located therein, a common electrode in electrical contact with the water column in the test well, the upper electrode, the lower electrode, and the common electrode is determined by the upper electrode and the common electrode. An operation command signal is issued to the pump by discriminating that the current value is the upper limit region current value obtained when the lower electrode is in electrical contact with the water column in the test well; A ground permeability test comprising a pump control means for discriminating that the lower limit region current value is obtained when the lower electrode is not in electrical contact with the water column in the test well and issuing a stop command signal to the pump. Device.
JP14041689A 1989-06-02 1989-06-02 Ground permeability test equipment Expired - Fee Related JP2700184B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14041689A JP2700184B2 (en) 1989-06-02 1989-06-02 Ground permeability test equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14041689A JP2700184B2 (en) 1989-06-02 1989-06-02 Ground permeability test equipment

Publications (2)

Publication Number Publication Date
JPH035511A true JPH035511A (en) 1991-01-11
JP2700184B2 JP2700184B2 (en) 1998-01-19

Family

ID=15268213

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14041689A Expired - Fee Related JP2700184B2 (en) 1989-06-02 1989-06-02 Ground permeability test equipment

Country Status (1)

Country Link
JP (1) JP2700184B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5257000A (en) * 1992-02-14 1993-10-26 At&T Bell Laboratories Circuit elements dependent on core inductance and fabrication thereof
JPH07127576A (en) * 1993-10-29 1995-05-16 Techno Takatsuki:Kk Diaphragm type air pump
JP2011047847A (en) * 2009-08-28 2011-03-10 Sanwacon Co Ltd Ground water level detector
JP2014101661A (en) * 2012-11-19 2014-06-05 Kajima Corp Groundwater level raising system, and groundwater level raising method
CN115125928A (en) * 2022-07-25 2022-09-30 南玉贤 Automatic change on-spot water injection test device and system of processing

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102151491B1 (en) * 2018-07-27 2020-10-26 주식회사 군장종합건설 Constructing method and control system for collector well building

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5257000A (en) * 1992-02-14 1993-10-26 At&T Bell Laboratories Circuit elements dependent on core inductance and fabrication thereof
JPH07127576A (en) * 1993-10-29 1995-05-16 Techno Takatsuki:Kk Diaphragm type air pump
JP2011047847A (en) * 2009-08-28 2011-03-10 Sanwacon Co Ltd Ground water level detector
JP2014101661A (en) * 2012-11-19 2014-06-05 Kajima Corp Groundwater level raising system, and groundwater level raising method
CN115125928A (en) * 2022-07-25 2022-09-30 南玉贤 Automatic change on-spot water injection test device and system of processing

Also Published As

Publication number Publication date
JP2700184B2 (en) 1998-01-19

Similar Documents

Publication Publication Date Title
US4619323A (en) Method for conducting workover operations
US10139262B2 (en) Method for air-coupled water level meter system
US7246662B2 (en) Systems and methods for controlling flow control devices
EP1309772B1 (en) Formation testing apparatus with axially and spirally mounted ports
US4120166A (en) Cement monitoring method
US6114857A (en) System and method for monitoring corrosion in oilfield wells and pipelines utilizing time-domain-reflectometry
US6502634B1 (en) Interface monitoring placement system
US4570480A (en) Method and apparatus for determining formation pressure
US2376878A (en) Method of determining the permeability of earth formations
US2517603A (en) Fluid ingress well logging
US3809170A (en) Method and apparatus for detecting fluid influx in offshore drilling operations
JPH035511A (en) Permeability test device of ground
US4191250A (en) Technique for cementing casing in an offshore well to seafloor
BRPI0912664B1 (en) TRAINING TEST METHOD
US2340993A (en) Method of testing wells
US2347615A (en) Apparatus for treating wells
JP3353714B2 (en) Pore water measurement method and apparatus
JP3648719B2 (en) Crack detection method and potential measuring electrode
US2454740A (en) Apparatus for treating wells
US2381875A (en) Apparatus for treating wells
JP7111652B2 (en) Groundwater multi-logging device and logging method
JP2626456B2 (en) Rock permeability test equipment
US2409674A (en) Determining permeability of subsurface formations
JP3772884B2 (en) In-situ vertical permeability test equipment
US2890405A (en) Fluid flow indicator and fluid identifier

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees